20191206_GSA_KEATING US TRUSTEES_ADDENDUM #2.pdf

PDF 247 KB Posted

Attached to
US Trustee 4th Floor Keating Renovation Federal contract opportunity
Solicitation number
47PC1120R0003
Issued by
General Services Administration Public Buildings Service Region 2

About this file

This document provides details for a federal construction contract opportunity with the General Services Administration to renovate approximately 2,700 square feet of space for the US Trustees office in the Kenneth B. Keating Federal Building in Rochester, New York. The renovation will include elements to support the work functions of the US Trustees such as reception, workstations, enclosed offices, storage, mail room, break room and conference room. Base interior work will include hazardous material abatement, new walls, doors, casework, flooring, plumbing, electrical, fire protection and mechanical systems. Additionally, technology, data and security infrastructure work is required. The construction completion date is approximately 192 calendar days after notice to proceed. The procurement is set aside for small businesses with offers from other than small businesses not being considered. Interested contractors must register in the System for Award Management and complete Representations and Certifications to receive specifications and drawings. The point of contact is James Berring, Contracting Officer, for any questions.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

Project: U.S. Trustees Office – 4th Floor Renovation

Kenneth B. Keating Federal Office Building and US Courthouse

Buffalo, NY 14202

GSA Project: N17777507 [NKB#12245.53]

A/E Contract No.: GS-07-P-16-UC-D-7008

Date of Issue: December 06, 2019

Attachments: Job Drawings

TO ALL BIDDERS: The following additions, deletions, and/or changes or clarifications to the drawings, specifications, and bidding documents for this project, shall become and are hereby made part of the Contract Documents. They change the original documents only in the manner and to the extent stated.

Each bidder shall acknowledge receipt of this ADDENDUM in the appropriate location on the bid proposal form.

This ADDENDUM consists of two (2) pages, including this page. All requirements of the original Specifications and Drawings and previous

Addendum, if applicable, shall remain in force except as noted by this

ADDENDUM.

THE PURPOSE OF THIS ADDENDUM IS TO CHANGE THE FOLLOWING ITEMS:

DRAWINGS

1.1 ADD Job Drawing AD-1

The intent is to incorporate the changes to the work shown on Job Drawing AD-1 for additional ballistic door / window / wall protection (three walls of Reception 4230, the entry door 4230a, and the security/transaction window shall meet the UL752 Level 1

Bullet-Resisting rating)

The intent is also to incorporate the reuse and reinstallation of the existing US Trustees transaction window salvaged on-site by GSA property management.

END OF ADDENDUM NO. 2

B

M B B C

E K F B G

F L P R

AE300

AE501

86 SF

STORAGE

4230B

86 SF

RECEPTION

STC 45

n

4230a 4230

03a

ALIGN

ALIGN

03a

A

03b

W1 03b

03b

WT-03b:

UL --

RATING 0 HOUR

STC --

EXISTING METAL STUD / BULLET RESISTANT

FIBERGLASS / GYPSUM WALL BOARD

EXISTING WALL STUDS

(1) LAYER 5/8" GWB

BOTTOM OF FLOOR STRUCTURE

TOP OF FLOOR STRUCTURE

7/16" UL752 LEVEL 3 BULLET

RESISTANT FIBERGLASS

(THREAT SIDE)

03b

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

1005 W. Fayette Street, Suite 500

Syracuse, NY 13204

Phone 315.428.1177

Fax 315.428.9822 www.nkbpc.com

SHEET OF

DRAWN:

CHECKED:

SCALE: AS NOTED

DATE:

DRAWING NO.

PROJECT

NUMBER:

DRAWING TITLE

NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)

PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS

OTHER THAN A LICENSED ARCHITECT OR THE DESIGN

ENGINEER. INFORMATION ON THESE DRAWINGS FOR

GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY

DEEM NECESSARY.

COPYRIGHT 2019

N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.

GSA PROJECT

MANAGER:

GSA CONTRACT

NUMBER:

REVISIONS

MARK DATE DESCRIPTION

GS-07-P-16-UC-D-7008

ERIN BISHOP

SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.1

/6 /2

:1 :3

P

M

K E

A T

IN

G

F E

D

B L

D G

U .S

.T

T

H F

L R

R E

N O

V A

T

IO

N

AD-1

DBH

JLHS

12/06/19

E n te r a d d re s s h e re

E R

IN

B

IS

H

O P

RECEPTION REVISIONS

N1777507

DOOR SCHEDULE 4230a

DOOR

ROOM

NAME

ROOM

DOOR FRAME

THRESHOLD

FIRE

RATING REMARKS

HARDWARE

SETWIDTH HT THICKNESS

LEAF

SIZE TYPE

DOOR

MATERIAL FINISH

FRAME

TYPE

FRAME

MATERIAL

FRAME

FINISH

FRAME

DETAIL

4230a CIRCULATION 4230A 3' - 0" 7' - 0" 0' - 1 3/4" 36 F WD STN H1 HM PNT 1 & 2/AE600 NA - 1, 2 3

WINDOW SCHEDULE

NUMBER DESCRIPTION COUNT DETAIL

W1 SALVAGED TRANSACTION WINDOW TO BE

PROVIDED BY GSA AND INSTALLED BY

CONTRACTOR.

1 9/AE501

DOOR SCHEDULE REMARKS

1 ELECTRONIC SECURITY - REFER TO HARDWARE SETS AND SECURITY

DRAWINGS

2 BALLISTIC WOOD DOOR BASIS OF DESIGN: CURRIES / ASSA ABLOY 737

SERIESUL 752 LEVEL 1 DOOR AND FARME WITH WOOD VENEER TO MATCH

REMAINDER OF DOOR PACKAGE. INCLUDE CLOSER AND LOCKSET

REINFORCEMENT FOR COORDINATION WITH HARDWARE SET.

1/4" = 1'-0"AD-1

1 PARTIAL FOURTH FLOOR NEW CONSTRUCTION PLAN

WALL TYPE WT-03b

1 12/06/19 ADDENDUM #2

Sheets
AD-1 - RECEPTION REVISIONS

File details come from the government source that posted it. Updated .