36C25018B0823-015.pdf
PDF 14 MB Posted
- Attached to
- Replace Windows-Various Buildings 515-14-103 Federal contract opportunity
- Solicitation number
- 36C25018B0823
About this file
36C25018B0823 S02 - Drawings - 515-14-103_Part13.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0823-0001001.pdf | ||
| 36C25018B0823-0001000.docx | DOCX document | |
| 36C25018B0823-007.pdf | ||
| 36C25018B0823-014.pdf | ||
| 36C25018B0823-009.pdf | ||
| 36C25018B0823-004.pdf | ||
| 36C25018B0823-002.pdf | ||
| 36C25018B0823-003.pdf | ||
| 36C25018B0823-013.pdf | ||
| 36C25018B0823-011.pdf | ||
| 36C25018B0823-018.docx | DOCX document | |
| 36C25018B0823-006.pdf | ||
| 36C25018B0823-017.pdf | ||
| 36C25018B0823-012.pdf | ||
| 36C25018B0823-010.pdf | ||
| 36C25018B0823-016.pdf | ||
| 36C25018B0823-019.pdf | ||
| 36C25018B0823-001.docx | DOCX document | |
| 36C25018B0823-008.pdf | ||
| 36C25018B0823-005.pdf | ||
| 36C25018B0823-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,
FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL
FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,
FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR
METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER
PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,
INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.
CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER
MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND
INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE
ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,
FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,
SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR
ADDITIONAL INFORMATION.
3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING
INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND
ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.
4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM
WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)
REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.
5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.
TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL
SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW
IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.
INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING
OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON
WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS
AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR
TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS
WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL
APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR
PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.
9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.
10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE
FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE
EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN
GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING
REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN
DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY
TIME.
12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR
OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR
REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER
CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM
AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.
13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.
FINISH TO MATCH ADJACENT.
14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA
MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH
COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING
BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND
OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL
EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION
THROUGH WINDOW OPENING. COORDINATE WITH COR.
15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR
ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND
CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL
INFORMATION.
16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO
ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS
NEEDED FROM J-BOX OR PANEL.
17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED
FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT
GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW
OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL
INFORMATION.
18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF
WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW
WINDOW INSTALLATION.
19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS
NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND
LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW
WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW
POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE
SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.
20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO
WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH
ADJACENT.
21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM
MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.
22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW
FRAME. CAP AT INTERIOR FOR FUTURE USE.
23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.
24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.
25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.
26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP
ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.
27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE
PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR
WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE
SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.
28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE
AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT
CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY
ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.
SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.
30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.
31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION
AND DETAIL DRAWINGS.
32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
AND DETAILS.
33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.
34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE
WITH WINDOW OPENING.
35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN
DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF
MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,
OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK
OR OTHER MECHANICAL EQUIPMENT.
36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.
SH SINGLE HUNG
DH DOUBLE HUNG
FXD FIXED
CASE CASEMENT
HOP HOPPER
AWN AWNING
SL SLIDER
HS HORIZONTAL SLIDER
ALS ALUMINUM STOREFRONT
DC DROPPED CEILING (ACT)
ACT ACOUSTICAL TILE CEILING
DW DRYWALL / PLASTER
RO ROUGH OPENING
BO BOTTOM OF
TO TOP OF
WC WALL COVERING
VWC VINYL WALL COVERING
WD WOOD
SCRN SCREEN
MTL METAL
SS SOLID SURFACE
CT CERAMIC TILE
VIF VERIFY IN FIELD
NOTE:
ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN
RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM
TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.
THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL
INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS
MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
NOTE:
WINDOW MUNTINS TO BE 7
8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.
RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW
ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO
BE INDICATED IN SHOP DRAWINGS FOR REVIEW BY THE VA AND ARCHITECT.
NOTE:
NOT ALL WINDOW REPLACEMENT NOTES APPEAR ON THIS SHEET.
NOTE:
ALL WINDOW FRAME DEPTHS TO MATCH EXISTING.
BUILDING 85 EXISTING WINDOW CONDITIONS REPLACEMENT WINDOWS
ROOM INTERIOR ROUGH OPENING EXTERIOR ROUGH OPENING WALL THICKNESS OPERATION FINISHES SILL SIZE & TYPE CEILING CONDITION SECURTIY SCREEN A/C OPENING ADDITIONAL COMMENTS ELECTRICAL ELEVATION /
OPERATION
DETAILS REMARKS
A001 CRAWL SPACE 1'7-1/2" X 11-1/2" 1'7-1/2" X 11-1/2" -- -- -- -- -- -- -- NO WINDOW - PLYWOOD COVER -- 85._/LOUVER -- --
A100 WORK ROOM 101 3'2" X 6'10.5" 3'2" X 3'5" TO BOTTOM OF LOUVER 14" AWN PAINT -- CLEAR -- -- LOUVER TOP SASH -- 85.C / SH 3,4/85.AS702 &
1,2/AS1101
2,5,21
A101 WORK ROOM 101 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- -- -- 85.B / SH 3,4/85.AS702 2,6,21
A102 WORK ROOM 101 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- -- -- 85.B / SH 3,4/85.AS702 2,6,21
A103 WORK ROOM 101 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- LOUVER TOP SASH -- 85.C / SH 3,4/85.AS702 &
1,2/AS1101
2,5,21
A104 WORK ROOM 101 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- VENT BOTTOM SASH -- 85.D / SH 3,4/85.AS702 &
1,2/AS1101
2,5,21
A105 WORK ROOM 101 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- -- -- 85.B / SH 3,4/85.AS702 2,6,21
B001 CRAWL SPACE 1'7" X 11-1/2" 1'7" X 11-1/2" 14" AWN PAINT -- CLEAR -- -- SCREEN, NO WINDOW -- 85._/LOUVER -- --
B002 STORAGE 001 LOUVER 4'3" X 2'4" 14" -- PAINT -- CLEAR -- -- LOUVER -- 85._/LOUVER -- --
B100 WORK ROOM 100 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- -- -- 85.B / SH 3,4/85.AS702 2,6,21
B101 WORK ROOM 100 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- EXHAUST FAN TOP SASH -- 85.C / SH 3,4/85.AS702 &
1,2/AS1101
2,5,21
B102 OFFICE 100C 3'2" X 6'10.5" 14" DH PAINT DW CLEAR -- Y - 26" x 16.5" INFILL, WALL FURRED IN -- 85.B / SH 1,2/85.AS702 &
3/AS1101
3,6,14,17,20
B200 WORK ROOM 100 NO ACCESS -- 14" FXD -- -- -- -- -- ORIG WOOD ARCH -- 85.A / FXD 5,6/85.AS702 1, 32
C001 CRAWL SPACE 1'7" X 11-1/4" 1'7" X 11-1/4" 14" -- -- -- -- -- -- NO WINDOW - MTL PANEL -- 85._/LOUVER -- --
C100 OFFICE 100F 3'2" X 6'10.5" 3'2" X 6'8.5" 14" S PAINT DW CLEAR -- Y - 18-1/2" x 14", INTEGRAL
INFILL, WALL FURRED IN -- 85.B / SH 1,2/85.AS702 &
3/AS1101
3,6,14,17,20
C101 TOILET 100D 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN TILE, PAINT -- CLEAR -- -- TEXTURED GLASS (RR), SHADE -- 85.B / SH 3,4/85.AS702 2,6,21,23
C102 WORK ROOM 101 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- LOUVER TOP SASH -- 85.C / SH 3,4/85.AS702 &
1,2/AS1101
2,5, 21
C103 WORK ROOM 101 3'2" X 6'10.5" 3'2" X 6'8.5" 14" AWN PAINT -- CLEAR -- -- -- -- 85.B / SH 3,4/85.AS702 2,6,21
C200 WORK ROOM 101 NO ACCESS -- 14" FXD -- -- -- -- -- ORIG WOOD ARCH -- 85.A / FXD 5,6/85.AS702 1,32
D100 OFFICE 100C 3'2" X 6'10.5" 3'2" X 6'8.5" 14" DH PAINT DW CLEAR -- -- INFILL, WALL FURRED IN -- 85.B / SH 1,2/85.AS702 3,6,14,17,20
D101 OFFICE 100F 3'2" X 6'10.5" 3'2" X 6'8.5" 14" DH PAINT DW CLEAR -- -- INFILL, WALL FURRED IN -- 85.B / SH 1,2/85.AS702 3,6,14,17,20
NOTE:
THE PROPOSED WORK WITHIN AND AROUND CERTAIN BUILDINGS MUST BE
SCHEDULED AND COORDINATED WITH THE VA. THE GENERAL CONTRACTOR SHALL
PROVIDE A COMPREHENSIVE SCHEDULE OF EACH WINDOW IN ACCORDANCE WITH
THE FOLLOWING.
WORK WITHIN AND AROUND BUILDING 85 SHALL OCCUR DURING NORMAL WORKING
HOURS AND SHALL BE COORDINATED WITH CONSOLIDATED WORK THERAPY
THROUGH THE COR.
SCALE: 1/4" = 1'-0"
NEW WINDOW ELEVATIONS
SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF
SEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF
SE
E
SC
HE
DU
LE
, V
IFSEE SCHEDULE, VIFSEE SCHEDULE, VIF
SE
E
SC
HE
DU
LE
, V
IF
SCALE: 1" = 1'-0"
NEW WINDOW - FIXED, DECORATIVE
HEAD / JAMB
SILL
APPLIED MUNTIN
CLEAN / SCRAPE ALL
CAULKING, PAINT, AND
OTHER DEBRIS FROM
EXISTING BRICK SURROUND
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT, SASH
FIXED
NEW BLOCKING
NEW INTERNAL MUNTIN
EXTERIORINTERIOR
EXTERIORINTERIOR
* APPLY SEALANT AT PERIMETER
OF NEW WINDOW AND
PANNING/TRIM, ALL SIDES,
CONTINUOUS.
CLEAN / SCRAPE ALL
CAULKING, PAINT, AND OTHER
DEBRIS FROM EXISTING BRICK
SURROUND
NEW BLOCKING
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT, SASH
FIXED
SCALE: 1" = 1'-0"
DEMO WINDOW - FIXED, DECORATIVE
HEAD / JAMB
SILL
CONTRACTOR TO TAKE CARE
NOT TO DAMAGE EXISTING
BRICK WINDOW SURROUND
REMOVE EXISTING WINDOW UNIT
EXISTING BLOCKING AND FRAMING
EXTERIORINTERIOR
EXTERIORINTERIOR
CONTRACTOR TO TAKE CARE
NOT TO DAMAGE EXISTING
BRICK WINDOW SURROUND
REMOVE EXISTING WINDOW UNIT
EXISTING BLOCKING AND FRAMING.
DRYWALL / PLASTER WALL
SURFACE AND CORNER DETAIL TO
REMAIN. DO NOT DAMAGE
DURING CONSTRUCTION.
DRYWALL / PLASTER WALL
SURFACE AND CORNER DETAIL TO
REMAIN. DO NOT DAMAGE
DURING CONSTRUCTION.
NEW WOOD TRIM
NEW WOOD TRIM
EXISTING LINTEL(S) TO REMAIN
EXISTING LINTEL(S) TO REMAIN
EXTERIORINTERIOR
PERIMETER OF NEW WINDOW
EXISTING LINTEL(S) TO
REMAIN
EXISTING CONCRETE SILL
AND STOOL TO REMAIN,
TAKE CARE NOT TO DAMAGE
DURING CONSTRUCTION
HEAD
SILL
JAMB
EXISTING BRICK WALL TO
REMAIN, TAKE CARE NOT TO
DAMAGE DURING
CONSTRUCTION
EXISTING CONCRETE SILL TO
REMAIN, DO NOT DAMAGE
DURING CONSTRUCTION
SCALE: 1" = 1'-0"
DEMO WINDOW - HOPPER
EXTERIORINTERIOR
EXTERIORINTERIOR
EXISTING LINTEL(S) TO
REMAIN
HEAD
SILL
JAMB
SCALE: 1" = 1'-0"
NEW WINDOW - SINGLE HUNG
EXTERIORINTERIOR
EXTERIORINTERIOR
APPLIED MUNTIN
NEW INTERNAL MUNTIN
MEETING RAILS
NEW REMOVABLE INSECT
SCREEN
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
REMOVE EXISTING WINDOW UNIT
REMOVE EXISTING WINDOW UNIT
REMOVE EXISTING WINDOW UNIT
EXISTING BRICK WALL TO
REMAIN, TAKE CARE NOT TO
DAMAGE DURING
CONSTRUCTION
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW WOOD OR ALUMINUM
BLOCKING
NEW WOOD TRIM
NEW 12" THICK SOLID SURFACE
STOOL, SECURE TO CONCRETE
STOOL
NEW ALUMINUM PANNING
NEW REMOVABLE INSECT
SCREEN
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS
FROM EXISTING SILL
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW ALUMINUM PANNING
NEW WOOD OR ALUMINUM
BLOCKING
NEW WOOD TRIM
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW WOOD OR ALUMINUM
BLOCKING
NEW WOOD TRIM
NEW ALUMINUM PANNING
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS
FROM EXISTING SILL
SCALE: 1" = 1'-0"
DEMO WINDOW - SINGLE HUNG
EXISTING LINTEL(S) TO
REMAIN
EXISTING CONCRETE SILL
AND STOOL TO REMAIN,
TAKE CARE NOT TO DAMAGE
DURING CONSTRUCTION
HEAD
SILL
JAMB
EXISTING BRICK WALL TO
REMAIN, TAKE CARE NOT TO
DAMAGE DURING
CONSTRUCTION
EXISTING CONCRETE SILL TO
REMAIN, DO NOT DAMAGE
DURING CONSTRUCTION
EXTERIORINTERIOR
EXTERIORINTERIOR
REMOVE EXISTING WINDOW
UNIT
EXISTING BRICK WALL TO
REMAIN, TAKE CARE NOT TO
DAMAGE DURING
CONSTRUCTION
REMOVE EXISTING A/C UNIT
REMOVE EXISTING WALL
INFILL AROUND A/C UNIT
REMOVE EXISTING WALL
INFILL SYSTEM DOWN TO
LEVEL OF ORIGINAL WINDOW
STOOL
REMOVE EXISTING WALL
INFILL SYSTEM UP TO LEVEL
OF ORIGINAL MASONRY
WINDOW OPENING
REMOVE EXISTING WALL
INFILL SYSTEM OUT TO
ORIGINAL MASONRY
WINDOW OPENING
REMOVE EXISTING WINDOW
UNIT AND A/C UNIT
REMOVE EXISTING WALL
INFILL DOWN TO LEVEL OF
ORIGINAL WINDOW STOOL
EXISTING LINTEL(S) TO
REMAIN
HEAD
SILL
JAMB
SCALE: 1" = 1'-0"
NEW WINDOW - SINGLE HUNG
EXTERIORINTERIOR
EXTERIORINTERIOR
APPLIED MUNTIN
NEW INTERNAL MUNTIN
MEETING RAILS
NEW REMOVABLE INSECT
SCREEN
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW WOOD OR ALUMINUM
BLOCKING
NEW WOOD TRIM
NEW 12" THICK SOLID
SURFACE STOOL, SECURE
TO STOOL
NEW ALUMINUM PANNING
NEW REMOVABLE INSECT
SCREEN
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS
FROM EXISTING SILL
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW ALUMINUM PANNING
NEW WOOD TRIM
NEW ALUMINUM INSULATED
GLASS WINDOW UNIT
NEW DRYWALL RETURN
AND METAL STUD
FRAMING, FINISH TO
MATCH ADJACENT WALL
NEW WOOD TRIM
NEW ALUMINUM PANNING
CLEAN / SCRAPE ALL CAULKING,
PAINT, AND OTHER DEBRIS
FROM EXISTING SILL
NEW DRYWALL RETURN /
STOOL, SUPPORT WITH
METAL STUDS
NEW 12" THICK SOLID
SURFACE STOOL, SECURE
TO STOOL
NEW BLOCKING
NEW BLOCKING
SUSPENDED ACOUSTICAL TILE CEILING
SYSTEM, CAREFULLY REMOVE SECTION
18"-24" FROM EXTERIOR WALL. NEW 58" TYPE "X" GYP BOARD AND 20 GA.
MTL STUD WINDOW POCKET.
DIMENSIONS TO BE DETERMINED BASED
ON EXTG CONDITIONS.
18" MIN
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
AS702
AS702
AS702
1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,
FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL
FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,
FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR
METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER
PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,
INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.
CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER
MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND
INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE
ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,
FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,
SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR
ADDITIONAL INFORMATION.
3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING
INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND
ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.
4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM
WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)
REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.
5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.
TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL
SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW
IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.
INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING
OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON
WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS
AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR
TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS
WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL
APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR
PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.
9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.
10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE
FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE
EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN
GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING
REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN
DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY
TIME.
12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR
OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR
REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER
CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM
AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.
13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.
FINISH TO MATCH ADJACENT.
14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA
MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH
COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING
BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND
OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL
EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION
THROUGH WINDOW OPENING. COORDINATE WITH COR.
15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR
ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND
CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL
INFORMATION.
16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO
ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS
NEEDED FROM J-BOX OR PANEL.
17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED
FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT
GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW
OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL
INFORMATION.
18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF
WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW
WINDOW INSTALLATION.
19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS
NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND
LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW
WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW
POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE
SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.
20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO
WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH
ADJACENT.
21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM
MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.
22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW
FRAME. CAP AT INTERIOR FOR FUTURE USE.
23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.
24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.
25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.
26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP
ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.
27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE
PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR
WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE
SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.
28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE
AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT
CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY
ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.
SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.
30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.
31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION
AND DETAIL DRAWINGS.
32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
AND DETAILS.
33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.
34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE
WITH WINDOW OPENING.
35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN
DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF
MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,
OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK
OR OTHER MECHANICAL EQUIPMENT.
36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.
SH SINGLE HUNG
DH DOUBLE HUNG
FXD FIXED
CASE CASEMENT
HOP HOPPER
AWN AWNING
SL SLIDER
HS HORIZONTAL SLIDER
ALS ALUMINUM STOREFRONT
DC DROPPED CEILING (ACT)
ACT ACOUSTICAL TILE CEILING
DW DRYWALL / PLASTER
RO ROUGH OPENING
BO BOTTOM OF
TO TOP OF
WC WALL COVERING
VWC VINYL WALL COVERING
WD WOOD
SCRN SCREEN
MTL METAL
SS SOLID SURFACE
CT CERAMIC TILE
VIF VERIFY IN FIELD
NOTE:
ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN
RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM
TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.
THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL
INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS
MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
NOTE:
WINDOW MUNTINS TO BE 7
8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.
RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW
ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO
BE INDICATED IN SHOP DRAWINGS FOR REVIEW BY THE VA AND ARCHITECT.
NOTE:
NOT ALL WINDOW REPLACEMENT NOTES APPEAR ON THIS SHEET.
NOTE:
ALL WINDOW FRAME DEPTHS TO MATCH EXISTING.
AS702
AS702
AS702
AS702
A100 A101 A102 A103 A104
A105 A106 A107
A108 A109 A110 A111 A112
A200 A201
B100 B101 B102
C100 C101 C102
C103 C104 C105 C106
D101 D102 D103
D100
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION A1
AS401
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION B2
AS401
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION C3
AS401
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION D4
AS401
NOT TO SCALE
BUILDING 136 KEY PLAN
A
N
B
C
D
XXXX WINDOW TAG
T TEMPERED GLASS, FULL WINDOW
(ALL OTHER WINDOWS SHALL HAVE ANNEALED GLASS)
SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION.
AC WINDOW AIR CONDITIONER
WINDOW INFILL PANEL
WALL INFILL, THROUGH-WALL
WINDOW WALLED OVER AT INTERIOR ONLY
LOUVERED OPENING
VENT / FAN
SECURITY SCREEN
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
XXXX WINDOW TAG
T TEMPERED GLASS, FULL WINDOW
(ALL OTHER WINDOWS SHALL HAVE ANNEALED GLASS)
SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION.
AC WINDOW AIR CONDITIONER
WINDOW INFILL PANEL
WALL INFILL, THROUGH-WALL
WINDOW WALLED OVER AT INTERIOR ONLY
LOUVERED OPENING
VENT / FAN
SECURITY SCREEN
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
THE PROPOSED WORK WITHIN AND AROUND CERTAIN BUILDINGS MUST BE
SCHEDULED AND COORDINATED WITH THE VA. THE GENERAL CONTRACTOR SHALL
PROVIDE A COMPREHENSIVE SCHEDULE OF EACH WINDOW IN ACCORDANCE WITH
THE FOLLOWING.
WORK WITHIN AND AROUND BUILDING 136 SHALL OCCUR DURING NORMAL
WORKING HOURS.
NOTE:
GC SHALL WORK AROUND FIXED / ATTACHED ITEMS OR COORDINATE WITH COR. VA
WILL RELOCATE CONTENTS OF FURNITURE IF NECESSARY, BUT FURNITURE SHALL BE
THE RESPONSIBILITY OF THE GC.
NOTE:
WINDOW D101: GC SHALL SHALL PROTECT BOWLING ALLEY FLOOR, COORDINATE
WITH COR.
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,
FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL
FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,
FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR
METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER
PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,
INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.
CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER
MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND
INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE
ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,
FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,
SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR
ADDITIONAL INFORMATION.
3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING
INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND
ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.
4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM
WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)
REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.
5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.
TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL
SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW
IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.
INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING
OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON
WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS
AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR
TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS
WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL
APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR
PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.
9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.
10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE
FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE
EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN
GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING
REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN
DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY
TIME.
12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR
OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR
REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER
CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM
AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.
13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.
FINISH TO MATCH ADJACENT.
14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA
MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH
COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING
BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND
OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL
EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION
THROUGH WINDOW OPENING. COORDINATE WITH COR.
15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR
ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND
CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL
INFORMATION.
16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO
ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS
NEEDED FROM J-BOX OR PANEL.
17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED
FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT
GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW
OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL
INFORMATION.
18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF
WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW
WINDOW INSTALLATION.
19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS
NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND
LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW
WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW
POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE
SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.
20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO
WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH
ADJACENT.
21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM
MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.
22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW
FRAME. CAP AT INTERIOR FOR FUTURE USE.
23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.
24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.
25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.
26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP
ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.
27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE
PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR
WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE
SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.
28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE
AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT
CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY
ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.
SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.
30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.
31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION
AND DETAIL DRAWINGS.
32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
AND DETAILS.
33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.
34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE
WITH WINDOW OPENING.
35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN
DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF
MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,
OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK
OR OTHER MECHANICAL EQUIPMENT.
36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.
SH SINGLE HUNG
DH DOUBLE HUNG
FXD FIXED
CASE CASEMENT
HOP HOPPER
AWN AWNING
SL SLIDER
HS HORIZONTAL SLIDER
ALS ALUMINUM STOREFRONT
DC DROPPED CEILING (ACT)
ACT ACOUSTICAL TILE CEILING
DW DRYWALL / PLASTER
RO ROUGH OPENING
BO BOTTOM OF
TO TOP OF
WC WALL COVERING
VWC VINYL WALL COVERING
WD WOOD
SCRN SCREEN
MTL METAL
SS SOLID SURFACE
CT CERAMIC TILE
VIF VERIFY IN FIELD
NOTE:
ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN
RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM
TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.
THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL
INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS
MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
NOTE:
WINDOW MUNTINS TO BE 7
8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.
RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW
ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO
BE INDICATED IN SHOP DRAWINGS FOR…