Attachment 1, Proposal Breakdown Template.xlsx
XLSX spreadsheet 349 KB Posted
- Attached to
- US Trustee 4th Floor Keating Renovation Federal contract opportunity
- Solicitation number
- 47PC1120R0003
About this file
This federal contract opportunity notice seeks contractors to furnish all labor, materials, equipment and supervision for the renovation of approximately 2,700 square feet of space for the United States Trustees on the fourth floor of the Kenneth B. Keating Federal Building and U.S. Courthouse in Rochester, New York. The renovated space will include elements to support the work functions of the US Trustees such as a reception area, workstations, enclosed offices, storage, mail room, break room and conference room. Base interior work includes hazardous material abatement, new walls, doors, casework, flooring, plumbing, electrical, fire protection and mechanical systems. Additionally, technology, data and security infrastructure work is required. The total project cost is estimated between $500,000 and $1,000,000. The solicitation is reserved for small businesses only. The required construction completion date is approximately 192 calendar days from notice to proceed. Interested contractors must register in SAM and submit a completed document security form to receive specifications and drawings for the project by email. The point of contact is James Berring at the General Services Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 47PC1120R0003_0002.pdf | ||
| Keating 4th Floor UST Addendum #3 2020-01-03.pdf | ||
| AE101-ADDENDUM_3.pdf | ||
| AE501-ADDENDUM_3.pdf | ||
| RFI QA part 2, 47PC1120R0003.pdf | ||
| GE Refrigerator.pdf | ||
| RFI QA, 47PC1120R0003.pdf | ||
| 20190307_Narrative_Keating_4th Floor UST Office Reno2.pdf | ||
| GE Microwave.pdf | ||
| Solicitation Amendment 47PC1120R0003_0001.pdf | ||
| 20191206_GSA_KEATING US TRUSTEES_ADDENDUM #2.pdf | ||
| Wage Determination, NY 20190010, 10 25 2019.pdf | ||
| Attachment 3 - Experience on Similar Projects Offeror Form.xlsx | XLSX spreadsheet | |
| DocumentSecurityStatement, 47PC1120R0003.pdf | ||
| Solicitation, 47PC1120R0003, Keating 4th Fl Relocation.pdf | ||
| GSA527.pdf | ||
| Reps&Certs for 47PC1120R0003.docx | DOCX document | |
| Agreement, 47PC1120R0003, Keating 4th Fl Relocation.pdf | ||
| Attachment 2, PBS Past Performance Questionnaire.pdf | ||
| SF1442, 47PC1120R0003 Form.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| GENERAL SERVICES ADMINISTRATION | Date: |
| Public Building Service / Property Management Division |
| GSA Contract No: | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | ||
| Contractor: | Trade: | All |
| CONTRACT AMOUNT | ||||||||||
| No. | GSA | CSI | DESCRIPTION | SHELL | T.I. | TOTAL | ||||
| SUMMARY | ||||||||||
| 01000 | GENERAL CONDITIONS | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 02000 | EXISTING CONDITIONS | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 03000 | CONCRETE | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 04000 | MASONRY | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 05000 | METALS | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 06000 | WOOD & PLASTIC | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 07000 | THERMAL & MOISTURE PROTECTION | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 08000 | DOORS & WINDOWS | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 09000 | FINISHES | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 10000 | SPECIALTIES | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 11000 | EQUIPMENT | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 12000 | FURNISHINGS | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 13000 | SPECIAL CONSTRUCTION | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 14000 | CONVEYING EQUIPMENT | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 21000 | FIRE PROTECTION | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 22000 | PLUMBING | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 23000 | HVAC | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 25000 | INTEGRATED AUTOMATION | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 26000 | ELECTRICAL | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 27000 | COMMUNICATIONS | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 28000 | ELECTRONIC SAFETY & SECURITY | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 31000 | EARTHWORK | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 32000 | EXTERIOR IMPROVEMENTS | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 33000 | UTILITIES | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 34000 | TRANSPORTATION | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 35000 | WATERWAY & MARINE | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 41000 | MATERIAL PROCESSING & HANDLING | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 44000 | POLLUTION & WASTE CONTROLL EQUIP. | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 46000 | WATER & WASTEWATER EQUIPMENT | $0.00 | $0.00 | $0 | $0 | 0 | TRUE | |||
| 48000 | ELECTRICAL POWER GENERATION | $0.00 | $0.00 | $0 | $0 | 0 | TRUE |
| SUBCONTRACTOR MARKUP | 0 | 0 | $0 |
| SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES |
| SUBTOTAL | 0 | 0 | $0 | $0 |
| DESIGN CONTINGENCY | 0 | 0 | $0 | $0 |
| CITY COST FACTOR | 0 | 0 | $0 | $0 |
| SUBTOTAL | 0 | 0 | $0 | $0 |
| OVERHEAD | 0 | 0 | $0 | $0 |
| PROFIT | 0 | 0 | $0 | $0 |
| ESCALATION TO MIDPOINT | 0 | 0 | $0 | $0 |
| TOTALS (ECCA) | $0 | $0 | $0 | $0 |
| BONDING | $0 | $0 | $0 | $0 |
| CONSTRUCTION CONTINGENCY | $ - 0 | $ - 0 | $0 | $0 |
| TOTALS (ECC) | $0 | $0 | $0 | $0 |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SUMMARY - LME
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| 0 | |||
| GSA Contract No: | 0 | ||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | ||
| Contractor: | 0 | Trade: | All |
| CONTRACT AMOUNT | |||||||||
| No. | GSA | CSI | DESCRIPTION | LABOR | MATERIAL | EQUIP | TOTAL | ||
| SUMMARY - Labor/Material/Equipment | |||||||||
| 01000 | GENERAL CONDITIONS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 02000 | EXISTING CONDITIONS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 03000 | CONCRETE | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 04000 | MASONRY | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 05000 | METALS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 06000 | WOOD & PLASTIC | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 07000 | THERMAL & MOISTURE PROTECTION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 08000 | DOORS & WINDOWS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 09000 | FINISHES | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 10000 | SPECIALTIES | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 11000 | EQUIPMENT | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 12000 | FURNISHINGS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 13000 | SPECIAL CONSTRUCTION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 14000 | CONVEYING EQUIPMENT | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 21000 | FIRE PROTECTION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 22000 | PLUMBING | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 23000 | HVAC | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 25000 | INTEGRATED AUTOMATION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 26000 | ELECTRICAL | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 27000 | COMMUNICATIONS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 28000 | ELECTRONIC SAFETY & SECURITY | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 31000 | EARTHWORK | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 32000 | EXTERIOR IMPROVEMENTS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 33000 | UTILITIES | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 34000 | TRANSPORTATION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 35000 | WATERWAY & MARINE | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 41000 | MATERIAL PROCESSING & HANDLING | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 44000 | POLLUTION & WASTE CONTROLL EQUIP. | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 46000 | WATER & WASTEWATER EQUIPMENT | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 48000 | ELECTRICAL POWER GENERATION | 0.00 | 0.00 | 0.00 | $0 | $0 |
| SUBCONTRACTOR MARKUP | 0.0% | 0 | 0 | 0 | $0 |
| SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES |
| SUBTOTAL | 0 | 0 | 0 | $0 | $0 | |
| DESIGN CONTINGENCY | 0% | 0 | 0 | 0 | $0 | $0 |
| CITY COST FACTOR | 0% | 0 | 0 | 0 | $0 | $0 |
| SUBTOTAL | 0 | 0 | 0 | $0 | $0 | |
| OVERHEAD | 0% | 0 | 0 | 0 | $0 | $0 |
| PROFIT | 0% | 0 | 0 | 0 | $0 | $0 |
| ESCALATION TO MIDPOINT | 0.0% | 0 | 0 | 0 | $0 | $0 |
| TOTALS (ECCA) | $0 | $0 | $0 | $0 | $0 | |
| BONDING | 0.0% | $0 | $0 | $0 | $0 | $0 |
| CONSTRUCTION CONTINGENCY | 0% | $ - 0 | $ - 0 | $ - 0 | $0 | $0 |
| TOTALS (ECC) | $0 | $0 | $0 | $0 | $0 |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
GENERAL CONDITIONS
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | |
| Public Building Service / Property Management Division | |||
| 0 | |||
| 0 | |||
| GSA Contract No: | 0 | ||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | ||
| Contractor: | 0 | Trade: | All |
| CONTRACT AMOUNT | ||||||||||
| No. | GSA | CSI | DESCRIPTION | SUB | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
01000 GENERAL CONDITIONS RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | $0 | ||||
| Full-Time Superintendent (22 wk @ 40 hrs/wk) | $0 | ||||
| Temporary Barricade Walls | $0 | ||||
| Interim Life Safety Measures (Sprinkler) | $0 | ||||
| Interim Life Safety Measures (Fire Alarm) | $0 | ||||
| Subtotal | $0 |
| TENANT IMPROVEMENTS | |||||
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | $0 | ||||
| Full-Time Superintendent | $0 | ||||
| Interim Life Safety Measures (Sprinkler) | $0 | ||||
| Interim Life Safety Measures (Fire Alarm) | $0 | ||||
| Subtotal | $0 |
TOTALS $0 $0 $0 $0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EXIST. COND.
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| SUB | CONTRACT AMOUNT | |||||||||
| No. | GSA | CSI | DESCRIPTION | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
02000 EXISTING CONDITIONS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| Fire Protection Demo | $0 | |
| Plumbing Demo | $0 | |
| HVAC Demo | $0 | |
| Electrical Demo | $0 | |
| Communications Demo | $0 | |
| Security Device & Cable Demo | $0 | |
| Fire Alarm Device Demo | $0 | |
| Partition Wall Demo | $0 | |
| Remove Door/Hardware/Frame for Reuse | $0 | |
| Door Demo, Hardware, & Frame (For Infill) | $0 | |
| Demo Door/Hardware | $0 | |
| Demo Interior Window | $0 | |
| Demo Ceramic Tile Floor | $0 | |
| Demo Vinyl FloorTile | $0 | |
| Demo Carpet Flooring | $0 | |
| Demo Casework Upper & Lower | $0 | |
| Demo Wall Base on Wall to Remain | $0 | |
| Demo ACT Ceiling | $0 | |
| Demo Gyp Ceiling | $0 | |
| ACM Flooring Abatement | $0 | $0 |
| Air Monitoring | $0 | $0 |
| Decontamination | $0 | $0 |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
CONCRETE
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
03000 CONCRETE SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
MASONRY
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
04000 MASONRY SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||
| $0 | $0 | S | |
| $0 | $0 | ||
| $0 | $0 | ||
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
METALS
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
05000 METALS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||
| Wall Type 3 - 3 5/8" Studs 10' Tall | $0 | $0 | S |
| Wall Type 1 - 3 5/8" Studs 8' Tall | $0 | $0 | |
| New metal studs at GWB ceilings at corridor | $0 | $0 |
Subtotal $0.00 $0.00 $0.00 $0 $0
| TENANT IMPROVEMENTS | |||||
| Wall Type 3 - 3 5/8" Studs 10' Tall | $0 | $0 | |||
| Wall Type 3 - 3 5/8" Studs 8' Tall | $0 | $0 | |||
| Wall Type 3a - 3 5/8" Studs 10' Tall | $0 | ||||
| Wall Type 7 - 3 5/8" Studs 10' Tall | $0 | ||||
| Wall Type 99 - 3 5/8" Studs 10' Tall | $0 | ||||
| Wall Type 09 - 3 5/8" Studs 48" Tall | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
WOOD & PLASTIC
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
06000 WOOD AND PLASTIC SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||||||
| 5/8" Sheathing - Wall Type 1 | $0 | $0 | T | |||
| $0 | $0 | |||||
| $0 | $0 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| Blocking | $0 | $0 | |||
| Level 3 Bullet Resistant Fiberglass | $0 | $0 | |||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
THERM. & MOIST. PROT.
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
07000 THERMAL & MOISTURE PROTECTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | 0 | 0 | 0 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| Misc. Caulking | $0 | $0 | |||
| 3 1/2" Batt Insulation | $0 | $0 | |||
| $0 | $0 | ||||
| Subtotal | 0 | 0 | 0 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
DOORS & WINDOWS
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
08000 DOORS AND WINDOWS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||||||
| $0 | $0 | |||||
| $0 | $0 | |||||
| $0 | $0 | T | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| New 3'0"x7'0" Flush Wooden Door | $0 | $0 | T | |||
| New 2'0"x7'0" Flush Wooden Door | $0 | |||||
| New 3'0"x7'0" Flush Wooden Door w/ Narrow Lite | $0 | |||||
| Install existing door and hardware in existing frame | $0 | |||||
| New 3'0"x7'0" Welded Hollow Metal Frame | $0 | |||||
| New 3'0"x7'0" Welded Hollow Metal Frame w/ Sidelight | $0 | |||||
| New 4'0"x7'0" Welded Hollow Metal | $0 | |||||
| Threshold | $0 | |||||
| Hardware Set #1 | $0 | |||||
| Hardware Set #2 | $0 | |||||
| Hardware Set #3 | $0 | |||||
| Hardware Set #4 | $0 | |||||
| Hardware Set #5 | $0 | |||||
| Hardware Set #6 | $0 | |||||
| Hardware Set #7 | $0 | |||||
| Hardware Set #8 | $0 | |||||
| Hardware Set #9 | $0 | |||||
| Hardware Set #10 | $0 | $0 | ||||
| Ballistic Transaction Window (42" x 72") | $0 | $0 | T | |||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FINISHES
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
09000 FINISHES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| 5/8" Gypboard on Walls - Corridor | $0 | $0 | |||
| Paint | $0 | $0 | |||
| Vinyl Wall Base - Corridor | $0 | ||||
| New LVT infill at suite entrances | $0 | ||||
| New GWB ceiling at corridor at suite entrance | $0 | $0 | |||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| 5/8" Gypboard | $0 | $0 | T | |||
| Paint | $0 | |||||
| Vinyl Wall Base | $0 | |||||
| Carpet Floor Finish - CPT2 | $0 | |||||
| Carpet Floor Finish - CPT1 | $0 | |||||
| Vinyl Composite Tile - VCT1 | $0 | |||||
| Vinyl Composite Tile - VCT2 | $0 | |||||
| New 2x2 Acoustical Ceiling Tile & Grid | $0 | |||||
| $0 | $0 | T | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SPECIALTIES
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
10000 SPECIALTIES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||||||
| $0 | $0 | T | ||||
| $0 | $0 | |||||
| $0 | $0 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| New ADA Plastic Laminate Signage | $0 | $0 | |||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EQUIPMENT
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
11000 EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||||||
| $0 | $0 | T | ||||
| $0 | $0 | |||||
| $0 | $0 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| Refrigerator | $0 | $0 | T | |||
| Microwave | $0 | $0 | ||||
| $0 | $0 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FURNISHINGS
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
12000 FURNISHINGS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| Base Cabinets 24"D x 35"H x 18"W | $0 | $0 | |||
| Base Cabinet 24"D x 35"H x 30"W | $0 | ||||
| Base Cabinets 24"D x 35"H x 24"W | $0 | ||||
| Base Cabinets 24"D x 18"H x 36"W | $0 | ||||
| Wall Cabinets 12"D x 15"H x 30"W | $0 | ||||
| Wall Cabinets 12"D x 30"H x 30"W | $0 | ||||
| Wall Cabinets 12"D x 30"H x 18"W | $0 | $0 | |||
| Wall Cabinets 12"D x 30"H x 36"W | $0 | ||||
| Solid Surface Countertop | $0 | $0 | |||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SPECIAL CONST.
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
13000 SPECIAL CONSTRUCTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | |||
| $0 | $0 | T | |
| $0 | $0 | ||
| $0 | $0 | ||
| Subtotal | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
CONVEYING
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
14000 CONVEYING EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FIRE PROTECTION
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
21000 FIRE PROTECTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| Sprinkler Re-work | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
PLUMBING
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
22000 PLUMBING SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| Escutcheons | $0.00 | $0.00 | S | |||
| General-Duty Valves | $0.00 | |||||
| Ball valves | $0.00 | |||||
| Hangers and Supports | $0.00 | |||||
| Identification for Piping and Equipment | $0.00 | |||||
| Valve Tags (brass, 2" diameter) | $0.00 | |||||
| Pipe Labels | $0.00 | |||||
| Plumbing Piping Insulation | $0.00 | |||||
| 1/2" diameter | $0.00 | |||||
| Domestic Water Piping | $0.00 | |||||
| Copper (type L) | $0.00 | |||||
| 1/2" diameter | $0.00 | |||||
| Sanitary Waste and Vent Piping | $0.00 | |||||
| Instanteanous Electric Water Heater | $0.00 | |||||
| Commercial Fixtures | ||||||
| Sink | $0.00 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
HVAC
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
23000 HVAC SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| 230514 | Electric Wiring for HVAC Equipment | $0.00 | $0.00 | |||
| 23 0518 | Escutcheons | $0.00 | ||||
| 23 0523 | General-Duty Valves | $0.00 | ||||
| Ball valves | $0.00 | |||||
| 3/4" soldered | $0.00 | |||||
| 23 0529 | Hangers and Supports | $0.00 | ||||
| 23 0553 | Identification for Piping and Equipment | $0.00 | ||||
| Valve Tags (brass, 2" diameter) | $0.00 | |||||
| Labels | $0.00 | |||||
| 23 0593 | Testing, Adjusting, and Balancing | $0.00 | ||||
| 23 0713 | Duct Insulation | $0.00 | ||||
| 1-1/2" blanket mineral fiber | $0.00 | |||||
| 23 0719 | HVAC Piping Insulation | $0.00 | ||||
| 3/4" diameter | $0.00 | |||||
| 23 0900 | Instrumentation and Control for HVAC | $0.00 | ||||
| 23 0900 | Pressure Independent Control Valve | $0.00 | ||||
| 23 2113 | Hydronic Piping, Type L copper | $0.00 | ||||
| 3/4" diameter | $0.00 | |||||
| 23 3113 | Metal Ducts | $0.00 | ||||
| Galvanized, MIL90 finish | $0.00 | |||||
| 23 3300 | Air Duct Accessories | $0.00 | ||||
| Balancing damper (butterfly) | $0.00 | |||||
| 233600 | Air Terminal Units | $0.00 | ||||
| 23 3713 | Diffusers, Registers, and Grilles | $0.00 | ||||
| Security grille | $0.00 | $0.00 | ||||
| 238219 | Fan-Coil Units | $0.00 | $0.00 | |||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
AUTOMATION
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
25000 INTEGRATED AUTOMATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | |||
| EA | $0.00 | $0.00 | |
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| Subtotal | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
ELECTRICAL
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
26000 ELECTRICAL ` SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | S | |||||
| Low Voltage #12 AWG | $0.00 | $0.00 | ||||
| Control-Voltage Elec. | $0.00 | |||||
| Grounding and Bonding | $0.00 | |||||
| Hangers and Supports | $0.00 | |||||
| Raceways and Boxes | $0.00 | |||||
| 3/4" EMT | $0.00 | |||||
| 3/4" EMT for security, camera, duress, etc. | $0.00 | |||||
| Sleeves and Sleeve Seals | $0.00 | |||||
| Identification | $0.00 | |||||
| Lighting Control Devices | $0.00 | |||||
| Lighting Control Switches (Occupancy & Vacancy) | $0.00 | |||||
| Dual Tech Occupancy Sensors | $0.00 | |||||
| Wire Devices | $0.00 | |||||
| Duplex Outlets | $0.00 | |||||
| Duplex GFCI Outlets | $0.00 | |||||
| Enclosed Switches and Circuit Breakers | $0.00 | |||||
| LED Interior Lighting | $0.00 | |||||
| Type A | $0.00 | |||||
| Emergency and Exit Lighting | $0.00 | |||||
| Type A/EM | $0.00 | |||||
| Type Exit | $0.00 | |||||
| $0.00 | $0.00 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
COMMUNICATIONS
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
27000 COMMUNICATIONS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | S | |||||
| Raceways and Boxes | $0.00 | $0.00 | ||||
| 1" EMT | $0.00 | |||||
| Misc. | $0.00 | |||||
| Cabling | $0.00 | |||||
| Cat 6 cable, jacks, patch panels | $0.00 | |||||
| Connectrac | $0.00 | |||||
| Data Rack | $0.00 | |||||
| Back Bone Fiber, Connectors, Panel | $0.00 | |||||
| Back Bone Copper, Blocks | $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
ELEC. S&S
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
28000 ELECTRONIC SAFETY & SECURITY SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| Fire Alarm | $0.00 | $0.00 | |||
| Programming and testing | $0.00 | ||||
| Raceways and Boxes | $0.00 | ||||
| 1" EMT | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EARTHWORK
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
31000 EARTHWORK SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EXT. IMP.
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
32000 EXTERIOR IMPROVEMENTS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | ||
| $0 | $0 | |
| $0 | $0 | |
| $0 | $0 | |
| Subtotal | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
UTILITIES
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
33000 UTILITIES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | |||
| EA | $0.00 | $0.00 | |
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| Subtotal | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
TRANSPORTATION
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
34000 TRANSPORTATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | |||
| EA | $0.00 | $0.00 | |
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| Subtotal | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
MARINE
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
35000 MARINE SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | S | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| Subtotal | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
MATL PROC
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
41000 MATERIAL PROCESSING & HANDLING SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | S | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| Subtotal | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
POLLUTION
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
44000 POLLUTION & WASTE CONTROL EQUIP. SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
WATER & WASTE
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
46000 WATER & WASTEWATER EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EGEN
| GENERAL SERVICES ADMINISTRATION | Date: | 12/31/99 | ||
| Public Building Service / Property Management Division | ROUND((H15*(I15+J15+K15)),0) | |||
| 0 | ||||
| 0 | ||||
| GSA Contract No: | 0 | |||
| Project: | Kenneth B. Keating Building U.S. Trustees Office | |||
| Contractor: | 0 | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
48000 ELECTRICAL POWER GENERATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
| TENANT IMPROVEMENTS | ||
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| $0.00 | $0.00 | |
| Subtotal | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
Instructions
| 1. | Enter the required information in the following cells: |
| No. - Sequentially number each item. | |
| GSA -select relevant system from GSA list (TABLES) | |
| CSI - select relevant spec. section from CSI list (TABLES) | |
| Description - maximum 27 characters, use standard abbreviations. Do not use punctuation such as periods, appostrophies or quotations. (feet = ft, inches = in)(example: 3/4in copper DHW) | |
| UM - select relevant unit from UM list (TABLES) Must be CAPS. | |
| Quantity - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar) | |
| Labor - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar) | |
| Material - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar) | |
| Total - no entry required, field will auto calculate. Shaded areas are auto calculating. | |
| 2. | To add lines to the sheet, select the last empty formatted line(above the red line) on the sheet(click in the left most column, the one EXCEL numbers) and from the Edit menu or the popup menu(right mouse button) select COPY(or use Ctrl-C). |
| From the Insert menu select Copied Cells or from the popup menu select Insert Copied Cells. | |
| 3. | Do not insert additional columns. |
| 4. | Do not add lines below the total line(red line). |
| 5. | Do not use header lines(Bldg names/numbers, floor numbers, elevation titles) Incorporate all titles in descriptions(example: Bld-1 Acc Ceilings) |
| 6. | Do not hide columns or rows. |
| 7. | Properly filled in TPB will facilitate CoA creation and upload of TPB into JDE/FMS by Cost Control. |
TABLES
| GSA Codes for TPB | CSI Codes for TPB | ||
| GSA Code | GSA Description | CSI Code | CSI Description |
| 01000 | Foundations | 00600 | Bonds and Certificates |
| 01100 | Standard Foundations | 00610 | Bonds |
| 01100 | Wall Foundations | 00620 | Insurance |
| 01120 | Col Fdtns & Pile Caps | 00700 | General Conditions |
| 01200 | Spec Fdtn Conditions | 00800 | Supplementary Conditions |
| 01210 | Pile Foundations | 01000 | General Requirements |
| 01220 | Caissons | 01100 | Summary |
| 01230 | Underpinning | 01200 | Price & Payment Procedures |
| 01240 | Dewatering | 01300 | Administrative Requirements |
| 01250 | Raft Foundations | 01400 | Quality Requirements |
| 01260 | Other Spec Fdtn Cond | 01500 | Temp Facilities & Controls |
| 02000 | Substructure | 01600 | Product Requirements |
| 02100 | Slab on Grade | 01700 | Execution Requirements |
| 02110 | Standard Slab on Grade | 01732 | Cutting and Patching |
| 02120 | Structural Slab on Grade | 01736 | Selective Demolition |
| 02130 | Inclined Slab on Grade | 01780 | Closeout Submittals |
| 02140 | Trenches, Pits & Bases | 01800 | Facility Operation |
| 02150 | Foundation Drainage | 01900 | Facility Decomissioning |
| 02200 | Basement Excavation | 02000 | Site Construction |
| 02210 | Excavation for Basements | 02050 | Basic Site Materials & Methods |
| 02220 | Structure Fill & Compact | 02100 | Site Remediation |
| 02230 | Shoring | 02200 | Site Preparation |
| 02300 | Basement Walls | 02300 | Earthwork |
| 02310 | Basement Wall Construction | 02400 | Tunneling, Boring, & Jacking |
| 02320 | Moisture Protection | 02450 | Fdtn & Load-Bearing Elements |
| 02330 | Basement Wall Insulation | 02500 | Utility Services |
| 03000 | Superstructure | 02600 | Drainage & Containment |
| 03100 | Floor Construction | 02700 | Base, Ballast, Pavmt, & Appurt |
| 03110 | Susp Basement Floor Const | 02800 | Site Improvements & Amenities |
| 03120 | Upper Floors Construction | 02900 | Planting |
| 03130 | Balcony Construction | 02950 | Site Restoration & Rehab |
| 03140 | Ramps | 03000 | Concrete |
| 03150 | Special Floor Const | 03050 | Basic Conc Materials & Methods |
| 03200 | Roof Construction | 03100 | Concrete Forms & Accessories |
| 03210 | Flat Roof Construction | 03200 | Concrete Reinforcement |
| 03220 | Pitched Roof Constr | 03300 | Cast-In-Place Concrete |
| 03230 | Canopies | 03310 | Structural Concrete |
| 03240 | Special Roof Systems | 03330 | Architectural Concrete |
| 03300 | Stair Construction | 03340 | Low Density Concrete |
| 03310 | Stair Structure | 03350 | Concrete Finishing |
| 04000 | Exterior Closure | 03360 | Concrete Finishes |
| 04100 | Exterior Walls | 03370 | Specially Placed Concrete |
| 04110 | Exterior Wall Const | 03380 | Post-Tensioned Concrete |
| 04120 | Exterior Louvers & Screens | 03390 | Concrete Curing |
| 04130 | Sun Control Devices(ext) | 03400 | Precast Concrete |
| 04140 | Balcony Walls & Handrails | 03500 | Cementit's Decks & Underlaymnt |
| 04150 | Exterior Soffits | 03600 | Grouts |
| 04200 | Ext Doors & Windows | 03700 | Mass Concrete |
| 04210 | Windows | 03900 | Conc Restoration & Cleaning |
| 04220 | Curtain Walls | 04000 | Masonry |
| 04230 | Exterior Doors | 04050 | Basic Masonry Mat'ls & Methods |
| 04240 | Storefronts | 04200 | Masonry Units |
| 05000 | Roofing | 04400 | Stone |
| 05010 | Roof Coverings | 04500 | Refractories |
| 05020 | Traf Topng & Pavng Membrane | 04600 | Corrosion-Resistant Masonry |
| GSA Codes for TPB | CSI Codes for TPB | ||
| GSA Code | GSA Description | CSI Code | CSI Description |
| 05030 | Roof Insulation & Fill | 04700 | Simulated Masonry |
| 05040 | Flashing & Trim | 04800 | Masonry Assemblies |
| 05050 | Roof Openings | 04900 | Masonry Restoration & Cleaning |
| 06000 | Interior Construction | 05000 | Metals |
| 06100 | Partitions | 05050 | Basic Metal Mat'ls & Methods |
| 06110 | Fixed Partitions | 05100 | Structural Metal Framing |
| 06120 | Demountable Partitions | 05200 | Metal Joists |
| 06130 | Retractable Partitions | 05300 | Metal Deck |
| 06140 | Compartments & Cubicles | 05400 | Cold-Formed Metal Framing |
| 06150 | Int Balustrades & Screens | 05500 | Metal Fabrications |
| 06160 | Interior Doors & Frames | 05600 | Hydraulic Fabrications |
| 06170 | Interior Storefronts | 05650 | Railroad Track & Accessories |
| 06200 | Interior Finishes | 05700 | Ornamental Metal |
| 06210 | Wall Finishes | 05800 | Expansion Control |
| 06220 | Floor | 05900 | Metal Restoration & Cleaning |
| 06230 | Ceiling Finishes | 06000 | Wood and Plastic |
| 06300 | Specialties | 06050 | Wood & Plastic Matls & Methds |
| 06310 | General Specialties | 06100 | Rough Carpentry |
| 06320 | Built-in Fittings | 06200 | Finish Carpentry |
| 06900 | Interior Demolition | 06400 | Architectural Woodwork |
| 06910 | Cut & Patch | 06500 | Structural Plastics |
| 06930 | Selective Demolition | 06600 | Plastic Fabrications |
| 07000 | Conveying Systems | 06900 | Wood & Plastic Restor' & Cl'ng |
| 07010 | Elevators | 07000 | Thermal & Moisture Protection |
| 07020 | Moving Stair & Walks | 07050 | Therml/Moist Prot Matls & Meth |
| 07030 | Dumbwaiters | 07100 | Dampproofing & Waterproofing |
| 07040 | Pneumatic Tube Systems | 07200 | Thermal Protection |
| 07050 | Other Conveying Systems | 07300 | Shingles, Roof Tiles & Covrngs |
| 07060 | General Construction Items | 07400 | Roofings & Siding Panels |
| 08000 | Mechanical | 07500 | Membrane Roofing |
| 08100 | Plumbing | 07600 | Flashing & Sheet Metal |
| 08110 | Domestic Water Supply Sys | 07700 | Roof Specialties & Accessories |
| 08120 | Sanitary Waste & Vent Sys | 07800 | Fire & Smoke Protection |
| 08130 | Rainwater Drainage Sys | 07900 | Joint Sealers |
| 08140 | Plumbing Fixtures | 08000 | Doors and Windows |
| 08200 | HVAC | 08050 | Door & Window Matls & Meth |
| 08210 | Energy Supply | 08100 | Metal Doors & Frames |
| 08220 | Heat Generating Sys | 08200 | Wood & Plastic Doors |
| 08230 | Cooling Generating Sys | 08300 | Specialty Doors |
| 08240 | Distribution Systems | 08400 | Entrances & Storefronts |
| 08250 | Terminal & Package Units | 08500 | Windows |
| 08260 | Controls & Instrumentation | 08600 | Skylights |
| 08270 | Systems Testing & Balancing | 08700 | Hardware |
| 08300 | Fire Protection | 08800 | Glazing |
| 08310 | Water Supply(Fire Protection) | 08900 | Glazed Curtain Wall |
| 08320 | Sprinklers | 09000 | Finishes |
| 08330 | Standpipe Systems | 09050 | Finishes Matls & Meth |
| 08340 | Fire Extinguishers | 09100 | Metal Support Assemblies |
| 08400 | Spec Mechanical Systems | 09200 | Plaster & Gypsum Board |
| 08410 | Special Plumbing Systems | 09300 | Tile |
| 08420 | Special Fire Protection Sys | 09400 | Terrazzo |
| 08430 | Misc Spec Sys & Devices | 09500 | Ceilings |
| 08440 | Gen Const Items(Mech) | 09600 | Flooring |
| 09000 | Electrical | 09700 | Wall Finishes |
| 09100 | Service & Distribution | 09800 | Acoustical Treatment |
| GSA Codes for TPB | CSI Codes for TPB | ||
| GSA Code | GSA Description | CSI Code | CSI Description |
| 09110 | High Tension Service & Dist | 09900 | Paints & Coatings |
| 09120 | Low Tension Service & Dist | 10000 | Specialties |
| 09200 | Lighting & Power | 10100 | Visual Display Boards |
| 09210 | Branch Wiring | 10150 | Compartments & Cubicles |
| 09220 | Lighting Equipment | 10200 | Louvers & Vents |
| 09300 | Spec Electrical Syst | 10240 | Grilles & Screens |
| 09310 | Communications & Alarm Sys | 10250 | Service Walls |
| 09320 | Grounding Systems | 10260 | Wall & Corner Guards |
| 09330 | Emergency Light & Power | 10270 | Access Flooring |
| 09340 | Electric Heating | 10290 | Pest Control |
| 09350 | Floor Raceway Systems | 10300 | Fireplaces & Stoves |
| 09360 | Other Spec Sys & Devices | 10340 | Manufactured Ext Specialties |
| 09370 | Gen Const Items(Elect) | 10350 | Flagpoles |
| 10000 | General Cond OH & Profit | 10400 | Identification Devices |
| 10010 | Mobilization & Init Expenses | 10450 | Pedestrian Control Devices |
| 10020 | Site Overhead | 10500 | Lockers |
| 10030 | Demobilization | 10520 | Fire Protection Specialties |
| 10040 | Main Off Expense & Profit | 10530 | Protective Covers |
| 10050 | Bldg/Syst Commissioning | 10550 | Postal Specialties |
| 11000 | Equipment | 10600 | Partitions |
| 11100 | Fixed & Movable Equip | 10670 | Storage Shelving |
| 11110 | Built-in Maintenance Equip | 10700 | Exterior Protection |
| 11120 | Checkroom Equipment | 10750 | Telephone Specialties |
| 11130 | Food Service Equipment | 10800 | Toilet, Bath, & Laundry Acc |
| 11140 | Vending Equipment | 10880 | Scales |
| 11150 | Waste Handling Equipment | 10900 | Wardrobe & Closet Specialties |
| 11160 | Loading Dock Equipment | 11000 | Equipment |
| 11170 | Parking Equipment | 11010 | Maintenance Equipment |
| 11180 | Detention Equipment | 11020 | Security & Vault Equipment |
| 11190 | Postal Equipment | 11030 | Teller & Service Equipment |
| 11195 | Other Specialized Equipment | 11040 | Ecclesiastical Equipment |
| 11200 | Furnishings | 11050 | Library Equipment |
| 11210 | Artwork | 11060 | Theater & Stage Equipment |
| 11220 | Window Treatment | 11070 | Instrumental Equipment |
| 11230 | Seating | 11080 | Registration Equipment |
| 11240 | Furniture | 11090 | Checkroom Equipment |
| 11250 | Rugs, Mats, & Furn Access | 11100 | Mercantile Eqipment |
| 11300 | Special Construction | 11110 | Comm Laundry & Dry Clean'g Eqp |
| 11310 | Vaults | 11120 | Vending Equipment |
| 11320 | Interior Swimming Pools | 11130 | Audio-Visual Equipment |
| 11330 | Modular Prefab Assemblies | 11140 | Vehicle Service Equipment |
| 11340 | Special Purpose Rooms | 11150 | Parking Control Equipment |
| 11350 | Other Special Construction | 11160 | Loading Dock Equipment |
| 12000 | Site Work | 11170 | Solid Waste Handling Equipment |
| 12100 | Site Preparation | 11190 | Detention Equipment |
| 12110 | Clearing | 11200 | Water Supply & Treatment Eqp |
| 12120 | Demolition | 11280 | Hydraulic Gates & Valves |
| 12130 | Site Earthwork | 11300 | Fl Waste Treatment & Disp Eqp |
| 12200 | Site Improvements | 11400 | Food Service Equipment |
| 12210 | Parking Lots | 11450 | Residential Equipment |
| 12220 | Roads, Walks, Terraces | 11460 | Unit Kitchens |
| 12230 | Site Development | 11470 | Darkroom Equipment |
| 12240 | Landscaping | 11480 | Athletic, Recr., & Therap. Eqp |
| 12300 | Site Utilities | 11500 | Industrial & Process Equipment |
| 12310 | Water Supply & Dist Sys | 11600 | Laboratory Equipment |
| GSA Codes for TPB | CSI Codes for TPB | ||
| GSA Code | GSA Description | CSI Code | CSI Description |
| 12320 | Drainage & Sewer Sys | 11650 | Planetarium Equipment |
| 12330 | Heating & Cooling Dist Sys | 11660 | Observatory Equipment |
| 12340 | Elec Dist & Lighting Sys | 11680 | Office Equipment |
| 12350 | Snow Melting Sys | 11700 | Medical Equipment |
| 12360 | Service Tunnels | 11780 | Mortuary Equipment |
| 12400 | Off-Site Work | 11850 | Navigation Equipment |
| 12410 | Railroad Work | 11870 | Agricultural Equipment |
| 12420 | Marine Work | 11900 | Exhibit Equipment |
| 12430 | Tunneling | 12000 | Furnishings |
| 12440 | Other Off-Site Work | 12010 | Air-Supported Structures |
| 13000 | Testing Program | 12050 | Fabrics |
| 12100 | Art | ||
| 12300 | Manufactured Casework | ||
| 12400 | Furnishings & Accessories | ||
| 12500 | Furniture | ||
| 12600 | Multiple Seating | ||
| 12700 | Systems Furniture | ||
| 12800 | Interior Plants & Planters | ||
| 12900 | Furnishings Rest & Repair | ||
| 13000 | Special Construction | ||
| 13020 | Building Modules | ||
| 13030 | Special Purpose Rooms | ||
| 13080 | Sound, Vibr., & Seismic Cont | ||
| 13090 | Radiation Protection | ||
| 13100 | Lightning Protection | ||
| 13110 | Cathodic Protection | ||
| 13120 | Pre-Engineered Structures | ||
| 13150 | Swimming Pools | ||
| 13160 | Aquariums | ||
| 13165 | Aquatic Park Facilities | ||
| 13170 | Tubs & Pools | ||
| 13175 | Ice Rinks | ||
| 13185 | Keensl & Animal Shelters | ||
| 13190 | Site-Constructed Incinerators | ||
| 13200 | Storage Tanks | ||
| 13220 | Filter Underdrains & Media | ||
| 13230 | Digester Covers & Appurt | ||
| 13240 | Oxygenation Systems | ||
| 13260 | Sludge Conditioning Systems | ||
| 13280 | Hazardous Material Remediation | ||
| 13400 | Measurement & Contrl Instr | ||
| 13500 | Recording Instrumentation | ||
| 13550 | Transportation Contrl Instr | ||
| 13600 | Solar & Wind Energy Equipment | ||
| 13700 | Security Access & Surveillance | ||
| 13800 | Building Automation & Control | ||
| 13850 | Detection & Alarm | ||
| 13900 | Fire Suppression | ||
| 14000 | Conveying Systems | ||
| 14100 | Dumbwaiters | ||
| 14200 | Elevators | ||
| 14300 | Escalators & Moving Walks | ||
| 14400 | Lifts | ||
| 14500 | Material Handling | ||
| 14600 | Hoists & Cranes | ||
| UM Codes for TPB | CSI Codes for TPB | ||
| UM | UM Desc | CSI Code | CSI Description |
| AC | Acres | 14700 | Turntables |
| BF | Board Feet | 14800 | Scaffolding |
| CF | Cubic Feet | 14900 | Transportation |
| CI | Cubic Inches | 15000 | Mechanical |
| CS | Hundred Square Feet | 15050 | Mechanical Materials & Methods |
| CY | Cubic Yard | 15100 | Building Services Piping |
| EA | Each | 15200 | Process Piping |
| FC | Hundred Feet | 15300 | Fire Protection Piping |
| FT | Feet | 15400 | Plumbing Fixtures & Equipment |
| GA | Gallons | 15500 | Heat-Generation Equipment |
| HR | Hour | 15600 | Refrigeration Equipment |
| IN | Inches | 15700 | Heatng, Ventilatng, & AC Equip |
| LB | Pounds | 15800 | Air Distribution |
| LF | Linear Feet | 15900 | HVAC Instrument' & Controls |
| LS | LumpSum | 15950 | Testing, Adjustng, & Balancng |
| LY | Linear Yard | 16000 | Electrical |
| MB | Thousand Board Feet | 16050 | Electrical Materials & Methods |
| MF | Thousand Feet | 16100 | Wiring Methods |
| MH | Man Hour | 16200 | Electrical Power |
| MI | Miles | 16300 | Transmission & Distribution |
| MO | Months | 16400 | Low-Voltage Distribution |
| NT | Not to Exceed | 16500 | Lighting |
| PC | Pieces | 16700 | Communications |
| SF | Square Feet | 16800 | Sound & Video |
| SI | Square Inch | 93310 | Asbestos Abatement |
| SQ | Square | ||
| SY | Square Yard | ||
| TN | Tons | ||
| WK | Weeks | ||
| YD | Yards |
Sheet1
| 10 | SEC24144 84" Support Post-Single Sided | $ 66.00 | $660.00 |
| 6 | SEC24147 40" wide back Panel Set | $ 363.00 | $2,178.00 |
| 6 | SEC24149 40" wide Base Cover | $ 59.40 | $356.40 |
| 6 | SEC24150 Base Cover end Caps | $ 30.60 | $183.60 |
| 6 | SEC24151 Wall Support Bracket | $ 9.60 | $57.60 |
| 48 | SEC24154 1 Capacity Stock Shelf | $ 10.80 | $518.40 |
| 9 | SEC24163 12 Capacity Stock Saddle | $ 97.80 | $880.20 |
| 54 | SEC24166 1 Capacity Barrel Saddle 5 1/2" | $ 10.80 | $583.20 |
| 54 | SEC24171 1 Capacity Barrel Saddle 7" | $ 10.80 | $583.20 |
| 3 | SEC34005 40'W Shelf for EWR, SWR (12 Spaces) | $ 63.60 | $190.80 |
| 1 | SECCAGE 8'x8' Cage Wall with sliding door (see details in quote) | $ 975.00 | $975.00 |
| 1 | SECINSTL Secureit Trained Installation | $ 1,295.00 | $1,295.00 |
| Subtotal | $8,461.40 | ||
| Freight | $ 350.00 | ||
| Total | $8,811.40 |
image1.jpeg
File details come from the government source that posted it. Updated .