This project manual outlines specifications for the conversion of a laundry facility to a distribution and storage space at the Alexandria VA Medical Center. Key requirements include demolishing existing walls and portions of flooring, as well as removing all abandoned mechanical, electrical, plumbing fixtures and equipment. The project scope also includes new partitions, flooring, walls, ceilings, a ramp, doors, windows, and mechanical, electrical, and plumbing systems. Bidders must comply with various general contracting requirements such as security protocols, operations and storage areas, alterations to existing structures, disposal and retention of materials, and protection of existing infrastructure. The specifications provide detailed instructions on scheduling, reporting, record keeping, and other project controls to be followed throughout the duration of the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25621R0148 0003.docx | DOCX document | |
| RFI Register 502-17-300 23 July 2021.docx | DOCX document | |
| Equipment List.docx | DOCX document | |
| 36C25621R0148 0002.docx | DOCX document | |
| Pre-Award RFI Register 19 May 2021 Final.pdf | ||
| 36C25621R0148 0001.docx | DOCX document | |
| Sign in Sheet.pdf | ||
| 36C25621R0148 Drawings .pdf | ||
| 36C25621R0148 EXHIBIT F.docx | DOCX document | |
| 36C25621R0148 EXHIBIT E.docx | DOCX document | |
| 36C25621R0148 ICRA.pdf | ||
| 36C25621R0148 JA.pdf | ||
| 36C25621R0148 EFT Form.pdf | ||
| 36C25621R0148 EXHIBIT C.docx | DOCX document | |
| 36C25621R0148 Vendor Request Form.xlsx | XLSX spreadsheet | |
| 36C25621R0148 SOW .docx | DOCX document | |
| 36C25621R0148 EXHIBIT G.docx | DOCX document | |
| 36C25621R0148 EXHIBIT A.docx | DOCX document | |
| 36C25621R0148 Solicitation.docx | DOCX document | |
| 36C25621R0148 EXHIBIT B.docx | DOCX document | |
| 36C25621R0148 EXHIBIT D.docx | DOCX document | |
| 36C25621R0148 WD.txt | TXT text file | |
| 36C25621R0148 Pre-Sol.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual for
CONVERT ALEXANDRIA
LAUNDRY TO DISTRIBUTION
STORAGE
REVISED 100% DESIGN SUBMISSION
October 30, 2020
JB Herbst, CONTRACTING SPECIALIST
2495 SHREVEPORT HIGHWAY
PINEVILLE, LA 71360
Project Number – 502-17-300 Task Order Number – 36C25618C0111
RCC Purchase Order Number – 502-C84108
Romanyk Consulting Corp. Copyright © 2016
PRIVILEGED AND CONFIDENTIAL PROPRIETARY INFORMATION
PROJECT INDEX IDX - 1
VA
CONVERT ALEXANDRIA LAUNDRY TO DISTRIBUTION STORAGE
GENERAL INDEX VOLUME
DIVISION SECTION TITLE PAGE
00 – SPECIAL SECTIONS
(NO WORK SPECIFIED IN THIS SECTION)
01 - GENERAL REQUIREMENTS
010000 General Requirements 1 – 19
013216.17 Network Analysis Schedules 1 – 25
013323 Shop Drawings, Product Data and Samples 1 – 10
013526 Safety Requirements 1 – 27
014219 Reference Standards 1 – 10
014529 Testing Laboratory Services 1 – 7
017300.18 Execution 1 – 10
017419 Construction Waste Management 1 – 7
018113 Sustainable Construction Requirements 1 - 12 019100 General Commissioning Requirements ` 1 - 48
02 – EXISTING CONDITIONS
024119.18 Selective Demolition 1 – 7
03 - CONCRETE
033053 Cast-in-place Concrete 1 – 10
04 - MASONRY
(NO WORK SPECIFIED IN THIS SECTION)
05 - METALS
051200 Structural Steel Framing 1 – 5
06 – WOOD, PLASTIC AND COMPOSITES
062000 Finish Carpentry 1 – 11
07 - THERMAL AND MOISTURE PROTECTION
072113 Thermal Insulation 1 – 5
078400 Firestopping 1 – 6 079200 Joint Sealants 1 – 12
08 – DOORS & WINDOWS
081113 Hollow Metal Door and Frames 1 – 8
082110.18 Plastic Laminate Doors 1 – 6
087100 Door Hardware 1 – 20
087100.18 Door Hardware Basis of Design 1 – 26
088000 Glazing 1 – 3
09 - FINISHES
PROJECT INDEX IDX - 2
090600 Schedule for Finishes 1 – 7
092226.18 Metal Suspension Systems 1 – 7
092900 Gypsum Board 1 – 7
093013 Ceramic/Porcelain Tiling 1 – 17
095100 Acoustical Ceiling 1 – 13
096513 Resilient Base and Accessories 1 – 5 099100 Painting 1 – 23
10 - SPECIALTIES
102113 Toilet Compartments and Urinal Screens 1 – 4
104413 Fire Extinguishers, Cabinets, and Accessories 1 – 2
11 - EQUIPMENT
12 - FURNISHINGS
13 - SPECIAL CONSTRUCTION
14 - CONVEYING EQUIPMENT
21 - FIRE SUPPRESSION
210800 Commissioning of Fire Suppression Systems 1 – 3
211313 Wet-Pipe Sprinkler Systems 1 – 8
22 - PLUMBING
220511 Common Work Results for Plumbing 1 – 25
220523 General-Duty Valves for Plumbing Piping 1 – 12
220711 Plumbing Insulation 1 – 15
221100 Facility Water Distribution 1 – 11
221123 Domestic Water Pumps 1 – 6
221300 Facility Sanitary and Vent Piping 1 – 13
221400 Facility Storm Drainage 1 – 15
223300 Electric Domestic Water Heaters 1 – 9 224000 Plumbing Fixtures 1 – 31
23 - HEATING VENTILATING AND AIR CONDITIONING
230511 Common Work Results HVAC 1 – 28
230593 Testing, Adjusting, Balancing for HVAC 1 – 9
230711 HVAC and Boiler Insulation 1 – 11
230800 Commissioning of HVAC System 1 – 3
230923 Direct Digital Control System for HVAC 1 – 36
232113 Hydronic Piping 1 – 17
232123 Hydronic Pumps 1 – 7
232213 Steam and Condensate Heating Piping 1 – 18
232500 HVAC Water Treatment 1 – 4
233100 HVAC Ducts and Casings 1 – 10 233400 HVAC Fans 1 – 5
PROJECT INDEX IDX - 3
233600 Air Terminal Units 1 – 4
233700 Air Outlets and Inlets 1 – 4
234000 HVAC Air Cleaning Devices 1 – 6
238143 Air-source Unitary Heat Pumps 1 – 8 238216 Air Coils 1 – 4
25 – INTEGRATED AUTOMATION
26 - ELECTRICAL
260511 Requirements for Electrical Installations 1 – 8
260519 Low Voltage Electrical Power 1 – 6
260526 Grounding and Bonding for Electrical Systems 1 – 6
260533 Raceway and Boxes for Electrical Systems 1 – 9
260923 Lighting Controls 1 – 4
262726 Wiring Devices 1 – 4
262921 Enclosed Switches and Circuit Breaker 1 – 4 265100 Interior Lighting 1 – 8
DIVISION 27 - COMMUNICATIONS
270511 Requirements for Communications Installations 1 – 36
270533 Raceways and Boxes for Communications Systems 1 – 12
271100 Telecommunications Room Fittings 1 – 11 271500 Communications Structured Cabling 1 – 18
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
283100 Fire Detection and Alarm 1 – 14
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
(NO WORK SPECIFIED – Refer to the Drawings for Any Work in This Section)
DIVISION 34 - TRANSPORTATION
DIVISION 48 – ELECTRICAL POWER
- - -END OF INDEX - - -
5/18/2020 i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 BID ITEMS
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 USE OF ROADWAYS
1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.17 TEMPORARY TOILETS
1.18 AVAILABILITY AND USE OF UTILITY SERVICES
1.19 NEW TELEPHONE EQUIPMENT
1.20 TESTS
1.21 INSTRUCTIONS
1.22 GOVERNMENT-FURNISHED PROPERTY
1.23 CONSTRUCTION SIGN
1.24 FINAL ELEVATION DIGITAL IMAGES
1.25 HISTORIC PRESERVATION
10/30/2020
GENERAL REQUIREMENTS 01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL REQUIREMENTS
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Convert
Alexandria Laundry to Distribution Storage as required by drawings, specifications, and Contract
Documents.
B .Offices of Romanyk Consulting (RCC) as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
C. Before placement and installation of work subject to tests by testing laboratory retained by the
Contractor, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
mailto:mark.gremillion@va.gov
GENERAL REQUIREMENTS 01 00 00 - 2
1.3 BID ITEMS:
A. BASE BID
Contractor to provide all labor, material, and equipment necessary for completion of the project, Convert Alexandria Laundry to Distribution Storage, as described in the Contract Documents.
Work includes, but is not limited to, the following: Interior demolition of walls, segments of flooring if necessary, MEP fixtures and equipment, lift, roof and exterior wall sections. Removal of all new or previously abandoned MEP items (ducts, wiring, plumbing pipes, conduit, etc.) is required as indicated in the drawings. Other work includes general office type construction of new partitions, new floor, walls, ceilings, ramp, doors, windows, and NEW Mechanical, Electrical, and Plumbing systems to serve the building as described in the Contract Documents. In addition to sitework necessary to make the site both ADA compliant and accessible.
Base Bid: $
B. ADD/DEDUCT ALTERNATES
DEDUCT ALTERNATE #1: Demolition of obsolete/abandoned mechanical equipment in the basement. Refer to sheet MD-100 for further information:
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge.
They may also be subject to inspection of their personal effects when entering or leaving the project site.
GENERAL REQUIREMENTS 01 00 00 - 3
2. Before starting work the General Contractor shall give one week’s notice to the Contracting
Officer and the COR, so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting
Officer.
4. VA reserves the right to close down or shut down the project site and order General
Contractor’s employees off the premises in the event of a national emergency. The General
Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the
Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the
Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary
GENERAL REQUIREMENTS 01 00 00 - 4
buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the
Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:
GENERAL REQUIREMENTS 01 00 00 - 5
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
H. Phasing:
The Medical Center must maintain its operation 24 hours a day, 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work on dates mutually agreeable to Medical Center
Director, COR and Contractor.
I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment.
In connection with fire alarm equipment, Contractor shall make arrangements for
GENERAL REQUIREMENTS 01 00 00 - 6
pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems
(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. Remove all unused items, DO NOT abandon in place.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to other specification Sections for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center.
Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR.
Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
GENERAL REQUIREMENTS 01 00 00 - 7
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of building in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
GENERAL REQUIREMENTS 01 00 00 - 8
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4 and VAAR 852.236-88).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations
GENERAL REQUIREMENTS 01 00 00 - 9
in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the
Polychlorinated Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the
Environmental Protection Agency (EPA) and the Department of Transportation (DOT) as outlined in Code of Federal Regulation (CFR), Titled 40 and 49 respectively. The EPA's
Toxic Substance Control Act (TSCA) Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-
7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Hazardous Waste Manifest (EPA Form 8700-22), along with the
Uniform Hazardous Waste Manifest Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the
Manifest to the Medical Center's Chief.
a. Copies of the following listed CFR titles may be obtained from the Government Printing
Office:
40 CFR 261 ................... Identification and Listing of Hazardous Waste
40 CFR 262 ................... Standards Applicable to Generators of Hazardous Waste
40 CFR 263 ................... Standards Applicable to Transporters of Hazardous Waste
40 CFR 761 ................... PCB Manufacturing, Processing, Distribution in Commerce, and use Prohibitions
49 CFR 172 ................... Hazardous Material tables and Hazardous Material
Communications Regulations
GENERAL REQUIREMENTS 01 00 00 - 10
49 CFR 173 ................... Shippers - General Requirements for Shipments and Packaging
49 CRR 173 .................. Subpart A General
49 CFR 173 ................... Subpart B Preparation of Hazardous Material for Transportation
49 CFR 173 ................... Subpart J Other Regulated Material; Definitions and Preparation
TSCA ............................ Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the
Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
GENERAL REQUIREMENTS 01 00 00 - 11
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work.
Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.
Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.)
disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE
CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA
A. Data and information furnished or referred to below is for the Contractor's information. The
Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1. The indications of physical conditions on the drawings and in the specifications, are the result of information obtained through record drawings furnished by the Alexandria VAMC.
(FAR 52.236-4)
B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.
GENERAL REQUIREMENTS 01 00 00 - 12
C. A copy of the soil report will be made available for inspection by bidders upon request to the
Engineering Officer at the VA Medical Center, a copy is also provided in the specs, and shall be considered part of the contract documents.
D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations.
Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to
Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, parking lots, are in accordance with lines and elevations shown on contract drawings.
GENERAL REQUIREMENTS 01 00 00 - 13
C. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services".
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical Center property. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical
Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not
GENERAL REQUIREMENTS 01 00 00 - 14
overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and also prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use;
maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government. Equipment must be operated as a complete system and be fully maintained by operating personnel.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.17 TEMPORARY TOILETS
A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.
1.18 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the
Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid
GENERAL REQUIREMENTS 01 00 00 - 15
by the Contractor for chargeable electrical services shall be the prevailing rates charged to the
Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the
Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
C. Contractor shall install meters at Contractor's expense and furnish the Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.
D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials.
E. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system. The
Contractor shall meter and pay for electricity required for hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.
F. Water (for Construction and Testing): Furnish temporary water service.
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted.
Failure to stop leakage or other wastes will be cause for revocation at COR discretion of use of water from Medical Center's system.
1.19 NEW TELEPHONE EQUIPMENT
The contractor shall coordinate with the work of installation of telephone equipment by others.
This work shall be completed before the building is turned over to VA.
GENERAL REQUIREMENTS 01 00 00 - 16
1.20 TESTS
A. The contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will
be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, refrigerant, hot water, controls and electricity, etc.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonable period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.
F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.21 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete
GENERAL REQUIREMENTS 01 00 00 - 17
information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the
VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
1.22 GOVERNMENT-FURNISHED PROPERTY
A. The Government shall deliver to the Contractor, the Government-furnished property shown on the drawings.
B. Equipment furnished by Government to be installed by Contractor will be furnished to Contractor at the Medical Center.
GENERAL REQUIREMENTS 01 00 00 - 18
C. Contractor shall be prepared to receive this equipment from Government and store or place such equipment not less than 90 days before Completion Date of project.
D. Notify Contracting Officer in writing, 60 days in advance, of date on which Contractor will be prepared to receive equipment furnished by Government. Arrangements will then be made by the
Government for delivery of equipment.
1. Immediately upon delivery of equipment, Contractor shall arrange for a joint inspection thereof with a representative of the Government. At such time, the Contractor shall acknowledge receipt of equipment described, make notations, and immediately furnish the
Government representative with a written statement as to its condition or shortages.
2. Contractor thereafter is responsible for such equipment until such time as acceptance of contract work is made by the Government.
E. Equipment furnished by the Government will be delivered in a partially assembled (knock down) condition in accordance with existing standard commercial practices, complete with all fittings, fastenings, and appliances necessary for connections to respective services installed under contract. All fittings and appliances (i.e., couplings, ells, tees, nipples, piping, conduits, cables, and the like) necessary to make the connection between the Government furnished equipment item and the utility stub-up shall be furnished and installed by the contractor at no additional cost to the Government.
F. Completely assemble and install the Government furnished equipment in place ready for proper operation in accordance with specifications and drawings.
G. Furnish supervision of installation of equipment at construction site by qualified factory trained technicians regularly employed by the equipment manufacturer.
1.23 CONSTRUCTION SIGN
A. Provide a Construction Sign where directed by the COR. All wood members shall be of framing lumber. Cover sign frame with 0.7 mm (24 gage) galvanized sheet steel nailed securely around edges and on all bearings. Provide three 100 by 100 mm (4 inch by 4 inch) posts (or equivalent round posts) set 1200 mm (four feet) into ground. Set bottom of sign level at 900 mm (three feet) above ground and secure to posts with through bolts. Make posts full height of sign. Brace posts with 50 x 100 mm (two by four inch) material as directed.
GENERAL REQUIREMENTS 01 00 00 - 19
B. Paint all surfaces of sign and posts two coats of white gloss paint. Border and letters shall be of black gloss paint, except project title which shall be blue gloss paint.
C. Maintain sign and remove it when directed by the COR.
1.24 FINAL DIGITAL IMAGES
A. A minimum of four (4) images shall be taken with a minimum 25 MP camera, with different settings to allow the COR to select the image to be printed. All images are provided to the COR on a CD.
B. Photographs shall be taken upon completion, including landscaping. They shall be taken on a clear sunny day to obtain sufficient detail to show depth and to provide clear, sharp pictures.
Pictures shall be 400 mm x 500 mm (16 by 20 inches), printed on regular weight paper, matte finish archival grade photographic paper and produced by a RA4 process from the digital image with a minimum 300 PPI. Identifying data shall be carried on label affixed to back of photograph without damage to photograph and shall be similar to that provided for final construction photographs.
1.25 HISTORIC PRESERVATION
Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.
- - - END OF SECTION 01 00 00 - - -
01 32 16.17 - 1
SECTION 01 32 16.17
NETWORK ANALYSIS SCHEDULES - MAJOR DESIGN/BUILD PROJECTS
PART 1 - GENERAL:
1.1 DESCRIPTION:
A. The Contractor shall develop two fully Resource loaded (cost and manpower) Network Analysis
System (NAS) plan and computer-generated schedule demonstrating fulfillment of the entire contract requirements and duration, shall keep the plan and computer-generated schedule up-to-date in accordance with the procedures and requirements of this section and shall utilize the plan for scheduling, coordinating, mitigating, monitoring (including all activities of subcontractors, equipment vendors and suppliers) and verification of every Periodic Progress and Payment
Submittals of the work under this contract. The Contractor’s initial NAS Diagram submission shall be designated as the Initial Day 1 Submittal and shall be due 30 calendar days after the issuance of the Notice to Proceed. The Preliminary Day 1 Submittal shall detail the design requirement activities associated with the project and summary level activities for the build portion of the contract and will be utilized for project monitoring and period progress payment.
The Final Day 1 submittal shall be submitted 45 calendar days prior to the commencement of the physical work of the project and shall consist of the detailed design activities and detailed build activities associated with the requirement of this section and will be the basis for their initial baseline schedule. After review and approval by the VA, this schedule will be designated as the approved Baseline Schedule.
B. Conventional Critical Path Method (CPM) Precedence Diagramming Method (PDM) technique shall be utilized to satisfy both time and cost applications. All schedule data and reports required under this specification section shall be based upon total float, not relative or free float schedules.
The initial and updated NAS submitted by the contractor, approved by VA, becomes the official project schedule of record governing schedule management, oversight and actions on the corresponding contract.
C. The Contractor shall conduct a statistical schedule risk analysis based on the detailed construction activities of the approved baseline schedule, identifying the major schedule risk areas and recommended risk mitigation plans.
1.2 CONTRACTOR'S REPRESENTATIVE:
A. The Contractor shall designate a representative (usually Project Executive or Project Manager) on the site who will be responsible for the preparation, timeliness,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .