4._Attachment_2_-_Billing_Rate_Schedule_Form.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- SFGOV-0000011966
- Issued by
- San Francisco County, San Francisco City, California
About this file
This file contains a Billing Rate Schedule form and invoice processing checklist for as-needed professional services contracts with the City and County of San Francisco, administered through San Francisco Public Works Project Controls & Services. The Billing Rate Schedule (Attachment 2) requires each firm to submit job classifications with corresponding direct labor rates and billing rates, which are calculated using a formula that applies an overhead multiplier and a 1.1 factor. The form accommodates up to 25 job classifications, excluding administrative and clerical positions whose costs are considered part of overhead. Craft positions subject to prevailing wage requirements must be paid at rates no less than applicable prevailing wage standards. The form requires completion of firm identification information, including firm name, role in the project delivery structure (Prime Proposer/Lead, Non-Lead JV Partner, or Subconsultant), SF City Partner Supplier ID or Bidder ID, and DIR Registration number if applicable.
The invoice processing checklist serves as the verification tool for payment requests on Master Contracts with a five-year expiration date. The checklist requires submission of completed forms including CMD forms, proof of current insurance, timesheets for time and material contracts, and certified payrolls where required. Pricing is structured on a time and material basis with billing rates derived from direct labor costs multiplied by an overhead multiplier (up to 4 decimal places) plus one, then multiplied by 1.1. The form includes verification checkpoints for invoice accuracy, contract compliance, insurance currency, work completion within approved contract time, and account reconciliation. Payments are processed through the City's accounting system with tracking by CSO number, purchase order number, project ID, and fund manager group designation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Billing Rates Schedule
ATTACHMENT 2 - BILLING RATE SCHEDULE
INSTRUCTIONS: Each firm must complete its own Billing Rate Schedule. Enter one row for each job classification and complete all yellow cells. Grey cells contain formulas and must be copied over when adding new rows.
Do not include administrative and clerical job classifications. Costs associated with these positions are considered part of overhead. Craft positions shall be paid no less than the prevailing wage rate, where applicable.
| Firm Name: |
| Firm Role: (Prime Proposer/Lead or Non-Lead JV Partner/Subconsultant): |
| SF City Partner Supplier ID or Bidder ID: |
| DIR Registration No. (Enter DIR No. or N/A if not applicable): |
| Overhead Multiplier (M) up to 4 decimal places, M: |
Job Classification Subject to Prevailing Wage? Direct Labor Rate Billing Rate = (A x (M+1) x 1.1)
| (Yes/No) | A ($/hr.) | B ($/hr.) | ||
| 1 | 0.00 | |||
| 2 | 0.00 | |||
| 3 | 0.00 | |||
| 4 | 0.00 | |||
| 5 | 0.00 | |||
| 6 | 0.00 | |||
| 7 | 0.00 | |||
| 8 | 0.00 | |||
| 9 | 0.00 | |||
| 10 | 0.00 | |||
| 11 | 0.00 | |||
| 12 | 0.00 | |||
| 13 | 0.00 | |||
| 14 | 0.00 | |||
| 15 | 0.00 | |||
| 16 | 0.00 | |||
| 17 | 0.00 | |||
| 18 | 0.00 | |||
| 19 | 0.00 | |||
| 20 | 0.00 | |||
| 21 | 0.00 | |||
| 22 | 0.00 | |||
| 23 | 0.00 | |||
| 24 | 0.00 | |||
| 25 | 0.00 | |||
| TOTAL PERMANENT EMPLOYEES, including owners: |
| Signature: | Date: |
| Print Name: | Position: |
&9Sourcing Event ID 11966 PWP-690 (4-26); Attachment 2 &9 Billing Rate Schedule
Invoice Form City and County of San Francisco San Francisco Public Works
| Project Controls & Services | INVOICE | |
| PROCESSING CHECKLIST |
AS-NEEDED PROFESSIONAL SERVICES
| 1. | Consultant and Master Contract Information | |||
| Consultant Name: | ERROR:#REF! | Consultant Invoice Date: | ||
| Consultant Contact: | Consultant Invoice No.: | |||
| Phone Number: | FSP Contract ID No.: | |||
| Master Contract Title: | ERROR:#REF! | Award Order No.: | ||
| City Project Manager: | 5-Year Expiration Date: | |||
| 2. | CSO and Invoice Information | |||
| CSO Project Title: | ERROR:#REF! | CSO No.: | ERROR:#REF! |
| CSO PO Number: | Payment Period No.: | ||||||||||||||||||||
| CSO Total Amount: | Invoice Amount: | ||||||||||||||||||||
| CSO NTP Date: | Invoice Period Start Date: | ||||||||||||||||||||
| CSO End Date: | Invoice Period End Date: | ||||||||||||||||||||
| 3. | Forms and Insurance | ||||||||||||||||||||
| Payment Request: | CMD Form Attached: | Insurance Exp.Dates | Contract Type: | ||||||||||||||||||
| FALSE | First Invoice | FALSE | CMD Form 8 | ERROR:#REF! | Lump Sum | ||||||||||||||||
| FALSE | Progress Invoice | GL: | ERROR:#REF! | Time & Material: | |||||||||||||||||
| FALSE | Final Invoice | AL: | Timesheets Attached | ||||||||||||||||||
| WC: | |||||||||||||||||||||
| PL: | |||||||||||||||||||||
| Notes: | |||||||||||||||||||||
| 4. | Submitted by: | ||||||||||||||||||||
| Name & Position: | Date: | ||||||||||||||||||||
| City Review and Approval | |||||||||||||||||||||
| Date Received: | |||||||||||||||||||||
| 5. | Account Summary | 6. | Verify Invoice | ||||||||||||||||||
| Project ID: | Are Invoice Details (rates,hours, etc.) correct? | FALSE | YES | ||||||||||||||||||
| Amount Approved for Payment: | Are Attachments Complete? | FALSE | YES | ||||||||||||||||||
| Total Invoice to Date: | Are Insurance Expiration Dates current? | FALSE | YES | ||||||||||||||||||
| CSO Balance: | Was Work done within approved Contract Time? | FALSE | YES | ||||||||||||||||||
| FSP Receipt No.: | Are Certified Payrolls required? | FALSE | YES | FALSE | NA | ||||||||||||||||
| Reviewed by: | |||||||||||||||||||||
| Fund Manager Group: | FALSE | BDC | FALSE | IDC/BSM | FALSE | Operations | FALSE | GEN | |||||||||||||
| 7. | Approvals | ||||||||||||||||||||
| ERROR:#REF! | Comments: |
| Project Manager/Project Lead | Date |
| ERROR:#REF! |
Contract Manager Date image1.png
File details come from the government source that posted it. Updated .