504-22-102 VA Amarillo Elevators Arch IFC.pdf

PDF 5 MB Posted

Attached to
J056--504-22-102 Upgrade Freight Elevators Buildings 4 & 7
Solicitation number
36C25723B0003
Issued by

About this file

This document package includes construction documents for upgrades to freight elevators in Buildings 4 and 7 at the Thomas E. Creek Amarillo VA Health Care System in Amarillo, Texas. The project includes installing new elevator cabs, controls, and related equipment in both buildings. Building 4 will be completed in two phases to maintain elevator service. Work includes demolishing existing components and constructing barriers to maintain infection control standards. The Department of Veterans Affairs is the contracting agency overseeing the upgrades.

The package consists of 55 drawings covering site plans, demolition plans, fire and life safety plans, schedules and sections. Drawings provide dimensions, notes and details for the elevator replacements and temporary construction. Specifications and standards listed on the architectural symbols sheet will govern materials and execution of work.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DESIGN TEAM

FIRE PROTECTION

STRUCTURAL

WSP GLOBAL INC.

ELECTRICAL

SPEES DESIGN BUILD

PLUMBING

MECHANICAL

DAVENERGY

10525 VISTA SORRENTO PARKWAY, SUITE 350

SAN DIEGO, CA 92121

PHONE: (858) 500-4500

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

PHONE: (619) 770-8552

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DAVENERGY

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

PHONE: (619) 770-8552

DAVENERGY

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

PHONE: (619) 770-8552

PROJECT INFORMATION

STATE:

COUNTY:

JURISTICTION:

OWNER:

SITE ZONING:

CONST TYPE:

OCCUPANCY:

CODE ANALYSIS

PROJECT DESCRIPTION

THREE NEW ELEVATOR CABS TO BE

INSTALLED. ADDITIONALLY, ALL SAFETY

FEATURES ARE TO BE BROUGHT UP TO CODE

AND FUNCTION WITH THE FACILITIES

CURRENT SYSTEMS.

APPLICABLE BUILDING

BUILDING 4 & 7

APPLICABLE FLOOR

BLDG 4 - GROUND, FIRST & UPPER

BLDG 7 - GROUND, FIRST & SECOND

APPLICABLE CLINIC

N/A

ICRA CLASS REQUIREMENTS

CONST TYPE:

CLINIC RISK:

CLASS REQS:

APPROX SQUARE FEET IN SCOPE

1,065 SF

TYPE C

HIGHEST

CLASS IV

TEXAS

POTTER

AMARILLO

GOV, VETERANS AFFAIRS

1A B

RESOURCE DOCUMENTS

ELEVATOR REFERENCE CUTSHEETS* PROVIDED BY NORTHBAY

* ONLY FOR USE AS A BASIS OF DESIGN. FINAL SITE-SPECIFIC DRAWINGS SHALL BE PROVIDED

BY THE VA AFTER SELECTION OF SURGICAL BOOM MFR.

GENERAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

APPLICABLE PUBLICATIONS

AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS OF CODE ENFOREMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC). THE VA

SHALL FUNCTION AS THE AUTHORITY HAVING JURISTICTION (AHJ).

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION

GUIDE AND OTHER GUIDEANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL). SEE ABOVE.

INTERNATIONAL BUILDING CODE (IBC) 2018.

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018.

NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES PRECEDENCE OVER

IBC.

NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

NATIONAL ELECTRICAL CODE (NEC).

INTERNATIONAL PLUMBING CODE (IPC).

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAL SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRCUTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RESE RESIDENTIAL BUILDINGS, 10 CFR

PARTS 433,434 AND 435.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECTUIVE ORDER 13423: STRENGTHEING FEDERAL ENVIRONMENTAL, ENERGY AND TRANSPORTATON

MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS

SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.

SAFETY STANDARD FOR REFRIDERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.

VAMC APPROVED HARDWARE LOCKING STANDARDS

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM)

FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND STANDARDS FOR

TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA)

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND

INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI)

JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),

ENVIRONMENT OF CARE GUIDELINES AND STANDARDS

FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE

DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES

THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL

ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING

“ENVIRONMENTALLY RESPONSIBLE DESIGN”

APPLICABLE VA STANDARDS

DESIGN AND CONSTRUCTION PROCEDURES (PG 18-3), TOPIC 1 - CODES, STANDARDS & EXECUTIVE ORDERS

SEPTEMBER 2013

EQUIPMENT GUIDE LISTS (PG 18-5)

ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT BARRIER

FREE DESIGN GUIDE (PG 18-13)

ELEVATOR DESIGN MANUAL PG 18-10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES G-001

COVER SHEET

MK RR

CONSTRUCTION

DOCUMENTS

07/20/2022

UPGRADE FREIGHT ELEVATORS BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM, 6010 W AMARILLO BLVD, AMARILLO, TX

PROJECT #: 504-22-102

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

1 OF 55 G-001 COVER SHEET

2 OF 55 G-002 FACILITY SITE PLAN

3 OF 55 G-003 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

ARCHITECTURAL

4 OF 55 AS101 BUILDING 4 - FIRST FLOOR - ICRA PLAN

5 OF 55 AS102 BUILDING 4 - SECOND FLOOR - ICRA PLAN

6 OF 55 AS103 BUILDING 4 - UPPER LEVEL / ROOF - ICRA PLAN

7 OF 55 AS104 BUILDING 7 - LEVEL B - ICRA PLAN

8 OF 55 AS105 BUILDING 7 - LEVEL 1 - ICRA PLAN

9 OF 55 AS106 BUILDING 7 - LEVEL 2 - ICRA PLAN

10 OF 55 AS201 BUILDING 4 - FIRST FLOOR - FIRE AND LIFE SAFETY

11 OF 55 AS202 BUILDING 4 - SECOND FLOOR - FIRE AND LIFE SAFETY

12 OF 55 AS203 BUILDING 4 - UPPER LEVEL / ROOF - FIRE AND LIFE SAFETY

13 OF 55 AS204 BUILDING 7 - LEVEL B - FIRE AND LIFE SAFETY

14 OF 55 AS205 BUILDING 7 - LEVEL 1 - FIRE AND LIFE SAFETY

15 OF 55 AS206 BUILDING 7 - LEVEL 2 - FIRE AND LIFE SAFETY

16 OF 55 AD101 BUILDING 4 - FIRST FLOOR - DEMO PLAN

17 OF 55 AD102 BUILDING 4 - SECOND & UPPER FLOOR - DEMO PLANS

18 OF 55 AD103 BUILDING 7 - LEVEL B - DEMO PLAN

19 OF 55 AD104 BUILDING 7 - LEVEL 1 - DEMO PLAN

20 OF 55 AD105 BUILDING 7 - LEVEL 2 - DEMO PLAN

21 OF 55 AE101 BUILDING 4 - FIRST FLOOR - OVERALL FLOOR PLAN

22 OF 55 AE102 BUILDING 4 - SECOND FLOOR - OVERALL FLOOR PLANS

23 OF 55 AE103 BUILDING 4 - UPPER LEVEL / ROOF - OVERALL FLOOR PLAN

24 OF 55 AE104 BUILDING 7 - LEVEL B - OVERALL FLOOR PLAN

25 OF 55 AE105 BUILDING 7 - LEVEL 1 - OVERALL FLOOR PLAN

26 OF 55 AE106 BUILDING 7 - LEVEL 2 - OVERALL FLOOR PLAN

27 OF 55 AE301 BUILDING 4 - BUILDING SECTION

28 OF 55 AE302 BUILDING 7 - HOISTWAY SECTIONS

29 OF 55 AE401 BUILDING 4 - ENLARGED FLOOR PLANS

30 OF 55 AE402 BUILDING 7 - ENLARGED FLOOR PLANS

31 OF 55 AE421 INTERIOR ELEVATIONS

32 OF 55 AE422 INTERIOR ELEVATIONS

33 OF 55 AE601 ROOM FINISH & DOOR SCHEDULE

34 OF 55 AE602 DOOR SCHEDULE

MECHANICAL

35 OF 55 M-001 MECHANICAL COVER SHEET

36 OF 55 M-101 MECHANICAL FLOOR PLANS - BUILDINGS 4 + 7

37 OF 55 M-401 MECHANICAL SCHEDULES AND DETAILS BUILDINGS 4 + 7

PLUMBING

38 OF 55 P-001 PLUMBING COVER SHEET

39 OF 55 P-101 BUILDING 4 + 7 PLUMBING DESIGN

ELECTRICAL

40 OF 55 E-001 ABBREVIATION, GENERAL NOTES AND SHEET INDEX

41 OF 55 E-002 ELECTRICAL LEGENDS

42 OF 55 EP101 BUILDING 4 - FIRST FLOOR - ELECTRICAL PLAN

43 OF 55 EP102 BUILDING 4 - SECOND FLOOR - ELECTRICAL PLAN

44 OF 55 EP103 BUILDING 4 - UPPER LEVEL / ROOF - ELECTRICAL PLAN

45 OF 55 EP104 BUILDING 7 - LEVEL B - ELECTRICAL PLAN

46 OF 55 EP105 BUILDING 7 - LEVEL 1 - ELECTRICAL PLAN

47 OF 55 EP106 BUILDING 7 - LEVEL 2 - ELECTRICAL PLAN

48 OF 55 EP401 BUILDING 4 - ENLARGED ELECTRICAL PLANS

49 OF 55 EP402 BUILDING 4 - ENLARGED ELECTRICAL PLANS

50 OF 55 EP403 BUILDING 7 - ENLARGED ELECTRICAL PLANS

51 OF 55 E-601 BUILDING 4 - ONE-LINE DIAGRAM

52 OF 55 E-602 BUILDING 7 - ONE-LINE DIAGRAM

53 OF 55 E-603 ELECTRICAL SCHEDULES

54 OF 55 E-604 ELECTRICAL SCHEDULES

55 OF 55 E-605 ELECTRICAL SCHEDULES

Revisions: Date:

07/28/2022 ISSUED FOR CONSTRUCTION 7/29/2022

BUILDING 4

BUILDING 7

KEY NOTES HERE

KEY NOTES HERE

1. COORDINATE CONTRACTOR STAGING AREA WITH VA COR

AT THE PRE-CONSTRUCTION MEETING. THIS INCLUDES,

BUT IS NOT LIMITED TO, AREAS TO BE USED FOR

MATERIAL STORAGE, ACCESS FOR MATERIAL DELIVERIES

AND TRANSPORTATION ROUTES TO THE PROJECT AREA.

2. DO NOT STORE PRODUCTS, MATERIALS, TOOLS,

EQUIPMENT, VEHICLES, OR ANY OTHER NON-PERMITTED

ITEMS ON MEDICAL CENTER PROPERTY UNLESS GIVEN

PRIOR APPROVAL BY THE VA COR.

3. A LIMITED AMOUNT OF SUPPLIES MAY BE STORED IN THE

CONSTRUCTION AREA AS LONG AS SAFETY AND

CLEANLINESS ARE NOT COMPROMISED. VA COR HAS

AUTHORITY TO REQUEST RELOCATION OF ANY AND

ALL STORED ITEMS TO A DIFFERENT LOCATION.

4. VERIFY CONTRACTOR STAGING AREA AND MATERIAL /

PRODUCT DELIVERY LOCATION WITH VA COR, PRIOR TO

BRINGING OR DELIVERING ITEMS TO THE MEDICAL

CENTER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES G-002

FACILITY SITE PLAN

MK RR

CONSTRUCTION

DOCUMENTS

07/20/2022

1" = 1'-0"

FACILITY SITE PLAN

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

NORTH

AB

ABA

AC(T)

ACM

ACW

ADA

ADJ

A/E

AF

AFF

AGG

ALT

ALUM

APPROX

ARCH

ASPH

A/V

BARR

BATH

BB

BLDG

BLK

BLKG

BLW

BM

BMTU

BO

BOC

BOS

BRC

BRKT

BRNG

BTM

BTWN

CAB

CC

CD

CJ

CLG

CLR

CMU

CO

COL

COMP

CONC

CONN

CONST

CONT

COORD

COR

CORR

CS

CT

CTR

CV

AND

ANGLE

AT

CENTERLINE

DEGREES

NUMBER

ANCHOR BOLT

ARCHITECTURAL BARRIERS ACT

ACOUSTICAL CEILING (TILE)

ASBESTOS CONTAINING MATERIAL

ACOUSTICAL WALL

AMERICANS W/ DISABILITIES ACT

ADJACENT

ARCHITECT/ENGINEER

ACCESS FLOOR

ABOVE FINISH FLOOR

AGGREGATE

ALTERNATE

ALUMINUM

APPROXIMATELY

ARCHITECT(URAL)

ASPHALT

AUDIO / VIDEO

BARRIER

BATHROOM

BACKER BOARD

BUILDING

BLOCK

BLOCKING

BELOW

BEAM

BONE MARROW TRANSPLANT UNIT

BOTTOM OF

BOTTOM OF CURB

BOTTOM OF SLAB

BRACE, BRACING

BRACKET

BEARING

BOTTOM

BETWEEN

CABINET

CONTRACTOR FURN, CONTRACTOR INST

CONSTRUCTION/CONTRACT DOCUMENTS

CONTROL JOINT

CEILING

CLEAR(ANCE)

CONCRETE MASONRY UNIT

CONTRACTING OFFICER

COLUMN

COMPOSITION

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

COORDINATE

CONTRACTING OFFICER REPRESENTATIVE

CORRIDOR

CONCRETE SEALER

CERAMIC TILE

CENTER

CONTRACTOR FURNISHED, VA INSTALLED

HDR

HDWE

HM

HORZ

HPDL

HR

HT

HVAC

ICRA

ID

ILSM

INCL

INST

INSUL

INT

JT

KV

LAM

LAV

LCM

LT

MAT

MAX

MDF

MECH

MEP

MFR

MIN

MISC

MOD

MTL

N N/A

NEG

NO.

NOM

NTS

O.C.

OPNG

OPP

OPT

OVHD

P

PCONC

PCRA

PL

PLAM

PLY(WD)

PNL

PR

PRFB

PS

PT

PTN(S)

PVMT

QTY

HEADER

HARDWARE

HOLLOW METAL

HORIZONTAL

HIGH PRESSURE DECORATIVE LAM

HOUR

HEIGHT

HEATING, VENTILATION & AIR CONDITIONING

INFECTIOUS CONTROL RISK ASSESSMENT

INSIDE DIAMETER OR DIM

INTERIM LIFE SAFETY MEASURES

INCLUDE(D,ING)

INSTALL

INSULATION

INTERIOR

JOINT

KILOVOLT

LAMINATE(D)

LAVATORY

LEAD CONTAINING MATERIAL(S)

LIGHT

MATERIAL(S)

MAXIMUM

MEDIUM-DENSITY FIBREBOARD

MECHANIC(AL)

MECHANICAL, ELECTRICAL, PLUMBING

MANUFACTURE(R)

MINIMUM

MISCELLANEOUS

MODIFIED

METAL

NORTH

NOT APPLICABLE

NEGATIVE

NUMBER

NOMINAL

NOT TO SCALE

ON CENTER(S)

OPENING

OPPOSITE

OPTION(AL)

OVERHEAD

PAINT

PRECAST CONCRETE

PRE-CONSTRUCTION RISK ASSESSMENT

PLATE

PLASTIC LAMINATE

PLYWOOD

PANEL

PAIR

PREFABRICATED

PLASTIC

PRESSURE TREATED

PARTITION(S)

PAVEMENT

QUANTITY

RAD

RCP

REF

REINF

REP

REQ(s,(')D)

RESIL

REV

RF

RM

RMV

RO

S

SCHED

SD

SECT

SF

SFRM

SHG

SHT(G)

SIM

SM

SOW

SPEC

SQ

SS

ST

STDG

STL

STOR

STRUCT

SUSP

SV

SYS

TEMP

T&G

THK

THRESH

TOC

TOS

TPH

TRANS

TS

TYP

UON

VA

VAR

VB

VC

VERT

VIF

VV

W W/

WD

WDW

WGHT

W/O

WP

WR

RADIUS

REFLECTED CEILING PLAN

REFERENCE

REINFORCE(D,ING)

REPRESENTATIVE

REQUIRE(D,S,MENT(S))

RESILIENT

REVERSE

RADIO FREQUENCY / ROOF

ROOM

REMOVE

ROUGH OPENING

SOUTH

SCHEDULE

SCHEMATIC DESIGN

SECTION

SQUARE FEET

SPRAY APPLIED FIRE-RESISTIVE MATERIAL

SHINGLES

SHEET (SHEATHING)

SIMILAR

SEAM

SCOPE OF WORK

SPECIFICATION

SQUARE

STAINLESS STEEL

STAIN

STANDING

STEEL

STORAGE

STRUCTURAL

SUSPENDED

SHEET VINYL

SYSTEM

TEMPORARY

TONGUE AND GROOVE

THICK(NESS)

THRESHOLD

TABLE OF CONTENTS

TOP OF SLAB

TOILET PAPER HOLDER

TRANSITION

TUBE STEEL

TYPICAL

UNLESS OTHERWISE NOTED

VETERANS AFFAIRS

VARIES

VAPOR BARRIER

VA FURNISHED, CONTRACTOR INSTALLED

VERTICAL

VERIFY IN FIELD

VA FURNISHED, VA INSTALLED

WEST

WITH

WOOD

WINDOW

WEIGHT

WITHOUT

WATERPROOF(ING)

WATER RESISTANT

DBL

DC

DD

DEMO

DEPT

DG

DIA

DIM

DWN

DR

DTL

DWG

E

EA

EJ

ELEC

ELEV

ENG

EOC

EOP

EPDM

EQ

EQUIP

ES

ETS

EX(IST)

EXP

EXT

FA

FD

FE(C)

FF

FFB

FFL

FIN

FLASH

FLR

FLRSNT

FNDN

FOC

FOF

FOS

FP

FR

FRM

FT

FTG

FUR

FURN

GA

GALV

GE

G(W)B

GC

GL

GLB

GMU

GOV(T)

GYP

DOUBLE

DIRECT CURRENT

DESIGN DEVELOPMENT

DEMOLISH(ION)

DEPARTMENT

DESIGN GUIDE

DIAMETER

DIMENSION

DOWN

DOOR

DETAIL

DRAWING(S)

EAST

EACH

EXPANSION JOINT

ELECTRIC(AL)

ELEVATION OR ELEVATOR

ENGINEER(ING)

EDGE OF CURB

EDGE OF PAVEMENT

ETHYLENE PROPYLENE DIENE TERPOLYMER

EQUAL

EQUIPMENT

EACH SIDE

EXPOSED TO STRUCTURE

EXISTING

EXPANSION

EXTERIOR

FIRE ALARM

FLOOR DRAIN

FIRE EXTINGUISHER (CABINET)

FACTORY FINISH

FINISH FLOOR BREAK

FINISH FLOOR LINE

FINISH(ED)

FLASHING

FLOOR(ING)

FLORESCENT

FOUNDATION

FACE OF CONCRETE

FACE OF FINISH

FACE OF STUDS

FIRE PROOF

FIRE RATED

FRAME

FOOT, FEET

FOOTING

FURRING

FURNISHED

GAGE, GAUGE

GALVANIZED

GENERAL ELECTRIC

GYPSUM (WALL) BOARD

GENERAL CONTRACTOR

GRID LINE

GLUE LAMINATED BEAM

GLASS MASONRY UNIT

GOVERNMENT

GYPSUM BOARD

A101

1 TYP

101.1

A-101

SIM

EXTERIOR ELEVATION

INTERIOR ELEVATION

BUILDING SECTION FLAG

WALL SECTION FLAG

CALLOUT FLAG

VERTICAL GRID LINE

HORIZONTAL GRID LINE

TRUE NORTH ARROW

PROJECT NORTH ARROW

(TRUE NORTH DASHED)

ELEVATION MARKER

KEY NOTE

ROOM TAG (SF OPTIONAL)

CEILING HEIGHT TAG

ROOM NAME

150 SF

A

A-101

SIM

01A

TRUE

NORTH

W1

A-101

NORTH

WALL TAG

FLOOR TAG

ROOF TAG

DOOR TAG

WINDOW TAG

SPECIALTY EQUIPMENT TAG

SIGNAGE TAG

SIGNAGE KEY NOTE

(AW SHEETS ONLY)

SIGNAGE MATERIAL TAG

(AW SHEETS ONLY)

EXISTING TO REMAIN

NEW CONSTRUCTION

TO DEMOLISH

HIDDEN ABOVE OR BELOW

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

SMOKE ZONE

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 1 HR FIRE RATED WALL

FIRE EXTINGUISHER CABINET

AREA OF WORK / AREA SHOWN

CONSTRUCTION ZONE, ( - - )

PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

PATH OF TRAVEL

EMERGENCY EGRESS PATHWAY

SEISMIC JOINT

BATT INSULATION

RIGID INSULATION

GYPSUM BOARD, TYPE X

ACOUSTICAL CEILING TILE, 2' x 2'

CONCRETE

STEEL

PLYWOOD, FIRE RATED

EARTH

SUPPLY GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

RETURN GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

LIGHTING PER ELECTRICAL

(SIZE & PROPORTIONS MAY VARY)

A-101

A01

D88

A5175SOAP DISH

IN-04.02-01

AFF

GYP ON MTL STUD

9' - 0"

FEC

F-1

R-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES G-003

ARCHITECTURAL SYMBOLS &

ABBREVIATIONS 4

MK AK

CONSTRUCTION

DOCUMENTS

07/20/2022

SYMBOLS ABBREVIATIONS

GENERAL NOTES

APPLICABLE PUBLICATIONS

1. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH

A HIGH LEVEL OF WORKMANSHIP.

2. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE AT ALL TIMES.

3. DO NOT SCALE DRAWINGS.

4. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL

INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS

INDICATED.

5. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT

ENCROACHMENTS.

6. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH THE CONTRACT DOCUMENTS.

7. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION, UON.

8. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN WALL BEHIND, THIS

INCLUDES BACKING FOR WALL MOUNTED DOOR STOPS. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED IN WALLS PRIOR TO INSTALLING DRYWALL.

9. IN TOILET ROOMS PROVIDE STAINLESS STEEL FILLER BEHIND ANY MIRRORS AND OTHER

WALL MOUNTED ACCESSORIES WHEN ITEM IS INSTALLED PARTIALLY OVER CERAMIC TILE.

APPLICABLE PUBLICATIONS ARCHITECTURAL NOTES

AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS

OF CODE ENFOREMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS,

FEES, ETC). THE VA SHALL FUNCTION AS THE AUTHORITY HAVING JURISTICTION (AHJ).

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD

APPLICATION GUIDE AND OTHER GUIDEANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).

INTERNATIONAL BUILDING CODE (IBC) 2018.

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018.

NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES

PRECEDENCE OVER IBC.

NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

NATIONAL ELECTRICAL CODE (NEC).

INTERNATIONAL PLUMBING CODE (IPC).

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAL SOCIETY OF MECHANICAL

ENGINEERS (ASME) A 17.1.

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT

BARRIER FREE DESIGN GUIDE (PG-18-3)

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUE

AND COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRCUTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL

AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RESE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND

TRANSPORTATON MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL

REQUIREMENTS SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.

SAFETY STANDARD FOR REFRIDERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.

VAMC APPROVED HARDWARE LOCKING STANDARDS

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM)

FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND

STANDARDS FOR TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA)

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND

INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI)

JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),

ENVIRONMENT OF CARE GUIDELINES AND STANDARDS

FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE

DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES

THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL

ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING

“ENVIRONMENTALLY RESPONSIBLE DESIGN”

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

CONTRACTOR PATH OF TRAVEL

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 2 HR FIRE RATED WALL

1 TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. USE STARC BARRIER SYSTEM WHERE POSSIBLE.

OTHERWISE, CONSTRUCT WITH MTL STUDS AND 5/8" TYPE

X GYP EACH SIDE AND PER REQUIREMENTS IN THE

INFECTION CONTROL SECTION OF SPECIFICATION

01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME COMPLYING WITH

REQUIREMENTS IN THE INFECTION CONTROL SECTION OF

SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.

ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

E F

G H J K L M N O

6.1

5.1

4.1

3.1

A B C D

ELECTRICAL

STORAGE

STORAGE

1013STORAGE

STORAGE

TELPHONE

STEAM

1019A

STORAGE

MAILROOM

COPY ROOM

1016A

UNIFORMS

ELEC

1014A

OFFICE

1012A

PATIENT LIBRARY

DAV COUNCIL

1010C

DVA

1010B TEXAS VET COMM

1010A

TRAINING

1008B

EMS OFFICE

STORAGE

1008A

KITCHEN

EMS EQUIPMENT

STORAGE

1009B

STORAGE

1009A POLICE STORAGE

STORAGE

1005A

STORAGE

1005B

CANTEEN

STORAGE

1005D

MECHANICAL

DRUG CACHE

RESTROOM

RESTROOM

RECEIVING

OFFICE

1021B

STORAGE

1009C

CORRIDOR

STORAGE

1005C

ELEV 1

STORAGE

1000D

WAITING

CORRIDOR

ELEVATOR

MACHINE

ELEV 2

ICRA CLASS IV REQUIREMENTS ICRA CLASS IV REQUIREMENTS

GROUND FLOOR ACCESS

FIRST FLOOR ACCESS

UPPER LEVEL /

ROOF ACCESS

SHOWN AREA

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS101

BUILDING 4 - FIRST FLOOR - ICRA

PLAN 4

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

NORTH

1/8" = 1'-0"

BUILDING 4 - FIRST FLOOR - ICRA PLAN

CLASS IV ICRA REQUIREMENTS

DURING CONSTRUCTION PROJECT:

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIRE FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTE ROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE, OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME

THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME

THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.

UPON COMPLETION OF THE PROJECT:

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

Revisions: Date:

NOTE: BUILDING 4 TO BE DONE IN 2 PHASES IN ORDER TO KEEP ONE ELEVATOR OPERATIONAL AT ALL TIMES.

ROTATED FROM KEY PLAN

E F

G H J K L M N O

6.1

5.1

4.1

3.1

A B C D

KITCHEN

POT WASH

CENTER

SOILED

CAR WASH

CLEAN

PATIENT CENTER

TRAY SERVICE

CART STORAGE

105ELEV 2

COOK'S COOLER

FOOD STORAGE

CONFERENCE

SECRETARY /

WAITING

CLINICAL

DIETITIANS

CLINICAL

DIETITIANS

SECTION CHIEF

NUTRITION

TECHNICIANS /

CLERKS

CONFERENCE

SUPERVISORS

NON-FOOD

STORAGE

C.E.F.

HAC

CORRIDOR

SANITATION

SUPPLY

CHIEF

CHIEF PROGRAM

MANAGEMENT

CORRIDOR

STAFF LOCKERS

TOILET

TOILET

CORRIDOR

CORRIDOR

NOURISHMENT

PREP

ICRA CLASS IV REQUIREMENTS ICRA CLASS IV REQUIREMENTS

SEE BUILDING 4 - GROUND FLOOR -

ICRA PLAN FOR CONTINUATION

ELEV 1

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

CONTRACTOR PATH OF TRAVEL

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 2 HR FIRE RATED WALL

1 TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. USE STARC BARRIER SYSTEM WHERE POSSIBLE.

OTHERWISE, CONSTRUCT WITH MTL STUDS AND 5/8" TYPE

X GYP EACH SIDE AND PER REQUIREMENTS IN THE

INFECTION CONTROL SECTION OF SPECIFICATION

01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME COMPLYING WITH

REQUIREMENTS IN THE INFECTION CONTROL SECTION OF

SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.

ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

SHOWN AREA

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS102

BUILDING 4 - SECOND FLOOR -

ICRA PLAN 4

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

1/8" = 1'-0"

BUILDING 4 - SECOND FLOOR - ICRA PLAN

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

CLASS IV ICRA REQUIREMENTS

DURING CONSTRUCTION PROJECT:

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIRE FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTE ROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE, OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME

THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME

THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.

UPON COMPLETION OF THE PROJECT:

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

NORTH

Revisions: Date:

NOTE: BUILDING 4 TO BE DONE IN 2 PHASES IN ORDER TO KEEP ONE ELEVATOR OPERATIONAL AT ALL TIMES.

E F

G H J K L M N O

6.1

5.1

4.1

3.1

A B C D

ELEVATOR 1

MACHINE ROOM

SEE BUILDING 4 - GROUND FLOOR -

ICRA PLAN FOR CONTINUATION

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

CONTRACTOR PATH OF TRAVEL

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 2 HR FIRE RATED WALL

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

SHOWN AREA

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS103

BUILDING 4 - UPPER LEVEL / ROOF

- ICRA PLAN 4

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

1/8" = 1'-0"

BUILDING 4 - UPPER LEVEL / ROOF - ICRA PLAN

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

NORTH

CLASS II ICRA REQUIREMENTS

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

Revisions: Date:

ROTATED FROM KEY PLAN

NOTE: BUILDING 4 TO BE DONE IN 2 PHASES IN ORDER TO KEEP ONE ELEVATOR OPERATIONAL AT ALL TIMES.

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONTRACTOR PATH OF TRAVEL

1 HOUR FIRE RATED WALL

TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. USE STARC BARRIER SYSTEM WHERE POSSIBLE.

OTHERWISE, CONSTRUCT WITH MTL STUDS AND 5/8" TYPE

X GYP EACH SIDE AND PER REQUIREMENTS IN THE

INFECTION CONTROL SECTION OF SPECIFICATION

01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME COMPLYING WITH

REQUIREMENTS IN THE INFECTION CONTROL SECTION OF

SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.

ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

SHOWN AREA

NORTH

E

F

F

G

G

H

H

A

A

B

B

C

C D

C.1 D.1

STORAGE

MECHANICAL

4A

ELECTRICAL

OFFICE

2A

OFFICE

MECHANICAL

B03A

B08

STORAGE

OFFICE

OFFICE

STORAGE

ELEVATOR 1

3PARTIALLY

EXCAVATED

PARTIALLY

EXCAVATED

PARTIALLY

EXCAVATED

BUILDING ACCESS

(ALL LEVELS)

CONTINUE TO

LEVELS ABOVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS104

BUILDING 7 - LEVEL B - ICRA PLAN

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

NORTH

1/4" = 1'-0"

BUILDING 7 - LEVEL B - ICRA PLAN

CLASS II ICRA REQUIREMENTS

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

TEMPORARY ICRA DOOR

CONTRACTOR PATH OF TRAVEL

1 HOUR FIRE RATED WALL

TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. USE STARC BARRIER SYSTEM WHERE POSSIBLE.

OTHERWISE, CONSTRUCT WITH MTL STUDS AND 5/8" TYPE

X GYP EACH SIDE AND PER REQUIREMENTS IN THE

INFECTION CONTROL SECTION OF SPECIFICATION

01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME COMPLYING WITH

REQUIREMENTS IN THE INFECTION CONTROL SECTION OF

SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.

ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

SHOWN AREA

NORTH

E

F

F

G

G

H

H

A

A

B

B

C

C D

C.1 D.1

OFFICE

106B OFFICE

VISTA TEAM

106A

OFFICE

OFFICE

B03F

OFFICE

WORKSPACE

106A /

OFFICE

OFFICE

111A

OFFICE

111B

ISO OFFICE

HALL

RESTROOM

MECHANICAL

110A

HAC

ELEVATOR 1

SEE BUILDING 7 -

LEVEL B ICRA

PLAN FOR

CONTINUATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS105

BUILDING 7 - LEVEL 1 - ICRA PLAN

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN1/4" = 1'-0"

BUILDING 7 - LEVEL 1 - ICRA PLAN NORTH

CLASS II ICRA REQUIREMENTS

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

TEMPORARY ICRA DOOR

CONTRACTOR PATH OF TRAVEL

1 HOUR FIRE RATED WALL

TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. USE STARC BARRIER SYSTEM WHERE POSSIBLE.

OTHERWISE, CONSTRUCT WITH MTL STUDS AND 5/8" TYPE

X GYP EACH SIDE AND PER REQUIREMENTS IN THE

INFECTION CONTROL SECTION OF SPECIFICATION

01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME COMPLYING WITH

REQUIREMENTS IN THE INFECTION CONTROL SECTION OF

SPECIFICATION 01 35 26 - SAFETY REQUIREMENTS.

ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

SHOWN AREA

NORTH

E

F

F

G

G

H

H

A

A

B

B

C

C D

C.1 D.1

CHIEF

SECRETARY

ISC

203 PROGRAM

COMPUTER

ROOM

RESTROOM

MECHANICAL

207A

HAC

HALL

PRIVATE ROOM

208A

ELEVATOR 1

SEE BUILDING 7 -

LEVEL B ICRA

PLAN FOR

CONTINUATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS106

BUILDING 7 - LEVEL 2 - ICRA PLAN

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1/4" = 1'-0"

BUILDING 7 - LEVEL 2 - ICRA PLAN

NORTH

CLASS II ICRA REQUIREMENTS

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

SHOWN AREA

EMERGENCY EGRESS ROUTE

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 2 HR FIRE RATED WALL

E F

G H J K L M N O

6.1

5.1

4.1

3.1

A B C D

ELECTRICAL

STORAGE

STORAGE

1013STORAGE

STORAGE

TELPHONE

STEAM

1019A

STORAGE

MAILROOM

COPY ROOM

1016A

UNIFORMS

ELEC

1014A

OFFICE

1012A

PATIENT LIBRARY

DAV COUNCIL

1010C

DVA

1010B TEXAS VET COMM

1010A

TRAINING

1008B

EMS OFFICE

STORAGE

1008A

KITCHEN

EMS EQUIPMENT

STORAGE

1009B

STORAGE

1009A POLICE STORAGE

STORAGE

1005A

STORAGE

1005B

CANTEEN

STORAGE

1005D

MECHANICAL

DRUG CACHE

RESTROOM

RESTROOM

RECEIVING

OFFICE

1021B

STORAGE

1009C

CORRIDOR

STORAGE

1005C

ELEV 1

STORAGE

1000D

WAITING

CORRIDOR

ELEVATOR

MACHINE

ELEV 2

MAX ALLOWABLE 300' - 0"

PROVIDED 92' - 7"

MAX ALLOWABLE 300' - 0"

PROVIDED 98' - 1"

3 3

14' - 3" TO POINT OF TWO EGRESS OPTIONS

1. NFPA BUILDING CONSTRUCTION: EXISTING

2. NFPA OCCUPANCY CLASSIFICATION: BUSINESS.

3. # OF REQ'D EGRESS OPENINGS: 2.

4. SEE ELECTRICAL FOR EXIT SIGNAGE LOCATIONS &

REQUIREMENTS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS201

BUILDING 4 - FIRST FLOOR - FIRE

AND LIFE SAFETY 4

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

NORTH

1/8" = 1'-0"

BUILDING 4 - GROUND FLOOR - FIRE & LIFE SAFETY PLAN

EGRESS START POINT

POINT OF TWO EGRESS OPTIONS

EGRESS END POINT

Revisions: Date:

NOTE: BUILDING 4 TO BE DONE IN 2 PHASES IN ORDER TO KEEP ONE ELEVATOR OPERATIONAL AT ALL TIMES.

EMERGENCY EGRESS ROUTE

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 2 HR FIRE RATED WALL

1. NFPA BUILDING CONSTRUCTION: EXISTING

2. NFPA OCCUPANCY CLASSIFICATION: BUSINESS.

3. # OF REQ'D EGRESS OPENINGS: 2.

4. SEE ELECTRICAL FOR EXIT SIGNAGE LOCATIONS &

REQUIREMENTS.

E F

G H J K L M N O

6.1

5.1

4.1

3.1

A B C D

MAX ALLOWABLE 300' - 0"

PROVIDED 110' - 2"

M A

X A

L L O

W A

B L E

P R

O V

ID

E

D

22' - 6" TO POINT OF

TWO EGRESS OPTIONS

KITCHEN

POT WASH

CENTER

SOILED

CAR WASH

CLEAN

PATIENT CENTER

TRAY SERVICE

CART STORAGE

ELEV 2

COOK'S COOLER

FOOD STORAGE

CONFERENCE

SECRETARY /

WAITING

CLINICAL

DIETITIANS

CLINICAL

DIETITIANS

SECTION CHIEF

NUTRITION

TECHNICIANS /

CLERKS

CONFERENCE

SUPERVISORS

NON-FOOD

STORAGE

C.E.F.

HAC

CORRIDOR

SANITATION

SUPPLY

CHIEF

CHIEF PROGRAM

MANAGEMENT

CORRIDOR

STAFF LOCKERS

TOILET

TOILET

CORRIDOR

CORRIDOR

NOURISHMENT

PREP

ELEV 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS202

BUILDING 4 - SECOND FLOOR -

FIRE AND LIFE SAFETY 4

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

NORTH

1/8" = 1'-0"

BUILDING 4 - SECOND FLOOR - FIRE & LIFE SAFETY PLAN

EGRESS START POINT

POINT OF TWO EGRESS OPTIONS

EGRESS END POINT

Revisions: Date:

NOTE: BUILDING 4 TO BE DONE IN 2 PHASES IN ORDER TO KEEP ONE ELEVATOR OPERATIONAL AT ALL TIMES.

EMERGENCY EGRESS ROUTE

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 2 HR FIRE RATED WALL

1. NFPA BUILDING CONSTRUCTION: EXISTING

2. NFPA OCCUPANCY CLASSIFICATION: BUSINESS.

3. # OF REQ'D EGRESS OPENINGS: 2.

4. SEE ELECTRICAL FOR EXIT SIGNAGE LOCATIONS &

REQUIREMENTS.

E F

G H J K L M N O

6.1

5.1

4.1

3.1

A B C D

M A

X A

L L O

W A

B L E

P R

O V

ID

E

D

ELEVATOR 1

MACHINE ROOM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS203

BUILDING 4 - UPPER LEVEL / ROOF

- FIRE AND LIFE SAFETY 4

MK MC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

NORTH

1/8" = 1'-0"

BUILDING 4 - UPPER LEVEL / ROOF - FIRE & LIFE SAFETY PLAN

EGRESS START POINT

EGRESS END POINT

ROOF ACCESS HATCH

Revisions: Date:

NOTE: BUILDING 4 TO BE DONE IN 2 PHASES IN ORDER TO KEEP ONE ELEVATOR OPERATIONAL AT ALL TIMES.

EMERGENCY EGRESS ROUTE

1 HR FIRE RATED WALL

1. NFPA BUILDING CONSTRUCTION: TYPE IIA

2. NFPA OCCUPANCY CLASSIFICATION: BUSINESS

3. SEE ELECTRICAL FOR EXIT SIGNAGE LOCATIONS &

REQUIREMENTS

E

F

F

G

G

H

H

A

A

B

B

C

C D

C.1 D.1

STORAGE

MECHANICAL

4A

STORAGE

OFFICE

STORAGE

OFFICE

ELECTRICAL

B08

OFFICE

2A

MECHANICAL

B03A

ELEVATOR 1

OFFICE

MAX ALLOWABLE 125' - 0"

PROVIDED 50' - 0"

10'-6" TO POINT OF TWO

EGRESS OPTIONS

EXIT

MAX ALLOWABLE 125' - 0"

PROVIDED 20' - 7"

EXIT STAIR

PARTIALLY

EXCAVATED

PARTIALLY

EXCAVATED

PARTIALLY

EXCAVATED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS204

BUILDING 7 - LEVEL B - FIRE AND

LIFE SAFETY PLAN 7

MK EC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1/4" = 1'-0"

BUILDING 7 - LEVEL B - FIRE & LIFE SAFETY PLAN

NORTH

EGRESS START POINT

POINT OF TWO EGRESS OPTIONS

EGRESS END POINT

EMERGENCY EGRESS ROUTE

1 HR FIRE RATED WALL

1. NFPA BUILDING CONSTRUCTION: TYPE IIA

2. NFPA OCCUPANCY CLASSIFICATION: BUSINESS

3. SEE ELECTRICAL FOR EXIT SIGNAGE LOCATIONS &

REQUIREMENTS

E

F

F

G

G

H

H

A

A

B

B

C

C D

C.1 D.1

OFFICE

106B OFFICE

VISTA TEAM

106A

OFFICE

OFFICE

B03F

OFFICE

WORKSPACE

106A /

OFFICE

OFFICE

111A

OFFICE

111B

ISO OFFICE

HALL

RESTROOM

MECHANICAL

110A

HAC

ELEVATOR 1

MAX ALLOWABLE 125' - 0"

PROVIDED 27' - 2"

EXIT STAIR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS205

BUILDING 7 - LEVEL 1 - FIRE AND

LIFE SAFETY PLAN 7

MK EC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

NORTH

1/4" = 1'-0"

BUILDING 7 - LEVEL 1 - FIRE & LIFE SAFTY PLAN

EGRESS START POINT

POINT OF TWO EGRESS OPTIONS

EGRESS END POINT

EMERGENCY EGRESS ROUTE

1 HR FIRE RATED WALL

1. NFPA BUILDING CONSTRUCTION: TYPE IIA

2. NFPA OCCUPANCY CLASSIFICATION: BUSINESS

3. SEE ELECTRICAL FOR EXIT SIGNAGE LOCATIONS &

REQUIREMENTS

E

F

F

G

G

H

H

A

A

B

B

C

C D

C.1 D.1

CHIEF

SECRETARY

ISC

203 PROGRAM

COMPUTER

ROOM

RESTROOM

MECHANICAL

207A

HAC

HALL

PRIVATE ROOM

208A

ELEVATOR 1

MAX ALLOWABLE 125' - 0"

PROVIDED 32' - 2"

EXIT STAIR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS206

BUILDING 7 - LEVEL 2 - FIRE AND

LIFE SAFETY PLAN 7

MK EC

CONSTRUCTION

DOCUMENTS

07/20/2022

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1/4" = 1'-0"

BUILDING 7 - LEVEL 2 - FIRE & LIFE SAFETY PLAN

NORTH

EGRESS START POINT

POINT OF TWO EGRESS OPTIONS

EGRESS END POINT

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

E F

G H J K L M N O

6.1

5.1

4.1

3.1

A B C D

ELECTRICAL

STORAGE

STORAGE

1013STORAGE

STORAGE

TELPHONE

STEAM

1019A

STORAGE

MAILROOM

COPY ROOM

1016A

UNIFORMS

ELEC

1014A

OFFICE

1012A

PATIENT LIBRARY

DAV COUNCIL

1010C

DVA

1010B TEXAS VET COMM

1010A

TRAINING

1008B

EMS OFFICE

STORAGE

1008A

KITCHEN

EMS EQUIPMENT

STORAGE

1009B

STORAGE

1009A POLICE STORAGE

STORAGE

1005A

STORAGE

1005B

CANTEEN

STORAGE

1005D

MECHANICAL

DRUG CACHE

RESTROOM

RESTROOM

RECEIVING

OFFICE

1021B

STORAGE

1009C

Room

STORAGE

1005C

ELEV 1

STORAGE

1000D

WAITING

CORRIDOR

ELEVATOR

MACHINE

ELEV 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

UPGRADE FREIGHT ELEVATORS

BLDG 4 + 7

THOMAS E. CREEK, AMARILLO VA HEATLH CARE SYSTEM

6010 W AMARILLO BLVD, AMARILLO, TX

504-22-102

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AD101

BUILDING 4 - FIRST FLOOR - DEMO

PLAN 4

MK RR

CONSTRUCTION

DOCUMENTS

07/20/2022

NORTH

1/8" = 1'-0"

OVERALL FIRST FLOOR DEMO PLAN

DEMO DOOR. DOOR FRAMES TO REMAIN.

DEMO EXISTING ELEVATOR CAB AND RELATED

EQUIPMENT, SEE SPEC SECTION 14 24 10

DEMO DOOR AND FRAME, TO BE REPLACED WITH NEW.

SEE ELECTRICAL DRAWINGS FOR EQUIPMENT

DEMOLITION.

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

NOTE: BUILDING 4 TO BE DONE IN 2 PHASES IN ORDER TO KEEP ONE ELEVATOR OPERATIONAL AT ALL TIMES.

E F

G H J K L M N O

6.1

5.1

4.1

3.1

A B C D

KITCHEN

POT WASH

CENTER

SOILED

CAR WASH

CLEAN

PATIENT CENTER

TRAY SERVICE

CART STORAGE

ELEV 2

COOK'S COOLER

FOOD STORAGE

CONFERENCE

SECRETARY /

WAITING

CLINICAL

DIETITIANS

CLINICAL

DIETITIANS

SECTION CHIEF

NUTRITION

TECHNICIANS /

CLERKS

CONFERENCE

SUPERVISORS

NON-FOOD

STORAGE

C.E.F.

Room

CORRIDOR

SANITATION

SUPPLY

CHIEF

CHIEF PROGRAM

MANAGEMENT

CORRIDOR

STAFF LOCKERS

TOILET

TOILET

CORRIDOR

CORRIDOR

NOURISHMENT

PREP

ELEV 1

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

G H

(E) CEILING @ 7'-6 5/8" AFF

ELEVATOR 1

MACHINE ROOM

11' - 6"

2' - 5 1/4"

3' - 9 1/2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date…