This is a notice for a forthcoming invitation for bid to construct a new Dermatology Outpatient Service Building. The Department of Veterans Affairs intends to issue an IFB to award a single, firm-fixed price contract for Project 612-501, with a period of performance of 500 days from notice to proceed. The contractor shall provide all labor, materials, tools, trades, permits and licenses for construction of the new building according to specifications and drawings. The location of performance is VA Northern California Healthcare System in Mather, CA. The solicitation and supporting documents will be available on FBO.gov on or around July 20, 2019, with amendments also posted there. The contract will be awarded following procedures in the solicitation. This project is set aside for Service-Disabled-Veteran-Owned-Small-Business concerns. The NAICS code is 236220 for commercial and institutional building construction with a small business size standard of $36.5 million. The estimated value is between $5-10 million.
36C26118B0618 C27 - 02-12-18 - ARCHITECTURAL - MATHER - DERMATOLOGY - 10TH SUBMITTAL_Part1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26118B0618-0004001.docx | DOCX document | |
| 36C26118B0618-0004000.docx | DOCX document | |
| 36C26118B0618-0003000.docx | DOCX document | |
| 36C26118B0618-0003001.pdf | ||
| 36C26118B0618-0003002.pdf | ||
| 36C26118B0618-0002000.docx | DOCX document | |
| 36C26118B0618-0001000.docx | DOCX document | |
| 36C26118B0618-0001001.pdf | ||
| 36C26118B0618-008.pdf | ||
| 36C26118B0618-012.pdf | ||
| 36C26118B0618-017.pdf | ||
| 36C26118B0618-007.pdf | ||
| 36C26118B0618-015.pdf | ||
| 36C26118B0618-003.pdf | ||
| 36C26118B0618-013.pdf | ||
| 36C26118B0618-010.pdf | ||
| 36C26118B0618-011.pdf | ||
| 36C26118B0618-014.pdf | ||
| 36C26118B0618-005.pdf | ||
| 36C26118B0618-006.pdf | ||
| 36C26118B0618-016.pdf | ||
| 36C26118B0618-009.pdf | ||
| 36C26118B0618-002.docx | DOCX document | |
| 36C26118B0618-001.docx | DOCX document |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW DERMATOLOGY OUTPATIENT
SERVICES BUILDING
PROJECT NO. : 612-501
VA MATHER NORTHERN CALIFORNIA HEALTHCARE SYSTEM
MATHER, CALIFORNIA
COVER SHEET
SITE MAPVICINITY MAP
SCALE: NTSSCALE: NTS
FINAL STAMPED SUBMITTAL
LEGEND:
PROJECT
NORTH
NORTH
NORTH
PERSPECTIVE VIEW
AREA 1
AREA 2
AREA 3
4 VA NORTHERN CALIFORNIA HEALTH
CARE SYSTEM MATHER, CALIFORNIA
(ARTIST RENDERING)
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/19
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
Dwg. of02/12/2018
VA MEDICAL CENTER, MATHER, CA 95655
644K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
3/13/2018 9:55:39 AMH:\PROJECTS\VA MEDICAL CENTERS\MATHER - DERMATOLOGY - 10TH SUBMITTAL_vball314.rvt
NEW DERMATOLOGY
OUTPATIENT SERVICES
BUILDING
D.DIMAT
GI100
COVER SHEET
J.ALFARO
612-501
D.DIMAT
1 151
SHEET INDEX
DWG
NO
SHEET
NO. SHEET NAME
81 P001 PLUMBING GENERAL NOTES, LEGEND AND ABBREVIATIONS
82 PL101-1 PLUMBING FIRST FLOOR ENLARGED PLAN - NORTH
83 PL101-2 PLUMBING FIRST FLOOR ENLARGED PLAN - SOUTH
84 PL102-1 PLUMBING SECOND FLOOR ENLARGED PLAN - NORTH
85 PL102-2 PLUMBING SECOND FLOOR ENLARGED PLAN - SOUTH
86 PL103 PLUMBING ROOF PLAN
87 PL501 PLUMBING SCHEDULES
88 PL502 PLUMBING DIAGRAMS AND DETAILS
89 PL503 PLUMBING DIAGRAMS AND DETAILS
90 PL601 PLUMBING WATER PIPING DIAGRAM
91 PL602 PLUMBING DWV PIPING DIAGRAM
92 M001 MECHANICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS
93 MH201 MECHANICAL SCHEDULES
94 MH202 MECHANICAL SCHEDULES
95 MH203 MECHANICAL SCHEDULES
96 MH204 MECHANICAL SCHEDULES
97 MH205 MECHANICAL SCHEDULES
98 MH206 MECHANICAL SCHEDULES
99 MH301-1 MECHANICAL FIRST FLOOR ENLARGED PLAN - NORTH
100 MH301-2 MECHANICAL FIRST FLOOR ENLARGED PLAN - SOUTH
101 MH302 MECHANICAL SECOND FLOOR ENLARGED PLAN
102 MH303 MECHANICAL ROOF PLAN
103 MH401-1 MECHANICAL FIRST FLOOR ENLARGED PIPING PLAN - NORTH
104 MH401-2 MECHANICAL FIRST FLOOR ENLARGED PIPING PLAN - SOUTH
105 MH402 MECHANICAL SECOND FLOOR ENLARGED PIPING PLAN -
SOUTH
106 MH403 MECHANICAL ROOF PIPING PLAN
107 MH501 MECHANICAL CHILLED WATER ICE STORAGE SYSTEM
108 MH502 MECHANICAL HEATING HOT WATER PRIMARY / SECONDARY
SYSTEM
109 MH503 MECHANICAL AIR SIDE P & ID
110 MH504 MECHANICAL VARIABLE AIR VOLUME AIR HANDLING UNIT
DIAGRAM
111 MH505 MECHANICAL CONTROL DIAGRAMS
112 MH506 MECHANICAL CONTROL DIAGRAM
113 MH601 MECHANICAL DETAILS
114 MH602 MECHANICAL DETAILS
115 MH603 MECHANICAL DETAILS
116 MH604 MECHANICAL DETAILS
117 E101 ELECTRICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS
118 EL111-1 ELECTRICAL LIGHTING PLAN - ENLARGED FIRST FLOOR -
NORTH
119 EL111-2 ELECTRICAL LIGHTING PLAN - ENLARGED FIRST FLOOR -
SOUTH
120 EL112-1 ELECTRICAL LIGHTING PLAN - ENLARGED SECOND FLOOR
PLAN - NORTH
121 EL112-2 ELECTRICAL LIGHTING PLAN - ENLARGED SECOND FLOOR
PLAN - SOUTH
122 EL113 ELECTRICAL LIGHTING PLAN - ROOF
123 EP120 ELECTRICAL POWER AND GROUNDING SITE PLAN
124 EP121-1 ELECTRICAL FIRST FLOOR ENLARGED POWER PLAN - NORTH
125 EP121-2 ELECTRICAL FIRST FLOOR ENLARGED POWER PLAN - SOUTH
126 EP122-1 ELECTRICAL SECOND FLOOR ENLARGED POWER PLAN -
NORTH
127 EP122-2 ELECTRICAL SECOND FLOOR ENLARGED POWER PLAN -
SOUTH
128 EP131-1 ELECTRICAL MECHANICAL PLUMBING AND ACCESS CONTROL
POWER PLAN - FIRST FLOOR - NORTH
129 EP131-2 ELECTRICAL MECHANICAL PLUMBING AND ACCESS CONTROL
POWER PLAN - FIRST FLOOR - SOUTH
130 EP132-1 ELECTRICAL MECHANICAL PLUMBING AND ACCESS CONTROL
POWER PLAN - SECOND FLOOR - NORTH
131 EP132-2 ELECTRICAL MECHANICAL PLUMBING AND ACCESS CONTROL
POWER PLAN - SECOND FLOOR - SOUTH
132 EP133 ELECTRICAL MECHANICAL POWER PLAN - ROOF
133 EP134 ELECTRICAL PROPOSAL FUTURE EYE CLINIC CONDUIT
ROUTING
134 EP402 ELECTRICAL LARGE SCALE ROOM DATA PLANS
135 EP405 ENLARGED ELECTRICAL ROOM PLANS
136 EP601 ELECTRICAL POWER SINGLE LINE DIAGRAM
137 EP701 ELECTRICAL LIGHTING SCHEDULE
138 EP702 ELECTRICAL PANEL SCHEDULES
139 EP703 ELECTRICAL PANEL SCHEDULES
140 EP704 ELECTRICAL PANEL SCHEDULES
141 ED801 ELECTRICAL DETAILS
142 ED802 ELECTRICAL DETAILS
143 ED803 ELECTRICAL DETAILS
144 ET101-1 TELECOM FIRST FLOOR ENLARGED PLAN NORTH
145 ET101-2 TELECOM FIRST FLOOR ENLARGED PLAN SOUTH
146 ET102-1 TELECOM SECOND FLOOR ENLARGED PLAN NORTH
147 ET102-2 TELECOM SECOND FLOOR ENLARGED PLAN SOUTH
148 ET103 FIRST & SECOND FLOOR COMMUNICATIONS CABLE TRAY
149 ET400 TELECOM OUTSIDE PLANT (OSP)
150 ET401 TYPICAL TELECOM ROOM LAYOUT
151 ET402 TYPICAL TELECOM ROOM LAYOUT
SHEET INDEX
DWG
NO
SHEET
NO. SHEET NAME
1 GI100 COVER SHEET
2 GI100-1 APPROVALS
3 GI101 PROJECT AREAS BID DEDUCTS
4 GI200 GENERAL PROJECT NOTES
5 GC001 EXIT PLAN AND CODE DATA
6 CS101 OVERALL SITE PLAN
7 CD101 DEMOLITION PLAN - AREA 1
8 CD102 DEMOLITION PLAN - AREAS 2 AND 3
9 CG101 GRADING PLAN - AREA 1
10 CG102 GRADING, SIGNING, STRIPPING AND DIMENSIONING PLAN -
AREA 2
11 CG103 GRADING, SIGNING, STRIPPING AND DIMENSIONING PLAN -
AREA 3
12 CU101 UTILITY PLAN
13 C101 SITE LAYOUT AND DIMENSION PLAN
14 C102 SITE DETAILS
15 C103 SIGNING AND STRIPING PLAN - AREA 1
16 CEC101 EROSION CONTROL PLAN
17 SS001 STRUCTURAL GENERAL NOTES
18 SS002 STRUCTURAL GENERAL NOTES
19 SS003 STRUCTURAL TYPICAL CONCRETE DETAILS
20 SS004 STRUCTURAL TYPICAL EXTERIOR METAL STUD DETAILS
21 SS005 STRUCTURAL TYPICAL INTERIOR METAL STUD DETAILS
22 SS006 STRUCTURAL TYPICAL METAL STUD DETAILS
23 SS007 STRUCTURAL TYPICAL METAL STUD DETAILS
24 SS101 STRUCTURAL FOUNDATION PLAN
25 SS102 STRUCTURAL 2ND FLOOR FRAMING PLAN
26 SS103 STRUCTURAL ROOF FRAMING PLAN
27 SS301 STRUCTURAL SECTIONS
28 SS302 STRUCTURAL SECTIONS
29 SS303 STRUCTURAL SECTIONS
30 SS304 STRUCTURAL SECTIONS
31 SS401 STRUCTURAL ELEVATIONS
32 SS402 STRUCTURAL SPECIAL CONCENTRIC BRACED FRAME
DETAILS
33 SS403 STRUCTURAL SPECIAL CONCENTRIC BRACED FRAME
DETAILS
34 SS501 STRUCTURAL TYPICAL STEEL DETAILS
35 SS502 STRUCTURAL TYPICAL STEEL DETAILS
36 SS503 STRUCTURAL TYPICAL STEEL DETAILS
37 SS504 STRUCTURAL TYPICAL METAL DECK DETAILS
38 SS505 STRUCTURAL TYPICAL METAL DECK DETAILS
39 SS506 STRUCTURAL ELEVATOR AND MISC DETAILS
40 A001 ARCHITECTURAL GENERAL NOTES, LEGEND AND
ABBRREVIATIONS
41 AS101 ARCHITECTURAL SITE PLAN
42 AE101 ARCHITECTURAL FIRST FLOOR PLAN
43 AE101-1 ARCHITECTURAL FIRST FLOOR ENLARGED PLAN - NORTH
44 AE101-2 ARCHITECTURAL FIRST FLOOR ENLARGED PLAN - SOUTH
45 AE102 ARCHITECTURAL SECOND FLOOR PLAN
46 AE102-1 ARCHITECTURAL SECOND FLOOR ENLARGED PLAN - NORTH
47 AE102-2 ARCHITECTURAL SECOND FLOOR ENLARGED PLAN - SOUTH
48 AE103 ARCHITECTURAL REFLECTED CEILING PLANS
49 AE104 ARCHITECTURAL ROOF PLAN
50 AE105 ARCHITECTURAL FINISH PLANS
51 AE106 ARCHITECTURAL SIGNAGE PLAN
52 AE201 ARCHITECTURAL EXTERIOR ELEVATIONS
53 AE301 ARCHITECTURAL BUILDING SECTIONS
54 AE302 ARCHITECTURAL EXTERIOR WALL SECTIONS
55 AE303 ARCHITECTURAL INTERIOR WALL SECTIONS
56 AE401 ARCHITECTURAL TOILET ACCESSIBILITY AND ACCESSORIES
57 AE402 ARCHITECTURAL LARGE SCALE TOILET PLANS AND INTERIOR
ELEVATIONS
58 AE403 ARCHITECTURAL STAIR S2 PLANS
59 AE404 ARCHITECTURAL STAIR S1 PLANS
60 AE405 ARCHITECTURAL ELEVATOR SECTION
61 AE406 ARCHITECTURAL LARGE SCALE ROOM DATA PLANS
62 AE501 ARCHITECTURAL DETAILS
63 AE502 ARCHITECTURAL DETAILS
64 AE503 ARCHITECTURAL DETAILS
65 AE504 ARCHITECTURAL DETAILS
66 AE505 ARCHITECTURAL DETAILS
67 AE506 ARCHITECTURAL DETAILS
68 AE507 ARCHITECTURAL DETAILS
69 AE508 ARCHITECTURAL DETAILS
70 AE509 ARCHITECTURAL DETAILS
71 AE601 ARCHITECTURAL DOOR AND GLAZING SCHEDULES
72 AE602 ARCHITECTURAL FINISH SCHEDULES
73 AE603 ARCHITECTURAL INTERIOR ELEVATIONS
74 AE604 ARCHITECTURAL INTERIOR ELEVATIONS
75 AC101 FIRST FLOOR ACCESS CONTROL & CCTV PLAN
76 AC102 SECOND FLOOR ACCESS CONTROL & CCTV PLAN
77 FA-101 FIRST FLOOR FIRE ALARM PLAN
78 FA-102 SECOND FLOOR & ROOF FIRE ALARM PLAN
79 FP-101 FIRST FLOOR FIRE SPRINKLER PLAN
80 FP-102 SECOND FLOOR FIRE SPRINKLER PLAN
SCHEMATIC DESIGN 08/29/2016
DESIGN DEVELOPMENT 11/14/2016
85% SUBMITTAL 05/17/2017
UNSTAMPED FINAL SUBMITTAL 09/19/2017
FINAL STAMPED SUBMITTAL 02/12/2018
F
A
D
I E
T D
S T N
U
E T
M
AP
R
E NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R
F S
F
A
D
I
E
T
D S T
N U
E T
M
AP
R
E NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R F
S
F.E.C.F.E.C.
F.E.C.
F .E
.C
F.E.C.
F .E
.C
F.E.C.
F.E.C.
NEW DERMATOLOGY OUTPATIENT
SERVICES BUILDING
PROJECT NO. : 612-501
VA MATHER NORTHERN CALIFORNIA HEALTHCARE SYSTEM
MATHER, CALIFORNIA
APPROVALS
Kevin C. Maxson PE Chief, E&FMS
Rivkah R. Isseroff, M.D.
Chief, Dermatology Service
David Siegel, M.D.
Chief, Medical Service
Dr. Dawn Erckenbrack, Associate Director Sacramento Valley Division
Margo Duckett, RN MSN, NEA-BC Chief Nurse, NCHCS
William Cahill, M.D.
Chief of Staff
David Stockwell, MHA Director
0.9122.1367 5
A
B
C
D
C4
D1
3.1
A.3
A.7
B.3
S T
A
IR
81 SF
ELEVATOR
E1
801 SF
WAITING
1A01
210 SF
RECEPTION
1A03
36 SF
H.A.C.
1AC2A
179 SF
HALL
1AC1
58 SF
PUBLIC
TOILET
1AC1A
59 SF
PUBLIC
TOILET
1AC1B
34 SF
ELEVATOR
CONTROL
1A01A56 SF
STAFF
1A02D
63 SF
STAFF
1A02C
354 SF
STAFF
1AC2B
1193 SF
OPEN OFFICE
1A02
75 SF
SHOWER
1A13A
63 SF
PATIENT
TOILET
1AC2C
174 SF
PHOTO
1A13
102 SF
OFFICE
1A02A
170 SF
LASER
1A12
100 SF
I.T.
1A16
108 SF
MULTI
PURPOSE
1A02B
225 SF
ELECTRICAL
1A15
710 SF
MECHANICAL
1A14
123 SF
EXAM
ROOM
1A11
124 SF
EXAM
ROOM
1A10
124 SF
EXAM
ROOM
1A09
124 SF
EXAM
ROOM
1A08
124 SF
EXAM
ROOM
1A07
122 SF
EXAM
ROOM
1A06
125 SF
EXAM
ROOM
1A05
126 SF
EXAM
ROOM
1A04
213 SF
STAIR 2
S2
847 SF
CORRIDOR
1AC2
0.9122.1367 5
A
B
C
D
C4
D1
3.1
A.3
A.7
B.3
175 SF
GEN
PROCEDURE
2A13
81 SF
DIRTY
2AC2B
120 SF
PROCEDURE
PREP
2A09
103 SF
OFFICE
2A05A
99 SF
MULTI
PURPOSE
2A05B
67 SF
PATIENT
TOILET
2AC2C
73 SF
ELECTRICAL
2AC1E
240 SF
PROCEDURE
WAITING
2A01
188 SF
MEN'S
TOILET
2AC1A
183 SF
WOMEN'S
TOILET
2AC1B
293 SF
STAFF
2AC2D
172 SF
DERM LAB
2A12
174 SF
GEN
PROCEDURE
2A11
370 SF
IT STORAGE
2A06
101 SF
I.T.
2A08
316 SF
IT OPEN
OFFICE
2A05
262 SF
CONFERENCE
2A04
214 SF
LOUNGE
2A03
370 SF
CONFERENCE
2A02
631 SF
CORRIDOR
2AC2
101 SF
SHAFT
175 SF
GEN
PROCEDURE
2A10
1078 SF
CORRIDOR
2AC1
19 SF
TANK STO.
2AC2A80 SF
CLEAN
SUPPLY
2AC2E
49 SF
HAC
2AC1D
14,884 SF
APPROVED BUILDING AREA
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/19
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
Dwg. of02/12/2018
VA MEDICAL CENTER, MATHER, CA 95655
644K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
3/13/2018 9:55:45 AMH:\PROJECTS\VA MEDICAL CENTERS\MATHER - DERMATOLOGY - 10TH SUBMITTAL_vball314.rvt
NEW DERMATOLOGY
OUTPATIENT SERVICES
BUILDING
E. MITCH
GI100-1
APPROVALS
J. ALFARO
612-501
E. MITCH
2 151
SCALE: NTSGI100-1
1 FIRST FLOOR PLAN
SCALE: NTSGI100-1
2 SECOND FLOOR PLAN
GROSS AREA TABLE
LEVEL AREA AREA TYPE
FIRST FLOOR 7698 SF Gross Building Area
SECOND FLOOR 6413 SF Gross Building Area
GRAND TOTAL 14110 SF
D
Y H
S
S
S S
S
S
S
S S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
V
S
91.64DI
91.49
91.87
92.45
92.91
90.23
92.42
MH
R
IM
9.
B
UR
IED
IN
V.
.6 0-
95 95
91 91
93 93
3 9
O2 LINES
O2
O2
O
O2
GAS REGULATOR
STATION
A B A N D O N E D
IN
P
LA
C E
G
"G
"G
3" G
3" G
3" G
3"G 3"G 3"G 3"G
4"G4"G 4"G
4"D
6"D
6"D
"R W D
6"
RW
D
4"D
17"AC
15"D
10"MU
13"MU
11"MU
12"MU
NORTH
12"FIR
9"F
10"EU
MTEU
28"D
5"D
7"MU
ssmh
SDMH
SDMH
sign fc l ip of g u tte r u asp h alt lip of gu tter cb cb
14" sycamore
5" oak alt lan d sca p in g con c strip tru nc ated do m es cb i sca pin g
6"oak
14"tree
4"oak fh
BLDG 807
BLDG 806
BLDG 805
BL
DG
BL
DG
A
BL
DG
T alt c on c e lec pa ne ls s mo kin g sh elt er wood deck
4" fire
5"oak
4"oak
4"tree
4"tree
4"tree
4"tree
4"tree
4"tree
4"tree
4"tree 5"tree
6"tree
8"tree
10"oak f c retainin g w a ll cb fh cb tru n cated do m e (typ) conc conc deck ra m p c on c la nd sc ap in g
"c on c
BL
DG
B wood deck
5"tree is s pb la nd sc ap in g w a lk w ay ssm h sdmh sdmh lip of gutter fc fc conc walk d i cb lan d sca ping c on c b ui ld in g co nc re te w a lkw a y lan d sca ping con crete w alkw ay lan d sca ping ba ck o f co nc rete w a lk w a y
BLDG T803
BL
DG
sca pin g asphalt alt a sp ha lt a sp ha lt a sp ha lt a sp ha lt a sp ha lt i el ec c ha rgin g s ta ti on
BL
DG
a sp ha lt u fa ce of c u rb li p of g ut te r f ac e of cu rb lip u fa ce of c u rb top of c urb c on c c on c s pe ed b um p di p b cb m h s dm h d i ir rig p b te l p b
3-e lec p b a sp ha lt a s p h a lt a sp ha lt a sp ha lt li p of g ut te r f ac e of cu rb ep
2 ' r oc k s wa le di di conc asphalt ir rig p b ir rig p b ir rig p b e lec p b p b
HO
SP
ITA
L
WA
Y
S O U T H
W H
IT
E
R O C K
R O A D isla n d ro u nd a b out irr p b con c irrpb irrpb d i sd mh cb con c walkway fh
(e) parking lot lan ds ca pesid ew alk wm irrpb
4"oak
30"tree
4"tree
4"tree
15"rdwd
18"rdwd
6"tree
12"red
12"tree
8"oak
10"oak 10"oak
12"oak
4"tree
16"tree elec va ult fh ssmh
PE
TE
R A M
CC
U
EN
B
LV
D
B L A
IS
D E L L
B L V D
HOSPITAL WAY
H O S P
IT
A L
W A Y
H O
SP
IT
AL
W
AY
AREA 3
AREA 2
A R
E A
PROJECT DESCRIPTION SUMMARY
THIS PROJECT CONSISTS OF BUILDING A NEW DERMATOLOGY OUTPATIENT
SERVICES FACILITY ON THE VA MATHER HOSPITAL CAMPUS (AREA 1), AND
REMOVING AND REPLACING MODULAR BUILDINGS ON THE EAST END OF
CAMPUS (AREAS 2 AND 3) WITH SITE IMPROVEMENTS AS SHOWN ON THE
DRAWINGS.
AREA 1 DEMOLISH EXISTING PARKING LOT AND BUILD A 2-
STORY DERMATOLOGY CLINIC BUILDING AND SITE
IMPROVEMENTS AS SHOWN.
AREA 2 REMOVE MODULAR BUILDINGS, RELOCATE SMOKING
SHELTER, AND REPLACE WITH REFURBISHED PARKING
AREA AND OTHER SITE IMPROVEMENTS AS SHOWN.
AREA 3 REMOVE MODULAR BUILDINGS AND REPLACE WITH
PAVED DRIVEWAY AND OTHER SITE IMPROVEMENTS
AS SHOWN.
SUMMARY OF WORK
BUILDING TITLE SHALL BE DERMATOLOGY OUTPATIENT SERVICE,
BUILDING 644. THE SITE IS LOCATED AT THE VA MATHER CAMPUS, 10535
HOSPITAL WAY, MATHER, CALIFORNIA 95655. THE LOCATION OF THE
BUILDING DESIGN SHALL BE ON THE WEST SIDE OF THE CAMPUS JUST
ACROSS FROM BUILDING 646, AND WILL INCLUDE THE DEMOLITION OF
PARKING SPOTS FOR THE CONSTRUCTION OF THE NEW BUILDING.
SPECIFICATIONS SHALL GOVERN THE DRAWINGS LANGUAGE. THE
BUILDING DESIGN SHALL INCLUDE A NEW 14,100 SQUARE FEET, 2
STORY OUTPATIENT DERMATOLOGY SERVICE BUILDING. THE DURATION
FOR CONSTRUCTION IS 500 DAYS. BUILDINGS OCCUPANCY WILL BE
B/NEW BUSINESS AND THE BUILDING TYPE WILL BE II B/ II (000).
COORDINATION WITH THE LOCAL UTILITY COMPANY SMUD IS REQUIRED
AND MUST BE COMPLETED BY THE CONTRACTOR.
PRELIMINARY WORK COMMON TO ALL AREAS
PRIOR TO DEMOLITION CONTRACTOR SHALL CONDUCT A SITE
WALKTHROUGH WITH THE VA TO IDENTIFY AND DOCUMENT ANY ITEMS
TO BE STORED, SALVAGED, AND/OR REUSED BY THE VA.
CONTRACTOR IS RESPONSIBLE FOR PROTECTING, STORING, AND
DELIVERING SUCH ITEMS WHERE INSTRUCTED BY THE VA.
BID DEDUCT NO. 1: DELETE ALL WORK ASSOCIATED WITH BUILDING A
PARKING LOT IN SITE AREA 2.
BID DEDUCT NO. 2: DELETE ALL WORK ASSOCIATED WITH DEMOLITION OF
MODULAR BUILDINGS AND RELOCATION OF SMOKING SHELTER IN SITE
AREA 2.
BID DEDUCT NO. 3: DELETE ALL WORK ASSOCIATED WITH BUILDING A
NEW PAVED DRIVEWAY IN SITE AREA 3.
BID DEDUCT NO. 4: DELETE ALL WORK ASSOCIATED WITH DEMOLITION OF
MODULAR BUILDINGS IN SITE AREA 3.
BID DEDUCT NO. 5: DELETE ALL ROOF EQUIPMENT SCREENS AND
ASSOCIATED STRUCTURAL SUPPORTS.
BID DEDUCT NO. 6: DELETE ALL WORK ASSOCIATED WITH INDEPENDENT
THIRD PARTY COMMISSIONING.
BID DEDUCT NO. 7: DELETE ALL INTERIOR SIGNAGE.
BID DEDUCT NO. 8: DELETE CMU WALL IN ITS ENTIRETY AND REPLACE
WITH ENGINEERED 10 FOOT HIGH CHAIN LINK FENCE MOUNTED ON
CONCRETE FOOTINGS. THE (2) CHAIN LINK GATES SHOWN ON THE
DRAWINGS SHALL REMAIN.
BID DEDUCT NO. 9: DELETE PORTION OF BUILDING ON SECOND FLOOR
CONSISTING OF ROOMS 2A05, 2A05A, 2A05B, 2A06, 2AC2D, AND 2AC2E AND
REPLACE WITH ROOF DECK INSULATION, EPDM ROOFING, AND DRAINS
SURROUNDED BY 4 FT. HIGH PARAPET (ELECTRICAL ROOM 2AC1A, IT
ROOM 2A08 TO REMAIN). PROVIDE EXTERIOR WALL AND 3 FOOT WIDE BY
7 FOOT HIGH INSULATED METAL DOOR AT END OF CORRIDOR 2AC1
(BETWEEN CONFERENCE ROOM 2A04 AND H.A.C. 2AC1D). PROVIDE ROOF
WALKWAY PADS CONNECTING CORRIDOR 2AC1 WITH EXTERIOR STAIR 1.
AT EXTERIOR SIDE OF REMAINING ROOMS, PROVIDE ALUMINUM
COMPOSITE WALL PANEL CONSTRUCTION TO MATCH ADJACENT.
BID DEDUCT NO. 10: DELETE ALL WORK ASSOCIATED WITH EXTERIOR
ALUMINUM SUN SHADES AND ASSOCIATED STRUCTURAL SUPPORTS.
BID DEDUCT NO. 11: DELETE SECOND FLOOR DRINKING FOUNTAIN AND
PROVIDE PLUMBING STUB-OUT INSIDE WALL WITH FLUSH-MOUNTED
ACCESS PANEL.
BID DEDUCT NO. 12: DELETE ALL SINKS FROM EXAM ROOMS AND PROVIDE
ONLY PLUMBING STUBOUTS.
BID DEDUCT NO. 13: DELETE ALL ROLLER SHADES AND ROLLER
LIGHTPROOF SHADES.
BID DEDUCTS
THE WORK INCLUDES, BUT IS NOT LIMITED TO, SITE WORK DEMOLITION,
MODULAR BUILDING DEMOLITION, SITE IMPROVEMENTS, SITE UTILITIES,
CONCRETE FOUNDATIONS, STEEL BUILDING STRUCTURAL FRAMING,
EXTERIOR ENVELOPE SYSTEMS, PREFABRICATED STEEL STAIRS,
ELEVATOR SYSTEM, INTERIOR NON-COMBUSTIBLE CONSTRUCTION,
FINISHES, AND ALL OTHER ASSOCIATED CIVIL, MECHANICAL, PLUMBING,
ELECTRICAL, FIRE PROTECTION, AND TELECOMMUNICATION WORK AS
SHOWN ON THE DRAWINGS AND AS SPECIFIED FOR A NEW
DERMATOLOGY OUT PATIENT SERVICES BUILDING INCLUDING REMOVAL
OF EXISTING MODULAR BUILDINGS.
0.9122.1367 5
A A
B
C C
D D
C4
D1
3.1
A.3
A.7
B.3
316 SF
IT OPEN
OFFICE
2A05
101 SF
I.T.
2A08
73 SF
ELECTRICAL
2AC1E
103 SF
OFFICE
2A05A
262 SF
CONFERENCE
2A04
99 SF
MULTI
PURPOSE
2A05B
214 SF
LOUNGE
2A03
370 SF
CONFERENCE
2A02
240 SF
PROCEDURE
WAITING
2A01
120 SF
PROCEDURE
PREP
2A09
188 SF
MEN'S
TOILET
2AC1A
183 SF
WOMEN'S
TOILET
2AC1B
101 SF
SHAFT
81 SF
DIRTY
2AC2B
631 SF
CORRIDOR
2AC2
49 SF
HAC
2AC1D
67 SF
PATIENT
TOILET
2AC2C
370 SF
IT STORAGE
2A06
80 SF
CLEAN
SUPPLY
2AC2E
293 SF
STAFF
2AC2D 175 SF
GEN
PROCEDURE
2A13
172 SF
DERM LAB
2A12
174 SF
GEN
PROCEDURE
2A11
175 SF
GEN
PROCEDURE
2A10
631 SF
CORRIDOR
2AC2
1078 SF
CORRIDOR
= BID DEDUCT NO. 9 AREA
DEDUCT NO 9 SHEET NOTES
SHADED AREA INDICATES SECOND FLOOR SPACES TO BE
DELETED. REPLACE WITH EPDM ROOFING MEMBRANE SYSTEM.
ROOF DRAIN.
48" HIGH PARAPET.
NEW EXTERIOR 3'-0" x 7'-0" DOOR.
ROOF WALKWAY PADS.
NEW EXTERIOR WALL WITH ALUMINUM COMPOSITE WALL
FINISH SYSTEM.
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/19
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
Dwg. of02/12/2018
VA MEDICAL CENTER, MATHER, CA 95655
644K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
"FULLY SPRINKLERED"
3/13/2018 9:55:48 AMH:\PROJECTS\VA MEDICAL CENTERS\MATHER - DERMATOLOGY - 10TH SUBMITTAL_vball314.rvt
NEW DERMATOLOGY
OUTPATIENT SERVICES
BUILDING
D. DIMAT
GI101
PROJECT AREAS BID DEDUCTS
J. ALFARO
612-501
D. DIMAT
3 151
NOT TO SCALEGI101
1 PROJECT AREAS
NORTH
PROJECT
NORTH
3/32" = 1'-0"GI101
3 BID DEDUCT NO.9 (SECOND FLOOR)
GENERAL NOTES
ABBREVIATIONS/DEFINITIONS
CO CONTRACTING OFFICER
COR/COTR CONTRACTING OFFICER'S (TECHNICAL) REPRESENTATIVE
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
GOVERNMENT THE TERM GOVERNMENT SHALL MEAN DEPARTMENT OF VETERANS AFFAIRS
EXISTING HAZARDOUS MATERIALS
IF THE CONTRACTOR ENCOUNTERS ANY UNKNOWN OR SUSPECTED HAZARDOUS MATERIAL, NOT SPECIFICALLY ADDRESSED IN SAID DOCUMENTS, HE SHALL IMMEDIATELY STOP WORK AND ADVISE THE C.O. FOR ACTION.
THE ARCHITECT/ENGINEER AND HIS/HER CONSULTANTS SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY, PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY FORM AT THE PROJECT SITE. THIS INCLUDES BUT IS NOT LIMITED TO, ASBESTOS, ASBESTOS PRODUCTS, POLYCHLORINATE BIPHENYL (PCB) OR OTHER TOXIC SUBSTANCES.
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY APPROVALS AND PERMITS REQUIRED FROM
REGULATING AGENCIES BEFORE STARTING ANY WORK INCLUDING SMUD PERMITS.
SUBJECT TO MINOR EXCEPTIONS, GENERALLY THE ITEMS SHOWN IN BOLD LINES ARE NEW AND ITEMS SHOWN IN
GRAYSCALE ARE EXISTING.
THE WORK ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO CONVEY THE SCOPE OF WORK, INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT AND FINAL LAYOUT. THE DRAWINGS ARE GENERIC IN NATURE AND ARE INTENDED TO BE SUPPORTED BY SPECIFIC MANUFACTURER AND/OR FABRICATORS SHOP DRAWINGS AND SIMILAR
DETAILS TO DETERMINE EXACT SPACING AND/OR INSTALLATION REQUIREMENTS.
IF ANY PART OF THE DRAWINGS OR SPECIFICATIONS CONTRADICT THE MANUFACTURER'S RECOMMENDATIONS, APPLICATION OR INSTALLATION INSTRUCTIONS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, ADVISE THE
CONTRACTING OFFICER AND RECEIVE CLEAR, WRITTEN, DIRECTION BEFORE PROCEEDING.
DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. IF ANY DISCREPANCIES OR OMISSIONS IN THE DIMENSIONS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY. ANY WORK DONE WITHOUT PROPER NOTIFICATION BEING GIVEN TO THE
CONTRACTING OFFICER IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
PRIOR TO DEMOLITION, CONTRACTOR SHALL VERIFY ALL DIMENSIONS, EXISTING CONDITIONS AND LOCATION OF NEW CONSTRUCTION WITH EXISTING UTILITIES, MECHANICAL AND ELECTRICAL EQUIPMENT AND EXISTING CONSTRUCTION.
FIELD INVESTIGATION PERFORMED DURING THE DESIGN STAGE IS LIMITED TO WHAT CAN BE REASONABLY SEEN AND DOCUMENTED WHILE THE SITE IS OPERATIONAL AND OCCUPIED BY PERSONNEL, EQUIPMENT AND FURNITURE. AS SUCH, THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING A THOROUGH REVIEW AND VALIDATING ALL FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR SHALL REPORT ANY PROBLEMS/CONFLICTS TO THE CONTRACTING OFFICER WITHIN TWO (2) DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH ARE NOT BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER ARE TO BE MADE BY THE
CONTRACTOR AT NO ADDITIONAL COST TO GOVERNMENT.
DRAWINGS SHOWN ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND ENSURE SHOP DRAWINGS ARE PROVIDED BEFORE DETAILING COMPLETE UTILITY LAYOUT AND INSTALLATION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ROUTE NEW CONDUITS, DUCTS, PIPING AND SIMILAR LINES TO AVOID POTENTIAL INTERFERENCES, AND WHERE THIS CANNOT BE ACCOMPLISHED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE, REROUTE, ADJUST REINSTALL THE INTERFERENCE SUCH THAT IT NO LONGER POSES A PROBLEM. THESE ITEMS
ARE TO BE ADDRESSED AND CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES TO AVOID POTENTIAL CONFLICTS.
FINAL LOCATION OF MECHANICAL AND ELECTRICAL EQUIPMENT SUCH AS PANELBOARDS, METERS, FLUES, VENTS, ETC., SHALL BE APPROVED BY THE GOVERNMENT.
EACH SUBCONTRACTOR IS CONSIDERED TO BE A SPECIALIST IN HIS RESPECTIVE FIELD AND SHALL, PRIOR TO SUBMISSION OF BID OR PERFORMANCE OF WORK, NOTIFY THE CONTRACTOR AND THE CONTRACTING OFFICER, IN WRITING, OF ANY WORK CALLED FOR IN THE DRAWINGS OR SPECIFICATIONS THAT CANNOT BE FULLY GUARANTEED.
THE CONTRACTOR WARRANTS ALL WORK TO BE PERFORMED AND ALL MATERIALS TO BE FURNISHED UNDER THISCONTRACT AGAINST DEFECTS IN WORKMANSHIP FOR A PERIOD OF NOT LESS THAN 1 YEAR FROM THE DATE OF FINAL ACCEPTANCE. UPON WRITTEN NOTICE OF ANY DEFECT IN MATERIALS OR WORKMANSHIP, THE CONTRACTOR SHALL, AT THE OPTION OF THE GOVERNMENT, REPAIR OR REPLACE SAID DEFECT WITHOUT COST TO THE GOVERNMENT.
ALL MATERIALS SHALL CONFORM TO THE "BUY AMERICAN ACT".
ALL CONSTRUCTION WORK, ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, ETC. SHALL CONFORM TO THE MOST CURRENT ISSUE OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), THE INTERNATIONAL BUILDING CODE, VA CRITERIA AND ANY APPLICABLE LOCAL, STATE AND FEDERAL CODES AND GUIDELINES. SHOULD THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE CONFLICT WITH THE REQUIREMENTS OF THE NATIONAL FIRE PROTECTION
ASSOCIATION (NFPA), THEN THE MORE STRINGENT BETWEEN THE TWO SHALL GOVERN.
IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR WORKING CONDITIONS AT THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORK HOURS. CONTRACTOR SHALL CONFORM TO ALL SAFETY REGULATIONS ENFORCED AT THE TIME OF CONSTRUCTION. JOB SITE SAFETY IS STRICTLY THE RESPONSIBILITY OF THE CONTRACTOR, AND NOT THE
ARCHITECT/ENGINEER OR THE GOVERNMENT.
THE CONTRACTOR SHALL PROVIDE U.L. RATED PORTABLE FIRE EXTINGUISHERS, TYPE 24.10.B.C ON SITE AND IN A LOCATION
APPROVED BY THE GOVERNMENT.
THE CONTRACTOR SHALL MAINTAIN THE CONSTRUCTION AREA AND ALL ADJACENT AFFECTED AREAS, IN A CLEAN AND ORDERLY MANNER THROUGHOUT THE COURSE OF CONSTRUCTION. DO NOT BLOCK ENTRANCES, EXITS, LOBBIES, CORRIDORS, ETC.
THE CONTRACTOR SHALL REMOVE ALL DEBRIS ON A DAILY BASIS IN ACCORDANCE WITH VA AND EPA REGULATIONS.
DEBRIS SHALL BE TRANSPORTED ON COVERED CARTS TO THE APPROVED DISPOSAL AREA AS DIRECTED BY THE CONTRACTING OFFICER. THE CONSTRUCTION AREA, AND ALL ADJACENT AREAS, SHALL BE CLEAN AND FREE OF DEBRIS AT
THE END OF EACH DAY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL LEFT-OVER MATERIALS, DEBRIS, TOOLS AND EQUIPMENT INVOLVED IN HIS OPERATIONS AT THE CONCLUSION OF THE PROJECT. ALL PROJECT AREAS AND SURROUNDING AREAS
AFFECTED BY CONSTRUCTION SHALL BE LEFT CLEAN AND IN PERFECT CONDITION.
THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO ENSURE THAT ALL PROPERTIES, EQUIPMENT AND DEVICES AT THE PROJECT SITE ARE PROTECTED DURING THE CONSTRUCTION PERIOD. ANY DAMAGES TO EXISTING CONSTRUCTION, LANDSCAPING, EQUIPMENT AND DEVICES SHALL BE REPAIRED AND RESTORED TO A CONDITION EQUAL TO THAT EXISTING AT THE COMMENCEMENT OF THE WORK. THE CONTRACTOR SHALL RESTORE ANY DAMAGE AT HIS OWN EXPENSE. THE CONTRACTOR SHALL SUBMIT THE PROCEDURE FOR CONSTRUCTION AND DEMOLITION PRIOR TO
COMMENCING WORK.
ALL FINISH WORK, EITHER NEW OR EXISTING, WHICH IS DAMAGED OR STAINED AS A RESULT OF CONSTRUCTION ACTIVITIES, SHALL BE REPAIRED OR REPLACED AS NECESSARY AT NO ADDITIONAL COST TO GOVERNMENT.
ALL SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF IMPERFECTIONS AND IN PROPER CONDITION TO RECEIVE THE FINISH AS SPECIFIED. IN AREAS WHERE A FINISH IS NOT SPECIFIED, THEY SHALL MATCH ADJACENT MATERIAL IN
CONSTRUCTION, COLOR, TEXTURE AND MANUFACTURER.
WORK SHALL NOT BE PERFORMED WHEN WEATHER CONDITIONS MAY CREATE HAZARDOUS WORKING CONDITIONS OR
LEAD TO FAILURE IN WORKMANSHIP.
ANY ROOF, WALL OR OTHER OPENINGS MADE DURING CONSTRUCTION SHALL BE SEALED AND PROTECTED FROM RAIN, MOISTURE, WIND, DUST AND OTHER OUTSIDE ELEMENTS.
AN APPROPRIATELY QUALIFIED REPRESENTATIVE OF THE CONTRACTOR SHALL BE ON SITE TO SUPERVISE AND COORDINATE CONSTRUCTION AT ALL TIMES WHILE WORK IS IN PROGRESS. SUCH PERSON SHALL BE RESPONSIBLE FOR OSHA COMPLIANCE AND JOB SITE SAFETY. JOB SITE SAFETY IS STRICTLY THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
THE GOVERNMENT, ARCHITECTS AND ENGINEERS ARE NOT RESPONSIBLE FOR ANY ASPECT OF JOB SITE SAFETY.
FIRE PROOFING
CONTRACTOR SHALL PROVIDE FIRE PROOFING WHERE INDICATED AND AS REQUIRED IN ACCORDANCE WITH SPECIFICATIONS. QUALITY CONTROL, INSPECTIONS AND WORKMANSHIP IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY OBSERVATIONS MADE BY THE GOVERNMENT OR ARCHITECT/ENGINEER DURING THE COURSE OF CONSTRUCTION ARE FOR THE BENEFIT OF THE GOVERNMENT AND DO NOT ALLEVIATE THE CONTRACTOR OF THIS RESPONSIBILITY.
THE CONTRACTOR SHALL NOT STORE ANY CHEMICALS ON THE SITE OR WITHIN THE CONFINES OF THE BUILDING
IF THE CONTRACTOR ENCOUNTERS ANY UNKNOWN SUBSTANCE OR MATERIAL THAT MAY BE SUSPECTED HAZARDOUS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK AND NOTIFY THE CONTRACTING OFFICER.
ASBESTOS CONTAINING MATERIALS ARE NOT PERMITTED.
CONTRACTOR SHALL MAINTAIN AND KEEP THE EXISTING FIRE ACCESS LANE AND PEDESTRIAN ACCESS AND EXIT
PATHS CLEAR AT ALL TIMES.
THE VA RESERVES THE RIGHT TO REQUIRE SOME WORK TO BE DONE AFTER NORMAL WORKING HOURS, ON HOLIDAYS AND/OR WEEKENDS. THIS INCLUDES ANY WORK WHICH COULD POTENTIALLY BLOCK ACCESS TO THE FACILITY OR CAUSE DISRUPTION TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THE WORK WILL HAVE TO BE CAREFULLY PLANNED AND PHASED FOR MINIMAL DISRUPTION TO MEDICAL CENTER ACTIVITIES. ANY WORK AFTER HOURS MUST BE CAREFULLY COORDINATED WITH, AND APPROVED BY THE GOVERNMENT, A MINIMUM OF THREE
WEEKS IN ADVANCE.
CONTRACTOR SHALL DEVELOP AND SUBMIT A DETAILED PHASING PLAN INDICATING THE SEQUENCE OF WORK, THE POTENTIAL UTILITY CUTOVERS OR OUTAGES, AND SPECIFICALLY LIST ANY POTENTIAL DISRUPTIONS TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THIS PLAN SHALL BE SUBMITTED AND APPROVED PRIOR TO MOBILIZING ON
THE SITE.
ALL UTILITY OUTAGES MUST OCCUR AFTER HOURS OR ON WEEKENDS UNDER NO CIRCUMSTANCES CAN THERE BE UTILITY OUTAGES,INCLUDING BRIEF CUTOVERS, ANYWHERE ON THE CAMPUS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE GOVERNMENT. THE CONTRACTOR SHALL PLAN AND FORECAST UPCOMING WORK WHICH MAY DISRUPT NORMAL OPERATIONS OR INTERFERE WITH STAFF OR PATIENTS AND IDENTIFY THESE IN THE PHASING PLAN, AS WELL AS REPORT THESE IN THE WEEKLY MEETINGS. IT MAY BE NECESSARY TO POSTPONE OR RESCHEDULE WORK TO ACCOMMODATE THE NEEDS OF THE MEDICAL CENTER. ALL SUCH TIME SHALL BE INCLUDED IN THE BASE BID AND
WILL NOT BE BILLABLE TO THE GOVERNMENT.
CONTRACTOR SHALL SUBMIT TO THE GOVERNMENT, FOR APPROVAL, THE LOCATION FOR LOADING AND UNLOADING MATERIALS. CONTRACTOR IS ADVISED THAT THERE WILL BE TIME RESTRICTIONS ASSOCIATED WITH SUCH ACTIVITIES
AND SHALL TAKE THIS INTO CONSIDERATION WHEN PREPARING THE PHASING PLAN.
CONTRACTOR SHALL PROVIDE SEISMIC ANCHORING AND/OR BRACING OF ALL CONSTRUCTION, WHETHER OR NOT SPECIFICALLY STATED ON THE DRAWINGS OR SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, WALLS, PARTITIONS, CASEWORK, FIXTURES, CEILING SUSPENDED ITEMS, OVERHEAD DUCTWORK, EQUIPMENT, PLUMBING AND ELECTRICAL PIPES AND RACEWAYS, AND FIRE PROTECTION SYSTEMS PER SPECIFICATION SECTION 130541 AND AS SHOWN ON THE
PLANS AND/OR SPECIFIED BY EACH RESPECTIVE DISCIPLINE.
WHERE EXTERIOR WORK OCCURS, THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE CONTRACTING OFFICER THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL
BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE.
CONTRACTOR SHALL PROVIDE ALL SAFETY AND CAUTION SIGNAGE TO REDIRECT PEDESTRIAN TRAFFIC AND/OR ALERT THEM TO POTENTIAL CONSTRUCTION ACTIVITIES AND HAZARDS. SAFE AND ACCESSIBLE PEDESTRIAN ROUTES SHALL BE MAINTAINED AT ALL TIMES. PROVIDE SIGNAGE IN ACCORDANCE WITH OSHA STANDARD SPECIFICATION FOR ACCIDENT PREVENTION SIGNS AND TAGS 1910.145. PRIOR TO DEMOLITION CONTRACTOR SHALL PROVIDE A TEMPORARY SIGNAGE PLAN FOR VA APPROVAL INDICATING SIGN LANGUAGE AND LOCATIONS. CONTRACTOR SHALL
MAINTAIN AND REPLACE DAMAGED SIGNS FOR THE DURATION OF CONSTRUCTION.
FOR VA-PROVIDED EQUIPMENT TO BE INSTALLED BY THE CONTRACTOR (SHOWN AS "VC" ON THE PLANS OR SCHEDULES), CONTRACTOR SHALL DISCONNECT, REMOVE AND RELOCATE SUCH EQUIPMENT AND SHALL BE RESPONSIBLE FOR RE-CONNECTING AND TESTING PROPER OPERATION (PER MANUFACTURER'S INSTRUCTIONS) OF
SUCH EQUIPMENT PRIOR TO TURNING OVER SUCH EQUIPMENT TO THE VA.
FOR UTILITY INTERRUPTIONS OF LESS THAN 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, TEN (10) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. FOR UTILITY INTERRUPTIONS EXCEEDING 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, TEN (10) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF
SUCH INTERRUPTION.
CONSTRUCTION IS TAKING PLACE NEAR AN EXISTING OCCUPIED FACILITY. AS SUCH, DEMOLITION OR CONSTRUCTION THAT PRODUCES EXCESSIVE (60 DB OR GREATER) NOISE OR VIBRATION SHALL BE PERFORMED AT TIMES COORDINATED AND APPROVED BY THE COTR. CONTRACTOR IS ADVISED THAT WORK MAY BE STOPPED OR DELAYED AT ANY TIME AT THE DISCRETION OF THE COTR SHOULD CONSTRUCTION ACTIVITIES CAUSE ANY DISTURBANCE OR
INTERFERENCE WITH PATIENT CARE.
THE CEILING ACCESS PANELS SHOWN ON DRAWINGS ARE FOR MAJOR MECHANICAL EQUIPMENT ACCESS ONLY.
ADDITIONAL ACCESS PANELS (NOT SHOWN) WILL BE REQUIRED FOR MAINTENANCE, PLUMBING, ELECTRICAL AND FIRE PROTECTION. CONTRACTOR SHALL PROVIDE ADDITIONAL ACCESS PANELS REQUIRED FOR THE ABOVE SPECIALTIES AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR SHALL COORDINATE WITH EACH SPECIALTY TRADE AND LOCATE ADDITIONAL ACCESS PANELS FOR REVIEW AND APPROVAL BY THE VA PRIOR TO FRAMING THE CEILING.
SHORING, BRACING AND PROTECTION OF EXISTING STRUCTURE AND EARTHWORK IS THE CONTRACTORS RESPONSIBILITY. PROVIDE ADEQUATE SHORING OF ANY EXISTING CONDITIONS OR CONDITIONS CAUSED BY CONSTRUCTION RELATED ACTIVITIES, AS NECESSARY TO PROTECT PERSONS AND STRUCTURE FROM POTENTIAL FALLING STRUCTURE, EQUIPMENT OR COLLAPSE OF EARTHWORK. AS A MINIMUM, FOR ANY EARTHWORK RESULTING IN TRENCHES OR EXCAVATIONS EXCEEDING THREE FEET (3') IN DEPTH, THE CONTRACTOR SHALL RETAIN THE SERVICES OF A LICENSED STRUCTURAL ENGINEER TO PROVIDE INSTRUCTIONS, FOR VA APPROVAL, ON THE METHODS TO BE USED FOR SHORING. ANY OVERHEAD STRUCTURE, EQUIPMENT OR SIMILARLY HEAVY CONDITION TO REMAIN, SHALL BE PROPERLY SHORED WITH INPUT FROM A LICENSED STRUCTURAL ENGINEER, AS REQUIRED, TO ENSURE THE
PERSONAL SAFETY AND PROTECTION OF REMAINING STRUCTURE.
THESE DOCUMENTS ARE NOT INTENDED TO SHOW EVERY EXISTING CONDITION OR ITEM. CONTRACTOR SHALL NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF SUCH ITEMS, AND
HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT.
NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF SUCH
ITEMS, AND HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT.
BEFORE LAYING OUT DUCTWORK, PIPING, CONDUITS, FIXTURES, REGISTERS AND/OR OTHER UTILITIES ABOVE CEILING, COORDINATE CEILING SUSPENSION SYSTEM SUPPORT LOCATIONS TO AVOID CONFLICTS WITH EXISTING OR NEW CONSTRUCTION. WHERE INTERFERENCE WITH CEILING SUPPORTS CANNOT BE AVOIDED, CONTRACTOR SHALL PROVIDE ALTERNATE CODE-COMPLIANT SUSPENSION SYSTEM AND LAYOUT AT NO EXTRA COST TO THE VA.
26.
WATER TIGHT FACILITY REQUIREMENTS
THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE CONTRACTING OFFICER THAT THE BUILDING DOES NOT LEAK. ANY
DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE.
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/19
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
Dwg. of02/12/2018
VA MEDICAL CENTER, MATHER, CA 95655
644K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
3/13/2018 9:55:49 AMH:\PROJECTS\VA MEDICAL CENTERS\MATHER - DERMATOLOGY - 10TH SUBMITTAL_vball314.rvt
NEW DERMATOLOGY
OUTPATIENT SERVICES
BUILDING
D.DIMAT
GI200
GENERAL PROJECT NOTES
J.ALFARO
612-501
D.DIMAT
4 151
F.E.C.F.E.C.
F.E.C.
UP
UP
F .E
.C
F.E.C.
F .E
.C
UP
UP
F.E.C.
F.E.C.
22222222
(M
AX D
IA
G D
IS
TANCE)
117' - 2 7/8"
59'-0" M
IN DISTANCE PER IB
C SECTION 1007.1.1 AND NFPA 7.5.1.3)
101' - 8 11/16"
MECH YARD
S T
A
IR
1 50
FUTURE
CORRIDOR
225 SF
ELECTRICAL
1A15
710 SF
MECHANICAL
1A14
108 SF
MULTI
PURPOSE
1A02B
100 SF
I.T.
1A16
102 SF
OFFICE
1A02A
170 SF
LASER
1A12
123 SF
EXAM
ROOM
1A11
124 SF
EXAM
ROOM
1A10
124 SF
EXAM
ROOM
1A09
124 SF
EXAM
ROOM
1A08
124 SF
EXAM
ROOM
1A07
122 SF
EXAM
ROOM
1A06
125 SF
EXAM
ROOM
1A05
126 SF
EXAM
ROOM
1A04 213 SF
STAIR 2
S2
36 SF
H.A.C.
1AC2A
210 SF
RECEPTION
1A03
179 SF
HALL
1AC1
58 SF
PUBLIC
TOILET
1AC1A
59 SF
PUBLIC
TOILET
1AC1B
354 SF
STAFF
1AC2B
56 SF
STAFF
1A02D
63 SF
PATIENT
TOILET
1AC2C
75 SF
SHOWER
1A13A
174 SF
PHOTO
1A13
63 SF
STAFF
1A02C
81 SF
ELEVATOR
E1
1193 SF
OPEN OFFICE
1A02
34 SF
ELEVATOR
CONTROL
1A01A
801 SF
WAITING
1A01
847 SF
CORRIDOR
1AC2
0.9122.1367 5
A
B
C
D
C4
D1
3.1
A.3
A.7
B.3
' A
L L O
W E
D P
E R
I B
C T
A B
L E
.2
( < 300'-0" MAX TRAVEL DISTANCE PER NFPA SECTION 7.6)
18 14
50S T
A
IR
FUTURE
CORRIDOR
370 SF
CONFERENCE
2A02
214 SF
LOUNGE
2A03
262 SF
CONFERENCE
2A04
103 SF
OFFICE
2A05A
99 SF
MULTI
PURPOSE
2A05B
316 SF
IT OPEN
OFFICE
2A05
101 SF
I.T.
2A08
73 SF
ELECTRICAL
2AC1E
370 SF
IT STORAGE
2A06
293 SF
STAFF
2AC2D
175 SF
GEN
PROCEDURE
2A13
172 SF
DERM LAB
2A12
174 SF
GEN
PROCEDURE
2A11
175 SF
GEN
PROCEDURE
2A10
631 SF
CORRIDOR
2AC2
67 SF
PATIENT
TOILET
2AC2C
81 SF
DIRTY
2AC2B
101 SF
SHAFT
183 SF
WOMEN'S
TOILET
2AC1B
188 SF
MEN'S
TOILET
2AC1A
240 SF
PROCEDURE
WAITING
2A01
120 SF
PROCEDURE
PREP
2A09
1078 SF
CORRIDOR
2AC1
80 SF
CLEAN
SUPPLY
2AC2E
0.9122.1367 5
A
B
C
D
C4
D1
3.1
A.3
A.7
B.3 (M
AX D
IA
G. D
IS
TANCE)
115' -
7 1/4"(>64,-0" MIN DISTANCE PER IBC SECTION 1007.1.1 AND NFPA 7.5.1.3)
108' - 1"
110' - 8"
( < 300' ALLOWED PER IBC TABLE 1017.2 )
( < 300'-0" MAX TRAVEL DISTANCE PER NFPA SECTION 7.6)
19 SF
TANK STO.
2AC2A
49 SF
HAC
2AC1D
BUILDING CODE DATA
BUILDING OCCUPANCY
CONSTRUCTION TYPE
BUILDING GROSS AREA
( STAIR AND ELEVATOR AREA
INCLUDED ON FIRST FLOOR ONLY)
FIRST FLOOR
SECOND FLOOR
TOTAL OCCUPANCY LOAD
FIRE SPRINKLER THROUGHOUT
ACCESSIBLE ENTRY ROUTE
ACCESSIBLE MEANS OF EGRESS
2ND FLOOR ACCESS VIA ELEVATOR
MIN. EGRESS DOORS CAPACITY (EA.)
STAIRWAY CAPACITY (EA.)
B/NEW BUSINESS
II B/ II (000)
14,105 SF
YES
YES
YES
YES
CODE REFERENCES
LEGEND
EXIT SIGN
EGRESS ROUTE
OCCUPANT LOAD
EXIT LOAD
1 HOUR FIRE RATED WALL
2 HOUR FIRE RATED WALL
FIRE EXTINGUISHER CABINET
MAXIMUM TRAVEL DISTANCE
FEC
THE FOLLOWING CODES ARE USED FOR THE BASIS
OF DESIGN FOR THIS PROJECT BUT ARE NOT
LIMITED TO:
· IBC
· NFPA 101
· NEC
· NFPA 80
· NFPA 110
· IMC
· IPC
· VA MANUAL H-18-8
· ASCE-7
NOTE: THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING AND USING THE MOST CURRENT
APPLICABLE CODE EDITION.
GENERAL NOTES:
1. OCCUPANCY CLASSIFICATION BASED ON PATIENTS NOT RECEIVING
TREATMENT OR ANESTHESIA THAT WOULD RENDER THEM INCAPABLE OF
TAKING ACTION FOR SELF PRESERVATION UNDER EMERGENCY
CONDITIONS WITHOUT THE ASSISTANCE OF OTHERS.
2. AUTOMATIC ENTRY SLIDING DOORS SHALL HAVE MANUAL EMERGENCY
BREAKOUT FUNCTION SWINGING IN THE DIRECTION OF EGRESS IN THE
EVENT OF POWER FAILURE (REF. IBC SECTION 1010.1.4.2)
3. EAST EXTERIOR WALL FIRE RATING AND OPENING PROTECTION BASED ON
ASSUMED PROPERTY LINE SHOWN ON SHEET AS101 (REF. IBC TABLE 602)
4. FIRE ALARM AUDIBLE SIGNAL USES SPEAKERS PER VA DIRECTION.
5. FIRE SPRINKLER PIPING SHALL HAVE ONE TEST-AND DRAIN VALVE PER
ZONE.
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/19
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
Dwg. of02/12/2018
VA MEDICAL CENTER, MATHER, CA 95655
644K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
"FULLY SPRINKLERED"
3/13/2018 9:55:38 AMH:\PROJECTS\VA MEDICAL CENTERS\MATHER - DERMATOLOGY - 10TH SUBMITTAL_vball314.rvt
NEW DERMATOLOGY
OUTPATIENT SERVICES
BUILDING
D.DIMAT
GC001
EXIT PLAN AND CODE DATA
J.ALFARO
612-501
D.DIMAT
5 151
1/8" = 1'-0"GC001
1 FIRST FLOOR EXIT PLAN
1/8" = 1'-0"GC001
2 SECOND FLOOR EXIT PLAN
PROJECT
NORTH
PROJECT
NORTH
NET AREA TABLE
LEVEL NAME AREA
SECOND FLOOR CLEAN SUPPLY 80 SF
SECOND FLOOR CONFERENCE 262 SF
SECOND FLOOR CONFERENCE 370 SF
SECOND FLOOR CORRIDOR 631 SF
SECOND FLOOR CORRIDOR 1078 SF
SECOND FLOOR DERM LAB 172 SF
SECOND FLOOR DIRTY 81 SF
SECOND FLOOR ELECTRICAL 73 SF
SECOND FLOOR GEN PROCEDURE 175 SF
SECOND FLOOR GEN PROCEDURE 174 SF
SECOND FLOOR GEN PROCEDURE 175 SF
SECOND FLOOR HAC 49 SF
SECOND FLOOR I.T. 101 SF
SECOND FLOOR IT OPEN OFFICE 316 SF
SECOND FLOOR IT STORAGE 370 SF
SECOND FLOOR LOUNGE 214 SF
SECOND FLOOR MEN'S TOILET 188 SF
SECOND FLOOR MULTI PURPOSE 99 SF
SECOND FLOOR OFFICE 103 SF
SECOND FLOOR PATIENT TOILET 67 SF
SECOND FLOOR PROCEDURE PREP 120 SF
SECOND FLOOR PROCEDURE WAITING 240 SF
SECOND FLOOR SHAFT 101 SF
SECOND FLOOR STAFF 293 SF
SECOND FLOOR TANK STO. 19 SF
SECOND FLOOR WOMEN'S TOILET 183 SF
SECOND FLOOR 5734 SF
GRAND TOTAL 12638 SF
NET AREA TABLE
LEVEL NAME AREA
FIRST FLOOR CORRIDOR 847 SF
FIRST FLOOR ELECTRICAL 225 SF
FIRST FLOOR ELEVATOR 81 SF
FIRST FLOOR ELEVATOR CONTROL 34 SF
FIRST FLOOR EXAM ROOM 123 SF
FIRST FLOOR EXAM ROOM 124 SF
FIRST FLOOR EXAM ROOM 125 SF
FIRST FLOOR EXAM ROOM 124 SF
FIRST FLOOR EXAM ROOM 122 SF
FIRST FLOOR EXAM ROOM 124 SF
FIRST FLOOR EXAM ROOM 124 SF
FIRST FLOOR EXAM ROOM 126 SF
FIRST FLOOR H.A.C. 36 SF
FIRST FLOOR HALL 179 SF
FIRST FLOOR I.T. 100 SF
FIRST FLOOR LASER 170 SF
FIRST FLOOR MECHANICAL 710 SF
FIRST FLOOR MULTI PURPOSE 108 SF
FIRST FLOOR OFFICE 102 SF
FIRST FLOOR OPEN OFFICE 1193 SF
FIRST FLOOR PATIENT TOILET 63 SF
FIRST FLOOR PHOTO 174 SF
FIRST FLOOR PUBLIC TOILET 58 SF
FIRST FLOOR PUBLIC TOILET 59 SF
FIRST FLOOR RECEPTION 210 SF
FIRST FLOOR SHOWER 75 SF
FIRST FLOOR STAFF 63 SF
FIRST FLOOR STAFF 56 SF
FIRST FLOOR STAFF 354 SF
FIRST FLOOR STAIR 2 213 SF
FIRST FLOOR WAITING 801 SF
FIRST FLOOR 6905 SF
GENERAL NOTES
ALL DIMENSIONS ARE TO FACE OF STUD, OR CENTERLINE OF COLUMN U.O.N.
ALL DIMENSIONS INDICATED AS "CLEAR" ARE TO FACE OF FINISH.
WHEN LAYING OUT WALLS, CONTRACTOR SHALL MAKE FIELD MEASUREMENTS TO ENSURE ALL REQUIRED CLEAR DIMENSIONS ARE MAINTAINED AS INDICATED. PENETRATIONS ARE NOT PERMITTED THROUGH STRUCTURAL MEMBERS.
WHERE FULL HEIGHT WALLS ARE SHOWN, FRAME WALL TO FORM A TIGHT FIT AROUND DUCT OR PIPING; SEAL ALL GAPS
AND CAULK ALL AROUND TO KEEP INTEGRITY OF WALL RATING AS APPLICABLE.
WHERE DUCTS OR PIPING PENETRATE FULL HEIGHT WALLS, EXTEND FRAMING & GYPSUM BOARD FINISH TO FORM A TIGHT FIT AROUND SUCH PIPING OR DUCTS; SEAL ALL GAPS AND FIRE CAULK ALL AROUND TO KEEP INTEGRITY OF FIRE
RATING AS APPLICABLE.
IN ALL AREAS WITH DEPRESSED SLAB, FILL AS APPLICABLE WITH CONCRETE TOPPING OR MORTAR BED PRIOR TO INSTALLING FLOOR FINISH. CONTRACTOR SHALL PATCH, LEVEL, AND PREPARE FLOOR SLAB TO RECEIVE NEW FLOORING. THIS INCLUDES REMOVAL OF BUMPS AND OTHER IMPERFECTION AND FILLING ANY VOIDS OR NON- LEVEL
SURFACES WHERE THEY OCCUR. INSTALL NEW FLOORING FLUSH WITH ADJACENT FLOORING.
TERMINATE FLOORING EDGE BELOW DOOR THRESHOLD OR CENTERED BELOW DOOR AS APPLICABLE U.O.N.
WHEN WALL SEGMENT IS AN EXTENSION OF A WALL OR FURRING, STUDS SHALL MATCH AND BOTH FINISHES SHALL
ALIGN. CONTRACTOR SHALL FIELD COORDINATE CORRECT PLACEMENT OF STUDS.
ALL METAL STUD WALLS SHALL BE 6" U.O.N. ALL WALL FURRING SHALL BE 2-1/2" METAL STUDS. MIN. U.O.N.
CONTRACTOR IS TO PROVIDE ALL ITEMS SHOWN ON THE PLANS UNLESS INDICATED AS (V C) OR (V V).
ALL SOUND RATED PARTITIONS SHALL HAVE A MIN. STC RATING OF 40 U.O.N. SOME FIRE RATED PARTITIONS ARE ALSO
SOUND RATED WHERE INDICATED.
AT FIRE RATED ROOMS, EXTEND COLUMN FURRING TO UNDERSIDE OF FLOOR/ROOF DECK OR BEAMS AS APPLICABLE.
FOR TYP. EXTERIOR WALL DIMENSIONING RELATIVE TO GRID LINES SEE DETAIL 2/AE101.
PROVIDE REQUIRED BLOCKING AND BACKING FOR ALL WALL MOUNTED ITEMS, FIXTURES, ACCESSORIES, CASEWORK
AND EQUIPMENT.
ALL EXTERIOR WALLS SHALL HAVE A VAPOR BARRIER ON THE INSIDE FACE OF STUD U.O.N.
BEFORE LAYING OUT DUCTWORK, PIPING, CONDUITS AND / OR UTILITIES ABOVE CEILING, COORDINATE CEILING
SUSPENSION SYSTEM SUPPORT LOCATIONS TO AVOID CONFLICTS.
WHERE INTERFERENCE WITH CEILING SUPPORTS CANNOT BE AVOIDED, CONTRACTOR SHALL PROVIDE ALTERNATE SUSPENSION SYSTEM IN COMPLIANCE WITH APPLICABLE CODES AND STANDARDS AT NO EXTRA COST TO THE
GOVERNMENT.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
ARCHITECTURAL ABBREVIATIONS
AND
ANGLE
AT
PARALLEL
PLATE
DIAMETER OR ROUND CHANNEL
CHANNEL
POUND OR NUMBER
ANCHOR BOLT
ASPHALT CONCRETE
AREA DRAIN
ADDENDUM
ABOVE FINISH FLOOR
AGGREGATE
ALUMINUM
ALTERNATE
ANODIZED
APPROXIMATE
ARCHITECT (URAL)
ASBESTOS
ACOUSTIC TILE CEILING
AUTOMATIC
AVERAGE
AIR RESISTANT BARRIER
BARIATRIC
BOARD
BELOW
BETWEEN
BITUMINOUS
BUILDING
BLOCK
BLOCKING
BEAM
BOTTOM
BOTH SIDES
BASEMENT
BOTH WAYS
CEMENT PLASTER
CABINET
CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CAST IN PLACE
CONTROL JOINT
CLOSET
CEILING
CAULK(ING)
CLEAR (ANCE)
CONCRETE MASONRY WALL
CONTRACTING OFFICER
COLUMN
COMPOSITE
CONCRETE
CONNECT (ION)
CONSTRUCTION
CONTINUOUS/CONTINUED
CONTRACTING OFFICER'S
REPRESENTATIVE
CORRIDOR
CONTRACTING OFFICER'S
TECHNICAL
REPRESENTATIVE
CERAMIC TILE
COLD WATER
CORNER GUARD
DOUBLE
DEMOLISH/DEMOLITION
DETAIL
DIAMETER
DIAGONAL
DIMENSION
DIVISION
DEAD LOAD
DOWN
DITTO
DOOR
DOWNSPOUT
DRAWING
EXISTING
EACH
ELEVATION
ELECTRIC (AL)
ELEVATOR
ENGINEER
ETHYLENE PROPYLENE
DIENE MONOMER
EQUAL
ESTIMATE
ETCETERA
EXPANSION
EXTERIOR
EXTERIOR INSULATION FINISH
SYSTEM
EXPANDED POLYSTYRENE
COMPOSITE
CUT TO FIT
ABBREVIATIONS DESCRIPTION
L ll
PL
ø
AB
AC
AD
ADD
AFF
AGG
ALUM
ALT
ANOD
APPROX
ARCH
ASB
ATC
AUTO
AVG
ARB
BARI
BD
BEL
BET
BITUM
BLDG
BLK
BLKG
BM
BOT
BS
BSMT
BW
CPL
CAB
CC
CIP
CJ
CLO
CLG
CLK(G)
CLR
CMU
CO
COL
COMP
CONC
CONN
CONST
CONT
COR
CORR
COTR
CT
CW
C.G.
DBL
DEMO
DET
DIA
DIAG
DIM
DIV
DL
DN
DO
DR
DS
DWG
(E)
EA
EL
ELEC
ELEV
ENGR
EPDM
EQ
EST
ETC
EXP
EXT
EIFS
EPS
COMP
CTF
ABBREVIATIONS DESCRIPTION ABBREVIATIONS DESCRIPTION
FLUSH
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FINISHED FLOOR
FULL HEIGHT PARTITION
FINISH (ED)
FIXTURE
FLASHING (ED)
FLEXIBLE
FLUORESCENT
FLOOR (ING)
FOUNDATION
FACE OF CONCRETE
FACE OF FINISH
FACE OF MASONRY
FACE OF STUD
FACE OF WALL
FIRE PROTECTION
FIBERGLASS REINFORCED
PANEL
FOOT/FEET
FIRE TREATED
FOOTING
FIRE TREATED WOOD
FURRING/FURRED
GAGE, GAUGE
GALVANIZED
GENERAL CONTRACT (OR)
GALVANIZED IRON
GRID LINE
GLAZING (ED)
GROUND
GALVANIZED SHEET METAL
GYPSUM WALL BOARD
GYPSUM
GLASS MAT FACE (D)
HOSE BIBB
HOLLOW CORE
HEAVY DUTY
HANDICAP
HEADER
HARDWARE
HARDWOOD
HOLLOW METAL
HORIZONTAL
HOUR
HEIGHT
HOT WATER
HEATING, VENTILATION AND
AIR CONDITIONING
INSIDE DIAMETER
INSULATED GLAZING UNIT
INCLUDE (D) (ING)
INSULATE (D) (ION)
INTERIOR
INVERT
JUNCTION BOX
JOIST
JOINT
LAMINATE
LAVATORY
LAMINAR AIRFLOW WORK BENCH
POUNDS
LIVE LOAD
LIGHT
MASONRY
MAXIMUM
MACHINE BOLT
MEDICINE CABINET
MECHANIC (AL)
MEDIUM
MEMBRANE
MANUFACTURER
MINIMUM
MISCELLANEOUS
MICROLAM
METAL
MULLION
METAL PAN FLASHING
NEW
NORTH
NOT APPLICABLE
NOT IN CONTRACT
NATIONAL FIRE PROTECTION
ASSOCIATION
NUMBER
NOMINAL
NOISE REDUCTION COEFFICIENT
NOT TO SCALE
OVER
OVERALL
OR APPROVED EQUAL
OBSCURE
ON CENTER (S)
OUTSIDE DIAMETER
OPPOSITE HAND
OPPOSITE
OPENING
OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
F
FD
FEC
FF
FHP
FIN
FIX
FLASH
FLEX
FLUOR
FLR
FNDN
FOC
FOF
FOM
FOS
FOW
FP
FRP
FT
F.T.
FTG
FTP
FURR
GA
GALV
GC
GI
GL
GLZ
GRND
GSM
GWB
GYP
GMF
HB
HC
HD
HDCP
HDR
HDW
HDWD
H.M.
HORIZ
HR
HT
HW
HVAC
ID
IGU
INCL
INSUL
INT
INV
JB
JST
JT
LAM
LAV
LAFW
LBS
LL
LT
MAS
MAX
MB
MC
MECH
MED
MEMBR
MFR
MIN
MISC
M-LAM
MTL
MUL
MPF
(N) N
NA
NIC
NFPA
NO.
NOM.
NRC
NTS
O/
OA
OAE
OBS
OC
OD
OH
OPP
OPNG
OSHA
PANORAMIC
PARALLEL
POLYCHLORINATE BIPHENYL
POUNDS PER CUBIC FOOT
PEDESTAL
PERFORATE (D)
PERPENDICULAR
PLATE
PLASTIC LAMINATE
POUNDS PER LINEAR FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE
PRESSURE TREATED
POLYVINYL CHLORIDE
PANEL (S)
PLYWOOD
RADIUS
RESILIENT CHANNEL
ROOF DRAIN
REDWOOD
REINFORCE (D) (ING)
RECEIVING
REFRIGERATOR
REMOVE (D)
REQUIRED
RETAINED
REVISION (S)/REVISED
ROOM
ROUGH OPENING
RAINWATER LEADER
SOLID SURFACE
SOUND ATTENUATION BLANKET
SOLID CORE
SEE CIVIL DRAWINGS
SCHEDULE
SMOKE DETECTOR
STORM DRAIN
SECTION
SUSTAINABLE ENERGY
DEVELOPMENTS
SELECT
SHEATHING
SIMILAR
SKYLIGHT
SEE MECHANICAL DRAWINGS
SPRAY ON FIRE PROOFING
SPECIFICATION (S)
SEE PLUMBING DRAWINGS
SEALANT AND BACK-UP ROD
SUPPLY/PROCESSING SERVICES
SQUARE
STAINLESS STEEL
SEE STRUCTURAL DRAWINGS
STREET
STEEL
STORAGE
STRUCTURAL
SUSPENDED
SYMMETRY (ICAL)
TREAD
TOP & BOTTOM
TELEPHONE
TEMPERED
TOP OF
TOP OF CONCRETE
TOP OF DECK
TOP OF GRADE
TOP OF PARAPET
TOP PLATE
TONGUE AND GROOVE
THICK (NESS)
THERMOPLASTIC POLYOLEFIN
TOP OF WALL
TELEVISION
TYPICAL
UNDERWRITERS LABORATORY
UNLESS OTHERWISE NOTED
VAPOR RETARDER
VETERAN'S ADMINISTRATION
VETERANS AFFAIRS
VAPOR BARRIER
VA FURNISHED, CONTRACTOR
INSTALLED
VA FURNISHED, VA INSTALLED
VENTILATE (ION)
VERIFY IN FIELD
VERTICAL
VINYL COATED FABRIC WALL
COVERING
VINYL WALL PROTECTION
WATER CLOSET
WOOD
WINDOW
WITH
WATER HEATER
WROUGHT IRON
WINDOW
WITHOUT
WATERPROOF (ED) (ING)
WATER RESISTANT
WATER RESISTANT BARRIER
WEIGHT
PANO
PAR
PCB
PCF
PED
PERF
PERP
PL
P-LAM
PLF
PSI
PT
P.T.
PVC
PNL
PLWD
RAD
RC
RD
RDWD
RE
REC
REF
REM
REQ'D
RET
REV
RM
RO
RWL
S
SAB
SC
SCD
SCHED
SD
SD
SECT
SED
SEL
SHTG
SIM
SKL
SMD
SOFP
SPEC
SPD
S&BR
SPS
SQ
SS
SSD
ST
STL
STOR
STRUCT
SUSP
SYM
T T&B
TELE
TEMP
TO
TOC
TOD
TOG
TOP
TP
T&G
THK
TPO
TW
TV
TYP
UL
UON
VR
VA
VB
VC
V V
VENT
VIF
VERT
VCFW
VWP
WC
WD
WDW
W/
WH
WI
WIN
W/O
WP
WR
WRB
WT
ARCHITECTURAL SYMBOLS
CENTER LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
PROJECT AREA
DEMOLITION LINE
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
MATCHLINE
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR
HIDDEN FEATURES LINE
NEW LINE
PROPERTY LINE
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DETAIL INDICATOR
DETAIL INDICATOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
DIMENSION LINE
DOOR NUMBER
WINDO…