About this file

This is a hazardous materials abatement drawing and inventory for the Oregon Youth Authority (OYA) MYCF Valley Cottages Alterations and Renovations project. The document provides architectural floor plans and detailed specifications for the removal of asbestos-containing and lead-containing materials throughout a facility. The scope of work includes the removal of asbestos-containing floor tile and mastic, vermiculite insulation in pipe trenches, glazing compound in windows, mastic on mirrors and fiberglass duct insulation, mudded hard pipe fittings in mechanical spaces and wet walls, and lead-containing vent pipe flashings on the roof. The document includes a comprehensive inventory of 33 asbestos samples and 12 lead samples with corresponding field codes, laboratory results, and material descriptions organized by location within the building. Sample results are documented with notation indicating negative (-), positive (+), or not tested results for each material sampled.

The document serves as a technical reference and abatement plan for contractors, with detailed material sampling data compiled prior to renovation work. Specific locations throughout the facility are mapped on the first floor plan with corresponding sample reference numbers, allowing contractors to identify and properly handle all hazardous materials during the renovation process. The inventory indicates a combination of confirmed asbestos-positive materials and non-detected materials, providing baseline documentation for the hazardous materials abatement phase of the Valley Cottages renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CPT

024 025

037 (ROOF)

038 (ROOF)

CPT

2 2

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

FIRST FLOOR PLAN

LEGEND

PRESUMED ASBESTOS-CONTAINING VERMICULITE IN

PIPE TRENCH UNDER SHELVING TO BE REMOVED

WINDOW WITH ASBESTOS-CONTAINING GLAZING

COMPOUND TO BE REMOVED

ABATEMENT KEY NOTES (THIS SHEET)

PRESUMED ASBESTOS-CONTAINING MASTIC ON BEHIND MIRRORS

TO BE REMOVED.

ASBESTOS-CONTAINING MASTIC ON FIBERGLASS DUCT

INSULATION ABOVE CEILING TO BE REMOVED.

1. ASBESTOS-CONTAINING FLOOR TILE AND MASTIC UNDER

CASEWORK TO BE REMOVED.

2. ASBESTOS-CONTAINING MUDDED HARD PIPE FITTINGS PRESENT

IN MECHANICAL SPACES, ABOVE CEILING, UNDER CASEWORK AND

WITHIN WET WALLS THROUGHOUT THE BUILDING TO BE REMOVED.

3. LEAD-CONTAINING VENT PIPE FLASHINGS ON ROOF TO BE

REMOVED.

ABATEMENT NOTES (THIS SHEET)

MISCELLANEOUS MATERIAL

THERMAL SYSTEM INSULATION

SURFACING MATERIAL

MATERIAL SYMBOL

DRAWING REFERENCE TO BULK SAMPLE FIELD CODE,

SEE INVENTORY OF SAMPLES

LEAD DETECTED BELOW THE LIMIT OF DETECTION

DRAWING REFERENCE TO LEAD SAMPLE FIELD CODE,

SEE INVENTORY OF SAMPLES

MATERIAL SYMBOL

ASBESTOS SAMPLE SYMBOLS

INVENTORY OF ASBESTOS SAMPLES

LEAD SAMPLE SYMBOLS

INVENTORY OF AA LEAD SAMPLES (CONTINUED)

DRAWING

REFERENCE

FIELD

CODE

LAB

RESULT

MATERIAL

SAMPLED

SAMPLE

NUMBER

FIELD

CODE

LAB RESULT

(ppm)

MATERIAL

DESCRIPTION

NOT

TESTED

NEGATIVE

POSITIVE

INVENTORY OF ASBESTOS SAMPLES (CONTINUED)

DRAWING

REFERENCE

FIELD

CODE

LAB

RESULT

MATERIAL

SAMPLED

ASBESTOS-CONTAINING FLOOR TILE AND MASTIC

UNDER NON-ASBESTOS VINYL FLOORING TO BE

REMOVED

ASBESTOS-CONTAINING FLOOR TILE AND MASTIC TO BE

REMOVED

CARPET COVERING ASBESTOS-CONTAINNG FLOOR TILE

AND MASTIC TO BE REMOVED

CPT

25425.001-0001

25425.001-0002

25425.001-0003

25425.001-0004

25425.001-0005

25425.001-0006

25425.001-0007

25425.001-0008

25425.001-0009

25425.001-0010

25425.001-0011

25425.001-0012

25425.001-0013

25425.001-0014

25425.001-0015

25425.001-0016

25425.001-0017

25425.001-0018

25425.001-0019

25425.001-0020

25425.001-0021

25425.001-0022

25425.001-0023

25425.001-0024

25425.001-0025

25425.001-0026

25425.001-0027

25425.001-0028

25425.001-0029

25425.001-0030

25425.001-0031

25425.001-0032

25425.001-0033

VINYL FLOOR TILE (01)

TECTUM (01)

MASTIC (01)

VINYL FLOOR TILE/MASTIC (02)

COVEBASE/MASTIC (01)

CERAMIC TILE/GROUT (01)

MORTAR (01)

CERAMIC TILE GROUT (01)

GYPSUM AND PLASTER (01)

GYPSUM AND PLASTER (02)

MASTIC (02)

VINYL FLOOR TILE/MASTIC (03)

CAULK (01)

MASTIC (03)

MASTIC (03)

CAULK (02)

CAULK (03)

CAULK (04)

BRICK (01)

CAULK

CAULK

CAULK

25425.001-

25425.001-

25425.001-

25425.001-

25425.001-

25425.001-

25425.001-

25425.001-

25425.001-

<160 ppm

<100 ppm

<96 ppm

<360 ppm

2,800 ppm

<130 ppm

<98 ppm

<110 ppm

180 ppm

WINDOW GLAZING

COMPOUND (03)

WINDOW GLAZING

COMPOUND (02)

WINDOW GLAZING

COMPOUND (02)

HARD FITTINGS/

FIBERGLASS (01)

HARD FITTINGS/

FIBERGLASS (01)

WINDOW GLAZING

COMPOUND (01)

HARD FITTINGS/

FIBERGLASS (01)

GYPSUM WALLBOARD/

JOINT COMPOUND (03)

TROWELED TEXTURED

MATERIAL (01)

GYPSUM WALLBOARD/

JOINT COMPOUND (02)

GYPSUM WALLBOARD/

JOINT COMPOUND (01)

1012 PAINT ON SOUTH EXTERIOR;

WINDOW TRIM, WOOD, BROWN

PAINT ON FURNACE ROOM;

WALL, PLASTER, WHITE

PAINT ON SOUTHEAST

EXTERIOR; FACIA, WOOD,

BROWN

PAINT ON CAGE EXTERIOR;

POST, METAL, RED

PAINT ON DINING EXTERIOR;

DOOR, METAL, TAN

PAINT ON EXTERIOR EAST SIDE,

BOLLARD, METAL, YELLOW,

GOOD CONDITION

PAINT ON EXTERIOR NORTH

SIDE; EAVE, WOOD, BROWN,

POOR CONDITION

PAINT ON EXTERIOR SOUTH

SIDE; CAGE, METAL, RED, GOOD

CONDITION

PAINT ON DORMITORY 102;

WINDOW FRAME, METAL,

WHITE, GOOD CONDITION

25425.001-

25425.001-

25425.001-

<99 ppm

<99 ppm

<98 ppm

1003 PAINT ON CORRIDOR

BATHROOM; WALL, PLASTER,

WHITE, GOOD CONDITION

PAINT ON TOILET 108;

SPRINKLER, METAL, WHITE,

FAIR CONDITION

PAINT ON TOILET 108; WALL,

PLASTER, WHITE, GOOD

CONDITION

Date

Date Issued

No. Revision

CONSULTANTS

b Arch Beaman Architecture, Ltd.

S

W

C o r b e t t

A v e n u e

P o r t l a n d

O

R

P B

S

E n g i n e e r i n g a n d

E n v i r o n m e n t a l

I n c p b s u s a c o m

1. THIS DRAWING IS DIAGRAMMATIC BASED ON A COMPILATION OF

BOTH FIELD AND HISTORIC DRAWINGS. IT SHOULD BE USED FOR

GENERAL MATERIAL INFORMATION AND SAMPLE LOCATIONS

ONLY. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL

CONDITIONS LOCATIONS AND QUANTITIES.

2. THE GENERAL CONTRACTOR SHALL RETAIN PBS ENGINEERING

AND ENVIRONMENTAL INC. (PBS) TO OVERSEE COMPLIANCE WITH

SPECIFICATION AND REGULATORY REQUIREMENTS FROM THE

START OF ABATEMENT TO COMPLETION. IN ADDITION, PBS WILL

PERFORM VISUAL INSPECTIONS, AMBIENT AIR MONITORING AS

APPROPRIATE AND AIR CLEARANCE SAMPLING.

3. REMOVE ALL ASBESTOS CONTAINING MATERIALS SHOWN IN

ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE

REGULATORY REQUIREMENTS. ALL ASBESTOS WASTE REMOVED

FROM THE BUILDING SHALL BE PROPERLY TRANSPORTED AND

DISPOSED OF BY THE CONTRACTOR.

4. ASBESTOS-CONTAINING MATERIALS ARE PRESENT IN ACCESSIBLE

AND INACCESSIBLE INTERSTITIAL SPACES THROUGHOUT THIS

BUILDING. CONTRACTOR IS TO PERFORM ALL SELECTIVE

DEMOLITION AS NEEDED OR NOTED TO ACCESS AND ABATE

ASBESTOS-CONTAINING MATERIALS.

5. IF THE CONTRACTOR UNCOVERS SUSPECT MATERIALS NOT

IDENTIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS,

CONTACT THE HAZARDOUS MATERIALS CONSULTANT FOR

INSPECTION AND TESTING.

6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING

DEMOLITION ACTIVITIES DEMOLITION ACTIVITIES ARE TO COMPLY

WITH ALL APPLICABLE LEAD PAINT REGULATIONS IN OAR

437-DIVISION 3, 1926.62 AND AS SPECIFIED IN SECTION 02 83 19 OF

THE PROJECT SPECIFICATIONS.

7. CONTRACTOR IS TO COORDINATE ALL ABATEMENT ACTIVITIES

WITH THE GENERAL CONTRACTOR AND PROJECT

SUPERINTENDENT INCLUDING BUT NOT LIMITED TO: SCHEDULING,

DEMOLITION PHASING, ACCESS, AND SECURITY, POWER AND

WATER NEEDS, PROTECT AND SAVE ITEMS, LOCKOUT/TAGOUT

PROCEDURES AND SITE SAFETY REQUIREMENTS.

8. REFERENCE THE PROJECT SPECIFICATIONS FOR ADDITIONAL

INFORMATION FOR LIGHT FIXTURE INSPECTION. PCB BALLASTS,

MERCURY VAPOR TUBE REMOVAL AND DISPOSAL REQUIREMENTS.

GENERAL NOTES

034035036

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

BASEMENT/TUNNEL PLAN

LEGEND

MISCELLANEOUS MATERIAL

THERMAL SYSTEM INSULATION

SURFACING MATERIAL

MATERIAL SYMBOL

DRAWING REFERENCE TO BULK SAMPLE FIELD CODE,

SEE INVENTORY OF SAMPLES

ASBESTOS SAMPLE SYMBOLS

INVENTORY OF ASBESTOS SAMPLES

DRAWING

REFERENCE

FIELD

CODE

LAB

RESULT

MATERIAL

SAMPLED

NOT

TESTED

NEGATIVE

POSITIVE

25425.001-0034

25425.001-0035

25425.001-0036

(<1%)

ASBESTOS PIPE INSULATION

ASBESTOS PIPE INSULATION

MATERIAL DEBRIS

ASBESTOS-CONTAINING BLACK WRAP ON FIBERGLASS

PIPE INSULATION TO BE REMOVED

Date

Date Issued

No. Revision

CONSULTANTS

b Arch Beaman Architecture, Ltd.

S

W

C o r b e t t

A v e n u e

P o r t l a n d

O

R

P B

S

E n g i n e e r i n g a n d

E n v i r o n m e n t a l

I n c p b s u s a c o m

ASBESTOS-CONTAINING DEBRIS TO BE REMOVED

1. THIS DRAWING IS DIAGRAMMATIC BASED ON A COMPILATION OF

BOTH FIELD AND HISTORIC DRAWINGS. IT SHOULD BE USED FOR

GENERAL MATERIAL INFORMATION AND SAMPLE LOCATIONS

ONLY. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL

CONDITIONS LOCATIONS AND QUANTITIES.

2. THE GENERAL CONTRACTOR SHALL RETAIN PBS ENGINEERING

AND ENVIRONMENTAL INC. (PBS) TO OVERSEE COMPLIANCE WITH

SPECIFICATION AND REGULATORY REQUIREMENTS FROM THE

START OF ABATEMENT TO COMPLETION. IN ADDITION, PBS WILL

PERFORM VISUAL INSPECTIONS, AMBIENT AIR MONITORING AS

APPROPRIATE AND AIR CLEARANCE SAMPLING.

3. REMOVE ALL ASBESTOS CONTAINING MATERIALS SHOWN IN

ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE

REGULATORY REQUIREMENTS. ALL ASBESTOS WASTE REMOVED

FROM THE BUILDING SHALL BE PROPERLY TRANSPORTED AND

DISPOSED OF BY THE CONTRACTOR.

4. ASBESTOS-CONTAINING MATERIALS ARE PRESENT IN ACCESSIBLE

AND INACCESSIBLE INTERSTITIAL SPACES THROUGHOUT THIS

BUILDING. CONTRACTOR IS TO PERFORM ALL SELECTIVE

DEMOLITION AS NEEDED OR NOTED TO ACCESS AND ABATE

ASBESTOS-CONTAINING MATERIALS.

5. IF THE CONTRACTOR UNCOVERS SUSPECT MATERIALS NOT

IDENTIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS,

CONTACT THE HAZARDOUS MATERIALS CONSULTANT FOR

INSPECTION AND TESTING.

6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING

DEMOLITION ACTIVITIES DEMOLITION ACTIVITIES ARE TO COMPLY

WITH ALL APPLICABLE LEAD PAINT REGULATIONS IN OAR

437-DIVISION 3, 1926.62 AND AS SPECIFIED IN SECTION 02 83 19 OF

THE PROJECT SPECIFICATIONS.

7. CONTRACTOR IS TO COORDINATE ALL ABATEMENT ACTIVITIES

WITH THE GENERAL CONTRACTOR AND PROJECT

SUPERINTENDENT INCLUDING BUT NOT LIMITED TO: SCHEDULING,

DEMOLITION PHASING, ACCESS, AND SECURITY, POWER AND

WATER NEEDS, PROTECT AND SAVE ITEMS, LOCKOUT/TAGOUT

PROCEDURES AND SITE SAFETY REQUIREMENTS.

8. REFERENCE THE PROJECT SPECIFICATIONS FOR ADDITIONAL

INFORMATION FOR LIGHT FIXTURE INSPECTION. PCB BALLASTS,

CPT

036 (ROOF)

035 (ROOF)

033 032

CPT

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

FIRST FLOOR PLAN

LEGEND

ASBESTOS-CONTAINING VERMICULITE IN PIPE TRENCH

UNDER SHELVING TO BE REMOVED

WINDOWS WITH ASBESTOS-CONTAINING GLAZING

COMPOUND AND PERIMETER CAULK TO BE REMOVED

ABATEMENT KEY NOTES (THIS SHEET)

PRESUMED ASBESTOS-CONTAINING MASTIC BEHIND MIRRORS TO

BE REMOVED.

ASBESTOS-CONTAINING MASTIC ON FIBERGLASS DUCT

INSULATION ABOVE CEILING TO BE REMOVED.

ASBESTOS-CONTAINING PERIMETER DOOR CAULK TO BE

REMOVED.

1. ASBESTOS-CONTAINING FLOOR TILE AND MASTIC UNDER

CASEWORK TO BE REMOVED.

2. ASBESTOS-CONTAINING MUDDED HARD PIPE FITTINGS PRESENT

IN MECHANICAL SPACES, ABOVE CEILINGS, UNDER CASEWORK,

AND WITHIN WET WALLS THROUGHOUT THE BUILDING TO BE

REMOVED.

3. LEAD-CONTAINING VENT PIPE FLASHINGS ON ROOF TO BE

REMOVED.

ABATEMENT NOTES (THIS SHEET)

MISCELLANEOUS MATERIAL

THERMAL SYSTEM INSULATION

SURFACING MATERIAL

MATERIAL SYMBOL

DRAWING REFERENCE TO BULK SAMPLE FIELD CODE,

SEE INVENTORY OF SAMPLES

LEAD DETECTED BELOW THE LIMIT OF DETECTION

DRAWING REFERENCE TO LEAD SAMPLE FIELD CODE,

SEE INVENTORY OF SAMPLES

MATERIAL SYMBOL

ASBESTOS SAMPLE SYMBOLS

INVENTORY OF ASBESTOS SAMPLES

LEAD SAMPLE SYMBOLS

INVENTORY OF AA LEAD SAMPLES (CONTINUED)

DRAWING

REFERENCE

FIELD

CODE

LAB

RESULT

MATERIAL

SAMPLED

SAMPLE

NUMBER

FIELD

CODE

LAB RESULT

(ppm)

MATERIAL

DESCRIPTION

NOT

TESTED

NEGATIVE

POSITIVE

INVENTORY OF ASBESTOS SAMPLES (CONTINUED)

DRAWING

REFERENCE

FIELD

CODE

LAB

RESULT

MATERIAL

SAMPLED

ASBESTOS-CONTAINING FLOOR TILE AND MASTIC

UNDER NON-ASBESTOS VINYL FLOORING TO BE

REMOVED

ASBESTOS-CONTAINING FLOOR TILE AND MASTIC TO BE

REMOVED

CARPET COVERING ASBESTOS-CONTAINING FLOOR TILE

AND MASTIC TO BE REMOVED

CPT

25425.001-0001

25425.001-0002

25425.001-0003

25425.001-0004

25425.001-0005

25425.001-0006

25425.001-0007

25425.001-0008

25425.001-0009

25425.001-0010

25425.001-0011

25425.001-0012

25425.001-0013

25425.001-0014

25425.001-0015

25425.001-0016

25425.001-0017

25425.001-0018

25425.001-0019

25425.001-0020

25425.001-0021

25425.001-0022

25425.001-0023

25425.001-0024

25425.001-0025

25425.001-0026

25425.001-0027

25425.001-0028

25425.001-0029

25425.001-0030

25425.001-0031

25425.001-0032

25425.001-0033

25425.001-0034

25425.001-0035

25425.001-0036

(<1%)

(<1%)

(<1%)

TECTUM (01)

MASTIC (01)

VINYL FLOOR TILE (01)

CAULK (01)

COVEBASE/MASTIC (01)

MASTIC (02)

COVEBASE/MASTIC (02)

VINYL FLOOR TILE (02)

CERAMIC TILE/GROUT (01)

CAULK (02)

CERAMIC TILE GROUT (01)

VINYL FLOOR TILE (03)

TECTUM (02)

GYPSUM AND PLASTER (01)

CAULK (03)

CAULK (04)

GYPSUM AND PLASTER (01)

MASTIC (03)

CAULK (05)

MORTAR (01)

CAULK (06)

FIBERGLASS PIPE WRAP

CAULK (03)

CAULK (05)

ASBESTOS PIPE INSULATION

BUILT-UP ROOFING

MASTIC

25425.001-

25425.001-

25425.001-

25425.001-

25425.001-

25425.001-

<110

<110

<98

<280

WINDOW GLAZING

COMPOUND (04)

WINDOW GLAZING

COMPOUND (04)

WINDOW GLAZING

COMPOUND (02)

WINDOW GLAZING

COMPOUND (02)

WINDOW GLAZING

COMPOUND (01)

TROWELED TEXTURED

MATERIAL (02)

GYPSUM WALLBOARD/

JOINT COMPOUND (02)

TROWELED TEXTURED

MATERIAL (01)

GYPSUM WALLBOARD/

JOINT COMPOUND (01)

1006 PAINT ON EXTERIOR NORTH

SIDE; EAVE, WOOD, BROWN,

POOR CONDITION

PAINT ON EXTERIOR SOUTH

SIDE; CAGE, METAL, RED, GOOD

CONDITION

PAINT ON ACTIVITY 104;

WINDOW FRAME, METAL,

WHITE, GOOD CONDITION

PAINT ON DORMITORY 102;

DOOR FRAME, METAL, WHITE,

GOOD CONDITION

PAINT ON TOILET 108; CEILING,

PLASTER, WHITE, GOOD

CONDITION

PAINT ON DINING 113; WINDOW

SILL, WOOD, BROWN, GOOD

CONDITION

S

W

C o r b e t t

A v e n u e

P o r t l a n d

O

R

P B

S

E n g i n e e r i n g a n d

E n v i r o n m e n t a l

I n c p b s u s a c o m

Date

Date Issued

No. Revision

CONSULTANTS

b Arch Beaman Architecture, Ltd.

C o r b e t t

A v e n u e

P o r t l a n d

O

R

P B

S

E n g i n e e r i n g a n d

E n v i r o n m e n t a l

I n c p b s u s a c o m

1. THIS DRAWING IS DIAGRAMMATIC BASED ON A COMPILATION OF

BOTH FIELD AND HISTORIC DRAWINGS. IT SHOULD BE USED FOR

GENERAL MATERIAL INFORMATION AND SAMPLE LOCATIONS

ONLY. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL

CONDITIONS LOCATIONS AND QUANTITIES.

2. THE GENERAL CONTRACTOR SHALL RETAIN PBS ENGINEERING

AND ENVIRONMENTAL INC. (PBS) TO OVERSEE COMPLIANCE WITH

SPECIFICATION AND REGULATORY REQUIREMENTS FROM THE

START OF ABATEMENT TO COMPLETION. IN ADDITION, PBS WILL

PERFORM VISUAL INSPECTIONS, AMBIENT AIR MONITORING AS

APPROPRIATE AND AIR CLEARANCE SAMPLING.

3. REMOVE ALL ASBESTOS CONTAINING MATERIALS SHOWN IN

ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE

REGULATORY REQUIREMENTS. ALL ASBESTOS WASTE REMOVED

FROM THE BUILDING SHALL BE PROPERLY TRANSPORTED AND

DISPOSED OF BY THE CONTRACTOR.

4. ASBESTOS-CONTAINING MATERIALS ARE PRESENT IN ACCESSIBLE

AND INACCESSIBLE INTERSTITIAL SPACES THROUGHOUT THIS

BUILDING. CONTRACTOR IS TO PERFORM ALL SELECTIVE

DEMOLITION AS NEEDED OR NOTED TO ACCESS AND ABATE

ASBESTOS-CONTAINING MATERIALS.

5. IF THE CONTRACTOR UNCOVERS SUSPECT MATERIALS NOT

IDENTIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS,

CONTACT THE HAZARDOUS MATERIALS CONSULTANT FOR

INSPECTION AND TESTING.

6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING

DEMOLITION ACTIVITIES DEMOLITION ACTIVITIES ARE TO COMPLY

WITH ALL APPLICABLE LEAD PAINT REGULATIONS IN OAR

437-DIVISION 3, 1926.62 AND AS SPECIFIED IN SECTION 02 83 19 OF

THE PROJECT SPECIFICATIONS.

7. CONTRACTOR IS TO COORDINATE ALL ABATEMENT ACTIVITIES

WITH THE GENERAL CONTRACTOR AND PROJECT

SUPERINTENDENT INCLUDING BUT NOT LIMITED TO: SCHEDULING,

DEMOLITION PHASING, ACCESS, AND SECURITY, POWER AND

WATER NEEDS, PROTECT AND SAVE ITEMS, LOCKOUT/TAGOUT

PROCEDURES AND SITE SAFETY REQUIREMENTS.

8. REFERENCE THE PROJECT SPECIFICATIONS FOR ADDITIONAL

INFORMATION FOR LIGHT FIXTURE INSPECTION. PCB BALLASTS,

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

BASEMENT PLAN

MISCELLANEOUS MATERIAL

THERMAL SYSTEM INSULATION

SURFACING MATERIAL

MATERIAL SYMBOL

DRAWING REFERENCE TO BULK SAMPLE FIELD CODE,

SEE INVENTORY OF SAMPLES

ASBESTOS SAMPLE SYMBOLS

NOT

TESTED

NEGATIVE

POSITIVE

INVENTORY OF ASBESTOS SAMPLES

DRAWING

REFERENCE

FIELD

CODE

LAB

RESULT

MATERIAL

SAMPLED

25425.001-0029

25425.001-0034

FIBERGLASS PIPE WRAP

ASBESTOS PIPE INSULATION

LEGEND

Date

Date Issued

No. Revision

CONSULTANTS

b Arch Beaman Architecture, Ltd.

C o r b e t t

A v e n u e

P o r t l a n d

O

R

P B

S

E n g i n e e r i n g a n d

E n v i r o n m e n t a l

I n c p b s u s a c o m

ASBESTOS-CONTAINING BLACK WRAP ON FIBERGLASS

PIPE INSULATION TO BE REMOVED

ASBESTOS-CONTAINING DEBRIS TO BE REMOVED

1. THIS DRAWING IS DIAGRAMMATIC BASED ON A COMPILATION OF

BOTH FIELD AND HISTORIC DRAWINGS. IT SHOULD BE USED FOR

GENERAL MATERIAL INFORMATION AND SAMPLE LOCATIONS

ONLY. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL

CONDITIONS LOCATIONS AND QUANTITIES.

2. THE GENERAL CONTRACTOR SHALL RETAIN PBS ENGINEERING

AND ENVIRONMENTAL INC. (PBS) TO OVERSEE COMPLIANCE WITH

SPECIFICATION AND REGULATORY REQUIREMENTS FROM THE

START OF ABATEMENT TO COMPLETION. IN ADDITION, PBS WILL

PERFORM VISUAL INSPECTIONS, AMBIENT AIR MONITORING AS

APPROPRIATE AND AIR CLEARANCE SAMPLING.

3. REMOVE ALL ASBESTOS CONTAINING MATERIALS SHOWN IN

ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE

REGULATORY REQUIREMENTS. ALL ASBESTOS WASTE REMOVED

FROM THE BUILDING SHALL BE PROPERLY TRANSPORTED AND

DISPOSED OF BY THE CONTRACTOR.

4. ASBESTOS-CONTAINING MATERIALS ARE PRESENT IN ACCESSIBLE

AND INACCESSIBLE INTERSTITIAL SPACES THROUGHOUT THIS

BUILDING. CONTRACTOR IS TO PERFORM ALL SELECTIVE

DEMOLITION AS NEEDED OR NOTED TO ACCESS AND ABATE

ASBESTOS-CONTAINING MATERIALS.

5. IF THE CONTRACTOR UNCOVERS SUSPECT MATERIALS NOT

IDENTIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS,

CONTACT THE HAZARDOUS MATERIALS CONSULTANT FOR

INSPECTION AND TESTING.

6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING

DEMOLITION ACTIVITIES DEMOLITION ACTIVITIES ARE TO COMPLY

WITH ALL APPLICABLE LEAD PAINT REGULATIONS IN OAR

437-DIVISION 3, 1926.62 AND AS SPECIFIED IN SECTION 02 83 19 OF

THE PROJECT SPECIFICATIONS.

7. CONTRACTOR IS TO COORDINATE ALL ABATEMENT ACTIVITIES

WITH THE GENERAL CONTRACTOR AND PROJECT

SUPERINTENDENT INCLUDING BUT NOT LIMITED TO: SCHEDULING,

DEMOLITION PHASING, ACCESS, AND SECURITY, POWER AND

WATER NEEDS, PROTECT AND SAVE ITEMS, LOCKOUT/TAGOUT

PROCEDURES AND SITE SAFETY REQUIREMENTS.

8. REFERENCE THE PROJECT SPECIFICATIONS FOR ADDITIONAL

INFORMATION FOR LIGHT FIXTURE INSPECTION. PCB BALLASTS,

25425.001_HM1_0002
25425.001_HM2_0002
25425.001_HM3_0002
25425.001_HM4_0002
25425.001_HM5_0002
25425.001_HM6_0002
25425.001_HM7_0002
25425.001_HM8_0002
25425.001_HM9_0002
25425.001_HM10_0002

File details come from the government source that posted it. Updated .