This is a comprehensive design and specification document for mechanical, plumbing, fire protection, and electrical work associated with the Oregon Youth Authority's MacLaren Youth Correctional Facility (MYCF) Valley Cottage Renovations project in Woodburn, Oregon. The project encompasses the complete renovation of a cottage facility, including HVAC systems with eight heat pump units and associated fan coil units, energy recovery ventilators, electric duct heaters, and exhaust fans. The plumbing scope includes hot water heaters, recirculation pumps, water softener connections, grease interceptors, floor drains, fixtures, and comprehensive piping systems for domestic water, hot water, waste, vent, and natural gas. The electrical work involves service panels, branch circuits, lighting controls, fire alarm systems, and connections for mechanical and plumbing equipment. The fire protection system includes sprinkler installation and backflow prevention. The drawings are dated April 2024 as part of Bid Pack 4, with project identification number 18105 prepared by Beaman Architecture, Ltd.
The specifications and schedules provide detailed equipment selections from manufacturers including Daikin for heat pumps and fan coils, Renewaire for energy recovery ventilators, Lochinvar for water heaters, American Standard and Elkay for plumbing fixtures, and Titus and Greenheck for air distribution components. All electrical work is designed for 120/208-volt three-phase service with comprehensive labeling and circuit documentation. The documents include detailed control sequences for HVAC operation across multiple modes (day/night, kitchen hood on/off), fixture schedules with specific model numbers and mounting requirements, riser diagrams for plumbing distribution, and enlarged floor plans with section details. Construction coordination requirements are emphasized throughout, particularly regarding timing for mechanical equipment startup, controls commissioning, and testing and balancing activities. The project appears to be a complete renovation with demolition of existing systems and installation of new equipment throughout the cottage facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
ABV
AFF
AFG
AL
BLDG
CLG
CP
CU
DIA
DIV
DWG
EA
FLR
FT
GA
H
HT
N L
MAX
MFR
MIN
MNT
N.C.
NIC
N.O.
REQ'D
RM
SIM
SS
TYP
W W/
W/IN
W/O Ø (E) (N)
ANNOTATION
+XX"
ABOVE
ABOVE FINISH FLOOR
ABOVE FINISH GRADE
ALUMINUM
BUILDING
CEILING
CHROME PLATED
COPPER
DIAMETER
DIVISION
DRAWING
EACH
FLOOR, OR FLOOR MOUNTED
FEET
GAUGE
HIGH
HEIGHT
INCHES
LONG
MOUNTING HEIGHT (AFF OR AFG)
MAXIMUM
MANUFACTURER
MINIMUM
MOUNT(ED)
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
REQUIRED
ROOM
SIMILAR
STAINLESS STEEL
TYPICAL
WIDE
WITH
WITHIN
WITHOUT
DIAMETER
EXISTING TO REMAIN
NEW
GENERAL SYMBOLS
SYMBOLS & ABBREVIATIONS
ROOM
NAME
ROOM NUMBER
CONNECTION TO EXISTING (#"
INDICATES EXISTING SIZE)EQ-#
Ref Sht Ref Sht
KEY NOTE
NOTE:
SYMBOLS AND ABBREVIATIONS ON THE DRAWINGS SHALL BE INTERPRETED IN ACCORDANCE
WITH THE LEGENDS WHEREVER APPLICABLE. NOT ALL SYMBOLS AND ABBREVIATIONS IN THE
LEGENDS ARE NECESSARILY USED FOR THE PROJECT. ALL SIZES ARE IN INCHES, UNLESS
OTHERWISE NOTED.
EQUIPMENT IDENTIFIER
DETAIL REFERENCE
DETAIL NUMBER
SHEET NUMBER
DETAIL REFERENCE
DETAIL NUMBER
MATCHED SHEET NUMBER
CURRENT SHEET NUMBER
MATCH LINE REFERENCE
MATCHED SHEET NUMBER
CENTER LINE
1 REVISION NUMBER
SECTION REFERENCE
SECTION NUMBER
SHEET NUMBER
NORTH ARROW
Sht #
SIM
A101
DEMOLITION
EXISTING TO REMAIN OR NOT IN CONTRACT
NEW WORK
FUTURE WORK
LINEWEIGHT LEGEND
HVAC SYMBOLS
AIR FLOW RATE (CFM)
RECTANGULAR SUPPLY DUCT (SECTION)
RECTANGULAR RETURN DUCT (SECTION)
RECTANGULAR EXHAUST DUCT (SECTION)
RECTANGULAR OSA DUCT (SECTION)
ROUND SUPPLY DUCT (SECTION)
ROUND RETURN DUCT (SECTION)
ROUND EXHAUST DUCT (SECTION)
ROUND OSA DUCT (SECTION)
DUCTWORK WITH INTERNAL LINING
ALUMINUM/STAINLESS STEEL DUCTWORK
(AS SPECIFIED)
AIR TRANSFER DUCT SLEEVE
FLEXIBLE DUCT
DUCT OFFSET AND DIRECTION
THERMOSTAT
SUPPLY AIR FLOW
RETURN AIR FLOW
FIRE/SMOKE DAMPER TYPE
SECURITY GRILLE TYPE
DAMPER MOTOR OPERATOR
ATTENUATOR
TERMINAL BOX, HEAT PUMP, OR FAN COIL
UNIT
DUCT SECURITY GRILLE
RECTANGULAR RETURN REGISTER/GRILLE
UNIT HEATER
RECTANGULAR SUPPLY DIFFUSER
(ARROWS INDICATE THROW)
LINEAR DIFFUSER
(ARROWS INDICATE THROW)
CIRCULAR DIFFUSER
(ARROWS INDICATE THROW)
SIDEWALL DIFFUSER
(ARROWS INDICATE THROW)
LOUVER
(ARROWS INDICATE THROW)
T
GRILLE/REGISTER/DIFFUSER INFORMATION
GRD TYPE
SIZE
UP DN
1 FlowSize
M
RECTANGULAR EXHAUST REGISTER/GRILLE/HOOD
TURNING VANES
AIR SPLIT TAKEOFF
SINGLE BLADE VOLUME DAMPER
OPPOSED BLADE VOLUME DAMPER
FIRE/SMOKE DAMPER
RECTANGULAR DUCT SIZE (WIDTHxDEPTH)
CIRCULAR DUCT DIAMETER
FLAT OVAL DUCT SIZE (WIDTH/DEPTH)
12"x12"
12"ø
12"/12"
ROUND MITERED ELL W/ TURNING VANES
FLAT OVAL SUPPLY DUCT (SECTION)
MECHANICAL ABBREVIATIONS
AIR HANDLING UNIT
AIR SEPARATOR
ATTENUATOR
BOILER
CUBIC FEET PER MINUTE
CIRCULATION
CONDENSATE RETURN PUMP
CHILLED WATER PUMP
ELECTRIC DUCT HEATER
EXHAUST FAN
ENERGY RECOVERY VENTILATOR
EXPANSION TANK
EXHAUST
FAN COIL UNIT
FEET PER MINUTE
GLYCOL FEEDER
GRILL/REGISTER/DIFFUSER
HEAT PUMP
HEATING WATER PUMP
OPPOSED BLADE VOLUME DAMPER
OUTSIDE AIR
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
RETURN AIR
ROOF COWL
STEAM CONVERTOR
STATIC PRESSURE
STORAGE TANK
UNIT HEATER
VELOCITY
WATER HEATER
ANNOTATION
AIR HANDLING UNIT NUMBER (AH-1)
AIR SEPARATOR (AS-1)
ATTENUATOR NUMBER (AT-1)
BOILER NUMBER (BLR-1)
CONDENSER UNIT NUMBER (CU-1)
EXHAUST FAN NUMBER (EF-1)
EXPANSION TANK NUMBER (ET-1)
FAN COIL UNIT (FC-1)
GLYCOL FEEDER (GF-1)
LOUVER NUMBER (L-1)
ROOF COWL NUMBER (RC-1)
STEAM CONVERTOR (SC-1)
STORAGE TANK (ST-1)
UNIT HEATER NUMBER (UH-1)
WATER HEATER (WH-1)
GENERAL NOTES:
1. LOAD CALCULATIONS WERE PERFORMED PER ASHRAE STD. 183.
2. EQUIPMENT CAPACITIES WERE SELECTED TO CONFORM WITH THE
REQUIREMENTS OF THE 2014 OEESC SECTION 503.2.2.
AH
AS
AT
BLR
CFM
CIRC
CRP
CWP
EDH
EF
ERV
ET
EXH
FC
FPM
GF
GRD
HP
HWP
OBVD
OSA
PRV
PSI
RA
RC
SC
SP
ST
UH
VEL
WH
AH-#
AS-#
AT-#
BLR-#
CU-#
EF-#
ET-#
FC-#
GF-#
L-#
RC-#
SC-#
ST-#
UH-#
WH-#
PLUMBING ABBREVIATIONS
CAST IRON
CLEAN-OUT
CLEAN-OUT IN WALL
CLEAN-OUT TO FLOOR
CLEAN-OUT TO GRADE
FLOOR DRAIN
FREEZE RESISTANT WALL HYDRANT
FLOOR SINK
GALLONS PER MINUTE
GAS TANK VENT
INVERT ELEVATION
INDIRECT WASTE
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
ROOF DRAIN
REDUCED PRESSURE BACKFLOW PREVENTER
SUMP VENT
VENT THRU ROOF
WATER COLUMN
WATER HAMMER ARRESTER
ANNOTATION
FIXTURE ITEM NUMBER (P1)
FLOOR DRAIN SIZE AND TYPE (2"FD-1)
FLOOR SINK SIZE AND TYPE (2"FS-1)
ROOF DRAIN SIZE AND TYPE (2"RD-1)
CI
CO
COIW
COTF
COTG
FD
FRWH
FS
GPM
GTV
IE
IW
PRV
PSI
PSF
RD
RPBP
SV
VTR
WC
WHA
P#
#"FD-#
#"FS-#
#"RD-#
PLUMBING/PIPING LEGEND
FIREF
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC RECIRCULATED WATER
DRY STAND PIPEDSP
FIRE DEPARTMENT CONNECTION PIPEFDC
INDIRECT WASTE (ABOVE FLOOR)IW
NATURAL GAS (7" WC, UNLESS OTHERWISE NOTED)G
OVERFLOW DRAIN LINEODL
ROOF DRAIN LINERDL
VENT
WASTE
VENT (BELOW GRADE)
WASTE (BELOW GRADE)
SANITARY SEWERSS
STORM DRAINSD
SOLAR HEATING SUPPLYSHS
SOLAR HEATING RETURNSHR
CHILLED WATER SUPPLY
CONDENSATE DRAIN
CONDENSER RETURN
CONDENSER SUPPLY
HYDRONIC PIPING LEGEND
CHILLED WATER RETURN
HEAT PUMP SUPPLY
HOT WATER RETURN
HOT WATER SUPPLY
HEAT PUMP RETURN
PUMPED CONDENSATE
CWR
CWS
CD
CDR
CDS
HR
HS
HWR
HWS
PC
SNOW MELT RETURNSMR
SNOW MELT SUPPLYSMS
REFRIGERANT DISCHARGERD
REFRIGERANT GASRG
REFRIGERANT LIQUIDRL
ACID RESISTANT WASTE
GREASE WASTE
REFRIGERANT PIPING RETURN
MISCELLANEOUS PIPING LEGEND
ACID RESISTANT VENT
SOFT COLD WATER
SOFT HOT WATER
TEMPERED WATER AT TEMPERATURE INDICATED
REFRIGERANT PIPING SUPPLY
AR
AR
BLENDED WATER
GW
RR
RS
SCW
SHW
(DEG F)
BW
AVERAGING SENSOR
CARBON DIOXIDE SENSOR
COIL (HEATING/COOLING)
TEMPERATURE CONTROL SYMBOLS
AIRFLOW MONITOR
MOTOR STARTER WITH CURRENT SENSING RELAY
POINT SENSOR
PUMP
CURRENT TRANSDUCER
DAMPER MOTOR ACTUATOR IDENTIFICATION
DIFFERENTIAL PRESSURE SWITCH
DUCT SMOKE DETECTOR
CONTROL POINT
EQUIPMENT IDENTIFICATION
FLOW SWITCH
HUMIDITY SENSOR
IN-LINE DEVICE
END SWITCH
LIGHT (PILOT OR ANNUNCIATOR)
LIGHT WITH AUDIO ANNUNCIATION
LOW LIMIT FREEZESTAT
MOTOR STARTER
INTERFACE RELAY
REFRIGERANT MONITOR
STATIC PRESSURE SENSOR
PRESSURE SENSOR
OCCUPANCY SENSOR
SWITCH
SOLENOID VALVE ACTUATOR
SWITCH WITH PILOT LIGHT
TEMPERATURE TRANSMITTER
TEMPERATURE TRANSMITTER WITH SUN SHIELD
THERMOWELL
SWITCH WITH GUARDED COVER
WATERFLOW METER
2-WAY MODULATING VALVE
3-WAY MODULATING VALVE
2-OR 3-WAY MODULATING VALVE
(SEE PLANS OR DETAILS FOR REQUIREMENTS)
VALVE MOTOR ACTUATOR IDENTIFICATION
TT
TT
2CO
C
S
V#
WM
OS
PS
SP
RM
LL
R
H
FS
ES
DS
DP
CT
AF
1i
G
CARBON MONOXIDE SENSORCO
MOTORIZED DAMPER
SENSORS
FILTER
TEMPERATURE CONTROL ABBREVIATIONS
AIR FLOW
ANALOG INPUT
ANALOG OUTPUT
COMMON
CIRCULATION
CHILLED WATER RETURN
CHILLED WATER SUPPLY
DIRECT DIGITAL CONTROL
DIGITAL INPUT
DIGITAL OUTPUT
EXHAUST AIR
EXHAUST FAN
ENERGY MANAGEMENT & CONTROL SYSTEM
EXHAUST
HOT WATER RETURN
HOT WATER SUPPLY
MODULAR BUILDING CONTROLLER
MODULAR EQUIPMENT CONTROLLER
OUTSIDE AIR
RETURN AIR
RETURN FAN
RELIEF FAN
SUPPLY AIR
STANDALONE CONTROL UNIT
SUPPLY FAN
TERMINAL CONTROL UNIT
UNITARY CONTROLLER
VARIABLE FREQUENCY DRIVE
WATER FLOW
AF
AI
AO
C
CIRC
CWR
CWS
DDC
DI
DO
EA
EF
EMCS
EXH
HWR
HWS
MBC
MEC
OSA
RA
RF
RLF
SA
SCU
SF
TEC
UC
VFD
WF
PLUMBING/PIPING SYMBOLS
ANGLE VALVE
CAP
CHECK VALVE
CIRCUIT SETTER
CIRCULATING PUMP
CLEAN-OUT (BELOW FLOOR OR GRADE)
CLEAN-OUT (FLUSH TO FLOOR OR GRADE)
CROSS
REDUCER
ELBOW
ELBOW DOWN
ELBOW UP
EXPANSION JOINT
FIRE DEPARTMENT CONNECTION
FLEXIBLE CONNECTION
FLOOR DRAIN (ROUND OR SQUARE)
FLOOR SINK
FLOW DIRECTION
FLOW DIRECTION AND SLOPE
FLOW SWITCH
BALL VALVE
GLOBE VALVE
HOSE BIBB/WALL HYDRANT
MANHOLE/DRYWELL
PENETRATION (FLOOR OR WALL)
PIPE ANCHOR
PIPE CONTINUES ALTHOUGH NOT DRAWN
PIPE GUIDE
PIPE SLEEVE
PRESSURE GAUGE
PRESSURE AND TEMPERATURE RELIEF VALVE
GAS & WATER PRESSURE REDUCING VALVE
(POINTS TOWARDS LOW PRESSURE)
ROOF DRAIN
SANITARY CROSS
SANITARY ELBOW
SANITARY TEE
SANITARY TEE IN RISER
SOLENOID VALVE
TEE
TEE DOWN
TEE DOWN TO ELBOW
TEE UP
TEE UP TO RISE
UNION/COUPLING
VALVE IN RISER
VALVE WITH TAMPER SWITCH
VENT THRU ROOF
WATER HAMMER ARRESTER
WYE
TEE UP TO ELBOW
BUTTERFLY VALVE
T
S
FS
1%
GAS VALVE
MISCELLANEOUS PLUMBING SYMBOLS
NRS
BLOW DOWN VALVE
GATE VALVE
AUTOMATIC BALL DRIP
BUTTERFLY VALVE
DOWNSPOUT NOZZLE
SHOWER HEAD
GATE VALVE, NON-RISING STEM
TRAP SET (AS SPECIFIED)
# INDICATES TRAP TYPE
KNIFE GATE VALVE
CONNECTION POINT
BALL VALVE
ANGLE STOP/CHECK VALVE
THRUST RESTRAINT
PLUG VALVE
STOP/CHECK VALVE
SERRATED COCK (COUNTER-TOP MOUNTED)
DIAPHRAGM VALVE
SERRATED COCK (WALL MOUNTED)
HYDRONIC PIPING SYMBOLS
2-WAY CONTROL VALVE
3-WAY MODULATING CONTROL VALVE
AIR SEPARATOR
AUTOMATIC AIR VENT
ELECTRO-PNEUMATIC CONTROL VALVE
GAUGE COCK
MANUAL AIR VENT
MOTOR OPERATED VALVE
M
P-TRAP
PRESSURE INDEPENDENT BALANCING VALVE
PRESSURE SWITCH
SIGHT GLASS
STRAIGHT THRU MODULATING CONTROL VALVE
STRAINER
THERMOMETER
THERMOWELL
VENTURI
PS
R
E
101260PE
OREGONN
O 08, 2 0 2 2
EG
I S
T ER ED PRO FESS I ONA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T
HO
S H O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
M0-1
LEGENDS & ABBREVIATIONS -
MECHANICAL
APRIL 2024
BID PACK 4
No. Revision Date
NOTESDEFL
POSSPC
BLADE
PATTERNMATERIAL MOUNTINGTYPEMODEL SERVICEMFR
AIR OUTLETS
HOR
1/2
HORIZONTAL
4-WAY
SURFACE
SURFACE
ALUM
STEEL
GRILLE
DIFFUSER
SUPPLY
SUPPLY
SG-1500
SG-TDC1
TITUS2
TITUS
NOTES:
1. PROVIDE WITH WHITE BAKED ENAMEL FINISH.
2. PROVIDE SQUARE TO ROUND ADAPTER AS REQUIRED.
3. BORDER: 16GA STEEL WITH WELDED CORNERS.
4. SEE SPECIFICATION SECTION 23 37 00.
GREENHECKEF-1 CUBE-099 BELT 800 0.75 1652 115/1
NOTES
V/Ø
SONESCFM
SP
("WC)
FAN
RPM
DRIVE
EXHAUST FANS
TAG MFR MODEL
MOTOR
NOTES:
1. PROVIDE EXHAUST FAN SUITABLE FOR TYPE I KITCHEN HOOD GREASE EXHAUST, SEE SPECIFICATIONS.
2. STARTER WITH RELAY (TOGGLE SWITCH ON WALL NEAR KITCHEN HOOD) BY DIV. 26.
TYPE I KITCHEN
HOOD EXHAUST
SERVICE
HP
10.3 1/3
INDOOR UNIT
STYLE
FAN
CFM
INDOOR UNIT
MODEL NOTES
TOTAL
COOL CAP.
(BTUH)
ESP
(IN.
WC)
OUTDOOR
CONDENSING
UNITTAG MFR
SPLIT SYSTEM FAN COIL UNITS (INDOOR)
NOTES:
1. PROVIDE WITH CONDENSATE PUMP.
2. PROVIDE WITH SENSOR/THERMISTOR FOR REMOTE MOUNTING IN RETURN AIR DUCT
3. SEE CONTROL DRAWINGS ON M0-3 FOR INTENDED HEAT PUMP OPERATION AND REQUIRED
CONTROLS PROVIDED BY HEAT PUMP MFR. HEAT PUMP SHALL ENABLE AUXILIARY ELECTRIC HEAT
WHEN HEAT PUMP CANNOT MAINTAIN THE SPACE TEMPERATURE.
4. PROVIDE WITH CONTROLLER DESIGNED FOR REMOTE MOUNTING IN ELECT. 118 FOR REMOTE
MONITORING AND ADJUSTMENT.
5. PROVIDE WITH ACCESSORIES REQUIRED FOR MOUNTING APPLICATION. SEE FLOOR PLAN ON M2-1
FOR ARRANGEMENT.
6. SEE SCHEDULE ON THIS SHEET FOR HEAT PUMP PERFORMANCE.
V/Ø
INDOOR UNIT ELECTRICAL
FC-4 HP-4
SERVICE
TAG MFR SEER
OPERATING
WEIGHT
(LBS)
V/ØMCA
REFRIG
TYPE
SPLIT SYSTEM HEAT PUMPS/CONDENSING UNITS (OUTDOOR)
OUTDOOR UNIT ELECTRICAL
NOTESMODEL #
TOTAL
COOL CAP.
(BTUH)
SERVICE
MOP
AMB.
AIR
(°F)
NOTES:
1. SCHEDULED CAPACITIES ARE LISTED FOR UNIT OPERATING AT DESIGN CONDITIONS: 95°F OUTDOOR, 75°F
INDOOR COOLING; 20°F OUTDOOR, 70°F INDOOR HEATING.
2. SCHEDULED SEER AND HSPF ARE LISTED FOR UNIT OPERATING AT AHRI CONDITIONS.
3. PROVIDE REQUIRED ACCESSORIES FOR LOW AMBIENT COOLING OPERATION DOWN TO 0°F.
4. DISCONNECT BY DIV. 26.
5. PROVIDE WITH TWO 3-3/4" HIGH FEET AND BOLTING KIT AS REQUIRED TO FIX UNIT TO FEET AND TO FIX FEET
TO CONCRETE PAD. BIG FOOT FIX-IT FOOT KIT, OR APPROVED EQUAL.
FC-8
HP-70.0 208/1
HIGH WALL
FC-1 HP-1DAIKIN FBQ24PVJU 0.5 24,000
HORIZONTAL
DUCTED
208/1DORM 112
FC-2
FC-3 HP-3COUNSEL 106 & 107
MCA
27,000
TOTAL
HEAT CAP.
(BTUH)
38HOR3/8FIXED BARSURFACESTEELGRILLERETURN/EXHSG-3300RLTITUS3
HP-80.0 208/1
CEILING
CASSETTE
MIN. OSA
(CFM)
SENSIBLE
COOL CAP.
(BTUH)
7,990
18,700
8,170
1.8
HSPF
5, 6, 7, 8, 9, 12
0.75 1.5 1.5 25.2 / 20.0 208/1
MCA
0.75850
ERV-2
ERV-1
FLA
LAT
DB/WB
EAT
DB/WB
LAT
DB/WB
EAT
DB/WB
HEAT EXCHANGER (SUMMER)
NOTES
HEAT EXCHANGER (WINTER)
ENERGY RECOVERY VENTILATORS
ESP
EXHAUST FAN
HPHPESP
NIGHT
CFM
SUPPLY FAN
TAG MFR
UNIT
WEIGHT
UNIT ELECTRICAL
MOP
RENEWAIRE 800550
VOLT/PHASE
EXHAUST
DB/WB
EXHAUST
DB/WB
HE1XRT
2518.516.4 1, 3, 4, 5
2, 3, 4
NOTES:
1. PROVIDE SUPPLY AND EXHAUST FANS WITH BELT DRIVE MOTORS AND ABB MODEL ACS320 VFDS (OR APPROVED EQUAL).
2. PROVIDE SUPPLY AND EXHAUST FANS WITH DIRECT DRIVE EC MOTORS.
3. PROVIDE WITH SINGLE POINT ELECTRICAL CONNECTION WITH STARTER, LOCKING FUSED DISCONNECT, AND 24VAC TRANSFORMER/RELAY PACKAGE.
4. PROVIDE WITH 7-DAY PROGRAMMABLE WALL MOUNT TIME CLOCK, CLASS 1 LOW LEAKAGE MOTORIZED DAMPERS/ACTUATORS ON SUPPLY AND EXHAUST AIRSTREAMS, AND FOUR MERV 8 FILTERS.
5. PERFORMANCE INDICATED IS FOR DAY/HOOD OFF MODE OF OPERATION. PROVIDE PERFORMANCE DATA FOR ALL MODES OF OPERATION IN SUBMITTAL.
RENEWAIRE
HE2XRT
MODEL
70.0 / 54.0 51.8 / 41.6 91.4 / 67.1 75.0 / 67.1 81.7 / 63.7
0.5 0.5 0.5 25.2 / 20.0 208/10.5825 500600 1510.89.651.6 / 40.7 81.7 / 63.7
7. PROVIDE WALL MOUNTED THERMOSTAT.
8. INDOOR UNIT POWERED FROM OUTDOOR UNIT. WIRING BETWEEN UNITS AND CONNECTIONS TO
BE PROVIDED BY DIVISION 26.
9. PROVIDE WITH AUXILIARY MOISTURE SENSOR IN DRAIN PAN TO SHUT-OFF COOLING IN HIGH
MOISTURE CONDITIONS.
10. SCHEDULED CAPACITIES ARE LISTED FOR UNIT OPERATING AT DESIGN CONDITIONS: 95°F
OUTDOOR, 75°F INDOOR COOLING; 20°F OUTDOOR, 70°F INDOOR HEATING.
11. PROVIDE WITH MODEL # DACA-FXMQ FILTER CABINET KIT WITH TWO MERV 13 FILTERS.
12. DISCONNECT BY DIV. 26.
FC-6 HP-6
FC-5 HP-5
HP-2DAIKIN FBQ18PVJU 0.5 18,000
HORIZONTAL
DUCTED
208/1DORM 110 20,000 9514,800 1.6
0.5
HORIZONTAL
DUCTED
208/1 1551.6FBQ24PVJUDAIKIN
DAIKIN FBQ30PVJU 0.5 30,000
HORIZONTAL
DUCTED
208/1MULTI PURPOSE 101 34,000 21023,400 2.3
DAIKIN FBQ48PVJU 0.5 48,000
HORIZONTAL
DUCTED
208/1DINING 114 54,000 40036,100 3.4
DAIKIN FBQ18PVJU 0.5
HORIZONTAL
DUCTED
208/1TOILET/SHOWER 120 5751.6
DAIKIN OFFICE 104
DAIKIN FTX09NMVJU LOW VOLT. 109
1, 2, 4
1, 2, 4
1, 2, 3, 4
FC-7 378
FFQ09Q2VJU 9,100
9,000
1, 5, 6, 7, 8, 9, 12
1, 2, 3, 4, 5, 6, 9, 10, 11, 12
6,000
6,700
24,000 27,00018,700
18,000 20,00014,800
DAY/
HOOD ON
CFM
DAY/
HOOD OFF
CFM
DAY/
HOOD ON
CFM
DAY/
HOOD OFF
CFM
NIGHT
CFM
0 70.0 / 54.0 91.4 / 67.1 75.0 / 67.1
TOTAL
EFFECTIVE
-NESS
88%
75%
90%
78%
TOTAL
EFFECTIVE
-NESS
1, 2, 3, 4, 5, 6, 9, 10, 11, 12
1, 2, 3, 4, 5, 6, 9, 10, 11, 12
1, 2, 3, 4, 5, 6, 9, 10, 11, 12
1, 2, 3, 4, 5, 6, 9, 10, 11, 12
1, 2, 3, 4, 5, 6, 9, 10, 11, 12
ELECTRIC DUCT HEATERS
NOTES
NOTES:
1. PROVIDE WITH THERMAL CUTOUTS, AIRFLOW SWITCH, CONTROL TRANSFORMERS, FUSED DISCONNECT SWITCH, CONTACTORS, SCR CONTROLLER, UL LISTED, DUCT STAT FOR MODULATED CONTROL TO DISCHARGE AIR TEMP, CONTACT CLOSURE FOR REMOTE ENABLE (DUCT HEATER SHALL BE ENABLED BY ASSOCIATED HEAT PUMP).
2. ORDER WITH RIGHT OR LEFT AIRFLOW ARRANGEMENT AS SHOWN ON SHEET M2-1.
3. ELECTRIC DUCT HEATER TO BE FIELD INSTALLED BY DIVISION 23, POWER WIRING BY DIV 26.
TAG DUCT SIZESERVES
EDH-1
CFM
LAT
KW VOLT PHASE
4.2
EDH-2 3.5
EDH-3 4.0
EDH-5
6.5
208 3
208 3
208 3
208 3
20x12 81
(°F)
EAT
(°F)
22x12
MODEL
DHR
4.7 208 35224x10
EDH-4
SERIES
3000MARKEL
HEATING
CAPACITY
(W)
STYLE
AIR FLOW
(CFM)MFR NOTES
UNIT ELECTRICAL
ELECTRIC WALL HEATERS
MCA
SERVICE
V/ø
FAN FORCED
WALL MOUNT
NOTES:
1. PROVIDE WITH SURFACE MOUNT FRAME, INTEGRAL THERMOSTAT, AND FACTORY INSTALLED DISCONNECT.
1120/1 12.51500100
MOP
WEIGHT
(LBS)
6 FIRE SPRINKLER
MFR
NAILOR 1, 2, 3
1, 2, 3
1, 2, 3
1, 2, 3
1, 2, 3
EWH-1
TAG
MOP
EDH-6 12.0 208 34926x12 1, 2, 3
DORM 112
COUNSEL 106 & 107
DORM 110
MULTI PURPOSE 101
DINING 114
TOILET/SHOWER 120
DHRNAILOR
DHRNAILOR
DHRNAILOR
DHRNAILOR
DHRNAILOR
20x12
20x12
HP-4
HP-1 DAIKIN RZQ24TAVJUA 16.5R410A 16.5 208/120 15095
HP-2
HP-3
FC-1
FC-3
HP-5
FC-4
HP-8
FC-7 2, 3, 4, 5
9.7
FC-8
HP-6
FC-5
HP-7
FC-6
DAIKIN RZQ18TAVJUA 16.7R410A 16.5 208/120 15095FC-2 9.5
DAIKIN
DAIKIN
DAIKIN
RZQ18TAVJUA
R410A 16.5 208/120 15095
16.7R410A 16.5 208/120 15095 9.5DAIKIN
RZQ30TAVJUA 16.0R410A 29.1 208/135 28595 9.2
RZQ48TAVJUA 14.0R410A 29.1 208/135 28595 8.4
DAIKIN RX09RMVJU9 20.9R410A 9.0 208/115 6095 11.7
DAIKIN RXL09QMVJU 20.0R410A 9.5 208/115 6095 12.5
24,000
18,000
30,000
48,000
9,100
9,000
18,000
1, 2, 4, 5
2, 3, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
RZQ24TAVJUA 16.5 9.724,000
R
E
101260PE
OREGONN
O 08, 2 0 2 2
EG
I S
T ER ED PRO FESS I O
NA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T
HO
S H
O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
M0-2
SCHEDULES - MECHANICAL
APRIL 2024
BID PACK 4
RL
RS
FILTER
DRAIN PAN WITH
MOISTURE SENSOR
RA SF
D
X
HP
OSA
SAT
SEQUENCE OF OPERATION:
REMOTE RETURN AIR THERMISTORS, DRAIN PAN MOISTURE SENSORS, HP CONTROLLERS, EDH ADAPTER BOARDS, (TO BE INSTALLED IN FAN COIL CONTROL ENCLOSURE) SHALL BE FURNISHED BY THE HP/FAN COIL MANUFACTURER. A SINGLE CENTRALIZED CONTROLLER SHALL BE FURNISHED BY THE HP/FAN COIL MANUFACTURER THAT ALLOWS FOR SPACE TEMPERATURE MONITORING, SETPOINT ADJUSTMENT, AND CONTROL OF HP/FC/EDH 1-6 AND HP/FC 7-8 FROM LOW VOLTAGE 109. 230923 SHALL INSTALL ALL CONTROL DEVICES PER MANUFACTURER REQUIREMENTS, PARTICIPATE IN EQUIPMENT START UP, AND COORDINATE WITH HP MANUFACTURER ON REQUIRED FIELD MODIFICATIONS TO HEAT PUMP CONTROLS TO ALLOW RETURN AIR THERMISTOR TO BE REMOTED. 230923 SHALL PROVIDE/INSTALL SUPPLEMENTAL CONTROL DEVICES AND WIRING AS REQUIRED TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATION:
SET FAN COIL DAY AND NIGHT MODE INITIATION TIMES TO SCHEDULE FURNISHED BY THE OWNER. FC-1, 2, 3, 4 & 6 FANS SHALL OPERATE CONTINUOUSLY IN AUTO FAN SPEED MODE DURING THE DAY.
FC-5 FAN SHALL OPERATE CONTINUOUSLY AT HIGH SPEED DURING THE DAY, IN ORDER TO MAINTAIN A FAN CFM THAT IS GREATER THAN THE OSA CFM AT FC-5. FC-1, 2 & 3 FANS SHALL OPERATE CONTINUOUSLY DURING THE NIGHT IN AUTO FAN SPEED MODE. FC-4, 5 & 6 FANS SHALL CYCLE ON/OFF IN AUTO FAN SPEED MODE TO MAINTAIN SPACE TEMPERATURE SETPOINT DURING THE NIGHT.
THE HEAT PUMP CONTROLS SHALL MODULATE HEATING AND COOLING OUTPUT TO MAINTAIN SPACE TEMPERATURE SETPOINT.
THE EDH SHALL PROVIDE BACKUP HEATING AND SHALL ONLY BE ENABLED WHEN THE HEAT PUMP CANNOT MAINTAIN SPACE HEATING TEMPERATURE SETPOINT. CONTROLS SHALL ENABLE THE EDH VIA A DRY CONTACT WHEN SPACE TEMPERATURE FALLS 4°F OR MORE (ADJUSTABLE) BELOW SETPOINT. WHEN ENABLED, THE EDH SHALL CONTROL TO MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT OF 85°F (ADJUSTABLE). CONTROLS SHALL DISENABLE EDH WHEN SPACE TEMPERATURE REACHES 2°F OR LESS (ADJUSTABLE) BELOW SETPOINT. EDH SHALL BE DISENABLED DURING MORNING WARM UP (ADJUSTABLE TIME PERIOD) TO ALLOW HEAT PUMPS TO BRING BUILDING UP TO DAY TEMPERATURE SETPOINT, REGARDLESS OF OFFSET BETWEEN SPACE AND DAY SETPOINT TEMPERATURES.
MOISTURE SENSOR SHALL SHUT OFF HEAT PUMP UPON DETECTION OF HIGH MOISTURE LEVELS IN THE DRAIN PAN.
ELECTRIC DUCT
HEATER (EDH) SCR
CONTROLLER
(FACTORY
FURNISHED WITH
HEATER.)
REMOTE CENTRALIZED
CONTROLLER LOCATED
IN LOW VOLTAGE 109.
LOCAL HEAT
PUMP (HP)
CONTROLLER
T
REMOTE THERMISTOR
INSTALLED IN RETURN
DUCT JUST DOWNSTREAM
OF RETURN AIR GRILLE
DISCHARGE AIR
TEMPERATURE SENSOR
(FACTORY SUPPLIED
WITH ELECTRIC DUCT
HEATER.)
* SEE NOTE *
NOTE:
CONTROL WIRING
BETWEEN OUTDOOR
"HP" UNIT AND
INDOOR FANCOIL
UNIT SHALL BE
PROVIDED UNDER
SECTION 23 09 23.
SEQUENCE OF OPERATION:
DRAIN PAN MOISTURE SENSORS, THERMOSTATS, AND CONTROLLERS SHALL BE PROVIDED BY THE HP MANUFACTURER. FC-7 MOISTURE SENSOR IS INTEGRAL TO THE UNIT AND FC-8 MOISTURE SENSOR IS SHIPPED LOOSE AND FIELD-INSTALLED. A SINGLE CENTRALIZED CONTROLLER SHALL BE PROVIDED BY THE HP MANUFACTURER THAT ALLOWS FOR SPACE TEMPERATURE MONITORING, SETPOINT ADJUSTMENT, AND CONTROL OF HP/FC/EDH 1-6 AND HP/FC 7-8 FROM LOW VOLTAGE 109. 230923 SHALL INSTALL ALL CONTROL DEVICES PER MANUFACTURER REQUIREMENTS AND INSTALL THERMOSTAT ON WALL IN ROOM SERVED BY THE INDOOR UNIT.
FC AND HP SHALL CYCLE UPON DEMAND FOR COOLING OR HEATING FROM SPACE SENSOR. MOISTURE SENSOR SHALL SHUT OFF HEAT PUMP
UPON DETECTION OF HIGH MOISTURE LEVELS IN THE DRAIN PAN.
RL
RS
DRAIN PAN WITH
MOISTURE SENSOR
HP
REMOTE CENTRALIZED
CONTROLLER LOCATED
IN ELECT. 118.
T
WALL MOUNTED
THERMOSTAT
FAN COIL UNIT
NOTE:
CONTROL WIRING
BETWEEN OUTDOOR
"HP" UNIT AND
INDOOR FANCOIL
UNIT SHALL BE
PROVIDED UNDER
SECTION 23 09 23.
*SEE NOTE*
ERV-1 SEQUENCE OF OPERATION:
7-DAY TIMECLOCK, SUPPLY FAN VFD, EXHAUST FAN VFD, AND MOTORIZIED DAMPERS (D-1 & D-2) SHALL BE FACTORY PROVIDED BY ERV MANUFACTURER. 230923 SHALL INSTALL ERV-1 TIMECLOCK IN LOW VOLTAGE 109 AND SET TO SCHEDULE FURNISHED BY THE OWNER. 230923 SHALL INSTALL ALL CONTROL DEVICES PER MANUFACTURER REQUIREMENTS AND PROVIDE/INSTALL SUPPLEMENTAL MOTORIZED DAMPERS, CONTROL DEVICES, AND WIRING AS REQUIRED TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATION. PARTICIPATE IN EQUIPMENT START UP, WORK WITH TAB AGENCY TO VERIFY CONTROL SEQUENCES, DETERMINE/PROGRAM VFD SPEEDS, AND DETERMINE/PROGRAM MOTORIZED DAMPER POSITIONS AS REQUIRED TO ACHIEVE THE AIRFLOWS LISTED FOR THE
FOLLOWING MODES OF OPERATION:
FANS:
ERV-1 SUPPLY AND EXHAUST FANS SHALL OPERATE CONTINUOSLY (24/7). D-1/D-2 100% OPEN.
DAY/KITCHEN HOOD OFF: DAY/HOOD OFF MODE SHALL BE INITIATED BY THE TIME CLOCK AT 6 AM (ADJ). ERV-1 SUPPLY AND EXHAUST FANS SHALL OPERATE AT FIXED SPEEDS TO PROVIDE AIRFLOWS
INDICATED. MOTORIZED DAMPERS SHALL OPERATE AT DAY/HOOD OFF MODE POSITIONS:
D-1 & D-2: 100% OPEN
D-3: 450 CFM OSA
D-4: 400 CFM OSA
D-5: 300 CFM EA
D-6: 250 CFM EA
DAY/KITCHEN HOOD ON: DAY/HOOD ON MODE SHALL BE INITIATED BY AN AUXILIARY SWITCH/RELAY ON THE KITCHEN HOOD EXHAUST FAN STARTER. WHEN KITCHEN HOOD EXHAUST FAN IS ON, ERV-1 SUPPLY AND EXHAUST FANS SHALL OPERATE AT FIXED SPEEDS TO PROVIDE AIRFLOWS INDICATED. MOTORIZED DAMPERS SHALL OPERATE AT DAY/HOOD ON MODE POSITIONS:
D-1 & D-2: 100% OPEN
D-3: 450 CFM OSA
D-4: 900 CFM OSA
D-5: 300 CFM EA (100% OPEN)
D-6: 0 CFM EA (100% CLOSED)
WHEN KITCHEN HOOD EXHAUST FAN IS TURNED OFF, ERV-1 SHALL REVERT BACK TO DAY/HOOD OFF MODE.
NIGHT: NIGHT MODE SHALL BE INITIATED BY THE TIME CLOCK AT 10 PM (ADJ). ERV-1 SUPPLY AND EXHAUST FANS SHALL OPERATE AT FIXED SPEEDS TO PROVIDE AIRFLOWS INDICATED. MOTORIZED
DAMPERS SHALL OPERATE AT NIGHT MODE POSITIONS:
D-1 & D-2: 100% OPEN
D-3: 450 CFM OSA (100% OPEN)
D-4: 0 CFM OSA (100% CLOSED)
D-5: 300 CFM EA (100% OPEN)
D-6: 0 CFM EA (100% CLOSED)
IN EVENT OF SUPPLY OR EXHAUST FAN FAILURE, ERV-1 SHALL POWER OFF AND AFTER TIME DELAY, DAMPERS D-1 AND D-2 SHALL CLOSE.
7-DAY TIMECLOCK
(PROVIDED WITH ERV-1)
LOCATED IN LOW
VOLTAGE 109.
KITCHEN HOOD
M
SF
EF
M
DINING 114:
250 CFM EA (DAY/HOOD OFF)
0 CFM EA (DAY/HOOD ON)
0 CFM EA (NIGHT)
M M
DORM 112 (FC-1):
170 CFM OSA
(ALL MODES)
OFFICE 104 (FC-7):
30 CFM OSA
(ALL MODES)
COUNSEL 106 & 107 (FC-3):
155 CFM OSA
(ALL MODES)
DORM 110 (FC-2):
95 CFM OSA
(ALL MODES)
JAN. 115
75 CFM EA
(ALL MODES)
TOILET 111:
75 CFM
(ALL MODES)
STAFF TOILET 105:
75 CFM
(ALL MODES)
TOILET 103:
75 CFM
(ALL MODES)
EF
ERV-1
EF-1 (800 CFM)
MOTORIZED DAMPER AND
ACTUATOR PROVIDED BY
230923 (TYP. 4)
D-3 D-4
D-5 D-6
M
D-1
M
D-2
DINING 114 (FC-6):
400 CFM OSA (DAY/HOOD OFF)
900 CFM OSA (DAY/HOOD ON)
0 CFM OSA (NIGHT)
MOTORIZED DAMPERS
AND ACTUATORS
PROVIDED W/ ERV-1
STARTER WITH RELAY
(TOGGLE SWITCH ON
WALL NEAR KITCHEN
HOOD) BY DIV. 26
SUPPLY FAN EXHAUST FAN
DAY/ HOOD ON
DAY/ HOOD OFF
1350 300
NIGHT CFM
450 300
CONTROL WIRING
BY 230923 (TYP)
ERV-2 SEQUENCE OF OPERATION:
7-DAY TIMECLOCK, EC MOTORS, AND MOTORIZIED DAMPERS (D-1 & D-2) SHALL BE PROVIDED BY ERV MANUFACTURER. 230923 SHALL INSTALL ERV-2 TIMECLOCK IN LOW VOLTAGE 109 AND SET TO SCHEDULE FURNISHED BY THE OWNER. 230923 SHALL INSTALL ALL CONTROL DEVICES PER MANUFACTURER REQUIREMENTS AND PROVIDE/INSTALL ADDITIONAL MOTORIZED DAMPERS, SUPPLEMENTAL CONTROL DEVICES, AND WIRING AS REQUIRED TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATION. PARTICIPATE IN EQUIPMENT START UP, WORK WITH TAB AGENCY TO BALANCE INLETS/OULETS, DETERMIINE/PROGRAM EC MOTOR SPEEDS, AND DETERMINE/PROGRAM MOTORIZED DAMPER POSITIONS AS REQUIRED TO ACHIEVE THE AIRFLOWS LISTED FOR THE
FOLLOWING MODES OF OPERATION:
DAY MODE: DAY MODE SHALL BE INITIATED BY THE TIME CLOCK AT 6 AM (ADJ). ERV-2 SUPPLY AND EXHAUST FANS SHALL OPERATE AT FIXED SPEEDS TO PROVIDE AIRFLOWS INDICATED ON
SCHEDULE ON SHEET M0-2. MOTORIZED DAMPERS SHALL OPERATE AT DAY MODE POSITIONS:
NIGHT: NIGHT MODE SHALL BE INITIATED BY THE TIME CLOCK AT 10 PM (ADJ). ERV-2 SUPPLY AND EXHAUST FAN SHALL POWER OFF AND ERV-2 MOTORIZED DAMPERS SHALL OPERATE AT NIGHT
MODE POSITIONS:
D-1, D-2 & D-3: 100% CLOSED
IN EVENT OF SUPPLY OR EXHAUST FAN FAILURE, ERV-2 SHALL POWER OFF AND DAMPERS D-1, D-2 & D-3 SHALL CLOSE.
7-DAY TIMECLOCK
(PROVIDED WITH ERV-2)
LOCATED IN LOW
VOLTAGE 109.
M
D-3
TOILET/SHOWER 120 (FC-5):
575 CFM OSA (DAY)
0 CFM OSA (NIGHT)
MULTI-PURPOSE 101 (FC-4):
250 CFM OSA (DAY)
0 CFM OSA (NIGHT)
TOILET/SHOWER 120:
600 CFM EA (DAY)
0 CFM EA (NIGHT)
SF
EF
ERV-2
M
D-1
M
D-2
MOTORIZED DAMPERS
AND ACTUATORS
PROVIDED W/ ERV-2
MOTORIZED DAMPER
AND ACTUATOR
PROVIDED BY 230923
SUPPLY FAN EXHAUST FAN
DAY CFM
NIGHT CFM
825 600
0 0
CONTROL WIRING
BY 230923 (TYP)
R
E
101260PE
OREGONN
O 08, 2 0 2 2
EG
I S
T ER ED PRO FESS I ONA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T
HO
S H O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
M0-3
CONTROL DIAGRAMS - MECHANICAL
APRIL 2024
BID PACK 4
N.T.S.4
HEAT PUMP - FAN COIL W/ ELEC. HEAT (HP-1-6)
N.T.S.3
HEAT PUMP (HP-7 & 8)
N.T.S.1
ERV-1 SEQUENCE OF OPERATION
N.T.S.2
ERV-2 SEQUENCE OF OPERATION
M5-1
M5-1
M5-1
M5-1
M5-1
M5-1
M5-1 9 2
M5-1
M5-1
A A
B B
B' B'
C C
D D
E E
20"x12"(TYP 2)
(TYP 2)
8"x8" EXHAUST DUCT WITH FIRE-
WRAP INSULATION UP TO EF-1 ON
ROOF. TRANSITION TO HOOD
CONNECTION SIZE BELOW ROOF,
SEE KITCHEN HOOD SUBMITTAL FOR
CONNECTION SIZE AND LOCATION.
TYPE I RANGE HOOD
(NOT IN DIV. 23)
ERV-1
FC-6
ERV-2
FC-4
FC-2
FC-3
FC-1
FC-7
FC-8
HP-2
HP-3
HP-6HP-1
12"x10"
SOFFIT
36"x24"
ACCESS
SOFFIT
36"x24"
ACCESS
10"x6"
10"ø
"x
8"
"x
"x
10"ø
24"x36"
ACCESS
36"x18"
ACCESS
EDH-2
1 28512"x12"
36"x18" ACCESS
22"x12"
24"x24"
ACCESS
SOFFIT
SOFFIT
"x
24"x18" ACCESS
8"x6" (ALUMINUM
DUCT, TYP 2)
6"x6"
6"x6"
M
20"x12"
2 70020"x12"
(TYP 2)
20"x12"
(TYP 2)
3 1508"x8"
(TYP 4)
HP-7
24"x36"
ACCESS
24"x18"
ACCESS
24"x18"
ACCESS
24"x24" SIDE WALL
ACCESS, 5'-6" AFF TO
ACCESS CENTERLINE
(TYP. 3)
CEILING AND WALL ACCESS
HATCHES NOT IN DIV. 23,
SEE ARCHITECTURAL (TYP)
EDH-1
EDH-6
EDH-4
3 21510"x10"
3 32010"x10"
310"x10"
(TYP 2)
30"x10"
EF-1 ON ROOF, SEE
DETAIL 4/M4-1
EDH-3
COORDINATE
LOCATION WITH
FIRE SPRINKLER
PIPING.
EWH-1
320"x12"
316"x16"
(TYP 2)
18"x10"
320"x12"
14"x10"
2 34514" x 10"
(TYP 2)
26"x12"
332"x14"
310"x10"
3 756"x6"
322"x22"
3 756"x6"
14"x14"
U P
D N
6"x6"
1 756"x6"
2 56518"x12"
(TYP 2) 18"x12"
(TYP 2)
14"x6"
"x
6"
4"ø
"x
8"
3 756"x6"
3 756"x6"
6"x6"
8"x6"
"x
12"x10"
8"x6"
"x
14"x8"
1 63520"x12"
4"Ø ALUMINUM DRYER VENT IN WALL
UP TO ROOF. TERMINATE ABOVE
ROOF WITH GOOSENECK AND
GRAVITY BACKDRAFT DAMPER AT
TERMINATION. PROVIDE 12" FLEXIBLE
DUCT CONNECTION AT DRYER.
FC-5
24"x18" ACCESS
12"x8"
2 26012"x 8"
(TYP 2)
EDH-5
"x
20"x12"
24"x10"
36"x24"
ACCESS
12"x8"
8"x6" (BELOW)
6"ø
320"x12"
"x
6"
U P
"x
6"
"x
22"x10"
2'-8"
(MIN)
KEY NOTE:
NO LINING WITH IN THE
FIRST 12" EITHER SIDE OF
EDH. (TYP FOR ALL EDH)
VANES IN RADIUS ELBOW
(BELOW) NO DUCT LINING FOR 12"
EITHER SIDE OF EDH.
2'-6" MIN
3' -0
1' -6
(M
IN
2'-6"
8"x6"
108"x8"
118"x8" (BELOW)
(BELOW)
1 40512"x12"
12"x10"
6"x6"
HP-8
HP-5
HP-4 R
E
101260PE
OREGONN
O 08, 2 0 2 2
EG
I S
T ER ED PRO FESS I O
NA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T
HO
S H
O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
M2-1
COTTAGE FLOOR PLAN - MECHANICAL
APRIL 2024
BID PACK 4N 3/16" = 1'-0"
COTTAGE FLOOR PLAN - HVAC
A A
B B
B' B'
C C
D D
E E
FC-5
FC-4
FC-2
FC-3
FC-1
FC-7
FC-8
RS
RR
RS
RR
R S
R R
RS
RR
RS
RR
ROUTE REFRIGERANT PIPING BETWEEN
HEAT PUMP AND FAN COIL UNIT IN
RAFTER SPACE BELOW ROOF
INSULATION. SIZE AND INSTALL PER
MANUFACTURER'S REQUIREMENTS (TYP).
1" PC AND 3/4" CD DOWN TO
FLOOR DRAIN. TERMINATE PC
AND CD A MINIMUM OF 1"
ABOVE THE FLOOR DRAIN
FLOOD PLAIN. SEE P2-1 FOR
FLOOR DRAIN LOCATION.
P C
3/4"
REFRIGERANT PIPING
DOWN IN WALL (TYP).
3/4" PC DOWN TO
SERVICE SINK
PC
3/4"
CD
P C
P C
PC
P C
3/4"
3/4"
3/4"
3/4" 1"
3/4"
3/4" 1"
RS, RR & 3/4" PC DOWN TO
FAN COIL CONNECTION (TYP)
T
T
T
T
T
T
T
INSTALL REMOTE THERMISTOR IN
RETURN AIR DUCT, SEE CONTROL
DIAGRAM 4/M0-3 (TYP FC-1 THRU 6)
WALL MOUNTED
THERMOSTAT
WALL MOUNTED
THERMOSTAT
TO HP-1
THRU 8
HP-1 THRU 8
CENTRALIZED
CONTROLLER
ERV-1
ERV-2
HP-2
HP-3
HP-8
HP-5
HP-6HP-1
HP-4
HP-7
R R
R S
T
R R
R S
FC-6
3/4"
RS
RR
PIPING TO BE PERPENDICULAR TO WALL.
ROUTE PIPING IN CHASE OR IN MULLIONS
TO LIMIT EXPOSED OUTDOOR PIPING.
COORDINATE WITH ARCHITECTUAL
DRAWINGS.
R
E
101260PE
OREGONN
O 08, 2 0 2
EG
I S
T ER ED PRO FESS
I O
NA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T H
O S
H O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
M2-2
COTTAGE FLOOR PLAN - MECHANICAL
PIPING
APRIL 2024
BID PACK 4
N 3/16" = 1'-0"
COTTAGE FLOOR PLAN - MECHANICAL PIPING
NOTES:
1. PROVIDE SQUARE TO ROUND ADAPTER WITH
STANDARD TOP INLET CONNECTION WHERE ADEQUATE
CLEARANCE EXISTS ABOVE DIFFUSER.
2. PROVIDE CONICAL DUCT COLLAR AT
PLENUM CONNECTION TO ROUND NECK
DIFFUSERS.
20 GA MINIMUM
THICKNESS SHEET
METAL PLENUM BOX
SIZED TO FIT DIFFUSER
CONNECTION WITH 1"
DUCT LINER INSULATION
SAME HEIGHT AS
DUCT INLET SIZE
IF SPACE ALLOWS
(4" MINIMUM)
HEIGHT AS REQUIRED
TO SUIT DUCT INLET
SIZE PLUS 1"
MINIMUM
DUCT CONNECTING
COLLAR &
DRAWBAND
ATTACH BOX TO
DIFFUSER WITH
SHEET METAL
SCREWS AND SEAL
AIRTIGHT
HARD DUCT (SEE
DWGS FOR SIZE)
CEILING, SEE ARCH
REFLECTED CEILING
PLANS FOR CEILING
TYPE
MINIMUM 40"
DISCHARGE
HEIGHT
8" MIN.
UP BLAST EXHAUST FAN. SEE
SCHEDULE FOR SIZE AND TYPE
NEMA 3R DISCONNECT FACTORY WIRED
FROM MOTOR TO DISCONNECT THROUGH
THE BREATHER TUBE
ATTACH FAN TO CURB AS REQUIRED BY
MANUFACTURER
VENTED CURB EXTENSION FACTORY
SUPPLIED WITH FAN
ATTACH VENTED CURB TO ROOF
CURB WITH 1/4" DIA. LAG BOLTS. 8"
O.C. ON ALL SIDES
ROOFING AND FLASHING
(NOT IN DIVISION 23)
LIQUID TIGHT FLEXIBLE CONDUIT
(NOT IN DIVISION 23)
ROOF INSULATION
ROOF DECK
ROOF CURB, SEE
ARCHITECTURAL
WELDED DUCT
MINIMUM OF 18"
ABOVE ROOF
DECK
GREASE
TRAP
1-1/4"
PAN ASSEMBLY PAINTED FLAT
BLACK
(4) ADJUSTABLE PATTERN
CONTROLLERS (PAINTED FLAT BLACK)
NOTE:
FINAL ASSEMBLY WILL ALLOW EDGE OF PAN ASSEMBLY
TO BE SLIGHTLY OFF THE PERFORATED GRILLE.
CONTRACTOR TO COORDINATE ALL CEILING THICKNESS
WITH MFR. THE DEPTH OF THE STRAPPING WILL BE
ADJUSTED TO ACCOMMODATE CEILING.
HEX NUT TACK WELDED TO CHANNEL W/(2)
NUTS PER SIDE AT MIN. 8" APART AT EQUAL
SPACING. USE ONLY (1) NUT IF SIDE LESS THAN
8" IN LENGTH.
18 GA. STEEL STRAPPING ALL AROUND
GRILLE/DIFFUSER. SPOT WELD TO
GRILLE/DIFFUSER ALL AROUND.
DIFFUSER/GRILLE PAN
ASSEMBLY
20 GAUGE
PERFORATED
GRILLE
PERFORATED GRILLE, 3/8" HOLES
ON 1/4" STAGGERED CENTERS
PAINTED H25 WHITE
SECURITY SCREWS.
LENGTH TO SUIT
INSTALLATION. SEE
SELECTION 15100
FOR SCREW TYPE,
(TYP. ALL AROUND)
18" STEEL (1" WIDE)
BORDER
GYPSUM BOARD
CEILING
18 GA. STEEL
CHANNEL ALL
AROUND STRAPPING.
SPOT WELD TO
STRAPPING ALL
AROUND
DX COOLING/
HEATING COIL
CEILING
ROOF
CONDENSATE DRAIN PAN.
PROVIDE WITH OVERFLOW
SWITCH.
FAN
VIBRATION ISOLATION
FILTER
MOUNT UNISTRUT TO STRUCTURE,
SUPPORT FAN COIL FROM
UNISTRUT SUPPORT
FLEXIBLE DUCT CONNECTOR, TYP.
R
E
101260PE
OREGONN
O 08, 2 0 2
EG
I S
T ER ED PRO FESS
I O
NA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T H
O S
H O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
M4-1
DETAILS - MECHANICAL
APRIL 2024
BID PACK 4
N.T.S.1
DIFFUSER BOX (LINED) DETAIL
N.T.S.4
KITCHEN HOOD EXHAUST FAN
N.T.S.2
SECURITY GRILLE/DIFFUSER
N.T.S.3
FAN COIL UNIT MOUNTING
Level 1 0' - 0"
FC-6FC-1
SOFFIT
WALL
FLOOR
B'C
6"
8"
2'-0"
6"
8' -4
10"x6"12"x8"6"x8" 2'-8"
2"Ø FIRE
PROTECTION
PIPE
1"Ø FIRE
PROTECTION
PIPE (BEYOND)
1"Ø FIRE
PROTECTION
PIPE (BEYOND)
FC-5
SOFFIT
8"
7' -6
1'-0"
18"x36"
ACCESS
12"x8"
12"x6"
8"x6"
2"Ø FIRE
PROTECTION
PIPE
1"Ø FIRE
PROTECTION
PIPE (BEYOND)
1"Ø FIRE
PROTECTION
PIPE (BEYOND)
EXTERIOR WALL
EXHAUST HOOD
ERV-2
14"x14" ALUMINUM
SA (IN FRONT)
FFE
TRANSITION DUCT TO ERV-2
CONNECTION SIZE (TYP 2)
CONCRETE PLATFORM,
SEE ARCH.
10x12" ALUMINUM
EA (BEYOND)
A
PROVIDE ALUMINUM
DUCTWORK FROM POINT
INDICATED TO ERV-2
CONNECTIONS (TYP 2)
INSTALL EXTERIOR DUCTS WITH
THE LONGITUDINAL SEAM ON THE
BOTTOM OF THE DUCTS (TYP)
Level 1 0' - 0"
ERV-1
FFE
EXTERIOR WALL
30"x12" EA
(BEYOND)
M5-1
TRANSITION DUCT TO ERV-1
CONNECTION SIZE (TYP 2)
12"x12" ALUMINUM
EA (BEYOND)
16"x16" ALUMINUM
SA (IN FRONT)
CONCRETE PLATFORM,
SEE ARCH.
PROVIDE ALUMINUM
DUCTWORK FROM POINT
INDICATED TO ERV-1
CONNECTIONS (TYP 2)
INSTALL EXTERIOR DUCTS WITH
THE LONGITUDINAL SEAM ON THE
BOTTOM OF THE DUCTS (TYP)
Level 1 0' - 0"
M5-1
B'C
M M
M M
1'-1"
8' -4
310"x10"
10"x10"
332"x14"
14"x32"
1'-1"1'-2"
16"x12"
8"x12"
12"x10"
"x
"x
8"x12"
26"x14"
16"x16"12"x12"
FC-3
FC-2
1'-2"14"x8"
8"x6"
" 18"x36"
ACCESS
8' -0
2"Ø FIRE
PROTECTION
PIPE
Level 1 0' - 0"
B'C
FC-4
6"
8' -9
2'-8"14"x6" 8"x6" 18"x10"
2"Ø FIRE
PROTECTION
PIPE
M5-1
M5-1
M5-1
FILTER
24"x24" SIDE WALL
ACCESS, 5'-6" AFF TO
ACCESS CENTERLINE
(TYP. 3)
U P
SOFFIT
B'B'
CC
"x
48"x14"
26"x12"
"x
8"
FC-6
FC-1 36"x24"
ACCESS
36"x24"
ACCESS
332"x14"
310"x10"
12"x10"
6"x6"
FILTER
"x
20"x10"
8"x6"
14"x6"
10"x6"
12"x12"
UP
38"x11"
16"x16"
12"x12"
SOFFIT
12"x8"
12"x8"
R
E
101260PE
OREGONN
O 08, 2 0 2 2
EG
I S
T ER ED PRO FESS I O
NA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T
HO
S H
O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
M5-1
ENLARGED FLOOR PLAN & SECTIONS -
MECHANICAL
APRIL 2024
BID PACK 4
1/4" = 1'-0"1 Section 1
1/4" = 1'-0"6 Section 6
1/4" = 1'-0"7 Section 7
1/4" = 1'-0"3 Section 3
1/4" = 1'-0"2 Section 2
1/4" = 1'-0"4 Section 4
1/4" = 1'-0"5 Section 5
N 1/4" = 1'-0"
COTTAGE FLOOR PLAN - HVAC - ENLARGED
BODY
MATERIAL
STYLE
REMARKS
GPM
FLOW RATE
MODEL NO.MANUFACTURERSYMBOL
NOTES:
INTERCEPTOR SCHEDULE
INLET/OUTLET
CONNECTIONS
1 PROVIDE FLOW CONTROL FITTING IN DISCHARGE PIPING FROM SINK. 3 LOCATE INTERCEPTOR EXTERIOR OF BUILDING.
FIBERGLASS
GREASE WASTE
BELOW GRADE 100.0GMC 500ZURNGI-1 279 GAL. GREASE CAPACITY.
PROVIDE SEDIMET BUCKET
4"/4" 1 2
2 VENT INTERCEPTOR TO BLDG. VENT SYSTEM.
4 PROVIDE EXTENSION TO GRADE
UNIONS FOR ALL UTILITY CONNECTIONS EXCEPT INDIRECT WASTE CONNECTIONS,
RECOMMENDATIONS. PROVIDE WITH IN-LINE ISOLATION SHUT-OFF VALVES WITH
INSTALL EQUIPMENT IN STRICT CONFORMANCE WITH EQUIPMENT MANUFACTURER'S
PROVIDE ALL REQUIRED ACCESSORIES TO PUT INTO OPERATION.
EQUIPMENT CONNECTED BY DIV. 22 CONTRACTOR,
EQUIPMENT NOT PROVIDED UNDER DIV. 22.
NOTES:
MOUNTING#
SERVERY EQUIPMENT CONNECTION SCHEDULE
EQUIPMENT P-TRAP SUPPLIES NOTESV W IW HW CW
3"3-COMPARTMENT SINK COUNTERS-1 1/2" YES
HAND SINK WALLS-2 1/2" YES
1 62
1 42
DISHWASHER FREE STANDINGK-5 - - 3/4" NO- - 1 22" 5
1/2
1¼"x17GA 1½" 1½" 1/2"
PROVIDE WITH SHUT-OFF VALVE, IN-LINE STRAINER & PRESS.
REDUCING VALVE. HW PIPE CONNECTION MADE BY MALE GARDEN
HOSE CONNECTION. PIPE DISCHARGE TO FLOOR SINK. MAINTAIN
1" AIR GAP. SEE DETAIL 7/P4-1.
INSTALL WITH FLOW CONTROL FITTING INSTALLED IN
INDIRECT WASTE PIPING TO FLOOR SINK. MAINTAIN 1" AIR GAP. SEE
DETAIL 1/P4-1.
PROVIDE MIXING VALVE (MV-1). LOCATE MIXING VALVE BELOW
FIXTURE. ROUTE BLENDED WATER TO HW SIDE OF FAUCET. SET
TEMPERATURE @ 105° F.
PROVIDE MODIFIED TRAP ASSEMBLY TRAP PRIMER FOR FLOOR
DRAIN
3-
FOOD WELL FREE STANDINGK-8 - - - NO- - 1 23/4" 7
ROUTE DRAIN MANIFOLD FOR (3) COMPARTMENS TO FLOOR SINK7
R
E
101260PE
OREGONN
O 08, 2 0 2
EG
I S
T ER ED PRO FESS
I O
NA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T H
O S
H O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
P0-2
SCHEDULES - PLUMBING
APRIL 2024
BID PACK 4
NOTES:
1. 1.6 GPF. BACK SPUD COMFORT HEIGHT WATER CLOSET. ACORN 2898 RECESS SECURITY WALL BOX W/ CONCEALED FLUSH VALVE &
PUSH BUTTON IN SECURITY WALL PANEL
2. 0.5 GPF BACKSPUD URINAL. ACORN 2898 RECESS SECURITY WALL BOX W/ CONCEALED FLUSH VALVE & PUSH BUTTON IN SECURITY
WALL PANEL.
3. 0.5 GPM PROVIDE MIXING VALVE (MV-1) WITH FIXTURE. ROUTE BLENDED WATER TO FAUCET. SET BW TEMP. @ 105°
4. ENCLOSURE NOT IN DIV. 22. PROVIDE ACORN-CSH-1.6 GPM CONICAL SHOWER HEAD & HEAD STOPS. PROVIDE W/ ACORN MVC2 PUSH...
5. ENCLOSURE AND SEAT NOT IN DIV. 22. PROVIDE ACORN-CSH-1.6 GPM CONICAL SHOWER HEAD & HEAD STOPS. PROVIDE W/ ACORN MVC2 PUSH BUTTON ACTIVATED TIME CONTROL VALVE. SET TEMP @ 110°.
6. PROVIDE WITH WATER HAMMER ARRESTORS
7. FAUCET WITH INTEGRAL CHECK VALVES, INTEGRAL STOPS, VACUUM, BREAKER, PAIL HOOK & WALL
BRACKET
8. NOT USED
9. MIXING VALVE & STOPS LOCATED IN WALL ACCES PANEL. SINGLE TEMP. LIGATURE RESISTANT FAUCET W/ PIEZO PUSH BUTTON
10. PROVIDE ANSI SIGN .
11. REFRIGERATED, VANDAL RESISTANT W/ BOTTLE FILLER AND WATER FILTER. REQUIRES ELECTRICAL RECEPTACLE
PLUMBING FIXTURE SCHEDULE
P#
FIXTURE
DESCRIPTION
MANUFACTURER MODEL MOUNTING FIXTURE TYPE MATERIAL SIZE MFR & MODEL # OF FAUCET & VALVE DRAIN TYPE TRAP CARRIER ACCESSORIES WASTE VENT HW CW IW BW ELECTRICAL REMARKS SUPPLIES NOTES
P1 WATER CLOSET
AMERICAN
STANDARD
MADERA 3463.001 FLOOR SYPHON JET VITREOUS CHINA ENLONGATED SLOAN ROYAL 952-1.28-2-10-3/4-LDIM - INTEGRAL - SEAT: CHURCH 255 4 2 - 1 - -
120/1, WITH
TRANSFORMER
- NOTE 1
P2 URINAL
AMERICAN
STANDARD
WASHBROOK
6515.001
WALL WASHOUT VITREOUS CHINA 26x19x14 SLOAN ROYAL 995-0.125-2-10-3/4-LDIM - INTEGRAL JAY R. SMITH #0635 - 2 2 - 3/4 - -
120/1, WITH
TRANSFORMER
- NOTE 2
P3 LAVATORY
AMERICAN
STANDARD
OVALYN 0496.221 COUNTER UNDERMOUNT VITREOUS CHINA 17x14 OVAL WHITEHALL MANUFACTURING WH3376-PPZ OFFSET GRID 1-1/4 x 17 GA. -
SCALD PROTECTION & MIXING
VALVE
1-1/2 1-1/2 1/2 1/2 - 1/2"
120/1, WITH
TRANSFORMER
BRASS CRAFT KTSCR19 NOTE 3 & 9
P4 LAVATORY
AMERICAN
STANDARD
RAVENNA 0268.444 WALL SEMI-PEDISTAL VITREOUS CHINA 24x20x18.5
AMERICAN STANDARD RELIANT 3. #
7385.003.V05 GRID 1-1/4 x 17 GA.
JAY R. SMITH # 7020
SERIES AT STAFF T.R.
MIXING VALVE 1-1/2 1-1/2 1/2 1/2 - 1/2" - BRASS CRAFT KTSCR19 NOTE 3
P4A LAVATORY
AMERICAN
STANDARD
RAVENNA 0268.444 WALL SEMI-PEDISTAL VITREOUS CHINA 24x20x18.5 WHITEHALL MANUFACTURING WH3376-PPZ OFFSET GRID 1-1/4 x 17 GA.
JAY R. SMITH #0700 @
T.R. 103 & 111.
MIXING VALVE 1-1/2 1-1/2 1/2 1/2 - 1/2" - BRASS CRAFT KTSCR19 NOTE 3
P5 SERVICE SINK
STERN
WILLIAMS
HILOW
HL-2100-T-35-T-40-
BP
FLOOR MOP SINK TERRAZZO 36x24x12 CHICAGO 897-CRCF INTEGRAL STRAINER 3 INCH -
HOSE & WALL HOOK, MOP HANGER
AND SPLASH CATCHER PANELS
3 2 1/2 1/2 - - - - NOTE 7
P6 SHOWER - - -
ENCLOSURE NOT IN
DIV. 22
SEE ACH. - ACORN 410B-0-EVSP1-MV-PBH-TF-CSH-RD SIOUX CHIEF 825 2 INCH - VANDAL PROOF DRAIN SCREWS 2 2 1/2 1/2 - -
120/1, WITH
TRANSFORMER
- NOTE 4
P7 ADA SHOWER - - -
ENCLOSURE NOT IN
DIV. 22
SEE ACH. - ACORN 410B-0-EVSP1-MV-PBH-TF-CSH-RD SIOUX CHIEF 825 2 INCH - VANDAL PROOF DRAIN SCREWS 2 2 1/2 1/2 - -
120/1, WITH
TRANSFORMER
- NOTE 5
P8 DRINKING FOUNTAIN ELKAY VRCGRN8WSK WALL SINGLE LEVEL GALV. STEEL 12x19x6.5 FLEXI-GUARD GRID 1-1/4x17 GA. JAY R. SMITH #0824 - 1-1/2 1-1/2 - 1/2 - - - BRASS CRAFT KTCR-19 NOTE 11
P9
WASHING MACHINE
BOX
GUY GRAY WB200WHA WALL RECESSED GALV. STEEL 11.5x9.5x3.5 DUO-CLOZ OPEN HUB 2x17 GA. - - 2 1-1/2 1/2 1/2 - - - BRASS CRAFT KTCR-19 NOTE 6
P10
EMERGENCY EYE
WASH
GUARDIAN G1814 WALL EYE WASH ABS CIRCULAR STAY OPEN - 1-1/4 x 17 GA. HANGER
GUARDIAN G3600LF THERMOSTATIC
MIXING VALVE IN LOCKING
RECESSED WALL BOX
1-1/2" 1-1/2" - - - 1/2" - NONE ANSI SIGN
DRAIN SCHEDULE
TYPE MARK MFR MODEL #
BODY STRAINER
VARIATIONS NOTES
TYPE STYLE MATERIAL STYLE MATERIAL
FD-1 JAY R. SMITH 2005-B-U-P050 FLOOR DRAIN VERTICAL CAST IRON 5" SQUARE NICKEL BRONZE TRAP PRIMER -
FD-2 JAY R. SMITH 3510-A-U-P05-F19 FLOOR DRAIN VERTICAL CAST IRON 8" ROUND NICKEL BRONZE TRAP PRIMER INTEGRATED FULL FLOW FUNNEL
FS-1 ZURN ZS1901-KC-VPS-1-23 FLOOR SINK VERTICAL A.R.C.I.
12" SQDUARE,
LESS GRATE
STAINLESS STEEL ST. ST. RIM, 8" DEEP
ANCHOR FLANGE W/SEEPAGE HOLES, ST. STL. RIM &
ALUMINUM BUCKET
FS-2 ZURN ZS1900-KC-VPS-2-32 FLOOR SINK VERTICAL A.R.C.I.
12" SQUARE, 1/2
GRATE
STAINLESS STEEL ST. ST. RIM, 6" DEEP
ANCHOR FLANGE W/SEEPAGE HOLES, ST. STL. RIM &
ALUMINUM DOME STRAINER
ELECTRONIC TRAP PRIMER SCHEDULE
ETP-# MFR MODEL # CW INLET OUTLET MOUNTING TYPE
MOUNTING
HEIGHT
ELECTRICAL
REMARKS
NOTES
ETP-1 PPP INC. PTS-8 3/4" (8) 1/2" WALL MOUNT 5' - 0"
120V, 1Φ, 60Hz,
0.28 AMP
CAP UNUSED OUTLETS. MOUNT @ 5'-0" AFF.
SEE DETAIL 6/P4-1
HOSE BIBB SCHEDULE
TYPE MFR MODEL
CW
INLET
MOUNTING
HEIGHT
NOTES
FPWH-1 JAY R. SMITH 5609QT 3/4" 1' - 4" EXPOSED, NON-FREEZE, VACUUM BREAKER & LOOSE KEY
HB-1 JAY R. SMITH 5673-BFP 3/4" 2' - 6"
WARM CLIMATE, INTEGRAL VACUUM BREAKER & WHEEL
HANDLE W/ WALL FLANGE
HB-2 JAY R. SMITH 5675-H 3/4" 3' - 0" WARM MCLIMATE, VACUUM BREAKER & WHEEL HANDLE
NOTES:
1. SET OUTLET TEMPERATURE AT 105°F MAX.
2. MAKE MIXING VALVE FULLY ACCESSIBLE. MOUNT BELOW FIXTURE
3. ENTIRE INSTALLATION, INCLUDING PIPE CONNECTIONS SHALL CONFORM
WITH MANUFACTURER'S RECOMMENDATIONS.
4. ROUTE CW BYPASS TO CW SIDE OF FAUCET. ROUTE BLENDED WATER TO
HW SIDE OF FAUCET.
MIXING VALVE SCHEDULE
MV-# 7. MODEL CW INLET HW INLET
BW
OUTLET
MOUNTING
TYPE
MOUNTING
HEIGHT
OUTLET
TEMPERATURE
NOTES
MV-1 WATTS LFMMV 1/2" 1/2" 1/2" SURFACE 2' - 0" 105 °F 1, 2, 3, 4
WATER HEATER SCHEDULE
TAG MFR MODEL #
CAPACITY
(GALLONS)
FUEL BTU/HR INPUT
FLUE
SIZE
VENT
SIZE
MIN GAS
PRESSURE
( WC)
ELECTRIC RECOVERY
SYSTEM
TEMP.
MAX WORKING
PRESSURE
MIN. ENERGY
FACTOR
ASME NOTES
VOLT PHASE GPM RISE
ST-1 LOCHINVAR RJA120 119.0 gal - - - - 0 0 3 0.0 gal 0 °F 120 °F 150.0 psi - YES
MANIFOLD STORAGE TANK-1 WITH STORAGE TANK-2 USING EQUAL LENGTH PIPES.
CONNECT TO STACKED REMOTE WATER HEATERS
ST-2 LOCHINVAR RJA120 119.0 gal - - - - 0 0 3 0.0 gal 0 °F 120 °F 150.0 psi - YES
MANIFOLD STORAGE TANK-1 WITH STORAGE TANK-2 USING EQUAL LENGTH PIPES.
CONNECT TO STACKED REMOTE WATER HEATERS
WH-1 LOCHINVAR
ARMOUR
AWN200PM
0.0 gal NAT. GAS 199,999 3" 3" 7 120 1 335.0 gal 70 °F 120 °F 160.0 psi 0.96 YES
MANIFOLD WH1 & WH-2. PROVIDE STACK FRAME MODEL AW 151-200 TO STACK
WATER HEATERS. PROVIDE SINGLE REMOTE STORAGE TANK (ST-1), CONDENSATE
NEUTRALIZATION TANK & CIRCULATING PUMP (HWR-1)
WH-2 LOCHINVAR
ARMOUR
AWN200PM
0.0 gal NAT. GAS 199,999 3" 3" 7 120 1 335.0 gal 70 °F 120 °F 160.0 psi 0.96 YES
MANIFOLD WH1 & WH-2., PROVIDE CONDENSATE NEUTRALIZATION TANK &
CIRCULATING PUMP (HWR-2)
WH-3 EEMAX AP036208 S 0.0 gal ELECTRIC
36 KW (122,837
BTU)
- - 0 208 3 240.0 gal 30 °F 150 °F 150.0 psi - NO ROUTE 150° DEGREE WATER TO DISHWASHER
SUMP PUMP SCHEDULE
WT NAME SPACE NUMBER SPACE NAME MANUFACTURER MODEL FLOW TDH (FT) RPM
TOTAL
MOTOR HP
ELECTRICAL
KW
DISCHARGE
SIZE
NOTES
VOLTS PHASE
SP-1 SUMP PIMP EBARA 50DSHU6.4 13 GPM 15 3600 1/2 208 V 3 0.40 2"
SIMPLEX SUMP PUMP LOCATED IN EXISTING SUMP BASIN. PROVIDE SJE RHOMBUS MODEL 312
CONTROL/ALARM PANEL WITH AUDIO/VISUAL ALARM. PROVIDE SEPARATE POWER SOURCES FOR
PUMP AND CONTROL PANEL. NEMA 4
GAS REGULATOR SCHEDULE
TAG MAN. MODEL #
INLET
PRESSURE
OUTLET
PRESSURE CFH
ORIFACE SIZE NOTES
GREG-1 FISHER S201 2-PSI 11" W.C. 400 1-1/2" BODY W/ 1/4" PORT DIA.
HOT WATER RECIRCULATION PUMP SCHEDULE
# MFR MODEL # SERVICE TYPE GPM
HD
(FT)
RPM
ELECTRICAL FLANGE
SIZE
NOTES
HP V PH HZ AMPS
HWR-1 B & G PL-55B
HOT WATER
CIRCULATION
IN-LINE 21.00 35 3250 2/5 115 1 60 4.70 1 1/2" CONTROLLED BY BLDG. AUTOMATION SYSTEM
HWR-2 B & G PL-55B
HOT WATER
CIRCULATION
IN-LINE 21.00 35 3250 2/5 115 1 60 4.70 1 1/2" CONTROLLED BY BLDG. AUTOMATION SYSTEM
HWR-3 B & G NBF-25
TANK
RECIRCULATION
IN-LINE 2.00 10 3250 1/8 115 1 60 1.10 3/4"
3-SPEED MOTOR. CONTROLLED BY BLDG. AUTOMATION
SYSTEM
A A
B B
B'
C
D D
E E
SLEEVE (TYP)
4" WASTE
4" WASTE
4" WASTE
SLEEVE (TYP)
4" WASTE
4" WASTE
4" COTF
4" COTF
4" COTF
4" COTF
(TYP)
4" COTF
4" WASTE
2" VENT UP (TYP. OF 4)
2" VENT UP
(TYP-7)
2" WASTE UP
TO LAV (TYP-5)
2" WASTE UP TO FD W/
P-TRAP & PRIMER CONN.
2" WASTE UP TO FD W/
P-TRAP & PRIMER CONN.
2" WASTE UP TO SHOWER
DRAIN W/ P-TRAP & NO
PRIMER CONN. (TYP-4)
2" WASTE UP W/
2" COIW ABOVE
4" WASTE UP
4" WASTE UP
2" WASTE UP TO FD W/
P-TRAP & PRIMER CONN.
2" WASTE UP TO FD W/
P-TRAP & PRIMER CONN.
4" W. UP
2" WASTE UP TO URINAL
2" WASTE UP
2" WASTE UP TO
FD W/ P-TRAP &
PRIMER CONN.
2" WASTE UP
2" VENT UP
4" WASTE UP
2" VENT
2" WASTE UP
TO LAV
2" WASTE UP
TO DF
2" VENT UP
3" GREASE WASTE UP
2" WASTE, 1/2" CW & 1/2"
HW UP TO HAND SINK
2" VENT UP
4" GREASE WASTE UP TO FS W/
P-TRAP & PRIMER CONN.
(PIPING SHALL BE CAST IRON)
3/4" HWR, 2" CW UP
& 1-1/4" HW UP
1/2" HW UP
TO LAV
1-1/4" CW
UP TO
FIXTURES
1/2" HW,& 1-1/4" CW
& 2" WASTE UP
2" VENT UP
P4-1
SLEEVE (TYP.)
2" WASTE UP TO
FD W/ P-TRAP &
PRIMER CONN.
2" VENT UP
4" WASTE
EXIST. C.O.
4" COTG
4" COTF
2" WASTE UP TO
FD W/ P-TRAP &
PRIMER CONN.
RISER DIAGRAMS
P5-1
P5-1
CONTRACTOR SHALL PROVIDE SAW-
CUTTING OF EXISTING CONCRETE
FLOOR AS REQUIRED TO PROVIDE
NEW WASTE, VENT OR WATER
PIPING BELOW SLAB AS INDICATED
CONTRACTOR SHALL PROVIDE SAW-
CUTTING OF EXISTING CONCRETE
FLOOR AS REQUIRED TO PROVIDE
NEW WASTE, VENT OR WATER
PIPING BELOW SLAB AS INDICATED
CONTRACTOR SHALL PROVIDE SAW-
CUTTING OF EXISTING CONCRETE
FLOOR AS REQUIRED TO PROVIDE
NEW WASTE, VENT OR WATER
PIPING BELOW SLAB AS INDICATED.
(TYPICAL)
3" WASTE UP
3/4" CW & 3/4"
HW UP TO SINK
EXISTING 1-1/2" DOMESTIC
WATER SERVICE (VERIFY)
CONNECT 4" C.I. WASTE
FROM GREASE TRAP TO
EXISTING 4" WASTE MAIN
(VERIFY INVERT)
EX. 4" W
2" G.W. UP
(CAST IRON)
2" VENT UP
2" GREASE WASTE
UP TO F.D.
3/4" CW UP
2" HW & 2" HWR CIRCULATION
PIPES UP TO WATER HEATERS
3/4" 150° HW UP
DEMOLITION NOTES FOR MECHANICAL ROOM & TUNNELS
1. REMOVE ALL EXISTING HOT WATER, COLD WATER,
RECIRCULATING WATER, WASTE & VENT PIPING IN
MECHANICAL ROOM. CONNECT NEW COLD WATER TO
EXISTING 1-1/2" COLD WATER AT ENTRANCE TO
BASEMENT MECHANICAL ROOM.
2. REMOVE EXISTING HOT WATER STORAGE TANK.
REMOVE EXISTING HOT WATER BOOSTER HEATER.
REMOVE EXISTING DOMESTIC HOT WATER
RECIRCULATION PUMP
3. REMOVE ALL DOMESTIC COLD, HOT AND HOT
WATER RECIRCULATION PIPING AND ASSOCIATED
VALVES & ACCESSORIES IN TUNNELS.
4. REMOVE ALL STEAM AND CONDENSATE PIPING IN
TUNNELS AND MECHANICAL ROOM. REMOVE
CONDENSATE PUMP. REMOVE ALL ASSOCIATED
VALVES AND TRAPS.
DEMOLITION NOTES FOR TOILET/SHOWER ROOM
1. REMOVE ALL BELOW SLAB WASTE & VENT PIPING
RELATED TO DEMO'D FIXTURES IN THIS AREA.
REMOVE VENTS COMPLETELY. REMOVE WASTES
BACK TO MAIN & CAP. RE-USE EXISTING WASTE
MAIN AS INDICATED
3/4" CW UP TO FPWH
HOT WATER STORAGE
TANKS (ST-1, ST-2 &
EXP-1))
P4-1
3/4" CW & EXISTING 2"
WASTE UP. ROTUE 3/4"
CW TO HOSED BIBB &
1/2" CW TO DRINKING
FOUNTAIN
BOOSTER HEATER FOR
DISHWASHER (WH-3, MOUNT
ON WALL, 3/4" IN/OUT)
SIMPLEX SUMP PUMP (SP-1)
P4-2
1-1/4" GAS UP.
(COORD. CUTTING
& PATCHING)
1" 2-PSI GAS SERVICE UP TO EARTHQUAKE VALVE, GAS
SHUT-OFF VALVE AND REGULATOR
CONNECT NEW 2" WATER TO
EXISTING 1-1/2" DOMESTIC
WATER SERVICE INTO
BUILDING. (VERIFY) PROVIDE
NEW SHUT-OFF IN VERT.
ALL GREASE WASTE PIPING
SHALL BE CAST IRON (TYP.)
PROVIDE CAST IRON WASTE
PIPING TO AND FROM
GREASE INTERCEPTOR
3" GREASE WASTE COIW
1/2" HW & CW UP TO
SERVICE SINK
CONNECT PUMPED WASTE
TO 4" GRAVITY WASTE
2" VENT UP
CONNECT 2" VENT
TO EXIST. 2" VENT
@ SUMP BASIN
EXIST. C.O.
C.O.
3/4" CW DN. TO HB.
PROVIDE VALVE
EX. 4" W
C.O.
1/2" CIRCUIT SETTER.
SET @ .5 GPM
4"
4"
2"
4"
2"
3/4"
4" 4"
3/4"3/4" 1 1/4"
1 1/2"
3/4"
3/4"
2"3/4"2"2"1 1/4"
2"2"
4"
2" 1/2" 4"
1 1/2"
2"
1/2"
2"
2"2"
2"
4"
2"
3"
3"
1/2" 3/4"
1"1"
2"
HB-2
HWR-3
3/4"
3/4"
2"2"
W
W
W
G W
V
V
VV VV
3" COTF
4" 4"
4"
4"
2"
2"
2"
2"
2" W
W
4"
2"
4"
3" 3"3"
4"
4"
W
W
W W
2"
2"
4"
4"
W
4"
3/4"
W
4"
EXIST. 4"
ENDPIPE
CLEANOUT
2" GREASE WASTE UP TO FD
3"
2" VENT DOWN
2"
2"
4"
2"
EXIST. 4" WASTE
EXIST. 4" WASTE
W
4" WASTE
4" WASTE
1/2" HW & CW UP TO
EYE WASH.
2" GREASE WASTE
UP TO EYE WASH
WATER SOFTENER
CONNECTIONSP4-1
4" WASTE UP
2" VENT UP
4"
4"
1-1/4" GAS UP, FROM REGULATOR AND VALVES.
GAS MAY NEED TO BE ROUTED THROUGH TUNNELS,
DEPENDING ON DEPTH OF TUNNELS,(VERIFY). PROVIDE
PIPE SLEEVES THRU TUNNEL WALLS IF REQ'D.
G
2-PSI G
G
G
1" 2-PSI GAS. ROUTE TO GAS SERVICE VALVE ON SITE.
SEE ARCHITECXTURAL PLANS FOR EXACT LOCATION.
COORDINATE CUTTING AND PATCHING. INSTALL GAS
LINE ISOLATION VALVES IN LOCATION AS DIRCTED BY
OWNER.SERVICE. CONNECT TO EXIST 2-PSI GAS ON
SITE.
1 1/4"
P4-1
2" VENT UP & 2"
WASTE DOWN
2" WASTE UP.
2" VENT UP & 2"
WASTE DOWN.
(TYP;. OF 4)
2"
P4-1
GI-1
4" COTG
2" VENT CONNECTION
P4-1
3 4" COTG
W
V
V
2"2"
GW
PROVIDE CAST IRON WASTE
PIPING TO AND FROM
GREASE INTERCEPTOR
4"
4"
GREASE INTERCEPTOR
V
G W
W
2" WASTE
2" VENT UP
R
E
101260PE
OREGONN
O 08, 2 0 2
EG
I S
T ER ED PRO FESS
I O
NA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T H
O S
H O
E N
N Y C
M E C H A N I C A L
Archb Beaman Architecture, Ltd.
1634 SE 54TH Ave.
Portland, Oregon 97215 tel.: (503) 236-3300
Scale:
Project No:
Date:
Drawing Number:
Date Issued
OREGON YOUTH AUTHORITY (OYA)
MacLaren Youth
Sheet Title:
CONSULTANTS
Woodburn, Oregon
Correctional Facility (MYCF)
VALLEY COTTAGE
RENOVATIONS
SET:
18105
AS NOTED
P2-0
COTTAGE FOUNDATION PLAN - PLUMBING
APRIL 2024
BID PACK 4N 3/16" = 1'-0"
COTTAGE FOUNDATION PLAN - PLUMBING
P5
S-2
S-1 K-5
P1
P1
P1
P1
P2
P2
P3
P3
P3
P3
P3
P4A
P4A
P6 P6 P6 P7
P8
P9P9
P1
P1
P4
K-8
P10
A A
B B
B' B'
C C
D D
E E
2" CW, 1-1/4" HW & 3/4"
HWR DOWN TO (EX) MAINS
(EX) 2" VTR
(EX) 4" VTR
(EX) 2" VTR
(EX) 2"
VTR
1" CW DOWN
3/4" CW
NEW 2" VENT UP TO NEW
3" VTR. REPLACE (EX)
1-1/4" VTR. PATCH ROOF
MEMBRANE
STACKED WATER HEATERS
WH-1 & WH-2
3" COIW AT
+ 48" AFF
2" VENT DOWN IN WALL
2" VENT DOWN IN
WALL TO BELOW
PROVIDE NEW 1/2" HW
& CW FROM BELOW TO
NEW HAND SINK
P4-1
CIRCUIT SETTER
(PROVIDE ACCESS
FOR VALVES)
CON`CENTRIC VENT KIT DETAIL
(2) 4" VENTS THRU ROOF P4-1
PROVIDE NEW 1/2"
HW & CW FROM
BELOW TO SERVICE
SINK FAUCET
1-1/2" VENT DOWN IN WALL
1-1/2" CW UP FROM BELOW
AT + 2'-0" AFF IN WALL
2" VENT DOWN IN WALL
2" VENT DOWN
(TYP. OF 8)
1/2" HW & CW DOWN
(TYP. OF 3)
1/2" HW & CW
DOWN
ON WALL
AT + 60" AFF
1" CW TO WC INLET
2" VENT DOWN TO BELOW
1/2" HW & CW IN
WALL TO LAV
SUPPLIES W/ 2"
VENT DOWN
4" COTF W/ SECURITY
SCREWS (TYP.)
3/4" CW
RISER DIAGRAMS
P5-1
P5-1
HB-1 @ +30" AFF
PROVIDE NEW 1/2" HW & CW FROM
BELOW TO 3-COMP. SINK FAUCET
3/4" CW DOWN
2" HW & 2" HWR CIRCULATION
PIPES TO STORAGE TANK IN
BASEMENT MECH. ROOM
1/2" 180°F HW FROM
BELOW TO DW
3-COMPARTMENT
SINK DETAIL
P4-1
8DISHWASHER
DETAIL
P4-2
P4-1
1-1/4" GAS TO WATER HEATERS
1-1/4" GAS FROM BELOW GRADE
3" GREASE WASTE COIW.
LOCATE ABOVE S.S. WALL PANEL
2" VENT UP TO 3" VTR
SHUT-OFF
(PROVIDE ACCESS)
VALVES, (PROVIDE
ACCESS)
2" VENT
DOWN
P4-1
2"FD-1
FPWH-1
4" COTF
FPWH-1
MV-1
4" FS-1
3" FS-2
2"FD-1
4" COTF
2"FD-1
2"FD-1 4" COTF
2"FD-2
2"FD-1
4" COTF
FPWH-1
4" COTF
2"FD-12"FD-1 2"FD-1
2"FD-1
2"FD-1
2"FD-1
HB-2
ETP-1
2"
2"
2"
2"
2" 2"
1"
3"
2"
3/4"
1"
3/4"
3/4"
2"
2"
2"
1" 3/4"
3/4"
1"
2"
3/4"
2" 2"
2"
2"
3/4"3/4"
3/4" 3/4"
1/2" 3/4"
1"1"
1"
2"2"
3/4"
1"1"
2" 1"
3/4"
2"
3/4"
1"
1"
1/2"
1"
1"1"
3" 3/4" 1 1/4" 2"
FPWH-1
MV-1
MV-1
3" COTF
1 1/2"
FPWH-1
2"2"
INDIRECT WASTE
PIPING
INDIRECT WASTE PIPING
CONN. NEW DF TO
EXIST W/V & NEW CW
EXIST. COTG
1/2" HW & CW FROM
BELOW TO MIXING
P12 MIXING VALVE.
ROUTE 1/2"
TEMPERED WATER
TO EYE WASH
1-1/2" VENT DOWN
GAS REGULATOR
1" 2-PSI GAS BLDG.
SERVICE TO
BELOW GRADE
1-1/4" GAS TO BELOW
GRADE TO BUILDING
ENTRANCE
GREG-1
GAS SHUT-OFF
VALVE
GAS EARTHQUAKE VALVE.
REPLACE WITH PACIFIC
SEISMIC HORIZONTAL
MODEL 311
GREASE
INTERCEPTOR
MANHOLOE
4" COTG
4" COTG
4" COTG
1" CW DOWN. BRANCH 1/2" CW
TO LAV. CONTINUE DOWN W/
1-1/4" CW
2" VENT DOWN
2"
2"
V
V
V
V
V V
V
V
V
V
V
V
R
E
101260PE
OREGONN
O 08, 2 0 2
EG
I S
T ER ED PRO FESS
I O
NA
L
NG I NEER
RENEWS: 06/30/2024
V.
A N
T H
O S
H O
E N
N Y C
M E C H A N I C A L
Archb…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .