This document package includes mechanical drawings and specifications for upgrading freight elevators in Buildings 4 and 7 at the Thomas E. Creek VA Medical Center in Amarillo, Texas. The project involves demolishing existing elevator equipment and installing new fan coil units, condensing units, and associated ductwork and piping. Key details include upgrading two elevators in each building with new fan coil units mounted in the elevator machine rooms and connected to outdoor condensing units. Mechanical plans show demolition areas, new equipment locations, and duct and pipe routing. Schedules and details provide specifications for the fan coil units and connections to condensing units. Related federal contract opportunity J056-504-22-102 has a solicitation number 36C25723B0003 to replace the elevator equipment, with responses due to the Department of Veterans Affairs.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scale: NTS
Department of Veteran Affairs
X X X X DEMOLITION
EXHAUST
EQUIPMENT
PIPING
RETURN
RELOCATE
REVISION
SUPPLY
TEXT
BACKGROUND
EXISTING
SCOPE
COLUMN LINE
MECHANICAL LAYERS MECHANICAL SYMBOLS
S-#
NECK SIZE
CFM
(TYP. #)
SUPPLY CEILING DIFFUSER
S-#
SLOTS-SLOT WIDTH-LENGTH
CFM
(TYP. #)
S-# LxW
CFM
(TYP. #)
SUPPLY SIDEWALL DIFFUSER
SUPPLY LINEAR DIFFUSER
B#-FC-# EQUIPMENT TAG (BUILDING NO -
EQUIP NAME - EQUIP NUMBER)
FSD
REVISION DELTAS
T STATS
FIRE SMOKE DAMPER
SHEET NOTES
CO2 SENSORCO2
TVAV-1
SMOKE DETECTOR
ROOM PRESSURE MONITORP
RELOCATE
GENERAL NOTES
1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL
BE EXERCISED TO MINIMIZE ALL INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF
THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS
OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE
CONSTRUCTION AREA.
2. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN
WITHOUT PRIOR REVIEW WITH THE COR AND/OR ENGINEER TO CONFIRM THAT AREAS TO
REMAIN IN OPERATION WILL NOT BE AFFECTED. IF AREAS NOT WITHIN THE SCOPE OF
WORK ARE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION, SUFFICIENT
ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER INDICATING WHICH AREAS WILL BE
AFFECTED, WHEN THE PROPOSED SHUTDOWN WILL OCCUR, AND FOR HOW LONG A
PERIOD OF TIME.
3. ALL ITEMS INDICATED AS BEING DEMOLISHED OR REMOVED SHALL BE DISPOSED OF
OFF-SITE.
4. THE MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO PROCEEDING WITH ALL WORK. WHERE DISCREPANCIES OCCUR
BETWEEN THESE DOCUMENTS AND EXISTING CONDITIONS, THE DISCREPANCY SHALL BE
REPORTED TO THE COR AND/OR ENGINEER FOR RESOLUTION.
5. ALL SHUT DOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE
COR PRIOR TO COMMENCEMENT OF SAID WORK.
6. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ALL DIRT AND DEBRIS
CAUSED BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.
7. USE OF THE OWNER'S ELEVATORS AND BUILDING CORRIDORS FOR THE HANDLING OF
NEW AND/OR REMOVED EQUIPMENT AND MATERIALS SHALL BE AT THE DIRECTION OF THE
COR AND SHALL BE COORDINATED WITH HIS OPERATIONS.
8. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS
OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR
PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS.
9. EXCEPT WHERE INDICATED AS BEING RELOCATED, EXISTING MATERIALS THAT ARE
REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS.
10. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR
PIPING/DUCTWORK. DO NOT LEAVE PIPING/DUCTWORK OPEN ENDED.
11. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL".
12. THE MECHANICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER TRADES
PRIOR TO FABRICATION, PURCHASE AND/OR INSTALLATION OF ANY WORK.
13. THE BALANCING CONTRACTOR SHALL TAKE AIRFLOW (CFM) AND PRESSURE READINGS
PRIOR TO THE START OF WORK ON ALL DUCTWORK THAT SERVES AREAS NOT PART OF
THIS PROJECT BUT WHERE AIRFLOW TO THOSE AREAS IS AFFECTED BY THIS PROJECT'S
WORK. AFTER MODIFICATIONS TO AIR SYSTEMS COVERED UNDER THIS PROJECT ARE
COMPLETED, THE BALANCING CONTRACTOR SHALL BALANCE THE NON-AFFECTED AREAS
TO THEIR ORIGINAL AIRFLOW AND PRESSURE OR NEW AIRFLOW AND PRESSURE IF
NOTED.
14. IF MECHANICAL CONTRACTOR ENCOUNTERS WHAT APPEARS TO BE A HAZARDOUS OR
QUESTIONABLE MATERIAL, HE SHALL DISCONTINUE WORK IMMEDIATELY AND CONTACT
THE OWNER'S REPRESENTATIVE.
15. USE OF OWNER'S UTILITIES (I.E. ELECTRICITY, WATER, HVAC, ETC.) FOR WORK INDICATED
ON THESE DOCUMENTS SHALL BE APPROVED BY THE COR PRIOR TO COMMENCEMENT OF
SAID WORK.
16. THE MECHANICAL CONTRACTOR SHALL CONFORM TO OWNER'S SAFETY AND SECURITY
GUIDELINES IN THE PERFORMANCE OF ALL WORK INCLUDED IN THIS CONTRACT.
17. ALL BRANCH PIPING SHALL BE FURNISHED WITH SHUT OFF VALVES AND SHALL BE
LOCATED IN ACCESSIBLE LOCATION BY OFFSETTING BRANCH PIPING WITH VALVES DOWN
NEAR CEILING. PROVIDE ACCESS PANEL FOR ALL VALVES AND EQUIPMENT IN NON
ACCESSIBLE CEILING AREAS.
18. ALL SUSPENDED PIPING, DUCTWORK, CONDUIT AND CABLE TRAYS SHALL BE PROVIDED
WITH, SEISMIC SWAY BRACES IN ACCORDANCE WITH THE MASON INDUSTRIES SEISMIC
RESTRAINT GUIDELINES FOR SUSPENDED PIPING, DUCTWORK AND ELECTRICAL SYSTEMS
AND THE APPLICABLE CODES. INSTALLED SYSTEM SHALL MATCH EXISTING, RIGID OR
CABLE TYPE.
19. ALL INDIVIDUAL INLET DUCTS TO CONSTANT AIR VOLUME BOXES (CAV) OR VARIABLE AIR
VOLUME BOXES (VAV) SHALL BE SAME SIZE AS INLET CONNECTION OF CAV BOX, UNLESS
NOTED OTHERWISE.
20. ALL INDIVIDUAL BRANCH PIPING TO CONSTANT AIR VOLUME BOXES (CAV) OR VARIABLE
AIR VOLUME BOXES (VAV) SHALL BE 3/4" IN SIZE, UNLESS NOTED OTHERWISE.
21. PRIOR TO ANY MODIFICATIONS OF EXISTING DUCT SYSTEMS, TEST EXISTING AIRFLOWS
AT TRAVERSE POINTS NOTED IN DRAWINGS AND SUBMIT TO ARCHITECT FOR REVIEW.
TEST REPORT SHALL INDICATE EXISTING CONDITION AIRFLOW VALUES. UPON
COMPLETION OF NEW SYSTEMS, WITHIN THE SCOPE OF THE PROJECT, ALL PREVIOUSLY
TESTED SYSTEM AIRFLOWS SHALL BE SET TO ORIGINAL CONDITIONS.
22. GENERAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES ARE INDICATED ON AIR
CONDITIONING PLANS. REFERENCE ARCHITECTURAL REFLECTED CEILING PLANS AND
INTERIOR ELEVATIONS FOR SPECIFIC LOCATIONS.
23. RESTORE EXISTING FIRE PROOFING TO BEAMS, DECKS AND ALL OTHER BUILDING
ELEMENTS WHICH ARE DISTURBED OR MODIFIED AS A RESULT OF NEW WORK BEING
INSTALLED. RESTORED CONDITIONS SHALL MATCH EXISTING PRIOR TO NEW WORK BEING
PERFORMED.
24. ALL EXISTING DUCT INSULATION REMOVED, AS REQUIRED TO PERFORM SCOPE OF WORK,
SHALL BE REPAIRED USING LIKE MATERIAL TO THAT WHICH IS EXISTING.
25. DUCT ROUTINGS ARE DIAGRAMMATIC IN NATURE. PROVIDE OFFSETS, DROPS AND RISERS
AS NECESSARY TO AVOID EXISTING ELECTRICAL, HVAC, PLUMBING, FIRE PROTECTION,
ETC. SYSTEMS WHICH MAY INTERFERE WITH GENERAL ROUTING SHOWN ON DRAWINGS.
RESIZING OF DUCTS WILL BE ALLOWED PROVIDED REVISED DUCT SIZE DOES NOT EXCEED
AIR VELOCITIES OF SYSTEM DESIGN AND DRAWING IS SUBMITTED FOR REVIEW, NOTING
CHANGES PROPOSED, PRIOR TO DUCT SYSTEM FABRICATION AND INSTALLATION.
26. VERIFY EXISTING DUCT SYSTEM SIZES PRIOR TO FABRICATION OF NEW DUCT SYSTEMS.
ANY EXISTING DUCT SYSTEMS DIFFERING IN SIZE FROM THAT NOTED ON DRAWINGS
SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE AND
MECHANICAL ENGINEER.
27. PROVIDE INSULATION OVER EXISTING DUCT SECTIONS WHICH HAVE BEEN PATCHED.
INSULATION TYPE, THICKNESS AND DENSITY SHALL MATCH EXISTING. SEE
SPECIFICATIONS FOR REQUIREMENTS OF NEW DUCT SYSTEM INSULATION.
28. NOT ALL SYMBOLS, ABBREVIATIONS AND EQUIPMENT ABBREVIATIONS INDICATED APPEAR
ON THESE CONTRACT DRAWINGS
29. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A
FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.
30. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.
DUCT SIZES ARE NET INSIDE DIMENSIONS.
31. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,
DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
32. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL
UNITS FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING.
33. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD
EQUIPMENT DETAILS.
34. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
35. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO
PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
36. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED
WITH BOTTOM ELEVATION OF REGISTER AT 7" ABOVE FINISHED FLOOR.
37. ALL PRESSURES LISTED ARE GAGE PRESSURE, UNLESS OTHERWISE NOTED.
VAV BOX
VAV BOX WITH REHEAT COIL
CEILING DIFFUSER (SUPPLY, RETURN,
EXHAUST)
RETURN/EXHAUST AIR SIDEWALL
DIFFUSER
DEMOLITION CEILING DIFFUSER
ELBOW (1R UNLESS OTHERWISE
NOTED)
MITERED ELBOW WITH TURNING VANES
CONICAL TAP
RISER
VOLUME DAMPER
POINT OF CONNECTION
CAP
HEPA DIFFUSERS
SUPPLY AIR SIDEWALL DIFFUSER
X
X
X
X XX
X
X
X
X
X
X
EXISTING CEILING DIFFUSER
PIPE UP
PIPING SYMBOLS
PIPE DOWN
TEE
FLOW DIRECTION
FLOOR DRAIN
FLOOR SINK
PUMP
REDUCER
ANGLED GLOBE
AUTOMATIC BALANCING CONTROL
BALANCING
BALL
BUTTERFLY
CHECK
CIRCUIT SETTER
CONTROL - FLOAT OPERATED
FLOW METER
GATE
GLOBE
M
MODULATING CONTROL
ABBREVIATIONS
TABLE OF CONTENTS
DWG # DWG TITLE
M-001 MECHANICAL AND PLUMBING COVER SHEET
M-101 MECHANICAL FLOOR PLANS - BUILDINGS 4 + 7
GENERAL DEMOLITION NOTES
1. SCHEDULE ALL SHUTDOWNS THAT AFFECT UTILITIES AND PORTIONS OF THE BUILDING
THAT MUST REMAIN IN OPERATION WITH THE COR .
2. DEMOLITION WORK AT ALL TIMES SHALL BE SUBJECT TO THE DIRECTION AND APPROVAL
OF THE COR AND CARRIED OUT IN SUCH A MANNER SO AS NOT TO INTERFERE WITH THE
NORMAL OPERATION OF THE BUILDING.
3. DISPOSE OF ALL REMOVED MATERIALS IN AN APPROVED MANNER.
4. ISOLATE, DRAIN, AND REFILL EXISTING SYSTEMS AS REQUIRED TO ACCOMMODATE
INSTALLATION OF EXISTING AND NEW SYSTEMS.
5. PROVIDE ALL NECESSARY TEMPORARY/PERMANENT CAPS OR PLUGS FOR PIPING. DO
NOT LEAVE PIPING OPEN ENDED.
6. ALL EXISTING PIPING SHALL BE FIELD VERIFIED FOR PROPER DEMOLITION. CONTRACTOR
SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY DISCREPANCIES FROM CONTRACT
DOCUMENTS OCCUR THAT MAY EFFECT EXISTING OPERATIONS.
7. DEMOLITION OF PIPING INCLUDES ALL ASSOCIATED VALVES, ACCESSORIES, INSULATION,
HANGERS, AND SUPPORTS.
8. COORDINATE WITH COR ON REMOVAL AND PLACEMENT OF EQUIPMENT NOTED TO BE
TURNED OVER TO COR. FOR EQUIPMENT NOT DESIRED BY COR, CONTRACTOR SHALL
REMOVE OFF SITE IN AN APPROVED MANNER.
LINEAR DIFFUSER (1-, 2-, 3-SLOT)
DETAIL NUMBER
DRAWING SYMBOLS
M-XXX
X
DRAWING NUMBER
SECTION LETTER
DRAWING NUMBERM-XXX
X
COLD WATER
HOT WATER
HOT WATER RETURN
SANITARY SEWER (WASTE)
VENT
EXISTING COLD WATER
EXISTING HOT WATER
EXISTING HOT WATER RETURN
EXISTING SANITARY SEWER
EXISTING VENT
PLUMBING LAYERS
SPECIALITY PIPING
SPECIALITY PIPING RETURN
XX
XX
MODULATING CONTROL BUTTERFLY
PLUG
PNEUMATIC CONTROL
PRESSURE REDUCING (PRV)
PRESSURE REGULATING
PRESSURE SAFETY
SHUTOFF
THREE-WAY MODULATING CONTROL
THREE-WAY TWO POSITION CONTROL
TWO POSITION CONTROL
WATER BALANCE DEVICE
WYE STRAINER
UNION
TEMPERATURE GAGE
PRESSURE GAGE
TEST PLUG
AUTOMATIC AIR VENT
MANUAL AIR VENTMV
AV
RADIANT CEILING PANEL
STANDARD 45° TAP
BLIND TRANSMITTER
CONTROL SYMBOLS
CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
OCCUPANCY SENSOR
CONDUCTIVITY TRANSMITTER
PRESSURE CONTROLLER
PRESSURE DIFFERENTIAL SWITCH
MOTOR OPERATOR FOR VALVE OR DAMPER
SOLENOID VALVE
VARIABLE FREQUENCY DRIVE CONTROLLER
ANALOG SIGNAL IN
PNEUMATIC OPERATOR FOR VALVE OR DAMPER
APPLICATION SPECIFIC CONTROLLER
BUILDING AUTOMATION SYSTEM
BUILDING CONTROLLER PANEL
DIGITAL SIGNAL IN
DIGITAL SIGNAL OUT
FAIL CLOSED
FAIL LAST
FAIL OPEN
NORMALLY CLOSED
NORMALLY OPEN
OPERATOR WORKSTATION
BUILDING MANAGEMENT SYSTEM
ANALOG SIGNAL OUT
CUSTOM APPLICATION CONTROLLER
AT
AT
AT
AT
CT
PC
PDS
M
VFD
AI
AO
SV
ASC
CAC
BAS
BCP
DO
FC
BMS
DI
FL
FO
NC
NO
OWS
PRESSURE SWITCH LOW
PRESSURE TRANSMITTER
SPEED CONTROLLER
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
VARIABLE SPEED MOTOR CONTROLLER
PSL
PT
SC
LTCP
HVAC
VSMC
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE GAUGE
PRESSURE SWITCH HIGH
PDT
PI
PSH
ELECTRONIC TO PNEUMATIC TRANSDUCER
FLOW CONTROLLER
FLOW ELEMENT
FLOW SWITCH
EPT
FC
FE
FS
FLOW SWITCH HIGH
FLOW SWITCH LOW
FLOW TRANSMITTER
HUMIDISTAT
FSH
FSL
FT
H
HAND SWITCH
CURRENT TRANSMITTER
TIME CLOCK CONTROLLING EQUIP ON SCHEDULE
LOCAL RECORDING TIME CLOCK (RUNTIME)
HS
IT
KC
KR
LEVEL CONTROLLER
LEVEL TRANSMITTER
HIGH LIMIT HUMIDITY SENSOR
MOISTURE (HUMIDITY) TRANSMITTER
LC
LT
MSH
MT
OC
CO
CO2
VALVE OR DAMPER POSITION CONTROLLER
POSITION SWITCH
ZC
ZS
ECC
SMOKE DETECTORSD
STATIC PRESSURE SENSOR
THERMOSTAT
TEMPERATURE CONTROLLER
THERMOMETER
SPS
T
TC
TI
TEMPERATURE SWITCH
TEMPERATURE SWITCH HIGH (FREEZESTAT)
TEMPERATURE SWITCH LOW (FREEZESTAT)
TEMPERATURE TRANSMITTER
TS
TSH
TSL
TT
INTEGRATE CONTROL POINT ON REMOTE
GRAPHICS WORKSTATION AT ENERGY CONTROL
CENTER
MOTOR STARTER
A/E ARCHITECT / ENGINEER
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CD CEILING DIFFUSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHW CHILLER WATER
CHS/CHR CHILLED WATER SUPPLY/RETURN
CO CLEAN OUT
CO2 CARBON DIOXODE
COP COEFFICIENT OF PERFORMANCE
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWS/CWR CONDENSER WATER
SUPPLY/RETURN (FROM/TO
COOLING TOWER)
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT
(SUBMISSION 1)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DX DIRECT EXPANSION
(E) EXISTING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EQUIP EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
F FAHRENHEIT
FSD COMBINATION FIRE SMOKE
DAMPER
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FD FIRE DAMPER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIBB
HP HORSEPOWER
HW HOT WATER
HWS/HWR HEATING HOT WATER
SUPPLY/RETURN
HZ HERTZ
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE STEAM
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAX MAXIMUM
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MERV MINIMUM EFFICIENCY
REPORTING VALUE
MIN MINIMUM
N/A NOT APPLICABLE
NC NOISE CRITERIA
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
Pa PASCAL
PD PRESSURE DROP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION LINE
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SD-1 SCHEMATIC DESIGN
(SUBMISSION1)
SDPR SMOKE DAMPER
SP STATIC PRESSURE
SQ FT/SF SQUARE FOOT (FEET)
TAB TESTING, ADJUSTING, BALANCE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
UC UNDER CUT
UTR UP TO ROOF
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
YR YEAR
EQUIP. ABBREVIATIONS
AAHX AIR TO AIR HEAT EXCHANGER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AF AFTER FILTER
AHU AIR-HANDLING UNIT
AS AIR SEPARATOR
B BOILER
BDR BASE BOARD RADIATOR
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BT BLOWOFF TANK
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CFP CHEMICAL FEED PUMP
CH CHILLER
CHP CHILLED WATER PUMP
COMP COMPRESSOR UNIT
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
DXCC DIRECT EXPANSION COOLING COIL
EC EVAPORATIVE COOLER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EH EXHAUST HOOD
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FPTU FAN POWERED TERMINAL UNIT
FTR FIN TUBE RADIATION
H HUMIDIFER
HC HEATING COIL
HD HOOD
HP HEAT PUMP
HPDT HIGH PRESSURE DRIP TRAP
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING)
PANEL
HRW HEAT RECOVERY WHEEL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
ICF IN-LINE CENTRIFUGAL FAN
IU INDUCTION UNIT
LLHX LIQUID TO LIQUID HEAT
EXCHANGER
MAU MAKE-UP AIR UNIT
P PUMP
PF PRE-FILTER
PHC PREHEAT COIL
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RAHX ROTARY AIR HEAT EXCHANGER
RCCH REMOTE CONDENSER
CHILLER
RCU RECIPROCATING CHILLER UNIT
RF RETURN FAN
RHC REHEAT COIL
SAD SOUND ATTENUATING DEVICE
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SSHX STEAM TO STEAM HEAT
EXCHANGER
ST STEAM TRAP
SUH STEAM UNIT HEATER
SWHX STEAM TO WATER HEAT
EXCHANGER
TU TERMINAL UNIT
UC UNIT COOLER
UH UNIT HEATER
VUH VERTICAL UNIT HEATER
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING
UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
M-401 MECHANICAL SCHEDULES AND DETAILS - BUILDINGS 4 + 7
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M-001
AutoCAD SHX Text
MECHANICAL COVER SHEET
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text
UPGRADE FREIGHT ELEVATORS BLDG 4 & 7
AutoCAD SHX Text 504-22-102
AutoCAD SHX Text
RV
AutoCAD SHX Text
JS
AutoCAD SHX Text 04/13/2022
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Dwg. of 03
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text 07/29/2022
AutoCAD SHX Text 4 & 7
AutoCAD SHX Text
MULTIPLE
AutoCAD SHX Text THOMAS E. CREEK, AMARILLO VA HEALTH CARE SYSTEM - AMARILLO TEXAS 6010 W AMARILLO BLVD, AMARILLO, TX 79106
AutoCAD SHX Text
SD
AutoCAD SHX Text R
Veteran Affairs
SHEET NOTES
USE MANUFACTURER'S RECOMMENDED
PIPE SIZING BETWEEN FC AND CU.
CURRENT SELECTION VIA PROVIDED CUT
SHEET 14"Ø
ROUT REFRIGERANT PIPING AND
EQUIPMENT CABLING IN A SAFE MANOR IN
EQUIPMENT AND MECHANICAL ROOMS.
PROPERLY SUPPORT PIPING AND
CABLING AS REQUIRED, COORDINATE ALL
PIPE, WIRE, AND POWER ROUTING WITH
VA COR AND EXISTING CONDITIONS
PRIOR TO INSTALLATION .
KEY NOTES
M-101 SCALE: 1/2" = 1'-0"
BUILDING 4 - UPPER LEVEL / ROOF -
MECHANICAL DEMO PLAN 2
M-101 SCALE: 1/2" = 1'-0"
BUILDING 4 - UPPER LEVEL / ROOF -
MECHANICAL NEW WORK PLAN
M-101 SCALE: 1/2" = 1'-0"
BUILDING 4 - GROUND FLOOR - OVERALL
MECHANICAL NEW WORK FLOOR PLAN 4
M-101
BUILDING 7 - LEVEL B - OVERALL MECHANICAL SCOPE OF WORK
SCALE: 1/2" = 1'-0"
N N
N N
ELEVATOR
EQUIPMENT
X
X
X
X
X X X X X
X
X X X X X
XX X X X X X
(E) FCU
ELEVATOR
EQUIPMENT
FC-1
CU-1
1 2
MECHANICAL
CORRIDOR
ELEVATOR
MACHINE
ELEV 2
CU-2
FC-2
OFFICE
MECHANICAL
B03A
ELEVATOR
OFFICE
15"x14"
15"x15"
14"x10" 20"x16"
S-2 9"x9"
110 CFM
(E) EF-1
110 CFM
AutoCAD SHX Text 4 & 7
AutoCAD SHX Text
AutoCAD SHX Text
MULTIPLE
AutoCAD SHX Text M-101
AutoCAD SHX Text
MECHANICAL FLOOR PLANS - BUILDINGS 4 & 7
AutoCAD SHX Text THOMAS E. CREEK, AMARILLO VA HEALTH CARE SYSTEM - AMARILLO TEXAS 6010 W AMARILLO BLVD, AMARILLO, TX 79106
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text
UPGRADE FREIGHT ELEVATORS, BLDG 4 & 7
AutoCAD SHX Text 504-22-102
AutoCAD SHX Text
RV
AutoCAD SHX Text
JS
AutoCAD SHX Text 04/13/2022
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Dwg. of 03
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
07/29/2022
Veteran Affairs
FAN COIL UNIT - DUCTLESS WALL MOUNT
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL SCHEDULES AND DETAILS BUILDINGS 4 & 7
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text
UPGRADE FREIGHT ELEVATORS, BLDG 4 & 7
AutoCAD SHX Text 504-22-102
AutoCAD SHX Text
RV
AutoCAD SHX Text
JS
AutoCAD SHX Text 04/13/2022
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Dwg. of 03
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text 07/29/2022
AutoCAD SHX Text 4 & 7
AutoCAD SHX Text
MULTIPLE
AutoCAD SHX Text M-401
THOMAS E. CREEK, AMARILLO VA HEALTH CARE SYSTEM - AMARILLO TEXAS 6010 W AMARILLO BLVD, AMARILLO, TX 79106
| Sheets and Views |
| VA Amarillo Elevator-Sheet - M001 - 20220728-Layout1 |
| VA Amarillo Elevator-Sheet - M101 - 20220728-Layout1 |
| VA Amarillo Elevator-Sheet - M401 - 20220728-Layout1 |
File details come from the government source that posted it. Updated .