36C25019B0052-0001000.docx
DOCX document Posted
- Attached to
- 552-17-101: Renovate Bldg. 410 (East Wing)
- Solicitation number
- 36C25019B0052
About this file
36C25019B0052 0001 36C25019B0052 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0268-000.docx | DOCX document | |
| 36C25019B0052-0001000.docx | DOCX document | |
| 36C25019B0052-007.pdf | ||
| 36C25019B0052-003.pdf | ||
| 36C25019B0052-005.pdf | ||
| 36C25019B0052-008.pdf | ||
| 36C25019B0052-006.pdf | ||
| 36C25019B0052-012.pdf | ||
| 36C25019B0052-009.pdf | ||
| 36C25019B0052-011.pdf | ||
| 36C25019B0052-002.pdf | ||
| 36C25019B0052-001.docx | DOCX document | |
| 36C25019B0052-004.pdf | ||
| 36C25019B0052-010.pdf | ||
| 36C25019B0052-007.pdf | ||
| 36C25019B0052-010.pdf | ||
| 36C25019B0052-003.pdf | ||
| 36C25019B0052-009.pdf | ||
| 36C25019B0052-005.pdf | ||
| 36C25019B0052-004.pdf | ||
| 36C25019B0052-012.pdf | ||
| 36C25019B0052-011.pdf | ||
| 36C25019B0052-002.pdf | ||
| 36C25019B0052-006.pdf | ||
| 36C25019B0052-001.docx | DOCX document | |
| 36C25019B0052-008.pdf | ||
| 36C25019B0052-000.docx | DOCX document | |
| 36C25019B0052-000.docx | DOCX document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-28-2019
552-19-4-6932-0028
552-17-101
36C250/701HL
Department of Veterans Affairs VHA Regional Procurement Office Central Netwrok Contracting Office (NCO) 3140 Governor’s Place Blvd. - Suite 210 Kettering OH 45409-1337
To all Offerors/Bidders
36C25019B0052 08-28-2019
X X X
The purpose for this amendment to to asnswer RFIs from potential offerors.
All other Terms and Conditions remaini in full force and effect.
Bob Ivey Contracting Officer
NCO1015L2-0500
RFI Responses & Clarifications
1. Any chance a second site visit can be scheduled? This has been requested by several subcontractors who were unable to make it to the first site visit. Response: Yes. Date: August 30, 2019. Time: 9:00 A.M. (EST). Ronde Vue Location: Bldg. 410 (Lobby). POC: Ravi Wani – VA project Engineer/COR -(937) 268-6511 Ext. 5402.
2. Letter “M” under the Demolition General Notes states to remove all terrazzo base, flooring and built up subfloor down to the structural slab. The demolition drawings do not call out any specific areas that have terrazzo flooring. Can these locations be marked on the drawings? Response: Terrazzo is located at the base of all the existing walls on the 1st and 2nd floors.
3. It appears that the 1st floor has been recently renovated - is there terrazzo under the flooring here? Response: The terrazzo located at the 1st floor hallway is still present, but floor leveling compound has been used to manage the height difference between the concrete floor and the raised edge of the terrazzo.
4. Is there terrazzo base behind the new walls/flooring on the 1st floor? Response: Terrazzo is located at the base of all the existing walls on the 1st floors.
5. Are the corridor and room partition walls on the 1st floor plaster and lath, or drywall? Response: Plaster and Lath
6. 085113, 2.3 - "Owner will furnish 17 windows and Historic replacement brick mold frames for contractor installation. New windows to match Owner’s windows in size, shape, material, profile, and performance." Would like clarification here, does this mean these 17 windows are already in place? Response: The 17 windows are in storage. VA to provide location.
7. If the 17 windows above are not yet installed we would like to submit the Kawneer/Traco 8410TL fixed window for approval, please provide substitution form if this would be possible. Response: Windows are required to match existing. Any substitutions will require OHPO approval.
8. The specs call out for Manual Roller shades, but I do not see any locations called out on the drawings. Please specify which windows will have the roller shades. Response: Provide roller shades at all windows on the first & second floors of the East wing. Rooms EW-141 thru EW-158 and EW-262 thru EW-280
9. Are we to assume that the previously renovated flooring was installed over old asbestos containing flooring throughout the 1st and 2nd floors? During our walk-thru I did see areas of new flooring over old. Please advise. Response: Reference the specifications and test report for ACM Locations. New flooring may be installed over old ACM flooring.
10. REGARDING THE FLOOR TILE ON THE 2nd FLOOR: Specifications section 02 82 11, page 3 notes a quantity of 4,810sf of asbestos floor tile and mastic. It says it is in the hallway, patient rooms and toilet rooms. That does not match the architectural drawing AD102 which only shows it in the patient room and toilet rooms, not the hallway. Is there asbestos floor tile in the hallway? Please clarify/advise. Response: Refer to the testing Agencies report and Sampling locations for areas to be abated.