36C26118R0214-0005000.docx
DOCX document 28 KB Posted
- Attached to
- 654-250 New Parking Structure
- Solicitation number
- 36C26118R0214
About this file
36C26118R0214 0005 36C26118R0214 0005.docx
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26118R0214 Amendment 0005
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-10-2018 654-18-2-3304-0073 654-250/654-16-603 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders
36C26118R0214 05-28-2018
X X X July 31, 2018, 10:00 AM Pacific Time 654-18-2-3304-0073 X The purpose of this amendment is to provide responses to request for information (RFI) and to extend the proposal closing date to Tuesday, July 31, 2018 at 10:00 AM Pacific Time.
All other terms and conditions shall remain unchanged.
Charee Harris Contract Specialist
Question 22 - Reference Section 01 35 26 Safety Requirements, 1.7 “Site Safety and Health Officer”, Paragraph C & D
A) Does the SSHO have to be a separate qualified individual? The SSHO (Safety person) can be the same as another position on the team (dual hats) up until the new garage build goes to the 2nd level, then it must be a separate person due to the possibility of fall hazards.
B) If so, is it required that the SSHO be present during construction operations? This is a costly item. See A Above.
Question 23 - On sheet CD101. The existing manhole that the sewer laterals tie into is approximately 18’-0” deep. The plans do not show the invert elevation that the (2) laterals tie into the manhole. Can you provide the elevation of the (2) laterals? If they are 18’-0” deep, can they be left in place & filled with slurry?
Leaving the sanitary sewer laterals in place and filling with slurry is not an acceptable solution. No portion of existing utilities should be left underneath the proposed parking garage and leaving the laterals would place them underneath the garage. The topographic survey does not include the lateral elevations.
We had our maintenance crew take measurements of the lateral lines and they are as follows:
Complex F - 4 feet 3 inches Bldg. 138 – 3 feet 6 inches.
Question 24 - Specification Section 02 82 11 includes Class I Negative Pressure Enclosure Asbestos Abatement Specifications that applies to Demo of buildings 15A, 15B, F, K & 138. There is no building K shown on the plans or referenced in the hazmat report. Section 1.1.2 Extent of Work in that spec states to include removal, cleanup and disposal of asbestos/waste contaminated elements in an approximate regulated area for the following approximate quantities; 5,760 s.f. of 12”x12” grey VCT. The hazmat report SELC for project 2012-0853 dated 4/23/14 on page 2 summary states that Bldg. 15, 138 & F contain no ACM to be abated. Is this abatement in Spec. 02 82 11 omitted from the scope of work? Also confirm that there is no building K that requires demolition or ACM abatement, or provide location information for Building K.
Answer 24 - Is there a Building K, if so, where is it?
1.1. Yes, Building K is attached to, and located at the South side of Building 15B. You will find it on Sheets: AD 0.1, AD 1.1, AD 3.1, and on AD 3.2
2. Specification 02 82 11, Section 1.1.2: B. Removal, clean-up and disposal of asbestos containing materials (ACM) and asbestos/waste contaminated elements in an appropriate regulated area for the following approximate quantities; Approximately 5,760 Square feet of 12”x12” gray VCT
2.1. This specification section is in error and should be removed from the specification and the project.
3. The hazmat report SELC for project 2012-0853 dated 4/23/14 on page 2 summary states that Building 15, 138 & F contain no ACM to be abated.
3.1. The Inspection & Assessment Report Asbestos Containing
Materials and Lead Based Paint prepared by Safety Environmental Laboratories and Consulting, Inc. dated April 23, 2014 does indicate that Buildings: 15, 138, and F do not contain any asbestos nor lead based paints. (By the way, the report indicates that 15A, 15B, and K are all included under Building 15 in their report.) In conclusion, if there is no asbestos and no lead based paints, then there is no asbestos or lead based paints to abate.
See 1.3 Summary of Findings on referenced report which was an attachment under amendment 0004 of this solicitation.
Question 25 - 7.1 Bituminous Damp proofing. Please advise the quantity of this spec. Please Respond.
Answer 25 - Damp proofing is called for below grade and around the elevator pit. We do not typically supply quantities as it is the contractor’s responsibility to review the documents and take off their own quantities.
File details come from the government source that posted it.