This document provides details of a federal contract solicitation for construction services. The General Services Administration is seeking a general contractor to perform renovations on floors 14 through 16 of approximately 52,584 square feet at the John F. Kennedy Federal Building in Boston, Massachusetts over a period of around 480 calendar days with anticipated completion by August 14, 2022. The project involves space for workspaces, meeting spaces, support spaces and storage and will be completed in five designated construction phases. The procurement is set aside for a service-disabled veteran-owned small business with a estimated cost between $5-10.2 million. The solicitation is scheduled for release on or around December 20, 2020 with proposals due around January 19, 2021 and includes a pre-proposal site visit on an estimated date of December 28, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to JFK-VARO Re-alignment Construction Project (14th-16th floors), newest first.
File Type Posted
gsa-5097 addendum no. 2 REV.pdf PDF
gsa-5097 addendum no.03.pdf PDF
SF1442-2021-04-29 Form (6).pdf PDF
Solicitation Amendment 47PB0020R0066_0005.pdf PDF
Question and Answers Q54-56.pdf PDF
Solicitation Amendment 47PB0020R0066_0004.pdf PDF
SF1442 Rev 3 2021 04 14.pdf PDF
Solicitation Amendment 0003.pdf PDF
Question and Answers Q52-53.pdf PDF
Question and Answers Q50-51.pdf PDF
Solicitation Amendment _0002.pdf PDF
Revised-2 Sf1442.pdf PDF
Questions and Answers Q35-45 2021 04 08 pdf.pdf PDF
Questions and Answers Q8-Q34.pdf PDF
Agreement 2021 03 19.pdf PDF
Bid Bond SF24.pdf PDF
PBS_Past_Performance_Form.pdf PDF
Pre Proposal Conference -Site Visit information 2020 09 02.docx DOCX document
Drawings dated 2021 02 03 .pdf PDF
Wage Determination MA20210001 dated 2021 02 12 .pdf PDF
GSA527-15e.pdf PDF
SPECIFICATION 2021 02 03.pdf PDF
Solicitation Amendment SF30.pdf PDF
Revised SF1442.pdf PDF
Questions and Answers Q1-Q7.pdf PDF
Pre-Proposal Conference Minutes and site walk thru Informaton.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. General Services Administration

THE SOLICITATION

SOLICITATION NO: 47PB0020R0066

PROJECT: JFK-VARO Re-alignment Construction Project (14th-16th floors)

PROPOSAL: DATE: April 20, 2021

TIME: 2:00 PM (1400 hrs) EST.

LOCATION: GENERAL SERVICES ADMINISTRATION

Contract Operation Branch, 1PQB

10 CAUSEWAY STREET, ROOM 1100

BOSTON, MA 02222-1077

REFERENCE: Carolyn Weekes

RE: 47PB0020R0066

Volume II of III

This procurement is a Service-Disabled-Veterans-Owned Small Business Set-Aside

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE

DRAWINGS, PLANS,

OR SPECIFICATIONS TO UNAUTHORIZED USERS IS

PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

THE INFORMATION COLLECTION REQUIREMENTS CONTAINED IN THIS SOLICITATION/ CONTRACT THAT ARE

NOT REQUIRED BY REGULATION HAVE BEEN APPROVED BY THE OFFICE OF MANAGEMENT AND BUDGET

PURSUANT TO THE PAPERWORK REDUCTION ACT AND ASSIGNED OMB CONTROL NO. 3990-0163

GSA Public Buildings Service U.S. General Services Administration

10 Causeway Street New England Region

Boston, MA 02222 North Service Center www.gsa.gov

GSA Solicitation No. 47PB0020R0066.

Document: C201-SB GC/JULY 2020 (The Solicitation)

Table of Contents

I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit – Construction H. Receipt of Offers

II. Proposals

A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements of Joint Venture Offerors

III. General Provisions

A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond Requirements H. Contractor Performance Information I. Safeguarding and Dissemination of Controlled Unclassified Information (CUI)

Building Information

J. INFORM 2.0

IV. FAR/GSAR Solicitation Provisions A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal

Specifications, Standards and Commercial Item Descriptions, FPMR 101-29 B. FAR 52.211-3, Availability of Specifications Not Listed in the GSA Index of

Federal Specifications, Standards and Commercial Items Description C. FAR 52.216-1 Type Of Contract D. FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of Work E. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal

Employment Opportunity for Construction F. FAR 52.225-10 Notice of Buy American Requirement-Construction Materials G. Buy American Exceptions H. FAR 52.233-2 Service of Protest I. FAR 52.252-1 Solicitation Provisions Incorporated by Reference J. GSAR 552.102 Incorporating Provisions and Clauses by Reference K. Additional Provisions

(i) GSAR 552.236-74, Evaluation of Options (Mar 2019)

(iii) GSAR Clause 552.236-77, Government’s Right to Exercise Options (Mar 2019)

L. Certified Cost or Pricing Data

V. Instructions to Offerors and Clauses A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition B. FAR 52.204-25 Prohibition on Contracting Certain Telecommunications and

Video Surveillance Service or Equipment C. Security Requirements D. Additional Clauses

VI. Method Of Award A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness/Price Realism D. Unbalanced Price E. Non Price Factors F. Evaluation of Joint Ventures

Notice of Service-Disabled Veteran-Owned Small Business Set-Aside

The General Services Administration (GSA) is setting aside the contract under the following clause found in the Agreement:

52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside

I. General Information

I.A. The Solicitation and Contract

(1) This Solicitation is set-aside for Service-Disabled Veteran-Owned Small Businesses in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.

(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer.

No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

I.B. List of Solicitation Documents

The Solicitation Documents are comprised of:

(1) The Solicitation

(2) Offeror Representations and Certifications Form

(3) Standard Form (SF) 1442 – Solicitation Offer and Award

(4) The Agreement and Attachments to the Agreement

(5) The Specifications

(6) GSA 527 Contractors Qualifications and Financial Information

(7) PBS Past Performance Form

(8) Pre-Proposal Conference

(9) Davis Bacon Wage Determination

(10) SF 24 Bid Bond

I.C. Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

Authorized Representative Information:

Contracting Officer’s Information

Name: Michele Valenza

Address: 10 Causeway Street, Room 1100, Boston, MA 02222

Telephone: 617-565-8505

Email: michele.valenza@gsa.gov

Alternate POC Information

Name: Carolyn Weekes

Address: 10 Causeway Street, Room 1100, Boston, MA 02222

Telephone: 617 565 5059

Email: carolyn.weekes@gsa.gov

I.D. Pre-Proposal Conference

Date: March 26,2021

Time: 11:00 AM Est

Location: Tele-Conference: Reference the Pre-Proposal Conference Notice for further details

Reference Site Visit information in Section: I G below.

I.E. Estimated Price Range

The estimated price range for the Project is More than $10,000,000.

I.F. FAR 52.228-1 Bid Guarantee (Sep 96)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and mailto:michele.valenza@gsa.gov mailto:carolyn.weekes@gsa.gov

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.G. FAR 52.236-27 Site Visit – Construction (Feb 95)

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

(2) Site visits will be held at the following dates and times:

Date: March 29, 2021

Monday 03/29/2021

1. 8am

2. 10am

3. 12pm

4. 2pm

It is imperative that Contractor’s reserved their respective time for the site visit.

(3) Pre-registration is required for all attendees to the pre-proposal Site Visit. The Site Visit shall be limited to not more than four (4) representatives from each Offeror.

Offerors shall submit a Visit Authorization Request (VAR) identifying all attendees from their respective team. Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit. Notification of the location of entry, where attendees are required to meet, and all other requirements for the Site Visit will be issued to the Offerors. Submit the VAR to the point of contact listed below.

http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113375

Contractors are required to wear face coverings when gaining access to and working within GSA-controlled facilities. Exceptions may apply for reasons such as impracticality, health or other bases, and shall be approved by the Contracting Officer.

Face coverings will not be provided to contractors by the Government. Contractors should maintain social distancing measures when practicable. Individuals may be required to lower their face coverings if requested when passing through security checkpoints

Contractor shall submits the names of personnel in writing 48 hours prior to the site visit

For further information about the site visit or access requirements, please contact:

Name: Carolyn Weekes

Telephone: 617- 565- 5059 Cell: 617 851 5080

Email: carolyn.weekes@gsa.gov

Name: Mathew Richards

Address: John F. Kennedy Federal Building 15 New Sudbury Street, Boston, MA 02203-0002

Telephone: 617- 565- 4699 Cell: 617- 947- 3378

Email: matthew.richards@gsa.gov

I.H. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 2:00 pm local time in the following email boxes.

Date: April 20,2021

Email To: carolyn.weekes@gsa.gov and michele.valenza@gsa.gov

Please be advised that single emails with attachments of 25 megabytes or more, or attachments other than those in PDF format, may be rejected by GSA's servers.

(2) Due to the COVID-19 Pandemic contractors shall email all proposal to the emails addresses provided above

II. Proposals

II.A. Proposal Contents

Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

1. Price Proposal

2. Technical Proposal

3. Representations and Certifications mailto:matthew.richards@gsa.gov mailto:matthew.richards@gsa.gov mailto:michele.valenza@gsa.gov

4. Standard Form 24, Bid Bond

5. GSA Form 527 – Contractor’s Qualification and Financial Information

6. Past Performance Questionnaire (PPV)

II.B. Proposal Format

Offerors responding to this solicitation notice shall submit proposals in two (2) separate volumes. To Email: to carolyn.weekes@gsa.gov and Michele.valenza@gsa.gov

Volume I: Technical Proposal, original Copy Volume II: Price Proposal, original copy

II.C. Price Proposal

(1) Contents

The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror.

(2) Qualifications, Exclusions and Conditions

If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

(3) Additional Proposal Requirements:

A detailed breakdown of your price proposal is to be submitted. This breakdown should follow the Divisional breakdown as referenced in the Specification

II.D. Technical Proposal

The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.

1. Management Plan:

The Offeror shall provide a Management Plan that fully describes how it plans to manage the projects without compromising cost, timeliness of delivery, and quality of work. If the Offeror is proposing a Contractor Team Arrangement in accordance with Federal Acquisition Regulation

(FAR) Subpart 9.601(2), as a prime contractor with one or more key subcontractors, it shall completely address both how the prime plans to manage the subcontractor(s) to ensure contract performance and how the prime will be able to continue uninterrupted performance in the event that the approved subcontract(s) are terminated by either-party(s). Schedule, and planned phasing of project requirements.

mailto:Michele.valenza@gsa.gov

Management plan offerors shall identify what they believe are the most significant risk associated with this project. Such risks should include matters that jeopardize the performance within budget and schedule limitations, problems created working in an occupied building.

Offerors shall provide a description of their response strategy. Offerors shall describe examples of successfully managing similar risks on previous projects a description their risk response strategy on previous projects. Offerors shall also describe their long range plan for securing and maintaining the resources necessary to complete the project. Resources discussed should indicate if that resource will come from in house for from major subcontractors. The Offeror shall provide a narrative discussion of methods used to manage subcontractors and the terms and conditions of subtract awarded. The Offeror shall also discuss the methods to be used in measuring the progress of a subcontractor during construction.

Quality Control Outline: The offeror shall submit a Quality Control Outline the demonstrates how the requirements of the contract will be provided as specified: At a minimum, the plan will include a description of the Offeror’s quality control program, methods for identifying, correcting and preventing defects in the quality of the planning, workmanship, and identifies authority and responsibilities of key personnel.

• The plan shall also address the methodology of the firm in place to address any emergencies that may occur during performance.

• The plan shall include training provided to employees’ weekly/monthly safety meetings, past performance history listings of OSHA violations, responsibility for implementing and enforcement.

Project Staffing: The Contractor shall provide all professional, technical, managerial and administrative staff needed to perform the scope of work for this contract including but not limited to: HVAC, Electrical, construction, Millwork, finishes, demolition, controls, cabling, environmental remediation. This is a project within an occupied and functioning space.

Therefore this work needs to be accomplished while minimizing disruption to the existing operations. Since the building will be occupied during construction, and the building has limited swing space, the construction has been broken up into 5 phase areas, which will be completed in 5 different sequence phases of construction. All demolition and work deemed

“noisy” is required to take place outside of normal business hours. The Contractor’s schedule must allow for phasing of construction which follows the specific phasing as shown on the contract drawings and specifications

Schedule: Can the Contractor meet the required schedule?

The contract documents show a planned timeline for each of the sequenced phases, to include transition time between phases for relocating staff and equipment. The schedule should show that each of the sequence phases specific timelines are met.

2. Experience with Similar Projects:

Experience with Similar Projects: This factor evaluates the extent of the Offeror’s past experience as a firm in providing similar construction services to determine the firm’s experience in completing the tasks detailed in the performance work.

The Offeror must demonstrate successful experience as a General Construction (GC) Contractor responsible for the construction of at least two (2) similar projects substantially completed within the last five (5) years in New England. A “similar project” is defined as a project that is comparable in nature, type, and complexity as defined by all of the following characteristics:

● Project involved the renovation and Realignment.

● Project was performed in an occupied and functioning office building.

● Project included requirements for noise control and Project Phasing

● The total project construction cost at award of the construction contract(s) was not less than $4 million

3. Staffing Plan/Key Personnel:

Staffing Plan:

The offeror shall provide an organizational chart illustrating key functions and personnel available to support the contract as well as the resumes for intended key personnel listed below to be utilized under this contract. The offeror shall include key personnel’s specific duties at a minimum, identify past experience in construction, estimating, responding and preparing responses to request for proposal, management of prime contractor’s employees, subcontractors, quality control, safety and health. Resumes shall also identify the length of services with the company. Each resume shall list all applicable licenses and certificates

At a minimum, key team members are as follows:

• Project Manager

• Project Scheduler

• Site Superintendent

• Foremen

Key Personnel

This factor evaluates the Offerors’ demonstrated qualifications of the key personnel.

The Offeror must provide a Resume for the following Key Personnel:

- Project Manager for Construction: Must have a minimum of five (5) years’ experience successfully managing construction projects that meet the criteria for similar projects as defined in evaluation factor above.

- On-Site Construction Superintendent: Must have a minimum of three (3) years’ experience successfully managing construction projects that meet the criteria for similar projects as defined in evaluation factor above.

- Project Scheduler (Resume must indicate Scheduling Software experience (e.g., Primavera, Microsoft Project)): Must have a minimum of two (2) years’ experience in performing as lead scheduler on construction projects greater than $4 million. Scheduling experience must include developing critical path and cost loaded schedules.

All Resumes must include the following information and may not exceed two (2) pages per

Resume, and must explain how the proposed Key Personnel’s experience meets the minimum qualification requirements for this contract, as described above:

- Name and title

- Project assignment

- Name of firm with which associated

- Years’ experience with this firm (in the key personnel’s field of expertise/discipline) and years of experience with other firms (in the key personnel’s field of expertise/ discipline)

- Education degree(s), year, and institution

- Active professional registration, year first registered, if applicable

- Other experience and qualifications relevant to same/similar work required under this contract

- List of projects in which the individual has worked to include Name of project(s) and project location(s)

5. Past Performance:

This factor considers the past performance of the Offeror, and will be evaluated as part of the responsibility determination. The Offeror’s past performance record must demonstrate satisfactory performance on at least three (3) comparably sized projects substantially completed within the last five (5) years. Any proposal which does not demonstrate satisfactory performance on at least three (3) comparable projects substantially completed within the last five (5) years will not considered technically acceptable.

The Offeror must submit a Past Performance Questionnaire (PPQ) included in the solicitation as

Attachment, completed by the applicable client, for each project included in its proposal for

Factor No.3 Experience with Similar Projects. Completed PPQs should be submitted with the proposal. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror is unable to obtain a completed PPQ from a client for a project before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the project.

If the client requests, the client may submit a questionnaire directly to the Government's point of contact, via email at prior to proposal closing date. Offerors may resubmit questionnaires previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.

Also, include performance recognition documents received within the last Five (5) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PP/RS), including Contractor Performance Assessment Reporting System (CPARS), using all

CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIISJ, Electronic Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the Offeror. While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. GSA will not maintain database of

PPQs submitted by Offerors.

In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.

II.E. Other Information to Submit with Proposal

(1) Representations and Certifications

Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7). Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management. Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications (C301-SAT).

(2) Qualifications of Offerors

Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract. Offerors shall https://www.sam.gov/ submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.

II.F. Requirements of Joint Venture Offerors

(1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.

(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.

(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.

(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.

III. General Provisions

III.A. Availability of Funds

Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.

III.B. Requests for Clarification or Interpretation:

The Government will attempt to answer all requests for clarifications or interpretations of the

Solicitation Documents prior to the date set for receipt of offers, but do not warrant that all such requests will be answered within 10 calendar days. Prospective Offerors should make such requests not less than 15 calendar days prior to the date set for receipt of offers.

III.C. Notice to Small Business Firms

A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (Small Business Administration). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.

III.D. Information Concerning the Disclosure of Solicitation Results

This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or http://www.sba.gov/ the information contained in such offers will be made available until after award except as provided by FAR 15.503.

III.E. Affirmative Procurement Program

GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement. Refer to Clause FAR 52.223-10 encouraging vendors to practice waste reduction.

III.F. Notice Concerning Preparation of Proposals

Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.

III.G. Bond Requirements

If a bid guarantee is required to be submitted with your offer, any contract awarded will require a performance bond and payment bond as specified in the Agreement. Offerors who utilize individual sureties should note the requirement for a certified, audited, financial statement for each person acting as an individual surety under clause FAR 52.228-1 Bid Guarantee and the requirements of clause FAR 52.228-11 Pledge of Assets.

III.H. Contractor Performance Information

(1) Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process.

CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is Contractor Performance Assessment

Completed CPARS evaluations are sent to the Past Performance Information Retrieval System (PPIRS) which may then be used by Federal acquisition community for use in making source selection decisions. PPIRS assists acquisition officials by serving as the single source for contractor past performance data.

(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS.

The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.

(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (CPARS Training) and updated as needed.

(4) Contractor Representative (CR) Role: All evaluations will be sent the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.

http://www.cpars.gov/ https://www.cpars.gov/webtrain.htm

Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.

GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.

Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.

III.I. Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information

Certain information contained in the Solicitation Documents may have been designated as Controlled Unclassified Information (CUI) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.

III.J. INFORM 2.0

A. Overview of the IN-depth Feedback through Open Reporting Methods (INFORM 2.0) Process

This solicitation is part of an initiative using the INFORM 2.0 process which is designed to enhance the quality and usefulness of post-award communications by providing greater transparency and openness into the procurement process. INFORM 2.0 seeks to increase GSA-industry communication by providing clearer and more complete information to explain the award decision.

Through the INFORM 2.0 process, GSA will seek to share additional information with offerors in writing and/or through an oral feedback meeting that is not required by statute or regulation. For purposes of this solicitation, and in addition to any information required by FAR 15.503 and 15.506, GSA is providing each offeror with the opportunity to participate in the INFORM 2.0 process as further discussed below.

B. Detailed Description of the INFORM 2.0 Process

B.1. Component 1 - Notification of Award

After award and in accordance with any post-award notification timeframes required by regulation (i.e., FAR Parts 15.503(b) and 16.505(b)(6)), the contracting officer will issue written notices to the successful and unsuccessful offerors (the Notification of Decision Statement (NODS)). The notices will contain:

● All information required by statute or regulation;

● An unredacted copy of the complete technical evaluation for that particular offeror that includes a full description of the unsuccessful offeror’s strengths, weaknesses, risks, and deficiencies;

● An overall technical evaluation summary for that particular offeror and the successful offeror that includes evaluated price; overall technical ranking, rating, or score.

B.2. Component 2 - Request for Feedback via Telephone or Web based Conferencing.

Within three business days after receipt of the NODS, an offeror may, but is not required to:

● submit a written request to the contracting officer for feedback or meeting

● submit a list of written questions to the contracting officer; or

● take no further action.

If the offeror timely elects to request an oral feedback meeting or submit a list of written questions, GSA will consider any such request to constitute a required debriefing pursuant to FAR 15.506. If an offeror does not request an oral feedback meeting or submit a list of written questions within the three day time period, the receipt of the NODS concludes the INFORM 2.0 process and satisfies the FAR requirement for debriefs pursuant to FAR 15.506.

If the offeror submits a list of written questions in lieu of the oral feedback meeting, the contracting officer will attempt to respond within five business days of receipt of the written questions. Unless otherwise stated, the contracting officer’s response to the written questions will conclude the INFORM 2.0 process and any corresponding post-award debriefing as further set forth at FAR 15.506.

If the offeror requests an oral feedback meeting, the offeror should provide the following information:

● Primary point of contact;

● List of participants with titles (e.g., Senior Vice President);

● List of topics to assist GSA better prepare for the oral feedback meeting; and

● Preference for in-person, telephone, or web-based conferencing (if available).

B.3. Component 3 - Oral Feedback Meeting

During the oral feedback meeting, GSA’s objectives are to provide:

● Reasonable responses to written questions submitted by the offeror;

● Explanations for the evaluation conclusions and contract award decisions;

● Any additional information about the fairness and impartiality of the evaluation and why the award decision was rational;

● Reasonable responses to additional questions raised during the meeting;

● Additional transparency into the underlying competition process; and,

● A greater understanding of the evaluation and award process.

GSA will not provide any information that is prohibited by law or regulation.

B.4. Component 4 - Post Oral Feedback Meeting Questions

Within two business days after the conclusion of the oral feedback meeting, the offeror may submit a list of written questions to the contracting officer. The contracting officer will provide a written response within five business days and, unless otherwise noted by the contracting officer, the INFORM 2.0 process and any corresponding postaward debriefing as further set forth at FAR 15.506 will have concluded.

If the offeror elects not to submit a list of written questions within two days after the oral feedback meeting, the INFORM 2.0 process and any corresponding post-award debriefing as further set forth at FAR 15.506 is concluded.

IV. FAR/GSAR Solicitation Provisions

IV.A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (AUG 98)

(a) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to—

GSA Federal Supply Service Specifications Section, Suite 8100 470 East L’Enfant Plaza, SW Washington, DC 20407

Telephone (202) 619-8925 Facsimile (202) 619-8978

(b) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.

IV.B. FAR 52.216-1 Type of Contract (APR 84)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

IV.C. FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work

(MAY 14)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.

IV.D. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

(Applicable to solicitations resulting in construction contracts in excess of $10,000.)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation for Each Trade

Goals for Female Participation for Each Trade

4% 6.9%

These goals are applicable to all of the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is: Massachusetts, Suffolk, Boston

IV.F. FAR 52.225-10 Notice of Buy American Requirement—Construction Materials.

(MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

https://www.acquisition.gov/far/current/html/52_223_226.html#wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html#wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html#wp1169273 https://www.acquisition.gov/far/current/html/FormsStandard62.html#wp1177057 https://www.acquisition.gov/far/current/html/FormsStandard62.html#wp1177057

IV.G. Buy American Exceptions

For Buy American exceptions, if any, see the applicable Buy American clause in Section IV of the Agreement

IV.H. FAR 52.233-2 Service of Protest (SEP 06)

(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer at the address provided in the provision “Receipt of Offers” in Section I (General Information).

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

IV.I. FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 98)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:

Federal Acquisition Regulation

NUMBER TITLE DATE

52.214-34 Submission of Offers in the English Language

APR 91

52.215-16 Facilities Capital Cost of Money JUN 03

52.236-28 Preparation of Proposals - Construction OCT 97

IV.J. GSAR Clause 552.102 Incorporating Provisions and Clauses

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

Number Title Date

552.236-11 Use and Possession Prior to Completion. MAR 19

IV.K. Additional Provisions

52.209-2- Prohibition on Contracting with Inverted Domestic Corporations—Representation (Nov 2015) http://www.acquisition.gov/comp/far/index.html

FAR 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal

Transactions (Sept 2007)

FAR 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal

Confidentiality Agreements or Statements-Representation (Jan 2017)

FAR 52.204-7 System for Award Management (Jan 2017)

FAR 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020)

FAR 52.204-17 Ownership or Control of Offeror (Aug 2020)

FAR 52.204-20 Predecessor of Offeror (Aug 2020)

(a) Definitions. As used in this provision

Commercial and Government Entity (CAGE) code means–

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and

Government Entity (CAGE) Branch to identify a commercial or government entity; or

(2) (2)An identifier assigned by a member of the North Atlantic Treaty

Organization (NATO) or by the NATO Support and Procurement Agency

(NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a

NATO CAGE (NCAGE) code.

Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.

Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

(b) The Offeror represents that it □ is or □ is not a successor to a predecessor that held a

Federal contract or grant within the last three years.

(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):

Predecessor CAGE code: (or mark “Unknown”).

Predecessor legal name: .

(Do not use a “doing business as” name).

FAR 52.204-22 Alternative Line Item Proposal (Jan 2017)

FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance

Services or Equipment (Jan 2017)

(a) Definitions. As used in this clause—

Covered foreign country means The People’s Republic of China.

Covered telecommunications equipment or services means–

(1) Telecommunications equipment produced by Huawei Technologies

Company or ZTE Corporation (or any subsidiary or affiliate of such entities);

(2)For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications

Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology

Company (or any subsidiary or affiliate of such entities);

(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or

(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of

National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

Critical technology means–

(1)…