This is a notice for a federal construction solicitation to expand engineering support space at the Cincinnati VA Medical Center. The solicitation will be issued as a 100% set-aside for verified veteran-owned small businesses, with a magnitude between $500,000 and $1 million. The project work includes renovations and system modifications. The NAICS code is 236220 and the size standard is $36.5 million. The performance period is 275 calendar days from the notice to proceed date. Bonds will be required in the forms of bid, payment, and performance guarantees. Interested vendors should register on FBO and ensure their VIP and SAM registrations as a verified VOSB are accurate and valid through the anticipated award date. Safety and experience data may be required prior to construction award.

36C25019B0048 Attach 3 Drawings 539-19-201 02.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Expand Engineering Support Space 539-19-201, newest first.
File Type Posted
36C25019B0048-0002000.docx DOCX document
36C25019B0048-0002000.docx DOCX document
36C25019B0048-0001001.pdf PDF
36C25019B0048-0001000.docx DOCX document
36C25019B0048-0001001.pdf PDF
36C25019B0048-0001000.docx DOCX document
36C25019B0048-018.pdf PDF
36C25019B0048-021.pdf PDF
36C25019B0048-019.pdf PDF
36C25019B0048-020.pdf PDF
36C25019B0048-013.docx DOCX document
36C25019B0048-022.pdf PDF
36C25019B0048-014.pdf PDF
36C25019B0048-016.docx DOCX document
36C25019B0048-017.docx DOCX document
36C25019B0048-012.docx DOCX document
36C25019B0048-012.docx DOCX document
36C25019B0048-013.docx DOCX document
36C25019B0048-016.docx DOCX document
36C25019B0048-018.pdf PDF
36C25019B0048-019.pdf PDF
36C25019B0048-020.pdf PDF
36C25019B0048-017.docx DOCX document
36C25019B0048-021.pdf PDF
36C25019B0048-014.pdf PDF
36C25019B0048-015.pdf PDF
36C25019B0048-022.pdf PDF
36C25019B0048-000.docx DOCX document
36C25019B0048-000.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

Ludlow Ave.

C lif to n A v e

CINCINNATI

STATE

TECH.

Hopple St.

M.L.K. Dr.

McMillan St.

UNIV. OF

CINCINNATI

W.H.T Rd.

VAMC

3200 VINE ST.

M.L.K. Dr.

V in e

St.

ZOO

Jefferson Ave.

UNIV.

HOSPITAL

Mitchell Ave.

R e ad in g

R d.

V ic to ry

P kw

y. XAVIER

UNIV.

EXTERIOR ELEVATION

INTERIOR ELEVATION

SEE 700 SERIES SHEETS

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

SEE SHEET A001

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

X

X

1/A101

X

XXXX

X

SIM

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Department of Veterans Affairs Medical Center

ARCHITECTURE PLANNING INTERIOR DESIGN

3131 NEWMARK DRIVE, SUITE 200

MIAMISBURG, OHIO 45342

937.461.3290 P

JOHN POE ARCHITECTS

HEAPY ENGINEERING

MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY

1400 WEST DOROTHY LANE

DAYTON, OH 45409

937.224.0861 P

937.224.5777 F

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

COVER SHEET

14A101

CVKR

17004.00

539-19-201

Cincinnati, Ohio

Expand Engineering Support Space

BUILDING 14

3200 VINE ST. CINCINNATI, OHIO 45220 PROJECT #: 539-19-201

GENERAL CONSTRUCTION NOTES

* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS

TO THE CONTRACTING OFFICER'S REPRESENTATIVE.

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE

SAFETY CODE, INTERNATIONAL BUILDING CODE, AND OTHER

CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC

01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN

BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,

TECHNICAL INFORMATION LIBRRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE

LATEST ARCHITECTURAL BARRIERS ACT ACCESSIBILITY

STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS

BARRIER FREE DESIGN GUIDE PG-18-13 WHICH CAN BE FOUND

ON THE DEPARTMENT OF VETERANS AFFAIRS TECHNICAL

INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE

AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE

VISIT TO BE COORDINATED BY THE CONTRACTING OFFICER.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH,

TO MATCH ADJACENT EXISTING SURFACES, ANY EXISTING

MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE

COURSE OF DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR

INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR

EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW

CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES

TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL

CONDITIONS AND DIMENSIONS PRIOR TO ORDERING,

FABRICATING OR INSTALLING NEW MATERIALS.

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL

EQUIPMENT, ETC. TO BE INSTALLED AS PART OF THIS

PROJECT, AND WHERE NECESSARY, MAKE SPECIAL

PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO

FIT THROUGH FINISHED OPENINGS.

8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET

ACCESSORIES, HAND RAILS, BUMPER RAILS, SHELVING,

CASEWORK, MOUNTING BRACKETS AND OTHER WALL

MOUNTED ITEMS, AS INDICATED IN THE CONTRACT

DOCUMENTS AND AS RECOMMENDED BY PRODUCT

MANUFACTURERS. ALL WOOD BLOCKING SHALL BE FIRE

RETARDANT TREATED.

9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES

UNLESS SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS

INDICATED AT A PARTICULAR SURFACE, CONTRACTOR SHALL

PROVIDE FINISH(S) AS INDICATED AT SIMILAR CONDITIONS.

10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY

OPERATIONAL SYSTEMS WHICH COMPLY WITH STATED CODES

AND REGULATIONS. WHERE THE OMISSION OF A PART OR

ELEMENT OF A SYSTEM WOULD RESULT IN THE

NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM,

CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS

PART OF THE WORK.

11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE

OR FIRE RATED WALLS SHALL BE SMOKE/FIRE STOPPED AS

REQUIRED BY THE RATING OF THE WALL.

12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL

BE SUBJECT TO AN INDEPENDENT REVIEW BY A CERTIFIED

FIRE PROTECTION ENGINEER RETAINED BY THE OWNER. THE

FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR

MAKING ANY REQUIRED CHANGES TO THE DESIGN AS

IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS

NECESSARY FOR COMPLIANCE WITH SPECIFIED NFPA

REQUIREMENTS.

14A101 COVER SHEET

14A102 CODE DATA

14A201 BASEMENT DEMO PLAN

14A301 BASEMENT DIMENSION PLAN

14A302 BASEMENT NOTE PLAN

14A311 REFLECTED CEILING PLAN - BASEMENT

14A501 CASEWORK DETAILS

14A601 DOOR SCHEDULE & DETAILS

14A701 ENLARGED PLANS & INTERIOR ELEVATIONS

14A702 INTERIOR ELEVATIONS

14A801 FLOOR FINISH PLAN

14A802 WALL FINISH AND PROTECTION PLAN

14A804 FINISH SCHEDULE

14IF100 FURNITURE PLAN

14QF100 EQUIPMENT PLAN

FX001 LEGEND, SYMBOLS & INDEX OF DRAWINGS

FX100 BASEMENT PLAN - FIRE SUPPRESSION

P001 LEGEND, SYMBOLS & INDEX OF DRAWINGS

PP100 FOUNDATION PLAN - PLUMBING

PP101 BASEMENT PLAN - PLUMBING

P501 SCHEDULES & DETAILS

P901 SANITARY WASTE & VENT DIAGRAM

M001 LEGEND, SYMBOLS & INDEX OF DRAWINGS

M501 DETAILS

M502 DETAILS

M601 SCHEDULES

M701 CONTROLS AND AUTOMATION

MD100 BASEMENT PLAN - REMOVALS

MH100 BASEMENT PLAN - DUCTWORK

MP100 BASEMENT PLAN - PIPING

E001 LEGEND, SYMBOLS & INDEX OF DRAWINGS

ED100 BASEMENT PLAN - REMOVALS

EL100 BASEMENT PLAN - LIGHTING

EP100 BASEMENT PLAN - POWER

ET100 BASEMENT PLAN - SYSTEMS

E401 ENLARGED PLANS

E501 DETAILS

E502 SINGLE LINE DIAGRAM

E601 SCHEDULES

DRAWING INDEX

N.T.S.Scale:

VICINITY MAP

GRAPHIC SYMBOLS

Revisions Date

S2.0

Existing 4 story w/ bsmt.

Building 15

New Expand Eng.

Support Space

Future Elev.

Area of Refuge Station

Ex. Mechanical

Compressor

RO/DI

Manifold Rm

Fire Pump

Signals

Electric

122 ft

125 ft

1-HR FIRE BARRIER

2-HR FIRE BARRIER

EXISTING WALL TO REMAIN

NEW WALL

MEANS OF EGRESS

FIRE EXTINGUISHERS

CODE LEGEND

Batt insulation

Horizontal masonry reinforcing @ 16" o.c.

vertical

FLOOR SLAB

FIN. CEILING

STRUCTURE

ABOVE

5 5/8"

Structure above

" 3"x3"x1/4" steel angle.

4" long segments, ea.

side, 5' o.c.. Attach to structure above w/ 1/2 exp. anchor.

6" Lightweight Concrete block

Continuous acoustic sealant each side

M1.1

3-5/8" 20 ga.

track & studs 16" o.c.

5/8" Type 'X' gypsum board

Fiberglass batt insulation

Acoustic sealant

Acoustic sealant

Deep leg deflection track

4 1/4"

Horizontal masonry reinforcing @ 16" o.c.

vertical

FLOOR SLAB

3'-4" AFF

5 5/8"

6" Lightweight Concrete block

TOP OF WALL

TOP OF CMU

2" H. Concrete cap sloped to inside

M1.3

6" Concrete bond beam

Note: Grout open end of walls solid

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

CODE DATA

14A102

CVKR

17004.00

539-19-201

Cincinnati, Ohio

N N.T.S.Scale:

CODE PLAN - BASEMENT

N.T.S.Scale:

WALL TYPES

N Scale: 1/16" = 1'-0"

CODE PLAN - PARTIAL FIRST FLOOR

CODE NOTES

NFPA 101, 2018 Edition:

Basement: Engineering Support Space (7,600 sf area of work)

Total building is designed to be 6 stories with a basement. Future floors 4 and 5 are planned to be labs, and the 6th floor is planned to be office space.

Table A.8.2.1.2 Fire resistance rating for Type II 222:

Exterior bearing walls 2 hour Interior bearing walls 2 hour Columns 2 hour Beam 2 hour Floor/ceiling assemblies 2 hour Interior non load bearing walls 0 hour Exterior non load bearing walls 0 hour

All building elements will be rated assuming future phases will occur. Roof will be treated as a floor assembly.

Chapter 4 General

4.6.3 Stories in height, Counted as a three story buildings

Chapter 6 Classification of Occupancy and Hazard of Contents

6.1 Basement (Engineering Support Space): Industrial

First Floor (Existing): Business

6.1.14.4 Separated Occupancies

Comment: Floors are seperated by 2 hour ratings.

Chapeter 7 Means of Egress

7.1.3.1 Exit access corridors.Exit access corridors w/ load of over 30 people shall have a 1 hour fire resistance rating.

(2) Requirement shall not apply where otherwise provided in chapters 11-43.

7.1.3.2.1 Exit to be separated as follows,

(2) Minimum 2 hour where exits connect 4 or more stories. (Building is planned for future expansion).

(4) 2 hour fire rating shall be constructed of non combustile material and shall be supported by construction having 2 hour rating.

(7) Openings in separation shall be protected w/ fire rated doors w/ closers.

Table 7.2.2.2.1.2 Stair width, less than 2000 people = 44" wide min.

7.2.12.1 An Area of refuge used as part of the required accessible means of egress in accordance with 7.5.4 conisting of a story in a building that is portected throughout by an automatic sprinkler system shall meet the following criteria:

1. Directions for use, instructions for summoning assistance and written identification of the location shall be posted adjacent to the communication system.

2. The two way communication shall include both audible and visual signals Thre Area of Refuge is provided on Basement floor.

Table 7.3.1.2 Occupant load Second floor 12,300 sf (Industrial /100 x 6,360 sf.=64, Storage/500 x 5,940 sf.=12)= 76 Basement: 11,155 sf (Industrial / 100) = 112

7.3.1.5 Capacity from a Point of Convergence at Exit Stairs on First Floor Occupants: 112 (Bsmt) + 76 (2nd Flr) = 198

7.3.3 Egress capacity

Table 7.3.3.1 Stairways .3" per person, level components .2" per person.

Total occupant load / total number of exit stairs = 198 / 2 = 99 Stairwells: 99 x .3 = 29.7"

Minimum width = 36" Level components: 99 x .2 = 19.8"

Minimum width = 36"

7.4 Two means of egress required.

7.5.4.1.1 Access within allowable travel distance shall be provided to not less than one accessible area of refuge.

Table A.6.7 Allowable travel distance to exits in sprinklered space

Common Path: 100 ft (max. common path on plan = 38') Dead-end: 50 ft (max. dead-end on plan = 12') Travel Distance: 250 ft (max. travel dist. on plan = 125')

7.7.2 Exit discharge through interior building spaces is allowed.

NFPA 221 Chapter 7 Fire Barrier Wall

7.2.1 Continuous from wall to wall/floor to floor.

7.2.5 Structural elements supporting wall shall have a rating not less than the wall.

7.3.1 Opening shall be proposed per 4.8 & 7.3.

7.3.2 Total glazing in door and windows shall not exceed 20% of the wall.

Table 4.8.2 2 hour fire barrier = 1.5 hour door Fire window assemblies- not permitted.

Chapter 8 Features of Fire Protection

8.2.1.3 Existing and new buildings are separated by a 2 hour fire barrier for occupancy separation per NFPA 221. 1-1/2 hour door.

Table 8.3.3.2.2 Elevator hoistway: 2 hour partitions, 1-1/2 hour door.

Stairs: 1 hour minimum, 2 hour actual, 1-1/2 hour door.

Chapter 9 Building Service and Fire Protection Equipment

9.7 Automatic sprinkler system is being provided.

9.9 Portable fire extinguishers shall be selected, installed, inspected and maintained in accordance with NFPA 10

Chapter 10 Interior Finishes, Contents and Furnishings

10.2.3 Interior wall and ceiling finishes required Class A, Class B or Class C shall be defined per ASTM E 84 or ANSI/UL 723.

10.2.3.4 Class A

Flame spread index, 0-25 Smoke development index, 0-450

Class B Flame spread index, 26-75 Smoke development index, 0-450

Class C Flame spread index, 76-200 Smoke development index, 0-450

10.2.7.1 Carpet shall comply with ASTM 28596

10.2.7.2 Floor covering other than carpet shall have a minimum critical flux of 0.1 W/cm3.

10.2.7.3 Interior floor finish shall be classified based on NFPA 253.

10.2.7.4 Interior finishes classified as follows:

Class 1: Critical radiant flux not less than 0.45 W/cm3.

Class 2: Critical radiant flux not less than 0.22 W/cm3.

10.2.8.1 Where sprinklered, interior wall and ceiling finish shall be reduced by one grade, eg, Class C can be reduced to Class B.

10.2.8.2 Where sprinklered, Class 2 interior floor finish shall be permitted where Class 1 is required.

IBC 2015

Table 2902.1 Required Plumbing Fixtures

Industrial: WC: 1/100 = 2 required (3 provided) Lav: 1/100 = 2 required (3 provided) DF: 1/400 = 1 required (2 provided) Serv. Sink = 1 required (1 provided)

NFPA 33 Standard for Spray Application using Flammable or Combustible Materials

Enclosed Paint Booth, Supplied by Owner

3.3.14 Ventilation shall prevent accumulation of significant quantities of vapor-air mixtures in concentractions over one-fourth of lower flammable limit (1/4 of LFL)

5.1 Walls, doors and ceilings that enclose a spray area shall be constructed of noncombustible materials and rigidly fastened. Interior surfaces shall be smooth to prevent pockets that can trap residues, and designed to facilitate ventilation and cleaning.

5.3 Spray booths shall be separated from other operations by a minimum of 3 ft or by a partition, wall or ceiling assembly having a minimum fire resistance rating of 1 hr.

5.3.1 Spray booths shall be installed so that all parts are readily maintained and cleaned.

5.5.1 Panels for lights and observation shall be heat-treated glass, laminated glass, or wired glass and shall be sealed to confine vapors, mists, residues, dust and deposits.

6.6.1 Light fixtures shall be attached to walls and ceilings of spray booth from the outside and separated from spray area by glass panels and serviced from the outside.

7.2 Ventilating and exhaust systems shall be designed and installed per NFPA 91.

7.3 Adequate supply of clean make-up air shall be provided to compensate for the air exhausted from spray operations. The make-up air intake shall be located so that air exhausted from spray operations is not recirculated. The exhaust duct shall not discharge in the direction of any combustible construction that is within 25 ft of the exhaust duct discharge point.

7.4 Air exhausted from spray operations shall be conducted by ducts directly to the outside of the building. The exhaust duct discharge point shall be at least 6 ft from any exterior wall or roof.

7.5.1 Air exhausted from spray booth shall not be recirculated.

8.1 Storage, handling and mixing of flammable and combustible liquids shall be per NFPA 30.

UP

DN

UP

2.63

2.23

2.63

2.63

2.23

7'-2 5/8"

2.692.69

2.70

ELEC. BLDG.

BLDG. 15

E L E

C

B L D

G

B L D

G

B L D

G

B L D

G

2.23

2.26 2.672.67

2.67 2.26

2.682.68

2.682.68

2.672.67

2.262.26 2.672.67

2.26

2.692.69

2.69

2.69

2.69

2.69

2.69

2.69

2.69

2.69

2.69

2.69

2.63

2.27

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

BASEMENT DEMO PLAN

14A201

CVKR

17004.00

539-19-201

Cincinnati, Ohio

N Scale: 1/8" = 1'-0"

BASEMENT - DEMOLITION PLAN

GENERAL DEMO NOTES

PLAN NOTES

2.23 Remove existing door and frame.

2.26 Remove existing VCT flooring and rubber base.

2.27 Remove existing recessed fire extinguisher cabinet in CMU wall and salvage to be relocated.

2.63 Remove existing CMU wall.

2.67 Remove existing ceiling and light fixtures this area.

2.68 Existing ceiling to remain this area.

2.69 No work this area.

2.70 Existing overhead steam trap to remain.

A. Protect existing structure, adjacent windows, doors and other building elements during demolition.

B. Remove all existing partitions shown with dashed line. Provide new finishes as scheduled at all area of removal or repair adjacent wall, ceilings and floor finishes to match adjacent surfaces.

C. Remove all existing doors and hollow metal frames where indicated with dashed line.

D. Demolish ceiling tiles and grid throughout unless noted otherwise.

E. Existing plaster or gypsum soffits are to remain unless noted otherwise.

F. Within the building, provide sticky mats at all exits from the construction area during the entire length of the construction project.

G. Remove all existing applied wall base in areas of floor or wall demolition.

H. Remove all existing corner guards and wall protection on walls to be remodeled.

J. Unless noted otherwise walls that are to be removed are metal stud and drywall construction. Walls of masonry construction are identified as such. The contractor shall be responsible for verifying conditions in the field.

K. Prepare existing floor surface throughout the entire area of demolition and construction for new floor covering. Pour cementitious topping to fill voids, feather all edges to match adjacent floor elevations and correct low areas. Review and coordinate new floor drain locations and any floor slopes prior to slab prep.

L. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required modifications, relocations and shut down times of these systems with the C.O.R.

M. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.

N. Sprinklers and water supply to be maintained throughout. See MEP Drawings.

P. Existing power must be maintained throughout as required during each phase of construction. Coordinate power shut-offs with the C.O.R. See Electrical Drawings.

Q. Patch and repair existing slab as required to fill voids in existing floor slab at abandoned mechanical chases, new electrical conduit and all MEP floor penetrations. Provide 2-Hr. fire rated floor construction, or 1 hour rated roof construction.

R. Remove wall-hung accessories and equipment, including TVs and computers, unless noted otherwise and turn over to C.O.R. Repair wall and floor finishes to match adjacent existing or provide new finishes as scheduled.

Revisions Date

N Scale: 1/8" = 1'-0"

PARTIAL FIRST FLOOR - DEMOLITION PLAN

Electrical Supervisor

Facilities Section

Supervisor

Utility Section

Supervisor

Work Leaders

Computer

Corridor

Conference

Lounge

Shared Shop Space

Corridor

Mech Shops

Future Elevator

E-1

Toilet

Elev.

Equip

HAC

Toilet

Toilet

Shower

Closet

Locksmith

Carpentry Shop

Closet

020A

29'-6 1/4" 5 5/8"

11'-4"

5 5/8"

5'-3"

5 5/8"

12'-0"

5 5/8"

17'-0 5/8" 5 5/8"

/8

/8

/8

/8

/8

/8

5 5/8"

11'-8 3/4"

10" 6'-8"

5 5/8"

5'-11" 5 5/8" 20'-0 5/8"

5 5/8"

17'-5 1/2"

14A701

A

ELEC. BLDG.

BLDG. 15

E L E

C

B L D

G

B L D

G

B L D

G

B L D

G

6'-5 1/8" +/- 2'-0"

14A701

C

Closet

/2

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/4

6'-5 1/8"

/8

/2

/8

/4

/8

/2

/8

Stair 1

S-1-0

Stair 2

S-2-0

6'-0"

S2.0

S2.0

Stair 1

S-1-1

1'-6"

14A601

Stair 1

S-1-2

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

BASEMENT DIMENSION PLAN

14A301

CVKR

17004.00

539-19-201

Cincinnati, Ohio

N Scale: 1/8" = 1'-0"

BASEMENT - DIMENSION PLAN

GENERAL NOTES

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls.

C. Install fire retardant blocking at all wall mounted equipment, accessories, casework and wall- mounted door stops.

D. All wall types to be M1.1 unless noted otherwise. For partition types refer to Drawing 14A102.

E. Verify all conditions in the field prior to fabrication, erection and construction.

F. Protect existing structure as required during all phases of construction.

G. Coordinate contractor access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.

H. Provide and maintain negative air pressure in construction area.

Coordinate with HVAC contractor. See HVAC plans for temporary venting requirements.

J. Maintain rating at all existing rated construction. Repair all damage to existing fire walls.

K. Refer to Sheet 14A701 sheets for interior elevations and accessory schedule.

L. Ensure that all existing & new shower floors slope to drain, 1/4" per foot, min.

Revisions Date

N Scale: 1/8" = 1'-0"

PARTIAL FIRST FLOOR - DIMENSION PLAN

PARTIAL SECOND FLOOR - DIMENSION PLAN

UP

Electrical Supervisor

Facilities Section

Supervisor

Utility Section

Supervisor

Work Leaders

Computer

Corridor

Conference

Lounge

Shared Shop Space

Corridor

Mech Shops

Future Elevator

E-1

Toilet

Elev.

Equip

HAC

Toilet

Shower

Closet

Paint Storage

Locksmith

Carpentry Shop

B

B

B

020A Closet

020A

14A701

A

M1.1

M1.1

M1.1

M1.1

M1.1

M1.1 M1.1

M1.1

M1.1

M1.1

M1.1

M1.1

M1.1

M1.1

M1.1

M1.1M1.1

M1.1

M1.1

M1.1

M1.1

M1.1

4.384.38

4.384.38

22.0222.02

22.0222.02

22.02

22.02

22.02

22.02

22.02

22.21

22.02

14A702

14A702

ELEC. BLDG.

BLDG. 15

E L E

C

B L D

G

B L D

G

B L D

G

B L D

G

4.384.38

22.02

026A

A

14A702

A

14A702

A

A

14A702

M1.3

026B

4.39

4.39 4.39

Closet

14A701

C

22.0222.0222.02

S01B

14A702

A

14A702

21.01

21.01

21.01

21.01

S01A

22.22

22.22

22.21

M1.3

10.03

4.39

4.39

21.02

Paint Booth

21.02

Toilet

Stair 1

S-1-0

Stair 2

S-2-0

21.04

Stair 1

S-1-1

200R Stair 1

S-1-2

14A601

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

BASEMENT NOTE PLAN

14A302

CVKR

17004.00

539-19-201

Cincinnati, Ohio

N Scale: 1/8" = 1'-0"

BASEMENT - NOTE PLAN

GENERAL NOTES

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls.

C. Install fire retardant blocking at all wall mounted equipment, accessories, casework and wall- mounted door stops.

D. All wall types to be M1.1 unless noted otherwise. For partition types refer to Drawing 14A102.

E. Verify all conditions in the field prior to fabrication, erection and construction.

F. Protect existing structure as required during all phases of construction.

G. Coordinate contractor access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.

H. Provide and maintain negative air pressure in construction area.

Coordinate with HVAC contractor. See HVAC plans for temporary venting requirements.

J. Maintain rating at all existing rated construction. Repair all damage to existing fire walls.

K. Refer to Sheet 14A701 sheets for interior elevations and accessory schedule.

L. Ensure that all existing & new shower floors slope to drain, 1/4" per foot, min.

PLAN NOTES

4.38 Align face of new wall with face of existing adjacent wall.

4.39 Patch existing CMU as necessary after demolition.

10.03 Metal lockers w/ sloped metal top. Provided and Installed by Owner.

21.01 Wall mounted fire extinguisher by owner.

21.02 Existing recessed fire extinguisher cabinet to remain.

21.04 Existing salvaged fire extinguisher cabinet installed in new duct chase wall.

22.02 Floor drain. See Plumbing Drawings.

22.21 Emergency eye wash station & drench shower. See Plumbing Drawings.

22.22 Utility sink. See Plumbing Drawings.

Revisions Date

N N.T.S.Scale:

PARTIAL FIRST FLOOR - NOTE PLAN

PARTIAL SECOND FLOOR - NOTE PLAN

E-2

E-1

021 022

020A

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

2.71

2.71

2.682.68

ELEC. BLDG.

BLDG. 15

E L E

C

B L D

G

B L D

G

B L D

G

B L D

G

Closet

2.71

2.71

2.68

2.712.71

3.21

REFLECTED CEILING PLAN LEGEND

Supply Air Diffuser

Return Air Grille

2' x 4' Recessed

LED fixture

2' x 2' acoustical tile ceiling

Gypsum board / soffit -painted, moisture resistant on first floor.

Chain-hung light fixture

2' x 2' Recessed

LED fixture

Recessed Downlight fixture

Ceiling Mounted Exhaust Fan

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

REFLECTED CEILING PLAN -

BASEMENT

14A311

CVKR

17004.00

539-19-201

Cincinnati, Ohio

N Scale: 1/8" = 1'-0"

BASEMENT REFLECTED CEILING PLAN

GENERAL NOTES

A. All wood blocking shall be fire retardant.

B. Light fixtures, sprinkler heads, speakers, and HVAC devices shall be located as close as possible to the center of acoustical ceiling panels.

Confirm any deviation from this with the Project Engineer.

C. See P, M, E and FP drawings for additional information regarding final information and quantites of fixtures/devices to be installed in ceiling.

D. See Electrical Drawings for lighting specifications.

E. All gypsum board ceilings to be painted P-4 unless noted otherwise.

PLAN NOTES

2.68 Existing ceiling to remain this area.

2.71 No ceiling this area.

3.21 Bond beam lintel. See Detail 1 on Sheet 14A601.

W1

B1B2

2'-1"2'-1"2'-1"

1'-1" 3" 8" 3"

/2

3"

/2

1" 1" Sink

Sink

12.10

12.05

6.09

W2

B3

22.23

12.05

6.10

6.13

6.08

9.15

12.10

12.10

12.05

6.13

6.11

9.15

6.08

6.10

V A

R

IE

S

S E

E I N

T E

R

IO

R E

L E

V A

T

IO

N S

1'-0" 2"1'-0" 2"

1'-8"

/4

6.10

6.08

6.11

6.13

9.07

26.01

6.08

9.07

11.02

6.086.08

26.01

1"

/2

/2

2'-1"

Sink

6.14

12.32

22.24

12.32

12.02

B4

Drawer

B5

2'-1"

/2

3"

12.32

12.32

12.03

12.02

1"

/2

/2

22.23

12.32

12.29

12.33

2'-1"

1"

Drawer

3"

/2

2'-1"

1"

Sink

/2

3"

22.14

12.32

12.33

12.24

12.25

12.26

11"

12.40

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

CASEWORK DETAILS

14A501

LPKR

17004.00

539-19-201

Cincinnati, Ohio

Scale: 1" = 1'-0"1

LAMINATE CASEWORK SECTIONS

6.08 Plastic laminate over 3/4" plywood.

6.09 Removable panel with concealed fasteners. Plastic laminate over 3/4" plywood.

6.10 4" recessed pull.

6.11 Adjustable shelf. Plastic laminate over 3/4" plywood.

6.13 Heavy-duty five-knuckle hinge.

6.14 Apron. Plastic laminate over 3/4" plywood.

9.07 Gypsum board soffit.

9.15 Resilient base. See Room Finish Schedule.

11.02 Owner provided and installed microwave.

12.02 Countertop support bracket.

12.03 2" wire management grommet. Coordinate exact location with COR.

12.05 Solid surface material over 3/4" plywood, with 1/4" eased edge.

12.10 Applied solid surface backsplash.

12.24 Adjustable painted steel shelf.

12.25 Slotted steel shelf bracket.

12.26 Double slotted wall vertical upright.

12.29 Adjustable metal shelf.

12.32 Epoxy countertop and back splash.

12.33 Metal base cabinet.

12.40 Screw fastener with concrete anchor. See manufacturer's installation instructions.

22.14 Epoxy resin sink. See Plumbing drawings.

22.23 Undermount integral solid surface sink bowl.

22.24 Stainless steel sink.

26.01 Light fixture. See electrical drawings.

GENERAL CASEWORK NOTES

A. See interior elevations on sheet A701 and A702 for further information.

DETAIL NOTES

Scale: 1" = 1'-0"2

B6 METAL CASEWORK

Scale: 1" = 1'-0"3

B7 METAL CASEWORK

Scale: 1" = 1'-0"4

W3 METAL CASEWORK

S1

2"

SEE

SCHED. 2"

S E

E S

C H

E D

U L E

Scale: 1/4" = 1'-0"

FRAME TYPES

SEE SCHED.

S E

E S

C H

E D

U L E

F

Scale: 1/4" = 1'-0"

DOOR TYPES

V

SEE SCHED.

EQ. 1'-0" EQ.

S E

E S

C H

E D

U L E

B

3'-8 3/8"

Level 0 88' - 0"

5 5/8"

Bot. of Lintel

7'-4" AFF

Scale: 1 1/2" = 1'-0"

FRAME DETAILS

EQ.

5 3/4"

EQ.

13 5

J1

SEE PLAN

EQ.

5 3/4"

EQ.

H1

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

DOOR SCHEDULE & DETAILS

14A601

CVKR

17004.00

539-19-201

Cincinnati, Ohio

DETAIL NOTES

1 Sealant both sides of frame. Provide backer rod at all exterior locations.

5 Hollow metal or stainless steel frame.

6 Bond beam. See Typical Lintel Detail.

13 Grout frames full.

14 Concrete Block.

19 Glazing. See Specs.

21 Hospital stops @ all interior door frames.

25 Bullnose block at all exposed jambs.

26 6" CMU bond beam.

27 (2) #4 rebars.

28 Grout solid.

29 6" Lighweight CMU wall. See Wall Type M1.1 on Sheet 14A102 for construction details.

30 Exterior wall: 8" CMU with rigid insulation and metal siding

31 3/8" thick galvanized bent steel plate, painted.

32 Door threshold.

33 Roof assembly: Ballasted EPDM membrane over 1/4" per foot sloped tapered insulation. 3" minimum insulation thickness over concrete deck.

GENERAL NOTES

A. All wood blocking shall be fire retardant.

B. See Finish Plans for typical sill conditions at unlike floor finishes.

C. Seal joints between finish material and bottom of door frames.

D. Paint window frames at door windows to match door frame.

DOOR SCHEDULE - BASE BID

DOOR#

BETWEEN DOOR DESCRIPTION FRAME DESCRIPTION

FIRE

RATING HDWE SET REMARKSRM RM TYPE MAT'L

SIZE

TYPE MAT'L HEAD JAMB SILLQTY. W H T

6' - 0" 7' - 2" 1 3/4"

010 001 010 F FRP 2 4' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 13 (1) 3'-0" Leaf x (1) 1'-0" Leaf

011 010 011 F FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 06 No Closer

012 010 012 V FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 05

014 010 014 V FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 05

015 015 013 F FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 09

016 013 016 V FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 06

017 017 013 V FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 02

018 018 010 V FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 05

019 019 010 V FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 05

020 010 020 V FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 01

020A 020A 020 F FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 08

025 010 025 F HM 2 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 12 Existing Door & Frame to Remain w/ New Hardware

026A 026 025 F FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 07

026B 027 026 V FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 07

028 027 028 F FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 04

029 027 029 F FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 03

030 030 027 F FRP 1 3' - 0" 7' - 2" 1 3/4" 1 HM H1 J1 03

031 031 028 F FRP 1 2' - 6" 7' - 2" 1 3/4" 1 HM H1 J1 10

200R F HM 1 3' - 0" 5' - 10" 1 3/4" 1 HM H1 J1 S1 15 Access Door from Second Floor onto First Floor Roof

S01A S-1-0 010 F HM 1 3' - 0" 7' - 2" 1 3/4" 1 HM 1 1/2 Hr 14 Existing Stairwell Door & Frame to Remain w/ New Hardware

S01B S-1-0 027 F HM 1 3' - 0" 7' - 2" 1 3/4" 1 HM 1 1/2 Hr 14 Existing Stairwell Door & Frame to Remain w/ New Hardware

Scale: 1 1/2" = 1'-0"2

ROOF ACCESS DOOR SILL DETAIL

Scale: 1/4" = 1'-0"

WINDOW TYPES

Revisions Date

Scale: 3" = 1'-0"1

CMU BOND BEAM LINTEL DETAIL

Toilet

Toilet

Shower

10" 6'-8" 5 5/8" 5'-11"

/8

/8

/8

/2

/8

/4

/8

A

4.38

10" 3'-3 7/8"

5 5/8"

4'-6"

Corridor

14A701

14A701

A

14A701

A

1 8

14A701

A

14A701

A

14A701

A

A

AF

B

I

G H

H

B

A

F

L

C

C

H

I

M

K

C

/8

/8

2'-3"

/8 "3

/8

/4

/8

D

E

G

I

B

H

10"

A

F

C

A

F

8"

C

B

G

I H

M

4'-6"

L

PL-1

SS-1 B3

N

O

I

H

K

C

D

/8

5 5/8" 5'-1 1/4" 5'-5 3/8"

3.18

3.18

M1.3

M1.3

T O

C E

IL

IN

G

P-1

CT-2

CT-1

PTB-1

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

ENLARGED PLANS & INTERIOR

ELEVATIONS

14A701

LPKR

17004.00

539-19-201

Cincinnati, Ohio

Scale: 1/4" = 1'-0"A

ENLARGED PARTIAL PLAN

Scale: 1/4" = 1'-0"3

TOILET ROOM 030

Scale: 1/4" = 1'-0"1

TOILET ROOM 030

Scale: 1/4" = 1'-0"2

TOILET ROOM 030

Scale: 1/4" = 1'-0"4

TOILET ROOM 030

Scale: 1/4" = 1'-0"5

TOILET ROOM 029

Scale: 1/4" = 1'-0"6

TOILET ROOM 029

Scale: 1/4" = 1'-0"7

TOILET ROOM 029

Scale: 1/4" = 1'-0"8

TOILET ROOM 029

Scale: 1/4" = 1'-0"9

SHOWER 028

Scale: 1/4" = 1'-0"10

SHOWER 028

Scale: 1/4" = 1'-0"11

SHOWER 028

Scale: 1/4" = 1'-0"12

SHOWER 028

TOILET ACCESSORIES SCHEDULE

MARK ITEM MOUNTING HEIGHT COMMENTS

A GRAB BAR 42" LENGTH 33" A.F.F. TO CENTER LINE PROVIDED AND INSTALLED BY GC

B GRAB BAR 36" LENGTH 33" A.F.F. TO CENTER LINE PROVIDED AND INSTALLED BY GC

C GRAB BAR 18" LENGTH, VERTICAL 36" A.F.F. TO BOTTOM PROVIDED AND INSTALLED BY GC

D GRAB BAR 24" LENGTH 33" A.F.F. TO CENTER LINE PROVIDED AND INSTALLED BY GC

E GRAB BAR 18" LENGTH 33" A.F.F. TO CENTER LINE PROVIDED AND INSTALLED BY GC

F TOILET PAPER DISPENSER 28" A.F.F. TO TOP PROVIDED BY OWNER, INSTALLED BY GC

G MIRROR, 24" x 36" 40" A.F.F. TO BOTTOM OF MIRROR PROVIDED AND INSTALLED BY GC

H PAPER TOWEL DISPENSER 42" A.F.F. TO BOTTOM PROVIDED BY OWNER, INSTALLED BY GC

I SOAP DISPENSER 44" A.F.F. TO BOTTOM PROVIDED BY OWNER, INSTALLED BY GC

K TOWEL HOOK 60" A.F.F. TO CENTER LINE PROVIDED AND INSTALLED BY GC

L SHOWER SEAT 18" A.F.F. TO TOP OF SEAT PROVIDED AND INSTALLED BY GC

M FRAMELESS MIRROR, 70" x 57" 32" A.F.F. TO BOTTOM PROVIDED AND INSTALLED BY GC

N SHOWER CURTAIN 76" A.F.F. TO CENTER LINE PROVIDED BY OWNER, INSTALLED BY GC

O SHOWER CURTAIN ROD 76" A.F.F. TO CENTER LINE PROVIDED AND INSTALLED BY GC

GENERAL INT. ELEVATION NOTES

A. See sheet A801 and A802 for Finish Plans.

B. See sheet A702 for Casework Details.

C. See sheet A804 for Room Finish Schedule.

D. See sheet A804 for Finish Materials Legend.

3.18 Grout CMU half walls solid at open unbraced ends of wash basin.

4.38 Align face of new wall with face of existing adjacent wall.

Scale: 1/4" = 1'-0"13

SHOWER 028

Scale: 1/4" = 1'-0"C

WASH BASIN FLOOR AREA

Scale: 1/4" = 1'-0"B

TYP. TILE PATTERN

PLAN NOTES

B1

2 5/8" 3'-0" 3'-0" 2 5/8"

SS-1

PL-1

RB-1

B1

P-1

W1 W1

B1 B2 B1

RF RF

3'-6" 3'-6" 7"

3'-0" 3'-6" 2'-6" 10"

H

I

PL-1

E-1

PL-1

RB-1

CM

P-1

5 1/2" 2'-6" 3'-0" 3'-0"

8 1/2" 3'-0" 3'-0" 3'-0" 2"

W1 W2 W2

B1 B1 B1

E-1

PL-1

PL-1

RB-1

MW MW

MWMW

P-1

RES-1

CG-2CG-2

CR-1

10.03

M-1

P-1

RES-1

21.02

E-1

HI

CG-2

M-2 3" 2'-3" 4'-0" 2'-3" 2 5/8"

B6 B7 B6

RB-1

P-1

2'-3" 4'-0" 2'-3"

W3 W3 W3

M-2

22.21

21.01

RES-1

6'-0"6'-0"6'-0"6'-0"6'-0" 2'-0"5'-4"2'-0"

CG-2

CG-2

B4B4 HIHI

E-1

PL-1

21.01

I

H

RES-1RES-1

I

H

22.21

CG-1

P-1

6" 3'-0" 2'-6"

B5

E-1

P-1

RES-1

3'-8 7/8"4'-0"4'-0"

B5

E-1

RES-1

P-1

2" 3'-10" 3'-10" 2"

RES-1

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

INTERIOR ELEVATIONS

14A702

LPKR

17004.00

539-19-201

Cincinnati, Ohio

GENERAL INT. ELEVATION NOTES

A. See sheet A801 and A802 for Finish Plans.

B. See sheet A702 for Casework Details.

C. See sheet A804 for Room Finish Schedule.

D. See sheet A804 for Finish Materials Legend.

ELEVATION NOTES

10.03 Metal lockers w/ sloped metal top. Provided and Installed by

Owner.

21.01 Wall mounted fire extinguisher by owner.

21.02 Existing recessed fire extinguisher cabinet to remain.

22.21 Emergency eye wash station & drench shower. See Plumbing Drawings.

Scale: 1/4" = 1'-0"14

CONFERENCE 017

Scale: 1/4" = 1'-0"15

LOUNGE 020

Scale: 1/4" = 1'-0"16

LOUNGE 020

Scale: 1/4" = 1'-0"17

CORRIDOR 027

Scale: 1/4" = 1'-0"18

MECH SHOPS 025

Scale: 1/4" = 1'-0"20

SHARED SHOP SPACE 010

Scale: 1/4" = 1'-0"19

SHARED SHOP SPACE 010

Scale: 1/4" = 1'-0"21

SHARED SHOP SPACE 010

Scale: 1/4" = 1'-0"22

LOCKSMITH 011

Scale: 1/4" = 1'-0"23

LOCKSMITH 011

Scale: 1/4" = 1'-0"24

LOCKSMITH 011

ELEC. BLDG.

BLDG. 15

E L E

C

B L D

G

B L D

G

B L D

G

B L D

G

Mech Shops

Carpentry

Shop

Corridor

Toilet

Toilet

Shower

HAC

Locksmith

Shared Shop Space

Future Elevator

E-1

Elev.

Equip

Toilet

Lounge

Conference

Utility

Section Supervisor

Facilities Section

Supervisor

Computer

Closet

Electrical Supervisor

Corridor

Work Leaders

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1 LVT-1

LVT-1

RES-1

RES-1

LVT-1

PT-1

PT-1

PT-1

SC-1

SC-1

RES-1

RES-1

SC-1

Closet

020A

LVT-1

22.02

TYP.

Closet

22.02

TYP.

RES-1

Paint Booth

SC-1

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

FLOOR FINISH PLAN

14A801

LPKR

17004.00

539-19-201

Cincinnati, Ohio

N Scale: 1/8" = 1'-0"

BASEMENT FLOOR FINISH PLAN

GENERAL FINISH PLAN NOTES

A. See Sheet A804 for Finish Materials Legend.

B. See Sheet A804 for Room Finish Schedule.

C. See Interior Elevations on Sheet A701 and A702 for further information.

PLAN NOTES

22.02 Floor drain. See Plumbing Drawings.

ELEC. BLDG.

BLDG. 15

E

L E

C

B L D

G

B L D

G

B L D

G

B L D

G

Electrical Supervisor

Facilities Section

Supervisor

Utility Section

Supervisor

Work Leaders

Computer

Corridor

Conference

Lounge

Shared Shop Space

Corridor

Mech Shops

Future Elevator

E-1

Toilet

Elev.

Equip

022 HAC

Toilet

Toilet

Shower

Closet

Locksmith

Carpentry Shop

Closet

020A

P-2

P-2

P-2

CG-1

CG-1

CG-1

CG-1CG-1

CG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-2

CG-2

CG-2CG-2

CG-2

CG-2

CG-2

CG-2CG-2

CG-2

CG-2CG-2

CR-1

CR-1

CR-1

CR-1

CR-1

CR-1CR-1

CR-1

CR-1 CR-1

CR-1

CG-2

CG-2

CG-2

CG-2

Closet

P-5

CG-2

CG-2

CG-2

CG-2

CG-1 CG-1

CR-1

CG-1

CG-1CG-1

Paint Booth

CG-1

CG-1

/2

1 1/2"

Floor

10.16

10.25

10.24

3.19

3"

10.02

10.01

3.19

3"

10.02

10.01

3.20

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

WALL FINISH AND PROTECTION

PLAN

14A802

LPKR

17004.00

539-19-201

Cincinnati, Ohio

N Scale: 1/8" = 1'-0"

BASEMENT WALL FINISH AND PROTECTION PLAN

GENERAL FINISH PLAN NOTES

A. See Sheet A804 for Finish Materials Legend.

B. See Sheet A804 for Room Finish Schedule.

C. See Interior Elevations on Sheet A701 and A702 for further information.

PLAN NOTES

3.19 CMU wall.

3.20 Concrete column.

10.01 Flush mounted full height stainless steel corner guard.

10.02 Screw fastener. See manufacturer's installation instructions.

10.16 Mounting bracket.

10.24 Stainless steel crash rail with V-groove.

10.25 Screw fastener with concrete anchor, 32" O.C. max. See

manufacturer's installation instructions.

Scale: 3" = 1'-0"3

CR-1 DETAIL

Scale: 3" = 1'-0"1

CG-1 DETAIL

Scale: 3" = 1'-0"2

CG-2 DETAIL

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

FINISH SCHEDULE

14A804

LPKR

17004.00

539-19-201

Cincinnati, Ohio

ROOM FINISH SCHEDULE

Number Name Floor Base Wall - N Wall - S Wall - E Wall - W Ceiling

010 Shared Shop Space RES-1 RES-1 P-1 P-1 P-1 P-1 -

011 Locksmith RES-1 RES-1 P-1 P-1 P-1 P-1 ACT-1

012 Work Leaders LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1

013 Corridor LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

014 Electrical Supervisor LVT-1 RB-1 P-2 P-1 P-1 P-1 ACT-1

015 Closet LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

016 Computer LVT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1

017 Conference LVT-1 RB-1 P-1 P-1 P-1 P-1,2 ACT-1

018 Facilities Section Supervisor LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1

019 Utility Section Supervisor LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1

020 Lounge LVT-1 RB-1 P-2 P-1 P-1 P-1 ACT-1

020A Closet LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

021 Toilet RES-1 RES-1 P-1 P-1 P-1 P-1 EXIST

022 Elev. Equip SC-1 RB-1 P-1 P-1 P-1 P-1 -

023 HAC SC-1 RB-1 - - - - -

024 Paint Booth

025 Mech Shops SC-1 RB-1 P-1 P-1 P-1 P-1,5 -

026 Carpentry Shop SC-1 RB-1 P-1 P-1 P-1 P-1 -

027 Corridor RES-1 RES-1 P-1 P-1 P-1 P-1 -

028 Shower PT-1 PTB-1 P-1/CT-1,2 P-1/CT-1,2 P-1/CT-1,2 P-1/CT-1,2 P-4

029 Toilet PT-1 PTB-1 P-1/CT-1,2 P-1/CT-1,2 P-1/CT-1,2 P-1/CT-1,2 P-4

030 Toilet PT-1 PTB-1 P-1/CT-1,2 P-1/CT-1,2 P-1/CT-1,2 P-1/CT-1,2 P-4

031 Closet PT-1 PTB-1 P-1 P-1 P-1 P-1 P-4

*PRODUCT MANUFACTURER AND COLOR ARE LISTED TO CONVEY DESIGN INTENT. ALTERNATE PRODUCTS WILL BE ALLOWED PROVIDED THEY ARE OF EQUAL QUALITY AND AESTHETIC/COLOR*

FINISH LEGEND

CODE DESCRIPTION MANUFACTURER MODEL / COLOR COMMENTS

CASEWORK FINISHES

E-1 EPOXY COUNTERTOP KEWAUNEE KEMRESIN BLACK

PL-1 PLASTIC LAMINATE WILSONART 7919-60 AMBER CHERRY

SS-1 SOLID SURFACE (TOILET ROOM) FORMICA TRADITIONS WHEAT MATRIX 333

CEILING FINISHES

ACT-1 ACOUSTIC CEILING TILE ARMSTRONG "FINE FISSURED" 1728 WHITE, 2' x 2' GRID: "PRELUDE XL" 15/16" EXPOSED TEE

P-4 PAINT GLIDDEN CEILING WHITE GLOSS LEVEL 1

FLOOR FINISHES

LVT-1 LUXURY VINYL TILE SHAW CONTRACT "STRAND" 0516V, CLAY 16761, 18" x 36" VERTICAL ASHLAR INSTALLATION

PT-1 PORCELAIN TILE DALTILE "KEYSTONES" D201 URBAN PUTTY SPECKLE, 2" x 2" GROUT: TEC ACCUCOLOR EFX EPOXY, 915 LIGHT SMOKE

RES-1 RESINOUS FLOORING SIKA INDUSTRIAL FLOORING PURCEM 22NA, RAL 7042 TRAFFIC GREY

SC-1 SEALED CONCRETE - -

MISCELLANEOUS FINISHES

M-1 METAL LOCKER LYON DOVE GRAY

M-2 PAINTED METAL KEWAUNEE 95 STORMY BLUE

WALL FINISHES

CT-1 CERAMIC TILE DALTILE MATTE ALMOND x735 6" x 6"

CT-2 CERAMIC TILE DALTILE MATTE ALMOND x735 2" x 6" BULLNOSE

P-1 PAINT GLIDDEN WATER CHESTNUT 30YY 62/127 GLOSS LEVEL 3

P-2 PAINT GLIDDEN GENTRY BLUE 70BG 28/060 GLOSS LEVEL 3

P-3 PAINT GLIDDEN MUSHROOM CAP 20YY 55/151 GLOSS LEVEL 5

P-5 PAINT SHERWIN WILLIAMS SW 7026 GRIFFIN GLOSS LEVEL 1

PTB-1 PORCELAIN TILE BASE DALTILE MATTE ALMOND x735 6" x 6"

RB-1 RUBBER BASE JOHNSONITE "TIGHTLOCK WALL BASE" TDC-49 BEIGE, 4-3/8" H

WALL PROTECTION FINISHES

CG-1 CORNER GUARD CS ACROVYN CO-8 STAINLESS STEEL 3.5" x FULL HEIGHT

CG-2 CORNER GUARD CS ACROVYN CO-8 STAINLESS STEEL 3.5" x FULL HEIGHT

CR-1 CRASH RAIL CS ACROVYN SCR-16SSV STAINLESS STEEL MOUNTED 1'-0" TO TOP A.F.F.

GENERAL FINISH PLAN NOTES

A. See Sheet A804 for Finish Materials Legend.

B. See Sheet A804 for Room Finish Schedule.

C. See Interior Elevations on Sheet A701 and A702 for further information.

Revisions Date

BID ITEMS

Item # Description

Bid Item 2 Delete card readers and security cameras as indicated on drawings.

Bid Item 3 Provide sealed concrete flooring (SC-1) in lieu of resinous flooring (RES-1) in all rooms scheduled to receive (RES-1). Provide rubber base (RB-1) in lieu of resinous base in all rooms scheduled to recieve (RES-1).

Electrical Supervisor

Facilities Section

Supervisor

Utility Section

Supervisor

Work Leaders

Computer

Corridor

Conference

Lounge

Shared Shop Space

Corridor

Mech Shops

Future Elevator

E-1

Toilet

Elev.

Equip

HAC

Toilet

Toilet

Shower

Closet

Locksmith

Carpentry Shop

Closet

020A

ELEC. BLDG.

BLDG. 15

E L E

C

B L D

G

B L D

G

B L D

G

B L D

G

GBGB

DF

DH

DS

PF

PS

MT

SR

MS

MB

PC

SB

GR LA

EM

DR

SA1

WS

WE1

WE2

TB

BC

SC

SP

SA2BN

WB2

BS

DP

WR WR

TS WB1

DC

WT1 WT1

WT2 WT2

WT3

JO

SM

RS

PL

PB

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

FURNITURE PLAN

14IF100

LPKR

17004.00

539-19-201

Cincinnati, Ohio

GENERAL NOTES

N Scale: 1/8" = 1'-0"

BASEMENT - FURNITURE PLAN

A. All furniture to be Owner provided and installed. Furniture layouts are for reference only. Coordinate final furniture plan with Owner.

GBGB

DF

DH

DS

PFPS

MT

SR

MS

MB

PC

SB

GR LA

EM

DR

SA1

WS

WE1

WE2

TB

BC

SC

SP

SA2BN

WB2

DP

WR WR

TS

WB1

DC

WT1 WT1

WT2 WT2

Electrical Supervisor

Facilities Section

Supervisor

Utility Section

Supervisor

Work Leaders

Computer

Corridor

Conference

Lounge

Shared Shop Space

Corridor

Mech Shops

Future Elevator

E-1

Toilet

Elev.

Equip

HAC

Toilet

Toilet

Shower

Closet

Locksmith

Carpentry Shop

Closet

020A

ELEC. BLDG.

BLDG. 15

E L E

C

B L D

G

B L D

G

BLDG. 14

BLDG. 15

RF

RF

MWMW

CM

MW MW

RS

SM

SB

BS

JOPL

WB2

WT3

PB

JOHN

A.

POE

IO

HO

FOET

A T

S

R E G

IS

E T

R

ED RA

C H

TI

E C T

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

JPA Project No.

Dwg. of

Expand Engineering Support Space

BUILDING 14

1/18/2019

EQUIPMENT PLAN

14QF100

LPKR

17004.00

539-19-201

Cincinnati, Ohio

N Scale: 1/8" = 1'-0"

BASEMENT - EQUIPMENT PLAN

Equipment Schedule

T a g

D e s c ri p ti o n

C o u n t

S u p p lie r

In s ta lle r

W id th

D e p th

H e ig h t

M o u n ti n g L o c a ti o n

V o lt

P h a s e

A m p

H a rd

W ir e

W o r

P lu g

P

E m

U P

S

D a ta

A la rm

C o ld

W a te r

H o t W a te r

S te a m

D ra in

C o m p A ir

D u s t C o lle c ti o n

R e m a rk s

Shared Shop Space

BS Brick Saw (WS) 1 V V 3' - 6" 2' - 0" 3' - 0"

DF Door & Frame Storage 1 V V 3' - 0" 3' - 0" 5' - 0"

DH Door Hardware 1 V V 4' - 0" 2' - 0" 6' - 0"

DS Drywall Storage 1 V V 10' - 0" 3' - 0" 5' - 0"

GB Gang Box 2 V V 5' - 0" 3' - 0" 3' - 0"

PF Pipe Fittings 1 V V 4' - 0" 2' - 0" 5' - 0"

PS Pipe Storage 1 V V 12' - 0" 3' - 0" 5' - 0" NA

WT1 Work Table 2 2 V V 5' - 0" 12' - 8" 3' - 0"

WT2 Work Table 3 2 V V 5' - 0" 20' - 0" 3' - 0"

WT3 Work Table 4 1 V V 2' - 6" 12' - 8" 3' - 0"

Lounge

CM SE-Coffee Maker Commercial 1 V V

MW Microwave 4 V V

RF Side-by-Side Refrigerator 2 V V Ref.

Paint Booth

PB Paint Booth 1 V V 6' - 4" 10' - 4" 7' - 0"

Mech Shops

BC Big Chop Saw (MS) 1 V V 6' - 0" 4' - 0" 3' - 0" 220 V 1 7 P

DR Drill (Metal Shop) 1 V V 2' - 0" 1' - 6" 3' - 0" 110 V 1 11 P

EM Enco Machine 1 V V 3' - 6" 4' - 6" 3' - 0" 220/440 V 1 6 P

GR Grinder (Metal Shop) 1 V V 2' - 0" 2' - 0" 3' - 0" 220 V 1 3.2 P

LA Lathe (Metal Shop) 1 V V 5' - 6" 1' - 6" 3' - 0" 220 V 1 20 W

MB Metal Band Saw 1 V V 3' - 9" 2' - 4" 3' - 0" 240 V 1 30 W

MS Metal Shear 1 V V 5' - 0" 2' - 8" 3' - 0" NA

MT Metal Work Table 1 V V 6' - 0" 6' - 0" 3' - 0" NA

PC Parts Cleaner 1 V V 3' - 8" 3' - 6" 3' - 0" 110 V 1 20 P

SA1 Belt Sander (Metal Shop) 1 V V 1' - 6" 1' - 6" 3' - 0" 110 V 1 11 P

SB Sand Blaster 1 V V 3' - 0" 4' - 2" 3' - 0" 110 V 1 20 P X

SC Small Chop Saw (MS) 1 V V 4' - 0" 1' - 6" 3' - 0" 110 V 1 14 P

SP Shop Press (MS) 1 V V 2' - 3" 3' - 0" 3' - 0" NA

SR Small Break 1 V V 5' - 0" 3' - 0" 3' - 0" NA

TB Black Tool Box…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .