SF1442_Moakley_Cooling_Tower_2018_05_25.pdf
PDF 3 MB Posted
- Solicitation number
- 47PB0018R0007
About this file
SF1442 (Bid Sheet) Moakley Cooling Tower (Design/Build)
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
the government. The Contractor commissioning and training for installation of one 91) cooling
Material -Temporary Cooling (if follows: DESIGN include start up testing, Base Bid Item: Contractor shall and the system is accepted by construction for the
PROPOSAL: -Equipment / Ancillary further be broken down as begin after testing is complete
Replace First Cooling Tower and maintenance period shall the Scope of Work. Work shall cooling tower system, and
TOTAL______________ CONSTRUCTION
and Construction, which shall detailed in paragraph 3.2.3 of
Moakley CH - Project Design and
Costs DESIGN design for replacing the entire this into two components: Design
Commencement of the operations
/ Supplies -Indirect the new cooling tower.
project including complete
EA
minimum one year warranty as shall break down their price for tower. System shall have a needed) -Controls -Labor -Indirect
PROPOSAL: -Labor -EFI -Materials provide a total “turnkey”
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
EA
bid price shall be broken down the new cooling tower.
tower. System shall have a
Bid Option Item 2: Provide
Costs -Project Management TOTAL commissioning and training for
PoP: 08/01/2018 - 12/07/2018
EA
the government. The submitted installation of a second cooling
Third Cooling Tower needed) -Controls -Labor -Indirect and the system is accepted by
Cost CONSTRUCTION TOTAL:
begin after testing is complete include start up testing, construction for the
Cooling (if the Scope of Work. Work shall
Costs -Project Management
PoP: 08/01/2018 - 12/07/2018
Bid Option Item 1: Provide
Ancillary Material -Temporary and maintenance period shall installation of a third cooling
1:_________________
Commencement of the operations
Second Cooling Tower detailed in paragraph 3.2.3 of as follows: -Equipment / minimum one year warranty as construction for the
COST FOR OPTION ITEM
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
accepted by the government. The testing, commissioning and isolate the offline units and
Replace Roof Dunnage needed) -Controls -Labor -Indirect
Work shall include start up water treatment system, controls
10004 is complete and the system is must have adequate valves to
Material -Temporary Cooling (if period shall begin after testing with VFD controllers, automatic operations and maintenance detailed in paragraph 3.2.3.
shall be replaced. All units
PoP: 08/01/2018 - 12/07/2018 follows: -Equipment / Ancillary minimum one year warranty as tower, condensing water pumps
2:_________________ the area of the cooling towers broken down as tower. Commencement of the dunnage on roof to better
COST FOR OPTION ITEM
training for the new cooling condensing water piping within replaced. System shall have a
EA
submitted bid price shall be all existing valves shall be
Bid Option Item 3: Replace
Costs -Project Management TOTAL and all related components. All
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
walls and roof penetrations.
towers (this is a separate
Supplies -Indirect Cost DESIGN their price for this into two in the area of the cooling broken down as in and proper flashing for the
1 __________
PoP: 08/01/2018 - 12/07/2018
PROPOSAL: -Labor -Materials /
The Contractor shall break down warranty. Work shall include tie submitted bid price shall be shall have a minimum five year replacement of the roof system
3 COST:____________________
follows: DESIGN manufacturers’ specifications.
design and construction of support new equipment. The
EA
further be broken down as
TOTAL BIT ITEM 3
in accordance with roofs on the building). System
PROPOSAL: -Equipment / Ancillary
Construction, which shall roofing system from all other
Cost -Project Management Cost
Bid Option Item 4: Include
Roofing system should be tested
Roof Replacement
TOTAL______________ CONSTRUCTION
components: Design and follows: -Material -Labor -Indirec
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Supplies -Indirect Cost DESIGN combining work items and being
Bid Option Item 5: Include
Cost -Project Management any cost savings associated with
Cost -Project Management
PROPOSAL: -Labor -Materials /
Temporary Chiller
PoP: 08/01/2018 - 12/07/2018
Cooling -Controls -Labor -Indirect items for the following: DESIGN system -Labor -Indirect bid shall include separate line
Option 5 price should include
OPTION:_______________________
Material -Temporary for use of a temporary chiller.
Material -Roofing
ASSOCIATED WITH THIS
PoP: 08/01/2018 - 12/07/2018
EA __________
PROPOSAL: -Equipment / Ancillary towers offline. The submitted
______________ COST SAVINGS
able to take all three (3) including tie in and switch over
TOTAL______________ CONSTRUCTION
design and construction, Cost CONSTRUCTION TOTAL:
Cost CONSTRUCTION TOTAL:
| topmostSubform[0]: |
| Page2[0]: |
| USC10[0]: |
| TelephoneNo\: |
| [0]: |
| Date31c[0]: |
| CheckBox29[0]: Off |
| AmendmentNo4[0]: |
| AdministeredBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS |
10 CAUSEWAY ST., RM 1100
BOSTON, MA 02222-1077 USA
| FacilityCode[0]: |
| AmendmentDate4[0]: |
| AmendmentNo7[0]: |
| AuthorizedSignature[0]: |
| Date30c[0]: |
| Amounts[0]: |
| AmendmentNo5[0]: |
| AmendmentDate8[0]: |
| AmendmentNo1[0]: |
| AccountingData[0]: |
| AmendmentDate3[0]: |
| Amount[0]: |
| AmendmentNo10[0]: |
| AmendmentDate7[0]: |
| PaymentMadeBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS |
10 CAUSEWAY ST., RM 1100
BOSTON, MA 02222-1077 USA
| AmendmentNo8[0]: |
| NameofOfferor[0]: |
| NameContractingOfficer[0]: Simeon Berry |
| Copies28[0]: |
| NameTitleSign[0]: |
| NameandTitle[0]: |
| OfferDate[0]: |
| Signature30b[0]: |
| AmendmentDate9[0]: |
| AmendmentNo6[0]: |
| ItemsAccepted[0]: |
| AmendmentDate2[0]: |
| AmendmentNo2[0]: |
| AmendmentDate6[0]: |
| RemittanceAddress[0]: |
| USC41[0]: |
| CalendarDays2[0]: |
| AmendmentNo9[0]: |
| CheckBox1[0]: Off |
| AmendmentDate10[0]: |
| CodeField[0]: |
| AmendmentNo3[0]: |
| AdministeredByCode[0]: 1PQB |
| CheckBox28[0]: Off |
| Item[0]: 7 |
| AmendmentDate1[0]: |
| AmendmentDate5[0]: |
| CheckBox2[0]: Off |
| Signature31b[0]: |
| Page1[0]: |
| Code[0]: 1PQB |
| Sealed[0]: Off |
| PurchaseRequestNo[0]: EQ1PC-18-0011 |
| Mandatory[0]: 1 |
| AddressOfferTo[0]: 1PQB |
Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS
10 CAUSEWAY ST., RM 1100
BOSTON, MA 02222-1077 USA
| Is[0]: 1 |
| Yes[0]: 1 |
| NumberofCopies[0]: 1 |
| Award[0]: Off |
| Pages[0]: 7 |
| WorkDescribed[0]: Title: Design Build Scope of Work, Moakley Cooling Tower Replacement Project |
Building: John Joseph Moakley Federal Courthouse Location: 1 Courthouse Way Boston, MA 02210 Building Number: MA0050ZZ Date: April 27, 2018
| PhoneNo[0]: 617-650-7858 |
| Hour[0]: 2:00 PM (EST) |
| Proceed[0]: 1 |
| See[0]: Contract Agreement |
| SolicitationNo[0]: 47PB0018R0007 |
| CalendarDays[0]: 15 |
| CalendarDaysComplete[0]: 120 |
| Name9a[0]: David Mark |
| Page[0]: 1 |
| Negotiated[0]: Off |
| By[0]: |
| Negotiable[0]: Off |
| IsNot[0]: Off |
| ProjectNo[0]: |
| DateDue[0]: 6/25/2018 |
| IssuedBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS |
10 CAUSEWAY ST., RM 1100
BOSTON, MA 02222-1077 USA
| ContractNo[0]: |
| No[0]: Off |
| CalendarDaysStart[0]: 14 |
| LessCalendarDays[0]: 60 |
| DateIssued[0]: 5/25/2018 |