5-2026-03-03 Hillcrest PV ARRAY.pdf

PDF 26 MB Posted

Attached to
RFP27-001 PV Array at Hillcrest Elementary
Solicitation number
RFP27-001
Issued by
Utah

About this file

These are construction documents for a photovoltaic (PV) array installation project at Hillcrest Elementary School for the Ogden School District in Ogden, Utah. The project involves the design and installation of a comprehensive rooftop PV system with an approximate 260 kilowatt-peak (kWp) installed DC power capacity, configured at a 10-degree angle to achieve a maximum AC power output of 240 kilowatts. The system must demonstrate a minimum annual energy production capability of 405 megawatt-hours (MWh) with an annual degradation rate not exceeding 1 percent. The scope includes solar modules, inverters, self-ballasted racking systems, power optimizers, conduits, conductors, terminations, and related electrical infrastructure. Two 120-kilowatt inverters will be installed in second-floor mechanical rooms (2320 and 2420). The project site is located at 1121 Vitt Drive, Ogden, Utah 84404. Construction documents are dated March 3, 2026, with revisions through April 24, 2026.

The contractor bears full responsibility for system design, procurement, installation, and commissioning to achieve the specified energy production requirements. All costs for a fully operational system, including engineering design stamped by a licensed Utah electrical engineer and structural certification by a licensed Utah structural engineer, must be included in the bid. The contractor must obtain Rocky Mountain Power (RMP) approval through Net Metering Level 2 application and coordinate all interconnection requirements. The system must comply with National Electrical Code 2020, International Building Code 2021, and include rapid shutdown requirements per NEC 690.12. Additionally, the contractor must provide a seamless owner portal and centralized monitoring system enabling remote access to PV production data through computers, smartphones, and building management systems, along with seven consecutive days of comprehensive performance testing and successful power delivery within 30 days of system completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SALT LAKE CITY - HQ

524 SOUTH 600 EAST

SALT LAKE CITY, UT

801.575.8800

VCBO.COM

ST. GEORGE

20 N. MAIN ST. #103

ST. GEORGE, UT

435.522.7070

OSD HILLCREST ELEMENTARY PV SYSTEM

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

1121 VITT DRIVE, OGDEN, UT 84404

OGDEN SCHOOL DISTRICT

CONSTRUCTION DOCUMENTS

MARCH 03, 2026

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

4/23/2026 6:10:09 PM

G001

GENERAL INFORMATION +

INDEX

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

SY

ST

EM

C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

V

IT

T D

R

IV

E , O

G D

E N

, U T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

ABBREVIATIONS NOT ALL ABBREVIATIONS MAY BE USED

& AND

@ AT

ACT ACOUSTICAL CEILING TILE

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

ALT ALTERNATE

AL / ALUM ALUMINUM

APPROX APPROXIMATE

ARCH ARCHITECTURAL

BD BOARD

BLDG BUILDING

BLK BLOCK(ING)

BO BOTTOM OF

BRG BEARING

BSMT BASEMENT

BS BOTH SIDES

BW BOTH WAYS

CAB CABINET

CB CATCH BASIN

CCSA CUSTOM COLOR SELECTED BY

ARCHITECT

CG CORNER GUARD

CHAM CHAMFER

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLR CLEAR

CM CONSTRUCTION MANAGER

COL COLUMN

COMP COMPUTER

CONC CONCRETE

CONT CONTINUOUS

CMU CONCRETE MASONRY UNIT

CSBA COLOR SELECTED BY ARCHITECT

CT CERAMIC TILE

D DEPTH

DB DECK BEARING

DBL DOUBLE

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DN DOWN

DRN DRAIN

DTL/DET DETAIL

DW DISHWASHER

DWG DRAWING

E EAST

(E) EXISTING

EA EACH

EIFS EXTERIOR INSULATION SYSTEM

EJ EXPANSION JOINT

ELEC ELECTRICAL

ELEV ELEVATION

EQ EQUAL

EQUIP EQUIPMENT

EVAP EVAPORATIVE

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FA FIRE ALARM

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FG FINISH GRADE

FH FIRE HYDRANT

FIN FINISHED

FLR FLOOR

F.O. FACE OF

FT FOOT, FEET

FRP FIBER REINFORCED PANEL

FRT FIRE RETARDANT TREATED WOOD

FTG FOOTING

FV FIELD VERIFY

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GFRC GLASSFIBER REINFORCED PANEL

GYP GYPSUM

GWB GYPSUM WALLBOARD

HB HOSE BIB

HC HANDICAP ACCESSIBLE

HDW HARDWARE

HDF HIGH DENSITY FIBERBOARD

HM HOLLOW METAL

H HEIGHT

HOR HORIZONTAL

ID INSIDE DIAMETER

ICF INSULATED CONCRETE FORM

IN INCH

INCL INCLUDE

INFO INFORMATION

INT INTERIOR

INSUL INSULATE, (D), (ION)

INV INVERT

JST JOIST

JT JOINT

LAV LAVATORY

LB / LBS POUND (S)

MAT MATERIAL (S)

MAX MAXIMUM

MDF MEDIUM DENSITY

MECH MECHANICAL

MEMB MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURER

MGR MANAGER

MIN MINIMUM

MIR MIRROR

MISC MISCELANEOUS

MO MASONRY OPENING

MTD MOUNT (ED)

MTL METAL

MW MICROWAVE

N NORTH

NIC NOT IN CONTRACT

NO. NUMBER

NOM NOMINAL

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED/ CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OH OVERHEAD

OPG OPENING

OPP OPPOSITE

OSB ORIENTED STRAND BOARD

OZ OUNCE

PERI PERIMETER

PERM PERMANENT

PL PLATE

PLAM PLASTIC LAMINATE

PNL PANEL

PNT PAINT (ED)

P.O. POINT OF

PR PAIR

PT POST TENSIONED

PART PARTITION

PLY PLYWOOD

QT QUARRY TILE

R / RAD RADIUS

RCP REFLECTED CEILING PLAN

REC RECESSED

REF REFERENCE

REFG REFRIGERATOR

REINF REINFORCE (ED)

REM REMOVE (ED)

REPL REPLACE

REQD REQUIRED

REV REVISION (S)

RM ROOM

RO ROUGH OPENING

S SOUTH

SALV SALVAGE (ED)

SECT SECTION

SF SQUARE FOOT

SIM SIMILAR

SLNT SEALANT

SPEC SPECIFICATION (S)

SQ SQUARE

SS STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURE (AL)

SUSP SUSPENDED

SYM SYMMETRY (ICAL)

T THICKNESS

T & B TOP AND BOTTOM

T & G TONGUE AND GROOVE

TBD TO BE DETERMINED

TEMP TEMPORARY

THRU THROUGH

T.O. TOP OF

TRANS TRANSFORMER

TS TUBE STEEL

TYP TYPICAL

UNF UNFINISHED

UNO UNLESS OTHERWISE NOTED

VAR VARIES

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VWC VINYL WALL COVERING

W WEST

W WIDTH

W/ WITH

WC WATER CLOSET

WD WOOD

W/O WITHOUT

WSCT WAINSCOT

WWF WELDED WIRE FABRIC

PROJECT TEAM

owner

KEN CRAWFORD

OGDEN SCHOOL DISTRICT

1950 MONROE BOULEVARD

OGDEN, UT 84401

crawfordk@ogdensd.org

801.430.5054

UTILITY CONTACTS

power

ROCKY MOUNTAIN POWER

1407 W. NORTH TEMPLE

SALT LAKE CITY, UT 84116

503.813.5122 natural gas

DOMINION ENERGY

dominionenergy.com 801.324.5111 water/storm drain

OGDEN CITY

133 WEST 29TH STREET

OGDEN, UTAH 84401

801.629.8271 sewer telephone

TERESA HINTON

LUMEN

teresa.hinton@lumen.com 801.661.7041

OGDEN CITY

133 WEST 29TH STREET

OGDEN, UTAH 84401

801.629.8271

SHEET NUMBERING + NAMING

THIS IS A QUICK REFERENCE GUIDE TO THE

SHEET NUMBERING AND NAMING SYSTEM USED

IN VCBO CONSTRUCTION DOCUMENTS.

X X 0 0 0 . 0

D

IS

C

IP

LI

N

E D

E S

IG

N

A T

O R

S H

E E

T T

Y P

E

LE

V

E L

S E

Q U

E N

C E

P

LA

N T

Y P

E

PLAN TYPE

.0 SLAB PLAN

.1 ANNOTATED PLAN

.2 DIMENSION + WALL TYPE PLAN

.3 FINISH PLAN

.4 REFLECTED CEILING PLAN

SEQUENCE

DENOTES AREA SEQUENCE IN PLAN, AND NUMERIC

SEQUENCE IN NON-PLAN SHEETS

LEVEL

DENOTES LEVEL IN A MULTI-STORY BUILDING. ALSO

BECOMES A SEQUENCE NUMBER DENOTING

DIVISIONS IN NON-PLAN SHEETS

SHEET TYPE SEQUENCE

0 GENERAL NOTES + LEGENDS

1 FLOOR PLANS

2 ELEVATIONS

3 SECTIONS

4 ENLARGED PLANS, ELEVATIONS, SECTIONS

5 DETAILS

6 DOOR, WINDOW, OTHER SCHEDULES

7 SIGNAGE

8 USER DEFINED

9 3D DRAWINGS + PERSPECTIVESVICINITY MAP

ADDRESS:

OGDEN SCHOOL DISTRICT

OGDEN, UT 84404

SCALE:SCALE:

T: W?

R: W?

B: W?

L: W?

B? :B F? :F

NAME

REFERENCE SYMBOL LEGEND

INTERIOR ELEVATION LEVEL LINE

AX.X

DETAIL REFERENCE

ROOM NAME AND NUMBER

SECOND LEVEL

116' - 0"

A101

WALL TYPE MARK

DRAWING TAGS

5A6 - 1

REVISIONS TAG

FLOOR TRANSITIONS MARKER

CEILING TAG

ELEVATION MARKER

X X' - X"

WINDOW TAG

FINISH TAG

SHEET SYMBOLS

A

BASIC DRAWING TITLE

MATCH LINEPROJECT

NORTH

XXXX

ELEVATION

NUMBER AND

DIRECTION

SHEET WHERE

DRAWN

DETAIL NUMBER

SHEET WHEN

DRAWN, HYPEN

INDICATES DETAIL

ON SAME SHEET

REVISION NUMBER

CEILING TYPE

CEILING HEIGHT

WINDOW MARKER

SEE WALL TYPE SHEET FOR ADDITIONAL

INFORMATION

TRANSITION

SYMBOL

ROOM NAME

CONSTRUCTION TYPE - BY

CSI DIVISION

WALL TYPE

FIRE RATING

NOMINAL SIZE

# DRAWING TITLE

BUILDING SECTION

DETAIL SECTIONWALL SECTION

LAYOUT GRID LINES

SIM

A101

SIM

A101

SIM

A101

A

WALL SECTION NUMBER

DIRECTION OF VIEW

SHEET WHERE DRAWN

ELEVATION NUMBER

AND DIRECTION

SHEET WHERE

DRAWN

WALL SECTION

NUMBER

SHEET WHERE

DRAWN

DIRECTION OF

VIEW

GRID IDENTIFICATION

A101

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF

ALL SUB-CONTRACTORS, TRADES AND SUPPLIERS WITH THE REQUIREMENTS OF THE

CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE

THAT ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE

REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE

WORK OF THAT PARTY.

2. AS PART OF THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE WORK OF ALL

SUB-CONTRACTORS, TRADES AND SUPPLIERS, THE CONTRACTOR SHALL ENDEAVOR

TO IDENTIFY AND NOTIFY THE ARCHITECT OF ANY CONFLICTS BETWEEN THE WORK OF

DIFFERENT PARTIES AT THE EARLIEST POSSIBLE DATE SO AS TO ALLOW REASONABLE

AND ADEQUATE TIME FOR THE CONFLICT TO BE RESOLVED WITHOUT DELAYING THE

WORK. ALL DEVIATIONS FROM THAT WHICH IS REQUIRED BY THE CONTRACT

DOCUMENTS MUST BE APPROVED IN ADVANCE BY THE ARCHITECT.

3. THE ARCHITECTURAL DRAWINGS ESTABLISH AND COORDINATE THE FINISHED

APPEARANCE AND EXACT LOCATION OF ALL EXPOSED ELEMENTS OF THE WORK OF

ALL THE TRADES, INCLUDING THAT WORK WHICH IS ILLUSTRATED PRIMARILY ON

DRAWINGS OF OTHER DISCIPLINES. QUANTITIES ARE TO BE PROVIDED AS SHOWN ON

DRAWINGS OF OTHER DISCIPLINES BUT LOCATIONS SHOWN ON OTHER DRAWINGS

ARE SCHEMATIC, UNLESS OTHERWISE NOTED ON THE ARCHITECTURAL DRAWINGS.

THE ARCHITECTURAL DRAWINGS TAKE PRECEDENCE FOR THE FINISHED APPEARANCE

AND EXACT LOCATION OF ALL PARTS OF THE WORK.

4. EXCEPT WHERE DIRECTED TO PLACE ITEMS OF WORK AT THE APPROXIMATE

LOCATION SHOWN; DO NOT SCALE DRAWINGS FOR DIMENSIONAL INFORMATION. ALL

ELEMENTS OF THE DRAWINGS MAY NOT BE DRAWN TO EXACT SCALE. ALL DIMENSIONS

REQUIRED ARE SHOWN OR MAY BE DERIVED FROM THOSE SHOWN ON THE FLOOR

PLANS, DETAIL PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND

SPECIFICATIONS. IF DIMENSIONS ARE NOT PRESENT, THE ARCHITECT IS TO BE

NOTIFIED SO THAT A CLARIFICATION CAN BE ISSUED.

5. CONTRACTOR TO FOLLOW CURRENT ANSI 117-1 STANDARDS AS REPRESENTED ON

SHEET G301, GENERAL ACCESSIBILITY GUIDELINES. NOTIFY ARCHITECT IF THE

DESIGN DRAWINGS CONFLICT WITH THIS SHEET.

DESIGN DATA

GOVERNING BUILDING CODES:

IBC 2021, to include Appendix J; ANSI 117.1 2017; IFC 2021w/ UTAH AMENDMENTS;

IMC 2021; IPC 2021; IECC 2021; IFGC 2021; NEC 2020

OCCUPANCY TYPE - CH.3

• E - EDUCATION (305)

CONSTRUCTION TYPE - CH.6

• TYPE II-B (TABLE 601)

NOTES TO BIDDERS

1. THIS SHEET CONTAINS A LIST OF DRAWINGS WHICH COMPRISE A FULL SET OF DRAWINGS

FOR THIS PROJECT. ANY CONTRACTOR, SUBCONTRACTOR, VENDOR OR ANY OTHER

PERSON PARTICIPATING IN OR BIDDING ON THIS PROJECT SHALL BE RESPONSIBLE FOR

THE INFORMATION CONTAINED IN ANY AND ALL SHEETS OF DRAWINGS AND

SPECIFICATIONS. IF ANY PERSON, PARTY OR ENTITY ELECTS TO SUBMIT BIDS FOR ANY

PORTION, OR ALL, OF THIS PROJECT, THAT PERSON, PARTY OR ENTITY SHALL BE

RESPONSIBLE FOR ANY AND ALL INFORMATION CONTAINED IN THESE DRAWINGS AND

SPECIFICATIONS, INCLUDING, BUT NOT LIMITED TO, ANY SUBSEQUENT ADDENDUMS OR

CLARIFICATIONS THAT MAY BE ISSUED.

2. THESE DOCUMENTS SHOW THE DESIGN INTENT. IT IS THE CONTRACTORS

RESPONSIBILITY TO PROVIDE EVERYTHING SHOWN ON THE DRAWINGS OR SPECIFIED

REGARDLESS OF WHERE IT IS SHOWN ON THE DRAWINGS OR IN THE SPECIFICATIONS.

FOR EXAMPLE; SOME MILLWORK DETAILS HAVE STEEL FRAMES WHICH MAY BE PROVIDED

BY DIVISION 05 OR WITH THE MILLWORK AT THE CONTRACTOR'S DISCRETION, BUT IT

SHALL BE PROVIDED AS PART OF THE CONTRACT.

3. EVERYTHING CALLED FOR IN THESE DOCUMENTS SHALL BE "NEW" AND PROVIDED BY THE

CONTRACTOR, SUBCONTRACTOR, VENDOR OR ANY OTHER PERSON PARTICIPATING IN

OR BIDDING ON THIS PROJECT UNLESS NOTED OTHERWISE AS EXISTING (EXIST), NOT IN

CONTRACT (NIC) OR FOR REFERENCE ONLY. FURNISHINGS SHOWN DASHED SHALL BE

FOR REFERENCE ONLY.

SHEET INDEX

NOTE: SHEET INDEX REFLECTS ALL SHEETS ISSUED IN THIS AND PREVIOUS BID PACKAGES, FOR REFERENCE

5 11/16/2023 BP5-ADDENDUM 01

24 2024-08-10 FLS Review

DEFERRED SUBMITTALS

CONTRACTOR IS RESPONSIBLE TO SUBMIT DEFERRED SUBMITTALS IN ACCORDANCE WITH

IBC 107.3.4.2. AS PART OF THE SUBMITTAL PROCESS, THE CONTRACTOR IS TO SUBMIT ALL

ICC ERS REPORTS FOR ITEMS NOTED.

• ELECTRICAL SEISMIC RESTRAINTS

Sheet Number Sheet Name

GENERAL

CV COVER

G001 GENERAL INFORMATION + INDEX

ARCHITECTURAL SITE

AS101 OVERALL SITE PLAN

ARCHITECTURAL

A010 OVERALL MAIN LEVEL FLOOR PLAN

A020 OVERALL UPPER LEVEL FLOOR PLAN

A031 OVERALL ROOF PLAN PV ARRAY

ELECTRICAL

E001 ELECTRICAL SYMBOLS AND NOTES

E101. LEVEL 01 ELECTRICAL DISTRIBUTION PLAN

E102. LEVEL 02 ELECTRICAL DISTRIBUTION PLAN

E201. MAIN LEVEL ENLARGED MECH. PLAN

E202. ROOF PV SYSTEM ELECTRICAL PLAN

E203. ROOF PV STRING REPORT

E204. ROOF PV SYSTEM DIAGRAMS

E301. PV ONE-LINE DIAGRAM

E401. ELECTRICAL DIAGRAMS

Grand total: 15 construction manager

CHRIS KARTCHNER

BDK - BIG-D | KITCHELL A JOINT VENTURE

ckartchner@bdkjv.com 602.432.2535 electrical engineer architect

DAVID COX, AIA / BREANNA BONSAVAGE, AIA

VCBO ARCHITECTURE

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

dcox@vcbo.com, bbonsavage@vcbo.com 801.575.8800

ERIC SKINKIS

BNA CONSULTING

635 SOUTH STATE STREET

SALT LAKE CITY, UT 84111

eskinkis@resolutgroup.com 801.532.2196

E

C

LE

S A

V E

ELECTRICAL YARD

VITT DR

HILLCREST

ELEMENTARY

SCHOOL

A031

D4

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

4/24/2026 11:02:33 AM

AS101

OVERALL SITE PLAN

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

SY

N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

V

IT

T D

R

IV

E , O

G D

E N

, U T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SCALE: 1" = 40'-0"

A3 PLAN - SITE - OVERALL

NORTH

SITE PLAN LEGEND

AREA TO BE UNDISTURBED DURING CONSTRUCTION

EXISTING BUILDING, PROTECT AS NECESSARY, REPAIR AS REQUIRED

DN

WR T

X

V

KINDERGARTEN

CLASSROOM

1206A

YARD

MECHANICAL

KINDERGARTEN

CLASSROOM

TEACHER

COLLABORATION

FUNCTIONAL

SKILLS

TOILET

PRE-SCHOOL

CLASSROOM

VESTIBULE

STORAGE

TOILET

1300A

STUDENT

COLLABORATION

KINDERGARTEN

CLASSROOM

TOILET

STORAGE

TOILET

KINDERGARTEN

CLASSROOM

THINK

TANK

RESOURCE

CLASSROOM

STORAGE

SENSORY

ROOM

FUNCTIONAL

SKILLS

STORAGE

TOILET

THINK

TANK

VESTIBULE

CORRIDOR

MAIN

CORRIDOR

VESTIBULE

STEAM

LAB

MULTI-PURPOSE

MUSIC

ROOM

PE

STORAGE

MDF

KITCHEN

- FRONT

SERVING

COOLER

VESTIBULE

CLASSROOM

STORAGE

CLASSROOM

TEACHER

COLLABORATION

CLASSROOM

STORAGE

CLASSROOM

STAIRS

THINK

TANK

CLASSROOM

STORAGE

CLASSROOM

STORAGE

CLASSROOM

ELEC

TELECOM

THINK

TANK

STORAGE

STEAM

LAB

OUTDOOR

STORAGE

U.1NGFCB QN.1

L S.1K P

TOILET

STORAGE

TOILET

TOILET

FAMILY

TOILET

ELEC

STEAM

STORAGE

SITE

TECH

OFFICE

MD E H JA

J.2 K.1

11.1

Q.1 S

8.1

7.1

14.1

12.1

H.1

TOILET

GIRLS

RR

BOYS

RR

DISH

WASHING

CHAIR/TABLE

STORAGE

FREEZER

DRY

STORAGE

KITCHEN

- BACK

RAMP

AFTER

SCHOOL

PROGRAM

STORAGE

MUSIC

STORAGE

RECEPTION

PRINCIPAL

CONFERENCE

ASSIST.

PRINCIPAL

RECORDS

FACULTY

LOUNGE

WORK

ROOM

QUIET

TOILET

WELLNESS

ROOM

TOILET

TOILET

BOYS

RR

GIRLS

RR

COMMUNITY

ROOM 1

COMMUNITY

ROOM 2

CORR.

NURSE

STAIRS

TELECOM

CORRIDOR1400A

STUDENT

COLLABORATION

CLASSROOM

STOR.

STOR.

LEVEL 01 F.F. = 100' - 0"

DATUM ELEVATION = 4476' - 0"

RECEIVING

CUSTODIAL

OFFICE

STORAGE

ELEC

LOCKER

ROOM

KITCHEN

OFFICE 1220

TOILET

JAN

J.1 S.2

6.1

U

JANITOR

JANITOR

GIRLS

RR

BOYS

RR

A031

D4

MIR.

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

4/24/2026 11:40:42 AM

A010

OVERALL MAIN LEVEL

FLOOR PLAN

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

SY

N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

V

IT

T

D R

IV

E

O

G D

E N

U

T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SCALE: 1/16" = 1'-0"

A1 OVERALL MAIN LEVEL FLOOR PLAN

NORTH

NORTH

KEY PLAN - MAIN LEVEL

OVERAL FLOOR PLAN LEGEND

AREA TO BE UNDISTURBED DURING CONSTRUCTION

LINE INDICATES EXISTING BUILDING TO BE PROTECTED IN PLACE, REPAIR

AS REQUIRED

WR T

X

V

CLASSROOM

CLASSROOM

TEACHER

COLLABORATION

CLASSROOM

CLASSROOM

STORAGE

STORAGE

CONFERENCE

CLASSROOM

CORRIDOR

STORAGE

INSTRUCTIONAL

COACH

INSTRUCTIONAL

COACH

COUNSELOR

SLP/SLT

GROUP

ROOM

MULTI-PURPOSE

MUSIC

ROOM

THINK

TANK

CLASSROOM

STORAGE

CLASSROOM

CLASSROOM

STORAGE

CLASSROOM

MECHANICAL

THINK

TANK

CORRIDOR

2300A

STUDENT

COLLABORATION

CORRIDOR

CORRIDOR

MECHANICAL

CLASSROOM

STORAGE

CLASSROOM

TEACHER

COLLABORATION2412

CLASSROOM

STORAGE

CLASSROOM

THINK

TANK

CLASSROOM

STORAGE

CLASSROOM 2409

BOYS

RR

GIRLS

RR

CLASSROOM

STORAGE

CLASSROOM

WORK

ROOM

MEDIA

CENTER

STACKS

MECHANICAL

THINK

TANK

2400A

STUDENT

COLLABORATION

CORRIDOR

U.1NGFCB QN.1

L S.1K PMD E H JA

J.2 K.1

11.1

Q.1 S

8.1

7.1

14.1

12.1

H.1

GIRLS

RR

BOYS

RR

TOILET

TOILET

STORAGE

COUNSELOR

COUNSELING

GROUP

BEHAVIORAL

SPECIALIST

MECHANICAL

J.1 S.2

6.1

U

STAIRS

STAIRS

ELEVATOR

FAMILY

TOILET

QUIET

A031

D1

A031

D1

MIR.

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

4/24/2026 11:17:08 AM

A020

OVERALL UPPER LEVEL

FLOOR PLAN

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

SY

N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

V

IT

T

D R

IV

E

O

G D

E N

U

T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SCALE: 1/16" = 1'-0"

A1 OVERALL UPPER LEVEL FLOOR PLAN

NORTH

KEY PLAN - UPPER LEVEL

1 08/28/2023 BP2 - ADDENDUM 01

OVERAL UPPER LEVEL FLOOR PLAN LEGEND

AREA TO BE UNDISTURBED DURING CONSTRUCTION

LINE INDICATES EXISTING BUILDING TO BE PROTECTED IN PLACE, REPAIR

AS REQUIRED

J

F

V F

D

C A

L

J

V F

D

T

V F

D

T

WR T

X

VU.1NGFCB QN.1

L S.1K PMD E H JA

J.2 K.1

11.1

Q.1 S

8.1

7.1

14.1

12.1

H.1

J.1 S.2

6.1

U

342' - 6 1/2"

9'

/4

8'

4'

1/ 2"

9'

/4

1'

/4

/4

7'

3/ 4"

/4

1/

4"

/2

5'

1/ 2"

/4

/4

9'

/4

1'

/2

9'

/4

4'

/2

4'

8' - 8" 12' - 8" 12' - 8 1/2" 10' - 4" 11' - 0" 10' - 4" 12' - 4" 9' - 6 3/4" 12' - 4" 12' - 1 1/2" 2' - 0"

5' - 9 1/2" 8' - 6 3/4"

4' - 4" 10' - 4" 11' - 0" 4' - 6" 5' - 10" 12' - 4" 10' - 3 1/2" 11' - 0 1/2" 28' - 2" 25' - 7" 12' - 1" 3' - 10 1/2"

8' - 7 1/2"

20' - 2 1/4" 20' - 6 1/2" 25' - 5 3/4"

TYP.

T Y

P

3'

T Y

P

3'

TYP.

226.1

TYP.

223.0

TYP.

224.1

TYP.

225.1

TYP.

225.1

TYP.

225.1

TYP.

225.1

TYP.

225.1

TYP

3' - 0"

TYP.

223.0

TYP.

227.0

TYP.

209.0

TYP.

209.1

TYP.

224.1

TYP.

224.0

TYP.

222.1

TYP.

226.1

TYP.

223.0

TYP.

224.1

TYP.

222.1

TYP.

223.0

TYP.

223.0

TYP.

209.0

TYP.

223.0

TYP.

222.1

TYP.

209.0

TYP.

226.1

TYP.

227.0

TYP.

223.0

TYP.

227.0

TYP.

227.0

TYP.

TYP.

TYP.

TYP.

213.0

TYP.

209.0

TYP

3' - 0"

T Y

P

3'

TYP

3' - 0"

T Y

P

3'

ROOF LEGEND

PVC MEMBRANE PROTECTION SHEET

EXG TAPERED INSULATION CRICKET - PROTECT IN PLACE, REPAIR AS

REQUIRED

EXG PROTECTIVE WALKABLE SURFACE - PROTECT IN PLACE, REPAIR

AS REQUIRED

EXG DECK RIDGE OR VALLEY

EXG IMAGINARY VALLEY WITH WARPED DECKING

EXG SINGLE PLY ROOF MEMBRANE - PROTECT IN PLACE, REPAIR AS

REQUIRED

EXG PRIMARY AND SECONDARY ROOF DRAINS

EXG SKYLIGHT - PROTECT IN PLACE, REPAIR AS REQUIRED

AREA TO REMAIN UNDISTURBED DURING CONSTRUCTION

RQ

Q.1

7.1

TYP.

211.0

TYP.

207.0

TYP.

202.0

TYP.

213.0

MECHANICAL

WV

11.1

12.1

TYP.

207.0

TYP.

202.0

TYP.

211.0

ELEC

1206A

YARD

TYP.

207.0

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

4/24/2026 11:49:26 AM

A031

OVERALL ROOF PLAN PV

ARRAY

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

SY

N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

V

IT

T D

R

IV

E , O

G D

E N

, U T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SCALE: 1/16" = 1'-0"

A1 PLAN - ROOF - OVERALL PV ARRAY

KEYED NOTES

202.0 EXISTING CONCRETE SLAB, PROTECT AS NECESSARY, REPAIR AS REQUIRED

207.0 EXISTING MASONRY WALL, PROTECT AS NECESSARY, REPAIR AS REQUIRED. REPAINT TO

MATCH EXISTING FINISH WHERE OCCURS.

209.0 EXISTING ROOF LADDER, PROTECT IN PLACE, REPAIR AS REQUIRED

209.1 EXISTING RETRACTABLE STAIR, PROTECT IN PLACE, REPAIR AS REQUIRED

211.0 EXISTING ELECTRICAL, PROTECT AS NECESSARY, REPAIR AS REQUIRED

213.0 EXISTING MECHANICAL, PROTECT AS NECESSARY, REPAIR AS REQUIRED

222.1 EXISTING SKYLIGHT, PROTECT IN PLACE, REPAIR AS REQUIRED

223.0 EXISTING PRIMARY AND SECONDARY ROOF DRAINS AND DOMES TO REMAIN.

224.0 EXISTING PRE-FINISHED METAL CAP AND CLEAT, PROTECT IN PLACE, REPAIR AS REQUIRED

224.1 EXISTING PRECAST CONCRETE PARAPET CAP, PROTECT IN PLACE, REPAIR AS REQUIRED

225.1 EXISTING ROOF SYSTEM, PROTECT IN PLACE, REPAIR AS REQUIRED

226.1 EXISTING CRICKET, PROTECT IN PLACE, REPAIR AS REQUIRED

227.0 EXISTING MECHANICAL EQUIPMENT, PROTECT IN PLACE, REPAIR AS REQUIRED

723 PVC MEMBRANE PROTECTION SHEET, THICKNESS PER ROOFING MFR - 60 MIL MINIMUM,

INSTALLED UNDER THE SOLAR RACKING / MOUNTING SYSTEMS, EACH BALLAST PAN, RAIL

OR OTHER COMPONENT IN CONTACT WITH THE ROOFING MEMBRANE

2607 PV ARRAY INVERTER

2611 PV ARRAY, REFER TO ELECTRICAL DRAWINGS

2612 NEW ELECTRICAL EQUIPMENT

NORTH

GENERAL DEMOLITION NOTES

1. FIELD VERIFY DIMENSIONS AND CONDITIONS INCLUDING EXISTING UTILITIES PRIOR TO

BIDDING. BRING DIFFERING DIMENSIONS AND CONDITIONS TO ARCHITECT'S ATTENTION

PRIOR TO BIDDING.

2. PROVIDE DUSTPROOF ENCLOSURES AT PERIMETER OF CONSTRUCTION & DEMOLITION

FOR PROTECTION OF ADJACENT SPACES.

3. COORDINATE MAINTENANCE OF FIRE EGRESS FOR OCCUPANTS IN EXISTING BUILDING

WITH THE OWNER AND FIRE MARSHAL. PROVIDE NECESSARY TEMPORARY WALLS OR

ENCLOSURES, EMERGENCY LIGHTS, ETC., FOR THE DURATION OF CONSTRUCTION.

4. BRING TO ARCHITECT'S ATTENTION EXISTING CONDITIONS THAT PRESENT ANY CODE

VIOLATIONS, INCORRECT CONSTRUCTION OR SAFETY PROBLEMS.

5. MAINTAIN EXISTING FIRE RATINGS, AND ASSOCIATED FIRE PROTECTION SYSTEMS (I.E.

FIRE SPRINKLERS AND FIRE ALARM SYSTEMS) THROUGHOUT CONSTRUCTION.

COORDINATE ANY INTERRUPTION TO THESE SYSTEMS WITH THE OWNER AND FIRE

MARSHAL. PROVIDE FIRE WATCH REQUIREMENTS ASSOCIATED WITH INTERRUPTIONS TO

THESE SYSTEMS.

6. MAINTAIN EXISTING UTILITY SERVICES FOR EXISTING FACILITIES. COORDINATE

REQUIRED DISRUPTION OF THESE SERVICES WITH OWNER PRIOR TO DISCONNECTING.

PROVIDE TEMPORARY UTILITY SERVICES TO KEEP FACILITIES IN OPERATION DURING

UTILITY RELOCATION INCLUDING BUT NOT LIMITED TO FIRE WATCHES, ELECTRICAL

GENERATORS, ETC.

7. PROTECT EXISTING STRUCTURE, FINISHES, AND SITE ELEMENTS NOT SCHEDULED FOR

DEMOLITION. RESTORE DAMAGED ITEMS TO THEIR ORIGINAL CONDITION OR REPLACE AT

CONTRACTOR'S EXPENSE.

8. REMOVE AND DISPOSE SELECTIVE DEMOLITION MATERIAL PER CITY REQUIREMENTS.

9. EXISTING ROOF PENETRATIONS & EQUIPMENT ARE SHOWN FOR REFERENCE AND MAY

NOT INCLUDE ALL ROOF PENETRATIONS & EQUIPMENT THAT OCCUR, CONTRACTOR TO

VERIFY PRIOR TO CONSTRUCTION.

10. DO NOT DISTURB EXISTING FIRE RATED ELEMENTS INCLUDING FIREPROOFING.

PATCH/REPAIR DAMAGED OR DISTURBED ITEMS.

11. PATCH, REPAIR & REFINISH TO MATCH EXISTING, WHERE ANY EXISTING FINISHES ARE

DAMAGED DURING CONSTRUCTION.

SCALE: 1/8" = 1'-0"

D1 MECHANICAL ROOM 2320 & 2420 (MIR)

SCALE: 1/8" = 1'-0"

D4 ELECTRICAL ROOM 1207 & YARD

HICKS

BRIAN

No. 7709037-2202

G

IN

E E R

ONA

O F

E

SS

I

R

UT

AH

TE OF

S T A

P

L EN

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

02/24/2026

5/4/2026 2:00:40 PM

E001

ELECTRICAL SYMBOLS AND

NOTES

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

S Y

S T

E M

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

V

IT

T D

R

IV

E , O

G D

E N

, U T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SHEET INDEX

E001 ELECTRICAL SYMBOLS AND NOTES

E101 LEVEL 01 ELECTRICAL DISTRIBUTION PLAN

E102 LEVEL 02 ELECTRICAL DISTRIBUTION PLAN

E201 MAIN LEVEL ENLARGED MECH. PLAN

E202 ROOF PV SYSTEM ELECTRICAL PLAN

E203 ROOF PV STRING REPORT

E204 ROOF PV SYSTEM DIAGRAMS

E301 PV ONE-LINE DIAGRAM

E401 ELECTRICAL DIAGRAMS

X

X X

X

ARCHITECTURAL ROOM NUMBER

EQUIPMENT NUMBER

LIGHT FIXTURE (LETTER DESIGNATES TYPE)

DEVICE / EQUIPMENT (TEXT DESIGNATES TYPE) SEE

SCHEDULE

SYMBOL SCHEDULE

STANDARD MOUNTING HEIGHT UNLESS OTHERWISE NOTED ON PLANS

NOTES:

1. SEE FIXTURE SCHEDULE FOR TYPE, MOUNTING AND WATTAGE.

2. HEIGHT MEASURED TO CENTER LINE OF THE BOX FROM THE FINISHED FLOOR.

3. REFER TO DRAWINGS FOR DIRECTIONAL ARROWS.

4. SUBSCRIPT INDICATES FIXTURES TO BE CONTROLLED.

5. NEMA TYPE 'ND' NON-FUSED UNLESS NOTED 'F' (FUSED). USE 'HD' 480 V.

6. HEIGHT MEASURED TO TOP OF THE BOX FROM FINISHED FLOOR.

7. PROVIDE H.O.A. AND S.S. PUSHBUTTONS AS REQUIRED.

8. DOUBLE ARROWS INDICATES A DOUBLE FACE UNIT.

9. DEVICES NOTED WITH AN 'A' INDICATE TO COORDINATE WITH MILLWORK SHOP

DRAWINGS AND ELEVATIONS FOR HEIGHT.

10. SUBSCRIPT INDICATES NEMA CONFIGURATION.

11. SOLID BOX AROUND DEVICE INDICATES INSTALLED IN FLOOR. DASHED BOX AROUND

DEVICE INDICATES INSTALLED IN CEILING.

12. COORDINATE WITH DOOR HARDWARE SUPPLIER.

13. FOR WATER COOLER LOCATION, SEE DIAGRAM R002. FOR ALL OTHER LOCATIONS,

MOUNT AT +16" TO BOTTOM OF BOX FROM FINISHED FLOOR, OR AS NOTED.

14. ARROWS SHOWN ON DEVICE INDICATE SENSOR AIMING DIRECTION.

15. CAMERA NUMBERS ARE SHOWN INSIDE THE CAMERA SYMBOL. CAMERA TYPES ARE

INDICATED IN TAG.

16. MOUNT ON TRACK OF OVERHEAD DOOR, 6" FROM TOP OF DOOR, UNLESS OVERHEAD DOOR

IS A ROLL UP DOOR, THEN MOUNT PER MANUFACTURER'S INSTRUCTIONS.

17. INSTALL DEVICES PER MANUFACTUER'S INSTALLATION INSTRUCTIONS.

18. DASHED LINE INDICATES EQUIPMENT CLEARANCES. ARROW INDICATES FRONT OF RACK.

19. SPEAKER TO BE MOUNTED IN HORIZONTAL POSITION.

20. MOUNTING HEIGHT IS TO BOTTOM OF DISPLAY.

*TYPICAL SYMBOL SCHEDULE. SOME SYMBOLS MAY NOT BE USED ON THIS SET OF DRAWINGS.

CABLE TRAY AS NOTED

CONDUIT STUB LOCATION CAP

CONDUIT

CONDUIT DOWN

CONDUIT UP

CONDUIT RUN CONCEALED IN FLOOR OR GROUND

CONDUIT RUN CONCEALED IN WALL OR CEILING

NOTES

MOUNTING

HEIGHTDESCRIPTIONSYMBOL

GENERAL

NOTES

MOUNTING

HEIGHTDESCRIPTIONSYMBOL

CONDUIT / CIRCUIT CONTINUATION

EQUIPMENT PANEL, SEE DRAWINGS +72"

F

S

C

MOTOR OUTLET

EQUIP.

TO SUIT

PUSHBUTTON +46" 2.

NON-FUSED DISCONNECT SWITCH +60" 5. 6.

FUSED DISCONNECT SWITCH

MANUAL STARTER THERMAL OVERLOAD SWITCH WITH PILOT

LIGHT

T

VARIABLE FREQUENCY DRIVEVFD

MAGNETIC STARTER / DISCONNECT COMBINATION

PANEL BOARD

MAIN DISTRIBUTION PANEL

CORD DROP SEE DIAGRAM

PLUGMOLD

+46" OR

AS NOTED

SPECIAL PURPOSE OUTLET 2. 10. W/ CAP.

AS NOTED

+18" OR

CLOCK OUTLET +90" 2.

5mA GFCI CIRCUIT BREAKER PROTECTED

RECEPTACLEG

A DUPLEX RECEPTACLE 9.

DUPLEX RECEPTACLE

WEATHERPROOF RECEPTACLEWP

GROUND FAULT INTERRUPTER DUPLEX RECEPTACLE

DUPLEX RECEPTACLE EMERGENCY POWER (RED)

FOURPLEX RECEPTACLE

FOURPLEX RECEPTACLE EMERGENCY POWER (RED)

TOMBSTONE RECEPTACLE

UPPER OUTLET

SWITCH CONTROLLED

DUPLEX RECEPTACLE 2. 9.AS NOTED

+18" OR

SIMPLEX RECEPTACLE

ISOLATED GROUND RECEPTACLEIG PT POKE THRU - SEE SCHEDULE FLOOR

MAGNETIC STARTER

GROUND FAULT INTERRUPTER FOURPLEX RECEPT

POWER POLE

TVSS PROTECTED RECEPTACLE

CORD REEL SEE DIAGRAM

DUPLEX RECEPTACLE WITH USB OUTLETU

CONTROLLED DUPLEX RECEPTACLE

FB FLOOR BOX - SEE SCHEDULE FLOOR

SEE DIAGRAM,

SPEC.

SEE DIAGRAM,

SPEC.

DP

CP CEILING PROJECTION SYSTEM CEILING BOX

FLAT PANEL DISPLAY WALL BOX TVSS RECEPT., SEE DIAGRAM,

SPEC. 26 2726

SEE DIAGRAM,

SPEC.

AS NOTED

CEILING

ABOVE

DATA AND OTHER DEVICES, REFER TO DIAGRAMS

13.

POWER - ALL 120V RECEPTACLES SHALL BE CONSIDERED TAMPERPROOF

B BREAKER DISCONNECT SWITCH

CONTROLLED FOURPLEX RECEPTACLE

M UTILITY METER / CT CABINET

J

RECEPTACLE SWITCH PACKR

6.

6.

ABBREV. DESCRIPTION ABBREV. DESCRIPTION

ABBREVIATIONS INDEX

# NUMBER

AC ALTERNATING CURRENT

A.F.F. ABOVE FINISH FLOOR

AIC AMPS INTERRUPTING CAPACITY

AM AMPS METER

AMP AMPERE

ANN ANNUNCIATOR

ATS AUTOMATIC TRANSFER SWITCH

AUX AUXILIARY

AWG AMERICAN WIRE GAUGE

BC BARE COPPER

BFG BELOW FINISH GRADE

C CONDUIT

CAB CABINET

CATB COMMUNITY ANTENNA TELEVISION

CATV CABLE TELEVISION

CKT CIRCUIT

CLG CEILING

CNTR CONTRACTOR

C.O. CONDUIT ONLY

CRT COMPUTER TERMINAL

CT CURRENT TRANSFORMER

CU COPPER

C/W COMPLETE WITH

DB DECIBEL

DC DIRECT CURRENT

DWG DRAWING

(E) EXISTING

EC EMPTY CONDUIT

EG EMERGENCY GENERATOR

EMT ELECTRICAL METALLIC TUBING

EX EXPLOSION PROOF

FACP FIRE ALARM CONTROL PANEL

FC FOOT CANDLE

FT FOOT

GFI GROUND FAULT INTERRUPTER

GND GROUND

GRC GALVANIZED RIGID CONDUIT

HP HORSE POWER

HZ HERTZ

IG ISOLATED GROUND

IMC INTERMEDIATE METALLIC CONDUIT

IN INCH

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT AMPERES

KVAR KILOVARS

KW KILOWATT

LRA LOCKED ROTOR AMPS

LTG LIGHTING

MNF MANUFACTURER

MAX MAXIMUM

MB MAIN BUS

MCC MOTOR CONTROL CENTER

MCM 1000 CIRCULAR MILLS

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MTG MOUNTING

MTR MOTOR

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECT. MANUFAC. ASSOC.

IFC INTERNATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION ASSOC.

N.I.C. NOT IN CONTRACT

NO NORMALLY OPENED

NTS NOT TO SCALE

OS & Y OUTSIDE SCREW & YOKE

PB PUSHBUTTON

PF POWER FACTOR

PFR PHASE FAILURE RELAY

PNL PANEL

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE CONDUIT

(R) RELOCATE

RECEP RECEPTACLE

REQ REQUIREMENT

RLA RATED LOAD AMPS

RMS ROOT MEAN SQUARE

SE SERVICE ENTRANCE

SPEC SPECIFICATIONS

SPKR SPEAKER

SS SELECTOR SWITCH

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TTB TELEPHONE TERMINAL BOARD

TTC TELEPHONE TERMINAL CABINET

TV TELEVISION

TYP TYPICAL

UG UNDERGROUND

RMP ROCKY MOUNTAIN POWER

UPS UNINTERRUPTED POWER SUPPLY

V VOLT (KV-KILOVOLT)

VA/R VOLT-AMPS/REACTIVE

VM VOLT METER

W WATTS

W/ WITH

WH WATTHOUR METER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFMR SW TRANSFER SWITCH

XP EXPLOSION PROOF

1P SINGLE-PHASE

2P TWO-POLE

3P THREE-POLE

4P FOUR-POLE

∅ PHASE

DEVICE / EQUIPMENT (TEXT DESIGNATES TYPE) SEE

SCHEDULE / LEGEND

EQUIPMENT 4-POST RACK / CABINET

TELEVISION OUTLET

WIRELESS ACCESS POINT, TWO CABLES

DATA OUTLET, ONE CABLE 2. 9. 11.

AS NOTED

DATA OUTLET, TWO CABLES

DATA OUTLET, THREE CABLES

+18" OR

TELECOMMUNICATIONS

DATA OUTLET, "X" INDICATES QUANTITYX

W WALL PHONE 2.

AS NOTED

+60" OR

DATA OUTLET, CEILING AS NOTED

ANTENNA CEILING

SPL

VIA

SPLITTER

ABOVE

CEILING

VIA

BDA FIBER BDAWAP

EQUIPMENT 2-POST RACK

ANT

CEILING

AS NOTED

AS NOTED

CLG EQUIPMENT CEILING RACK

18. SEE SPEC.

18. SEE SPEC.

CEILING

ABOVE

CEILING

ABOVE

CEILING

XX

6.

GROUND BUS BAR

F JUNCTION BOX ('F' IN FLOOR) AS NOTEDJ

+18" 6.

CEILING

ABOVE

2. 9.AS NOTED

+18" OR

2. 9. 11.AS NOTED

+18" OR

2. 9.AS NOTED

+18" OR

2. 9.AS NOTED

+18" OR

2. 9.AS NOTED

+24" OR

2. 9.AS NOTED

+18" OR

2. 9.AS NOTED

+18" OR

2. 9. 11.AS NOTED

+18" OR

2. 9. 11.AS NOTED

+18" OR

2. 9. AS NOTED

+18" OR

2. 9. 11.AS NOTED

+18" OR

2. 9.AS NOTED

+18" OR

2. 9.AS NOTED

+18" OR

2. SEE SPEC.

+60" 5. 6.

+60" 5. 6.

+46" 2.

+60" 6. 7.

+60" 6. 7.

+66" 6.

+72"

+72"

AS NOTED

+18" OR

AS NOTED

+18" OR

AS NOTED

+18" OR

AS NOTED

+18" OR

2. 9. 11.

2. 9. 11.

2. 9. 11.

11.

9. 11.

DOORBELL CHIME +90" 2.

TELEPHONE DEMARCATION BOARD

X

X

WAP WALL /

PS = PUBLIC SAFETY

COM = CELLULAR/COMMERCIAL

GENERAL NOTES

1. CONTRACTOR IS RESPONSBILE FOR COMPLETING ALL NECESSARY RMP DOCUMENTATION, INCLUDING

NET METERING APPLICATION, FOR APPROVAL OF SYSTEM. COORDINATE ADDITIONAL REQUIREMENTS

AND INSPECTION/APPROVAL TIMELINES WITH RMP.

2. VERIFY ALL EQUIPMENT DIMENSIONS AND LOCATIONS BEFORE BEGINNING ROUGH IN. CONSULT ALL

APPLICABLE CONTRACT DRAWINGS AND SHOP DRAWINGS TO INSURE NEC CODE CLEARANCES

REQUIRED AROUND ALL ELECTRICAL EQUIPMENT.

3. CONTRACTOR SHALL VERIFY ALL ELECTRICAL LOADS (VOLTAGE, PHASE, CONNECTION REQUIREMENTS, ETC) OF ALL EQUIPMENT FURNISHED UNDER ALL DIVISIONS, INCLUDING ALL EXISTING EQUIPMENT TO BE RE-USED. REVIEW ALL SHOP DRAWINGS AND EXISTING EQUIPMENT BEFORE BEGINNING ROUGH-IN.

4. SEE APPLICABLE SHOP DRAWINGS FOR ROUGH IN LOCATION OF ALL EQUIPMENT, WIRING DEVICES, ETC.

WHERE APPLICABLE MOUNT ALL WIRING DEVICES ABOVE BACK SPLASH EXCEPT THOSE SERVING

UNDER COUNTER EQUIPMENT.

5. THE ELECTRICAL CONTRACTOR SHALL NOTIFY AND COOPERATE WITH THE MECHANICAL CONTRACTOR SUCH THAT NO PIPING, DUCTS, OR EQUIPMENT FOREIGN TO THE OPERATION OF THE ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE INSTALLED IN, ENTER OR PASS THRU ELECTRICAL ROOMS OR

SPACES, OR ABOVE OR BELOW ELECTRICAL EQUIPMENT IN OTHER AREAS.

6. ELECTRICAL BOXES SHALL NOT BE LOCATED IN MASONRY COLUMNS IN BRICK WALLS OR IN GROUTED CELLS ADJACENT TO OPENINGS. COORDINATE LOCATION OF BOXES WITH MASONRY CONTRACTOR.

7. ALL PENETRATIONS OF FIRE RATED FLOORS, WALLS, AND CEILINGS SHALL BE SEALED WITH APPROVED

MATERIAL TO MAINTAIN FIRE RATING OF SURFACE PENETRATED.

8. CIRCUITS EXTENDING OVER 70' FOR 120 VOLT AND 115' FOR 277 VOLT 20 AMP CIRCUITS SHALL BE RUN

WITH CONDUCTORS PER TABLE BELOW.

A. THESE ARE BASED ON MAXIMUM LENGTH OF CIRCUIT.

B. PERFORM VOLTAGE DROP CALCULATIONS AND PROVIDE CONDUCTOR SIZE TO KEEP BRANCH

CIRCUIT VOLTAGE DROP LESS THAN 3% WITH A 15 AMP LOAD.

C. CONTRACTOR SHALL ENSURE THAT THE INSTALLATION OF EACH BRANCH CIRCUIT STAYS

WITHIN 3% VOLTAGE DROP FOR A 15 AMP LOAD. IF NECESSARY,CONTRACTOR SHALL INCREASE

WIRE AND CONDUIT SIZE TO MEET THE STANDARD AT NO ADDITIONAL COST TO OWNER.

MAXIMUM LENGTH

20 AMP MINIMUM BRANCH CIRCUIT CONDUCTOR SIZING

BRANCH CIRCUIT VOLTAGE

CONDUCTOR LENGTH (FT) 120 VOLT 277 VOLT

<70 MIN. #12 AWG

70 - 115

115 - 170

170 - 270

271 - 380

>380

MIN. #12 AWG

MIN. #10 AWG MIN. #12 AWG

MIN. #8 AWG MIN. #10 AWG

MIN. #6 AWG MIN. #8 AWG

NOTE B MIN. #8 AWG

NOTE B NOTE B

ALL CONDUIT SHALL BE INSTALLED IN STRAIGHT LINES PARALLEL TO, OR AT RIGHT ANGLES TO, THE STRUCTURE OR ADJACENT BUILDING ELEMENTS. SEPARATIONS BETWEEN CONDUITS AND FASTENINGS OF CONDUITS SHALL BE NEAT AND CONSISTENT. CONDUIT SHALL BE INSTALLED AS TIGHT TO THE BOTTOM OF STRUCTURAL ELEMENTS WHEN PARALLEL TO JOISTS AS CODE WILL ALLOW. OVERALL INSTALLATION SHALL BE ACCOMPLISHED IN AN AESTHETIC AND WORKMANLIKE MANNER. NO CONDUITS SHALL BE

ALLOWED TO RUN PERPENDICULAR TO THE BOTTOM CHORD OF THE JOISTS.

DIVISION 26 SHALL VISIT SITE PRIOR TO BIDDING. BIDS SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF

EXISTING CONDITIONS. FIELD VERIFY ALL ELECTRICAL EQUIPMENT.

BIDDERS SHALL EXAMINE THE SITE AND THE COMPLETE SET OF PLANS AND SPECIFICATIONS COVERING

THE ENTIRE PROJECT. THEY SHALL BECOME FULLYCONVERSANT WITH THE TYPE OF GENERAL

CONSTRUCTION AS WELL AS ALL PERTINENT FACTS AFFECTING THE COST OF CARRYING OUT THE WORK

THEY WILL CONTRACT TO

PERFORM.

ELECTRICAL CONTRACTOR SHALL COORDINATE PROJECT PHASING WITH GENERAL CONTRACTOR AND BID AND PERFORM RESPONSIBILITIES FOR THIS PROJECT TO GENERAL CONTRACTOR EXPECTATIONS.

COORDINATE ELECTRICAL DEMOLITION WITH ARCHITECTURAL DRAWINGS AND GENERAL CONTRACTOR.

CLOSELY COORDINATE ANY REQUIRED POWER SHUTDOWNS WITH HEAD CUSTODIAN AND OWNER.

WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OF INSTALLATION OR NATURE OF WORK REQUIRED, THE CONTRACTOR WILL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT

WRITTEN PERMISSION OF THE OWNER.

SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF ELECTRICAL MATERIALS AND EQUIPMENT FOR EFFICIENT FLOW OF THE WORK. GIVE PARTICULAR ATTENTION TO LARGE EQUIPMENT REQUIRING POSITIONING PRIOR TO CLOSING-IN THE BUILDING. COORDINATE THE CUTTING AND PATCHING OF BUILDING

COMPONENTS TO ACCOMMODATE INSTALLATION OF ELECTRICAL EQUIPMENT AND MATERIALS.

DO NOT PENETRATE STRUCTURAL ELEMENTS OF FLOORS, WALLS, CEILINGS, ROOFS, ETC.

DISCONNECT AND RECONNECT ANY/ALL FIXTURES, DEVICES, EQUIPMENT, ETC. REQUIRED FOR PROPER

COMPLETION OF THE WORK.

CONTRACTOR MUST CONCEAL ALL RACEWAY THROUGHOUT THE PROJECT. SURFACE MOUNT RACEWAY IS UNACCEPTABLE EXCEPT WHERE THE USE OF PAINTED SURFACE METAL RACEWAYS (EMT) IS APPROVED

SOLEY BY THE ARCHITECT. PAINT TO MATCH SURROUNDING SURFACE.

ALL CONCRETE CUT AND PATCH WORK REQUIRED FOR INSTALLATION AND/OR RELOCATION OF

ELECTRICAL DEVICES AND PANELS THAT REQUIRE WORK WITHIN THE FLOORS SHALL BE DONE BY ELECTRICAL CONTRACTOR. ALL CORE CUTTING FOR NEW SERVICE SHALL ALSO BE COVERED UNDER

ELECTRICAL CONTRACTORS REQUIRED WORK.

CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE OF ALL WASTE, SURPLUS MATERIALS, RUBBISH OR DEBRIS WHICH IS CAUSED BY HIS EMPLOYEES OR RESULTING FROM HIS WORK. AFTER ALL EQUIPMENT AND DEVICES HAVE BEEN INSTALLED, REMOVE ALL LABELS, STICKERS, STAINS, TEMPORARY

COVERS, ETC. IDENTIFICATION PLATES ON ALL EQUIPMENT.

IT IS THE INTENT THAT THE FOREGOING WORK SHALL BE COMPLETE IN EVERY RESPECT AND THAT ANY MATERIAL OR WORK NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS, BUT NECESSARY TO

FULLY COMPLETE THE WORK SHALL BE FURNISHED BY ELECTRICAL CONTRACTOR.

CAREFULLY REVIEW THE ENTIRE DRAWING PACKAGE PRIOR TO PROVIDING BID, INCLUDING THE ARCHITECTURAL AND MECHANICAL DRAWINGS. NOT REVIEWING THE ENTIRE SET IS NOT ACCEPTABLE.

PROVIDE CONDUIT FROM DEVICE TO DEVICE IN OPEN AND/OR EXPOSED CEILINGS. CEILINGS WITH CLOUDS

ARE CONSIDERED OPEN/EXPOSED CEILING. NO EXPOSED CABLES SHALL BE SEEN FROM BELOW.

PROVIDE WEATHERPROOF, NEMA 3R RATED EQUIPMENT FOR ALL EXTERIOR APPLICATIONS.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

T THERMOSTAT

ROOFING GENERAL NOTES

1. CONTRACTOR SHALL NOT INSTALL ELECTRICAL CONDUIT(S) THROUGH MECHANICAL CURB AND/OR

DUCTWORK. LOCATE ELECTRICAL CONDUITS A MINIMUM OF 12" AWAY FROM MECHANICAL CURB ALONG WITH MAINTAINING A MINIMUM OF 12" BETWEEN ANY CONDUIT AND ANY OTHER OBSTACLE. CONDUITS MUST EXTEND 24" FROM DECK WITH 16"-18" OF CONDUIT PROTRUDING FROM FINISHED ROOF LINE.

PROVIDE LIQUID TIGHT CONDUIT FROM CONDUIT STUB TO FINAL CONNECTION AT EQUIPMENT.

COORDINATE ANY AND ALL OTHER REQUIRED ROOFING REQUIREMENTS WITH OWNER PRIOR TO ROUGH-IN.

DN

ES

ES

ES

ES

ES

X

11.1

WVU.1UTS.1SRQ.1QPN.1NMLK.1KJ.1JH.1HGFEDCBA

E201

'DPHD1'

'TX-DPLD1''DPLD1'

'MDP'

'CT/MS'

'RMP

XFRM/VAULT'

'GENSET'

'1LA1''1LA2'

'DPLC1'

'TX-DPLC1'

'DPHC1'

'1HB3'

'1LB1'

'TX-DPLB1'

'RMP PV

DISCONNECT'

WSR T

X

VU.1U

NGFCB QN.1

L S.1K PMD E H H.1 JA

J.1 K.1

11.1

Q.1

7.1

6.1

S.2J.2

'PCS'

HICKS

BRIAN

No. 7709037-2202

G

IN

E E R

ONA

O F

E

SS

I

R

UT

AH

TE OF

S T A

P

L EN

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

02/24/2026

5/4/2026 2:00:48 PM

E101

LEVEL 01 ELECTRICAL

DISTRIBUTION PLAN

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

S Y

S T

E M

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

V

IT

T D

R

IV

E , O

G D

E N

, U T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SCALE = 1/16" = 1'-0"

LEVEL 01 ELECTRICAL DISTRIBUTION PLAN

GENERAL SHEET NOTES

1. NOT EVERY INSTANCE OF REQUIRED ELECTRICAL DISTRIBUTION OR TELECOM

EQUIPMENT HAVE BEEN INCLUDED WITHIN OVERALL DRAWINGS. GEAR AND EQUIPMENT

LOCATIONS ARE DIAGRAMMATICALLY SHOWN AND ARE TO SERVE AS REFERENCE ONLY.

REFER TO COMPLETE DRAWINGS AND SPECIFICATIONS FOR MORE INOFRMATION.

2. SUBMIT DIMENSIONED DRAWINGS OF ALL ELECTRICAL AND TELECOM ROOMS BASED

UPON ACTUAL BID SELECTED MANUFACTURER EQUIPMENT. SHOW PLAN VIEW OF

EQUIPMENT WITH DIMENSIONED CLEARANCES TO PROXIMATE EQUIPMENT. FAILURE TO

SUBMIT SAID PLAN VIEW SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITY TO

VERIFY REQUIRED CLEARANCES BEFORE RELEASE OF EQUIPMENT FOR FABRICATION.

CONTRACTOR MAY REARRANGE EQUIPMENT WITH ROOM AS NEEEDED TO HELP

ACHIEVE OPTIMAL LAYOUT OF EQUIPMENT.

3. FINAL ROUTING OF THE CONDUITS, CIRCUITING, AND CABLING SHALL BE DETERMINED

BY THE CONTRACTOR.

4. REFER TO APPENDIX B FOR DA/ERRCS DESIGN. PROVIDE BOTH PATHWAYS,POWER,ETC

REQUIRED FOR DAS SYSTEM DEPLOYMENT DIVISION 26 RESPONSIBLE FOR

COORDINATING FINAL PATHWAYS AND INFRASTRUCTURE REQUIRED FOR ERRCS

SYSTEM INSTALLATION.

5. NOT EVERY INSTANCE OF REQUIRED ELECTRICAL DISTRIBUTION OR TELECOM

EQUIPMENT HAVE BEEN INCLUDED WITHIN THE OVERALL DRAWINGS. GEAR AND

EQUIPMENT LOCATIONS ARE DIAGRAMMATICALLY SHOWN AND ARE TO SERVE AS

REFERENCE ONLY. REFER TO COMPLETE DRAWINGS AND SPECIFICATIONS FOR MORE

INFORMATION.

6. SUBMIT DIMENSIONED DRAWINGS OF ALL ELECTRICAL AND TELECOM ROOMS BASED

UPON ACTUAL BID SELECTED MANUFACTURER EQUIPMENT. SHOW PLAN VIEW OF

EQUIPMENT WITH DIMENSIONED CLEARANCES TO PROXIMATE EQUIPMENT. FAILURE TO

SUBMIT SAID PLAN VIEW SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITY TO

VERIFY REQUIRED CLEARANCES BEFORE RELEASE OF EQUIPMENT FOR FABRICATION.

CONTRACTOR MAY REARRANGE EQUIPMENT WITH ROOM AS NEEDED TO HELP ACHIEVE

OPTIMAL LAYOUT OF EQUIPMENT

NORTH

13 11

14 12

A1 A302

D3 A301

A1 A301

D1 A301

D1 A302

B1 A301

B1 A302

X

11.1

WVU.1UTS.1SRQ.1QPN.1NMLK.1KJ.1JH.1HGFEDCBA

'2LC2'

'2LC1'

'2HC1'

'2RPC1'

'2LA1'

'2MHB1'

'2LD1'

'2LD2'

'2LD3'

'2HD1'

'DPPV'

'2LC3'

WSR T

X

VU.1U

NGFCB QN.1

L S.1K PMD E H H.1 JA

J.1 K.1

11.1

Q.1

7.1

6.1

S.2J.2

'2EMH1'

'TX-2EML1'

'2EML1'

'2EMH2'

'TX-2EML2'

'2EML2'

'INV-2'

'INV-1'

4' - 6 1/8"

4' - 6 11/16"

4' - 0 13/16" HICKS

BRIAN

No. 7709037-2202

G

IN

E E R

ONA

O F

E

SS

I

R

UT

AH

TE OF

S T A

P

L EN

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

02/24/2026

5/4/2026 2:00:53 PM

E102

LEVEL 02 ELECTRICAL

DISTRIBUTION PLAN

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

S Y

S T

E M

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

V

IT

T D

R

IV

E , O

G D

E N

, U T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SCALE = 1/16" = 1'-0"

LEVEL 02 ELECTRICAL DISTRIBUTION PLAN

GENERAL SHEET NOTES

1. NOT EVERY INSTANCE OF REQUIRED ELECTRICAL DISTRIBUTION OR TELECOM

EQUIPMENT HAVE BEEN INCLUDED WITHIN OVERALL DRAWINGS. GEAR AND EQUIPMENT

LOCATIONS ARE DIAGRAMMATICALLY SHOWN AND ARE TO SERVE AS REFERENCE ONLY.

REFER TO COMPLETE DRAWINGS AND SPECIFICATIONS FOR MORE INOFRMATION.

2. SUBMIT DIMENSIONED DRAWINGS OF ALL ELECTRICAL AND TELECOM ROOMS BASED

UPON ACTUAL BID SELECTED MANUFACTURER EQUIPMENT. SHOW PLAN VIEW OF

EQUIPMENT WITH DIMENSIONED CLEARANCES TO PROXIMATE EQUIPMENT. FAILURE TO

SUBMIT SAID PLAN VIEW SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITY TO

VERIFY REQUIRED CLEARANCES BEFORE RELEASE OF EQUIPMENT FOR FABRICATION.

CONTRACTOR MAY REARRANGE EQUIPMENT WITH ROOM AS NEEEDED TO HELP

ACHIEVE OPTIMAL LAYOUT OF EQUIPMENT.

3. FINAL ROUTING OF THE CONDUITS, CIRCUITING, AND CABLING SHALL BE DETERMINED

BY THE CONTRACTOR.

4. REFER TO APPENDIX B FOR DA/ERRCS DESIGN. PROVIDE BOTH PATHWAYS,POWER,ETC

REQUIRED FOR DAS SYSTEM DEPLOYMENT DIVISION 26 RESPONSIBLE FOR

COORDINATING FINAL PATHWAYS AND INFRASTRUCTURE REQUIRED FOR ERRCS

SYSTEM INSTALLATION.

5. NOT EVERY INSTANCE OF REQUIRED ELECTRICAL DISTRIBUTION OR TELECOM

EQUIPMENT HAVE BEEN INCLUDED WITHIN THE OVERALL DRAWINGS. GEAR AND

EQUIPMENT LOCATIONS ARE DIAGRAMMATICALLY SHOWN AND ARE TO SERVE AS

REFERENCE ONLY. REFER TO COMPLETE DRAWINGS AND SPECIFICATIONS FOR MORE

INFORMATION.

6. SUBMIT DIMENSIONED DRAWINGS OF ALL ELECTRICAL AND TELECOM ROOMS BASED

UPON ACTUAL BID SELECTED MANUFACTURER EQUIPMENT. SHOW PLAN VIEW OF

EQUIPMENT WITH DIMENSIONED CLEARANCES TO PROXIMATE EQUIPMENT. FAILURE TO

SUBMIT SAID PLAN VIEW SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITY TO

VERIFY REQUIRED CLEARANCES BEFORE RELEASE OF EQUIPMENT FOR FABRICATION.

CONTRACTOR MAY REARRANGE EQUIPMENT WITH ROOM AS NEEDED TO HELP ACHIEVE

OPTIMAL LAYOUT OF EQUIPMENT

NORTH

24 22

A1 A302

D3 A301

A1 A301

D1 A301

D1 A302

B1 A301

B1 A302

DIV. 26 SHALL FIELD

VERIFY CLEARANCES

DIV. 26 SHALL FIELD

VERIFY CLEARANCES

T

T

J

T

ESES

J

V

FD

'2EML1'

'2HC1'

'2EMH1'

'2LC1'

'2LC2'

'TX-2EML1'

'INV-1'

'2RPC1'

NEW INVERTER #1 LOCATION

(FIELD VERIFY FINAL LOCATION)

P54

'2LD1'

'2LD2'

'2EML2'

'2EMH2'

'2HD1'

'TX-2EML2'

'INV-2'

'DPPV'

'2RPD1'

2LD1-20

ATC PANEL

NEW DPPV (FIELD

VERIFY FINAL

LOCATION)

NEW INVERTER #2 (FIELD

VERIFY FINAL LOCATION)

P53

P53

P54

'RMP

XFRM/VAULT'

'CT/MS'

'MDP'

'1LB1'

DUCT BANK

U006

E401

Q015

E401

'ATS-EMDP'

'EMDP''1EMHF'

'ATS-OEMHF''TX-OEMLF'

'OEMLF'

'1RPB1'

CONCRETE PAD

(SIZE AS REQUIRED)

'RMP PV

DISCONNECT'

'DPLB1'

'TX-DPLB1'

'1MLB1' '1MHB1'

'1HB3'

'TX-1EML1'

'1EML1'

'PCS'

1LB1-1

1LB1-5

WP

BLAST WALL

1LB1-9

1LB1-9

U008

E401

REFER TO ONE-LINE

1LB1-11

EMB HUB A8810

GENSET EPO

WP

'1MHB1'

(SEC 1) (SEC 2)

1MLB1-29

1MLB1-29 1MLB1-29

NEW POWER CONDITIONING SYSTEM

P55

HICKS

BRIAN

No. 7709037-2202

G

IN

E E R

ONA

O F

E

SS

I

R

UT

AH

TE OF

S T A

P

L EN

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

02/24/2026

5/4/2026 2:00:56 PM

E201

MAIN LEVEL ENLARGED

MECH. PLAN

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

S Y

S T

E M

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

V

IT

T D

R

IV

E , O

G D

E N

, U T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SCALE = 1/4" = 1'-0"

ENLARGED MAIN ELECTRICAL ROOM

& YARD

SCALE = 1/4" = 1'-0"

LEVEL 02 MECHANICAL ELECTRICAL

PLAN - AREA 23

3 SCALE = 1/4" = 1'-0"

LEVEL 02 MECHANICAL ELECTRICAL

PLAN - AREA 24

SHEET KEYNOTES

P53 FIELD COORDINATE FINAL ELECTRICAL EQUIPMENT LOCATIONS WITHIN MECHANICAL ROOM. LOCATE

EQUIPMENT AWAY FROM ALL MECHANICAL PIPING/DUCTWORK WITHIN THE SPACE WHERE POSSIBLE.

P54 PROVIDE NEW CAT6A (HUBBELL C6ASPDSBK BLACK JACKET) FROM INVERTER TO NEAREST DATA ROOM LOCATED ON FLOOR BELOW. PROVIDE ALL NECESSARY PATCH CABLES, CONNECTORS, CONDUIT, AND

CABLING SUPPORTS.

P55 PROVIDE NEW POWER CONDITIONING SYSTEM AS SHOWN. REWORK EXISTING AND EXTEND DATA OUTLET

AND 120V RECEPTACLE AS NEEDED TO CONNECT TO NEW POWER CONDITIONING SYSTEM.

/A2.1 A2.1

1'

1'

"1'

1'

/4

1'

/4

1'

1' - 4"

1'

1'

1'

PRE-FABRICATED FIXED SKYLIGHT:

MAINTAIN ACCESS

PRIMARY AND SECONDARY ROOF DRAINS:

MAINTAIN ACCESS [TYP.]

SELF-BALLASTED RACKING

SYSTEM (SOUTH FACING 10

DEGREE TILT) (TYP.)

485W BIFACIAL DUAL GLASS

MONOCRYSTALLINE MODULE

ROOF HATCH:

MAINTAIN ACCESS [TYP.]

ROOF HATCH:

MAINTAIN ACCESS [TYP.]

REQUIRED RMP PV

DISCONNECT

WP

WP

WP

'INV-1'

LOCATED WITHIN

LEVEL 2

MECHANICAL 2320

'DPPV'

'INV-2'

LOCATED

WITHIN

LEVEL 2

MECHANICAL

2LD2-3

2LD2-3

2LC1-1

EXHAUST FAN [TYP.]

/8

14' - 6 7/16"

/1 6"

/8

/4

14' - 2 1/16"

14' - 9 7/8"

10' - 5 3/8"

'CT/MS'

'RMP

XFRM/VAULT'

ROOF LEGEND

SINGLE PLY ROOFING MEMBRANE

TAPERED INSULATION CRICKET MINIMUM SLOPES: 1/8" ALONG VALLEY,

1/4" ACROSS CRICKET

PROTECTIVE WALKABLE SURFACE

DECK RIDGE OR VALLEY

IMAGINARY VALLEY WITH WARPED DECKING

AREAS HATCHED AS SUCH SHALL NOT HAVE ANY PENETRATIONS THRU

THE ROOF IN ORDER TO MAINTAIN THE 2 HOUR FIRE WALL ASSEMBLY

LOCATED BELOW THE DECK (AS PER 2015 IBC SECTION 706.6).

PRIMARY AND SECONDARY ROOF DRAINS

PRE-FABRICATED FIXED SKYLIGHT

TYPICAL SIZE: 60x72

DIMENSIONED TO THE CENTERS

PHOTOVOLTAIC PANEL + RACKING

HICKS

BRIAN

No. 7709037-2202

G

IN

E E R

ONA

O F

E

SS

I

R

UT

AH

TE OF

S T A

P

L EN

REV DATE DESCRIPTION

SALT LAKE CITY, UT - HQ

ST. GEORGE, UT

LAIE, HI

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

C

A

B

D D

C

B

A

1 2 3 4 5 6

02/24/2026

5/4/2026 2:01:03 PM

E202

ROOF PV SYSTEM

ELECTRICAL PLAN

O S

D H

IL

L

C R

E S

T E

L E

M E

N T

A R

Y P

V

S Y

S T

E M

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

V

IT

T D

R

IV

E , O

G D

E N

, U T

VCBO NUMBER: 22785.101

CLIENT NUMBER: -

DATE: MARCH 03, 2026

SCALE = 1/16" = 1'-0"

OVERALL ROOF ELECTRICAL/PV PLAN

PV INSTALLER/DIVISION 26 COORDINATE

FINAL ROOF EQUIPMENT AND

PENETRATIONS WITH ALL TRADES.

ADJUST LAYOUT ACCORDINGLY

ROOFING GENERAL NOTES

1. CONTRACTOR SHALL NOT INSTALL ELECTRICAL CONDUIT(S) THROUGH MECHANICAL CURB AND/OR DUCTWORK. LOCATE ELECTRICAL CONDUITS A MINIMUM OF 12" AWAY FROM MECHANICAL CURB ALONG WITH MAINTAINING A MINIMUM OF 12" BETWEEN ANY CONDUIT AND ANY OTHER OBSTACLE. CONDUITS MUST EXTEND 24" FROM DECK WITH 16"-18" OF CONDUIT PROTRUDING FROM FINISHED ROOF LINE.

PROVIDE LIQUID TIGHT CONDUIT FROM CONDUIT STUB TO FINAL CONNECTION AT EQUIPMENT.

COORDINATE ANY AND ALL OTHER REQUIRED ROOFING REQUIREMENTS WITH OWNER PRIOR TO ROUGH-IN.

GENERAL SHEET NOTES

1. WORKMANSHIP THROUGHOUT THE INSTALLATION SHALL BE CONSISTENT FROM ONE PV ARRAY/RACK

TO THE NEXT. INSTALLATION IS EXPECTED TO BE NEAT, HAVE A GOOD MECHANICAL APPEARANCE AND CONFORM TO BEST ELECTRICAL CONSTRUCTION PRACTICES. WHEREVER POSSIBLE, SUPPORT AND SECURE ALL PV WIRING TO RACKING BENEATH MODULES IN MANNER THAT WIRING IS PROTECTED FROM PHYSICAL DAMAGE. CONTRACTOR SHALL SUBMIT CONDUIT ROUTING DETAIL TO ENGINEER FOR REVIEW

PRIOR TO ROUGH-IN/INSTALLATION. GROUP PANELS TO MINIMIZE ROOF PENETRATIONS WHERE

POSSIBLE.

2. PV WIRING BETWEEN ROWS SHALL BE INSTALLED IN MINIMUM 3/4" IMC CONDUIT MOUNTED A MINIMUM OF 2" ABOVE THE ROOF. IMC CONDUIT SHALL BE SECURELY FASTENED AT INTERVALS NOT TO EXCEED

10 FEET AND WITHIN 3 FEET OF BOX OR TERMINATION POINT.

3. PROVIDE PROPER ELECTRICAL IDENTIFICATION AND LABELING OF PV EQUIPMENT AS REQUIRED BY THE LATEST VERSION OF THE NEC 690 AND 705. REFER SPECIFICATION SECTION 26 0553, 26 3100, NEC, AND RMP E.G. EQUIPMENT IDENTIFICATION LABELS OF ENGRAVED PLASTIC-LAMINATE (RED BACKGROUND

WITH WHITE ENGRAVING), ETC.

4. MAINTAIN A MINIMUM OF AT LEAST 10' BETWEEN PV SYSTEM COMPONENTS AND ROOF EDGE.

5. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING RMP NET METERING REQUEST FOR COMMERCIAL

SOLAR APPLICATION. COORDINATE ALL REQUIREMENTS WITH RMP.

GENERAL PHOTOVOLTAIC NOTES

PREVIOUS WORK INSTALLED:

CONDUIT PATHWAYS FOR HAVE PREVIOUSLY BEEN INSTALLED FOR THE FOLLOWING PATHWAYS. CONTRACTOR SHALL SCOPE EXISTING CONDUITS PRIOR TO USE TO ENSURE CONDUITS ARE IN GOOD CONDITION. REFER TO

ONE-LINE FOR REQUIRED CABLING SIZES TO BE INSTALLED IN EXISTING CONDUIT.

• 'CT/MS' TO RMP PV DISCONNECT

• RMP PV DISCONNECT TO 'DPPV'

• 'DPPV' TO INVERTERS #1 AND #2

NEW WORK GENERAL NOTES:

SPECIFICATIONS: REFER TO ELECTRICAL SPECIFICATION AND SECTION 26 3100, TURNKEY PHOTOVOLTAIC (PV) RENEWABLE ENERGY SYSTEM FOR MORE INFORMATION. ANY ALTERNATE PROPOSED EQUIPMENT MUST BE

SUBMITTED A MINIMUM OF 5 WORKING DAYS PRIOR TO BID CLOSE FOR REVIEW.

SYSTEM OUTPUT REQUIREMENTS: THE CONTRACTOR TO FURNISH A COMPREHENSIVE DECENTRALIZED ROOFTOP PHOTOVOLTAIC SYSTEM. THIS SYSTEM MUST DEMONSTRATE A MINIMUM ANNUAL PRODUCTION CAPABILITY OF 405 MWh, WITH AN ANNUAL DEGRADATION RATE NOT EXCEEDING 1%. THE ALL-ENCOMPASSING SYSTEM MUST ENCOMPASS VARIOUS COMPONENTS, INCLUDING, BUT NOT LIMITED TO, SOLAR MODULES, INVERTERS, SELF-BALLASTED RACKING SYSTEMS, POWER OPTIMIZERS, CONDUITS, CONDUCTORS, TERMINATIONS, ETC.

THE CONTRACTOR BEARS THE RESPONSIBILITY OF EXECUTING THE FINAL DESIGN, PROCUREMENT, INSTALLATION, AND COMMISSIONING PROCEDURES NECESSARY TO ESTABLISH A FULLY OPERATIONAL PHOTOVOLTAIC SYSTEM THAT ALIGNS WITH THE SPECIFICATIONS DELINEATED THROUGHOUT THE CONSTRUCTION DOCUMENTS. ACCORDING TO PRELIMINARY CALCULATIONS, THE SYSTEM SHOULD BE SIZED AT APPROXIMATELY 260 kWp INSTALLED DC POWER, WITH PANELS INCLINED AT A 10-DEGREE ANGLE, RESULTING IN A MAXIMUM ACHIEVED AC POWER OUTPUT OF 240.00 kW. THE DEFINITIVE CONFIGURATION OF THE SYSTEM WILL BE DETERMINED BY THE CONTRACTOR TO MEET THE SPECIFIED ENERGY PRODUCTION GOAL AS PREVIOUSLY INDICATED. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING RMP NET METERING REQUEST FOR COMMERCIAL

SOLAR APPLICATION. COORDINATE ALL REQUIREMENTS WITH RMP.

INVERTER, RACKING AND PV MODULE REQUIREMENTS:

1. LOCATE INVERTERS WITHIN 2ND-FLOOR ELECTRICAL ROOMS OR AS INDICATED IN THE PLANS. CONTRACTOR IS

RESPONSIBLE FOR FIELD VERIFYING FINAL LOCATION.

2. MOUNT THE PHOTOVOLTAIC (PV) PANELS ON THE ROOF USING AN ENGINEERED BALLASTED ROOF MOUNT SYSTEM ENGINEERD TO OGDEN CITY WIND SPEED RECOMMENDATIONS (120 MPH 3 SECOND GUST). PROVIDE THE NECESSARY MOUNTING SYSTEM, FRAMES, AND RACKS TO SUPPORT THE PV PANELS, MAINTAINING AN ANGLE

BETWEEN 10 TO 20 DEGREES FROM THE HORIZONTAL.

3. INCLUDE ALL NECESSARY COMPONENTS AND APPURTENANCES TO SECURELY MOUNT THE PV PANELS ONTO THE ROOFING MATERIAL, ENSURING THEY ARE POSITIONED AT LEAST 10 INCHES ABOVE THE ROOF SURFACE.

4. WHENEVER POSSIBLE, ROUTE FEEDERS TO THE INVERTERS IN THE CEILING SPACE BELOW THE ROOF DECK.

5. INSTALL ROOF FLASHING FOR ALL CONDUITS THAT PENETRATE THE ROOF MEMBRANE TO MAINTAIN

WATERTIGHT INTEGRITY.

6. USE IMC CONDUIT FOR ALL WIRING FROM THE INVERTERS TO THE SOLAR MODULES AND ENSURE THAT THE

WIRING IS OF THE 1000-VOLT TYPE PV-WIRE CU."

ROOF PV LAYOUT AND ZONING: THE PRESENTED LAYOUT IS A PRELIMINARY PROPOSED PV ARRAY LAYOUT WITH SPECIFIC PARAMETERS (AZIMUTH: 180°, TILT: 10°). IT IS IMPERATIVE FOR THE CONTRACTOR TO COLLABORATE AND COORDINATE THE PRECISE POSITIONING OF ALL ROOFTOP EQUIPMENT WITH OTHER TRADES AND EXISTING CONDITIONS BEFORE PROCEEDING WITH THE SYSTEM DESIGN. IN CASES WHERE OBSTACLES OR POTENTIAL SHADING ISSUES ARE IDENTIFIED, THE CONTRACTOR SHOULD CONDUCT A SHADING STUDY TO SUBSTANTIATE

AND VALIDATE THE PROPOSED PANEL LOCATIONS.

POWER COMPANY COORDINATION: THE SELECTED PROPOSER/CONTRACTOR SHALL COMPLETE AND SUBMIT ALL REQUIRED ROCKY MOUNTAIN POWER SOLAR DEPARTMENT (RMP) INTERCONNECTION AND NET-METERING LEVEL 2 APPLICATION FORMS AND ASSOCIATED REQUIREMENTS. CONTRACTOR RESPONSIBLE TO MEET ALL

REQUIREMENTS OF THE (RMP).

a. APPROVED EXTERIOR AC DISCONNECT AND PRODUCTION METER.

b. RMP NET METER AT MAIN

c. RMP APPROVED PRODUCTION METER AND ENCLOSURE

c. NEC 2020 690.12 RAPID SHUTDOWN REQUIREMENTS

PROJECT FINAL PLANS: THE SELECTED PROPOSER/CONTRACTOR WILL BE RESPONSIBLE FOR DEVELOPING PV SYSTEM PROJECT PLANS, WHICH WILL BE SUBJECTED TO A PROCESS OF JOINT AGREEMENT, PLAN CHECKS, AND DESIGN REVIEWS INVOLVING VARIOUS STAKEHOLDERS, INCLUDING THE OWNER, THE GENERAL CONTRACTOR, THE ARCHITECT, ELECTRICAL ENGINEER, THE LOCAL AUTHORITY HAVING JURISDICTION, AND OTHER RELEVANT LOCAL PARTIES. THE FINAL DRAWINGS AND SPECIFICATIONS MUST BEAR THE STAMP AND SIGNATURE OF AN ELECTRICAL ENGINEER LICENSED IN THE STATE OF UTAH, AND ALL STRUCTURAL MOUNTING DETAILS MUST BE CERTIFIED WITH THE STAMP AND SIGNATURE OF A STRUCTURAL ENGINEER LICENSED IN THE STATE OF UTAH.

SUBMITTALS: SUBMIT SUPPORT DESIGN DOCUMENTATION WITH FINAL PLANS FOR REVIEW INCLUDING SHADE ANALYSIS, VOLTAGE DROP CALCULATIONS, ENERGY ANALYSIS, INCLUDING EFFECTS OF SHADING, AND SHOP

DRAWINGS OF PROPOSED PV AND MOUNTING EQUIPMENT.

INSTALLATION OF PV SYSTEM: DIVISION 26 AND ITS SUB-CONTRACTOR ARE ENTIRELY RESPONSIBLE FOR ALL EXPENSES RELATED TO THE CONSTRUCTION OF THE PV SYSTEM, ENCOMPASSING INSURANCE COVERAGE, LABOR, MATERIALS, PERMITS, BONDING, ENGINEERING/DESIGN, TRANSPORTATION, STORAGE, AND EQUIPMENT RENTAL COSTS. THIS SHALL COVER THE COMPREHENSIVE SCOPE OF WORK REQUIRED TO BUILD THE PV SYSTEM

IN STRICT COMPLIANCE WITH THE FINAL APPROVED PLANS.

OWNER PORTAL AND CENTRALIZED MONITORING SYSTEM: PROVIDE A SEAMLESS OWNER PORTAL AND A CENTRALIZED MONITORING SYSTEM FOR THIS PROJECT. THE CONTRACTOR SHALL ENSURE NETWORK CONNECTIVITY AND BMS INTEGRATION WITH ALL INVERTERS ACROSS THE ENTIRE PROJECT. IN ADDITION, THE CONTRACTOR IS RESPONSIBLE FOR REGISTERING AND CONFIGURING AN ONLINE PORTAL. THIS PORTAL WILL GRANT BUILDING AND PROJECT OWNERS THE ABILITY TO ACCESS COMPREHENSIVE PV AND PRODUCTION DATA FOR EVERY BUILDING AND CANOPY SYSTEM ACROSS THE SCHOOL DISTRICT.