This is an information requirements document for bidders submitted to the Jordan Basin Improvement District for the 12600 South Mountain View Corridor Sewer Project in Utah. The project involves installation of approximately 2,620 linear feet of 30-inch sanitary sewer pipeline, 10 sanitary sewer manholes, two guided bores (225 feet and 81 feet long) with 42-inch minimum casing crossing under Mountain View Corridor in UDOT right-of-way, landscaping, roadway restoration, and associated work. Bidders must be prequalified for the Multiple Mountain View Corridor Sewer Projects to submit a bid. The document establishes comprehensive bidder qualification and information submission requirements that are mandatory for bid responsiveness.

Bidders are required to provide sworn statements notarized by a public notary confirming the truth and completeness of all submitted information. Required submissions include the bidder's name, address, contact information, Utah contractor license with primary and supplemental classifications, years of experience in similar work, names and titles of owners and managing agents, site inspection documentation, proposed project superintendent and manager with resumes and experience levels, site safety representative information, surety company details for performance and payment bonds, current job listings with completion percentages, subcontractor listings for work exceeding five percent of total bid price, and supplier and manufacturer information for specified items. Contractors or subcontractors performing trenchless construction guided bore work must submit additional qualification and experience information as defined in Specification 31 71 00 Tunnel Excavation and Initial Support. No changes or substitutions to listed subcontractors or suppliers are permitted after bid opening without written owner approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JORDAN BASIN IMPROVEMENT DISTRICT INFORMATION REQUIRED OF BIDDER

12600 S MOUNTAIN VIEW CORRIDOR SEWER PROJECT PAGE 00260-1

SECTION 00260

INFORMATION REQUIRED OF BIDDER

The Bidder shall furnish all of the following information. The Bidder is required to make a sworn statement that the information provided is true and complete in the presence of a notary public, and that notary public must notarize the signature of the Bidder. Failure to comply with these requirements may render the Bid non-responsive and subject to rejection. Attach additional sheets as needed to provide the required information. Award of a contract will be based upon review and evaluation of this information.

1. Bidder’s name and address:

2. Bidder’s Telephone Number:

Bidder’s Fax Number:

Bidder’s Email Address:

3. Bidder’s Contractor License: Primary Classification

Utah License No.

Supplemental Classification, if any:

4. Number of years experience in work of this type:

5. Names and titles of owners, officers, managing members, general partners, joint venturers or other managing agents of Bidder:

Name Title

12600 S MOUNTAIN VIEW CORRIDOR SEWER PROJECT PAGE 00260-2

6. Name of person who inspected site of the work on behalf of Bidder.

Name: Date of Inspection:

Title:

7. Proposed Project superintendent (attach resume):

Name: Years experience:

8. Proposed Project Manager, if other than superintendent (attach resume):

9. Proposed Site safety representative, if other than superintendent (attach resume):

10. Name, address, and telephone number of surety company and agent who will provide the required performance and payment bonds for the contract:

11. List of current jobs:

Owner Telephone No. Contract Amount ($) Type of Job Completion Percentage

12. List of Subcontractors

The Bidder shall list below the name of each Subcontractor who will perform Work on this Project in excess of five percent (5%) of the total Bid Price; a description of the type of Work to be completed by the Subcontractor and the value of the Work as a percentage of the total Bid Price.

After the opening of Bids, no changes or substitutions will be allowed without the written approval of the Owner.

12600 S MOUNTAIN VIEW CORRIDOR SEWER PROJECT PAGE 00260-3

Subcontractor’s Name Type of Work Percent (%) of Total Bid Price

Note: Contractor or Subcontractor performing the trenchless construction guided bore Work under Mountain View Corridor shall submit qualification and experience information included with the Contractor’s Bid as defined in Specification 31 71 00 Tunnel Excavation and Initial Support.

13. List of Suppliers

The Bidder shall list below the name of the manufacturer and the name of the supplier it intends to use, and upon which its Bid was based, for each item listed below. After the opening of Bids, no changes or substitutions will be allowed without the written approval of the Owner.

Item Manufacturer Supplier

STATE OF )

: ss

COUNTY OF )

, being first duly sworn on oath, deposes and says that the foregoing answers to questions, and all statements and information contained herein, are true and complete.

Printed Name

Printed Title

SUBSCRIBED AND SWORN to before me this ____ day of _______________, 20___.

Notary Public Residing at:

My Commission Expires:

File details come from the government source that posted it. Updated .