Attachment M3 - DIT Process for 2022 Transit Bus Solicitation (Leasing).docx

DOCX document 346 KB Posted

Attached to
2022 Transit Bus Program Federal contract opportunity
Solicitation number
47QMCA21R0013
Issued by
GSA Federal Acquisition Service

About this file

This document provides step-by-step instructions for submitting damage in transit claims for leased vehicles under GSA Fleet's 2022 Transit Bus Program solicitation. Claim packages must be filed through GSA Fleet's Google Form by the third business day following vehicle receipt and include photos of all damage, the signed bill of lading, and vehicle details like VIN and order number. Claims will be adjudicated by the vehicle supplier within 21 days, with GSA Fleet providing status updates. The related solicitation seeks bids for transit buses under contract number 47QMCA21R0013, with proposals due via FedConnect and pricing through AutoBid. GSA's Federal Acquisition Service will host a pre-proposal conference on September 2nd to discuss the RFP requirements.

View the file

Other files for this federal contract opportunity

Other files attached to 2022 Transit Bus Program, newest first.
File Type Posted
JointProgram_OpenSeasonConferenceFY25Fall_2025-09-17.pdf PDF
GACA__Instructions_Version4_2025-05-01.pdf PDF
OCONUS-MainBus_TransitBus_OpenSeasonNotice_2025-07-23.pdf PDF
PD - SIN 377A Heavy Duty Low Floor Transit Bus Diesel 07.10.2024.docx DOCX document
PD - SIN 377F Heavy Duty Low Floor Transit Bus CHG-BEV 07.10.2024.docx DOCX document
PD - SIN 377E Heavy Duty Low Floor Transit Bus BEV 07.10.2024.docx DOCX document
PD - SIN 377L Heavy Duty Low Floor Transit Bus BEV 07.10.2024.docx DOCX document
PD - SIN 377I Heavy Duty Low Floor Transit Bus BEV Zion 07.10.2024.docx DOCX document
Request for GSA AutoBid Account Form.docx DOCX document
Request for GSA Fleet Systems Account Form.docx DOCX document
PD - SIN 377H Heavy Duty Low Floor Transit Bus BEV Zion 08.03.2023.docx DOCX document
PD - SIN 377K Heavy Duty Low Floor Transit Bus BEV Amended 10.13.2023.docx DOCX document
47QMCA21R0013_FY23_Fall_Open_Season_Conference_Slides_2023-08-03.pptx PPTX presentation
47QMCA21R0013_FY23_Open_Season_2_RequestForAutoBidAccount.docx DOCX document
888E Proposal Template.xlsx XLSX spreadsheet
47QMCA21R0013 FY22 Fall Open Season Conference slides 07_21_2022.pptx PPTX presentation
47QMCA21R0013 FY22 Open Season 1 - Special Notice (letter) Revised.pdf PDF
47QMCA21R0013 Request for AutoBid Account.docx DOCX document
47QMCA21R0013 Amendment 0005 SF30 11_09_2021.pdf PDF
PD - SIN 377I Heavy Duty Low Floor Transit Bus BEV Zion Amended 11.09.2021.docx DOCX document
PD - SIN 377D Heavy Duty Low Floor Transit Bus BEV AMENDED 11.09.2021.docx DOCX document
PD - SIN 377E Heavy Duty Low Floor Transit Bus BEV AMENDED 11.09.2021 (2).docx DOCX document
PD - SIN 377G Heavy Duty Low Floor Transit Bus CHG-BEV AMENDED 11.09.2021.docx DOCX document
47QMCA21R0013 Amendment 0003 SF30 10_13_2021.pdf PDF
47QMCA21R0013 Amendment 0003 SF30 10_13_2021.pdf PDF
PD - SIN 377B Heavy Duty Low Floor Transit Bus CNG AMENDED 10.01.2021.docx DOCX document
PD - SIN 377F Heavy Duty Low Floor Transit Bus CHG-BEV AMENDED 10.01.2021.docx DOCX document
47QMCA21R0013 Pre-Proposal Conference slides 09_02_2021.pptx PPTX presentation
Attachment E2 - Technical Exceptions Spreadsheet.xlsx XLSX spreadsheet
Attachment E3 - 888E Proposal Template.xlsx XLSX spreadsheet
Attachment F4 - PD - SIN 377D BEV 40Ft 07.01.2021.pdf PDF
Attachment F5 - PD - SIN 377E BEV 60Ft 07.01.2021.pdf PDF
Attachment F7 - PD - SIN 377G CHG-BEV 60Ft 07.01.2021.pdf PDF
Attachment F9 - PD - SIN 377I BEV Zion 60Ft 07.01.2021.pdf PDF
Attachment K - Inspection Points Template.xlsx XLSX spreadsheet
Attachment M1 - DIT Claim Form Template (Leasing).pdf PDF
Attachment Q2 - FedConnect Ready Set Go Guide.pdf PDF
47QMCA21R0013 Significant Changes.pdf PDF
Attachment A - SF1449.pdf PDF
Attachment B - Proposal Checklist.docx DOCX document
Attachment F6 - PD - SIN 377F CHG-BEV 40Ft 07.01.2021.pdf PDF
Attachment I - Estimated Quantities.xlsx XLSX spreadsheet
Attachment O2 - Monthly Vendor Status Reports Template.xls XLS spreadsheet
Attachment P - AutoChoice Online Ordering Procedures.pdf PDF
Attachment D - Commercial Model_Subk Plan- Feb 2021.docx DOCX document
Attachment H1 - Schedule of Items New Flyer.pdf PDF
Attachment H5 - Schedule of Items BYD Coach and Bus LLC.pdf PDF
Attachment H7 - Schedule of Items - Item 888E.pdf PDF
Attachment J1 - Optional Equipment Analysis.pdf PDF
Attachment M2 - DIT Claim Form Template (Purchasing).pdf PDF
Show all 50

2022 Transit Bus Program has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Leasing Damage in Transit (DIT) Claim Submission Step-by-Step Instructions

The following instructions are in accordance with vehicle supplier required information and documentation submissions necessary to file a claim for Damage in Transit (DIT). The following Marshaller instructions only apply to GSA Fleet Leased Vehicles. Follow the steps below to file your DIT claim:

1. If a vehicle is delivered damaged:

a. Within 24 hours of identifying DIT, contact GSA Fleet, and CC your GSA POC (e.g. FSR/Marshalling COR), at vehicle.claims@gsa.gov. We will send you the link to the claim form. If you are unable to access the form we can send you an excel version.

i. Please note that you must submit the notated Bill of Lading (BOL)/delivery receipt and photographs of the damages with your initial claims notification

b. Obtain a signed Bill of Lading (BOL)/delivery receipt from the delivery driver with all damages notated prior to the driver’s departure. This is a critical document for claim submission.

c. Electronic versions of BOLs/delivery receipts are acceptable. Make sure you receive a link to the carrier’s website and/or an email of the BOL.

d. If BOL/delivery receipt is unavailable, include an explanation on the DIT form submission.

e. Marshalling/Consignor locations are required to accept the vehicle even if it is damaged.

2. Document location and type of damage using the Industry Standardized Damage Codes on the Bill of Lading and on the Claims Submission Form.

a. See Appendix A for the codes.

b. Take photographs that clearly show damage and its location.

i. You must also include a photograph of the VIN Plate/Sticker.

c. The standardized damage codes matrix are already loaded into the google submission form

3. Prior to submitting the DIT report ensure you have the following information:

a. Your name, position/title, company name, email address, & phone number.

b. GSA Zonal POC Name, Title, email address, Phone Number and Zone Number.

c. Marshaller/Consignee POC’s: Name, email address, & phone number.

d. Address where vehicle was received, and receipt location POC’s Name, email address, and phone number.

e. Name of Vehicle Supplier/Vehicle Brand, i.e. Chevy, Ford, Ram, Hyundai, etc.

f. RPN/Order Number & complete VIN.

g. Date received.

h. Delivered during normal business hours (Y/N)?

i. Current Location Address of Vehicle.

j. Name of Transportation Company.

k. Name of Transportation Driver (when available, enter N/A if unknown).

l. Date Damage Noticed.

m. Description of Damage.

n. Select Damage Codes.

o. Name of Preferred Dealership & Contact Information for Preferred Dealership.

p. Attachments: Photos (to include photo of VIN plate/sticker), Signed Bill of Lading/delivery receipt (or explanation of missing BOL/delivery receipt).

i. Photos and all files must be labeled with RPN and the last 8 of VIN like this: ON655-LR234842_1, ON655-LR234842_2, ON655-LR234842_3, etc.

q. Additional Information (if applicable).

4. DIT reports must be submitted in accordance with: :

a. Use the Google Claim Reporting Form link provided by the GSA Fleet to file your Claims Package. Your completed Claims Package must be received by no later than 12:00 PM Eastern Time on the 3rd Business Day following receipt of the damaged vehicle.

b. To submit the DIT report you are required to utilize a Business Gmail address or use your GSA Affiliated Customer Account (GACA) email address.

c. Your GSA POC (e.g. FSR/Marshalling COR) will assist with any questions regarding the submission of the DIT Report or on how to obtain a GACA email.

d. Once you provide the requested information you will then certify all of the information you provided is accurate and complete, and that all documents, photographs, and attachments are included as necessary.

e. Customers/Marshallers who are unable to use the Google Form must e-mail vehicle.claims@gsa.gov to request a one-time exemption from using the Google Form. GSA Fleet will then provide the Customer/Marshaller with an Excel spreadsheet to complete in place of the Google Form. Customers/Marshallers must complete the Excel Spreadsheet and submit it to vehicle.claims@gsa.gov with all necessary attachments. Customers/Marshallers must request to use the Excel Spreadsheet to submit their claim for each individual claim prior to submitting their claim in each individual instance. Customers/Marshallers must CC their GSA POC (e.g. FSR/Marshalling COR) on all email communications with GSA Fleet.

f. GSA Fleet will not perform quality control on submissions; it is the responsibility of the submitter to ensure that their claim is complete and accurate. GSA Fleet will submit your claim upon receipt exactly as submitted. GSA Fleet monitors and may report repeated instances of incomplete/inaccurate claims package submissions, especially those causing claims denials, to the respective interested parties.

5. Once you have submitted the DIT Claims Form:

a. GSA Fleet will send the claim to the Vehicle Supplier for adjudication..

b. GSA Fleet will use your RPN & VIN to serve as a reference for your claim.

c. GSA Fleet will obtain status updates at 7 calendar day intervals following your submission of your claims package.

i. Guidance regarding the status of the DIT vehicle claim will be provided by your GSA POC (e.g. FSR/Marshalling COR).

d. Per contract terms, claim resolution terms will consist of either approval (repair or replace, depending on the specific circumstances of your claim) or denial. No concessions will be applicable, and there shall be no appeals.

e. Under the contract, all claims shall be fully adjudicated within 21 calendar days following the submission of your claims package to the vehicle supplier.

f. GSA Fleet will assist customer agencies to ensure that resolution terms are fulfilled within a timely manner.

For additional information and training on this process, or if you have any questions or concerns, please email GSA Fleet at vehicle.claims@gsa.gov. Thank you!

APPENDIX A

Industry Standardized Damage Code Reference Guide image1.png

File details come from the government source that posted it. Updated .