36C25018B0823-004.pdf
PDF 13 MB Posted
- Attached to
- Replace Windows-Various Buildings 515-14-103 Federal contract opportunity
- Solicitation number
- 36C25018B0823
About this file
36C25018B0823 S02 - Drawings - 515-14-103_Part2.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0823-0001001.pdf | ||
| 36C25018B0823-0001000.docx | DOCX document | |
| 36C25018B0823-007.pdf | ||
| 36C25018B0823-014.pdf | ||
| 36C25018B0823-009.pdf | ||
| 36C25018B0823-002.pdf | ||
| 36C25018B0823-003.pdf | ||
| 36C25018B0823-013.pdf | ||
| 36C25018B0823-011.pdf | ||
| 36C25018B0823-018.docx | DOCX document | |
| 36C25018B0823-019.pdf | ||
| 36C25018B0823-001.docx | DOCX document | |
| 36C25018B0823-008.pdf | ||
| 36C25018B0823-005.pdf | ||
| 36C25018B0823-015.pdf | ||
| 36C25018B0823-006.pdf | ||
| 36C25018B0823-017.pdf | ||
| 36C25018B0823-012.pdf | ||
| 36C25018B0823-010.pdf | ||
| 36C25018B0823-016.pdf | ||
| 36C25018B0823-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EITHER KEEP RUNNING
COVER ALL RETURNS
TAPE ALL SERVICES
FIRE EXTINGUISHER ON
A
O
V
SUPPLY DUCTS
OR COVER WHEN RUNNING
TO KEEP DUST OUT.
AT THE GRATE/DIFFUSERS
TO PROTECT AGAINST
PORTABLE FLOOR BRACKET
CONTAMINATION
E
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES
AND THE DIFFUSERS)
OUTSIDE OF BUILDING
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
(ILSM MAY REQUIRE MORE
THAN ONE).
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS).
POST ICRA, ILSM, FIRE INSPECTION
SHEETS VISIBLE TO PUBLIC
SUSPENDED PLASTIC ZIPPER
WALL CURTAIN BARRIER
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS).
INDICATOR MUST BE AT -0.01 OR GREATER
(VERIFY DAILY), IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
AP
PR
OX
. 4
8" A
.F .F
INDICATOR MUST MAINTAIN -0.01 INCHES OF WATER GAUGE
(VERIFY DAILY) AIR PRESSURE, IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
FIRE INSPECTION
SHEETS VISIBLE
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
INDICATOR (REFER
TO PLAN & ELEVATION)
POST ICRA, ILSM,
TO PUBLIC
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
AREA UNDER
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
CONSTRUCTION
RESTRICTED AREA
THIS IS A
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
BOILER PLANT AFTER HOURS
CONTACT PHONE #####
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
C.O.R. CONTACT
INFORMATION
OFFICE AREAS CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
2. ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
3. PERMITS TO INCLUDE:
ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES,
UTILITY SHUT-DOWN, FIRE/SMOKE WALL, FIRE ALARM SYSTEM.
4. THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION.
NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS.
1. ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT
AND SAFETY GLASSES ALONG WITH ANY OTHER PPE REQUIRED IN THAT AREA.
CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT.
(WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY.
NEGATIVE PRESSURE MACHINES MUST BE ON AND OPERATIONAL 24/7.
MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.
5. CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.
6. DURING CONSTRUCTION BE CERTAIN THAT:
BARRIERS ARE INTACT AND MAINTAINED.
PARTICAL COUNT METER IS AVAILABLE.
NEGATIVE INDICATOR IS AVAILABLE.
ICRA REQUIREMENTS ARE INTACT AND
VERIFY ARE BEING MAINTAINED.
TYPE A
W
AL
L H
EIG
HT
V
ER
IES
TYPE B
FIE
LD
V
ER
IFY
CE
ILI
NG
H
EIG
HT
'-0
W
AL
L H
EIG
HT
V
ER
IES
FIE
LD
V
ER
IFY
4" RUBBER COVE
BASE @ BOTH SIDES
4" RUBBER COVE
4 7/8"4 7/8"
TO MATCH EXISTING AREA TO MATCH EXISTING AREABASE @ BOTH SIDES
AS SCHEDULED
ACOUSTICAL CEILING
SUSPENDED
ON FLOOR PLAN.
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION/ DUST CONTROL
PARTITION(S) SHALL BE SEALED TO
EXISTING FLOOR, CEILING, WALL, &
DOOR/ WINDOW FRAME
CONSTRUCTION AS APPLICABLE, PER
INFECTION CONTROL REQUIREMENTS
PRIOR TO DEMOLITION & FOR
DURATION OF CONSTRUCTION. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
TEMPORARY CONSTRUCTION "SMOKE
TIGHT" BARRIER - INFECTION/ DUST
CONTROL PARTITION: 4" , 20 GA.
METAL STUDS @ 16" O.C., SECURED
TO FLOOR, CEILING, WALL, & DOOR/
WINDOW FRAME INTERSECTIONS
FOR STRUCTURAL STABILITY, W/ 1/2"
GYP. BD. EA. SIDE, W/ ALL JOINTS
TAPED AND SEALED FOR INFECTION/
DUST CONTROL (NOT MUDDED).
AS SCHEDULED
ACOUSTICAL CEILING
SUSPENDED
ON FLOOR PLAN.
DECK ABOVE
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION/ DUST CONTROL
PARTITION(S) SHALL BE SEALED TO
EXISTING FLOOR, CEILING, WALL, &
DOOR/ WINDOW FRAME
CONSTRUCTION AS APPLICABLE, PER
INFECTION CONTROL REQUIREMENTS
PRIOR TO DEMOLITION & FOR
DURATION OF CONSTRUCTION. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
TEMPORARY CONSTRUCTION "SMOKE
TIGHT" BARRIER - INFECTION/ DUST
CONTROL PARTITION: 4" , 20 GA.
METAL STUDS @ 16" O.C., SECURED
TO FLOOR, CEILING, WALL, & DOOR/
WINDOW FRAME INTERSECTIONS
FOR STRUCTURAL STABILITY, W/ 1/2"
GYP. BD. EA. SIDE, W/ ALL JOINTS
TAPED AND SEALED FOR INFECTION/
DUST CONTROL (NOT MUDDED).
6 MIL VAPOR BARRIER SEALED TO
DECK ABOVE.
FLEX DUCT
CART WITH CANVAS /
1-1/4" SQUARE STEEL
TUBULAR FRAME
PLASTIC WINDOW
HEPA NEGATIVE AIR UNIT
MOBILE CONTAINMENT
FLEX DUCT
AD
JU
ST
AB
LE
HE
IG
HT
SWIVEL CASTERS
(ON ALL SIDES)
ZIPPER SIDE ENTRY
AD
JU
ST
AB
LE
HE
IG
HT
1. EXECUTE WORK METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE CEILING TILE DISPLACED FOR VISUAL INSPECTION.
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT WORK AREAS.
6. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA
REQUIREMENTS
NO ENTRY
DUST BARRIER
INSTALLED
PROVIDE AND DISPLAY ICRA REQUIREMENT
DOCUMENTATION. COORDINATE WITH COR.
5-PLY SOLID CORE FLUSH DOORS SHALL BE
SECURED, AND HAVE LIMITED, ZIPPERED ACCESS, &
MASKED OFF / SEALED & PROTECTED PER
INFECTION CONTROL REQUIREMENTS PRIOR TO
DEMOLITION & FOR DURATION OF CONSTRUCTION.
COORDINATE EGRESS REQUIREMENTS WITH COR.
SEE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
CLEARLY LABEL DOORS TO DIRECT EMERGENCY
EGRESS TRAFFIC TO ALTERNATIVE EXIT(S). ALL
RELATED EXIT SIGNS THAT CORRELATE TO THE USE
OF THESE EXIT DOORS FOR EMERGENCY EGRESS
SHALL BE COVERED THROUGHOUT THE DURATION
OF CONSTRUCTION. PROVIDE TEMPORARY EXIT
SIGNAGE TO REDIRECT TRAFFIC AS REQUIRED FOR
EMERGENCY EGRESS DURING CONSTRUCTION.
CLOSED FOR
CONSTRUCTION
USE ALTERNATIVE
EXITS
EXIT
CAUTION
THIS AREA
CLOSED OFF
PROVIDE AND INSTALL LIFE-SAFETY EGRESS/ EXIT
SIGN(S) ON OCCUPIED SIDE OF EXIT DOORS.
SIGN(S) SHALL BE LABELED AS "CLOSED FOR
CONSTRUCTION - USE ALTERNATIVE EXITS."
5-PLY SOLID CORE FLUSH DOORS SHALL BE
SECURED, AND HAVE LIMITED, ZIPPERED ACCESS, &
MASKED OFF/ SEALED & PROTECTED PER INFECTION
CONTROL REQUIREMENTS PRIOR TO DEMOLITION &
FOR DURATION OF CONSTRUCTION. COORDINATE
EGRESS REQUIREMENTS WITH COR. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
SCALE: 1/2" = 1'-0"
TYPICAL CONSTRUCTION LAYOUT CLASS I & II
SCALE: 1/2" = 1'-0"
MOBILE CONTAINMENT CAR (CONST. BARRIER TYPES)
SCALE: 1/2" = 1'-0"
ROOM ELEVATION
SCALE: 3/8" = 1'-0"
WALL CONSTRUCTION TYPES (DETAILS)
SCALE: 1/2" = 1'-0"
INFECTION / DUST CONTROL DOOR
SCALE: 1/2" = 1'-0"
EXIT CLOSED FOR CONSTRUCTION
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
GI004
GI004
GI004
GI004
GI004
GI004
AP
PR
OX
. 4
8" A
.F .F
INDICATOR MUST MAINTAIN -0.01 INCHES OF WATER GAUGE
(VERIFY DAILY) AIR PRESSURE, IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
FIRE INSPECTION
SHEETS VISIBLE
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
INDICATOR (REFER
TO PLAN & ELEVATION)
POST ICRA, ILSM,
TO PUBLIC
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
AREA UNDER
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
CONSTRUCTION
RESTRICTED AREA
THIS IS A
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
BOILER PLANT AFTER HOURS
CONTACT PHONE #####
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
C.O.R. CONTACT
INFORMATION
EXISTING AIR PLENUM
EXISTING CONCRETE SLAB FLOORING
FIRE/U.L. RATED PLASTIC
TO PREVENT DUST
FIRE/U.L. RATED PLASTIC
TO PREVENT DUST
EXISTING WALLEXISTING WALL
(INSTALL PRIOR TO
CONSTRUCTION). PRIOR TO CONSTRUCTION).
INFILTRATION (INSTALL
EXISTING FIRE
SPRINKLER SYSTEM
HEPA NEGATIVE AIR UNIT
NEGATIVE AIR
DUCT DAMPER
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED TO BE
PROTECTED OR COVERED WITH ROSEN
PAPER / FIRE RATED PLYWOOD.
HEATED DETECTOR CUT-OFF
OFFICE AREAS CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
TYPE A
W
AL
L H
EIG
HT
V
ER
IES
TYPE B
FIE
LD
V
ER
IFY
CE
ILI
NG
H
EIG
HT
'-0
W
AL
L H
EIG
HT
V
ER
IES
FIE
LD
V
ER
IFY
4" RUBBER COVE
BASE @ BOTH SIDES
4" RUBBER COVE
4 7/8"4 7/8"
TO MATCH EXISTING AREA TO MATCH EXISTING AREA
BASE @ BOTH SIDES
AS SCHEDULED
ACOUSTICAL CEILING
SUSPENDED
ON FLOOR PLAN.
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION/ DUST CONTROL
PARTITION(S) SHALL BE SEALED TO
EXISTING FLOOR, CEILING, WALL, &
DOOR/ WINDOW FRAME
CONSTRUCTION AS APPLICABLE, PER
INFECTION CONTROL REQUIREMENTS
PRIOR TO DEMOLITION & FOR
DURATION OF CONSTRUCTION. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
TEMPORARY CONSTRUCTION "SMOKE
TIGHT" BARRIER - INFECTION/ DUST
CONTROL PARTITION: 4" , 20 GA.
METAL STUDS @ 16" O.C., SECURED
TO FLOOR, CEILING, WALL, & DOOR/
WINDOW FRAME INTERSECTIONS
FOR STRUCTURAL STABILITY, W/ 1/2"
GYP. BD. EA. SIDE, W/ ALL JOINTS
TAPED AND SEALED FOR INFECTION/
DUST CONTROL (NOT MUDDED).
AS SCHEDULED
ACOUSTICAL CEILING
SUSPENDED
ON FLOOR PLAN.
DECK ABOVE
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION/ DUST CONTROL
PARTITION(S) SHALL BE SEALED TO
EXISTING FLOOR, CEILING, WALL, &
DOOR/ WINDOW FRAME
CONSTRUCTION AS APPLICABLE, PER
INFECTION CONTROL REQUIREMENTS
PRIOR TO DEMOLITION & FOR
DURATION OF CONSTRUCTION. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
TEMPORARY CONSTRUCTION "SMOKE
TIGHT" BARRIER - INFECTION/ DUST
CONTROL PARTITION: 4" , 20 GA.
METAL STUDS @ 16" O.C., SECURED
TO FLOOR, CEILING, WALL, & DOOR/
WINDOW FRAME INTERSECTIONS
FOR STRUCTURAL STABILITY, W/ 1/2"
GYP. BD. EA. SIDE, W/ ALL JOINTS
TAPED AND SEALED FOR INFECTION/
DUST CONTROL (NOT MUDDED).
6 MIL VAPOR BARRIER SEALED TO
DECK ABOVE.
FLEX DUCT
CART WITH CANVAS /
1-1/4" SQUARE STEEL
TUBULAR FRAME
PLASTIC WINDOW
HEPA NEGATIVE AIR UNIT
MOBILE CONTAINMENT
FLEX DUCT
AD
JU
ST
AB
LE
HE
IG
HT
SWIVEL CASTERS
(ON ALL SIDES)
ZIPPER SIDE ENTRY
AD
JU
ST
AB
LE
HE
IG
HT
1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES
DEPARTMENT.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
3. WET MOP AREA WITH DISINFECTANT.
4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
2. ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
3. PERMITS TO INCLUDE:
ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES,
UTILITY SHUT-DOWN, FIRE/SMOKE WALL, FIRE ALARM SYSTEM.
4. THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION.
NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS.
1. ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT
AND SAFETY GLASSES ALONG WITH ANY OTHER PPE REQUIRED IN THAT AREA.
CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT.
(WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY.
NEGATIVE PRESSURE MACHINES MUST BE ON AND OPERATIONAL 24/7.
MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.
5. CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.
6. DURING CONSTRUCTION BE CERTAIN THAT:
BARRIERS ARE INTACT AND MAINTAINED.
PARTICAL COUNT METER IS AVAILABLE.
NEGATIVE INDICATOR IS AVAILABLE.
ICRA REQUIREMENTS ARE INTACT AND
VERIFY ARE BEING MAINTAINED.
EITHER KEEP RUNNING
COVER ALL RETURNS
TAPE ALL SERVICES
FIRE EXTINGUISHER ON
A
O
V
SUPPLY DUCTS
OR COVER WHEN RUNNING
TO KEEP DUST OUT.
AT THE GRATE/DIFFUSERS
TO PROTECT AGAINST
PORTABLE FLOOR BRACKET
CONTAMINATION
E
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES
AND THE DIFFUSERS)
OUTSIDE OF BUILDING
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
(ILSM MAY REQUIRE MORE
THAN ONE).
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS).
POST ICRA, ILSM, FIRE INSPECTION
SHEETS VISIBLE TO PUBLIC
SUSPENDED PLASTIC ZIPPER
WALL CURTAIN BARRIER
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS).
HEPA NEGATIVE AIR UNIT
FIRE RATED PLYWOOD
WEEKLY CHANGED
(OR MORE AS NEEDED)
MONTHLY CHANGED
HEPA FILTER
PRE-FILTER
(REFER TO ELEVATION)
FL
EX
D
UC
T
AA
INDICATOR MUST BE AT -0.01 OR GREATER
(VERIFY DAILY), IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
SCALE: 1/2" = 1'-0"
TYPICAL CONSTRUCTION LAYOUT CLASS III
GI005
SCALE: 1/2" = 1'-0"
MOBILE CONTAINMENT CAR (CONST. BARRIER TYPES)
GI005
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS SCALE: 1/2" = 1'-0"
TYPICAL CROSS SECTION A-A - CLASS III
GI005
SCALE: 1/2" = 1'-0"
ROOM ELEVATION
GI005
SCALE: 3/8" = 1'-0"
WALL CONSTRUCTION TYPES (DETAILS)
GI005
2. ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
3. PERMITS TO INCLUDE:
ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES,
UTILITY SHUT-DOWN, FIRE/SMOKE WALL, FIRE ALARM SYSTEM.
4. THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION.
NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS.
1. ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT
AND SAFETY GLASSES ALONG WITH ANY OTHER PPE REQUIRED IN THAT AREA.
CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT.
(WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY.
NEGATIVE PRESSURE MACHINES MUST BE ON AND OPERATIONAL 24/7.
MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.
5. CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.
6. DURING CONSTRUCTION BE CERTAIN THAT:
BARRIERS ARE INTACT AND MAINTAINED.
PARTICAL COUNT METER IS AVAILABLE.
NEGATIVE INDICATOR IS AVAILABLE.
ICRA REQUIREMENTS ARE INTACT AND
VERIFY ARE BEING MAINTAINED.
POST ICRA, ILSM, FIRE INSPECTION
TEMP. ANTE ROOMHARD BARRIER
EITHER KEEP RUNNING
COVER ALL RETURNS
HEPA NEGATIVE AIR UNIT
TAPE ALL SERVICES
ABC TYPE FIRE EXTINGUISHER ON
FIRE RATED PLYWOOD
A
O
V
WEEKLY CHANGED
(OR MORE AS NEEDED)
MONTHLY CHANGED
HEPA FILTER
PRE-FILTER
SUPPLY DUCTS
OR COVER WITH FIRE
AT THE GRATE/DIFFUSERS
TO PROTECT AGAINST
PORTABLE FLOOR BRACKET
SHEETS VISIBLE TO PUBLIC
CONTAMINATION
(REFER TO ELEVATION)
FL
EX
D
UC
T
E
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES
AND THE DIFFUSERS)
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
(LOCKED AT ALL TIMES)
BLUE CORE LOCKSET
AA
OUTSIDE OF BUILDING
ELEVATION1
WITH FIRE RATED PLASTIC
SHEETING AND SECURE
WITH DUCT TAPE.
RATED PLASTIC SHEETING
AND SECURE WITH DUCT
TAPE TO KEEP DUST OUT.
(ILSM MAY REQUIRE MORE
THAN ONE OR WALL MOUNTED).
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS).
(TYPICAL REGULATOR INSTALLATION).
TYPE B
TYPE A
NEED INSPECTION TAG AND
MONTHLY INSPECTION).
(INITIALS/DATED).
(REFER TO
ELEV. DETAIL)
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY), IF NOT VERIFY ALL OPENING
AP
PR
OX
. 4
8" A
.F .F
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY) AIR PRESSURE, IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
FIRE INSPECTION
SHEETS VISIBLE
ANTE ROOM
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
INDICATOR (REFER
TO PLAN & ELEVATION)
POST ICRA, ILSM,
TO PUBLIC
AREA UNDER
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
CONSTRUCTION
RESTRICTED AREA
THIS IS A
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
BOILER PLANT AFTER HOURS
CONTACT PHONE #####
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
C.O.R. CONTACT
INFORMATION
EXISTING WINDOW FRAME
FIRE RATED PLYWOOD
(TEMP. REMOVE
HEPA NEGATIVE AIR UNIT
EXISTING FIRE
SPRINKLER SYSTEM
EXISTING CONCRETE SLAB FLOORING
FIRE/U.L. RATED PLASTIC
TO PREVENT DUST
GLASS PANEL)
FIRE/U.L. RATED PLASTIC
TO PREVENT DUST
EXISTING WALLEXISTING WALL
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED TO BE
(INSTALL PRIOR TO
CONSTRUCTION). PRIOR TO CONSTRUCTION).
INFILTRATION (INSTALL
PROTECTED OR COVERED WITH ROSEN
PAPER/FIRE RATED PLYWOOD.
OFFICE AREAS CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
TYPE A
W
AL
L H
EIG
HT
V
ER
IES
TYPE B
FIE
LD
V
ER
IFY
CE
ILI
NG
H
EIG
HT
'-0
W
AL
L H
EIG
HT
V
ER
IES
FIE
LD
V
ER
IFY
4" RUBBER COVE
BASE @ BOTH SIDES
4" RUBBER COVE
4 7/8"4 7/8"
TO MATCH EXISTING AREA TO MATCH EXISTING AREA
BASE @ BOTH SIDES
AS SCHEDULED
ACOUSTICAL CEILING
SUSPENDED
ON FLOOR PLAN.
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION/ DUST CONTROL
PARTITION(S) SHALL BE SEALED TO
EXISTING FLOOR, CEILING, WALL, &
DOOR/ WINDOW FRAME
CONSTRUCTION AS APPLICABLE, PER
INFECTION CONTROL REQUIREMENTS
PRIOR TO DEMOLITION & FOR
DURATION OF CONSTRUCTION. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
TEMPORARY CONSTRUCTION "SMOKE
TIGHT" BARRIER - INFECTION/ DUST
CONTROL PARTITION: 4" , 20 GA.
METAL STUDS @ 16" O.C., SECURED
TO FLOOR, CEILING, WALL, & DOOR/
WINDOW FRAME INTERSECTIONS
FOR STRUCTURAL STABILITY, W/ 1/2"
GYP. BD. EA. SIDE, W/ ALL JOINTS
TAPED AND SEALED FOR INFECTION/
DUST CONTROL (NOT MUDDED).
AS SCHEDULED
ACOUSTICAL CEILING
SUSPENDED
ON FLOOR PLAN.
DECK ABOVE
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION/ DUST CONTROL
PARTITION(S) SHALL BE SEALED TO
EXISTING FLOOR, CEILING, WALL, &
DOOR/ WINDOW FRAME
CONSTRUCTION AS APPLICABLE, PER
INFECTION CONTROL REQUIREMENTS
PRIOR TO DEMOLITION & FOR
DURATION OF CONSTRUCTION. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
TEMPORARY CONSTRUCTION "SMOKE
TIGHT" BARRIER - INFECTION/ DUST
CONTROL PARTITION: 4" , 20 GA.
METAL STUDS @ 16" O.C., SECURED
TO FLOOR, CEILING, WALL, & DOOR/
WINDOW FRAME INTERSECTIONS
FOR STRUCTURAL STABILITY, W/ 1/2"
GYP. BD. EA. SIDE, W/ ALL JOINTS
TAPED AND SEALED FOR INFECTION/
DUST CONTROL (NOT MUDDED).
6 MIL VAPOR BARRIER SEALED TO
DECK ABOVE.
FLEX DUCT
CART WITH CANVAS /
1-1/4" SQUARE STEEL
TUBULAR FRAME
PLASTIC WINDOW
HEPA NEGATIVE AIR UNIT
MOBILE CONTAINMENT
FLEX DUCT
MOBILE CONTAINMENT CART
AD
JU
ST
AB
LE
HE
IG
HT
SWIVEL CASTERS
(ON ALL SIDES)
ZIPPER SIDE ENTRY
AD
JU
ST
AB
LE
HE
IG
HT
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
SCALE: 1/2" = 1'-0"
TYPICAL CONSTRUCTION LAYOUT CLASS IV
SCALE: 1/2" = 1'-0"
MOBILE CONTAINMENT CAR (CONST. BARRIER TYPES)
SCALE: 1/2" = 1'-0"
TYPICAL CROSS SECTION A-A - CLASS IV
SCALE: 1/2" = 1'-0"
ROOM ELEVATION
SCALE: 3/8" = 1'-0"
WALL CONSTRUCTION TYPES (DETAILS)
GI006
GI006
GI006
GI006
GI006
A010A009A008A007A006A005A004A003A002A001
A100 A101 A102 A103 A104
A105 A106
A107 A108 A109 A110 A111
A200 A201 A202 A203 A204
A205 A206 A207
A208 A209 A210 A211 A212
AC AC AC AC AC AC AC
AC AC AC AC AC
AC
AC AC AC
T T
T
T T T T T T T
AC AC AC AC AC AC AC
AC AC AC AC AC
AC
AC AC AC
T T
T
T T T T T T T
AC AC AC
ACAC
AC
ACAC
AC
AC
T
T
TTT
TT
TT
TT
C010C009C008C007C006C005C004C003C002C001
C101 C102 C103 C104 C105 C106 C107 C108 C109 C110 C111
C200 C201 C202 C203
C204
C205 C206 C207 C208 C209 C210 C211 C212
C013C012C011
C112
AC AC AC
ACAC
AC
ACAC
AC
AC
T
T
TTT
TT
TT
TT
AC
AC
T
T
T
B002
B100 B101 B102
B200 B201
B001
AC
AC
T
T
T
ACAC
T
D001
D100 D101
D200 D201 D202
ACAC
T
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION A 1
AS401
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION B 2
AS401
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION C3
AS401SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION D4
AS401
NOT TO SCALE
BUILDING 1 KEY PLAN
A
N B
C
D
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
XXXX WINDOW TAG
T TEMPERED GLASS, FULL WINDOW
(ALL OTHER WINDOWS SHALL HAVE ANNEALED GLASS)
SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION.
AC WINDOW AIR CONDITIONER
WINDOW INFILL PANEL
WALL INFILL, THROUGH-WALL
WINDOW WALLED OVER AT INTERIOR ONLY
LOUVERED OPENING
VENT / FAN
SECURITY SCREEN
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
THE PROPOSED WORK WITHIN AND AROUND CERTAIN BUILDINGS MUST BE
SCHEDULED AND COORDINATED WITH THE VA. THE GENERAL CONTRACTOR SHALL
PROVIDE A COMPREHENSIVE SCHEDULE OF EACH WINDOW IN ACCORDANCE WITH
THE FOLLOWING.
-WORK WITHIN AND AROUND BUILDING 1.
NOTE:
-CONTRACTOR TO REMOVE ALL SECURITY SCREENS FROM LOWER LEVEL
WINDOWS AS NEEDED FOR INSTALLATION OF NEW WINDOW SYSTEMS.
CONTRACTOR TO REINSTALL SECURITY SCREENS ONCE NEW WINDOW SYSTEM IS
INSTALLED.
| 1 |
| 04 515-14-103.GI004 |
| Sheets and Views |
| GI004 |
| 05 515-14-103.GI005 |
| Sheets and Views |
| GI005 |
| 06 515-14-103.GI006 |
| Sheets and Views |
| GI006 |
File details come from the government source that posted it.