This document package includes construction drawings and specifications for plumbing upgrades at two buildings at the Amarillo VA Health Care System in Amarillo, Texas. The drawings show demolition of existing plumbing systems and installation of new systems on the first floor of Building 4 and basement of Building 7. Key details include upgrading the freight elevators in both buildings, replacement of sanitary, storm, and domestic water piping, and addition of a sump pump system in the basement of Building 7. The related federal contract opportunity is solicitation number 36C25723B0003 for project number 671-22-196 to replace the keying system at the facility. The Department of Veterans Affairs Veterans Health Administration VISN 17 is listed as the contracting agency. The documents provide requirements for planned plumbing system upgrades at two buildings on the Amarillo VA campus.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scale: NTS
Department of Veteran Affairs
TABLE OF CONTENTS
DWG # DWG TITLE
P-001 PLUMBING COVER SHEET
P-101 PLUMBING FLOOR PLANS, SCHEDULES AND DETAILS - BUILDINGS 4 + 7
X X X X DEMOLITION
EQUIPMENT
RELOCATE
REVISION
TEXT
BACKGROUND
SCOPE
COLUMN LINE
PLUMBING LAYERS PLUMBING SYMBOLS
B#-FC-# EQUIPMENT TAG (BUILDING NO -
EQUIP NAME - EQUIP NUMBER)
REVISION DELTAS
SHEET NOTES5
RELOCATE
GENERAL NOTES
1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL
BE EXERCISED TO MINIMIZE ALL INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF
THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS
OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE
CONSTRUCTION AREA.
2. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN
WITHOUT PRIOR REVIEW WITH THE COR AND/OR ENGINEER TO CONFIRM THAT AREAS TO
REMAIN IN OPERATION WILL NOT BE AFFECTED. IF AREAS NOT WITHIN THE SCOPE OF
WORK ARE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION, SUFFICIENT
ADVANCE NOTICE SHALL BE GIVEN TO THE COR AND/OR OWNER INDICATING WHICH
AREAS WILL BE AFFECTED, WHEN THE PROPOSED SHUTDOWN WILL OCCUR, AND FOR
HOW LONG A PERIOD OF TIME.
3. ALL ITEMS INDICATED AS BEING DEMOLISHED OR REMOVED SHALL BE DISPOSED OF
OFF-SITE.
4. THE PLUMBING CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO PROCEEDING WITH ALL WORK. WHERE DISCREPANCIES OCCUR
BETWEEN THESE DOCUMENTS AND EXISTING CONDITIONS, THE DISCREPANCY SHALL BE
REPORTED TO THE COR AND/OR ENGINEER FOR RESOLUTION.
5. ALL SHUT DOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE
COR PRIOR TO COMMENCEMENT OF SAID WORK.
6. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ALL DIRT AND DEBRIS
CAUSED BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.
7. USE OF THE OWNER'S ELEVATORS AND BUILDING CORRIDORS FOR THE HANDLING OF
NEW AND/OR REMOVED EQUIPMENT AND MATERIALS SHALL BE AT THE DIRECTION OF THE
COR AND SHALL BE COORDINATED WITH HIS OPERATIONS.
8. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS
OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR
PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS.
9. EXCEPT WHERE INDICATED AS BEING RELOCATED, EXISTING MATERIALS THAT ARE
REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS.
10. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR PIPING. DO
NOT LEAVE PIPING OPEN ENDED.
11. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL".
12. THE PLUMBING CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER TRADES
PRIOR TO FABRICATION, PURCHASE AND/OR INSTALLATION OF ANY WORK.
13. THE BALANCING CONTRACTOR SHALL TAKE FLOW (GPM) AND PRESSURE READINGS
PRIOR TO THE START OF WORK ON ALL DUCTWORK THAT SERVES AREAS NOT PART OF
THIS PROJECT BUT WHERE FLOW TO THOSE AREAS IS AFFECTED BY THIS PROJECT'S
WORK. AFTER MODIFICATIONS TO SYSTEMS COVERED UNDER THIS PROJECT ARE
COMPLETED, THE BALANCING CONTRACTOR SHALL BALANCE THE NON-AFFECTED AREAS
TO THEIR ORIGINAL FLOW AND PRESSURE OR NEW FLOW AND PRESSURE IF NOTED.
14. IF PLUMBING CONTRACTOR ENCOUNTERS WHAT APPEARS TO BE A HAZARDOUS OR
QUESTIONABLE MATERIAL, HE SHALL DISCONTINUE WORK IMMEDIATELY AND CONTACT
THE COR AND/OR OWNER'S REPRESENTATIVE.
15. USE OF OWNER'S UTILITIES (I.E. ELECTRICITY, WATER, HVAC, ETC.) FOR WORK INDICATED
ON THESE DOCUMENTS SHALL BE APPROVED BY THE COR PRIOR TO COMMENCEMENT OF
SAID WORK.
16. THE PLUMBING CONTRACTOR SHALL CONFORM TO OWNER'S SAFETY AND SECURITY
GUIDELINES IN THE PERFORMANCE OF ALL WORK INCLUDED IN THIS CONTRACT.
17. ALL BRANCH PIPING SHALL BE FURNISHED WITH SHUT OFF VALVES AND SHALL BE
LOCATED IN ACCESSIBLE LOCATION BY OFFSETTING BRANCH PIPING WITH VALVES DOWN
NEAR CEILING. PROVIDE ACCESS PANEL FOR ALL VALVES, CLEANOUTS, EQUIPMENT, ETC.
IN NON ACCESSIBLE CEILING AREAS.
18. ALL SUSPENDED PIPING, DUCTWORK, CONDUIT AND CABLE TRAYS SHALL BE PROVIDED
WITH, SEISMIC SWAY BRACES IN ACCORDANCE WITH THE MASON INDUSTRIES SEISMIC
RESTRAINT GUIDELINES FOR SUSPENDED PIPING, DUCTWORK AND ELECTRICAL SYSTEMS
AND THE APPLICABLE CODES. INSTALLED SYSTEM SHALL MATCH EXISTING, RIGID OR
CABLE TYPE.
19. GENERAL LOCATION OF FIXTURES ARE INDICATED ON PLUMBING PLANS. REFERENCE
ARCHITECTURAL PLANS AND INTERIOR ELEVATIONS FOR SPECIFIC LOCATIONS.
20. RESTORE EXISTING FIRE PROOFING TO BEAMS, DECKS AND ALL OTHER BUILDING
ELEMENTS WHICH ARE DISTURBED OR MODIFIED AS A RESULT OF NEW WORK BEING
INSTALLED. RESTORED CONDITIONS SHALL MATCH EXISTING PRIOR TO NEW WORK BEING
PERFORMED.
21. ALL EXISTING PIPE INSULATION REMOVED, AS REQUIRED TO PERFORM SCOPE OF WORK,
SHALL BE REPAIRED USING LIKE MATERIAL TO THAT WHICH IS EXISTING.
22. PIPE ROUTINGS ARE DIAGRAMMATIC IN NATURE. PROVIDE OFFSETS, DROPS AND RISERS
AS NECESSARY TO AVOID EXISTING ELECTRICAL, HVAC, PLUMBING, FIRE PROTECTION,
ETC. SYSTEMS WHICH MAY INTERFERE WITH GENERAL ROUTING SHOWN ON DRAWINGS.
23. VERIFY EXISTING PLUMBING SYSTEM SIZES PRIOR TO FABRICATION OF NEW PLUMBING
SYSTEMS. ANY EXISTING PLUMBING SYSTEMS DIFFERING IN SIZE FROM THAT NOTED ON
DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE
AND ENGINEER.
24. NOT ALL SYMBOLS, ABBREVIATIONS AND EQUIPMENT ABBREVIATIONS INDICATED APPEAR
ON THESE CONTRACT DRAWINGS
25. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE
OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.
26. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,
DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
PLUMBING INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
27. ALL PRESSURES LISTED ARE GAGE PRESSURE, UNLESS OTHERWISE NOTED.
28. PRIOR TO CONSTRUCTION, PLUMBING CONTRACTOR TO DETERMINE EXACT INVERT
ELEVATION, SIZE, DEPTH, AND LOCATION OF UTILITIES WHERE CONNECTIONS ARE TO
OCCUR. NOTIFY COR AND ENGINEER OF ANY DISCREPANCIES BETWEEN DRAWINGS AND
FIELD CONDITIONS.
29. PLUMBING CONTRACTOR SHALL KEEP ONE SET OF CONTRACT DRAWINGS ASIDE AT THE
SITE TO MARK UP ALL DEVIATIONS FROM CONTRACT DRAWINGS AND ANY DATA THAT IS
PERTINENT FOR COMPLETION OF DOCUMENTS. AT COMPLETION OF PROJECT, TRANSFER
MARKS TO A SET OF REPRODUCIBLE DRAWINGS AND DELIVER THIS SET OF DRAWINGS TO
OWNER PRIOR TO FINAL ACCEPTANCE.
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
LIMIT OF DEMOLITION
POINT OF CONNECTION
CAP
PIPE UP
PIPING SYMBOLS
PIPE DOWN
TEE
FLOW DIRECTION
FLOOR DRAIN
FLOOR SINK
PUMP
REDUCER
ANGLED GLOBE
AUTOMATIC BALANCING CONTROL
BALANCING
BALL
BUTTERFLY
CHECK
CIRCUIT SETTER
CONTROL - FLOAT OPERATED
FLOW METER
GATE
GLOBE
M
MODULATING CONTROL
ABBREVIATIONS
GENERAL DEMOLIION NOTES
1. SCHEDULE ALL SHUTDOWNS THAT AFFECT UTILITIES AND PORTIONS OF THE BUILDING
THAT MUST REMAIN IN OPERATION WITH THE COR.
2. DEMOLITION WORK AT ALL TIMES SHALL BE SUBJECT TO THE DIRECTION AND APPROVAL
OF THE COR AND CARRIED OUT IN SUCH A MANNER SO AS NOT TO INTERFERE WITH THE
NORMAL OPERATION OF THE BUILDING.
3. DISPOSE OF ALL REMOVED MATERIALS IN AN APPROVED MANNER.
4. ISOLATE, DRAIN, AND REFILL EXISTING SYSTEMS AS REQUIRED TO ACCOMMODATE
INSTALLATION OF EXISTING AND NEW SYSTEMS.
5. PROVIDE ALL NECESSARY TEMPORARY/PERMANENT CAPS OR PLUGS FOR PIPING. DO
NOT LEAVE PIPING OPEN ENDED.
6. ALL EXISTING PIPING SHALL BE FIELD VERIFIED FOR PROPER DEMOLITION. CONTRACTOR
SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY DISCREPANCIES FROM CONTRACT
DOCUMENTS OCCUR THAT MAY EFFECT EXISTING OPERATIONS.
7. DEMOLITION OF PIPING INCLUDES ALL ASSOCIATED VALVES, ACCESSORIES, INSULATION,
HANGERS, AND SUPPORTS.
8. COORDINATE WITH COR ON REMOVAL AND PLACEMENT OF EQUIPMENT NOTED TO BE
TURNED OVER TO COR. FOR EQUIPMENT NOT DESIRED BY COR, CONTRACTOR SHALL
REMOVE OFF SITE IN AN APPROVED MANNER.
DETAIL NUMBER
DRAWING SYMBOLS
M-XXX
X
DRAWING NUMBER
SECTION LETTER
DRAWING NUMBERM-XXX
X
COLD WATER
HOT WATER
HOT WATER RETURN
SANITARY SEWER (WASTE)
VENT
EXISTING COLD WATER
EXISTING HOT WATER
EXISTING HOT WATER RETURN
EXISTING SANITARY SEWER
EXISTING VENT
MODULATING CONTROL BUTTERFLY
PLUG
PNEUMATIC CONTROL
PRESSURE REDUCING (PRV)
PRESSURE REGULATING
PRESSURE SAFETY
SHUTOFF
THREE-WAY MODULATING CONTROL
THREE-WAY TWO POSITION CONTROL
TWO POSITION CONTROL
WATER BALANCE DEVICE
WYE STRAINER
UNION
TEMPERATURE GAGE
PRESSURE GAGE
TEST PLUG
AUTOMATIC AIR VENT
MANUAL AIR VENTMV
AV
EQUIP. ABBREVIATIONS
AAHX AIR TO AIR HEAT EXCHANGER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AF AFTER FILTER
AHU AIR-HANDLING UNIT
AS AIR SEPARATOR
B BOILER
BDR BASE BOARD RADIATOR
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BT BLOWOFF TANK
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CFP CHEMICAL FEED PUMP
CH CHILLER
CHP CHILLED WATER PUMP
COMP COMPRESSOR UNIT
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
DXCC DIRECT EXPANSION COOLING COIL
EC EVAPORATIVE COOLER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EH EXHAUST HOOD
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FPTU FAN POWERED TERMINAL UNIT
FTR FIN TUBE RADIATION
H HUMIDIFER
HC HEATING COIL
HD HOOD
HP HEAT PUMP
HPDT HIGH PRESSURE DRIP TRAP
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING)
PANEL
HRW HEAT RECOVERY WHEEL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
ICF IN-LINE CENTRIFUGAL FAN
IU INDUCTION UNIT
LLHX LIQUID TO LIQUID HEAT
EXCHANGER
MAU MAKE-UP AIR UNIT
P PUMP
PF PRE-FILTER
PHC PREHEAT COIL
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RAHX ROTARY AIR HEAT EXCHANGER
RCCH REMOTE CONDENSER
CHILLER
RCU RECIPROCATING CHILLER UNIT
RF RETURN FAN
RHC REHEAT COIL
SAD SOUND ATTENUATING DEVICE
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SSHX STEAM TO STEAM HEAT
EXCHANGER
ST STEAM TRAP
SUH STEAM UNIT HEATER
SWHX STEAM TO WATER HEAT
EXCHANGER
TU TERMINAL UNIT
UC UNIT COOLER
UH UNIT HEATER
VUH VERTICAL UNIT HEATER
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING
UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
RISER SYSTEM
RISER NUMBER
MEDICAL VACUUM
MEDICAL AIR
STORM WATER, BELOW GRADE
STORM WATER
MA MA MA
MV MV MV
SD SD
SD SD
OXYGEN0 0 0
NATURAL GAS, BELOW GRADE
NATURAL GAS
NG NG NG
NG NG NG
MA
MV
NG
NG
SDSD
SDSD
DIRECTION OF PIPE PITCH (DOWN)
FLOW ELEMENT
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING PIPING
ACCESSORIES
FLOAT & THERMOSTATIC TRAP SET
INCLUDING PIPING ACCESSORIES
STRAINER
THERMOMETER
PRESSURE GAGE
CLEAN OUT
HOSE BIB
ABS ACRYLONITRILE BUTADIENE
STYRENE
AC ALTERNATING CURRENT
A/E ARCHITECT/ENGINEER
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AISI AMERICAN IRON AND STEEL
INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION, AIR
CONDITIONING ENGINEERS
ASJ ALL SERVICE JACKET
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AWG AMERICAN WIRE GAUGE
BACNET BUILDING AUTOMATION AND
CONTROL NETWORK
BAS BUILDING AUTOMATION SYSTEM
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
C CELSIUS
CDA COPPER DEVELOPMENT
ASSOCIATION
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CO CLEANOUT
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPVC CHLORINATED POLYVINYL
CHLORIDE
CRS CORROSION RESISTANT STEEL
CV CONTROL VALVE
CXA COMMISSIONING AGENT
DB DECIBELS
DB(A) DECIBELS (A WEIGHTED)
DDC DIRECT DIGITAL CONTROL
DFU DRAINAGE FIXTURE UNITS
DI DEIONIZED WATER
DOE DEPARTMENT OF ENERGY
DW DISHWASHER
DWG DRAWING
ECC ENGINEERING CONTROL CENTER
AKA BAS
EL ELEVATION
EPA ENVIRONMENTAL PROTECTION
AGENCY
(E) EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOW SWITCH
FU FIXTURE UNITS
GAL GALLON
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HDPE HIGH DENSITY POLYETHYLENE
HG MERCURY
HOA HANDS-OFF-AUTOMATIC
HP HORSEPOWER
HWCP HOT WATER CIRCULATING PUMP
HX HEAT EXCHANGER
HYD HYDRANT
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
KPA KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LAV LAVATORY
LB POUND
LBS/HR POUNDS PER HOUR
LNG LIQUID NATURAL GAS
L/MIN LITERS PER MINUTE
L/S LITERS PER SECOND
M METER
MA MEDICAL AIR
MAV MEDICAL AIR VENT
MAX MAXIMUM
MBH 1000 BTU PER HOUR
ABBREVIATIONS
MFG MANUFACTURER
MG MILLIGRAM
MG/L MILLIGRAMS PER LITER
ML MILLILITER
MM MILLIMETER
MIN MINIMUM
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROGEN OXIDE
NC NORMALLY CLOSED
NF OIL FREE DRY (NITROGEN)
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPTF NATIONAL PIPE THREAD FEMALE
NPS NOMINAL PIPE SIZE
NPT NOMINAL PIPE THREAD
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSD OPEN SIGHT DRAIN
OS&Y OUTSIDE STEM AND YOKE
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE
INSTITUTE
PG PRESSURE GAUGE
PID PROPORTIONAL-INTEGRAL-
DIFFERENTIAL
PLC PROGRAMMABLE LOGIC
CONTROLLERS
PP POLYPROPYLENE
PPM PARTS PER MILLION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTFE POLYTETRAFLUOROETHYLENE
PVC POLYVINYL CHLORIDE
PVDF POLYVINYLIDENE FLUORIDE
PW POTABLE WATER
RD ROOF DRAIN
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RTD RESISTANCE TEMPERATURE
DETECTORS
RTRP REINFORCED THERMOSETTING
RESIN PIPE
SCFM STANDARD CUBIC FEET PER
MINUTE
SDI SILT DENSITY INDEX
SDMH STORM DRAIN MANHOLE
SF SQUARE FEET
SPEC SPECIFICATION
SPS STERILE PROCESSING SERVICES
SQFT SQUARE FEET
SS SANITARY SEWER
STD STANDARD
SUS SAYBOLT UNIVERSAL SECOND
SW STORM WATER
SWP STEAM WORKING PRESSURE
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TFE TETRAFLUOROETHYLENE
THHN THERMOPLASTIC HIGH-HEAT
RESISTANT NYLON COATED WIRE
THWN THERMOPLASTIC HEAT & WATER
RESISTANT NYLON COATED WIRE
TMV THERMOSTATIC MIXING VALVE
T/P TEMPERATURE AND PRESSURE
TP TRAP PRIMER
TSTAT THERMOSTAT
TYP TYPICAL
V VOLT
VA VETERANS ADMINISTRATION
VAC VACUUM
VAC VOLTAGE IN ALTERNATING
CURRENT
VAMC VETERANS ADMINISTRATION
MEDICAL CENTER
VA TIL WWW.CFM.VA.GOV/TIL/INDEX.ASP
VHA VETERANS HEALTH
ADMINISTRATION
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WATER CLEANOUT
WG WATER GAUGE
WH WALL HYDRANT
WOG WATER, OIL, GAS
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P-001
AutoCAD SHX Text
PLUMBING COVER SHEET
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text
UPGRADE FREIGHT ELEVATORS BLDG 4 & 7
AutoCAD SHX Text 504-22-102
AutoCAD SHX Text
RV
AutoCAD SHX Text
JS
AutoCAD SHX Text 04/13/2022
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Dwg. of 02
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text 07/29/2022
AutoCAD SHX Text 4 & 7
AutoCAD SHX Text
MULTIPLE
AutoCAD SHX Text THOMAS E. CREEK, AMARILLO VA HEALTH CARE SYSTEM - AMARILLO TEXAS 6010 W AMARILLO BLVD, AMARILLO, TX 79106
AutoCAD SHX Text R
AutoCAD SHX Text
SAN
AutoCAD SHX Text
AutoCAD SHX Text
FE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CO
P-101
BUILDING 4 FIRST FLOOR PLUMBING PLAN
SCALE: 1/4" = 1'-0"
Department of Veteran Affairs
SHEET NOTES
CONNECT TO NEAREST SANITARY LINE
WITH INDIRECT DRAIN, OR AIR GAP.
CONNECT TO EXISTING SEWAGE PIPING
WITH INDIRECT DRAIN.
UP TO CEILING
CONNECT TO BATHROOM DRAIN
LOCATED ON FIRST FLOOR.
KEY NOTES
P-101
BUILDING 7 BASEMENT PLUMBING PLAN
SCALE: 1/4" = 1'-0"
Pump Stop Pump Start
Sump Cover
Check Valve
SUMP PUMP DETAIL2
N
N
TYPE "W" HUB DRAIN 1
EMS EQUIPMENT
STORAGE
1009B
STORAGE
1009A POLICE STORAGE
STORAGE
1005A
CANTEEN
STORAGE
1005D
RESTROOM
RESTROOM
1005C
ELEV 1
ELEVATOR
MACHINE
ELEV 2
(E) 6" GW
(E) 6" SS
(E) 4" GW
(E) 3" GW
(E) 6" GW
BELOW SLAB
P - 1
P - 21-1/2"Ø
1-1/2"Ø
(E) 3" SS
2 2
STORAGE
MECHANICAL
4A
STORAGE
OFFICE
STORAGE
OFFICE
2ELECTRICAL
MECHANICAL
B03A
ELEVATOR
PARTIALLY
EXCAVATED
PARTIALLY
EXCAVATED
OFFICE
2A
OFFICE
P - 3
1-1/2"Ø
AutoCAD SHX Text
AutoCAD SHX Text
BUILDINGS 4 & 7 PLUMBING DESIGN
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text 07/29/2022
AutoCAD SHX Text
UPGRADE FREIGHT ELEVATORS, BLDG 4 + 7
AutoCAD SHX Text 504-22-102
AutoCAD SHX Text
RV
AutoCAD SHX Text
JS
AutoCAD SHX Text 04/13/2022
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Dwg. of 02
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text 4 & 7
AutoCAD SHX Text
MULTIPLE
AutoCAD SHX Text P-101
AutoCAD SHX Text THOMAS E. CREEK, AMARILLO VA HEALTH CARE SYSTEM - AMARILLO TEXAS 6010 W AMARILLO BLVD, AMARILLO, TX 79106
| Sheets and Views |
| VA Amarillo Elevator-Sheet - P001 - 20220728-Layout1 |
| VA Amarillo Elevator-Sheet - P101 - 20220728-Layout1 |
File details come from the government source that posted it. Updated .