This solicitation notice provides details for an upcoming construction contract opportunity at Riverside National Cemetery in Riverside, California. The Department of Veterans Affairs intends to issue an Invitation for Bid on or around July 15, 2021 for cemetery improvements including replacing irrigation pumps, demolishing a sewage treatment plant, and other site work. The contract value is estimated between $2 million to $5 million. The NAICS code is 237990 and the business size standard is $36.5 million. This procurement is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. Interested parties must register in the System for Award Management and Vendor Information Pages databases. The solicitation and any amendments will be posted on beta.sam.gov. The point of contact is provided for any questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78621B0013 0005.docx | DOCX document | |
| RFI as of 9-23-21_(Revised).docx | DOCX document | |
| 36C78621B0013 0001.docx | DOCX document | |
| Procedure 5 Work Plan.pdf | ||
| Hazardous Materials Survey.pdf | ||
| 36C78621B0013 0004.docx | DOCX document | |
| 36C78621B0013 0003.docx | DOCX document | |
| RFI as of 9-13-21_VCI Responses.pdf | ||
| Attendance Sheet 2021_08_26_15_40_08.pdf | ||
| 36C78621B0013 0002.docx | DOCX document | |
| IFB Lump Sum Division Spreadsheet.xlsx | XLSX spreadsheet | |
| 36C78621B0013_1.docx | DOCX document | |
| Wage Determination.txt | TXT text file | |
| 210727 Riverside 901CM3043 IFB Scope of Work.docx | DOCX document | |
| Attachment-_Contractor Cost Estimate Worksheet.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
36" DIA PEPPER
12" DIA PEPPER
34" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
36" DIA PEPPER
36" DIA PEPPER
8" DIA PEPPER
12" DIA PEPPER
18" DIA PEPPER
8" DIA PEPPER
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA PEPPER
8" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA PEPPER
6" DIA PEPPER
8" DIA PEPPER
8" DIA PEPPER
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA PEPPER
12" DIA PEPPER
8" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
12" DIA PEPPER
16" DIA PEPPER
12" DIA PEPPER
36" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
12" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
36" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
32" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
16" DIA PEPPER
24" DIA PEPPER
6" DIA PEPPER
12" DIA SYCAMORE
8" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
16" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
16" DIA SYCAMORE
16" DIA SYCAMORE
6" DIA PEPPER
8" DIA SYCAMORE
8" DIA SYCAMORE
24" DIA PEPPER
12" DIA PEPPER
24" DIA PEPPER
24" DIA PEPPER
6" DIA PEPPER
12" DIA PINE
24" DIA PINE
12" DIA PINE
12" DIA PINE
12" DIA PINE
12" DIA PINE
24" DIA PEPPER
24" DIA PINE
12" DIA PINE
12" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
24" DIA PINE
12" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
24" DIA PINE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
16" DIA SYCAMORE
16" DIA SYCAMORE
16" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
16" DIA PEPPER
24" DIA PEPPER
12" DIA PEPPER
6" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
6" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA SYCAMORE
8" DIA SYCAMORE
12" DIA SYCAMORE
8" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
36" DIA PALM
24" DIA PALM
24" DIA PALM
12" DIA EUCALYPTUS
6" DIA SYCAMORE
24" DIA PALM
24" DIA EUCALYPTUS
8" DIA EUCALYPTUS
24" DIA EUCALYPTUS
24" DIA EUCALYPTUS
12" DIA EUCALYPTUS
6" DIA STAGHORN SUMACS
24" DIA PINE
6" DIA HACKBERRY
8" DIA HACKBERRY
6" DIA HACKBERRY
6" DIA HACKBERRY
8" DIA HACKBERRY
8" DIA STAGHORN SUMACS
8" DIA STAGHORN SUMACS
6" DIA STAGHORN SUMACS
8" DIA STAGHORN SUMACS
8" DIA STAGHORN SUMACS
8" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
6" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
12" DIA STAGHORN SUMACS
16" DIA PEPPER
6" DIA SYCAMORE
6" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
12" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
6" DIA SYCAMORE
LANDSCAPE BORDER
LANDSCAPE BORDER
12" DRAIN
PUMP STATION
INTAKE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
WATER
FEATURE
15" STORM
DRAIN
15" STORM
DRAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
RIVERSIDE NATIONAL CEMETERY REPLACE
IRRIGATION PUMPS, DEMOLISH SEWAGE
TREATMENT PLANT AND OTHER SITE
IMPROVEMENTS
Riverside, CA
901CM3043
N/A Project Director
07/02/2021Revisions: Date:
Juan Kays Department of Veterans Affairs, NCA
Phone: 202.632.5057 Email: juan.kays@va.gov Sheet of 92
BID DOCUMENTS
VCI Project Management Construction Management Engineering
0 30 60
1 INCH = 30 FEET
PHASING PLAN
GC201
LEGEND AND SYMBOLS
PHASE 1
PHASE 2
EXISTING GRAVEL DRIVE
EXISTING ROCK BORDER
EXISTING SIDEWALK
EXISTING CANAL
EXISTING RIBBON CURB
EXISTING FENCING
EXISTING LIGHT POLE
EXISTING SIGN
EXISTING TREE
EXISTING WALL
EXISTING CATCH BASIN
EXISTING BOULDERS
EXISTING UTILITY MANHOLE
EXISTING LANDSCAPE BORDER
VICINITY MAP
NOT TO SCALE
AOI
GENERAL NOTES
1. ALL CONSTRUCTION ACTIVITIES THAT ARE NOT
SPECIFICALLY MENTIONED WITHIN THE PHASING
PLANS MAY BE COMPLETED AT ANY TIME
THROUGHOUT THE PROJECT.
PHASE 1
1. PHASE 1 MAY BE COMPLETED DURING NORMAL
IRRIGATION MONTHS (MARCH 16, THROUGH NOVEMBER
30) AS LONG AS THE WATER SUPPLY TO LAKE A IS NOT
INTERRUPTED.
2. PHASE 1 MAY BE COMPLETED IN CONJUNCTION WITH
PHASE 3
3. REMOVE SEDIMENT FROM THE REFLECTIVE POOL AND
CANAL AREA AS SHOWN ON SHEET CD405. MEANS AND
METHODS OF SEDIMENT REMOVAL IS AT THE
CONTRACTORS DISCRETION.
4. REPAIR ANY DAMAGED GUNITE LINER ENCOUNTERED
AS DESCRIBED ON SHEET CD405.
PHASE 2
1. PHASE 2 MAY BE COMPLETED DURING NORMAL
IRRIGATION MONTHS (MARCH 16, THROUGH NOVEMBER
30) AS LONG AS THE WATER SUPPLY TO LAKE A IS NOT
INTERRUPTED.
2. PHASE 2 MUST BE COMPLETED IN CONJUNCTION WITH
PHASE 3.
3. CONTRACTOR MAY BYPASS THE WATER SUPPLY FROM
THE REFLECTIVE POOL TO THE UPPER LAKE. TEMPORARY
PIPING SHALL NOT IMPEDE TRAFFIC AT ANY TIME.
4. REMOVE THE EXISTING UPPER POND AND LOWER POND
AS SHOWN ON SHEET CD404.
5. REPLACE THE UPPER POND AND LOWER POND AS SHOWN
ON SHEET C-407.
6. REPAIR THE EXISTING WATER FALL AS SHOWN ON SHEET
C-407.
CANAL
PHASE 3
1. PHASE 3 MUST BE COMPLETED DURING LOW
IRRIGATION MONTHS (DECEMBER 1, THROUGH MARCH
15).
2. SILT REMOVAL MAY BEGIN IN PHASE 3 DURING NORMAL
IRRIGATION MONTHS (MARCH 16, THROUGH NOVEMBER
30) AS LONG AS THE WATER SUPPLY TO LAKE A IS NOT
INTERRUPTED.
3. UPPER AND LOWER LAKE A MAY BE COMPLETED
SIMULTANEOUSLY.
PHASE 3
REFLECTIVE
POOL
UPPER
POND
LOWER
POND
UPPER
LAKE A
LOWER
LAKE A
PUMP STATION PHASING
1. PUMP STATION A MUST BE COMPLETED
SIMULTANEOUSLY WITH PHASE THREE OF THE WATER
FEATURE IMPROVEMENTS OR DURING LOW IRRIGATION
MONTHS (DECEMBER 1, THROUGH MARCH 15).
2. PUMP STATION B MUST BE COMPLETED DURING LOW
IRRIGATION MONTHS (DECEMBER 1, THROUGH MARCH
15).
3. PUMP STATION B MUST NOT BE COMPLETED
SIMULTANEOUSLY WITH PUMP STATION A.
3.1. IF PUMP STATION B IS TO BE COMPLETED PRIOR
TO STARTING PHASE THREE OF WATER FEATURE
IMPROVEMENTS, THE PUMP STATION MUST BE
FULLY OPERATIONAL PRIOR TO TAKING PUMP
STATION A OFFLINE.
WATER FEATURE PHASING
No. 44593
PROFESSIONAL
R
E
G
I S
TE
R
E
D
J
O
R
D
A
N
D
VA
N
D
E
R
M
E
E
R
E
N
G
IN
E
E
R
7/02/2021
GENERAL PHASING
1. EGRESS ROAD PAVING MUST NOT TAKE PLACE PRIOR
TO THE COMPLETION OF PUMP STATION A.
2. ROAD TO PUMP STATION A IMPROVEMENTS PAVING
MUST NOT TAKE PLACE PRIOR TO THE COMPLETION OF
PUMP STATION A.
Amendment - 001 09/14/2021
AutoCAD SHX Text
IRB
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRB
AutoCAD SHX Text
IRB
AutoCAD SHX Text
IRB
AutoCAD SHX Text E
AutoCAD SHX Text
YL
AutoCAD SHX Text
YL
AutoCAD SHX Text W
AutoCAD SHX Text
IRB
AutoCAD SHX Text
YL
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRB
AutoCAD SHX Text
IRB
AutoCAD SHX Text
IRB
AutoCAD SHX Text
IRB
AutoCAD SHX Text
ELB
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRV
AutoCAD SHX Text
ELB
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRV
AutoCAD SHX Text
IRV
AutoCAD SHX Text D
AutoCAD SHX Text
IRB
AutoCAD SHX Text M
AutoCAD SHX Text
IRB
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
| Sheets and Views |
| GC201 PHASING PLAN |
File details come from the government source that posted it. Updated .