Attachment 1, Proposal Breakdown Template.xlsx

XLSX spreadsheet 349 KB Posted

Attached to
US Trustee 4th Floor Keating Renovation Federal contract opportunity
Solicitation number
47PC1120R0003
Issued by
General Services Administration Public Buildings Service Region 2

About this file

This federal contract opportunity notice seeks contractors to furnish all labor, materials, equipment and supervision for the renovation of approximately 2,700 square feet of space for the United States Trustees on the fourth floor of the Kenneth B. Keating Federal Building and U.S. Courthouse in Rochester, New York. The renovated space will include elements to support the work functions of the US Trustees such as a reception area, workstations, enclosed offices, storage, mail room, break room and conference room. Base interior work includes hazardous material abatement, new walls, doors, casework, flooring, plumbing, electrical, fire protection and mechanical systems. Additionally, technology, data and security infrastructure work is required. The total project cost is estimated between $500,000 and $1,000,000. The solicitation is reserved for small businesses only. The required construction completion date is approximately 192 calendar days from notice to proceed. Interested contractors must register in SAM and submit a completed document security form to receive specifications and drawings for the project by email. The point of contact is James Berring at the General Services Administration.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

GENERAL SERVICES ADMINISTRATIONDate:
Public Building Service / Property Management Division
GSA Contract No:
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:Trade:All
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONSHELLT.I.TOTAL
SUMMARY
01000GENERAL CONDITIONS$0.00$0.00$0$00TRUE
02000EXISTING CONDITIONS$0.00$0.00$0$00TRUE
03000CONCRETE$0.00$0.00$0$00TRUE
04000MASONRY$0.00$0.00$0$00TRUE
05000METALS$0.00$0.00$0$00TRUE
06000WOOD & PLASTIC$0.00$0.00$0$00TRUE
07000THERMAL & MOISTURE PROTECTION$0.00$0.00$0$00TRUE
08000DOORS & WINDOWS$0.00$0.00$0$00TRUE
09000FINISHES$0.00$0.00$0$00TRUE
10000SPECIALTIES$0.00$0.00$0$00TRUE
11000EQUIPMENT$0.00$0.00$0$00TRUE
12000FURNISHINGS$0.00$0.00$0$00TRUE
13000SPECIAL CONSTRUCTION$0.00$0.00$0$00TRUE
14000CONVEYING EQUIPMENT$0.00$0.00$0$00TRUE
21000FIRE PROTECTION$0.00$0.00$0$00TRUE
22000PLUMBING$0.00$0.00$0$00TRUE
23000HVAC$0.00$0.00$0$00TRUE
25000INTEGRATED AUTOMATION$0.00$0.00$0$00TRUE
26000ELECTRICAL$0.00$0.00$0$00TRUE
27000COMMUNICATIONS$0.00$0.00$0$00TRUE
28000ELECTRONIC SAFETY & SECURITY$0.00$0.00$0$00TRUE
31000EARTHWORK$0.00$0.00$0$00TRUE
32000EXTERIOR IMPROVEMENTS$0.00$0.00$0$00TRUE
33000UTILITIES$0.00$0.00$0$00TRUE
34000TRANSPORTATION$0.00$0.00$0$00TRUE
35000WATERWAY & MARINE$0.00$0.00$0$00TRUE
41000MATERIAL PROCESSING & HANDLING$0.00$0.00$0$00TRUE
44000POLLUTION & WASTE CONTROLL EQUIP.$0.00$0.00$0$00TRUE
46000WATER & WASTEWATER EQUIPMENT$0.00$0.00$0$00TRUE
48000ELECTRICAL POWER GENERATION$0.00$0.00$0$00TRUE
SUBCONTRACTOR MARKUP00$0
SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES
SUBTOTAL00$0$0
DESIGN CONTINGENCY00$0$0
CITY COST FACTOR00$0$0
SUBTOTAL00$0$0
OVERHEAD00$0$0
PROFIT00$0$0
ESCALATION TO MIDPOINT00$0$0
TOTALS (ECCA)$0$0$0$0
BONDING$0$0$0$0
CONSTRUCTION CONTINGENCY$ - 0$ - 0$0$0
TOTALS (ECC)$0$0$0$0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

SUMMARY - LME

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management Division
Special Projects Division
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONLABORMATERIALEQUIPTOTAL
SUMMARY - Labor/Material/Equipment
01000GENERAL CONDITIONS0.000.000.00$0$0
02000EXISTING CONDITIONS0.000.000.00$0$0
03000CONCRETE0.000.000.00$0$0
04000MASONRY0.000.000.00$0$0
05000METALS0.000.000.00$0$0
06000WOOD & PLASTIC0.000.000.00$0$0
07000THERMAL & MOISTURE PROTECTION0.000.000.00$0$0
08000DOORS & WINDOWS0.000.000.00$0$0
09000FINISHES0.000.000.00$0$0
10000SPECIALTIES0.000.000.00$0$0
11000EQUIPMENT0.000.000.00$0$0
12000FURNISHINGS0.000.000.00$0$0
13000SPECIAL CONSTRUCTION0.000.000.00$0$0
14000CONVEYING EQUIPMENT0.000.000.00$0$0
21000FIRE PROTECTION0.000.000.00$0$0
22000PLUMBING0.000.000.00$0$0
23000HVAC0.000.000.00$0$0
25000INTEGRATED AUTOMATION0.000.000.00$0$0
26000ELECTRICAL0.000.000.00$0$0
27000COMMUNICATIONS0.000.000.00$0$0
28000ELECTRONIC SAFETY & SECURITY0.000.000.00$0$0
31000EARTHWORK0.000.000.00$0$0
32000EXTERIOR IMPROVEMENTS0.000.000.00$0$0
33000UTILITIES0.000.000.00$0$0
34000TRANSPORTATION0.000.000.00$0$0
35000WATERWAY & MARINE0.000.000.00$0$0
41000MATERIAL PROCESSING & HANDLING0.000.000.00$0$0
44000POLLUTION & WASTE CONTROLL EQUIP.0.000.000.00$0$0
46000WATER & WASTEWATER EQUIPMENT0.000.000.00$0$0
48000ELECTRICAL POWER GENERATION0.000.000.00$0$0
SUBCONTRACTOR MARKUP0.0%000$0
SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES
SUBTOTAL000$0$0
DESIGN CONTINGENCY0%000$0$0
CITY COST FACTOR0%000$0$0
SUBTOTAL000$0$0
OVERHEAD0%000$0$0
PROFIT0%000$0$0
ESCALATION TO MIDPOINT0.0%000$0$0
TOTALS (ECCA)$0$0$0$0$0
BONDING0.0%$0$0$0$0$0
CONSTRUCTION CONTINGENCY0%$ - 0$ - 0$ - 0$0$0
TOTALS (ECC)$0$0$0$0$0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

GENERAL CONDITIONS

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management Division
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONSUBUMQTYLABORMATERIALEQUIPTOTAL

01000 GENERAL CONDITIONS RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
General Conditions%$0$0$0$0
Security Clearnances$0
Full-Time Superintendent (22 wk @ 40 hrs/wk)$0
Temporary Barricade Walls$0
Interim Life Safety Measures (Sprinkler)$0
Interim Life Safety Measures (Fire Alarm)$0
Subtotal$0
TENANT IMPROVEMENTS
General Conditions%$0$0$0$0
Security Clearnances$0
Full-Time Superintendent$0
Interim Life Safety Measures (Sprinkler)$0
Interim Life Safety Measures (Fire Alarm)$0
Subtotal$0

TOTALS $0 $0 $0 $0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EXIST. COND.

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
SUBCONTRACT AMOUNT
No.GSACSIDESCRIPTIONY/NUMQTYLABORMATERIALEQUIPTOTAL

02000 EXISTING CONDITIONS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Fire Protection Demo$0
Plumbing Demo$0
HVAC Demo$0
Electrical Demo$0
Communications Demo$0
Security Device & Cable Demo$0
Fire Alarm Device Demo$0
Partition Wall Demo$0
Remove Door/Hardware/Frame for Reuse$0
Door Demo, Hardware, & Frame (For Infill)$0
Demo Door/Hardware$0
Demo Interior Window$0
Demo Ceramic Tile Floor$0
Demo Vinyl FloorTile$0
Demo Carpet Flooring$0
Demo Casework Upper & Lower$0
Demo Wall Base on Wall to Remain$0
Demo ACT Ceiling$0
Demo Gyp Ceiling$0
ACM Flooring Abatement$0$0
Air Monitoring$0$0
Decontamination$0$0
Subtotal$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

CONCRETE

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNT
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

03000 CONCRETE SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

MASONRY

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

04000 MASONRY SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0S
$0$0
$0$0
Subtotal$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

METALS

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

05000 METALS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Wall Type 3 - 3 5/8" Studs 10' Tall$0$0S
Wall Type 1 - 3 5/8" Studs 8' Tall$0$0
New metal studs at GWB ceilings at corridor$0$0

Subtotal $0.00 $0.00 $0.00 $0 $0

TENANT IMPROVEMENTS
Wall Type 3 - 3 5/8" Studs 10' Tall$0$0
Wall Type 3 - 3 5/8" Studs 8' Tall$0$0
Wall Type 3a - 3 5/8" Studs 10' Tall$0
Wall Type 7 - 3 5/8" Studs 10' Tall$0
Wall Type 99 - 3 5/8" Studs 10' Tall$0
Wall Type 09 - 3 5/8" Studs 48" Tall$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

WOOD & PLASTIC

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

06000 WOOD AND PLASTIC SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
5/8" Sheathing - Wall Type 1$0$0T
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Blocking$0$0
Level 3 Bullet Resistant Fiberglass$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

THERM. & MOIST. PROT.

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

07000 THERMAL & MOISTURE PROTECTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal000$0$0
TENANT IMPROVEMENTS
Misc. Caulking$0$0
3 1/2" Batt Insulation$0$0
$0$0
Subtotal000$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

DOORS & WINDOWS

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

08000 DOORS AND WINDOWS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0T
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
New 3'0"x7'0" Flush Wooden Door$0$0T
New 2'0"x7'0" Flush Wooden Door$0
New 3'0"x7'0" Flush Wooden Door w/ Narrow Lite$0
Install existing door and hardware in existing frame$0
New 3'0"x7'0" Welded Hollow Metal Frame$0
New 3'0"x7'0" Welded Hollow Metal Frame w/ Sidelight$0
New 4'0"x7'0" Welded Hollow Metal$0
Threshold$0
Hardware Set #1$0
Hardware Set #2$0
Hardware Set #3$0
Hardware Set #4$0
Hardware Set #5$0
Hardware Set #6$0
Hardware Set #7$0
Hardware Set #8$0
Hardware Set #9$0
Hardware Set #10$0$0
Ballistic Transaction Window (42" x 72")$0$0T
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FINISHES

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

09000 FINISHES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
5/8" Gypboard on Walls - Corridor$0$0
Paint$0$0
Vinyl Wall Base - Corridor$0
New LVT infill at suite entrances$0
New GWB ceiling at corridor at suite entrance$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
5/8" Gypboard$0$0T
Paint$0
Vinyl Wall Base$0
Carpet Floor Finish - CPT2$0
Carpet Floor Finish - CPT1$0
Vinyl Composite Tile - VCT1$0
Vinyl Composite Tile - VCT2$0
New 2x2 Acoustical Ceiling Tile & Grid$0
$0$0T
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

SPECIALTIES

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

10000 SPECIALTIES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0T
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
New ADA Plastic Laminate Signage$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EQUIPMENT

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

11000 EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0T
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Refrigerator$0$0T
Microwave$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FURNISHINGS

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

12000 FURNISHINGS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Base Cabinets 24"D x 35"H x 18"W$0$0
Base Cabinet 24"D x 35"H x 30"W$0
Base Cabinets 24"D x 35"H x 24"W$0
Base Cabinets 24"D x 18"H x 36"W$0
Wall Cabinets 12"D x 15"H x 30"W$0
Wall Cabinets 12"D x 30"H x 30"W$0
Wall Cabinets 12"D x 30"H x 18"W$0$0
Wall Cabinets 12"D x 30"H x 36"W$0
Solid Surface Countertop$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

SPECIAL CONST.

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

13000 SPECIAL CONSTRUCTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0$0
TENANT IMPROVEMENTS
$0$0T
$0$0
$0$0
Subtotal$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

CONVEYING

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

14000 CONVEYING EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FIRE PROTECTION

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

21000 FIRE PROTECTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Sprinkler Re-work$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS $0.00 $0.00 $0.00

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

PLUMBING

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

22000 PLUMBING SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Escutcheons$0.00$0.00S
General-Duty Valves$0.00
Ball valves$0.00
Hangers and Supports$0.00
Identification for Piping and Equipment$0.00
Valve Tags (brass, 2" diameter)$0.00
Pipe Labels$0.00
Plumbing Piping Insulation$0.00
1/2" diameter$0.00
Domestic Water Piping$0.00
Copper (type L)$0.00
1/2" diameter$0.00
Sanitary Waste and Vent Piping$0.00
Instanteanous Electric Water Heater$0.00
Commercial Fixtures
Sink$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS $0.00 $0.00 $0.00

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

HVAC

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

23000 HVAC SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
230514Electric Wiring for HVAC Equipment$0.00$0.00
23 0518Escutcheons$0.00
23 0523General-Duty Valves$0.00
Ball valves$0.00
3/4" soldered$0.00
23 0529Hangers and Supports$0.00
23 0553Identification for Piping and Equipment$0.00
Valve Tags (brass, 2" diameter)$0.00
Labels$0.00
23 0593Testing, Adjusting, and Balancing$0.00
23 0713Duct Insulation$0.00
1-1/2" blanket mineral fiber$0.00
23 0719HVAC Piping Insulation$0.00
3/4" diameter$0.00
23 0900Instrumentation and Control for HVAC$0.00
23 0900Pressure Independent Control Valve$0.00
23 2113Hydronic Piping, Type L copper$0.00
3/4" diameter$0.00
23 3113Metal Ducts$0.00
Galvanized, MIL90 finish$0.00
23 3300Air Duct Accessories$0.00
Balancing damper (butterfly)$0.00
233600Air Terminal Units$0.00
23 3713Diffusers, Registers, and Grilles$0.00
Security grille$0.00$0.00
238219Fan-Coil Units$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS $0.00 $0.00 $0.00

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

AUTOMATION

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

25000 INTEGRATED AUTOMATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0
TENANT IMPROVEMENTS
EA$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS $0.00 $0.00 $0.00

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

ELECTRICAL

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

26000 ELECTRICAL ` SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTSS
Low Voltage #12 AWG$0.00$0.00
Control-Voltage Elec.$0.00
Grounding and Bonding$0.00
Hangers and Supports$0.00
Raceways and Boxes$0.00
3/4" EMT$0.00
3/4" EMT for security, camera, duress, etc.$0.00
Sleeves and Sleeve Seals$0.00
Identification$0.00
Lighting Control Devices$0.00
Lighting Control Switches (Occupancy & Vacancy)$0.00
Dual Tech Occupancy Sensors$0.00
Wire Devices$0.00
Duplex Outlets$0.00
Duplex GFCI Outlets$0.00
Enclosed Switches and Circuit Breakers$0.00
LED Interior Lighting$0.00
Type A$0.00
Emergency and Exit Lighting$0.00
Type A/EM$0.00
Type Exit$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

COMMUNICATIONS

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

27000 COMMUNICATIONS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTSS
Raceways and Boxes$0.00$0.00
1" EMT$0.00
Misc.$0.00
Cabling$0.00
Cat 6 cable, jacks, patch panels$0.00
Connectrac$0.00
Data Rack$0.00
Back Bone Fiber, Connectors, Panel$0.00
Back Bone Copper, Blocks$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

ELEC. S&S

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

28000 ELECTRONIC SAFETY & SECURITY SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Fire Alarm$0.00$0.00
Programming and testing$0.00
Raceways and Boxes$0.00
1" EMT$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EARTHWORK

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

31000 EARTHWORK SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EXT. IMP.

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

32000 EXTERIOR IMPROVEMENTS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

UTILITIES

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

33000 UTILITIES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0
TENANT IMPROVEMENTS
EA$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS $0.00 $0.00 $0.00

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

TRANSPORTATION

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

34000 TRANSPORTATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0
TENANT IMPROVEMENTS
EA$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS $0.00 $0.00 $0.00

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

MARINE

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

35000 MARINE SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0
TENANT IMPROVEMENTSS
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

MATL PROC

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

41000 MATERIAL PROCESSING & HANDLING SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0
TENANT IMPROVEMENTSS
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

POLLUTION

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

44000 POLLUTION & WASTE CONTROL EQUIP. SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0
TENANT IMPROVEMENTS
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

WATER & WASTE

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

46000 WATER & WASTEWATER EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0
TENANT IMPROVEMENTS
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EGEN

GENERAL SERVICES ADMINISTRATIONDate:12/31/99
Public Building Service / Property Management DivisionROUND((H15*(I15+J15+K15)),0)
0
0
GSA Contract No:0
Project:Kenneth B. Keating Building U.S. Trustees Office
Contractor:0Trade:All
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

48000 ELECTRICAL POWER GENERATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0
TENANT IMPROVEMENTS
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

Instructions

1.Enter the required information in the following cells:
No. - Sequentially number each item.
GSA -select relevant system from GSA list (TABLES)
CSI - select relevant spec. section from CSI list (TABLES)
Description - maximum 27 characters, use standard abbreviations. Do not use punctuation such as periods, appostrophies or quotations. (feet = ft, inches = in)(example: 3/4in copper DHW)
UM - select relevant unit from UM list (TABLES) Must be CAPS.
Quantity - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar)
Labor - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar)
Material - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar)
Total - no entry required, field will auto calculate. Shaded areas are auto calculating.
2.To add lines to the sheet, select the last empty formatted line(above the red line) on the sheet(click in the left most column, the one EXCEL numbers) and from the Edit menu or the popup menu(right mouse button) select COPY(or use Ctrl-C).
From the Insert menu select Copied Cells or from the popup menu select Insert Copied Cells.
3.Do not insert additional columns.
4.Do not add lines below the total line(red line).
5.Do not use header lines(Bldg names/numbers, floor numbers, elevation titles) Incorporate all titles in descriptions(example: Bld-1 Acc Ceilings)
6.Do not hide columns or rows.
7.Properly filled in TPB will facilitate CoA creation and upload of TPB into JDE/FMS by Cost Control.

TABLES

GSA Codes for TPBCSI Codes for TPB
GSA CodeGSA DescriptionCSI CodeCSI Description
01000Foundations00600Bonds and Certificates
01100Standard Foundations00610Bonds
01100Wall Foundations00620Insurance
01120Col Fdtns & Pile Caps00700General Conditions
01200Spec Fdtn Conditions00800Supplementary Conditions
01210Pile Foundations01000General Requirements
01220Caissons01100Summary
01230Underpinning01200Price & Payment Procedures
01240Dewatering01300Administrative Requirements
01250Raft Foundations01400Quality Requirements
01260Other Spec Fdtn Cond01500Temp Facilities & Controls
02000Substructure01600Product Requirements
02100Slab on Grade01700Execution Requirements
02110Standard Slab on Grade01732Cutting and Patching
02120Structural Slab on Grade01736Selective Demolition
02130Inclined Slab on Grade01780Closeout Submittals
02140Trenches, Pits & Bases01800Facility Operation
02150Foundation Drainage01900Facility Decomissioning
02200Basement Excavation02000Site Construction
02210Excavation for Basements02050Basic Site Materials & Methods
02220Structure Fill & Compact02100Site Remediation
02230Shoring02200Site Preparation
02300Basement Walls02300Earthwork
02310Basement Wall Construction02400Tunneling, Boring, & Jacking
02320Moisture Protection02450Fdtn & Load-Bearing Elements
02330Basement Wall Insulation02500Utility Services
03000Superstructure02600Drainage & Containment
03100Floor Construction02700Base, Ballast, Pavmt, & Appurt
03110Susp Basement Floor Const02800Site Improvements & Amenities
03120Upper Floors Construction02900Planting
03130Balcony Construction02950Site Restoration & Rehab
03140Ramps03000Concrete
03150Special Floor Const03050Basic Conc Materials & Methods
03200Roof Construction03100Concrete Forms & Accessories
03210Flat Roof Construction03200Concrete Reinforcement
03220Pitched Roof Constr03300Cast-In-Place Concrete
03230Canopies03310Structural Concrete
03240Special Roof Systems03330Architectural Concrete
03300Stair Construction03340Low Density Concrete
03310Stair Structure03350Concrete Finishing
04000Exterior Closure03360Concrete Finishes
04100Exterior Walls03370Specially Placed Concrete
04110Exterior Wall Const03380Post-Tensioned Concrete
04120Exterior Louvers & Screens03390Concrete Curing
04130Sun Control Devices(ext)03400Precast Concrete
04140Balcony Walls & Handrails03500Cementit's Decks & Underlaymnt
04150Exterior Soffits03600Grouts
04200Ext Doors & Windows03700Mass Concrete
04210Windows03900Conc Restoration & Cleaning
04220Curtain Walls04000Masonry
04230Exterior Doors04050Basic Masonry Mat'ls & Methods
04240Storefronts04200Masonry Units
05000Roofing04400Stone
05010Roof Coverings04500Refractories
05020Traf Topng & Pavng Membrane04600Corrosion-Resistant Masonry
GSA Codes for TPBCSI Codes for TPB
GSA CodeGSA DescriptionCSI CodeCSI Description
05030Roof Insulation & Fill04700Simulated Masonry
05040Flashing & Trim04800Masonry Assemblies
05050Roof Openings04900Masonry Restoration & Cleaning
06000Interior Construction05000Metals
06100Partitions05050Basic Metal Mat'ls & Methods
06110Fixed Partitions05100Structural Metal Framing
06120Demountable Partitions05200Metal Joists
06130Retractable Partitions05300Metal Deck
06140Compartments & Cubicles05400Cold-Formed Metal Framing
06150Int Balustrades & Screens05500Metal Fabrications
06160Interior Doors & Frames05600Hydraulic Fabrications
06170Interior Storefronts05650Railroad Track & Accessories
06200Interior Finishes05700Ornamental Metal
06210Wall Finishes05800Expansion Control
06220Floor05900Metal Restoration & Cleaning
06230Ceiling Finishes06000Wood and Plastic
06300Specialties06050Wood & Plastic Matls & Methds
06310General Specialties06100Rough Carpentry
06320Built-in Fittings06200Finish Carpentry
06900Interior Demolition06400Architectural Woodwork
06910Cut & Patch06500Structural Plastics
06930Selective Demolition06600Plastic Fabrications
07000Conveying Systems06900Wood & Plastic Restor' & Cl'ng
07010Elevators07000Thermal & Moisture Protection
07020Moving Stair & Walks07050Therml/Moist Prot Matls & Meth
07030Dumbwaiters07100Dampproofing & Waterproofing
07040Pneumatic Tube Systems07200Thermal Protection
07050Other Conveying Systems07300Shingles, Roof Tiles & Covrngs
07060General Construction Items07400Roofings & Siding Panels
08000Mechanical07500Membrane Roofing
08100Plumbing07600Flashing & Sheet Metal
08110Domestic Water Supply Sys07700Roof Specialties & Accessories
08120Sanitary Waste & Vent Sys07800Fire & Smoke Protection
08130Rainwater Drainage Sys07900Joint Sealers
08140Plumbing Fixtures08000Doors and Windows
08200HVAC08050Door & Window Matls & Meth
08210Energy Supply08100Metal Doors & Frames
08220Heat Generating Sys08200Wood & Plastic Doors
08230Cooling Generating Sys08300Specialty Doors
08240Distribution Systems08400Entrances & Storefronts
08250Terminal & Package Units08500Windows
08260Controls & Instrumentation08600Skylights
08270Systems Testing & Balancing08700Hardware
08300Fire Protection08800Glazing
08310Water Supply(Fire Protection)08900Glazed Curtain Wall
08320Sprinklers09000Finishes
08330Standpipe Systems09050Finishes Matls & Meth
08340Fire Extinguishers09100Metal Support Assemblies
08400Spec Mechanical Systems09200Plaster & Gypsum Board
08410Special Plumbing Systems09300Tile
08420Special Fire Protection Sys09400Terrazzo
08430Misc Spec Sys & Devices09500Ceilings
08440Gen Const Items(Mech)09600Flooring
09000Electrical09700Wall Finishes
09100Service & Distribution09800Acoustical Treatment
GSA Codes for TPBCSI Codes for TPB
GSA CodeGSA DescriptionCSI CodeCSI Description
09110High Tension Service & Dist09900Paints & Coatings
09120Low Tension Service & Dist10000Specialties
09200Lighting & Power10100Visual Display Boards
09210Branch Wiring10150Compartments & Cubicles
09220Lighting Equipment10200Louvers & Vents
09300Spec Electrical Syst10240Grilles & Screens
09310Communications & Alarm Sys10250Service Walls
09320Grounding Systems10260Wall & Corner Guards
09330Emergency Light & Power10270Access Flooring
09340Electric Heating10290Pest Control
09350Floor Raceway Systems10300Fireplaces & Stoves
09360Other Spec Sys & Devices10340Manufactured Ext Specialties
09370Gen Const Items(Elect)10350Flagpoles
10000General Cond OH & Profit10400Identification Devices
10010Mobilization & Init Expenses10450Pedestrian Control Devices
10020Site Overhead10500Lockers
10030Demobilization10520Fire Protection Specialties
10040Main Off Expense & Profit10530Protective Covers
10050Bldg/Syst Commissioning10550Postal Specialties
11000Equipment10600Partitions
11100Fixed & Movable Equip10670Storage Shelving
11110Built-in Maintenance Equip10700Exterior Protection
11120Checkroom Equipment10750Telephone Specialties
11130Food Service Equipment10800Toilet, Bath, & Laundry Acc
11140Vending Equipment10880Scales
11150Waste Handling Equipment10900Wardrobe & Closet Specialties
11160Loading Dock Equipment11000Equipment
11170Parking Equipment11010Maintenance Equipment
11180Detention Equipment11020Security & Vault Equipment
11190Postal Equipment11030Teller & Service Equipment
11195Other Specialized Equipment11040Ecclesiastical Equipment
11200Furnishings11050Library Equipment
11210Artwork11060Theater & Stage Equipment
11220Window Treatment11070Instrumental Equipment
11230Seating11080Registration Equipment
11240Furniture11090Checkroom Equipment
11250Rugs, Mats, & Furn Access11100Mercantile Eqipment
11300Special Construction11110Comm Laundry & Dry Clean'g Eqp
11310Vaults11120Vending Equipment
11320Interior Swimming Pools11130Audio-Visual Equipment
11330Modular Prefab Assemblies11140Vehicle Service Equipment
11340Special Purpose Rooms11150Parking Control Equipment
11350Other Special Construction11160Loading Dock Equipment
12000Site Work11170Solid Waste Handling Equipment
12100Site Preparation11190Detention Equipment
12110Clearing11200Water Supply & Treatment Eqp
12120Demolition11280Hydraulic Gates & Valves
12130Site Earthwork11300Fl Waste Treatment & Disp Eqp
12200Site Improvements11400Food Service Equipment
12210Parking Lots11450Residential Equipment
12220Roads, Walks, Terraces11460Unit Kitchens
12230Site Development11470Darkroom Equipment
12240Landscaping11480Athletic, Recr., & Therap. Eqp
12300Site Utilities11500Industrial & Process Equipment
12310Water Supply & Dist Sys11600Laboratory Equipment
GSA Codes for TPBCSI Codes for TPB
GSA CodeGSA DescriptionCSI CodeCSI Description
12320Drainage & Sewer Sys11650Planetarium Equipment
12330Heating & Cooling Dist Sys11660Observatory Equipment
12340Elec Dist & Lighting Sys11680Office Equipment
12350Snow Melting Sys11700Medical Equipment
12360Service Tunnels11780Mortuary Equipment
12400Off-Site Work11850Navigation Equipment
12410Railroad Work11870Agricultural Equipment
12420Marine Work11900Exhibit Equipment
12430Tunneling12000Furnishings
12440Other Off-Site Work12010Air-Supported Structures
13000Testing Program12050Fabrics
12100Art
12300Manufactured Casework
12400Furnishings & Accessories
12500Furniture
12600Multiple Seating
12700Systems Furniture
12800Interior Plants & Planters
12900Furnishings Rest & Repair
13000Special Construction
13020Building Modules
13030Special Purpose Rooms
13080Sound, Vibr., & Seismic Cont
13090Radiation Protection
13100Lightning Protection
13110Cathodic Protection
13120Pre-Engineered Structures
13150Swimming Pools
13160Aquariums
13165Aquatic Park Facilities
13170Tubs & Pools
13175Ice Rinks
13185Keensl & Animal Shelters
13190Site-Constructed Incinerators
13200Storage Tanks
13220Filter Underdrains & Media
13230Digester Covers & Appurt
13240Oxygenation Systems
13260Sludge Conditioning Systems
13280Hazardous Material Remediation
13400Measurement & Contrl Instr
13500Recording Instrumentation
13550Transportation Contrl Instr
13600Solar & Wind Energy Equipment
13700Security Access & Surveillance
13800Building Automation & Control
13850Detection & Alarm
13900Fire Suppression
14000Conveying Systems
14100Dumbwaiters
14200Elevators
14300Escalators & Moving Walks
14400Lifts
14500Material Handling
14600Hoists & Cranes
UM Codes for TPBCSI Codes for TPB
UMUM DescCSI CodeCSI Description
ACAcres14700Turntables
BFBoard Feet14800Scaffolding
CFCubic Feet14900Transportation
CICubic Inches15000Mechanical
CSHundred Square Feet15050Mechanical Materials & Methods
CYCubic Yard15100Building Services Piping
EAEach15200Process Piping
FCHundred Feet15300Fire Protection Piping
FTFeet15400Plumbing Fixtures & Equipment
GAGallons15500Heat-Generation Equipment
HRHour15600Refrigeration Equipment
INInches15700Heatng, Ventilatng, & AC Equip
LBPounds15800Air Distribution
LFLinear Feet15900HVAC Instrument' & Controls
LSLumpSum15950Testing, Adjustng, & Balancng
LYLinear Yard16000Electrical
MBThousand Board Feet16050Electrical Materials & Methods
MFThousand Feet16100Wiring Methods
MHMan Hour16200Electrical Power
MIMiles16300Transmission & Distribution
MOMonths16400Low-Voltage Distribution
NTNot to Exceed16500Lighting
PCPieces16700Communications
SFSquare Feet16800Sound & Video
SISquare Inch93310Asbestos Abatement
SQSquare
SYSquare Yard
TNTons
WKWeeks
YDYards

Sheet1

10SEC24144 84" Support Post-Single Sided$ 66.00$660.00
6SEC24147 40" wide back Panel Set$ 363.00$2,178.00
6SEC24149 40" wide Base Cover$ 59.40$356.40
6SEC24150 Base Cover end Caps$ 30.60$183.60
6SEC24151 Wall Support Bracket$ 9.60$57.60
48SEC24154 1 Capacity Stock Shelf$ 10.80$518.40
9SEC24163 12 Capacity Stock Saddle$ 97.80$880.20
54SEC24166 1 Capacity Barrel Saddle 5 1/2"$ 10.80$583.20
54SEC24171 1 Capacity Barrel Saddle 7"$ 10.80$583.20
3SEC34005 40'W Shelf for EWR, SWR (12 Spaces)$ 63.60$190.80
1SECCAGE 8'x8' Cage Wall with sliding door (see details in quote)$ 975.00$975.00
1SECINSTL Secureit Trained Installation$ 1,295.00$1,295.00
Subtotal$8,461.40
Freight$ 350.00
Total$8,811.40