4-MEP RENOVATIONS.pdf

PDF 9 MB Posted

Attached to
OYA MYCF Valley Cottages Alterations and Renovations
Solicitation number
S-DASOBO-00016991
Issued by
Oregon

About this file

This is a comprehensive design and specification document for mechanical, plumbing, fire protection, and electrical work associated with the Oregon Youth Authority's MacLaren Youth Correctional Facility (MYCF) Valley Cottage Renovations project in Woodburn, Oregon. The project encompasses the complete renovation of a cottage facility, including HVAC systems with eight heat pump units and associated fan coil units, energy recovery ventilators, electric duct heaters, and exhaust fans. The plumbing scope includes hot water heaters, recirculation pumps, water softener connections, grease interceptors, floor drains, fixtures, and comprehensive piping systems for domestic water, hot water, waste, vent, and natural gas. The electrical work involves service panels, branch circuits, lighting controls, fire alarm systems, and connections for mechanical and plumbing equipment. The fire protection system includes sprinkler installation and backflow prevention. The drawings are dated April 2024 as part of Bid Pack 4, with project identification number 18105 prepared by Beaman Architecture, Ltd.

The specifications and schedules provide detailed equipment selections from manufacturers including Daikin for heat pumps and fan coils, Renewaire for energy recovery ventilators, Lochinvar for water heaters, American Standard and Elkay for plumbing fixtures, and Titus and Greenheck for air distribution components. All electrical work is designed for 120/208-volt three-phase service with comprehensive labeling and circuit documentation. The documents include detailed control sequences for HVAC operation across multiple modes (day/night, kitchen hood on/off), fixture schedules with specific model numbers and mounting requirements, riser diagrams for plumbing distribution, and enlarged floor plans with section details. Construction coordination requirements are emphasized throughout, particularly regarding timing for mechanical equipment startup, controls commissioning, and testing and balancing activities. The project appears to be a complete renovation with demolition of existing systems and installation of new equipment throughout the cottage facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

ABV

AFF

AFG

AL

BLDG

CLG

CP

CU

DIA

DIV

DWG

EA

FLR

FT

GA

H

HT

N L

MAX

MFR

MIN

MNT

N.C.

NIC

N.O.

REQ'D

RM

SIM

SS

TYP

W W/

W/IN

W/O Ø (E) (N)

ANNOTATION

+XX"

ABOVE

ABOVE FINISH FLOOR

ABOVE FINISH GRADE

ALUMINUM

BUILDING

CEILING

CHROME PLATED

COPPER

DIAMETER

DIVISION

DRAWING

EACH

FLOOR, OR FLOOR MOUNTED

FEET

GAUGE

HIGH

HEIGHT

INCHES

LONG

MOUNTING HEIGHT (AFF OR AFG)

MAXIMUM

MANUFACTURER

MINIMUM

MOUNT(ED)

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

REQUIRED

ROOM

SIMILAR

STAINLESS STEEL

TYPICAL

WIDE

WITH

WITHIN

WITHOUT

DIAMETER

EXISTING TO REMAIN

NEW

GENERAL SYMBOLS

SYMBOLS & ABBREVIATIONS

ROOM

NAME

ROOM NUMBER

CONNECTION TO EXISTING (#"

INDICATES EXISTING SIZE)EQ-#

Ref Sht Ref Sht

KEY NOTE

NOTE:

SYMBOLS AND ABBREVIATIONS ON THE DRAWINGS SHALL BE INTERPRETED IN ACCORDANCE

WITH THE LEGENDS WHEREVER APPLICABLE. NOT ALL SYMBOLS AND ABBREVIATIONS IN THE

LEGENDS ARE NECESSARILY USED FOR THE PROJECT. ALL SIZES ARE IN INCHES, UNLESS

OTHERWISE NOTED.

EQUIPMENT IDENTIFIER

DETAIL REFERENCE

DETAIL NUMBER

SHEET NUMBER

DETAIL REFERENCE

DETAIL NUMBER

MATCHED SHEET NUMBER

CURRENT SHEET NUMBER

MATCH LINE REFERENCE

MATCHED SHEET NUMBER

CENTER LINE

1 REVISION NUMBER

SECTION REFERENCE

SECTION NUMBER

SHEET NUMBER

NORTH ARROW

Sht #

SIM

A101

DEMOLITION

EXISTING TO REMAIN OR NOT IN CONTRACT

NEW WORK

FUTURE WORK

LINEWEIGHT LEGEND

HVAC SYMBOLS

AIR FLOW RATE (CFM)

RECTANGULAR SUPPLY DUCT (SECTION)

RECTANGULAR RETURN DUCT (SECTION)

RECTANGULAR EXHAUST DUCT (SECTION)

RECTANGULAR OSA DUCT (SECTION)

ROUND SUPPLY DUCT (SECTION)

ROUND RETURN DUCT (SECTION)

ROUND EXHAUST DUCT (SECTION)

ROUND OSA DUCT (SECTION)

DUCTWORK WITH INTERNAL LINING

ALUMINUM/STAINLESS STEEL DUCTWORK

(AS SPECIFIED)

AIR TRANSFER DUCT SLEEVE

FLEXIBLE DUCT

DUCT OFFSET AND DIRECTION

THERMOSTAT

SUPPLY AIR FLOW

RETURN AIR FLOW

FIRE/SMOKE DAMPER TYPE

SECURITY GRILLE TYPE

DAMPER MOTOR OPERATOR

ATTENUATOR

TERMINAL BOX, HEAT PUMP, OR FAN COIL

UNIT

DUCT SECURITY GRILLE

RECTANGULAR RETURN REGISTER/GRILLE

UNIT HEATER

RECTANGULAR SUPPLY DIFFUSER

(ARROWS INDICATE THROW)

LINEAR DIFFUSER

(ARROWS INDICATE THROW)

CIRCULAR DIFFUSER

(ARROWS INDICATE THROW)

SIDEWALL DIFFUSER

(ARROWS INDICATE THROW)

LOUVER

(ARROWS INDICATE THROW)

T

GRILLE/REGISTER/DIFFUSER INFORMATION

GRD TYPE

SIZE

UP DN

1 FlowSize

M

RECTANGULAR EXHAUST REGISTER/GRILLE/HOOD

TURNING VANES

AIR SPLIT TAKEOFF

SINGLE BLADE VOLUME DAMPER

OPPOSED BLADE VOLUME DAMPER

FIRE/SMOKE DAMPER

RECTANGULAR DUCT SIZE (WIDTHxDEPTH)

CIRCULAR DUCT DIAMETER

FLAT OVAL DUCT SIZE (WIDTH/DEPTH)

12"x12"

12"ø

12"/12"

ROUND MITERED ELL W/ TURNING VANES

FLAT OVAL SUPPLY DUCT (SECTION)

MECHANICAL ABBREVIATIONS

AIR HANDLING UNIT

AIR SEPARATOR

ATTENUATOR

BOILER

CUBIC FEET PER MINUTE

CIRCULATION

CONDENSATE RETURN PUMP

CHILLED WATER PUMP

ELECTRIC DUCT HEATER

EXHAUST FAN

ENERGY RECOVERY VENTILATOR

EXPANSION TANK

EXHAUST

FAN COIL UNIT

FEET PER MINUTE

GLYCOL FEEDER

GRILL/REGISTER/DIFFUSER

HEAT PUMP

HEATING WATER PUMP

OPPOSED BLADE VOLUME DAMPER

OUTSIDE AIR

PRESSURE REDUCING VALVE

POUNDS PER SQUARE INCH

RETURN AIR

ROOF COWL

STEAM CONVERTOR

STATIC PRESSURE

STORAGE TANK

UNIT HEATER

VELOCITY

WATER HEATER

ANNOTATION

AIR HANDLING UNIT NUMBER (AH-1)

AIR SEPARATOR (AS-1)

ATTENUATOR NUMBER (AT-1)

BOILER NUMBER (BLR-1)

CONDENSER UNIT NUMBER (CU-1)

EXHAUST FAN NUMBER (EF-1)

EXPANSION TANK NUMBER (ET-1)

FAN COIL UNIT (FC-1)

GLYCOL FEEDER (GF-1)

LOUVER NUMBER (L-1)

ROOF COWL NUMBER (RC-1)

STEAM CONVERTOR (SC-1)

STORAGE TANK (ST-1)

UNIT HEATER NUMBER (UH-1)

WATER HEATER (WH-1)

GENERAL NOTES:

1. LOAD CALCULATIONS WERE PERFORMED PER ASHRAE STD. 183.

2. EQUIPMENT CAPACITIES WERE SELECTED TO CONFORM WITH THE

REQUIREMENTS OF THE 2014 OEESC SECTION 503.2.2.

AH

AS

AT

BLR

CFM

CIRC

CRP

CWP

EDH

EF

ERV

ET

EXH

FC

FPM

GF

GRD

HP

HWP

OBVD

OSA

PRV

PSI

RA

RC

SC

SP

ST

UH

VEL

WH

AH-#

AS-#

AT-#

BLR-#

CU-#

EF-#

ET-#

FC-#

GF-#

L-#

RC-#

SC-#

ST-#

UH-#

WH-#

PLUMBING ABBREVIATIONS

CAST IRON

CLEAN-OUT

CLEAN-OUT IN WALL

CLEAN-OUT TO FLOOR

CLEAN-OUT TO GRADE

FLOOR DRAIN

FREEZE RESISTANT WALL HYDRANT

FLOOR SINK

GALLONS PER MINUTE

GAS TANK VENT

INVERT ELEVATION

INDIRECT WASTE

PRESSURE REDUCING VALVE

POUNDS PER SQUARE INCH

POUNDS PER SQUARE FOOT

ROOF DRAIN

REDUCED PRESSURE BACKFLOW PREVENTER

SUMP VENT

VENT THRU ROOF

WATER COLUMN

WATER HAMMER ARRESTER

ANNOTATION

FIXTURE ITEM NUMBER (P1)

FLOOR DRAIN SIZE AND TYPE (2"FD-1)

FLOOR SINK SIZE AND TYPE (2"FS-1)

ROOF DRAIN SIZE AND TYPE (2"RD-1)

CI

CO

COIW

COTF

COTG

FD

FRWH

FS

GPM

GTV

IE

IW

PRV

PSI

PSF

RD

RPBP

SV

VTR

WC

WHA

P#

#"FD-#

#"FS-#

#"RD-#

PLUMBING/PIPING LEGEND

FIREF

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC RECIRCULATED WATER

DRY STAND PIPEDSP

FIRE DEPARTMENT CONNECTION PIPEFDC

INDIRECT WASTE (ABOVE FLOOR)IW

NATURAL GAS (7" WC, UNLESS OTHERWISE NOTED)G

OVERFLOW DRAIN LINEODL

ROOF DRAIN LINERDL

VENT

WASTE

VENT (BELOW GRADE)

WASTE (BELOW GRADE)

SANITARY SEWERSS

STORM DRAINSD

SOLAR HEATING SUPPLYSHS

SOLAR HEATING RETURNSHR

CHILLED WATER SUPPLY

CONDENSATE DRAIN

CONDENSER RETURN

CONDENSER SUPPLY

HYDRONIC PIPING LEGEND

CHILLED WATER RETURN

HEAT PUMP SUPPLY

HOT WATER RETURN

HOT WATER SUPPLY

HEAT PUMP RETURN

PUMPED CONDENSATE

CWR

CWS

CD

CDR

CDS

HR

HS

HWR

HWS

PC

SNOW MELT RETURNSMR

SNOW MELT SUPPLYSMS

REFRIGERANT DISCHARGERD

REFRIGERANT GASRG

REFRIGERANT LIQUIDRL

ACID RESISTANT WASTE

GREASE WASTE

REFRIGERANT PIPING RETURN

MISCELLANEOUS PIPING LEGEND

ACID RESISTANT VENT

SOFT COLD WATER

SOFT HOT WATER

TEMPERED WATER AT TEMPERATURE INDICATED

REFRIGERANT PIPING SUPPLY

AR

AR

BLENDED WATER

GW

RR

RS

SCW

SHW

(DEG F)

BW

AVERAGING SENSOR

CARBON DIOXIDE SENSOR

COIL (HEATING/COOLING)

TEMPERATURE CONTROL SYMBOLS

AIRFLOW MONITOR

MOTOR STARTER WITH CURRENT SENSING RELAY

POINT SENSOR

PUMP

CURRENT TRANSDUCER

DAMPER MOTOR ACTUATOR IDENTIFICATION

DIFFERENTIAL PRESSURE SWITCH

DUCT SMOKE DETECTOR

CONTROL POINT

EQUIPMENT IDENTIFICATION

FLOW SWITCH

HUMIDITY SENSOR

IN-LINE DEVICE

END SWITCH

LIGHT (PILOT OR ANNUNCIATOR)

LIGHT WITH AUDIO ANNUNCIATION

LOW LIMIT FREEZESTAT

MOTOR STARTER

INTERFACE RELAY

REFRIGERANT MONITOR

STATIC PRESSURE SENSOR

PRESSURE SENSOR

OCCUPANCY SENSOR

SWITCH

SOLENOID VALVE ACTUATOR

SWITCH WITH PILOT LIGHT

TEMPERATURE TRANSMITTER

TEMPERATURE TRANSMITTER WITH SUN SHIELD

THERMOWELL

SWITCH WITH GUARDED COVER

WATERFLOW METER

2-WAY MODULATING VALVE

3-WAY MODULATING VALVE

2-OR 3-WAY MODULATING VALVE

(SEE PLANS OR DETAILS FOR REQUIREMENTS)

VALVE MOTOR ACTUATOR IDENTIFICATION

TT

TT

2CO

C

S

V#

WM

OS

PS

SP

RM

LL

R

H

FS

ES

DS

DP

CT

AF

1i

G

CARBON MONOXIDE SENSORCO

MOTORIZED DAMPER

SENSORS

FILTER

TEMPERATURE CONTROL ABBREVIATIONS

AIR FLOW

ANALOG INPUT

ANALOG OUTPUT

COMMON

CIRCULATION

CHILLED WATER RETURN

CHILLED WATER SUPPLY

DIRECT DIGITAL CONTROL

DIGITAL INPUT

DIGITAL OUTPUT

EXHAUST AIR

EXHAUST FAN

ENERGY MANAGEMENT & CONTROL SYSTEM

EXHAUST

HOT WATER RETURN

HOT WATER SUPPLY

MODULAR BUILDING CONTROLLER

MODULAR EQUIPMENT CONTROLLER

OUTSIDE AIR

RETURN AIR

RETURN FAN

RELIEF FAN

SUPPLY AIR

STANDALONE CONTROL UNIT

SUPPLY FAN

TERMINAL CONTROL UNIT

UNITARY CONTROLLER

VARIABLE FREQUENCY DRIVE

WATER FLOW

AF

AI

AO

C

CIRC

CWR

CWS

DDC

DI

DO

EA

EF

EMCS

EXH

HWR

HWS

MBC

MEC

OSA

RA

RF

RLF

SA

SCU

SF

TEC

UC

VFD

WF

PLUMBING/PIPING SYMBOLS

ANGLE VALVE

CAP

CHECK VALVE

CIRCUIT SETTER

CIRCULATING PUMP

CLEAN-OUT (BELOW FLOOR OR GRADE)

CLEAN-OUT (FLUSH TO FLOOR OR GRADE)

CROSS

REDUCER

ELBOW

ELBOW DOWN

ELBOW UP

EXPANSION JOINT

FIRE DEPARTMENT CONNECTION

FLEXIBLE CONNECTION

FLOOR DRAIN (ROUND OR SQUARE)

FLOOR SINK

FLOW DIRECTION

FLOW DIRECTION AND SLOPE

FLOW SWITCH

BALL VALVE

GLOBE VALVE

HOSE BIBB/WALL HYDRANT

MANHOLE/DRYWELL

PENETRATION (FLOOR OR WALL)

PIPE ANCHOR

PIPE CONTINUES ALTHOUGH NOT DRAWN

PIPE GUIDE

PIPE SLEEVE

PRESSURE GAUGE

PRESSURE AND TEMPERATURE RELIEF VALVE

GAS & WATER PRESSURE REDUCING VALVE

(POINTS TOWARDS LOW PRESSURE)

ROOF DRAIN

SANITARY CROSS

SANITARY ELBOW

SANITARY TEE

SANITARY TEE IN RISER

SOLENOID VALVE

TEE

TEE DOWN

TEE DOWN TO ELBOW

TEE UP

TEE UP TO RISE

UNION/COUPLING

VALVE IN RISER

VALVE WITH TAMPER SWITCH

VENT THRU ROOF

WATER HAMMER ARRESTER

WYE

TEE UP TO ELBOW

BUTTERFLY VALVE

T

S

FS

1%

GAS VALVE

MISCELLANEOUS PLUMBING SYMBOLS

NRS

BLOW DOWN VALVE

GATE VALVE

AUTOMATIC BALL DRIP

BUTTERFLY VALVE

DOWNSPOUT NOZZLE

SHOWER HEAD

GATE VALVE, NON-RISING STEM

TRAP SET (AS SPECIFIED)

# INDICATES TRAP TYPE

KNIFE GATE VALVE

CONNECTION POINT

BALL VALVE

ANGLE STOP/CHECK VALVE

THRUST RESTRAINT

PLUG VALVE

STOP/CHECK VALVE

SERRATED COCK (COUNTER-TOP MOUNTED)

DIAPHRAGM VALVE

SERRATED COCK (WALL MOUNTED)

HYDRONIC PIPING SYMBOLS

2-WAY CONTROL VALVE

3-WAY MODULATING CONTROL VALVE

AIR SEPARATOR

AUTOMATIC AIR VENT

ELECTRO-PNEUMATIC CONTROL VALVE

GAUGE COCK

MANUAL AIR VENT

MOTOR OPERATED VALVE

M

P-TRAP

PRESSURE INDEPENDENT BALANCING VALVE

PRESSURE SWITCH

SIGHT GLASS

STRAIGHT THRU MODULATING CONTROL VALVE

STRAINER

THERMOMETER

THERMOWELL

VENTURI

PS

R

E

101260PE

OREGONN

O 08, 2 0 2 2

EG

I S

T ER ED PRO FESS I ONA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T

HO

S H O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

M0-1

LEGENDS & ABBREVIATIONS -

MECHANICAL

APRIL 2024

BID PACK 4

No. Revision Date

NOTESDEFL

POSSPC

BLADE

PATTERNMATERIAL MOUNTINGTYPEMODEL SERVICEMFR

AIR OUTLETS

HOR

1/2

HORIZONTAL

4-WAY

SURFACE

SURFACE

ALUM

STEEL

GRILLE

DIFFUSER

SUPPLY

SUPPLY

SG-1500

SG-TDC1

TITUS2

TITUS

NOTES:

1. PROVIDE WITH WHITE BAKED ENAMEL FINISH.

2. PROVIDE SQUARE TO ROUND ADAPTER AS REQUIRED.

3. BORDER: 16GA STEEL WITH WELDED CORNERS.

4. SEE SPECIFICATION SECTION 23 37 00.

GREENHECKEF-1 CUBE-099 BELT 800 0.75 1652 115/1

NOTES

V/Ø

SONESCFM

SP

("WC)

FAN

RPM

DRIVE

EXHAUST FANS

TAG MFR MODEL

MOTOR

NOTES:

1. PROVIDE EXHAUST FAN SUITABLE FOR TYPE I KITCHEN HOOD GREASE EXHAUST, SEE SPECIFICATIONS.

2. STARTER WITH RELAY (TOGGLE SWITCH ON WALL NEAR KITCHEN HOOD) BY DIV. 26.

TYPE I KITCHEN

HOOD EXHAUST

SERVICE

HP

10.3 1/3

INDOOR UNIT

STYLE

FAN

CFM

INDOOR UNIT

MODEL NOTES

TOTAL

COOL CAP.

(BTUH)

ESP

(IN.

WC)

OUTDOOR

CONDENSING

UNITTAG MFR

SPLIT SYSTEM FAN COIL UNITS (INDOOR)

NOTES:

1. PROVIDE WITH CONDENSATE PUMP.

2. PROVIDE WITH SENSOR/THERMISTOR FOR REMOTE MOUNTING IN RETURN AIR DUCT

3. SEE CONTROL DRAWINGS ON M0-3 FOR INTENDED HEAT PUMP OPERATION AND REQUIRED

CONTROLS PROVIDED BY HEAT PUMP MFR. HEAT PUMP SHALL ENABLE AUXILIARY ELECTRIC HEAT

WHEN HEAT PUMP CANNOT MAINTAIN THE SPACE TEMPERATURE.

4. PROVIDE WITH CONTROLLER DESIGNED FOR REMOTE MOUNTING IN ELECT. 118 FOR REMOTE

MONITORING AND ADJUSTMENT.

5. PROVIDE WITH ACCESSORIES REQUIRED FOR MOUNTING APPLICATION. SEE FLOOR PLAN ON M2-1

FOR ARRANGEMENT.

6. SEE SCHEDULE ON THIS SHEET FOR HEAT PUMP PERFORMANCE.

V/Ø

INDOOR UNIT ELECTRICAL

FC-4 HP-4

SERVICE

TAG MFR SEER

OPERATING

WEIGHT

(LBS)

V/ØMCA

REFRIG

TYPE

SPLIT SYSTEM HEAT PUMPS/CONDENSING UNITS (OUTDOOR)

OUTDOOR UNIT ELECTRICAL

NOTESMODEL #

TOTAL

COOL CAP.

(BTUH)

SERVICE

MOP

AMB.

AIR

(°F)

NOTES:

1. SCHEDULED CAPACITIES ARE LISTED FOR UNIT OPERATING AT DESIGN CONDITIONS: 95°F OUTDOOR, 75°F

INDOOR COOLING; 20°F OUTDOOR, 70°F INDOOR HEATING.

2. SCHEDULED SEER AND HSPF ARE LISTED FOR UNIT OPERATING AT AHRI CONDITIONS.

3. PROVIDE REQUIRED ACCESSORIES FOR LOW AMBIENT COOLING OPERATION DOWN TO 0°F.

4. DISCONNECT BY DIV. 26.

5. PROVIDE WITH TWO 3-3/4" HIGH FEET AND BOLTING KIT AS REQUIRED TO FIX UNIT TO FEET AND TO FIX FEET

TO CONCRETE PAD. BIG FOOT FIX-IT FOOT KIT, OR APPROVED EQUAL.

FC-8

HP-70.0 208/1

HIGH WALL

FC-1 HP-1DAIKIN FBQ24PVJU 0.5 24,000

HORIZONTAL

DUCTED

208/1DORM 112

FC-2

FC-3 HP-3COUNSEL 106 & 107

MCA

27,000

TOTAL

HEAT CAP.

(BTUH)

38HOR3/8FIXED BARSURFACESTEELGRILLERETURN/EXHSG-3300RLTITUS3

HP-80.0 208/1

CEILING

CASSETTE

MIN. OSA

(CFM)

SENSIBLE

COOL CAP.

(BTUH)

7,990

18,700

8,170

1.8

HSPF

5, 6, 7, 8, 9, 12

0.75 1.5 1.5 25.2 / 20.0 208/1

MCA

0.75850

ERV-2

ERV-1

FLA

LAT

DB/WB

EAT

DB/WB

LAT

DB/WB

EAT

DB/WB

HEAT EXCHANGER (SUMMER)

NOTES

HEAT EXCHANGER (WINTER)

ENERGY RECOVERY VENTILATORS

ESP

EXHAUST FAN

HPHPESP

NIGHT

CFM

SUPPLY FAN

TAG MFR

UNIT

WEIGHT

UNIT ELECTRICAL

MOP

RENEWAIRE 800550

VOLT/PHASE

EXHAUST

DB/WB

EXHAUST

DB/WB

HE1XRT

2518.516.4 1, 3, 4, 5

2, 3, 4

NOTES:

1. PROVIDE SUPPLY AND EXHAUST FANS WITH BELT DRIVE MOTORS AND ABB MODEL ACS320 VFDS (OR APPROVED EQUAL).

2. PROVIDE SUPPLY AND EXHAUST FANS WITH DIRECT DRIVE EC MOTORS.

3. PROVIDE WITH SINGLE POINT ELECTRICAL CONNECTION WITH STARTER, LOCKING FUSED DISCONNECT, AND 24VAC TRANSFORMER/RELAY PACKAGE.

4. PROVIDE WITH 7-DAY PROGRAMMABLE WALL MOUNT TIME CLOCK, CLASS 1 LOW LEAKAGE MOTORIZED DAMPERS/ACTUATORS ON SUPPLY AND EXHAUST AIRSTREAMS, AND FOUR MERV 8 FILTERS.

5. PERFORMANCE INDICATED IS FOR DAY/HOOD OFF MODE OF OPERATION. PROVIDE PERFORMANCE DATA FOR ALL MODES OF OPERATION IN SUBMITTAL.

RENEWAIRE

HE2XRT

MODEL

70.0 / 54.0 51.8 / 41.6 91.4 / 67.1 75.0 / 67.1 81.7 / 63.7

0.5 0.5 0.5 25.2 / 20.0 208/10.5825 500600 1510.89.651.6 / 40.7 81.7 / 63.7

7. PROVIDE WALL MOUNTED THERMOSTAT.

8. INDOOR UNIT POWERED FROM OUTDOOR UNIT. WIRING BETWEEN UNITS AND CONNECTIONS TO

BE PROVIDED BY DIVISION 26.

9. PROVIDE WITH AUXILIARY MOISTURE SENSOR IN DRAIN PAN TO SHUT-OFF COOLING IN HIGH

MOISTURE CONDITIONS.

10. SCHEDULED CAPACITIES ARE LISTED FOR UNIT OPERATING AT DESIGN CONDITIONS: 95°F

OUTDOOR, 75°F INDOOR COOLING; 20°F OUTDOOR, 70°F INDOOR HEATING.

11. PROVIDE WITH MODEL # DACA-FXMQ FILTER CABINET KIT WITH TWO MERV 13 FILTERS.

12. DISCONNECT BY DIV. 26.

FC-6 HP-6

FC-5 HP-5

HP-2DAIKIN FBQ18PVJU 0.5 18,000

HORIZONTAL

DUCTED

208/1DORM 110 20,000 9514,800 1.6

0.5

HORIZONTAL

DUCTED

208/1 1551.6FBQ24PVJUDAIKIN

DAIKIN FBQ30PVJU 0.5 30,000

HORIZONTAL

DUCTED

208/1MULTI PURPOSE 101 34,000 21023,400 2.3

DAIKIN FBQ48PVJU 0.5 48,000

HORIZONTAL

DUCTED

208/1DINING 114 54,000 40036,100 3.4

DAIKIN FBQ18PVJU 0.5

HORIZONTAL

DUCTED

208/1TOILET/SHOWER 120 5751.6

DAIKIN OFFICE 104

DAIKIN FTX09NMVJU LOW VOLT. 109

1, 2, 4

1, 2, 4

1, 2, 3, 4

FC-7 378

FFQ09Q2VJU 9,100

9,000

1, 5, 6, 7, 8, 9, 12

1, 2, 3, 4, 5, 6, 9, 10, 11, 12

6,000

6,700

24,000 27,00018,700

18,000 20,00014,800

DAY/

HOOD ON

CFM

DAY/

HOOD OFF

CFM

DAY/

HOOD ON

CFM

DAY/

HOOD OFF

CFM

NIGHT

CFM

0 70.0 / 54.0 91.4 / 67.1 75.0 / 67.1

TOTAL

EFFECTIVE

-NESS

88%

75%

90%

78%

TOTAL

EFFECTIVE

-NESS

1, 2, 3, 4, 5, 6, 9, 10, 11, 12

1, 2, 3, 4, 5, 6, 9, 10, 11, 12

1, 2, 3, 4, 5, 6, 9, 10, 11, 12

1, 2, 3, 4, 5, 6, 9, 10, 11, 12

1, 2, 3, 4, 5, 6, 9, 10, 11, 12

ELECTRIC DUCT HEATERS

NOTES

NOTES:

1. PROVIDE WITH THERMAL CUTOUTS, AIRFLOW SWITCH, CONTROL TRANSFORMERS, FUSED DISCONNECT SWITCH, CONTACTORS, SCR CONTROLLER, UL LISTED, DUCT STAT FOR MODULATED CONTROL TO DISCHARGE AIR TEMP, CONTACT CLOSURE FOR REMOTE ENABLE (DUCT HEATER SHALL BE ENABLED BY ASSOCIATED HEAT PUMP).

2. ORDER WITH RIGHT OR LEFT AIRFLOW ARRANGEMENT AS SHOWN ON SHEET M2-1.

3. ELECTRIC DUCT HEATER TO BE FIELD INSTALLED BY DIVISION 23, POWER WIRING BY DIV 26.

TAG DUCT SIZESERVES

EDH-1

CFM

LAT

KW VOLT PHASE

4.2

EDH-2 3.5

EDH-3 4.0

EDH-5

6.5

208 3

208 3

208 3

208 3

20x12 81

(°F)

EAT

(°F)

22x12

MODEL

DHR

4.7 208 35224x10

EDH-4

SERIES

3000MARKEL

HEATING

CAPACITY

(W)

STYLE

AIR FLOW

(CFM)MFR NOTES

UNIT ELECTRICAL

ELECTRIC WALL HEATERS

MCA

SERVICE

V/ø

FAN FORCED

WALL MOUNT

NOTES:

1. PROVIDE WITH SURFACE MOUNT FRAME, INTEGRAL THERMOSTAT, AND FACTORY INSTALLED DISCONNECT.

1120/1 12.51500100

MOP

WEIGHT

(LBS)

6 FIRE SPRINKLER

MFR

NAILOR 1, 2, 3

1, 2, 3

1, 2, 3

1, 2, 3

1, 2, 3

EWH-1

TAG

MOP

EDH-6 12.0 208 34926x12 1, 2, 3

DORM 112

COUNSEL 106 & 107

DORM 110

MULTI PURPOSE 101

DINING 114

TOILET/SHOWER 120

DHRNAILOR

DHRNAILOR

DHRNAILOR

DHRNAILOR

DHRNAILOR

20x12

20x12

HP-4

HP-1 DAIKIN RZQ24TAVJUA 16.5R410A 16.5 208/120 15095

HP-2

HP-3

FC-1

FC-3

HP-5

FC-4

HP-8

FC-7 2, 3, 4, 5

9.7

FC-8

HP-6

FC-5

HP-7

FC-6

DAIKIN RZQ18TAVJUA 16.7R410A 16.5 208/120 15095FC-2 9.5

DAIKIN

DAIKIN

DAIKIN

RZQ18TAVJUA

R410A 16.5 208/120 15095

16.7R410A 16.5 208/120 15095 9.5DAIKIN

RZQ30TAVJUA 16.0R410A 29.1 208/135 28595 9.2

RZQ48TAVJUA 14.0R410A 29.1 208/135 28595 8.4

DAIKIN RX09RMVJU9 20.9R410A 9.0 208/115 6095 11.7

DAIKIN RXL09QMVJU 20.0R410A 9.5 208/115 6095 12.5

24,000

18,000

30,000

48,000

9,100

9,000

18,000

1, 2, 4, 5

2, 3, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

RZQ24TAVJUA 16.5 9.724,000

R

E

101260PE

OREGONN

O 08, 2 0 2 2

EG

I S

T ER ED PRO FESS I O

NA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T

HO

S H

O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

M0-2

SCHEDULES - MECHANICAL

APRIL 2024

BID PACK 4

RL

RS

FILTER

DRAIN PAN WITH

MOISTURE SENSOR

RA SF

D

X

HP

OSA

SAT

SEQUENCE OF OPERATION:

REMOTE RETURN AIR THERMISTORS, DRAIN PAN MOISTURE SENSORS, HP CONTROLLERS, EDH ADAPTER BOARDS, (TO BE INSTALLED IN FAN COIL CONTROL ENCLOSURE) SHALL BE FURNISHED BY THE HP/FAN COIL MANUFACTURER. A SINGLE CENTRALIZED CONTROLLER SHALL BE FURNISHED BY THE HP/FAN COIL MANUFACTURER THAT ALLOWS FOR SPACE TEMPERATURE MONITORING, SETPOINT ADJUSTMENT, AND CONTROL OF HP/FC/EDH 1-6 AND HP/FC 7-8 FROM LOW VOLTAGE 109. 230923 SHALL INSTALL ALL CONTROL DEVICES PER MANUFACTURER REQUIREMENTS, PARTICIPATE IN EQUIPMENT START UP, AND COORDINATE WITH HP MANUFACTURER ON REQUIRED FIELD MODIFICATIONS TO HEAT PUMP CONTROLS TO ALLOW RETURN AIR THERMISTOR TO BE REMOTED. 230923 SHALL PROVIDE/INSTALL SUPPLEMENTAL CONTROL DEVICES AND WIRING AS REQUIRED TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATION:

SET FAN COIL DAY AND NIGHT MODE INITIATION TIMES TO SCHEDULE FURNISHED BY THE OWNER. FC-1, 2, 3, 4 & 6 FANS SHALL OPERATE CONTINUOUSLY IN AUTO FAN SPEED MODE DURING THE DAY.

FC-5 FAN SHALL OPERATE CONTINUOUSLY AT HIGH SPEED DURING THE DAY, IN ORDER TO MAINTAIN A FAN CFM THAT IS GREATER THAN THE OSA CFM AT FC-5. FC-1, 2 & 3 FANS SHALL OPERATE CONTINUOUSLY DURING THE NIGHT IN AUTO FAN SPEED MODE. FC-4, 5 & 6 FANS SHALL CYCLE ON/OFF IN AUTO FAN SPEED MODE TO MAINTAIN SPACE TEMPERATURE SETPOINT DURING THE NIGHT.

THE HEAT PUMP CONTROLS SHALL MODULATE HEATING AND COOLING OUTPUT TO MAINTAIN SPACE TEMPERATURE SETPOINT.

THE EDH SHALL PROVIDE BACKUP HEATING AND SHALL ONLY BE ENABLED WHEN THE HEAT PUMP CANNOT MAINTAIN SPACE HEATING TEMPERATURE SETPOINT. CONTROLS SHALL ENABLE THE EDH VIA A DRY CONTACT WHEN SPACE TEMPERATURE FALLS 4°F OR MORE (ADJUSTABLE) BELOW SETPOINT. WHEN ENABLED, THE EDH SHALL CONTROL TO MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT OF 85°F (ADJUSTABLE). CONTROLS SHALL DISENABLE EDH WHEN SPACE TEMPERATURE REACHES 2°F OR LESS (ADJUSTABLE) BELOW SETPOINT. EDH SHALL BE DISENABLED DURING MORNING WARM UP (ADJUSTABLE TIME PERIOD) TO ALLOW HEAT PUMPS TO BRING BUILDING UP TO DAY TEMPERATURE SETPOINT, REGARDLESS OF OFFSET BETWEEN SPACE AND DAY SETPOINT TEMPERATURES.

MOISTURE SENSOR SHALL SHUT OFF HEAT PUMP UPON DETECTION OF HIGH MOISTURE LEVELS IN THE DRAIN PAN.

ELECTRIC DUCT

HEATER (EDH) SCR

CONTROLLER

(FACTORY

FURNISHED WITH

HEATER.)

REMOTE CENTRALIZED

CONTROLLER LOCATED

IN LOW VOLTAGE 109.

LOCAL HEAT

PUMP (HP)

CONTROLLER

T

REMOTE THERMISTOR

INSTALLED IN RETURN

DUCT JUST DOWNSTREAM

OF RETURN AIR GRILLE

DISCHARGE AIR

TEMPERATURE SENSOR

(FACTORY SUPPLIED

WITH ELECTRIC DUCT

HEATER.)

* SEE NOTE *

NOTE:

CONTROL WIRING

BETWEEN OUTDOOR

"HP" UNIT AND

INDOOR FANCOIL

UNIT SHALL BE

PROVIDED UNDER

SECTION 23 09 23.

SEQUENCE OF OPERATION:

DRAIN PAN MOISTURE SENSORS, THERMOSTATS, AND CONTROLLERS SHALL BE PROVIDED BY THE HP MANUFACTURER. FC-7 MOISTURE SENSOR IS INTEGRAL TO THE UNIT AND FC-8 MOISTURE SENSOR IS SHIPPED LOOSE AND FIELD-INSTALLED. A SINGLE CENTRALIZED CONTROLLER SHALL BE PROVIDED BY THE HP MANUFACTURER THAT ALLOWS FOR SPACE TEMPERATURE MONITORING, SETPOINT ADJUSTMENT, AND CONTROL OF HP/FC/EDH 1-6 AND HP/FC 7-8 FROM LOW VOLTAGE 109. 230923 SHALL INSTALL ALL CONTROL DEVICES PER MANUFACTURER REQUIREMENTS AND INSTALL THERMOSTAT ON WALL IN ROOM SERVED BY THE INDOOR UNIT.

FC AND HP SHALL CYCLE UPON DEMAND FOR COOLING OR HEATING FROM SPACE SENSOR. MOISTURE SENSOR SHALL SHUT OFF HEAT PUMP

UPON DETECTION OF HIGH MOISTURE LEVELS IN THE DRAIN PAN.

RL

RS

DRAIN PAN WITH

MOISTURE SENSOR

HP

REMOTE CENTRALIZED

CONTROLLER LOCATED

IN ELECT. 118.

T

WALL MOUNTED

THERMOSTAT

FAN COIL UNIT

NOTE:

CONTROL WIRING

BETWEEN OUTDOOR

"HP" UNIT AND

INDOOR FANCOIL

UNIT SHALL BE

PROVIDED UNDER

SECTION 23 09 23.

*SEE NOTE*

ERV-1 SEQUENCE OF OPERATION:

7-DAY TIMECLOCK, SUPPLY FAN VFD, EXHAUST FAN VFD, AND MOTORIZIED DAMPERS (D-1 & D-2) SHALL BE FACTORY PROVIDED BY ERV MANUFACTURER. 230923 SHALL INSTALL ERV-1 TIMECLOCK IN LOW VOLTAGE 109 AND SET TO SCHEDULE FURNISHED BY THE OWNER. 230923 SHALL INSTALL ALL CONTROL DEVICES PER MANUFACTURER REQUIREMENTS AND PROVIDE/INSTALL SUPPLEMENTAL MOTORIZED DAMPERS, CONTROL DEVICES, AND WIRING AS REQUIRED TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATION. PARTICIPATE IN EQUIPMENT START UP, WORK WITH TAB AGENCY TO VERIFY CONTROL SEQUENCES, DETERMINE/PROGRAM VFD SPEEDS, AND DETERMINE/PROGRAM MOTORIZED DAMPER POSITIONS AS REQUIRED TO ACHIEVE THE AIRFLOWS LISTED FOR THE

FOLLOWING MODES OF OPERATION:

FANS:

ERV-1 SUPPLY AND EXHAUST FANS SHALL OPERATE CONTINUOSLY (24/7). D-1/D-2 100% OPEN.

DAY/KITCHEN HOOD OFF: DAY/HOOD OFF MODE SHALL BE INITIATED BY THE TIME CLOCK AT 6 AM (ADJ). ERV-1 SUPPLY AND EXHAUST FANS SHALL OPERATE AT FIXED SPEEDS TO PROVIDE AIRFLOWS

INDICATED. MOTORIZED DAMPERS SHALL OPERATE AT DAY/HOOD OFF MODE POSITIONS:

D-1 & D-2: 100% OPEN

D-3: 450 CFM OSA

D-4: 400 CFM OSA

D-5: 300 CFM EA

D-6: 250 CFM EA

DAY/KITCHEN HOOD ON: DAY/HOOD ON MODE SHALL BE INITIATED BY AN AUXILIARY SWITCH/RELAY ON THE KITCHEN HOOD EXHAUST FAN STARTER. WHEN KITCHEN HOOD EXHAUST FAN IS ON, ERV-1 SUPPLY AND EXHAUST FANS SHALL OPERATE AT FIXED SPEEDS TO PROVIDE AIRFLOWS INDICATED. MOTORIZED DAMPERS SHALL OPERATE AT DAY/HOOD ON MODE POSITIONS:

D-1 & D-2: 100% OPEN

D-3: 450 CFM OSA

D-4: 900 CFM OSA

D-5: 300 CFM EA (100% OPEN)

D-6: 0 CFM EA (100% CLOSED)

WHEN KITCHEN HOOD EXHAUST FAN IS TURNED OFF, ERV-1 SHALL REVERT BACK TO DAY/HOOD OFF MODE.

NIGHT: NIGHT MODE SHALL BE INITIATED BY THE TIME CLOCK AT 10 PM (ADJ). ERV-1 SUPPLY AND EXHAUST FANS SHALL OPERATE AT FIXED SPEEDS TO PROVIDE AIRFLOWS INDICATED. MOTORIZED

DAMPERS SHALL OPERATE AT NIGHT MODE POSITIONS:

D-1 & D-2: 100% OPEN

D-3: 450 CFM OSA (100% OPEN)

D-4: 0 CFM OSA (100% CLOSED)

D-5: 300 CFM EA (100% OPEN)

D-6: 0 CFM EA (100% CLOSED)

IN EVENT OF SUPPLY OR EXHAUST FAN FAILURE, ERV-1 SHALL POWER OFF AND AFTER TIME DELAY, DAMPERS D-1 AND D-2 SHALL CLOSE.

7-DAY TIMECLOCK

(PROVIDED WITH ERV-1)

LOCATED IN LOW

VOLTAGE 109.

KITCHEN HOOD

M

SF

EF

M

DINING 114:

250 CFM EA (DAY/HOOD OFF)

0 CFM EA (DAY/HOOD ON)

0 CFM EA (NIGHT)

M M

DORM 112 (FC-1):

170 CFM OSA

(ALL MODES)

OFFICE 104 (FC-7):

30 CFM OSA

(ALL MODES)

COUNSEL 106 & 107 (FC-3):

155 CFM OSA

(ALL MODES)

DORM 110 (FC-2):

95 CFM OSA

(ALL MODES)

JAN. 115

75 CFM EA

(ALL MODES)

TOILET 111:

75 CFM

(ALL MODES)

STAFF TOILET 105:

75 CFM

(ALL MODES)

TOILET 103:

75 CFM

(ALL MODES)

EF

ERV-1

EF-1 (800 CFM)

MOTORIZED DAMPER AND

ACTUATOR PROVIDED BY

230923 (TYP. 4)

D-3 D-4

D-5 D-6

M

D-1

M

D-2

DINING 114 (FC-6):

400 CFM OSA (DAY/HOOD OFF)

900 CFM OSA (DAY/HOOD ON)

0 CFM OSA (NIGHT)

MOTORIZED DAMPERS

AND ACTUATORS

PROVIDED W/ ERV-1

STARTER WITH RELAY

(TOGGLE SWITCH ON

WALL NEAR KITCHEN

HOOD) BY DIV. 26

SUPPLY FAN EXHAUST FAN

DAY/ HOOD ON

DAY/ HOOD OFF

1350 300

NIGHT CFM

450 300

CONTROL WIRING

BY 230923 (TYP)

ERV-2 SEQUENCE OF OPERATION:

7-DAY TIMECLOCK, EC MOTORS, AND MOTORIZIED DAMPERS (D-1 & D-2) SHALL BE PROVIDED BY ERV MANUFACTURER. 230923 SHALL INSTALL ERV-2 TIMECLOCK IN LOW VOLTAGE 109 AND SET TO SCHEDULE FURNISHED BY THE OWNER. 230923 SHALL INSTALL ALL CONTROL DEVICES PER MANUFACTURER REQUIREMENTS AND PROVIDE/INSTALL ADDITIONAL MOTORIZED DAMPERS, SUPPLEMENTAL CONTROL DEVICES, AND WIRING AS REQUIRED TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATION. PARTICIPATE IN EQUIPMENT START UP, WORK WITH TAB AGENCY TO BALANCE INLETS/OULETS, DETERMIINE/PROGRAM EC MOTOR SPEEDS, AND DETERMINE/PROGRAM MOTORIZED DAMPER POSITIONS AS REQUIRED TO ACHIEVE THE AIRFLOWS LISTED FOR THE

FOLLOWING MODES OF OPERATION:

DAY MODE: DAY MODE SHALL BE INITIATED BY THE TIME CLOCK AT 6 AM (ADJ). ERV-2 SUPPLY AND EXHAUST FANS SHALL OPERATE AT FIXED SPEEDS TO PROVIDE AIRFLOWS INDICATED ON

SCHEDULE ON SHEET M0-2. MOTORIZED DAMPERS SHALL OPERATE AT DAY MODE POSITIONS:

NIGHT: NIGHT MODE SHALL BE INITIATED BY THE TIME CLOCK AT 10 PM (ADJ). ERV-2 SUPPLY AND EXHAUST FAN SHALL POWER OFF AND ERV-2 MOTORIZED DAMPERS SHALL OPERATE AT NIGHT

MODE POSITIONS:

D-1, D-2 & D-3: 100% CLOSED

IN EVENT OF SUPPLY OR EXHAUST FAN FAILURE, ERV-2 SHALL POWER OFF AND DAMPERS D-1, D-2 & D-3 SHALL CLOSE.

7-DAY TIMECLOCK

(PROVIDED WITH ERV-2)

LOCATED IN LOW

VOLTAGE 109.

M

D-3

TOILET/SHOWER 120 (FC-5):

575 CFM OSA (DAY)

0 CFM OSA (NIGHT)

MULTI-PURPOSE 101 (FC-4):

250 CFM OSA (DAY)

0 CFM OSA (NIGHT)

TOILET/SHOWER 120:

600 CFM EA (DAY)

0 CFM EA (NIGHT)

SF

EF

ERV-2

M

D-1

M

D-2

MOTORIZED DAMPERS

AND ACTUATORS

PROVIDED W/ ERV-2

MOTORIZED DAMPER

AND ACTUATOR

PROVIDED BY 230923

SUPPLY FAN EXHAUST FAN

DAY CFM

NIGHT CFM

825 600

0 0

CONTROL WIRING

BY 230923 (TYP)

R

E

101260PE

OREGONN

O 08, 2 0 2 2

EG

I S

T ER ED PRO FESS I ONA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T

HO

S H O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

M0-3

CONTROL DIAGRAMS - MECHANICAL

APRIL 2024

BID PACK 4

N.T.S.4

HEAT PUMP - FAN COIL W/ ELEC. HEAT (HP-1-6)

N.T.S.3

HEAT PUMP (HP-7 & 8)

N.T.S.1

ERV-1 SEQUENCE OF OPERATION

N.T.S.2

ERV-2 SEQUENCE OF OPERATION

M5-1

M5-1

M5-1

M5-1

M5-1

M5-1

M5-1 9 2

M5-1

M5-1

A A

B B

B' B'

C C

D D

E E

20"x12"(TYP 2)

(TYP 2)

8"x8" EXHAUST DUCT WITH FIRE-

WRAP INSULATION UP TO EF-1 ON

ROOF. TRANSITION TO HOOD

CONNECTION SIZE BELOW ROOF,

SEE KITCHEN HOOD SUBMITTAL FOR

CONNECTION SIZE AND LOCATION.

TYPE I RANGE HOOD

(NOT IN DIV. 23)

ERV-1

FC-6

ERV-2

FC-4

FC-2

FC-3

FC-1

FC-7

FC-8

HP-2

HP-3

HP-6HP-1

12"x10"

SOFFIT

36"x24"

ACCESS

SOFFIT

36"x24"

ACCESS

10"x6"

10"ø

"x

8"

"x

"x

10"ø

24"x36"

ACCESS

36"x18"

ACCESS

EDH-2

1 28512"x12"

36"x18" ACCESS

22"x12"

24"x24"

ACCESS

SOFFIT

SOFFIT

"x

24"x18" ACCESS

8"x6" (ALUMINUM

DUCT, TYP 2)

6"x6"

6"x6"

M

20"x12"

2 70020"x12"

(TYP 2)

20"x12"

(TYP 2)

3 1508"x8"

(TYP 4)

HP-7

24"x36"

ACCESS

24"x18"

ACCESS

24"x18"

ACCESS

24"x24" SIDE WALL

ACCESS, 5'-6" AFF TO

ACCESS CENTERLINE

(TYP. 3)

CEILING AND WALL ACCESS

HATCHES NOT IN DIV. 23,

SEE ARCHITECTURAL (TYP)

EDH-1

EDH-6

EDH-4

3 21510"x10"

3 32010"x10"

310"x10"

(TYP 2)

30"x10"

EF-1 ON ROOF, SEE

DETAIL 4/M4-1

EDH-3

COORDINATE

LOCATION WITH

FIRE SPRINKLER

PIPING.

EWH-1

320"x12"

316"x16"

(TYP 2)

18"x10"

320"x12"

14"x10"

2 34514" x 10"

(TYP 2)

26"x12"

332"x14"

310"x10"

3 756"x6"

322"x22"

3 756"x6"

14"x14"

U P

D N

6"x6"

1 756"x6"

2 56518"x12"

(TYP 2) 18"x12"

(TYP 2)

14"x6"

"x

6"

4"ø

"x

8"

3 756"x6"

3 756"x6"

6"x6"

8"x6"

"x

12"x10"

8"x6"

"x

14"x8"

1 63520"x12"

4"Ø ALUMINUM DRYER VENT IN WALL

UP TO ROOF. TERMINATE ABOVE

ROOF WITH GOOSENECK AND

GRAVITY BACKDRAFT DAMPER AT

TERMINATION. PROVIDE 12" FLEXIBLE

DUCT CONNECTION AT DRYER.

FC-5

24"x18" ACCESS

12"x8"

2 26012"x 8"

(TYP 2)

EDH-5

"x

20"x12"

24"x10"

36"x24"

ACCESS

12"x8"

8"x6" (BELOW)

6"ø

320"x12"

"x

6"

U P

"x

6"

"x

22"x10"

2'-8"

(MIN)

KEY NOTE:

NO LINING WITH IN THE

FIRST 12" EITHER SIDE OF

EDH. (TYP FOR ALL EDH)

VANES IN RADIUS ELBOW

(BELOW) NO DUCT LINING FOR 12"

EITHER SIDE OF EDH.

2'-6" MIN

3' -0

1' -6

(M

IN

2'-6"

8"x6"

108"x8"

118"x8" (BELOW)

(BELOW)

1 40512"x12"

12"x10"

6"x6"

HP-8

HP-5

HP-4 R

E

101260PE

OREGONN

O 08, 2 0 2 2

EG

I S

T ER ED PRO FESS I O

NA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T

HO

S H

O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

M2-1

COTTAGE FLOOR PLAN - MECHANICAL

APRIL 2024

BID PACK 4N 3/16" = 1'-0"

COTTAGE FLOOR PLAN - HVAC

A A

B B

B' B'

C C

D D

E E

FC-5

FC-4

FC-2

FC-3

FC-1

FC-7

FC-8

RS

RR

RS

RR

R S

R R

RS

RR

RS

RR

ROUTE REFRIGERANT PIPING BETWEEN

HEAT PUMP AND FAN COIL UNIT IN

RAFTER SPACE BELOW ROOF

INSULATION. SIZE AND INSTALL PER

MANUFACTURER'S REQUIREMENTS (TYP).

1" PC AND 3/4" CD DOWN TO

FLOOR DRAIN. TERMINATE PC

AND CD A MINIMUM OF 1"

ABOVE THE FLOOR DRAIN

FLOOD PLAIN. SEE P2-1 FOR

FLOOR DRAIN LOCATION.

P C

3/4"

REFRIGERANT PIPING

DOWN IN WALL (TYP).

3/4" PC DOWN TO

SERVICE SINK

PC

3/4"

CD

P C

P C

PC

P C

3/4"

3/4"

3/4"

3/4" 1"

3/4"

3/4" 1"

RS, RR & 3/4" PC DOWN TO

FAN COIL CONNECTION (TYP)

T

T

T

T

T

T

T

INSTALL REMOTE THERMISTOR IN

RETURN AIR DUCT, SEE CONTROL

DIAGRAM 4/M0-3 (TYP FC-1 THRU 6)

WALL MOUNTED

THERMOSTAT

WALL MOUNTED

THERMOSTAT

TO HP-1

THRU 8

HP-1 THRU 8

CENTRALIZED

CONTROLLER

ERV-1

ERV-2

HP-2

HP-3

HP-8

HP-5

HP-6HP-1

HP-4

HP-7

R R

R S

T

R R

R S

FC-6

3/4"

RS

RR

PIPING TO BE PERPENDICULAR TO WALL.

ROUTE PIPING IN CHASE OR IN MULLIONS

TO LIMIT EXPOSED OUTDOOR PIPING.

COORDINATE WITH ARCHITECTUAL

DRAWINGS.

R

E

101260PE

OREGONN

O 08, 2 0 2

EG

I S

T ER ED PRO FESS

I O

NA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T H

O S

H O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

M2-2

COTTAGE FLOOR PLAN - MECHANICAL

PIPING

APRIL 2024

BID PACK 4

N 3/16" = 1'-0"

COTTAGE FLOOR PLAN - MECHANICAL PIPING

NOTES:

1. PROVIDE SQUARE TO ROUND ADAPTER WITH

STANDARD TOP INLET CONNECTION WHERE ADEQUATE

CLEARANCE EXISTS ABOVE DIFFUSER.

2. PROVIDE CONICAL DUCT COLLAR AT

PLENUM CONNECTION TO ROUND NECK

DIFFUSERS.

20 GA MINIMUM

THICKNESS SHEET

METAL PLENUM BOX

SIZED TO FIT DIFFUSER

CONNECTION WITH 1"

DUCT LINER INSULATION

SAME HEIGHT AS

DUCT INLET SIZE

IF SPACE ALLOWS

(4" MINIMUM)

HEIGHT AS REQUIRED

TO SUIT DUCT INLET

SIZE PLUS 1"

MINIMUM

DUCT CONNECTING

COLLAR &

DRAWBAND

ATTACH BOX TO

DIFFUSER WITH

SHEET METAL

SCREWS AND SEAL

AIRTIGHT

HARD DUCT (SEE

DWGS FOR SIZE)

CEILING, SEE ARCH

REFLECTED CEILING

PLANS FOR CEILING

TYPE

MINIMUM 40"

DISCHARGE

HEIGHT

8" MIN.

UP BLAST EXHAUST FAN. SEE

SCHEDULE FOR SIZE AND TYPE

NEMA 3R DISCONNECT FACTORY WIRED

FROM MOTOR TO DISCONNECT THROUGH

THE BREATHER TUBE

ATTACH FAN TO CURB AS REQUIRED BY

MANUFACTURER

VENTED CURB EXTENSION FACTORY

SUPPLIED WITH FAN

ATTACH VENTED CURB TO ROOF

CURB WITH 1/4" DIA. LAG BOLTS. 8"

O.C. ON ALL SIDES

ROOFING AND FLASHING

(NOT IN DIVISION 23)

LIQUID TIGHT FLEXIBLE CONDUIT

(NOT IN DIVISION 23)

ROOF INSULATION

ROOF DECK

ROOF CURB, SEE

ARCHITECTURAL

WELDED DUCT

MINIMUM OF 18"

ABOVE ROOF

DECK

GREASE

TRAP

1-1/4"

PAN ASSEMBLY PAINTED FLAT

BLACK

(4) ADJUSTABLE PATTERN

CONTROLLERS (PAINTED FLAT BLACK)

NOTE:

FINAL ASSEMBLY WILL ALLOW EDGE OF PAN ASSEMBLY

TO BE SLIGHTLY OFF THE PERFORATED GRILLE.

CONTRACTOR TO COORDINATE ALL CEILING THICKNESS

WITH MFR. THE DEPTH OF THE STRAPPING WILL BE

ADJUSTED TO ACCOMMODATE CEILING.

HEX NUT TACK WELDED TO CHANNEL W/(2)

NUTS PER SIDE AT MIN. 8" APART AT EQUAL

SPACING. USE ONLY (1) NUT IF SIDE LESS THAN

8" IN LENGTH.

18 GA. STEEL STRAPPING ALL AROUND

GRILLE/DIFFUSER. SPOT WELD TO

GRILLE/DIFFUSER ALL AROUND.

DIFFUSER/GRILLE PAN

ASSEMBLY

20 GAUGE

PERFORATED

GRILLE

PERFORATED GRILLE, 3/8" HOLES

ON 1/4" STAGGERED CENTERS

PAINTED H25 WHITE

SECURITY SCREWS.

LENGTH TO SUIT

INSTALLATION. SEE

SELECTION 15100

FOR SCREW TYPE,

(TYP. ALL AROUND)

18" STEEL (1" WIDE)

BORDER

GYPSUM BOARD

CEILING

18 GA. STEEL

CHANNEL ALL

AROUND STRAPPING.

SPOT WELD TO

STRAPPING ALL

AROUND

DX COOLING/

HEATING COIL

CEILING

ROOF

CONDENSATE DRAIN PAN.

PROVIDE WITH OVERFLOW

SWITCH.

FAN

VIBRATION ISOLATION

FILTER

MOUNT UNISTRUT TO STRUCTURE,

SUPPORT FAN COIL FROM

UNISTRUT SUPPORT

FLEXIBLE DUCT CONNECTOR, TYP.

R

E

101260PE

OREGONN

O 08, 2 0 2

EG

I S

T ER ED PRO FESS

I O

NA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T H

O S

H O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

M4-1

DETAILS - MECHANICAL

APRIL 2024

BID PACK 4

N.T.S.1

DIFFUSER BOX (LINED) DETAIL

N.T.S.4

KITCHEN HOOD EXHAUST FAN

N.T.S.2

SECURITY GRILLE/DIFFUSER

N.T.S.3

FAN COIL UNIT MOUNTING

Level 1 0' - 0"

FC-6FC-1

SOFFIT

WALL

FLOOR

B'C

6"

8"

2'-0"

6"

8' -4

10"x6"12"x8"6"x8" 2'-8"

2"Ø FIRE

PROTECTION

PIPE

1"Ø FIRE

PROTECTION

PIPE (BEYOND)

1"Ø FIRE

PROTECTION

PIPE (BEYOND)

FC-5

SOFFIT

8"

7' -6

1'-0"

18"x36"

ACCESS

12"x8"

12"x6"

8"x6"

2"Ø FIRE

PROTECTION

PIPE

1"Ø FIRE

PROTECTION

PIPE (BEYOND)

1"Ø FIRE

PROTECTION

PIPE (BEYOND)

EXTERIOR WALL

EXHAUST HOOD

ERV-2

14"x14" ALUMINUM

SA (IN FRONT)

FFE

TRANSITION DUCT TO ERV-2

CONNECTION SIZE (TYP 2)

CONCRETE PLATFORM,

SEE ARCH.

10x12" ALUMINUM

EA (BEYOND)

A

PROVIDE ALUMINUM

DUCTWORK FROM POINT

INDICATED TO ERV-2

CONNECTIONS (TYP 2)

INSTALL EXTERIOR DUCTS WITH

THE LONGITUDINAL SEAM ON THE

BOTTOM OF THE DUCTS (TYP)

Level 1 0' - 0"

ERV-1

FFE

EXTERIOR WALL

30"x12" EA

(BEYOND)

M5-1

TRANSITION DUCT TO ERV-1

CONNECTION SIZE (TYP 2)

12"x12" ALUMINUM

EA (BEYOND)

16"x16" ALUMINUM

SA (IN FRONT)

CONCRETE PLATFORM,

SEE ARCH.

PROVIDE ALUMINUM

DUCTWORK FROM POINT

INDICATED TO ERV-1

CONNECTIONS (TYP 2)

INSTALL EXTERIOR DUCTS WITH

THE LONGITUDINAL SEAM ON THE

BOTTOM OF THE DUCTS (TYP)

Level 1 0' - 0"

M5-1

B'C

M M

M M

1'-1"

8' -4

310"x10"

10"x10"

332"x14"

14"x32"

1'-1"1'-2"

16"x12"

8"x12"

12"x10"

"x

"x

8"x12"

26"x14"

16"x16"12"x12"

FC-3

FC-2

1'-2"14"x8"

8"x6"

" 18"x36"

ACCESS

8' -0

2"Ø FIRE

PROTECTION

PIPE

Level 1 0' - 0"

B'C

FC-4

6"

8' -9

2'-8"14"x6" 8"x6" 18"x10"

2"Ø FIRE

PROTECTION

PIPE

M5-1

M5-1

M5-1

FILTER

24"x24" SIDE WALL

ACCESS, 5'-6" AFF TO

ACCESS CENTERLINE

(TYP. 3)

U P

SOFFIT

B'B'

CC

"x

48"x14"

26"x12"

"x

8"

FC-6

FC-1 36"x24"

ACCESS

36"x24"

ACCESS

332"x14"

310"x10"

12"x10"

6"x6"

FILTER

"x

20"x10"

8"x6"

14"x6"

10"x6"

12"x12"

UP

38"x11"

16"x16"

12"x12"

SOFFIT

12"x8"

12"x8"

R

E

101260PE

OREGONN

O 08, 2 0 2 2

EG

I S

T ER ED PRO FESS I O

NA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T

HO

S H

O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

M5-1

ENLARGED FLOOR PLAN & SECTIONS -

MECHANICAL

APRIL 2024

BID PACK 4

1/4" = 1'-0"1 Section 1

1/4" = 1'-0"6 Section 6

1/4" = 1'-0"7 Section 7

1/4" = 1'-0"3 Section 3

1/4" = 1'-0"2 Section 2

1/4" = 1'-0"4 Section 4

1/4" = 1'-0"5 Section 5

N 1/4" = 1'-0"

COTTAGE FLOOR PLAN - HVAC - ENLARGED

BODY

MATERIAL

STYLE

REMARKS

GPM

FLOW RATE

MODEL NO.MANUFACTURERSYMBOL

NOTES:

INTERCEPTOR SCHEDULE

INLET/OUTLET

CONNECTIONS

1 PROVIDE FLOW CONTROL FITTING IN DISCHARGE PIPING FROM SINK. 3 LOCATE INTERCEPTOR EXTERIOR OF BUILDING.

FIBERGLASS

GREASE WASTE

BELOW GRADE 100.0GMC 500ZURNGI-1 279 GAL. GREASE CAPACITY.

PROVIDE SEDIMET BUCKET

4"/4" 1 2

2 VENT INTERCEPTOR TO BLDG. VENT SYSTEM.

4 PROVIDE EXTENSION TO GRADE

UNIONS FOR ALL UTILITY CONNECTIONS EXCEPT INDIRECT WASTE CONNECTIONS,

RECOMMENDATIONS. PROVIDE WITH IN-LINE ISOLATION SHUT-OFF VALVES WITH

INSTALL EQUIPMENT IN STRICT CONFORMANCE WITH EQUIPMENT MANUFACTURER'S

PROVIDE ALL REQUIRED ACCESSORIES TO PUT INTO OPERATION.

EQUIPMENT CONNECTED BY DIV. 22 CONTRACTOR,

EQUIPMENT NOT PROVIDED UNDER DIV. 22.

NOTES:

MOUNTING#

SERVERY EQUIPMENT CONNECTION SCHEDULE

EQUIPMENT P-TRAP SUPPLIES NOTESV W IW HW CW

3"3-COMPARTMENT SINK COUNTERS-1 1/2" YES

HAND SINK WALLS-2 1/2" YES

1 62

1 42

DISHWASHER FREE STANDINGK-5 - - 3/4" NO- - 1 22" 5

1/2

1¼"x17GA 1½" 1½" 1/2"

PROVIDE WITH SHUT-OFF VALVE, IN-LINE STRAINER & PRESS.

REDUCING VALVE. HW PIPE CONNECTION MADE BY MALE GARDEN

HOSE CONNECTION. PIPE DISCHARGE TO FLOOR SINK. MAINTAIN

1" AIR GAP. SEE DETAIL 7/P4-1.

INSTALL WITH FLOW CONTROL FITTING INSTALLED IN

INDIRECT WASTE PIPING TO FLOOR SINK. MAINTAIN 1" AIR GAP. SEE

DETAIL 1/P4-1.

PROVIDE MIXING VALVE (MV-1). LOCATE MIXING VALVE BELOW

FIXTURE. ROUTE BLENDED WATER TO HW SIDE OF FAUCET. SET

TEMPERATURE @ 105° F.

PROVIDE MODIFIED TRAP ASSEMBLY TRAP PRIMER FOR FLOOR

DRAIN

3-

FOOD WELL FREE STANDINGK-8 - - - NO- - 1 23/4" 7

ROUTE DRAIN MANIFOLD FOR (3) COMPARTMENS TO FLOOR SINK7

R

E

101260PE

OREGONN

O 08, 2 0 2

EG

I S

T ER ED PRO FESS

I O

NA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T H

O S

H O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

P0-2

SCHEDULES - PLUMBING

APRIL 2024

BID PACK 4

NOTES:

1. 1.6 GPF. BACK SPUD COMFORT HEIGHT WATER CLOSET. ACORN 2898 RECESS SECURITY WALL BOX W/ CONCEALED FLUSH VALVE &

PUSH BUTTON IN SECURITY WALL PANEL

2. 0.5 GPF BACKSPUD URINAL. ACORN 2898 RECESS SECURITY WALL BOX W/ CONCEALED FLUSH VALVE & PUSH BUTTON IN SECURITY

WALL PANEL.

3. 0.5 GPM PROVIDE MIXING VALVE (MV-1) WITH FIXTURE. ROUTE BLENDED WATER TO FAUCET. SET BW TEMP. @ 105°

4. ENCLOSURE NOT IN DIV. 22. PROVIDE ACORN-CSH-1.6 GPM CONICAL SHOWER HEAD & HEAD STOPS. PROVIDE W/ ACORN MVC2 PUSH...

5. ENCLOSURE AND SEAT NOT IN DIV. 22. PROVIDE ACORN-CSH-1.6 GPM CONICAL SHOWER HEAD & HEAD STOPS. PROVIDE W/ ACORN MVC2 PUSH BUTTON ACTIVATED TIME CONTROL VALVE. SET TEMP @ 110°.

6. PROVIDE WITH WATER HAMMER ARRESTORS

7. FAUCET WITH INTEGRAL CHECK VALVES, INTEGRAL STOPS, VACUUM, BREAKER, PAIL HOOK & WALL

BRACKET

8. NOT USED

9. MIXING VALVE & STOPS LOCATED IN WALL ACCES PANEL. SINGLE TEMP. LIGATURE RESISTANT FAUCET W/ PIEZO PUSH BUTTON

10. PROVIDE ANSI SIGN .

11. REFRIGERATED, VANDAL RESISTANT W/ BOTTLE FILLER AND WATER FILTER. REQUIRES ELECTRICAL RECEPTACLE

PLUMBING FIXTURE SCHEDULE

P#

FIXTURE

DESCRIPTION

MANUFACTURER MODEL MOUNTING FIXTURE TYPE MATERIAL SIZE MFR & MODEL # OF FAUCET & VALVE DRAIN TYPE TRAP CARRIER ACCESSORIES WASTE VENT HW CW IW BW ELECTRICAL REMARKS SUPPLIES NOTES

P1 WATER CLOSET

AMERICAN

STANDARD

MADERA 3463.001 FLOOR SYPHON JET VITREOUS CHINA ENLONGATED SLOAN ROYAL 952-1.28-2-10-3/4-LDIM - INTEGRAL - SEAT: CHURCH 255 4 2 - 1 - -

120/1, WITH

TRANSFORMER

- NOTE 1

P2 URINAL

AMERICAN

STANDARD

WASHBROOK

6515.001

WALL WASHOUT VITREOUS CHINA 26x19x14 SLOAN ROYAL 995-0.125-2-10-3/4-LDIM - INTEGRAL JAY R. SMITH #0635 - 2 2 - 3/4 - -

120/1, WITH

TRANSFORMER

- NOTE 2

P3 LAVATORY

AMERICAN

STANDARD

OVALYN 0496.221 COUNTER UNDERMOUNT VITREOUS CHINA 17x14 OVAL WHITEHALL MANUFACTURING WH3376-PPZ OFFSET GRID 1-1/4 x 17 GA. -

SCALD PROTECTION & MIXING

VALVE

1-1/2 1-1/2 1/2 1/2 - 1/2"

120/1, WITH

TRANSFORMER

BRASS CRAFT KTSCR19 NOTE 3 & 9

P4 LAVATORY

AMERICAN

STANDARD

RAVENNA 0268.444 WALL SEMI-PEDISTAL VITREOUS CHINA 24x20x18.5

AMERICAN STANDARD RELIANT 3. #

7385.003.V05 GRID 1-1/4 x 17 GA.

JAY R. SMITH # 7020

SERIES AT STAFF T.R.

MIXING VALVE 1-1/2 1-1/2 1/2 1/2 - 1/2" - BRASS CRAFT KTSCR19 NOTE 3

P4A LAVATORY

AMERICAN

STANDARD

RAVENNA 0268.444 WALL SEMI-PEDISTAL VITREOUS CHINA 24x20x18.5 WHITEHALL MANUFACTURING WH3376-PPZ OFFSET GRID 1-1/4 x 17 GA.

JAY R. SMITH #0700 @

T.R. 103 & 111.

MIXING VALVE 1-1/2 1-1/2 1/2 1/2 - 1/2" - BRASS CRAFT KTSCR19 NOTE 3

P5 SERVICE SINK

STERN

WILLIAMS

HILOW

HL-2100-T-35-T-40-

BP

FLOOR MOP SINK TERRAZZO 36x24x12 CHICAGO 897-CRCF INTEGRAL STRAINER 3 INCH -

HOSE & WALL HOOK, MOP HANGER

AND SPLASH CATCHER PANELS

3 2 1/2 1/2 - - - - NOTE 7

P6 SHOWER - - -

ENCLOSURE NOT IN

DIV. 22

SEE ACH. - ACORN 410B-0-EVSP1-MV-PBH-TF-CSH-RD SIOUX CHIEF 825 2 INCH - VANDAL PROOF DRAIN SCREWS 2 2 1/2 1/2 - -

120/1, WITH

TRANSFORMER

- NOTE 4

P7 ADA SHOWER - - -

ENCLOSURE NOT IN

DIV. 22

SEE ACH. - ACORN 410B-0-EVSP1-MV-PBH-TF-CSH-RD SIOUX CHIEF 825 2 INCH - VANDAL PROOF DRAIN SCREWS 2 2 1/2 1/2 - -

120/1, WITH

TRANSFORMER

- NOTE 5

P8 DRINKING FOUNTAIN ELKAY VRCGRN8WSK WALL SINGLE LEVEL GALV. STEEL 12x19x6.5 FLEXI-GUARD GRID 1-1/4x17 GA. JAY R. SMITH #0824 - 1-1/2 1-1/2 - 1/2 - - - BRASS CRAFT KTCR-19 NOTE 11

P9

WASHING MACHINE

BOX

GUY GRAY WB200WHA WALL RECESSED GALV. STEEL 11.5x9.5x3.5 DUO-CLOZ OPEN HUB 2x17 GA. - - 2 1-1/2 1/2 1/2 - - - BRASS CRAFT KTCR-19 NOTE 6

P10

EMERGENCY EYE

WASH

GUARDIAN G1814 WALL EYE WASH ABS CIRCULAR STAY OPEN - 1-1/4 x 17 GA. HANGER

GUARDIAN G3600LF THERMOSTATIC

MIXING VALVE IN LOCKING

RECESSED WALL BOX

1-1/2" 1-1/2" - - - 1/2" - NONE ANSI SIGN

DRAIN SCHEDULE

TYPE MARK MFR MODEL #

BODY STRAINER

VARIATIONS NOTES

TYPE STYLE MATERIAL STYLE MATERIAL

FD-1 JAY R. SMITH 2005-B-U-P050 FLOOR DRAIN VERTICAL CAST IRON 5" SQUARE NICKEL BRONZE TRAP PRIMER -

FD-2 JAY R. SMITH 3510-A-U-P05-F19 FLOOR DRAIN VERTICAL CAST IRON 8" ROUND NICKEL BRONZE TRAP PRIMER INTEGRATED FULL FLOW FUNNEL

FS-1 ZURN ZS1901-KC-VPS-1-23 FLOOR SINK VERTICAL A.R.C.I.

12" SQDUARE,

LESS GRATE

STAINLESS STEEL ST. ST. RIM, 8" DEEP

ANCHOR FLANGE W/SEEPAGE HOLES, ST. STL. RIM &

ALUMINUM BUCKET

FS-2 ZURN ZS1900-KC-VPS-2-32 FLOOR SINK VERTICAL A.R.C.I.

12" SQUARE, 1/2

GRATE

STAINLESS STEEL ST. ST. RIM, 6" DEEP

ANCHOR FLANGE W/SEEPAGE HOLES, ST. STL. RIM &

ALUMINUM DOME STRAINER

ELECTRONIC TRAP PRIMER SCHEDULE

ETP-# MFR MODEL # CW INLET OUTLET MOUNTING TYPE

MOUNTING

HEIGHT

ELECTRICAL

REMARKS

NOTES

ETP-1 PPP INC. PTS-8 3/4" (8) 1/2" WALL MOUNT 5' - 0"

120V, 1Φ, 60Hz,

0.28 AMP

CAP UNUSED OUTLETS. MOUNT @ 5'-0" AFF.

SEE DETAIL 6/P4-1

HOSE BIBB SCHEDULE

TYPE MFR MODEL

CW

INLET

MOUNTING

HEIGHT

NOTES

FPWH-1 JAY R. SMITH 5609QT 3/4" 1' - 4" EXPOSED, NON-FREEZE, VACUUM BREAKER & LOOSE KEY

HB-1 JAY R. SMITH 5673-BFP 3/4" 2' - 6"

WARM CLIMATE, INTEGRAL VACUUM BREAKER & WHEEL

HANDLE W/ WALL FLANGE

HB-2 JAY R. SMITH 5675-H 3/4" 3' - 0" WARM MCLIMATE, VACUUM BREAKER & WHEEL HANDLE

NOTES:

1. SET OUTLET TEMPERATURE AT 105°F MAX.

2. MAKE MIXING VALVE FULLY ACCESSIBLE. MOUNT BELOW FIXTURE

3. ENTIRE INSTALLATION, INCLUDING PIPE CONNECTIONS SHALL CONFORM

WITH MANUFACTURER'S RECOMMENDATIONS.

4. ROUTE CW BYPASS TO CW SIDE OF FAUCET. ROUTE BLENDED WATER TO

HW SIDE OF FAUCET.

MIXING VALVE SCHEDULE

MV-# 7. MODEL CW INLET HW INLET

BW

OUTLET

MOUNTING

TYPE

MOUNTING

HEIGHT

OUTLET

TEMPERATURE

NOTES

MV-1 WATTS LFMMV 1/2" 1/2" 1/2" SURFACE 2' - 0" 105 °F 1, 2, 3, 4

WATER HEATER SCHEDULE

TAG MFR MODEL #

CAPACITY

(GALLONS)

FUEL BTU/HR INPUT

FLUE

SIZE

VENT

SIZE

MIN GAS

PRESSURE

( WC)

ELECTRIC RECOVERY

SYSTEM

TEMP.

MAX WORKING

PRESSURE

MIN. ENERGY

FACTOR

ASME NOTES

VOLT PHASE GPM RISE

ST-1 LOCHINVAR RJA120 119.0 gal - - - - 0 0 3 0.0 gal 0 °F 120 °F 150.0 psi - YES

MANIFOLD STORAGE TANK-1 WITH STORAGE TANK-2 USING EQUAL LENGTH PIPES.

CONNECT TO STACKED REMOTE WATER HEATERS

ST-2 LOCHINVAR RJA120 119.0 gal - - - - 0 0 3 0.0 gal 0 °F 120 °F 150.0 psi - YES

MANIFOLD STORAGE TANK-1 WITH STORAGE TANK-2 USING EQUAL LENGTH PIPES.

CONNECT TO STACKED REMOTE WATER HEATERS

WH-1 LOCHINVAR

ARMOUR

AWN200PM

0.0 gal NAT. GAS 199,999 3" 3" 7 120 1 335.0 gal 70 °F 120 °F 160.0 psi 0.96 YES

MANIFOLD WH1 & WH-2. PROVIDE STACK FRAME MODEL AW 151-200 TO STACK

WATER HEATERS. PROVIDE SINGLE REMOTE STORAGE TANK (ST-1), CONDENSATE

NEUTRALIZATION TANK & CIRCULATING PUMP (HWR-1)

WH-2 LOCHINVAR

ARMOUR

AWN200PM

0.0 gal NAT. GAS 199,999 3" 3" 7 120 1 335.0 gal 70 °F 120 °F 160.0 psi 0.96 YES

MANIFOLD WH1 & WH-2., PROVIDE CONDENSATE NEUTRALIZATION TANK &

CIRCULATING PUMP (HWR-2)

WH-3 EEMAX AP036208 S 0.0 gal ELECTRIC

36 KW (122,837

BTU)

- - 0 208 3 240.0 gal 30 °F 150 °F 150.0 psi - NO ROUTE 150° DEGREE WATER TO DISHWASHER

SUMP PUMP SCHEDULE

WT NAME SPACE NUMBER SPACE NAME MANUFACTURER MODEL FLOW TDH (FT) RPM

TOTAL

MOTOR HP

ELECTRICAL

KW

DISCHARGE

SIZE

NOTES

VOLTS PHASE

SP-1 SUMP PIMP EBARA 50DSHU6.4 13 GPM 15 3600 1/2 208 V 3 0.40 2"

SIMPLEX SUMP PUMP LOCATED IN EXISTING SUMP BASIN. PROVIDE SJE RHOMBUS MODEL 312

CONTROL/ALARM PANEL WITH AUDIO/VISUAL ALARM. PROVIDE SEPARATE POWER SOURCES FOR

PUMP AND CONTROL PANEL. NEMA 4

GAS REGULATOR SCHEDULE

TAG MAN. MODEL #

INLET

PRESSURE

OUTLET

PRESSURE CFH

ORIFACE SIZE NOTES

GREG-1 FISHER S201 2-PSI 11" W.C. 400 1-1/2" BODY W/ 1/4" PORT DIA.

HOT WATER RECIRCULATION PUMP SCHEDULE

# MFR MODEL # SERVICE TYPE GPM

HD

(FT)

RPM

ELECTRICAL FLANGE

SIZE

NOTES

HP V PH HZ AMPS

HWR-1 B & G PL-55B

HOT WATER

CIRCULATION

IN-LINE 21.00 35 3250 2/5 115 1 60 4.70 1 1/2" CONTROLLED BY BLDG. AUTOMATION SYSTEM

HWR-2 B & G PL-55B

HOT WATER

CIRCULATION

IN-LINE 21.00 35 3250 2/5 115 1 60 4.70 1 1/2" CONTROLLED BY BLDG. AUTOMATION SYSTEM

HWR-3 B & G NBF-25

TANK

RECIRCULATION

IN-LINE 2.00 10 3250 1/8 115 1 60 1.10 3/4"

3-SPEED MOTOR. CONTROLLED BY BLDG. AUTOMATION

SYSTEM

A A

B B

B'

C

D D

E E

SLEEVE (TYP)

4" WASTE

4" WASTE

4" WASTE

SLEEVE (TYP)

4" WASTE

4" WASTE

4" COTF

4" COTF

4" COTF

4" COTF

(TYP)

4" COTF

4" WASTE

2" VENT UP (TYP. OF 4)

2" VENT UP

(TYP-7)

2" WASTE UP

TO LAV (TYP-5)

2" WASTE UP TO FD W/

P-TRAP & PRIMER CONN.

2" WASTE UP TO FD W/

P-TRAP & PRIMER CONN.

2" WASTE UP TO SHOWER

DRAIN W/ P-TRAP & NO

PRIMER CONN. (TYP-4)

2" WASTE UP W/

2" COIW ABOVE

4" WASTE UP

4" WASTE UP

2" WASTE UP TO FD W/

P-TRAP & PRIMER CONN.

2" WASTE UP TO FD W/

P-TRAP & PRIMER CONN.

4" W. UP

2" WASTE UP TO URINAL

2" WASTE UP

2" WASTE UP TO

FD W/ P-TRAP &

PRIMER CONN.

2" WASTE UP

2" VENT UP

4" WASTE UP

2" VENT

2" WASTE UP

TO LAV

2" WASTE UP

TO DF

2" VENT UP

3" GREASE WASTE UP

2" WASTE, 1/2" CW & 1/2"

HW UP TO HAND SINK

2" VENT UP

4" GREASE WASTE UP TO FS W/

P-TRAP & PRIMER CONN.

(PIPING SHALL BE CAST IRON)

3/4" HWR, 2" CW UP

& 1-1/4" HW UP

1/2" HW UP

TO LAV

1-1/4" CW

UP TO

FIXTURES

1/2" HW,& 1-1/4" CW

& 2" WASTE UP

2" VENT UP

P4-1

SLEEVE (TYP.)

2" WASTE UP TO

FD W/ P-TRAP &

PRIMER CONN.

2" VENT UP

4" WASTE

EXIST. C.O.

4" COTG

4" COTF

2" WASTE UP TO

FD W/ P-TRAP &

PRIMER CONN.

RISER DIAGRAMS

P5-1

P5-1

CONTRACTOR SHALL PROVIDE SAW-

CUTTING OF EXISTING CONCRETE

FLOOR AS REQUIRED TO PROVIDE

NEW WASTE, VENT OR WATER

PIPING BELOW SLAB AS INDICATED

CONTRACTOR SHALL PROVIDE SAW-

CUTTING OF EXISTING CONCRETE

FLOOR AS REQUIRED TO PROVIDE

NEW WASTE, VENT OR WATER

PIPING BELOW SLAB AS INDICATED

CONTRACTOR SHALL PROVIDE SAW-

CUTTING OF EXISTING CONCRETE

FLOOR AS REQUIRED TO PROVIDE

NEW WASTE, VENT OR WATER

PIPING BELOW SLAB AS INDICATED.

(TYPICAL)

3" WASTE UP

3/4" CW & 3/4"

HW UP TO SINK

EXISTING 1-1/2" DOMESTIC

WATER SERVICE (VERIFY)

CONNECT 4" C.I. WASTE

FROM GREASE TRAP TO

EXISTING 4" WASTE MAIN

(VERIFY INVERT)

EX. 4" W

2" G.W. UP

(CAST IRON)

2" VENT UP

2" GREASE WASTE

UP TO F.D.

3/4" CW UP

2" HW & 2" HWR CIRCULATION

PIPES UP TO WATER HEATERS

3/4" 150° HW UP

DEMOLITION NOTES FOR MECHANICAL ROOM & TUNNELS

1. REMOVE ALL EXISTING HOT WATER, COLD WATER,

RECIRCULATING WATER, WASTE & VENT PIPING IN

MECHANICAL ROOM. CONNECT NEW COLD WATER TO

EXISTING 1-1/2" COLD WATER AT ENTRANCE TO

BASEMENT MECHANICAL ROOM.

2. REMOVE EXISTING HOT WATER STORAGE TANK.

REMOVE EXISTING HOT WATER BOOSTER HEATER.

REMOVE EXISTING DOMESTIC HOT WATER

RECIRCULATION PUMP

3. REMOVE ALL DOMESTIC COLD, HOT AND HOT

WATER RECIRCULATION PIPING AND ASSOCIATED

VALVES & ACCESSORIES IN TUNNELS.

4. REMOVE ALL STEAM AND CONDENSATE PIPING IN

TUNNELS AND MECHANICAL ROOM. REMOVE

CONDENSATE PUMP. REMOVE ALL ASSOCIATED

VALVES AND TRAPS.

DEMOLITION NOTES FOR TOILET/SHOWER ROOM

1. REMOVE ALL BELOW SLAB WASTE & VENT PIPING

RELATED TO DEMO'D FIXTURES IN THIS AREA.

REMOVE VENTS COMPLETELY. REMOVE WASTES

BACK TO MAIN & CAP. RE-USE EXISTING WASTE

MAIN AS INDICATED

3/4" CW UP TO FPWH

HOT WATER STORAGE

TANKS (ST-1, ST-2 &

EXP-1))

P4-1

3/4" CW & EXISTING 2"

WASTE UP. ROTUE 3/4"

CW TO HOSED BIBB &

1/2" CW TO DRINKING

FOUNTAIN

BOOSTER HEATER FOR

DISHWASHER (WH-3, MOUNT

ON WALL, 3/4" IN/OUT)

SIMPLEX SUMP PUMP (SP-1)

P4-2

1-1/4" GAS UP.

(COORD. CUTTING

& PATCHING)

1" 2-PSI GAS SERVICE UP TO EARTHQUAKE VALVE, GAS

SHUT-OFF VALVE AND REGULATOR

CONNECT NEW 2" WATER TO

EXISTING 1-1/2" DOMESTIC

WATER SERVICE INTO

BUILDING. (VERIFY) PROVIDE

NEW SHUT-OFF IN VERT.

ALL GREASE WASTE PIPING

SHALL BE CAST IRON (TYP.)

PROVIDE CAST IRON WASTE

PIPING TO AND FROM

GREASE INTERCEPTOR

3" GREASE WASTE COIW

1/2" HW & CW UP TO

SERVICE SINK

CONNECT PUMPED WASTE

TO 4" GRAVITY WASTE

2" VENT UP

CONNECT 2" VENT

TO EXIST. 2" VENT

@ SUMP BASIN

EXIST. C.O.

C.O.

3/4" CW DN. TO HB.

PROVIDE VALVE

EX. 4" W

C.O.

1/2" CIRCUIT SETTER.

SET @ .5 GPM

4"

4"

2"

4"

2"

3/4"

4" 4"

3/4"3/4" 1 1/4"

1 1/2"

3/4"

3/4"

2"3/4"2"2"1 1/4"

2"2"

4"

2" 1/2" 4"

1 1/2"

2"

1/2"

2"

2"2"

2"

4"

2"

3"

3"

1/2" 3/4"

1"1"

2"

HB-2

HWR-3

3/4"

3/4"

2"2"

W

W

W

G W

V

V

VV VV

3" COTF

4" 4"

4"

4"

2"

2"

2"

2"

2" W

W

4"

2"

4"

3" 3"3"

4"

4"

W

W

W W

2"

2"

4"

4"

W

4"

3/4"

W

4"

EXIST. 4"

ENDPIPE

CLEANOUT

2" GREASE WASTE UP TO FD

3"

2" VENT DOWN

2"

2"

4"

2"

EXIST. 4" WASTE

EXIST. 4" WASTE

W

4" WASTE

4" WASTE

1/2" HW & CW UP TO

EYE WASH.

2" GREASE WASTE

UP TO EYE WASH

WATER SOFTENER

CONNECTIONSP4-1

4" WASTE UP

2" VENT UP

4"

4"

1-1/4" GAS UP, FROM REGULATOR AND VALVES.

GAS MAY NEED TO BE ROUTED THROUGH TUNNELS,

DEPENDING ON DEPTH OF TUNNELS,(VERIFY). PROVIDE

PIPE SLEEVES THRU TUNNEL WALLS IF REQ'D.

G

2-PSI G

G

G

1" 2-PSI GAS. ROUTE TO GAS SERVICE VALVE ON SITE.

SEE ARCHITECXTURAL PLANS FOR EXACT LOCATION.

COORDINATE CUTTING AND PATCHING. INSTALL GAS

LINE ISOLATION VALVES IN LOCATION AS DIRCTED BY

OWNER.SERVICE. CONNECT TO EXIST 2-PSI GAS ON

SITE.

1 1/4"

P4-1

2" VENT UP & 2"

WASTE DOWN

2" WASTE UP.

2" VENT UP & 2"

WASTE DOWN.

(TYP;. OF 4)

2"

P4-1

GI-1

4" COTG

2" VENT CONNECTION

P4-1

3 4" COTG

W

V

V

2"2"

GW

PROVIDE CAST IRON WASTE

PIPING TO AND FROM

GREASE INTERCEPTOR

4"

4"

GREASE INTERCEPTOR

V

G W

W

2" WASTE

2" VENT UP

R

E

101260PE

OREGONN

O 08, 2 0 2

EG

I S

T ER ED PRO FESS

I O

NA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T H

O S

H O

E N

N Y C

M E C H A N I C A L

Archb Beaman Architecture, Ltd.

1634 SE 54TH Ave.

Portland, Oregon 97215 tel.: (503) 236-3300

Scale:

Project No:

Date:

Drawing Number:

Date Issued

OREGON YOUTH AUTHORITY (OYA)

MacLaren Youth

Sheet Title:

CONSULTANTS

Woodburn, Oregon

Correctional Facility (MYCF)

VALLEY COTTAGE

RENOVATIONS

SET:

18105

AS NOTED

P2-0

COTTAGE FOUNDATION PLAN - PLUMBING

APRIL 2024

BID PACK 4N 3/16" = 1'-0"

COTTAGE FOUNDATION PLAN - PLUMBING

P5

S-2

S-1 K-5

P1

P1

P1

P1

P2

P2

P3

P3

P3

P3

P3

P4A

P4A

P6 P6 P6 P7

P8

P9P9

P1

P1

P4

K-8

P10

A A

B B

B' B'

C C

D D

E E

2" CW, 1-1/4" HW & 3/4"

HWR DOWN TO (EX) MAINS

(EX) 2" VTR

(EX) 4" VTR

(EX) 2" VTR

(EX) 2"

VTR

1" CW DOWN

3/4" CW

NEW 2" VENT UP TO NEW

3" VTR. REPLACE (EX)

1-1/4" VTR. PATCH ROOF

MEMBRANE

STACKED WATER HEATERS

WH-1 & WH-2

3" COIW AT

+ 48" AFF

2" VENT DOWN IN WALL

2" VENT DOWN IN

WALL TO BELOW

PROVIDE NEW 1/2" HW

& CW FROM BELOW TO

NEW HAND SINK

P4-1

CIRCUIT SETTER

(PROVIDE ACCESS

FOR VALVES)

CON`CENTRIC VENT KIT DETAIL

(2) 4" VENTS THRU ROOF P4-1

PROVIDE NEW 1/2"

HW & CW FROM

BELOW TO SERVICE

SINK FAUCET

1-1/2" VENT DOWN IN WALL

1-1/2" CW UP FROM BELOW

AT + 2'-0" AFF IN WALL

2" VENT DOWN IN WALL

2" VENT DOWN

(TYP. OF 8)

1/2" HW & CW DOWN

(TYP. OF 3)

1/2" HW & CW

DOWN

ON WALL

AT + 60" AFF

1" CW TO WC INLET

2" VENT DOWN TO BELOW

1/2" HW & CW IN

WALL TO LAV

SUPPLIES W/ 2"

VENT DOWN

4" COTF W/ SECURITY

SCREWS (TYP.)

3/4" CW

RISER DIAGRAMS

P5-1

P5-1

HB-1 @ +30" AFF

PROVIDE NEW 1/2" HW & CW FROM

BELOW TO 3-COMP. SINK FAUCET

3/4" CW DOWN

2" HW & 2" HWR CIRCULATION

PIPES TO STORAGE TANK IN

BASEMENT MECH. ROOM

1/2" 180°F HW FROM

BELOW TO DW

3-COMPARTMENT

SINK DETAIL

P4-1

8DISHWASHER

DETAIL

P4-2

P4-1

1-1/4" GAS TO WATER HEATERS

1-1/4" GAS FROM BELOW GRADE

3" GREASE WASTE COIW.

LOCATE ABOVE S.S. WALL PANEL

2" VENT UP TO 3" VTR

SHUT-OFF

(PROVIDE ACCESS)

VALVES, (PROVIDE

ACCESS)

2" VENT

DOWN

P4-1

2"FD-1

FPWH-1

4" COTF

FPWH-1

MV-1

4" FS-1

3" FS-2

2"FD-1

4" COTF

2"FD-1

2"FD-1 4" COTF

2"FD-2

2"FD-1

4" COTF

FPWH-1

4" COTF

2"FD-12"FD-1 2"FD-1

2"FD-1

2"FD-1

2"FD-1

HB-2

ETP-1

2"

2"

2"

2"

2" 2"

1"

3"

2"

3/4"

1"

3/4"

3/4"

2"

2"

2"

1" 3/4"

3/4"

1"

2"

3/4"

2" 2"

2"

2"

3/4"3/4"

3/4" 3/4"

1/2" 3/4"

1"1"

1"

2"2"

3/4"

1"1"

2" 1"

3/4"

2"

3/4"

1"

1"

1/2"

1"

1"1"

3" 3/4" 1 1/4" 2"

FPWH-1

MV-1

MV-1

3" COTF

1 1/2"

FPWH-1

2"2"

INDIRECT WASTE

PIPING

INDIRECT WASTE PIPING

CONN. NEW DF TO

EXIST W/V & NEW CW

EXIST. COTG

1/2" HW & CW FROM

BELOW TO MIXING

P12 MIXING VALVE.

ROUTE 1/2"

TEMPERED WATER

TO EYE WASH

1-1/2" VENT DOWN

GAS REGULATOR

1" 2-PSI GAS BLDG.

SERVICE TO

BELOW GRADE

1-1/4" GAS TO BELOW

GRADE TO BUILDING

ENTRANCE

GREG-1

GAS SHUT-OFF

VALVE

GAS EARTHQUAKE VALVE.

REPLACE WITH PACIFIC

SEISMIC HORIZONTAL

MODEL 311

GREASE

INTERCEPTOR

MANHOLOE

4" COTG

4" COTG

4" COTG

1" CW DOWN. BRANCH 1/2" CW

TO LAV. CONTINUE DOWN W/

1-1/4" CW

2" VENT DOWN

2"

2"

V

V

V

V

V V

V

V

V

V

V

V

R

E

101260PE

OREGONN

O 08, 2 0 2

EG

I S

T ER ED PRO FESS

I O

NA

L

NG I NEER

RENEWS: 06/30/2024

V.

A N

T H

O S

H O

E N

N Y C

M E C H A N I C A L

Archb…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .