36C25018B0823 S02 - Drawings - 515-14-103_Part14.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0823-0001001.pdf | ||
| 36C25018B0823-0001000.docx | DOCX document | |
| 36C25018B0823-007.pdf | ||
| 36C25018B0823-014.pdf | ||
| 36C25018B0823-009.pdf | ||
| 36C25018B0823-004.pdf | ||
| 36C25018B0823-002.pdf | ||
| 36C25018B0823-003.pdf | ||
| 36C25018B0823-013.pdf | ||
| 36C25018B0823-011.pdf | ||
| 36C25018B0823-018.docx | DOCX document | |
| 36C25018B0823-006.pdf | ||
| 36C25018B0823-017.pdf | ||
| 36C25018B0823-012.pdf | ||
| 36C25018B0823-010.pdf | ||
| 36C25018B0823-019.pdf | ||
| 36C25018B0823-001.docx | DOCX document | |
| 36C25018B0823-008.pdf | ||
| 36C25018B0823-005.pdf | ||
| 36C25018B0823-015.pdf | ||
| 36C25018B0823-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SILL
HEAD
EXTERIORINTERIOR
JAMB
REMOVE EXISTING
WINDOW UNIT AND
METAL INTERIOR TRIM
EXTERIORINTERIOR
JAMB
HEAD
EXISTING STONE JAMB
EXISTING ANCHOR
REMOVE EXISTING
WINDOW UNIT
EXISTING STONE WINDOW
TRIM
REMOVE EXISTING WINDOW
UNIT
EXISTING STONE SILL
REMOVE EXISTING WINDOW
UNIT
REMOVE EXISTING INTERIOR
STORM WINDOW UNIT
REMOVE EXISTING INTERIOR
STORM WINDOW UNIT
EXTERIORINTERIOR
JAMB
HEAD
SILL
EXISTING STONE WINDOW
TRIM TO REMAIN
REMOVE EXISTING WINDOW
UNIT
REMOVE EXISTING CERAMIC
BACK GLASS INSULATED
PANEL
EXISTING STONE SILL
TO REMAIN
REMOVE EXISTING WINDOW
UNIT
EXISTING PAINTED CMU SILL
TO REMAIN
EXISTING STONE JAMB
TO REMAIN
EXISTING ANCHOR
REMOVE EXISTING WINDOW
UNIT
REMOVE EXISTING ANGLE
REMOVE EXISTING 1/4"
STEEL PLATE SUPPORT
REMOVE EXISTING ANGLE
ATTACHED AT SILL AND HEADER.
EXTERIORINTERIOR
JAMB
HEAD
SILL
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS FROM
EXISTING STONE WINDOW TRIM
NEW CERAMIC BACK GLASS
INSULATED PANEL, COLOR: T.B.D.
CLEAN / SCRAPE ALL
CAULKING, PAINT, AND OTHER
DEBRIS FROM EXISTING SILL
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS
FROM EXISTING STONE JAMB
EXISTING ANCHOR
NEW ALUMINUM INSULATED GLASS
WINDOW UNIT, SASHES FIXED
NEW ALUMINUM INSULATED GLASS
WINDOW UNIT, SASHES FIXED
NEW ALUMINUM INSULATED GLASS
WINDOW UNIT, SASHES FIXED
EXISTING LINTEL TO REMAIN
NEW 12" THICK SOLID SURFACE
STOOL, SECURE TO WALL OPENING
EXISTING LINTEL,
REMOVE RUST,
PRIME AND PAINT
NEW WOOD OR ALUMINUM
BLOCKING
EXTERIORINTERIOR
JAMB
HEAD
EXISTING ANCHOR
REMOVE EXISTING
WINDOW UNIT AND
METAL INTERIOR TRIM
REMOVE EXISTING
WINDOW UNIT AND
METAL INTERIOR TRIM
EXTERIORINTERIOR
EXTERIORINTERIOR
SILL
HEAD
EXTERIORINTERIOR
JAMB
NEW INTERIOR TRIM
NEW ALUMINUM INSULATED GLASS
WINDOW UNIT, SASHES FIXED
NEW ALUMINUM INSULATED GLASS
WINDOW UNIT, SASHES FIXED
CLEAN / SCRAPE ALL
CAULKING, PAINT, AND
OTHER DEBRIS FROM
EXISTING SILL
NEW 12" THICK SOLID SURFACE
STOOL, SECURE TO WALL OPENING
NEW ALUMINUM INSULATED GLASS
WINDOW UNIT, SASHES FIXED
NEW 12" THICK SOLID SURFACE
STOOL, SECURE TO WALL OPENING
APPLY SEALANT AT
PERIMETER OF NEW
WINDOW AND
PANNING/TRIM, ALL
SIDES, CONTINUOUS.
APPLY SEALANT AT
PERIMETER OF NEW
WINDOW AND
PANNING/TRIM, ALL
SIDES, CONTINUOUS.
NEW INTERIOR TRIM
CLEAN / SCRAPE ALL
CAULKING, PAINT, AND OTHER
DEBRIS FROM EXISTING SILL
APPLY SEALANT AT
PERIMETER OF NEW
WINDOW AND
PANNING/TRIM, ALL
SIDES, CONTINUOUS.
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS FROM
EXISTING STONE WINDOW TRIM
NEW ALUMINUM
INSULATED GLASS
WINDOW UNIT,
SASHES FIXED
NEW 12" THICK SOLID SURFACE
STOOL, SECURE TO WALL OPENING
NEW 12" THICK SOLID
SURFACE STOOL, SECURE
TO WALL OPENING
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT,
SASHES FIXED
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS
FROM EXISTING STONE JAMB
SILLSILL
SCALE: 1/4" = 1'-0"
NEW WINDOW ELEVATIONS
SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF
SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF
SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF
SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF
SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF
EXTERIORINTERIOR
JAMB
HEAD
SILL
EXISTING STONE
WINDOW TRIM
REMOVE EXISTING
WINDOW UNIT
REMOVE EXISTING CERAMIC
BACK GLASS INSULATED
PANEL
EXISTING STONE SILL
REMOVE EXISTING
WINDOW UNIT
EXISTING QUARRY TILE
OR WOOD STOOL
EXISTING STONE JAMB
EXISTING ANCHOR
REMOVE EXISTING
WINDOW UNIT
EXTERIORINTERIOR
JAMB
HEAD
SILL
NEW INSULATED PANEL
EXISTING ANCHOR
NEW ALUMINUM
STOREFRONT WINDOW
UNIT
NEW ALUMINUM
STOREFRONT WINDOW
UNIT
CLEAN / SCRAPE ALL
CAULKING, PAINT, AND OTHER
DEBRIS FROM EXISTING SILL
APPLY SEALANT AT
PERIMETER OF NEW
WINDOW AND
PANNING/TRIM, ALL
SIDES, CONTINUOUS.
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS FROM
EXISTING STONE WINDOW TRIM
NEW ALUMINUM STOREFRONT
WINDOW UNIT
NEW 12" THICK SOLID
SURFACE STOOL, SECURE
TO WALL OPENING
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS
FROM EXISTING STONE JAMB
NEW 12" THICK SOLID
SURFACE STOOL, SECURE
TO WALL OPENING
SILL
HEAD
EXTERIORINTERIOR
JAMB
REMOVE EXISTING WINDOW
UNIT
REMOVE EXISTING WINDOW
UNIT
REMOVE EXISTING
WINDOW UNIT
REMOVE EXISTING
FRAMING / TRIM
EXISTING SILL TO REMAIN
REMOVE EXISTING
FRAMING / TRIM
REMOVE EXISTING
FRAMING / TRIM
EXTERIORINTERIOR
EXTERIORINTERIOR
SILL
HEAD
EXTERIORINTERIOR
JAMB
APPLIED MUNTIN
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT APPLY SEALANT AT
PERIMETER OF NEW
WINDOW AND
PANNING/TRIM, ALL
SIDES, CONTINUOUS.
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,
FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL
FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,
FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR
METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER
PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,
INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.
CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER
MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND
INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE
ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,
FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,
SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR
ADDITIONAL INFORMATION.
3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING
INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND
ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.
4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM
WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)
REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.
5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.
TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL
SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW
IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.
INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING
OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON
WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS
AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR
TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS
WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL
APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR
PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.
9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.
10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE
FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE
EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN
GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING
REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN
DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY
TIME.
12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR
OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR
REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER
CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM
AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.
13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.
FINISH TO MATCH ADJACENT.
14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA
MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH
COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING
BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND
OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL
EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION
THROUGH WINDOW OPENING. COORDINATE WITH COR.
15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR
ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND
CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL
INFORMATION.
16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO
ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS
NEEDED FROM J-BOX OR PANEL.
17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED
FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT
GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW
OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL
INFORMATION.
18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF
WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW
WINDOW INSTALLATION.
19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS
NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND
LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW
WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW
POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE
SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.
20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO
WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH
ADJACENT.
21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM
MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.
22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW
FRAME. CAP AT INTERIOR FOR FUTURE USE.
23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.
24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.
25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.
26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP
ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.
27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE
PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR
WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE
SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.
28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE
AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT
CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY
ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.
SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.
30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.
31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION
AND DETAIL DRAWINGS.
32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
AND DETAILS.
33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.
34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE
WITH WINDOW OPENING.
35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN
DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF
MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,
OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK
OR OTHER MECHANICAL EQUIPMENT.
36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.
SH SINGLE HUNG
DH DOUBLE HUNG
FXD FIXED
CASE CASEMENT
HOP HOPPER
AWN AWNING
SL SLIDER
HS HORIZONTAL SLIDER
ALS ALUMINUM STOREFRONT
DC DROPPED CEILING (ACT)
ACT ACOUSTICAL TILE CEILING
DW DRYWALL / PLASTER
RO ROUGH OPENING
BO BOTTOM OF
TO TOP OF
WC WALL COVERING
VWC VINYL WALL COVERING
WD WOOD
SCRN SCREEN
MTL METAL
SS SOLID SURFACE
CT CERAMIC TILE
VIF VERIFY IN FIELD
NOTE:
ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN
RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM
TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.
THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL
INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS
MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
NOTE:
WINDOW MUNTINS TO BE 7
8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.
RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW
ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO
BE INDICATED IN SHOP DRAWINGS FOR REVIEW BY THE VA AND ARCHITECT.
NOTE:
NOT ALL WINDOW REPLACEMENT NOTES APPEAR ON THIS SHEET.
NOTE:
ALL WINDOW FRAME DEPTHS TO MATCH EXISTING.
SCALE: 1/8" = 1'-0"
DEMO DETAIL
SCALE: 1/8" = 1'-0"
DEMO DETAIL 1
AS702SCALE: 1/8" = 1'-0"
NEW DETAIL3
AS702
AS702SCALE: 1/8" = 1'-0"
NEW DETAIL 4
AS702SCALE: 1/8" = 1'-0"
DEMO DETAIL 5
AS702SCALE: 1/8" = 1'-0"
NEW DETAIL 6
AS702
AS701
SCALE: 1/8" = 1'-0"
DEMO DETAIL 7
AS702SCALE: 1/8" = 1'-0"
NEW DETAIL 8
AS702SCALE: 1/8" = 1'-0"
DEMO DETAIL 9
AS702SCALE: 1/8" = 1'-0"
NEW DETAIL 10
AS702
EXISTING AIR CONDITIONING UNIT, INSTALL
WITH A 38" SLOPE FROM FRONT TO BACK
PROVIDE FLASHING AND SEALANT TO CREATE
A WEATHER-TIGHT SEAL AT PENETRATION, ALL
SIDES, CONTINUOUS
FASTEN STEEL SUPPORT BRACKETS TO
BRICK EXTERIOR WALL
NEW STEEL SUPPORT BRACKET (X2)
FASTEN STEEL SUPPORT BRACKETS TO AIR
CONDITIONING UNIT. AIR CONDITIONER MUST
BE FULLY SUPPORTED BY THESE BRACKETS.
The AIR CONDITIONER MAY NOT BEAR UPON
THE WINDOW FRME OR INSULATED PANEL.
PROVIDE FLASHING AND SEALANT TO CREATE
A WEATHER-TIGHT SEAL AT PENETRATION, ALL
SIDES, CONTINUOUS
NEW 1" NSULATED PANEL WITH
ALUMINUM FRAME TO MATCH
NEW WINDOW SYSTEM,
GLAZED INTO NEW SASH AT
FACTORY, FINISH TO MATCH
NEW WINDOW FRAME
CONTRACTOR TO FIELD CUT
PENETRATION FOR EQUIPMENT
USING CARBIDE-TIP BLADE.
APPLY SEALANT AROUND FULL
PENETRATION, INTERIOR AND
EXTERIOR.
SCALE: 1" = 1'-0"
SALVAGE MECHANICAL EQUIPMENT
SCALE: 1" = 1'-0"
REINSTALLATION OF MECHANICAL EQUIPMENT
HEAD
JAMB
SILL
MEETING RAILS
JAMB
SILL
REMOVE EXISTING WINDOW UNIT
NEW WINDOW UNIT
NEW WINDOW UNIT
EXTERIORINTERIOR EXTERIORINTERIOR
REMOVE EXISTING WINDOW UNIT
TEMPORARILY REMOVE EXISTING
VENT, LOUVER, OR OTHER
MECHANICAL EQUIPMENT
TEMPORARILY REMOVE EXISTING
VENT, LOUVER, OR OTHER
MECHANICAL EQUIPMENT
REMOVE EXISTING WINDOW UNIT
* WINDOW UNIT, BLOCKING,
AND WALL TYPE SHOWN
REPRESENTS ONLY ONE
GENERAL CONDITION. ACTUAL
CONDITIONS WILL VARY. VERIFY
ALL IN FIELD.
HEAD
CONTRACTOR TO FIELD CUT
PENETRATION FOR EQUIPMENT
USING CARBIDE-TIP BLADE.
APPLY SEALANT AROUND FULL
PENETRATION, INTERIOR AND
EXTERIOR.
NEW INSULATED PANEL, GLAZED
INTO NEW SASH AT FACTORY
EXISTING EQUIPMENT
PENETRATING WINDOW.
CONTRACTOR TO FIELD INSTALL.
NEW INSULATED PANEL,
GLAZED INTO NEW SASH AT
FACTORY, FINISH TO MATCH
NEW WINDOW FRAME
EXISTING EQUIPMENT
PENETRATING WINDOW.
CONTRACTOR TO FIELD INSTALL.
EXTERIORINTERIOR
MEETING RAILS
EXTERIORINTERIOR
TEMPORARILY REMOVE EXISTING
VENT, LOUVER, OR OTHER
MECHANICAL EQUIPMENT
NEW WINDOW UNIT
PROVIDE FLASHING AND SEALANT
TO CREATE A WEATHER-TIGHT
SEAL AT PENETRATION, ALL
SIDES, CONTINUOUS
PROVIDE FLASHING AND SEALANT
TO CREATE A WEATHER-TIGHT
SEAL AT PENETRATION, ALL
SIDES, CONTINUOUS
PROVIDE FLASHING AND SEALANT
TO CREATE A WEATHER-TIGHT
SEAL AT PENETRATION, ALL
SIDES, CONTINUOUS
NEW INSULATED PANEL,
GLAZED INTO NEW SASH AT
FACTORY, FINISH TO MATCH
NEW WINDOW FRAME
NEW WINDOW UNIT
* WINDOW UNIT, BLOCKING,
AND WALL TYPE SHOWN
REPRESENTS ONLY ONE
GENERAL CONDITION. ACTUAL
CONDITIONS WILL VARY. VERIFY
ALL IN FIELD.
SCALE: 1" = 1'-0"
DEMO WINDOW - @ DRYWALL/ PLASTER CEILING
SCALE: 1" = 1'-0"
NEW WINDOW - @ DRYWALL/ PLASTER CEILING
HEADHEAD
EXISTING WINDOW TO
BE REMOVED.
EXTERIORINTERIOR EXTERIORINTERIOR
SCALE: 1" = 1'-0"
DEMO WINDOW - @ ACT CEILING
SCALE: 1" = 1'-0"
NEW WINDOW - @ ACT CEILING
HEADHEAD
EXTERIORINTERIOR EXTERIORINTERIOR
DRYWALL/PLASTER WALL SURFACE
AND CORNER DETAIL TO REMAIN. DO
NOT DAMAGE DURING
CONSTRUCTION.
PLASTER OR DRYWALL CEILING
SYSTEM, CAREFULLY REMOVE
SECTION 18"-24" FROM
EXTERIOR WALL.
NEW 58" TYPE "X" GYP BOARD AND 20 GA.
MTL STUD WINDOW POCKET.
DIMENSIONS TO BE DETERMINED BASED
ON EXTG CONDITIONS.
EXISTING WINDOW TO
BE REMOVED.
SUSPENDED ACOUSTICAL TILE CEILING
SYSTEM, CAREFULLY REMOVE SECTION
18"-24" FROM EXTERIOR WALL. SALVAGE
TILES TO BE REINSTALLED.
NEW ALUMINUM
WINDOW SYSTEM
AND ALUMINUM
PANNING / TRIM
NEW 58" TYPE "X" GYP BOARD AND 20 GA.
MTL STUD WINDOW POCKET.
DIMENSIONS TO BE DETERMINED BASED
ON EXTG CONDITIONS.
18" MIN
4" M
IN
NEW ALUMINUM
WINDOW SYSTEM
AND ALUMINUM
PANNING / TRIM
REINSTALL SALVAGED SUSPENDED
ACOUSTICAL TILE CEILING SYSTEM,
MODIFY TILE AND GRID TO FIT AT NEW
WINDOW POCKET.
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
WC-1
WALL COVERING
PAINT
WALL PAINT - MATCH EXISTING IN COLOR, FINISH, AND SHEEN. COORDINATE WITH COR.PT-1
PT-2
PT-3
SEE ARCHITECTURAL DRAWINGS FOR EXTENT OF FINISHES.
PATCH AND REPAIR WALLS FROM CORNER TO CORNER AND FLOOR TO CEILING IN THEIR ENTIRETY UPON COMPLETION OF CONSTRUCTION.
PAINT CORNER TO CORNER AND FLOOR TO CEILING.
1.
2.
3.
4.
MATCH EXISTING. CONTRACTOR TO ENSURE PATTERN MATCH AT SEAMS AS NEEDED. COORDINATE WITH COR.
WHITE ANODIZED ALUMINUM FINISH AT INTERIOR AND EXTERIOR, EXACT COLOR TO MATCH EXISTING EXTERIOR BUILDING TRIM, COORDINATE WITH COR.WN-1
ALUMINUM WINDOW FRAME AND SASHES
LEGEND
ROOM FINISH LEGEND AND REMARKS
REMARKS
WALLS / BULKHEAD / CEILING
CEILING PAINT - MATCH EXISTING IN COLOR, FINISH, AND SHEEN. COORDINATE WITH COR.
TRIM PAINT - MATCH EXISTING IN COLOR, FINISH, AND SHEEN. COORDINATE WITH COR.
LAY-IN
ACT-1
CEILING
MATCH EXISTING TILE AND GRID SYSTEM IN ITS ENTIRETY. COORDINATE WITH COR.
WINDOWS
ALL OTHER FINISHES AFFECTED BY DEMOLITION AND CONSTRUCTION / DAMAGED BY CONTRACTOR SHALL BE REPAIRED / REPLACED TO MATCH EXISTING.
CERAMIC / PORCELAIN TILE
WALL TILE - MATCH EXISTING IN COLOR, FINISH, SHAPE, AND SIZE. COORDINATE WITH COR.WT-1
BL-1 VENETIAN (HORIZONTAL) BLINDS - ALUMINUM, 1" SLATS, STANDARD CORD OPERATION, COLOR TO BE SELECTED BY VA FROM MANUFACTURERS RANGE OF
STANDARD COLOR OPTIONS.
WINDOW TREATMENTS
WINDOW STOOLS - TO BE SELECTED BY VA FROM MANUFACTURE'S FULL RANGE OF COLORS & PATTERNS INCLUDING PREMIUM PRODUCTS, 1
2" THICK.SS-1
SOLID SURFACE
WP-1
WALL PANELS
FAUX-WOOD WALL PANELS. MATCH EXISTING. CONTRACTOR TO ENSURE PATTERN MATCH AT SEAMS AS NEEDED. COORDINATE WITH COR.
FIBERGLASS REINFORCED PLASTIC PANELS
FRP PANELS - MATCH EXISTING IN COLOR, FINISH, SHAPE, AND SIZE. COORDINATE WITH COR.FRP-1
NOTE:
FINISHES APPLY TO ALL AFFECTED AREAS OF ALL BUILDINGS.
SCALE: 1" = 1'-0"
AIR CONDITIONER UNIT MOUNTING DETAIL3
AS1101
NOTE:
WALLS AFFECTED BY WINDOW REPLACEMENT MUST BE REFINISHED IN THEIR ENTIRETY,
CORNER TO CORNER, FLOOR TO CEILING.
NOTE:
ALL FINISHES TO BE SELECTED BY VA FROM MANUFACTURER'S FULL RANGE OF COLOR
OPTIONS.
AS1101
AS1101
AS1101
AS1101
AS1101
AS1101
NOTE:
WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER. THEY
INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL INSTALLATION
REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS MUST BE VERIFIED IN FIELD
BY THE CONTRACTOR. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
| 7 |
| 42 515-14-103.136-AS702 |
| Sheets and Views |
| AS702 |
| 43 515-14-103.AS1101-AS1101 |
| Sheets and Views |
| AS1101 |
File details come from the government source that posted it.