SF1442_Moakley_Cooling_Tower_2018_05_25.pdf

PDF 3 MB Posted

Attached to
Moakley Cooling Tower Replacement Project, Design/Build
Solicitation number
47PB0018R0007
Issued by

About this file

SF1442 (Bid Sheet) Moakley Cooling Tower (Design/Build)

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO., FORM OR

STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-

TITY

UNIT

OF

ISSUE

UNIT

PRICE

AMOUNT

the government. The Contractor commissioning and training for installation of one 91) cooling

Material -Temporary Cooling (if follows: DESIGN include start up testing, Base Bid Item: Contractor shall and the system is accepted by construction for the

PROPOSAL: -Equipment / Ancillary further be broken down as begin after testing is complete

Replace First Cooling Tower and maintenance period shall the Scope of Work. Work shall cooling tower system, and

TOTAL______________ CONSTRUCTION

and Construction, which shall detailed in paragraph 3.2.3 of

Moakley CH - Project Design and

Costs DESIGN design for replacing the entire this into two components: Design

Commencement of the operations

/ Supplies -Indirect the new cooling tower.

project including complete

EA

minimum one year warranty as shall break down their price for tower. System shall have a needed) -Controls -Labor -Indirect

PROPOSAL: -Labor -EFI -Materials provide a total “turnkey”

OF

ITEM NO., FORM OR

STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-

TITY

UNIT

OF

ISSUE

UNIT

PRICE

AMOUNT

EA

bid price shall be broken down the new cooling tower.

tower. System shall have a

Bid Option Item 2: Provide

Costs -Project Management TOTAL commissioning and training for

PoP: 08/01/2018 - 12/07/2018

EA

the government. The submitted installation of a second cooling

Third Cooling Tower needed) -Controls -Labor -Indirect and the system is accepted by

Cost CONSTRUCTION TOTAL:

begin after testing is complete include start up testing, construction for the

Cooling (if the Scope of Work. Work shall

Costs -Project Management

PoP: 08/01/2018 - 12/07/2018

Bid Option Item 1: Provide

Ancillary Material -Temporary and maintenance period shall installation of a third cooling

1:_________________

Commencement of the operations

Second Cooling Tower detailed in paragraph 3.2.3 of as follows: -Equipment / minimum one year warranty as construction for the

COST FOR OPTION ITEM

OF

ITEM NO., FORM OR

STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-

TITY

UNIT

OF

ISSUE

UNIT

PRICE

AMOUNT

accepted by the government. The testing, commissioning and isolate the offline units and

Replace Roof Dunnage needed) -Controls -Labor -Indirect

Work shall include start up water treatment system, controls

10004 is complete and the system is must have adequate valves to

Material -Temporary Cooling (if period shall begin after testing with VFD controllers, automatic operations and maintenance detailed in paragraph 3.2.3.

shall be replaced. All units

PoP: 08/01/2018 - 12/07/2018 follows: -Equipment / Ancillary minimum one year warranty as tower, condensing water pumps

2:_________________ the area of the cooling towers broken down as tower. Commencement of the dunnage on roof to better

COST FOR OPTION ITEM

training for the new cooling condensing water piping within replaced. System shall have a

EA

submitted bid price shall be all existing valves shall be

Bid Option Item 3: Replace

Costs -Project Management TOTAL and all related components. All

OF

ITEM NO., FORM OR

STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-

TITY

UNIT

OF

ISSUE

UNIT

PRICE

AMOUNT

walls and roof penetrations.

towers (this is a separate

Supplies -Indirect Cost DESIGN their price for this into two in the area of the cooling broken down as in and proper flashing for the

1 __________

PoP: 08/01/2018 - 12/07/2018

PROPOSAL: -Labor -Materials /

The Contractor shall break down warranty. Work shall include tie submitted bid price shall be shall have a minimum five year replacement of the roof system

3 COST:____________________

follows: DESIGN manufacturers’ specifications.

design and construction of support new equipment. The

EA

further be broken down as

TOTAL BIT ITEM 3

in accordance with roofs on the building). System

PROPOSAL: -Equipment / Ancillary

Construction, which shall roofing system from all other

Cost -Project Management Cost

Bid Option Item 4: Include

Roofing system should be tested

Roof Replacement

TOTAL______________ CONSTRUCTION

components: Design and follows: -Material -Labor -Indirec

OF

ITEM NO., FORM OR

STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-

TITY

UNIT

OF

ISSUE

UNIT

PRICE

AMOUNT

Supplies -Indirect Cost DESIGN combining work items and being

Bid Option Item 5: Include

Cost -Project Management any cost savings associated with

Cost -Project Management

PROPOSAL: -Labor -Materials /

Temporary Chiller

PoP: 08/01/2018 - 12/07/2018

Cooling -Controls -Labor -Indirect items for the following: DESIGN system -Labor -Indirect bid shall include separate line

Option 5 price should include

OPTION:_______________________

Material -Temporary for use of a temporary chiller.

Material -Roofing

ASSOCIATED WITH THIS

PoP: 08/01/2018 - 12/07/2018

EA __________

PROPOSAL: -Equipment / Ancillary towers offline. The submitted

______________ COST SAVINGS

able to take all three (3) including tie in and switch over

TOTAL______________ CONSTRUCTION

design and construction, Cost CONSTRUCTION TOTAL:

Cost CONSTRUCTION TOTAL:

topmostSubform[0]:
Page2[0]:
USC10[0]:
TelephoneNo\:
[0]:
Date31c[0]:
CheckBox29[0]: Off
AmendmentNo4[0]:
AdministeredBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

FacilityCode[0]:
AmendmentDate4[0]:
AmendmentNo7[0]:
AuthorizedSignature[0]:
Date30c[0]:
Amounts[0]:
AmendmentNo5[0]:
AmendmentDate8[0]:
AmendmentNo1[0]:
AccountingData[0]:
AmendmentDate3[0]:
Amount[0]:
AmendmentNo10[0]:
AmendmentDate7[0]:
PaymentMadeBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

AmendmentNo8[0]:
NameofOfferor[0]:
NameContractingOfficer[0]: Simeon Berry
Copies28[0]:
NameTitleSign[0]:
NameandTitle[0]:
OfferDate[0]:
Signature30b[0]:
AmendmentDate9[0]:
AmendmentNo6[0]:
ItemsAccepted[0]:
AmendmentDate2[0]:
AmendmentNo2[0]:
AmendmentDate6[0]:
RemittanceAddress[0]:
USC41[0]:
CalendarDays2[0]:
AmendmentNo9[0]:
CheckBox1[0]: Off
AmendmentDate10[0]:
CodeField[0]:
AmendmentNo3[0]:
AdministeredByCode[0]: 1PQB
CheckBox28[0]: Off
Item[0]: 7
AmendmentDate1[0]:
AmendmentDate5[0]:
CheckBox2[0]: Off
Signature31b[0]:
Page1[0]:
Code[0]: 1PQB
Sealed[0]: Off
PurchaseRequestNo[0]: EQ1PC-18-0011
Mandatory[0]: 1
AddressOfferTo[0]: 1PQB

Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

Is[0]: 1
Yes[0]: 1
NumberofCopies[0]: 1
Award[0]: Off
Pages[0]: 7
WorkDescribed[0]: Title: Design Build Scope of Work, Moakley Cooling Tower Replacement Project

Building: John Joseph Moakley Federal Courthouse Location: 1 Courthouse Way Boston, MA 02210 Building Number: MA0050ZZ Date: April 27, 2018

PhoneNo[0]: 617-650-7858
Hour[0]: 2:00 PM (EST)
Proceed[0]: 1
See[0]: Contract Agreement
SolicitationNo[0]: 47PB0018R0007
CalendarDays[0]: 15
CalendarDaysComplete[0]: 120
Name9a[0]: David Mark
Page[0]: 1
Negotiated[0]: Off
By[0]:
Negotiable[0]: Off
IsNot[0]: Off
ProjectNo[0]:
DateDue[0]: 6/25/2018
IssuedBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

ContractNo[0]:
No[0]: Off
CalendarDaysStart[0]: 14
LessCalendarDays[0]: 60
DateIssued[0]: 5/25/2018

File details come from the government source that posted it.