36C25919R0007-0002004.pdf

PDF 18 MB Posted

Attached to
436-113 Renovate Primary Care
Solicitation number
36C25919R0007
Issued by

About this file

36C25919R0007 0002 17.1032-18.07.24 - VA Fort Harrison Bid Submission Set - AF100 -MH604.pdf

View the file

Other files

File Type Posted
36C25919R0007-0008000.docx DOCX document
36C25919R0007-0008001.pdf PDF
36C25919R0007-0007001.pdf PDF
36C25919R0007-0007000.docx DOCX document
36C25919R0007-0006000.docx DOCX document
36C25919R0007-0005000.docx DOCX document
36C25919R0007-0005001.pdf PDF
36C25919R0007-0005003.pdf PDF
36C25919R0007-0005002.pdf PDF
36C25919R0007-0004000.docx DOCX document
36C25919R0007-0003000.docx DOCX document
36C25919R0007-0002002.docx DOCX document
36C25919R0007-0002003.pdf PDF
36C25919R0007-0002000.docx DOCX document
36C25919R0007-0002005.pdf PDF
36C25919R0007-0002001.pdf PDF
36C25919R0007-0001001.pdf PDF
36C25919R0007-0001000.docx DOCX document
36C25919R0007-001.docx DOCX document
36C25919R0007-005.pdf PDF
36C25919R0007-010.docx DOCX document
36C25919R0007-009.docx DOCX document
36C25919R0007-004.pdf PDF
36C25919R0007-008.pdf PDF
36C25919R0007-003.pdf PDF
36C25919R0007-007.pdf PDF
36C25919R0007-006.pdf PDF
36C25919R0007-002.pdf PDF
36C25919R0007_2.docx DOCX document
36C25919R0007-000.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

STAIR 1

C102

B

2A

CRAWL

SPACE

C101

PIT

C103

IN-01.10

FINISHES GENERAL NOTES

WALLS AND INFILL WALL CONSTRUCTION AND FINISHES SHALL BE PROVIDED FROM

WALL CORNER TO WALL CORNER.

REFER TO INTERIOR ELEVATION A400 SERIES FOR ADDITIONAL INFORMATION.

REFER TO FINISH PLANS AF100 SERIES FOR INFORMATION ACCENT PAINT LOCATIONS

AND FLOORING PATTERNS AND FLOORING GRAINS DIRECTION

PROVIDE PT-1 ON WALLS AS FIELD COLOR, REFER TO FINISH SCHEDULE AND FINISH

PLANS FOR ACCENT WALL COLOR DESIGNATIONS.

PROVIDE PT-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-GLOSS

FINISH.

PROVIDE PT-8 ON GYPSUM BOARD CEILINGS AND BULKHEADS.

PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS PANELS,

DUCTS AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS.

PATCH AND/OR REPAIR, FINISH, AND PAINT ALL WALLS IN AREA OF WORK.

REFER TO INTERIOR ELEVATION SHEET AS401 FOR CERAMIC WALL TILE PATTERN.

PAINT WALLS ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.

INSTALL CORNER GUARDS MOUNTED ABOVE RESILIENT BASE.

INSTALL WALL BASE OVER IMPACT RESISTANT WALL PROTECTION.

PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING ACCESSORIES.

EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO MANUFACTURER'S

INSTRUCTIONS.

CONFIRM SIGNAGE MESSAGE, LOCATIONS, AND ROOM NUMBERS WITH COR PRIOR

TO ORDERING.

NOT ALL SIGNAGE MAY BE IN ROOM FINISH SCHEDULE. REFER TO SIGNAGE PLAN FOR

MORE INFORMATION.

ALL SIGNAGE TYPES AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE VA

SIGNAGE AND WAYFINDING GUIDELINES.

ALL METAL DOOR AND WINDOW FRAMES PAINT COLOR PT- 2 .

PROVIDE TRANSITION STRIP TS-1 BETWEEN ALL LVT AND CERAMIC TILE FLOORING.

PROVIDE TRANSITION STRIP TS-2 BETWEEN ALL LVT AND CARPET FLOORING.

PROVIDE TRANSITION STRIP TS-3 BETWEEN ALL SEALED CONCRETE FLOORING.

PROVIDE TRANSITION STRIP TS-4 BETWEEN ALL LVT AND LVT FLOORING.

REFER TO VA SIGNAGE GUIDES FOR MORE INFORMATION AND MOUNTING DETAILS.

ALL METAL HANDRAILS TO BE TRIPLE COATED EPOXY PAINT.

INSTALL BUMPRAILS BR-1 UNDER ALL HANDRAILS.

REFERS TO FINISHES SHEETS AF101 AF102 AF111 AND AF112

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

WFINISHES GENERAL NOTES

A.

B.

REFER TO INTERIOR ELEVATIONS AS401, AS402 AND AS403 SERIES AND FINISH SHEET

AS602 FOR ADDITIONAL NOTES AND FINISH LEGEND.

PROVIDE CERAMIC TILE BACK AND SIDE SPLASH AT ALL HANDWASHING SINKS.

REFER TO ELEVATIONS AND FINISH PLANS.

REFERS TO FINISH PLAN SHEETS AF101 AND AF102

154 A

SADIE

PHARMACY

MED LAB

PROJECT

AREA

N N

KEYPLANPLAN NORTHTRUE NORTH

#WALL FINISH LEGEND

CG

REFERS TO FINISH PLAN SHEETS AF101 AND AF102

TAG

GRT

HR

CT

PT

WP

CORNER GUARD

GROUT

CERAMIC TILE

PAINT

RIGID WALL PROTECTION

WALL GUARD

HAND RAIL

WG

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

g u id o n d e si g n .c o m

\U S

E R

\k h a w ki n s \1

.1

-A

-V A

F o rt

H a rr is o n -P ri m a ry

C a re k h a w ki n s g u id o n d e s ig n .c o m

.r vt

/2

/2

:0

:2

P

M

AF100

CRAWL SPACE FINISH AND

SIGNAGE PLANGUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

APOGEE CONSULTING GROUP

1151 KILDAIRE FARM ROAD, SUITE 120

CARY, NC 27511

TELE: 919-858-7420

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION -

SOUTH ELEVATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/19/2018 LL KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AF100

1 WALL FINISH PLAN - CRAWL SPACE

N

Revisions: Date:

REF.

DN

DN

UP

UP

R E

F

DN

DN

COMPRESSORS

B-12

EMPLOYEE

LOUNGE

B-7

STORAGE

B-6

LOCKERS

B-3

B-1B

B-2

TOILET

B-3A

WOMENS

LOCKER

ROOM

B-8

B-11

B-13

ELEV

GARBAGE

B-10

B-10

VEST

C-3

CORRIDOR

C-2

C-1

CORRIDOR

C-4

B-9

EQUIPMENT

B-5

OFFICE

B4

OFFICE

B7

OFFICE

B6

MALE

B8

FEMALE

B9

SUMP

B16

STORAGE

B15

MECHANICAL

B2

OFFICE

B1

CORRIDOR

B25

MEDICAL

RECORDS

B11

MEDICAL

RECORDS

B10

CLOSET

B5

OFFICE

B3

IRM

B30

MECHANICAL

ROOM

B32

PT WORK

AREA

B310

MEN'S

BATH

B31S

WOMEN'S

BATH

B31R

POOL

THERAPY

B31P

STORAGE

B31J

WORK

ROOM

B31I

OFFICE

B31G

OFFICE

B31D

SPEECH

B31E

TELEMEDICINE

B31H

EXAM

B31N

EXAM

B31M

EXAM

B31L

OT

B31K

WAITING

B31B

RECEPT

B31C

REHABILITATION

SERVICES

B31A

HALLWAY

B31F

MECH

B31Q

STOR.

B31T

WOMEN'S

EXAM

B135

EXAM/CONSULT

B134

EXAM/CONSULT

B133

EXAM/CONSULT

B131

P.

TOILET

B132

P. TOILET

BARIATRIC

B136B

PROCEDURE

ROOM

B136

MED

ROOM

B124

EXAM/CONSULT

B125

EXAM/CONSULT

B126

EXAM/CONSULT

B127

EXAM/CONSULT

B128

EXAM/CONSULT

B129

EXAM/CONSULT

B130

TELE

HEALTH

B146

CLEAN

SUPPLY

B123

ELEC.

B111

SHARED

OFFICE

B108

FAMILY

TOILET

B105

UNISEX

TOILET

B106

WAITING

B100

H.W.

ALCOVE

B143

STAIR 1

B102

ELEV 1

B103

COPIER/FAX

B140

CORRIDOR

B115

ELEC.

B142

CORRIDOR

B116

CRAWL

SPACE

B25

CORRIDOR

B25

MECH

B13

KIOSK

B100E

FIRE

SPRINKLER

B137

AS402

TYP.

AS403

TYP.

ELEV.

KIOSK

B100D

BARIATRIC

TOILET

B104

WORK

ROOM /

PATIENT

COUNSELLING

B117

CG-1

CG-1

CG-1

CG-1CG-1

CG-1CG-1

CG-1CG-1

CG-1CG-1 CG-1CG-1

CG-1

HSK

B112

CG-1

CG-1

DATA

B113

RECEPTION

B101

P.

TOILET

B145

COFFEE

B100C

SHARED

MED

STORAGE

B110

CG-1

SOILED

HOLDING

B121

EQUIP.

STOR.

B122STAFF

TOILET

B120

STAFF

TOILET

B119

LOCKERS

B118

CONFERENCE/

BREAK

B114

EDUCATION

B100B

CG-1CG-1

CG-1

CG-1 CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1 CG-1

HR-1

HR-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CHASE

B117A

CHASE

B104A

RAMP

90' - 0"

HR-1

CG-1

CG-1

LINEN

B141

CORRIDOR

B144

PT-2 PT-3 PT-4 PT-5 PT-2 PT-3

PT-2 PT-5 PT-4

PT-4

PT-3

IN-04.01 IN-04.01 IN-04.01 IN-04.01IN-04.01IN-04.01

IN-04.01 IN-04.01 IN-04.01 IN-04.01 IN-04.01 IN-04.04

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01 IN-09.01

IN-03.01

IN-09.01

IN-04.01

TEAM

WORK

AREA

B139

PT-3

IN-01.26

IN-09.08

HR-1

IN-09.01 IN-09.08F

IN-09.01

IN-09.01

IN-09.01

IN-03.01

IN-04.01

IN

-0

.0

IN

-0

.0

IN

-0

.0

IN

-0 .0

IN-04.01

IN-09.01

IN

-0

.0

IN

-0 .0

IN

-0 .0

IN-03.01

IN-03.01

IN-03.01

IN-03.01 IN-03.01

IN-03.01

CORRIDOR

B138

WG-1

WG-1

WG-1

WG-1

WG-1

WG-1 WG-1 HR-1

WG-1

PT-5

PT-4

VESTIBULE

B100A

CG-1

PT-4

IN-01.05

IN-03.01

CG-1

WG-1

WG-1

WG-1

WG-1

HR-1HR-1 WG-1

CG-1

CG-1

IN-01.02

IN-01.02

IN-04.01

CG-1

CG-1

IN-04.02

IN-04.01

IN-04.02

89' - 0"

IN-01

HR-1WG-1

HR-1

HR-1

WG-1

BR-1

IN-01.26

IN-01.05

IN-15.51 & IN-15.52

AS402

TYP.

AS402

TYP.

AS402

TYP.

AS401

TYP.

WP-1

WP-2

WP-2

WP-2

WP-1

WP-1

WP-2

CG-1

CG-1

IN-01.05

IN-01.02

IN-01.02

IN-01.02

IN-04.01

HR-1

WG-1

WG-1

PT-4

PT-4

PT-2 PT-2 PT-2

CT

IN-04.01 IN-04.01

IN-04.01

SHARED

OFFICE

B107

TELE

HEALTH

B109

154 A

SADIE

PHARMACY

MED LAB

PROJECT

AREA

N N

KEYPLANPLAN NORTHTRUE NORTH

#WALL FINISH LEGEND

CG

REFERS TO FINISH PLAN SHEETS AF101 AND AF102

TAG

GRT

HR

CT

PT

WP

CORNER GUARD

GROUT

CERAMIC TILE

PAINT

RIGID WALL PROTECTION

WALL GUARD

HAND RAIL

WG

FINISHES GENERAL NOTES

WALLS AND INFILL WALL CONSTRUCTION AND FINISHES SHALL BE PROVIDED FROM

WALL CORNER TO WALL CORNER.

REFER TO INTERIOR ELEVATION A400 SERIES FOR ADDITIONAL INFORMATION.

REFER TO FINISH PLANS AF100 SERIES FOR INFORMATION ACCENT PAINT LOCATIONS

AND FLOORING PATTERNS AND FLOORING GRAINS DIRECTION

PROVIDE PT-1 ON WALLS AS FIELD COLOR, REFER TO FINISH SCHEDULE AND FINISH

PLANS FOR ACCENT WALL COLOR DESIGNATIONS.

PROVIDE PT-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-GLOSS

FINISH.

PROVIDE PT-8 ON GYPSUM BOARD CEILINGS AND BULKHEADS.

PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS PANELS,

DUCTS AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS.

PATCH AND/OR REPAIR, FINISH, AND PAINT ALL WALLS IN AREA OF WORK.

REFER TO INTERIOR ELEVATION SHEET AS401 FOR CERAMIC WALL TILE PATTERN.

PAINT WALLS ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.

INSTALL CORNER GUARDS MOUNTED ABOVE RESILIENT BASE.

INSTALL WALL BASE OVER IMPACT RESISTANT WALL PROTECTION.

PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING ACCESSORIES.

EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO MANUFACTURER'S

INSTRUCTIONS.

CONFIRM SIGNAGE MESSAGE, LOCATIONS, AND ROOM NUMBERS WITH COR PRIOR

TO ORDERING.

NOT ALL SIGNAGE MAY BE IN ROOM FINISH SCHEDULE. REFER TO SIGNAGE PLAN FOR

MORE INFORMATION.

ALL SIGNAGE TYPES AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE VA

SIGNAGE AND WAYFINDING GUIDELINES.

ALL METAL DOOR AND WINDOW FRAMES PAINT COLOR PT- 2 .

PROVIDE TRANSITION STRIP TS-1 BETWEEN ALL LVT AND CERAMIC TILE FLOORING.

PROVIDE TRANSITION STRIP TS-2 BETWEEN ALL LVT AND CARPET FLOORING.

PROVIDE TRANSITION STRIP TS-3 BETWEEN ALL SEALED CONCRETE FLOORING.

PROVIDE TRANSITION STRIP TS-4 BETWEEN ALL LVT AND LVT FLOORING.

REFER TO VA SIGNAGE GUIDES FOR MORE INFORMATION AND MOUNTING DETAILS.

ALL METAL HANDRAILS TO BE TRIPLE COATED EPOXY PAINT.

INSTALL BUMPRAILS BR-1 UNDER ALL HANDRAILS.

REFERS TO FINISHES SHEETS AF101 AF102 AF111 AND AF112

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

FINISHES GENERAL NOTES

A.

B.

REFER TO INTERIOR ELEVATIONS AS401, AS402 AND AS403 SERIES AND FINISH SHEET

AS602 FOR ADDITIONAL NOTES AND FINISH LEGEND.

PROVIDE CERAMIC TILE BACK AND SIDE SPLASH AT ALL HANDWASHING SINKS.

REFER TO ELEVATIONS AND FINISH PLANS.

REFERS TO FINISH PLAN SHEETS AF101 AND AF102

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

g u id o n d e si g n .c o m

\U S

E R

\k h a w ki n s \1

.1

-A

-V A

F o rt

H a rr is o n -P ri m a ry

C a re k h a w ki n s g u id o n d e s ig n .c o m

.r vt

/2

/2

:0

:3

P

M

AF101

BASEMENT FINISH AND SIGNAGE

PLANGUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

APOGEE CONSULTING GROUP

1151 KILDAIRE FARM ROAD, SUITE 120

CARY, NC 27511

TELE: 919-858-7420

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION -

SOUTH ELEVATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/19/2018 LL KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AF101

1 WALL FINISH PLAN - BASEMENT

R E

F

STORAGE

OFFICE

DIET

SUPERVISOR

PATIENT

ED

CONFERENCE

A163

PODIATRY

EXAM

A162

EXAM

A161

EXAM

A160

EXAM

A159

CARDIOLOGY

OFFICE

A158

CARDIOLOGY

OFFICE

A157

EKG

OFFICE

A156

EKG

OFFICE

A155

EXAM

A154

PFT

A153 MALE

TOILET

A172

FEMALE

TOILET

A171

ENT

OFFICE

A170

ENT

OFFICE

A169

PROCEDURE

A168

GYN

PROCEDURE

A167

STOR

A166A

PODIATRY

EXAM

A165

ORTHO

EXAM

A180

CHIROPRACTOR

ORTHO

A181

ORTHO

CAST

A179

ORTHO

EXAM

A178

VISITING

SPECIALIST

A177

A176

SPECIALIST

A176

EXAM

A175

EXAM

MINOR

PROCDURE

A183

EYE

EXAM C3

A184

EYE

EXAM C2

B185

TOILET

A166

EYE

EXAM C1

B186

ELEV.

OFFICE

A148

MENS

RESTROOM

A135

TEAM

WORK

AREA

A136

TOILET

A202

RECEPTION

A129

BARIATRIC

TOILET

A104

CORRIDOR

AC111

CORRIDOR

AC112

CORRIDOR

AC114

STORAGE

A142

CHECK IN

-OUT

A141

INTAKE

EVALUTATION

A143

PT WORK

AREA

A145

A146

SOILED

UTILITY

A173

SCHEDULING

A133

B35 B36

B42

B43

101-A

HALL

AC113

REFRIG.

106-N

PROCEDURE

ROOM

A134

WOMEN'S

EXAM

A133

EXAM/CONSULT

A132

EXAM/CONSULT

A131

P. TOILET

A130

EXAM/CONSULT

A129

EXAM/CONSULT

A128

EXAM/CONSULT

A127

EXAM/CONSULT

A126

EXAM/CONSULT

A125

EXAM/CONSULT

A124

EXAM/CONSULT

A123

RECEPTION

A101

WAITING

A100

COFFEE

A100B H.W.

ALCOVE

A140P. TOILET

A142

EQUIP.

STOR.

A120

MED

ROOM

A122

LOCKERS

A116

CLEAN

SUPPLY

A121

WORK

ROOM /

PATIENT

COUNSELLNG

A115

COPIER/FAX

A136A

ELEC.

A109

FAMILY

TOILET

A105

BARIATRIC

TOILET

A104

ELEV.

A103

STAFF

TOILET

A118

STAFF

TOILET

A117

EDUCATION

A141A

CORRIDOOR

A114

STAIR 1

A102

TELEHEALTH

A187

TELEHEALTH

A188

TELEHEALTH

A190

CORRIDOR/WAITING

A137

OFFICE

A192

A150

A151C A151B

OFFICE

A151C

SPEECH

THERAPY

A150D

P. TOILET

A149A

LAB

A149B

P. TOILET

BARIATRIC

A134B

A151

STAIR

CORRIDOR

AC109

CORRIDOR

AC106

STAIR

KIOSK

A100C

KIOSK

A100D

WAITING

A197

AS403

TYP.

AS402

TYP.

AS402

TYP.

AS402

TYP.

AS401

TYP.

AS401

TYP.

UNISEX

TOILET

A106

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1CG-1

CG-1CG-1

CG-1CG-1

CG-1CG-1

CG-1CG-1 CG-1CG-1

CG-1

CG-1 CG-1

CG-1

TELE

HEALTH

A143

DATA

A111

CONFERENCE/

BREAK

A112

SOILED

HOLDING

A119

CG-1

CG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-1

STORAGE

A110

STORAGE

A164

ELEC.

A139

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1 CG-1

HR-1

HR-1

HR-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CHASE

A119A

CHASE

A104A

HSK

STROAGE

A198

HR-1

CG-1

CG-1

HR-1HR-1

HR-2

LINEN

A138

TEAM

WORK

AREA

A136

CORRIDOR

A149

PT-2 PT-3 PT-4 PT-5 PT-2 PT-3

PT-3 PT-2 PT-5 PT-4PT-4

PT-3

CG-1

CG-1

IN-04.01 IN-04.01 IN-04.01 IN-04.01IN-04.01IN-04.01

IN-04.01 IN-04.01 IN-04.01 IN-04.01 IN-04.01 IN-04.01

IN-01.02

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01IN-04.01

IN-04.01 IN-09.01

IN-03.01

IN-09.01

IN-04.04

IN-09.08

IN-09.01 IN-09.08F IN-09.01

IN-09.01

IN-09.01IN-03.01

IN-04.01

IN

-0

.0

IN

-0

.0

IN

-0

.0

IN

-0 .0

IN-04.01

IN-09.01

IN

-0

.0

IN

-0 .0

IN

-0 .0

IN-03.01

IN-03.01

IN-03.01

IN-03.01 IN-03.01

IN-03.01

HR-1

IN-03.01

IN

-0

.0

IN-04.01

IN

-0

.0

IN

-0

.0

IN-09.01

IN-03.01

CORRIDOR/WAITING

A135

CORRIDOR

A141

WG-1

WG-1

WG-1

WG-1

WG-1

CG-1

CG-1

CG-1

CG-1

HR-1

WG-1

WG-1

WG-1

WG-1

WG-1

WG-1

WG-1

HR-1 WG-1

HR-1 WG-1

WG-1

CG-1

WG-1

WG-1

WG-1

HR-1

PT-4

PT-5

CG-1

HR-1 WG-1 WG-1 HR-1

HR-1

WG-1

CG-1

PT-4

CG-1

CG-1

IN-01.02

IN-01.02

CG-1

CG-1

IN-01

IN-04.01

IN-04.02

IN-04.01

IN-04.02

IN-04.02

IN-04.02

IN-04.02

WG-1

HR-1

WG-1

WG-1

HR-1

HR-1

HR-1WG-1

WG-1

HR-1

HR-1

IN-15.51 & IN-15.52

WP-2

CG-1

WP-1

WP-1

WP-2

IN-01.02

IN-04.01

CG-1

HR-1

WG-1

CG-1

IN-04.01

AS401

TYP.

CT

AS402

TYP.

AS402

TYP.

CG-1

CG-1

HR-2

AS901

WP-1

PT-4

PT-4

CG-1

PT-3

SHARED

MEDIA

ROOM

A107

STORAGE

A108

154 A

SADIE

PHARMACY

MED LAB

PROJECT

AREA

N N

KEYPLANPLAN NORTHTRUE NORTH

#WALL FINISH LEGEND

CG

REFERS TO FINISH PLAN SHEETS AF101 AND AF102

TAG

GRT

HR

CT

PT

WP

CORNER GUARD

GROUT

CERAMIC TILE

PAINT

RIGID WALL PROTECTION

WALL GUARD

HAND RAIL

WG

FINISHES GENERAL NOTES

WALLS AND INFILL WALL CONSTRUCTION AND FINISHES SHALL BE PROVIDED FROM

WALL CORNER TO WALL CORNER.

REFER TO INTERIOR ELEVATION A400 SERIES FOR ADDITIONAL INFORMATION.

REFER TO FINISH PLANS AF100 SERIES FOR INFORMATION ACCENT PAINT LOCATIONS

AND FLOORING PATTERNS AND FLOORING GRAINS DIRECTION

PROVIDE PT-1 ON WALLS AS FIELD COLOR, REFER TO FINISH SCHEDULE AND FINISH

PLANS FOR ACCENT WALL COLOR DESIGNATIONS.

PROVIDE PT-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-GLOSS

FINISH.

PROVIDE PT-8 ON GYPSUM BOARD CEILINGS AND BULKHEADS.

PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS PANELS,

DUCTS AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS.

PATCH AND/OR REPAIR, FINISH, AND PAINT ALL WALLS IN AREA OF WORK.

REFER TO INTERIOR ELEVATION SHEET AS401 FOR CERAMIC WALL TILE PATTERN.

PAINT WALLS ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.

INSTALL CORNER GUARDS MOUNTED ABOVE RESILIENT BASE.

INSTALL WALL BASE OVER IMPACT RESISTANT WALL PROTECTION.

PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING ACCESSORIES.

EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO MANUFACTURER'S

INSTRUCTIONS.

CONFIRM SIGNAGE MESSAGE, LOCATIONS, AND ROOM NUMBERS WITH COR PRIOR

TO ORDERING.

NOT ALL SIGNAGE MAY BE IN ROOM FINISH SCHEDULE. REFER TO SIGNAGE PLAN FOR

MORE INFORMATION.

ALL SIGNAGE TYPES AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE VA

SIGNAGE AND WAYFINDING GUIDELINES.

ALL METAL DOOR AND WINDOW FRAMES PAINT COLOR PT- 2 .

PROVIDE TRANSITION STRIP TS-1 BETWEEN ALL LVT AND CERAMIC TILE FLOORING.

PROVIDE TRANSITION STRIP TS-2 BETWEEN ALL LVT AND CARPET FLOORING.

PROVIDE TRANSITION STRIP TS-3 BETWEEN ALL SEALED CONCRETE FLOORING.

PROVIDE TRANSITION STRIP TS-4 BETWEEN ALL LVT AND LVT FLOORING.

REFER TO VA SIGNAGE GUIDES FOR MORE INFORMATION AND MOUNTING DETAILS.

ALL METAL HANDRAILS TO BE TRIPLE COATED EPOXY PAINT.

INSTALL BUMPRAILS BR-1 UNDER ALL HANDRAILS.

REFERS TO FINISHES SHEETS AF101 AF102 AF111 AND AF112

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

FINISHES GENERAL NOTES

A.

B.

REFER TO INTERIOR ELEVATIONS AS401, AS402 AND AS403 SERIES AND FINISH SHEET

AS602 FOR ADDITIONAL NOTES AND FINISH LEGEND.

PROVIDE CERAMIC TILE BACK AND SIDE SPLASH AT ALL HANDWASHING SINKS.

REFER TO ELEVATIONS AND FINISH PLANS.

REFERS TO FINISH PLAN SHEETS AF101 AND AF102

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

g u id o n d e si g n .c o m

\U S

E R

\k h a w ki n s \1

.1

-A

-V A

F o rt

H a rr is o n -P ri m a ry

C a re k h a w ki n s g u id o n d e s ig n .c o m

.r vt

/2

/2

:0

:4

P

M

AF102

FIRST FLOOR FINISH AND SIGNAGE

PLANGUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

APOGEE CONSULTING GROUP

1151 KILDAIRE FARM ROAD, SUITE 120

CARY, NC 27511

TELE: 919-858-7420

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION -

SOUTH ELEVATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/19/2018 LL KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AF102

1 WALL FINISH PLAN - FIRST FLOOR

DN

ELEV.

MACHINE

R103

STAIR

R102

AHU

PENTHOUSE

R104

CONDENSER

B-133

R104

R

R

CHILLER

CHILLER

IN-01.10

FINISHES GENERAL NOTES

WALLS AND INFILL WALL CONSTRUCTION AND FINISHES SHALL BE PROVIDED FROM

WALL CORNER TO WALL CORNER.

REFER TO INTERIOR ELEVATION A400 SERIES FOR ADDITIONAL INFORMATION.

REFER TO FINISH PLANS AF100 SERIES FOR INFORMATION ACCENT PAINT LOCATIONS

AND FLOORING PATTERNS AND FLOORING GRAINS DIRECTION

PROVIDE PT-1 ON WALLS AS FIELD COLOR, REFER TO FINISH SCHEDULE AND FINISH

PLANS FOR ACCENT WALL COLOR DESIGNATIONS.

PROVIDE PT-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-GLOSS

FINISH.

PROVIDE PT-8 ON GYPSUM BOARD CEILINGS AND BULKHEADS.

PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS PANELS,

DUCTS AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS.

PATCH AND/OR REPAIR, FINISH, AND PAINT ALL WALLS IN AREA OF WORK.

REFER TO INTERIOR ELEVATION SHEET AS401 FOR CERAMIC WALL TILE PATTERN.

PAINT WALLS ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.

INSTALL CORNER GUARDS MOUNTED ABOVE RESILIENT BASE.

INSTALL WALL BASE OVER IMPACT RESISTANT WALL PROTECTION.

PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING ACCESSORIES.

EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO MANUFACTURER'S

INSTRUCTIONS.

CONFIRM SIGNAGE MESSAGE, LOCATIONS, AND ROOM NUMBERS WITH COR PRIOR

TO ORDERING.

NOT ALL SIGNAGE MAY BE IN ROOM FINISH SCHEDULE. REFER TO SIGNAGE PLAN FOR

MORE INFORMATION.

ALL SIGNAGE TYPES AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE VA

SIGNAGE AND WAYFINDING GUIDELINES.

ALL METAL DOOR AND WINDOW FRAMES PAINT COLOR PT- 2 .

PROVIDE TRANSITION STRIP TS-1 BETWEEN ALL LVT AND CERAMIC TILE FLOORING.

PROVIDE TRANSITION STRIP TS-2 BETWEEN ALL LVT AND CARPET FLOORING.

PROVIDE TRANSITION STRIP TS-3 BETWEEN ALL SEALED CONCRETE FLOORING.

PROVIDE TRANSITION STRIP TS-4 BETWEEN ALL LVT AND LVT FLOORING.

REFER TO VA SIGNAGE GUIDES FOR MORE INFORMATION AND MOUNTING DETAILS.

ALL METAL HANDRAILS TO BE TRIPLE COATED EPOXY PAINT.

INSTALL BUMPRAILS BR-1 UNDER ALL HANDRAILS.

REFERS TO FINISHES SHEETS AF101 AF102 AF111 AND AF112

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

FINISHES GENERAL NOTES

A.

B.

REFER TO INTERIOR ELEVATIONS AS401, AS402 AND AS403 SERIES AND FINISH SHEET

AS602 FOR ADDITIONAL NOTES AND FINISH LEGEND.

PROVIDE CERAMIC TILE BACK AND SIDE SPLASH AT ALL HANDWASHING SINKS.

REFER TO ELEVATIONS AND FINISH PLANS.

REFERS TO FINISH PLAN SHEETS AF101 AND AF102

154 A

SADIE

PHARMACY

MED LAB

PROJECT

AREA

N N

KEYPLANPLAN NORTHTRUE NORTH

#WALL FINISH LEGEND

CG

REFERS TO FINISH PLAN SHEETS AF101 AND AF102

TAG

GRT

HR

CT

PT

WP

CORNER GUARD

GROUT

CERAMIC TILE

PAINT

RIGID WALL PROTECTION

WALL GUARD

HAND RAIL

WG

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

g u id o n d e si g n .c o m

\U S

E R

\k h a w ki n s \1

.1

-A

-V A

F o rt

H a rr is o n -P ri m a ry

C a re k h a w ki n s g u id o n d e s ig n .c o m

.r vt

/2

/2

:0

:5

P

M

AF103

ROOF FINISH AND SIGNAGE PLAN

GUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

APOGEE CONSULTING GROUP

1151 KILDAIRE FARM ROAD, SUITE 120

CARY, NC 27511

TELE: 919-858-7420

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION -

SOUTH ELEVATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/19/2018 LL KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AF103

1 ROOF PLAN

DN

UP

UP

DN

DN

COMPRESSORS

B-12

EMPLOYEE

LOUNGE

B-7

STORAGE

B-6

LOCKERS

B-3

B-1B

B-2

TOILET

B-3A

WOMENS

LOCKER

ROOM

B-8

B-11

B-13

ELEV

GARBAGE

B-10

B-10

VEST

C-3

CORRIDOR

C-2

C-1

CORRIDOR

C-4

B-9

EQUIPMENT

B-5

OFFICE

B4

OFFICE

B7

OFFICE

B6

MALE

B8

FEMALE

B9

SUMP

B16

STORAGE

B15

MECHANICAL

B2

OFFICE

B1

CORRIDOR

B25

MEDICAL

RECORDS

B11

MEDICAL

RECORDS

B10

CLOSET

B5

OFFICE

B3

IRM

B30

MECHANICAL

ROOM

B32

PT WORK

AREA

B310

MEN'S

BATH

B31S

WOMEN'S

BATH

B31R

POOL

THERAPY

B31P

STORAGE

B31J

WORK

ROOM

B31I

OFFICE

B31G

OFFICE

B31D

SPEECH

B31E

TELEMEDICINE

B31H

EXAM

B31N

EXAM

B31M

EXAM

B31L

OT

B31K

WAITING

B31B

RECEPT

B31C

REHABILITATION

SERVICES

B31A

HALLWAY

B31F

MECH

B31Q

STOR.

B31T

WOMEN'S

EXAM

B135

EXAM/CONSULT

B134

EXAM/CONSULT

B133

EXAM/CONSULT

B131

P.

TOILET

B132

P. TOILET

BARIATRIC

B136B

PROCEDURE

ROOM

B136

MED

ROOM

B124

EXAM/CONSULT

B125

EXAM/CONSULT

B126

EXAM/CONSULT

B127

EXAM/CONSULT

B128

EXAM/CONSULT

B129

EXAM/CONSULT

B130

TELE

HEALTH

B146

CLEAN

SUPPLY

B123

ELEC.

B111

SHARED

OFFICE

B108

FAMILY

TOILET

B105

UNISEX

TOILET

B106

WAITING

B100

H.W.

ALCOVE

B143

STAIR 1

B102

ELEV 1

B103

TEAM

WORK

AREA

B139

COPIER/FAX

B140

CORRIDOR

B115

ELEC.

B142

CORRIDOR

B116

CRAWL

SPACE

B25

CORRIDOR

B25

MECH

B13

KIOSK

B100E

FIRE

SPRINKLER

B137

ELEV.

WORK

ROOM /

PATIENT

COUNSELLING

B117

LVT-2

LVT-2

LVT-2

LVT-3

LVT-1

LVT-1 LVT-1 LVT-1 LVT-1

LVT-1 LVT-1 LVT-1 LVT-1 LVT-1LVT-1

LVT-3

CPT-1

LVT-1

LVT-2

LVT-1

LVT-3

LVT-3

CPT-1

CPT-1

CPT-1

CPT-1

CT-3 CT-3

CT-3

CT-3

CT-3

CT-3

BARIATRIC

TOILET

B104

CT-3 CT-3

HSK

B112

LVT-2

LVT-3

LVT-3

KIOSK

B100D

COFFEE

B100C

DATA

B113

P.

TOILET

B145

RECEPTION

B101

SHARED

MED

STORAGE

B110

STAFF

TOILET

B119

STAFF

TOILET

B120

EQUIP.

STOR.

B122

SOILED

HOLDING

B121

LOCKERS

B118

CONFERENCE/

BREAK

B114

EDUCATION

B100B

VESTIBULE

B100A

CHASE

B104A

CHASE

B117A

90' - 0"

89' - 0"

89' - 0"

SC-1

CORRIDOR

B144

LINEN

B141

CORRIDOR

B138

LVT-2 LVT-2

LVT-2

LVT-2

LVT-2

LVT-2

LVT-2

LVT-2

LVT-3 LVT-3

LVT-3LVT-3

LVT-3

LVT-3

LVT-2

LVT-2LVT-2

LVT-3 LVT-3

LVT-3

SC-1

2'

1'

2'

2' - 9 1/8"

1' - 0"

2' - 0"

1'

/2

1'

1'

/2

1' - 0"

1' - 9 3/8"

LVT-3

2'

/8

1'

2'

/8

SC-1

SC-1

SC-1

ETR

LVT-2SHARED

OFFICE

B107

TELE

HEALTH

B109

CPT-1 CPT-1LVT-1

154 A

SADIE

PHARMACY

MED LAB

PROJECT

AREA

N N

KEYPLANPLAN NORTHTRUE NORTH

#FINISH FLOOR PLAN LEGEND

LVT-1

CT-3

SC-1

REFERS TO FINISH FLOORING PLAN SHEETS AF111 AND AF112

CPT-1

LVT-2

LVT-3

#FLOOR FINISH PLAN NOTES

1.

2.

PROVIDE NEW WALL BASE RB-1 THROUGHOUT CORRIDORS.

FINISH FLOOR TO MATCH EXISTING IN HEIGHT, PATTERN AND MATERIAL. VERIFY

IN FIELD.

REFERS TO FINISH FLOORING PLAN SHEETS AF111 AND AF112

FINISHES GENERAL NOTES

WALLS AND INFILL WALL CONSTRUCTION AND FINISHES SHALL BE PROVIDED FROM

WALL CORNER TO WALL CORNER.

REFER TO INTERIOR ELEVATION A400 SERIES FOR ADDITIONAL INFORMATION.

REFER TO FINISH PLANS AF100 SERIES FOR INFORMATION ACCENT PAINT LOCATIONS

AND FLOORING PATTERNS AND FLOORING GRAINS DIRECTION

PROVIDE PT-1 ON WALLS AS FIELD COLOR, REFER TO FINISH SCHEDULE AND FINISH

PLANS FOR ACCENT WALL COLOR DESIGNATIONS.

PROVIDE PT-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-GLOSS

FINISH.

PROVIDE PT-8 ON GYPSUM BOARD CEILINGS AND BULKHEADS.

PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS PANELS,

DUCTS AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS.

PATCH AND/OR REPAIR, FINISH, AND PAINT ALL WALLS IN AREA OF WORK.

REFER TO INTERIOR ELEVATION SHEET AS401 FOR CERAMIC WALL TILE PATTERN.

PAINT WALLS ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.

INSTALL CORNER GUARDS MOUNTED ABOVE RESILIENT BASE.

INSTALL WALL BASE OVER IMPACT RESISTANT WALL PROTECTION.

PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING ACCESSORIES.

EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO MANUFACTURER'S

INSTRUCTIONS.

CONFIRM SIGNAGE MESSAGE, LOCATIONS, AND ROOM NUMBERS WITH COR PRIOR

TO ORDERING.

NOT ALL SIGNAGE MAY BE IN ROOM FINISH SCHEDULE. REFER TO SIGNAGE PLAN FOR

MORE INFORMATION.

ALL SIGNAGE TYPES AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE VA

SIGNAGE AND WAYFINDING GUIDELINES.

ALL METAL DOOR AND WINDOW FRAMES PAINT COLOR PT- 2 .

PROVIDE TRANSITION STRIP TS-1 BETWEEN ALL LVT AND CERAMIC TILE FLOORING.

PROVIDE TRANSITION STRIP TS-2 BETWEEN ALL LVT AND CARPET FLOORING.

PROVIDE TRANSITION STRIP TS-3 BETWEEN ALL SEALED CONCRETE FLOORING.

PROVIDE TRANSITION STRIP TS-4 BETWEEN ALL LVT AND LVT FLOORING.

REFER TO VA SIGNAGE GUIDES FOR MORE INFORMATION AND MOUNTING DETAILS.

ALL METAL HANDRAILS TO BE TRIPLE COATED EPOXY PAINT.

INSTALL BUMPRAILS BR-1 UNDER ALL HANDRAILS.

REFERS TO FINISHES SHEETS AF101 AF102 AF111 AND AF112

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

1 SOLID SURFACE TRANSITION SHALL HAVE 1/4" RADIUS BULLNOSE EDGES.

2 ALL TRANSITIONS TO BE CENTERED UNDER DOOR LEAF.

TRANSITION LEGEND

LVT FLOORING

REDUCER STRIP

VINYL ADAPTOR STRIP

SOLID SURFACE TRANSITION

STRIP (SS1)

TS1

TS2

TS3

CERAMIC

TILE

GROUT

LVT FLOORING CONCRETE SUBFLOOR

LVT FLOORING

CARPET

TS4

LVT FLOORING

LVT FLOORING

VINYL ADAPTOR STRIP

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

g u id o n d e si g n .c o m

\U S

E R

\k h a w ki n s \1

.1

-A

-V A

F o rt

H a rr is o n -P ri m a ry

C a re k h a w ki n s g u id o n d e s ig n .c o m

.r vt

/2

/2

:0

:5

P

M

AF111

BASEMENT FINISH PLAN FLOORING

GUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

APOGEE CONSULTING GROUP

1151 KILDAIRE FARM ROAD, SUITE 120

CARY, NC 27511

TELE: 919-858-7420

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION -

SOUTH ELEVATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/19/2018 LL KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AF111

1 FLOOR FINISH PLAN - BASEMENT

STORAGE

OFFICE

DIET

SUPERVISOR

PATIENT

ED

CONFERENCE

A163

PODIATRY

EXAM

A162

EXAM

A161

EXAM

A160

EXAM

A159

CARDIOLOGY

OFFICE

A158

CARDIOLOGY

OFFICE

A157

EKG

OFFICE

A156

EKG

OFFICE

A155

EXAM

A154

PFT

A153 MALE

TOILET

A172

FEMALE

TOILET

A171

ENT

OFFICE

A170

ENT

OFFICE

A169

PROCEDURE

A168

GYN

PROCEDURE

A167

STOR

A166A

PODIATRY

EXAM

A165

ORTHO

EXAM

A180

CHIROPRACTOR

ORTHO

A181

ORTHO

CAST

A179

ORTHO

EXAM

A178

VISITING

SPECIALIST

A177

A176

SPECIALIST

A176

EXAM

A175

EXAM

MINOR

PROCDURE

A183

EYE

EXAM C3

A184

EYE

EXAM C2

B185

TOILET

A166

EYE

EXAM C1

B186

ELEV.

OFFICE

A148

MENS

RESTROOM

A135

TEAM

WORK

AREA

A136

TOILET

A202

RECEPTION

A129

BARIATRIC

TOILET

A104

CORRIDOR

AC111

CORRIDOR

AC112

CORRIDOR

AC114

STORAGE

A142

CHECK IN

-OUT

A141

INTAKE

EVALUTATION

A143

PT WORK

AREA

A145

A146

SOILED

UTILITY

A173

SCHEDULING

A133

B35 B36

B42

B43

101-A

HALL

AC113

REFRIG.

106-N

PROCEDURE

ROOM

A134

WOMEN'S

EXAM

A133

EXAM/CONSULT

A132

EXAM/CONSULT

A131

P. TOILET

A130

EXAM/CONSULT

A129

EXAM/CONSULT

A128

EXAM/CONSULT

A127

EXAM/CONSULT

A126

EXAM/CONSULT

A125

EXAM/CONSULT

A124

EXAM/CONSULT

A123

RECEPTION

A101

WAITING

A100

COFFEE

A100B

H.W.

ALCOVE

A140

P. TOILET

A142

EQUIP.

STOR.

A120

MED

ROOM

A122

LOCKERS

A116

CLEAN

SUPPLY

A121

WORK

ROOM /

PATIENT

COUNSELLNG

A115

COPIER/FAX

A136A

ELEC.

A109

FAMILY

TOILET

A105

BARIATRIC

TOILET

A104

ELEV.

A103

STAFF

TOILET

A118

STAFF

TOILET

A117

EDUCATION

A141A

LINEN

A138

CORRIDOOR

A114

STAIR 1

A102

TELEHEALTH

A187

TELEHEALTH

A188

TELEHEALTH

A190

CORRIDOR/WAITING

A137

OFFICE

A192

A150

A151C A151B

OFFICE

A151C

SPEECH

THERAPY

A150D

P. TOILET

A149A

LAB

A149B

P. TOILET

BARIATRIC

A134B

A151

STAIR

CORRIDOR

AC109

CORRIDOR

AC106

STAIR

KIOSK

A100C

KIOSK

A100D

WAITING

A197

UNISEX

TOILET

A106

LVT-2 LVT-2

LVT-2

LVT-2LVT-2

LVT-2

LVT-2 LVT-2

LVT-2

LVT-2

LVT-2

LVT-2

LVT-2

LVT-3

LVT-1 LVT-1 LVT-1 LVT-1 LVT-1

LVT-1 LVT-1 LVT-1 LVT-1 LVT-1LVT-1

LVT-3

LVT-3

CPT-1 CPT-1

LVT-2

LVT-2

CT-3 CT-3

CT-3 CT-3

CT-3 CT-3 CT-3

LVT-2

LVT-2

LVT-2

CT-3

LVT-1

CPT-1

CPT-1

CONFERENCE/

BREAK

A112

SOILED

HOLDING

A119

LVT-3

LVT-2

LVT-2

LVT-2

LVT-1

CT-3

SC-1

LVT-3

TELE

HEALTH

A143

DATA

A111

STORAGE

A110

CORRIDOOR

A113

STORAGE

A164

ELEC.

A139

LVT-2

CHASE

A104A

CHASE

A119A

HSK

STROAGE

A198

CPT-1

LVT-3

LVT-2

CORRIDOR

A141

TEAM

WORK

AREA

A136

CORRIDOR

A149

CORRIDOR/WAITING

A135

LVT-2

LVT-3 LVT-3

LVT-3 LVT-3

LVT-3

LVT-3LVT-3

LVT-3

LVT-3

LVT-3

LVT-3

SC-1

LVT-3

V.I.F.

2' - 11"

V.I.F.

1' - 0"

V.I.F.

2' - 11"

V .I.

F

3'

V .I.

F

1'

V .I.

F

3'

V .I.

F

2'

/8

LVT-2

LVT-2

SHARED

MEDIA

ROOM

A107

STORAGE

A108

154 A

SADIE

PHARMACY

MED LAB

PROJECT

AREA

N N

KEYPLANPLAN NORTHTRUE NORTH

#FINISH FLOOR PLAN LEGEND

LVT-1

CT-3

SC-1

REFERS TO FINISH FLOORING PLAN SHEETS AF111 AND AF112

CPT-1

LVT-2

LVT-3

#FLOOR FINISH PLAN NOTES

1.

2.

PROVIDE NEW WALL BASE RB-1 THROUGHOUT CORRIDORS.

FINISH FLOOR TO MATCH EXISTING IN HEIGHT, PATTERN AND MATERIAL. VERIFY

IN FIELD.

REFERS TO FINISH FLOORING PLAN SHEETS AF111 AND AF112

FINISHES GENERAL NOTES

WALLS AND INFILL WALL CONSTRUCTION AND FINISHES SHALL BE PROVIDED FROM

WALL CORNER TO WALL CORNER.

REFER TO INTERIOR ELEVATION A400 SERIES FOR ADDITIONAL INFORMATION.

REFER TO FINISH PLANS AF100 SERIES FOR INFORMATION ACCENT PAINT LOCATIONS

AND FLOORING PATTERNS AND FLOORING GRAINS DIRECTION

PROVIDE PT-1 ON WALLS AS FIELD COLOR, REFER TO FINISH SCHEDULE AND FINISH

PLANS FOR ACCENT WALL COLOR DESIGNATIONS.

PROVIDE PT-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-GLOSS

FINISH.

PROVIDE PT-8 ON GYPSUM BOARD CEILINGS AND BULKHEADS.

PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS PANELS,

DUCTS AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS.

PATCH AND/OR REPAIR, FINISH, AND PAINT ALL WALLS IN AREA OF WORK.

REFER TO INTERIOR ELEVATION SHEET AS401 FOR CERAMIC WALL TILE PATTERN.

PAINT WALLS ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.

INSTALL CORNER GUARDS MOUNTED ABOVE RESILIENT BASE.

INSTALL WALL BASE OVER IMPACT RESISTANT WALL PROTECTION.

PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING ACCESSORIES.

EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO MANUFACTURER'S

INSTRUCTIONS.

CONFIRM SIGNAGE MESSAGE, LOCATIONS, AND ROOM NUMBERS WITH COR PRIOR

TO ORDERING.

NOT ALL SIGNAGE MAY BE IN ROOM FINISH SCHEDULE. REFER TO SIGNAGE PLAN FOR

MORE INFORMATION.

ALL SIGNAGE TYPES AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE VA

SIGNAGE AND WAYFINDING GUIDELINES.

ALL METAL DOOR AND WINDOW FRAMES PAINT COLOR PT- 2 .

PROVIDE TRANSITION STRIP TS-1 BETWEEN ALL LVT AND CERAMIC TILE FLOORING.

PROVIDE TRANSITION STRIP TS-2 BETWEEN ALL LVT AND CARPET FLOORING.

PROVIDE TRANSITION STRIP TS-3 BETWEEN ALL SEALED CONCRETE FLOORING.

PROVIDE TRANSITION STRIP TS-4 BETWEEN ALL LVT AND LVT FLOORING.

REFER TO VA SIGNAGE GUIDES FOR MORE INFORMATION AND MOUNTING DETAILS.

ALL METAL HANDRAILS TO BE TRIPLE COATED EPOXY PAINT.

INSTALL BUMPRAILS BR-1 UNDER ALL HANDRAILS.

REFERS TO FINISHES SHEETS AF101 AF102 AF111 AND AF112

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

1 SOLID SURFACE TRANSITION SHALL HAVE 1/4" RADIUS BULLNOSE EDGES.

2 ALL TRANSITIONS TO BE CENTERED UNDER DOOR LEAF.

TRANSITION LEGEND

LVT FLOORING

REDUCER STRIP

VINYL ADAPTOR STRIP

SOLID SURFACE TRANSITION

STRIP (SS1)

TS1

TS2

TS3

CERAMIC

TILE

GROUT

LVT FLOORING CONCRETE SUBFLOOR

LVT FLOORING

CARPET

TS4

LVT FLOORING

LVT FLOORING

VINYL ADAPTOR STRIP

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

g u id o n d e si g n .c o m

\U S

E R

\k h a w ki n s \1

.1

-A

-V A

F o rt

H a rr is o n -P ri m a ry

C a re k h a w ki n s g u id o n d e s ig n .c o m

.r vt

/2

/2

:0

:0

P

M

AF112

FIRST FLOOR FINISH PLAN

FLOORINGGUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

APOGEE CONSULTING GROUP

1151 KILDAIRE FARM ROAD, SUITE 120

CARY, NC 27511

TELE: 919-858-7420

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION -

SOUTH ELEVATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/19/2018 LL KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AF112

1 FLOOR FINISH PLAN - FIRST FLOOR

UP

DN

DN

UP

UP

R E

F

DN

DN

I J K L M N O P Q R

TEAM

WORK

AREA

B139

COMPRESSORS

B-12

EMPLOYEE

LOUNGE

B-7

STORAGE

B-6

LOCKERS

B-3

B-1B

B-2

TOILET

B-3A

WOMENS

LOCKER

ROOM

B-8

B-11

B-13

ELEV

GARBAGE

B-10

B-10

VEST

C-3

CORRIDOR

C-2

C-1

CORRIDOR

C-4

B-9

EQUIPMENT

B-5

OFFICE

B4

OFFICE

B7

OFFICE

B6

MALE

B8

FEMALE

B9

SUMP

B16

STORAGE

B15

MECHANICAL

B2

OFFICE

B1

CORRIDOR

B25

MEDICAL

RECORDS

B11

MEDICAL

RECORDS

B10

CLOSET

B5

OFFICE

B3

IRM

B30

MECHANICAL

ROOM

B32

PT WORK

AREA

B310

MEN'S

BATH

B31S

WOMEN'S

BATH

B31R

POOL

THERAPY

B31P

STORAGE

B31J

WORK

ROOM

B31I

OFFICE

B31G

OFFICE

B31D

SPEECH

B31E

TELEMEDICINE

B31H

EXAM

B31N

EXAM

B31M

EXAM

B31L

OT

B31K

WAITING

B31B

RECEPT

B31C

REHABILITATION

SERVICES

B31A

HALLWAY

B31F

MECH

B31Q

STOR.

B31T

WOMEN'S

EXAM

B135

EXAM/CONSULT

B134

EXAM/CONSULT

B133

P.

TOILET

B132P. TOILET

BARIATRIC

B136B

PROCEDURE

ROOM

B136

MED

ROOM

B124 EXAM/CONSULT

B125

EXAM/CONSULT

B126

EXAM/CONSULT

B127

EXAM/CONSULT

B128

EXAM/CONSULT

B129

EXAM/CONSULT

B130

TELE

HEALTH

B146

CLEAN

SUPPLY

B123

ELEC.

B111

FAMILY

TOILET

B105

UNISEX

TOILET

B106

WAITING

B100

H.W.

ALCOVE

B143

S T U V W

CORRIDOR

B115

ELEV 1

B103

STAIR 1

B102

COPIER/FAX

B140

ELEC.

B142

CRAWL

SPACE

B25

FIRE

SPRINKLER

B137

CORRIDOR

B116

AS403

TYP.

AS402

TYP.

AS402

TYP.

AS402

AS401

TYP.

ELEV.

BARIATRIC

TOILET

B104

WORK

ROOM /

PATIENT

COUNSELLING

B117

KIOSK

B100E

KIOSK

B100D

COFFEE

B100C

HSK

B112

P.

TOILET

B145

DATA

B113

300 300

SHARED

MED

STORAGE

B110

CONFERENCE/

BREAK

B114

SOILED

HOLDING

B121

EQUIP.

STOR.

B122

STAFF

TOILET

B119

STAFF

TOILET

B120

VESTIBULE

B100A

CHASE

B117A

CHASE

B104A

EDUCATION

B100B

RAMP

90' - 0"

89' - 0"

89' - 0"

CA CB CC CD

C1

C2

CORRIDOR

B144

LINEN

B141

EXAM/CONSULT

B131

304AS402

TYP.

TA7

TA7

TA7

106103 400

TYP.

TA7

TA14 TA18

TYP.

TYPICAL WORKSTATION

CE

SHARED

OFFICE

B107

SHARED

OFFICE

B108

TELE

HEALTH

B109

RECEPTION

B101

154 A

SADIE

PHARMACY

MED LAB

PROJECT

AREA

N N

KEYPLANPLAN NORTHTRUE NORTH

EQUIPMENT GENERAL NOTES

PROVIDE BLOCKING IN WALLS TO ACCOMMODATE CASEWORK, FURNISHINGS,

TECHNOLOGY AND WALL MOUNTED ACCESSORIES.

REFER TO ENLARGED FLOOR PLANS FOR TYPICAL ROOM EQUIPMENT AND

LOCATIONS

EQUIPMENT LABELS FROM EQUIPMENT SCHEDULE ARE LOCATED ON AQ SERIES

SHEETS, ENLARGED PLANS AND INTERIOR ELEVATION SHEETS AS400 SHEETS.

EQUIPMENT LABELS FOR TOILET ACCESSORIES BEGIN WITH TA AND THE TOILET

ACCESSORY SCHEDULE IS LOCATED IN THE AS400 SERIES.

SINKS THROUGH OUT PROJECT BOUNDARY SHALL BE PROVIDED WITH TA8 PAPER

TOWEL DISPENSERS AND TA16 SOAP DISPENSER.

REFER TO SHEET AS602 FOR ADDITIONAL EQUIPMENT INFORMATION.

EACH CONFERENCE ROOM TO HAVE 24 LINEAR FEET OF COMBINATION TACKLESS

AND TACKABLE BULLETIN BARS WITH ALUMINUM FRAME.

A.

B.

C.

D.

E.

F.

G.

RESPONSIBLE PARTY LEGEND

100 SERIES = CFCI (CONTRACTOR FURNISHED/ INSTALLED)

200 SERIES = GFCI (GOVERNMENT FURNISHED/ CONTRACTOR INSTALLED)

300 SERIES = GFCRI (GOVERNMENT FURNISHED/CONTRACTOR ROUGH IN)

400 SERIES = GFI (GOVERNMENT FURNISHED & INSTALLED)

EQUIPMENT SCHEDULE REMARKS

1.

2.

COORDINATE EQUIPMENT LOCATION, POWER AND DATA EQUIPMENTS WITH

EQUIPMENT AND ENGINEERING DRAWINGS.

COORDINATE EQUIPMENT LOCATION AND WATER REQUIREMENTS WITH

EQUIPMENT AND ENGINEERING DRAWINGS.

REFERS TO EQUIPMENT PLAN SHEETS AQ101 AND AQ102

REFERS TO EQUIPMENT PLAN SHEETS AQ101 AND AQ102

REFERS TO EQUIPMENT PLAN SHEETS AQ101 AND AQ102

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

g u id o n d e si g n .c o m

\U S

E R

\k h a w ki n s \1

.1

-A

-V A

F o rt

H a rr is o n -P ri m a ry

C a re k h a w ki n s g u id o n d e s ig n .c o m

.r vt

/2

/2

:0

:2

P

M

AQ101

BASEMENT FLOOR EQUIPMENT

PLANGUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

APOGEE CONSULTING GROUP

1151 KILDAIRE FARM ROAD, SUITE 120

CARY, NC 27511

TELE: 919-858-7420

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION -

SOUTH ELEVATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/19/2018 LL KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AQ101

1 EQUIPMENT PLAN - BASEMENT

N

EQUIPMENT AND FURNITURE SCHEDULE

MARK DESCRIPTION MANUFACTURER COMMENTS

CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

100 LOCKER - DOUBLE STACKED BASE AND ADA PACKAGE,

101 CUBICLE CURTAIN AND TRACK INPROP VA

102 PROJECTION SCREEN CEILING RECESSED

103 CEILING MOUNTED PROJECTOR

104 BARIATRIC CELING LIFT SYSTEM ARJO PER VA

105 REFRIGERATOR REFRIGERATOR WITH ICE MAKER

106 WALL MOUNTED LCD SCREEN - 42" PROVIDE FULL MOTION WALL MOUNT BRACKET

107 TACK BOARD

108 MARKER BOARD

GFCI - GOVERNMENT FURNISHED CONTRACTOR INSTALLED

200 SHARPS DISPOSAL

201 GLOVE DISPENSER

202 OPHTHALMOSCOPE

GFCRI - GOVERNMENT FURNISHED CONTRACTOR ROUGH-IN

300 KIOSK

301 COFFEE MACHINE

302 DESKTOP TELEPHONE

303 EQUIPMENT SCALE

304 WHEELCHAIR ACCESSIBLE SCALE

305 MICROWAVE VERIFY SIZE WITH COR

306 WALL MOUNTED MONITOR

307 DESKTOP COMPUTER W/ SINGLE MONITOR

308 DESKTOP COMPUTER W/ DUAL MONITOR

309 WALL MOUNTED PHONE

310 TELEMETRY MONITOR

311 OMNI CELL HERMAN MILLER 18" W. X 20"D. WALL MOUNTED

312 COPIER/SCANNER

GFI - GOVERNMENT FURNISHED AND INSTALLED

400 LOOSE FURNITURE

401 OFFICE FURNITURE

402 LINEN CART

403 SUPPLY CART

404 OPERATING ROOM TABLE Generic

405 TRASH CAN

406 EXAM SUPPLY CART

407 WHEELCHAIR

408 CAMERA - TELEHEALTH

R E

F

I J K L M N O P Q R

CORRIDOOR

A114

STORAGE

OFFICE

DIET

SUPERVISOR

PATIENT

ED

CONFERENCE

A163

PODIATRY

EXAM

A162

EXAM

A161

EXAM

A160EXAM

A159

CARDIOLOGY

OFFICE

A158

CARDIOLOGY

OFFICE

A157

EKG

OFFICE

A156

EKG

OFFICE

A155

EXAM

A154

PFT

A153 MALE

TOILET

A172

FEMALE

TOILET

A171

ENT

OFFICE

A170

ENT

OFFICE

A169

PROCEDURE

A168

GYN

PROCEDURE

A167

STOR

A166A

PODIATRY

EXAM

A165

ORTHO

EXAM

A180

CHIROPRACTOR

ORTHO

A181

ORTHO

CAST

A179

ORTHO

EXAM

A178

VISITING

SPECIALIST

A177

A176

SPECIALIST

A176

EXAM

A175

EXAM

MINOR

PROCDURE

A183

EYE

EXAM C3

A184

EYE

EXAM C2

B185

TELEHEALTH

A188

TELEHEALTH

A190

TOILET

A166

EYE

EXAM C1

B186

ELEV.

OFFICE

A148

MENS

RESTROOM

A135

TEAM

WORK

AREA

A136

TOILET

A202

RECEPTION

A129

TELEHEALTH

A187

BARIATRIC

TOILET

A104

CORRIDOR

AC111

CORRIDOR

AC112

CORRIDOR

AC114

STORAGE

A142

CHECK IN

-OUT

A141

INTAKE

EVALUTATION

A143

PT WORK

AREA

A145

A146

SOILED

UTILITY

A173

SCHEDULING

A133

BARIATRIC

TOILET

A104

B35 B36

B42

B43

101-A

HALL

AC113

REFRIG.

106-N

PROCEDURE

ROOM

A134

WOMEN'S

EXAM

A133

EXAM/CONSULT

A132

EXAM/CONSULT

A131

P. TOILET

A130

EXAM/CONSULT

A129

EXAM/CONSULT

A128

EXAM/CONSULT

A127

EXAM/CONSULT

A126

EXAM/CONSULT

A125

EXAM/CONSULT

A124

EXAM/CONSULT

A123

RECEPTION

A101

WAITING

A100

COFFEE

A100B

H.W.

ALCOVE

A140

P. TOILET

A142

EQUIP.

STOR.

A120

MED

ROOM

A122

LOCKERS

A116

CLEAN

SUPPLY

A121

WORK

ROOM /

PATIENT

COUNSELLNG

A115

COPIER/FAX

A136A

ELEC.

A109

FAMILY

TOILET

A105

BARIATRIC

TOILET

A104

ELEV.

A103

STAFF

TOILET

A118

STAFF

TOILET

A117

EDUCATION

A141A

LINEN

A138

STAIR 1

A102

S T U V W

LAB

A149B

P. TOILET

A149A

OFFICE

A151CSPEECH

THERAPY

A150D

A151B A151C

A150

STAIR

A151

OFFICE

A192

HSK

STROAGE

A198

STAIR

KIOSK

A100C

KIOSK

A100D

P. TOILET

BARIATRIC

A134B

CORRIDOR/WAITING

A137

WAITING

A197

AS402

TYP.

AS402

TYP.

AS402

TYP.

AS401

TYP.

UNISEX

TOILET

A106

TELE

HEALTH

A143

DATA

A111

CONFERENCE/

BREAK

A112

SOILED

HOLDING

A119

STORAGE

A110

300 300

CHASE

A119A

CHASE

A104A

ELEC.

A139

STORAGE

A164

400400

TA7

TA7

TA7

CA CB CC CD

C1

C2

CORRIDOR

A141

AS403

TYP.

AS402

TYP.

AS402

TYP.

103 400400

TYP.

TYP.

TA7

TA14 TA18

TYP.

TA7

TYPICAL WORKSTATION

CORRIDOOR

A137A

CORRIDOR

A149

CORRIDOR

A149

CE

107108

SHARED

MEDIA

ROOM

A107

STORAGE

A108

TEAM

WORK

AREA

A136

154 A

SADIE

PHARMACY

MED LAB

PROJECT

AREA

N N

KEYPLANPLAN NORTHTRUE NORTH

EQUIPMENT GENERAL NOTES

PROVIDE BLOCKING IN WALLS TO ACCOMMODATE CASEWORK, FURNISHINGS,

TECHNOLOGY AND WALL MOUNTED ACCESSORIES.

REFER TO ENLARGED FLOOR PLANS FOR TYPICAL ROOM EQUIPMENT AND

LOCATIONS

EQUIPMENT LABELS FROM EQUIPMENT SCHEDULE ARE LOCATED ON AQ SERIES

SHEETS, ENLARGED PLANS AND INTERIOR ELEVATION SHEETS AS400 SHEETS.

EQUIPMENT LABELS FOR TOILET ACCESSORIES BEGIN WITH TA AND THE TOILET

ACCESSORY SCHEDULE IS LOCATED IN THE AS400 SERIES.

SINKS THROUGH OUT PROJECT BOUNDARY SHALL BE PROVIDED WITH TA8 PAPER

TOWEL DISPENSERS AND TA16 SOAP DISPENSER.

REFER TO SHEET AS602 FOR ADDITIONAL EQUIPMENT INFORMATION.

EACH CONFERENCE ROOM TO HAVE 24 LINEAR FEET OF COMBINATION TACKLESS

AND TACKABLE BULLETIN BARS WITH ALUMINUM FRAME.

A.

B.

C.

D.

E.

F.

G.

RESPONSIBLE PARTY LEGEND

100 SERIES = CFCI (CONTRACTOR FURNISHED/ INSTALLED)

200 SERIES = GFCI (GOVERNMENT FURNISHED/ CONTRACTOR INSTALLED)

300 SERIES = GFCRI (GOVERNMENT FURNISHED/CONTRACTOR ROUGH IN)

400 SERIES = GFI (GOVERNMENT FURNISHED & INSTALLED)

EQUIPMENT SCHEDULE REMARKS

1.

2.

COORDINATE EQUIPMENT LOCATION, POWER AND DATA EQUIPMENTS WITH

EQUIPMENT AND ENGINEERING DRAWINGS.

COORDINATE EQUIPMENT LOCATION AND WATER REQUIREMENTS WITH

EQUIPMENT AND ENGINEERING DRAWINGS.

REFERS TO EQUIPMENT PLAN SHEETS AQ101 AND AQ102

REFERS TO EQUIPMENT PLAN SHEETS AQ101 AND AQ102

REFERS TO EQUIPMENT PLAN SHEETS AQ101 AND AQ102

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

g u id o n d e si g n .c o m

\U S

E R

\k h a w ki n s \1

.1

-A

-V A

F o rt

H a rr is o n -P ri m a ry

C a re k h a w ki n s g u id o n d e s ig n .c o m

.r vt

/2

/2

:0

:4

P

M

AQ102

FIRST FLOOR EQUIPMENT PLAN

GUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

APOGEE CONSULTING GROUP

1151 KILDAIRE FARM ROAD, SUITE 120

CARY, NC 27511

TELE: 919-858-7420

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION -

SOUTH ELEVATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/19/2018 LL KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AQ102

1 EQUIPMENT PLAN - FIRST FLOOR

N

EQUIPMENT AND FURNITURE SCHEDULE

MARK DESCRIPTION MANUFACTURER COMMENTS

CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

100 LOCKER - DOUBLE STACKED BASE AND ADA PACKAGE,

101 CUBICLE CURTAIN AND TRACK INPROP VA

102 PROJECTION SCREEN CEILING RECESSED

103 CEILING MOUNTED PROJECTOR

104 BARIATRIC CELING LIFT SYSTEM ARJO PER VA

105 REFRIGERATOR REFRIGERATOR WITH ICE MAKER

106 WALL MOUNTED LCD SCREEN - 42" PROVIDE FULL MOTION WALL MOUNT BRACKET

107 TACK BOARD

108 MARKER BOARD

GFCI - GOVERNMENT FURNISHED CONTRACTOR INSTALLED

200 SHARPS DISPOSAL

201 GLOVE DISPENSER

202 OPHTHALMOSCOPE

GFCRI - GOVERNMENT FURNISHED CONTRACTOR ROUGH-IN

300 KIOSK

301 COFFEE MACHINE

302 DESKTOP TELEPHONE

303 EQUIPMENT SCALE

304 WHEELCHAIR ACCESSIBLE SCALE

305 MICROWAVE VERIFY SIZE WITH COR

306 WALL MOUNTED MONITOR

307 DESKTOP COMPUTER W/ SINGLE MONITOR

308 DESKTOP COMPUTER W/ DUAL MONITOR

309 WALL MOUNTED PHONE

310 TELEMETRY MONITOR

311 OMNI CELL HERMAN MILLER 18" W. X 20"D. WALL MOUNTED

312 COPIER/SCANNER

GFI - GOVERNMENT FURNISHED AND INSTALLED

400 LOOSE FURNITURE

401 OFFICE FURNITURE

402 LINEN CART

403 SUPPLY CART

404 OPERATING ROOM TABLE Generic

405 TRASH CAN

406 EXAM SUPPLY CART

407 WHEELCHAIR

408 CAMERA - TELEHEALTH

6 RETURN BEND ASSEMBLY DETAIL

NTS

2 SPRINKLER MOUNTING DETAIL

NTS

METAL PIPE THRU RATED WALL DETAIL3

NTS

1 INSPECTORS TEST AND DRAIN DETAIL

NTS

5 SWING JOINT DETAIL

NTS

7 UPRIGHT SPRINKLER HEAD DETAIL

NTS

SEISMIC BRACING DETAIL

NTS

8 MULTI-FLOOR SPRINKLER RISER DETAIL

NTS

FOR HEAD TYPES. SEE

FIRE PROTECTION

FLOOR PLANS

1" X 1/2" R.C.

DROP

90 EL.

ARMOVER

RISER NIPPLE

BRANCHLINE

CEILING. SEE

REFLECTED CEILING

PLANS

SPRINKLERS IN GRID CEILING SYSTEMS SHALL BE LOCATED AT THE

MIDPOINT OR QUARTERPOINT OF THE FOUR FOOT (4') DIMENSION AND THE

MIDPOINT OF THE TWO (2') DIMENSION. WHERE A CONFLICT OCCURS,

SYMMETRY ABOUT THE AXIS SHALL BE MAINTAINED.

EQ.EQ.

EQ

. E

Q

EQ

. E

Q

EQ.EQ.

EQ

. E

Q

.EQ. EQ.

EQ

. E

Q

EQ. EQ.

SPRINKLER

SPEAKER OR

OTHER DEVICE

AIR DEVICE OR

LIGHT FIXTURE

CEILING LEGEND

FOR HEAD TYPES. SEE

FIRE PROTECTION

FLOOR PLANS

1" X 1/2" R.C.

DROP

90 EL.

ARMOVERDROP NIPPLE

BRANCHLINE

CEILING. SEE

REFLECTED CEILING

PLANS

ELBOW WITH CORROSION

RESISTANT OUTLET EQUAL TO

ONE SPRINKLER

1-1/2" INSPECTOR

TEST PIPING

1" TEST VA. IN ACCESSIBLE

LOCATION NOT OVER 7' FOOT

ABOVE FLOOR

SPLASH BLOCK

SLEEVE

EXTERIOR WALL

PROVIDE SIGHT GLASS

FLOOR

CAULK MIN. 1/4" THICKNESS OF FILL

MATERIAL FLUSH WITH TOP

SURFACE OF FLOOR OR WITH BOTH

SURFACES OF WALL. EQUAL TO 3M

CP-25WB.

1 OR 2 HOUR RATED WALL, STEEL

CHANNEL, GYPSUM BOARD 1/2" OR

5/8" IN. THICK. SEE ARCH FOR

WALL TYPES.

NOMINAL 12" DIA OR SMALLER

SCH 10 (OR HEAVIER) STEEL

PIPE, SERVICE WEIGHT (OR

HEAVIER) CAST IRON PIPE,

CLASS 50 (OR HEAVIER)

DUCTILE PRESSURE PIPE

NOMINAL 6" DIA OR SMALLER

TYPE "L" (OR HEAVIER)

COPPER TUBING.

COMPLIES WITH UL SYSTEM

NUMBER W-L-1001

F RATING - 1, 2, 3 & 4 HR

T RATING - 0, 1, 2, 3, & 4 HR

REFER TO UL DIRECTORY LISTING

FOR FURTHER INFORMATION.

1" X 1/2" R.C.

1" X 1/2" R.C.

90 EL.

BRANCHLINE

BRANCHLINE

INSPECTOR'S TEST & DRAIN "SURETEST" (TYP)

GROOVED BUTTERFLY W/ TAMPER SWITCH (TYP)

GROOVED CHECK(TYP)

GAGE (TYP)

FLOW SWITCH (TYP)

2" DRAIN, SEE FIRE

PROTECTION PLANS

TOLCO FIG. 980

UNIVERSAL SWAY BRACE

FITTING

TOLCO FIG. 980

UNIVERSAL SWAY BRACE

FITTING

TOLCO FIG.

1000 FAST

CLAMP

STEEL PIPE

LATERAL BRACE

STEEL PIPE

LATERAL BRACE

TOLCO FIG. 4L

SWAY BRACE

ASSEMBLY

LATERAL EQ

BRACING 1" THRU

6" PIPE

LONGITUDINAL EQ

BRACING 1" THRU 6"

PIPE

TYP FLOOR

SUPPLY

1ST FLOOR

SPRINKLER

MAIN

SPRINKLER MAIN

TOP FLOOR

6"ø

3"ø

4"ø

4"ø

6" ø

3" ø

2 1/2"ø

RISER UP TO 1ST FLOOR

DRAIN TO

EXTERIOR

FIRE PROTECTION

CHECK VALVE

DOMESTIC WATER

CHECK VALVE

WATER SUPPLY PIPING

TO SERVE EXISTING

RISER IN ROOM B-11

DOMESTIC WATER

ISOLATION VALVE

INDICATING-TYPE FLOOR

CONTROL VALVE WITH

SUPERVISORY SWITCH

INDICATING-TYPE FLOOR

CONTROL VALVE WITH

SUPERVISORY SWITCH

Project Number

Contract Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

Building Number

VA259-17-C-0201

C :\U se rs

\D m ot i\D oc um en ts

\1

_F ire _P ro te ct io n_ M od el

_d m ot l.r vt 7/

/2

:5

5:

A M

FX001

FIRE PROTECTION - NOTES AND

DETAILSGUIDON DESIGN, INC

905 N CAPITOL AVE, SUITE 100

INDIANAPOLIS, IN 46204

TELE: 317-800-6388

KARI ALLEN

MES GROUP, INC.

550 NORTH REO STREET, SUITE 203

TAMPA, FL 33609

TELE: 813-289-4700

CONSTRUCT PRIMARY CARE

MENTAL HEALTH INTEGRATION

FORT HARRISON VAMC

436-113

172ROY STEINER, COR/PE.

ENGINEERING/FMS

FORT HARRISON, MT. 07/13/2018 CJF CJF

100% CONSTRUCTION

DRAWINGS

FULLY SPRINKLED

GENERAL NOTES

1 SPRINKLERS ARE TO BE LOCATED IN CENTER OF CEILING TILE.

2 THE SPACING OF SPRINKLERS: THE SPACING AND SIZES OF PIPES SHALL CONFORM TO THE

REQUIREMENTS OF NFPA PAMPHLET NO. 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL

WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO ARE

REGULARLY EMPLOYED TO DO SUCH WORK.

3 IN LOCATING SPRINKLERS AND PIPING, CONTRACTOR SHALL COORDINATE THE SPRINKLER

LAYOUT WITH THE LIGHTING AND AIR CONDITIONING LAYOUT.

4 ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE IN A THOROUGH

AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST SHALL BE IN ACCORDANCE WITH

THE CURRENT REQUIREMENTS OF NFPA 13, LATEST EDITION.

6 PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND FITTINGS

CONFORMING TO ASTM A-53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE 10 MAY BE USED FOR 2

1/2" AND LARGER. DO NOT THREAD THINWALL PIPE.

7 PIPING: EXPOSED/DRY PIPE SPRINKLER PIPING SHALL BE SCHEDULE 40 GALVANIZED STEEL PIPE

AND FITTINGS CONFORMING TO ASTM A-53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE 10

GALVANIZED MAY BE USED FOR 2 1/2" AND LARGER. DO NOT THREAD THINWALL PIPE.

8 PIPE SUPPORTS: HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES OF AN APPROVED TYPE

AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL PIPING SHALL BE FURNISHED AND

INSTALLED. PIPING SHALL BE SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED ADJUSTABLE

HANGERS.\

9 SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT WHERE

EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS HIGH TEMPERATURE

SPRINKLERS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA NO. 13.

10 PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE BOTTOM OF THE

SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.

11 REFER TO ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF ALL SMOKE AND/OR FIRE WALLS

WHICH FIRE PROTECTION PIPING PENETRATES AND PENETRATION DETAILS SHOWING THE

MAINTENANCE OF THE INTEGRITY OF THE SMOKE/FIRE WALLS IN AN APPROVED MANNER WHEN

PENETRATING WALLS AND FLOORS. SEE DETAILS.

12 THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW ALL

ELBOWS, OFFSETS, UNIONS, VALVES AND FITTINGS REQUIRED TO COMPLETE THE INSTALLATION OF THE WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS MADE

SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES

ENCOUNTERED WILL NOT BE RECOGNIZED. IF THEY COULD HAVE BEEN FORESEEN HAD PROPER

EXAMINATION BEEN MADE.

13 ALL VALVES SHALL BE UL LISTED OR FM APPROVED. 1. MINIMUM PRESSURE RATING FOR

STANDARD-PRESSURE PIPING: 175 PSIG. 2. MAXIMUM PRESSURE RATING FOR

STANDARD-PRESSURE PIPING: 250 PSIG.

14 CHECK VALVES: 1. STANDARD: UL 312. 2. TYPE: SWING CHECK. 3. BODY MATERIAL: CAST IRON. 4.

END CONNECTIONS: FLANGED OR GROOVED.

15 GATE VALVES: BRONZE OS&Y GATE VALVES: 1. STANDARD: UL 262. 2. BODY MATERIAL: BRONZE. 3.