This is a hazardous materials abatement drawing and inventory for the Oregon Youth Authority (OYA) MYCF Valley Cottages Alterations and Renovations project. The document provides architectural floor plans and detailed specifications for the removal of asbestos-containing and lead-containing materials throughout a facility. The scope of work includes the removal of asbestos-containing floor tile and mastic, vermiculite insulation in pipe trenches, glazing compound in windows, mastic on mirrors and fiberglass duct insulation, mudded hard pipe fittings in mechanical spaces and wet walls, and lead-containing vent pipe flashings on the roof. The document includes a comprehensive inventory of 33 asbestos samples and 12 lead samples with corresponding field codes, laboratory results, and material descriptions organized by location within the building. Sample results are documented with notation indicating negative (-), positive (+), or not tested results for each material sampled.
The document serves as a technical reference and abatement plan for contractors, with detailed material sampling data compiled prior to renovation work. Specific locations throughout the facility are mapped on the first floor plan with corresponding sample reference numbers, allowing contractors to identify and properly handle all hazardous materials during the renovation process. The inventory indicates a combination of confirmed asbestos-positive materials and non-detected materials, providing baseline documentation for the hazardous materials abatement phase of the Valley Cottages renovation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CPT
024 025
037 (ROOF)
038 (ROOF)
CPT
2 2
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
FIRST FLOOR PLAN
LEGEND
PRESUMED ASBESTOS-CONTAINING VERMICULITE IN
PIPE TRENCH UNDER SHELVING TO BE REMOVED
WINDOW WITH ASBESTOS-CONTAINING GLAZING
COMPOUND TO BE REMOVED
ABATEMENT KEY NOTES (THIS SHEET)
PRESUMED ASBESTOS-CONTAINING MASTIC ON BEHIND MIRRORS
TO BE REMOVED.
ASBESTOS-CONTAINING MASTIC ON FIBERGLASS DUCT
INSULATION ABOVE CEILING TO BE REMOVED.
1. ASBESTOS-CONTAINING FLOOR TILE AND MASTIC UNDER
CASEWORK TO BE REMOVED.
2. ASBESTOS-CONTAINING MUDDED HARD PIPE FITTINGS PRESENT
IN MECHANICAL SPACES, ABOVE CEILING, UNDER CASEWORK AND
WITHIN WET WALLS THROUGHOUT THE BUILDING TO BE REMOVED.
3. LEAD-CONTAINING VENT PIPE FLASHINGS ON ROOF TO BE
REMOVED.
ABATEMENT NOTES (THIS SHEET)
MISCELLANEOUS MATERIAL
THERMAL SYSTEM INSULATION
SURFACING MATERIAL
MATERIAL SYMBOL
DRAWING REFERENCE TO BULK SAMPLE FIELD CODE,
SEE INVENTORY OF SAMPLES
LEAD DETECTED BELOW THE LIMIT OF DETECTION
DRAWING REFERENCE TO LEAD SAMPLE FIELD CODE,
SEE INVENTORY OF SAMPLES
MATERIAL SYMBOL
ASBESTOS SAMPLE SYMBOLS
INVENTORY OF ASBESTOS SAMPLES
LEAD SAMPLE SYMBOLS
INVENTORY OF AA LEAD SAMPLES (CONTINUED)
DRAWING
REFERENCE
FIELD
CODE
LAB
RESULT
MATERIAL
SAMPLED
SAMPLE
NUMBER
FIELD
CODE
LAB RESULT
(ppm)
MATERIAL
DESCRIPTION
NOT
TESTED
NEGATIVE
POSITIVE
INVENTORY OF ASBESTOS SAMPLES (CONTINUED)
DRAWING
REFERENCE
FIELD
CODE
LAB
RESULT
MATERIAL
SAMPLED
ASBESTOS-CONTAINING FLOOR TILE AND MASTIC
UNDER NON-ASBESTOS VINYL FLOORING TO BE
REMOVED
ASBESTOS-CONTAINING FLOOR TILE AND MASTIC TO BE
REMOVED
CARPET COVERING ASBESTOS-CONTAINNG FLOOR TILE
AND MASTIC TO BE REMOVED
CPT
25425.001-0001
25425.001-0002
25425.001-0003
25425.001-0004
25425.001-0005
25425.001-0006
25425.001-0007
25425.001-0008
25425.001-0009
25425.001-0010
25425.001-0011
25425.001-0012
25425.001-0013
25425.001-0014
25425.001-0015
25425.001-0016
25425.001-0017
25425.001-0018
25425.001-0019
25425.001-0020
25425.001-0021
25425.001-0022
25425.001-0023
25425.001-0024
25425.001-0025
25425.001-0026
25425.001-0027
25425.001-0028
25425.001-0029
25425.001-0030
25425.001-0031
25425.001-0032
25425.001-0033
VINYL FLOOR TILE (01)
TECTUM (01)
MASTIC (01)
VINYL FLOOR TILE/MASTIC (02)
COVEBASE/MASTIC (01)
CERAMIC TILE/GROUT (01)
MORTAR (01)
CERAMIC TILE GROUT (01)
GYPSUM AND PLASTER (01)
GYPSUM AND PLASTER (02)
MASTIC (02)
VINYL FLOOR TILE/MASTIC (03)
CAULK (01)
MASTIC (03)
MASTIC (03)
CAULK (02)
CAULK (03)
CAULK (04)
BRICK (01)
CAULK
CAULK
CAULK
25425.001-
25425.001-
25425.001-
25425.001-
25425.001-
25425.001-
25425.001-
25425.001-
25425.001-
<160 ppm
<100 ppm
<96 ppm
<360 ppm
2,800 ppm
<130 ppm
<98 ppm
<110 ppm
180 ppm
WINDOW GLAZING
COMPOUND (03)
WINDOW GLAZING
COMPOUND (02)
WINDOW GLAZING
COMPOUND (02)
HARD FITTINGS/
FIBERGLASS (01)
HARD FITTINGS/
FIBERGLASS (01)
WINDOW GLAZING
COMPOUND (01)
HARD FITTINGS/
FIBERGLASS (01)
GYPSUM WALLBOARD/
JOINT COMPOUND (03)
TROWELED TEXTURED
MATERIAL (01)
GYPSUM WALLBOARD/
JOINT COMPOUND (02)
GYPSUM WALLBOARD/
JOINT COMPOUND (01)
1012 PAINT ON SOUTH EXTERIOR;
WINDOW TRIM, WOOD, BROWN
PAINT ON FURNACE ROOM;
WALL, PLASTER, WHITE
PAINT ON SOUTHEAST
EXTERIOR; FACIA, WOOD,
BROWN
PAINT ON CAGE EXTERIOR;
POST, METAL, RED
PAINT ON DINING EXTERIOR;
DOOR, METAL, TAN
PAINT ON EXTERIOR EAST SIDE,
BOLLARD, METAL, YELLOW,
GOOD CONDITION
PAINT ON EXTERIOR NORTH
SIDE; EAVE, WOOD, BROWN,
POOR CONDITION
PAINT ON EXTERIOR SOUTH
SIDE; CAGE, METAL, RED, GOOD
CONDITION
PAINT ON DORMITORY 102;
WINDOW FRAME, METAL,
WHITE, GOOD CONDITION
25425.001-
25425.001-
25425.001-
<99 ppm
<99 ppm
<98 ppm
1003 PAINT ON CORRIDOR
BATHROOM; WALL, PLASTER,
WHITE, GOOD CONDITION
PAINT ON TOILET 108;
SPRINKLER, METAL, WHITE,
FAIR CONDITION
PAINT ON TOILET 108; WALL,
PLASTER, WHITE, GOOD
CONDITION
Date
Date Issued
No. Revision
CONSULTANTS
b Arch Beaman Architecture, Ltd.
S
W
C o r b e t t
A v e n u e
P o r t l a n d
O
R
P B
S
E n g i n e e r i n g a n d
E n v i r o n m e n t a l
I n c p b s u s a c o m
1. THIS DRAWING IS DIAGRAMMATIC BASED ON A COMPILATION OF
BOTH FIELD AND HISTORIC DRAWINGS. IT SHOULD BE USED FOR
GENERAL MATERIAL INFORMATION AND SAMPLE LOCATIONS
ONLY. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL
CONDITIONS LOCATIONS AND QUANTITIES.
2. THE GENERAL CONTRACTOR SHALL RETAIN PBS ENGINEERING
AND ENVIRONMENTAL INC. (PBS) TO OVERSEE COMPLIANCE WITH
SPECIFICATION AND REGULATORY REQUIREMENTS FROM THE
START OF ABATEMENT TO COMPLETION. IN ADDITION, PBS WILL
PERFORM VISUAL INSPECTIONS, AMBIENT AIR MONITORING AS
APPROPRIATE AND AIR CLEARANCE SAMPLING.
3. REMOVE ALL ASBESTOS CONTAINING MATERIALS SHOWN IN
ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE
REGULATORY REQUIREMENTS. ALL ASBESTOS WASTE REMOVED
FROM THE BUILDING SHALL BE PROPERLY TRANSPORTED AND
DISPOSED OF BY THE CONTRACTOR.
4. ASBESTOS-CONTAINING MATERIALS ARE PRESENT IN ACCESSIBLE
AND INACCESSIBLE INTERSTITIAL SPACES THROUGHOUT THIS
BUILDING. CONTRACTOR IS TO PERFORM ALL SELECTIVE
DEMOLITION AS NEEDED OR NOTED TO ACCESS AND ABATE
ASBESTOS-CONTAINING MATERIALS.
5. IF THE CONTRACTOR UNCOVERS SUSPECT MATERIALS NOT
IDENTIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS,
CONTACT THE HAZARDOUS MATERIALS CONSULTANT FOR
INSPECTION AND TESTING.
6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION ACTIVITIES DEMOLITION ACTIVITIES ARE TO COMPLY
WITH ALL APPLICABLE LEAD PAINT REGULATIONS IN OAR
437-DIVISION 3, 1926.62 AND AS SPECIFIED IN SECTION 02 83 19 OF
THE PROJECT SPECIFICATIONS.
7. CONTRACTOR IS TO COORDINATE ALL ABATEMENT ACTIVITIES
WITH THE GENERAL CONTRACTOR AND PROJECT
SUPERINTENDENT INCLUDING BUT NOT LIMITED TO: SCHEDULING,
DEMOLITION PHASING, ACCESS, AND SECURITY, POWER AND
WATER NEEDS, PROTECT AND SAVE ITEMS, LOCKOUT/TAGOUT
PROCEDURES AND SITE SAFETY REQUIREMENTS.
8. REFERENCE THE PROJECT SPECIFICATIONS FOR ADDITIONAL
INFORMATION FOR LIGHT FIXTURE INSPECTION. PCB BALLASTS,
MERCURY VAPOR TUBE REMOVAL AND DISPOSAL REQUIREMENTS.
GENERAL NOTES
034035036
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
BASEMENT/TUNNEL PLAN
LEGEND
MISCELLANEOUS MATERIAL
THERMAL SYSTEM INSULATION
SURFACING MATERIAL
MATERIAL SYMBOL
DRAWING REFERENCE TO BULK SAMPLE FIELD CODE,
SEE INVENTORY OF SAMPLES
ASBESTOS SAMPLE SYMBOLS
INVENTORY OF ASBESTOS SAMPLES
DRAWING
REFERENCE
FIELD
CODE
LAB
RESULT
MATERIAL
SAMPLED
NOT
TESTED
NEGATIVE
POSITIVE
25425.001-0034
25425.001-0035
25425.001-0036
(<1%)
ASBESTOS PIPE INSULATION
ASBESTOS PIPE INSULATION
MATERIAL DEBRIS
ASBESTOS-CONTAINING BLACK WRAP ON FIBERGLASS
PIPE INSULATION TO BE REMOVED
Date
Date Issued
No. Revision
CONSULTANTS
b Arch Beaman Architecture, Ltd.
S
W
C o r b e t t
A v e n u e
P o r t l a n d
O
R
P B
S
E n g i n e e r i n g a n d
E n v i r o n m e n t a l
I n c p b s u s a c o m
ASBESTOS-CONTAINING DEBRIS TO BE REMOVED
1. THIS DRAWING IS DIAGRAMMATIC BASED ON A COMPILATION OF
BOTH FIELD AND HISTORIC DRAWINGS. IT SHOULD BE USED FOR
GENERAL MATERIAL INFORMATION AND SAMPLE LOCATIONS
ONLY. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL
CONDITIONS LOCATIONS AND QUANTITIES.
2. THE GENERAL CONTRACTOR SHALL RETAIN PBS ENGINEERING
AND ENVIRONMENTAL INC. (PBS) TO OVERSEE COMPLIANCE WITH
SPECIFICATION AND REGULATORY REQUIREMENTS FROM THE
START OF ABATEMENT TO COMPLETION. IN ADDITION, PBS WILL
PERFORM VISUAL INSPECTIONS, AMBIENT AIR MONITORING AS
APPROPRIATE AND AIR CLEARANCE SAMPLING.
3. REMOVE ALL ASBESTOS CONTAINING MATERIALS SHOWN IN
ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE
REGULATORY REQUIREMENTS. ALL ASBESTOS WASTE REMOVED
FROM THE BUILDING SHALL BE PROPERLY TRANSPORTED AND
DISPOSED OF BY THE CONTRACTOR.
4. ASBESTOS-CONTAINING MATERIALS ARE PRESENT IN ACCESSIBLE
AND INACCESSIBLE INTERSTITIAL SPACES THROUGHOUT THIS
BUILDING. CONTRACTOR IS TO PERFORM ALL SELECTIVE
DEMOLITION AS NEEDED OR NOTED TO ACCESS AND ABATE
ASBESTOS-CONTAINING MATERIALS.
5. IF THE CONTRACTOR UNCOVERS SUSPECT MATERIALS NOT
IDENTIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS,
CONTACT THE HAZARDOUS MATERIALS CONSULTANT FOR
INSPECTION AND TESTING.
6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION ACTIVITIES DEMOLITION ACTIVITIES ARE TO COMPLY
WITH ALL APPLICABLE LEAD PAINT REGULATIONS IN OAR
437-DIVISION 3, 1926.62 AND AS SPECIFIED IN SECTION 02 83 19 OF
THE PROJECT SPECIFICATIONS.
7. CONTRACTOR IS TO COORDINATE ALL ABATEMENT ACTIVITIES
WITH THE GENERAL CONTRACTOR AND PROJECT
SUPERINTENDENT INCLUDING BUT NOT LIMITED TO: SCHEDULING,
DEMOLITION PHASING, ACCESS, AND SECURITY, POWER AND
WATER NEEDS, PROTECT AND SAVE ITEMS, LOCKOUT/TAGOUT
PROCEDURES AND SITE SAFETY REQUIREMENTS.
8. REFERENCE THE PROJECT SPECIFICATIONS FOR ADDITIONAL
INFORMATION FOR LIGHT FIXTURE INSPECTION. PCB BALLASTS,
CPT
036 (ROOF)
035 (ROOF)
033 032
CPT
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
FIRST FLOOR PLAN
LEGEND
ASBESTOS-CONTAINING VERMICULITE IN PIPE TRENCH
UNDER SHELVING TO BE REMOVED
WINDOWS WITH ASBESTOS-CONTAINING GLAZING
COMPOUND AND PERIMETER CAULK TO BE REMOVED
ABATEMENT KEY NOTES (THIS SHEET)
PRESUMED ASBESTOS-CONTAINING MASTIC BEHIND MIRRORS TO
BE REMOVED.
ASBESTOS-CONTAINING MASTIC ON FIBERGLASS DUCT
INSULATION ABOVE CEILING TO BE REMOVED.
ASBESTOS-CONTAINING PERIMETER DOOR CAULK TO BE
REMOVED.
1. ASBESTOS-CONTAINING FLOOR TILE AND MASTIC UNDER
CASEWORK TO BE REMOVED.
2. ASBESTOS-CONTAINING MUDDED HARD PIPE FITTINGS PRESENT
IN MECHANICAL SPACES, ABOVE CEILINGS, UNDER CASEWORK,
AND WITHIN WET WALLS THROUGHOUT THE BUILDING TO BE
REMOVED.
3. LEAD-CONTAINING VENT PIPE FLASHINGS ON ROOF TO BE
REMOVED.
ABATEMENT NOTES (THIS SHEET)
MISCELLANEOUS MATERIAL
THERMAL SYSTEM INSULATION
SURFACING MATERIAL
MATERIAL SYMBOL
DRAWING REFERENCE TO BULK SAMPLE FIELD CODE,
SEE INVENTORY OF SAMPLES
LEAD DETECTED BELOW THE LIMIT OF DETECTION
DRAWING REFERENCE TO LEAD SAMPLE FIELD CODE,
SEE INVENTORY OF SAMPLES
MATERIAL SYMBOL
ASBESTOS SAMPLE SYMBOLS
INVENTORY OF ASBESTOS SAMPLES
LEAD SAMPLE SYMBOLS
INVENTORY OF AA LEAD SAMPLES (CONTINUED)
DRAWING
REFERENCE
FIELD
CODE
LAB
RESULT
MATERIAL
SAMPLED
SAMPLE
NUMBER
FIELD
CODE
LAB RESULT
(ppm)
MATERIAL
DESCRIPTION
NOT
TESTED
NEGATIVE
POSITIVE
INVENTORY OF ASBESTOS SAMPLES (CONTINUED)
DRAWING
REFERENCE
FIELD
CODE
LAB
RESULT
MATERIAL
SAMPLED
ASBESTOS-CONTAINING FLOOR TILE AND MASTIC
UNDER NON-ASBESTOS VINYL FLOORING TO BE
REMOVED
ASBESTOS-CONTAINING FLOOR TILE AND MASTIC TO BE
REMOVED
CARPET COVERING ASBESTOS-CONTAINING FLOOR TILE
AND MASTIC TO BE REMOVED
CPT
25425.001-0001
25425.001-0002
25425.001-0003
25425.001-0004
25425.001-0005
25425.001-0006
25425.001-0007
25425.001-0008
25425.001-0009
25425.001-0010
25425.001-0011
25425.001-0012
25425.001-0013
25425.001-0014
25425.001-0015
25425.001-0016
25425.001-0017
25425.001-0018
25425.001-0019
25425.001-0020
25425.001-0021
25425.001-0022
25425.001-0023
25425.001-0024
25425.001-0025
25425.001-0026
25425.001-0027
25425.001-0028
25425.001-0029
25425.001-0030
25425.001-0031
25425.001-0032
25425.001-0033
25425.001-0034
25425.001-0035
25425.001-0036
(<1%)
(<1%)
(<1%)
TECTUM (01)
MASTIC (01)
VINYL FLOOR TILE (01)
CAULK (01)
COVEBASE/MASTIC (01)
MASTIC (02)
COVEBASE/MASTIC (02)
VINYL FLOOR TILE (02)
CERAMIC TILE/GROUT (01)
CAULK (02)
CERAMIC TILE GROUT (01)
VINYL FLOOR TILE (03)
TECTUM (02)
GYPSUM AND PLASTER (01)
CAULK (03)
CAULK (04)
GYPSUM AND PLASTER (01)
MASTIC (03)
CAULK (05)
MORTAR (01)
CAULK (06)
FIBERGLASS PIPE WRAP
CAULK (03)
CAULK (05)
ASBESTOS PIPE INSULATION
BUILT-UP ROOFING
MASTIC
25425.001-
25425.001-
25425.001-
25425.001-
25425.001-
25425.001-
<110
<110
<98
<280
WINDOW GLAZING
COMPOUND (04)
WINDOW GLAZING
COMPOUND (04)
WINDOW GLAZING
COMPOUND (02)
WINDOW GLAZING
COMPOUND (02)
WINDOW GLAZING
COMPOUND (01)
TROWELED TEXTURED
MATERIAL (02)
GYPSUM WALLBOARD/
JOINT COMPOUND (02)
TROWELED TEXTURED
MATERIAL (01)
GYPSUM WALLBOARD/
JOINT COMPOUND (01)
1006 PAINT ON EXTERIOR NORTH
SIDE; EAVE, WOOD, BROWN,
POOR CONDITION
PAINT ON EXTERIOR SOUTH
SIDE; CAGE, METAL, RED, GOOD
CONDITION
PAINT ON ACTIVITY 104;
WINDOW FRAME, METAL,
WHITE, GOOD CONDITION
PAINT ON DORMITORY 102;
DOOR FRAME, METAL, WHITE,
GOOD CONDITION
PAINT ON TOILET 108; CEILING,
PLASTER, WHITE, GOOD
CONDITION
PAINT ON DINING 113; WINDOW
SILL, WOOD, BROWN, GOOD
CONDITION
S
W
C o r b e t t
A v e n u e
P o r t l a n d
O
R
P B
S
E n g i n e e r i n g a n d
E n v i r o n m e n t a l
I n c p b s u s a c o m
Date
Date Issued
No. Revision
CONSULTANTS
b Arch Beaman Architecture, Ltd.
C o r b e t t
A v e n u e
P o r t l a n d
O
R
P B
S
E n g i n e e r i n g a n d
E n v i r o n m e n t a l
I n c p b s u s a c o m
1. THIS DRAWING IS DIAGRAMMATIC BASED ON A COMPILATION OF
BOTH FIELD AND HISTORIC DRAWINGS. IT SHOULD BE USED FOR
GENERAL MATERIAL INFORMATION AND SAMPLE LOCATIONS
ONLY. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL
CONDITIONS LOCATIONS AND QUANTITIES.
2. THE GENERAL CONTRACTOR SHALL RETAIN PBS ENGINEERING
AND ENVIRONMENTAL INC. (PBS) TO OVERSEE COMPLIANCE WITH
SPECIFICATION AND REGULATORY REQUIREMENTS FROM THE
START OF ABATEMENT TO COMPLETION. IN ADDITION, PBS WILL
PERFORM VISUAL INSPECTIONS, AMBIENT AIR MONITORING AS
APPROPRIATE AND AIR CLEARANCE SAMPLING.
3. REMOVE ALL ASBESTOS CONTAINING MATERIALS SHOWN IN
ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE
REGULATORY REQUIREMENTS. ALL ASBESTOS WASTE REMOVED
FROM THE BUILDING SHALL BE PROPERLY TRANSPORTED AND
DISPOSED OF BY THE CONTRACTOR.
4. ASBESTOS-CONTAINING MATERIALS ARE PRESENT IN ACCESSIBLE
AND INACCESSIBLE INTERSTITIAL SPACES THROUGHOUT THIS
BUILDING. CONTRACTOR IS TO PERFORM ALL SELECTIVE
DEMOLITION AS NEEDED OR NOTED TO ACCESS AND ABATE
ASBESTOS-CONTAINING MATERIALS.
5. IF THE CONTRACTOR UNCOVERS SUSPECT MATERIALS NOT
IDENTIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS,
CONTACT THE HAZARDOUS MATERIALS CONSULTANT FOR
INSPECTION AND TESTING.
6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION ACTIVITIES DEMOLITION ACTIVITIES ARE TO COMPLY
WITH ALL APPLICABLE LEAD PAINT REGULATIONS IN OAR
437-DIVISION 3, 1926.62 AND AS SPECIFIED IN SECTION 02 83 19 OF
THE PROJECT SPECIFICATIONS.
7. CONTRACTOR IS TO COORDINATE ALL ABATEMENT ACTIVITIES
WITH THE GENERAL CONTRACTOR AND PROJECT
SUPERINTENDENT INCLUDING BUT NOT LIMITED TO: SCHEDULING,
DEMOLITION PHASING, ACCESS, AND SECURITY, POWER AND
WATER NEEDS, PROTECT AND SAVE ITEMS, LOCKOUT/TAGOUT
PROCEDURES AND SITE SAFETY REQUIREMENTS.
8. REFERENCE THE PROJECT SPECIFICATIONS FOR ADDITIONAL
INFORMATION FOR LIGHT FIXTURE INSPECTION. PCB BALLASTS,
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
BASEMENT PLAN
MISCELLANEOUS MATERIAL
THERMAL SYSTEM INSULATION
SURFACING MATERIAL
MATERIAL SYMBOL
DRAWING REFERENCE TO BULK SAMPLE FIELD CODE,
SEE INVENTORY OF SAMPLES
ASBESTOS SAMPLE SYMBOLS
NOT
TESTED
NEGATIVE
POSITIVE
INVENTORY OF ASBESTOS SAMPLES
DRAWING
REFERENCE
FIELD
CODE
LAB
RESULT
MATERIAL
SAMPLED
25425.001-0029
25425.001-0034
FIBERGLASS PIPE WRAP
ASBESTOS PIPE INSULATION
LEGEND
Date
Date Issued
No. Revision
CONSULTANTS
b Arch Beaman Architecture, Ltd.
C o r b e t t
A v e n u e
P o r t l a n d
O
R
P B
S
E n g i n e e r i n g a n d
E n v i r o n m e n t a l
I n c p b s u s a c o m
ASBESTOS-CONTAINING BLACK WRAP ON FIBERGLASS
PIPE INSULATION TO BE REMOVED
ASBESTOS-CONTAINING DEBRIS TO BE REMOVED
1. THIS DRAWING IS DIAGRAMMATIC BASED ON A COMPILATION OF
BOTH FIELD AND HISTORIC DRAWINGS. IT SHOULD BE USED FOR
GENERAL MATERIAL INFORMATION AND SAMPLE LOCATIONS
ONLY. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL
CONDITIONS LOCATIONS AND QUANTITIES.
2. THE GENERAL CONTRACTOR SHALL RETAIN PBS ENGINEERING
AND ENVIRONMENTAL INC. (PBS) TO OVERSEE COMPLIANCE WITH
SPECIFICATION AND REGULATORY REQUIREMENTS FROM THE
START OF ABATEMENT TO COMPLETION. IN ADDITION, PBS WILL
PERFORM VISUAL INSPECTIONS, AMBIENT AIR MONITORING AS
APPROPRIATE AND AIR CLEARANCE SAMPLING.
3. REMOVE ALL ASBESTOS CONTAINING MATERIALS SHOWN IN
ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE
REGULATORY REQUIREMENTS. ALL ASBESTOS WASTE REMOVED
FROM THE BUILDING SHALL BE PROPERLY TRANSPORTED AND
DISPOSED OF BY THE CONTRACTOR.
4. ASBESTOS-CONTAINING MATERIALS ARE PRESENT IN ACCESSIBLE
AND INACCESSIBLE INTERSTITIAL SPACES THROUGHOUT THIS
BUILDING. CONTRACTOR IS TO PERFORM ALL SELECTIVE
DEMOLITION AS NEEDED OR NOTED TO ACCESS AND ABATE
ASBESTOS-CONTAINING MATERIALS.
5. IF THE CONTRACTOR UNCOVERS SUSPECT MATERIALS NOT
IDENTIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS,
CONTACT THE HAZARDOUS MATERIALS CONSULTANT FOR
INSPECTION AND TESTING.
6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION ACTIVITIES DEMOLITION ACTIVITIES ARE TO COMPLY
WITH ALL APPLICABLE LEAD PAINT REGULATIONS IN OAR
437-DIVISION 3, 1926.62 AND AS SPECIFIED IN SECTION 02 83 19 OF
THE PROJECT SPECIFICATIONS.
7. CONTRACTOR IS TO COORDINATE ALL ABATEMENT ACTIVITIES
WITH THE GENERAL CONTRACTOR AND PROJECT
SUPERINTENDENT INCLUDING BUT NOT LIMITED TO: SCHEDULING,
DEMOLITION PHASING, ACCESS, AND SECURITY, POWER AND
WATER NEEDS, PROTECT AND SAVE ITEMS, LOCKOUT/TAGOUT
PROCEDURES AND SITE SAFETY REQUIREMENTS.
8. REFERENCE THE PROJECT SPECIFICATIONS FOR ADDITIONAL
INFORMATION FOR LIGHT FIXTURE INSPECTION. PCB BALLASTS,
| 25425.001_HM1_0002 |
| 25425.001_HM2_0002 |
| 25425.001_HM3_0002 |
| 25425.001_HM4_0002 |
| 25425.001_HM5_0002 |
| 25425.001_HM6_0002 |
| 25425.001_HM7_0002 |
| 25425.001_HM8_0002 |
| 25425.001_HM9_0002 |
| 25425.001_HM10_0002 |