36C25018B0823-005.pdf

PDF 13 MB Posted

Attached to
Replace Windows-Various Buildings 515-14-103 Federal contract opportunity
Solicitation number
36C25018B0823
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0823 S02 - Drawings - 515-14-103_Part3.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Windows-Various Buildings 515-14-103, newest first.
File Type Posted
36C25018B0823-0001000.docx DOCX document
36C25018B0823-0001001.pdf PDF
36C25018B0823-002.pdf PDF
36C25018B0823-003.pdf PDF
36C25018B0823-013.pdf PDF
36C25018B0823-011.pdf PDF
36C25018B0823-018.docx DOCX document
36C25018B0823-019.pdf PDF
36C25018B0823-001.docx DOCX document
36C25018B0823-008.pdf PDF
36C25018B0823-015.pdf PDF
36C25018B0823-006.pdf PDF
36C25018B0823-017.pdf PDF
36C25018B0823-012.pdf PDF
36C25018B0823-010.pdf PDF
36C25018B0823-016.pdf PDF
36C25018B0823-007.pdf PDF
36C25018B0823-014.pdf PDF
36C25018B0823-009.pdf PDF
36C25018B0823-004.pdf PDF
36C25018B0823-000.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

100% BID DOCUMENTS

1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED

OTHERWISE.

2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL

DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE

REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND

MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED

SCOPE.

5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME

FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID

THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL

NOT BE HELD TO BE ALL INCLUSIVE.

6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,

TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE

EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL

INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER

IMMEDIATELY.

7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR

ABILITIES AT THE END OF EACH WORK DAY.

8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL

COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO

OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.

UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL

REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS

WORK HAD OCCURRED.

MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE

EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN

WITH THE SURROUNDING SURFACES.

CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION

WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE

AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.

9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING

CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND

FINISHED TO MATCH ADJACENT SURFACES.

10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE

INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY

SHOWN OR NOTED IN THESE DOCUMENTS.

11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL

MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.

12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS

NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.

THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL

PROPRTY. COORDINATE WITH COR.

13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING

THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS

TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,

SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW

CONSTRUCTION.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR

SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,

FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL

FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,

FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR

METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER

PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,

INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.

CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER

MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND

INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE

ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,

FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,

SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR

ADDITIONAL INFORMATION.

3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING

INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND

ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.

4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM

WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)

REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.

5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.

TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL

SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW

IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.

INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING

OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.

6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW

UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON

WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS

AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR

TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS

WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL

APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.

8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR

PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.

9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.

10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE

FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE

EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN

GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING

REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN

DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY

TIME.

12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR

OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR

REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER

CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM

AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.

13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.

FINISH TO MATCH ADJACENT.

14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA

MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH

COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING

CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING

BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND

OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL

EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION

THROUGH WINDOW OPENING. COORDINATE WITH COR.

15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR

ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND

CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL

INFORMATION.

16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO

ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS

NEEDED FROM J-BOX OR PANEL.

17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED

FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT

GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW

OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL

INFORMATION.

18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF

WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW

WINDOW INSTALLATION.

19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS

NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND

LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW

WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW

POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE

SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.

20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO

WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH

ADJACENT.

21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM

MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.

22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW

FRAME. CAP AT INTERIOR FOR FUTURE USE.

23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.

24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.

25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.

26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP

ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.

27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE

PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR

WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE

SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.

28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE

AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT

CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING

CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY

ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.

SEE SPECIFICATION FOR ADDITIONAL INFORMATION.

29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.

30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.

31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION

AND DETAIL DRAWINGS.

32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW

WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION

AND DETAILS.

33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.

34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE

WITH WINDOW OPENING.

35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN

DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF

MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,

OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK

OR OTHER MECHANICAL EQUIPMENT.

36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.

SH SINGLE HUNG

DH DOUBLE HUNG

FXD FIXED

CASE CASEMENT

HOP HOPPER

AWN AWNING

SL SLIDER

HS HORIZONTAL SLIDER

ALS ALUMINUM STOREFRONT

DC DROPPED CEILING (ACT)

ACT ACOUSTICAL TILE CEILING

DW DRYWALL / PLASTER

RO ROUGH OPENING

BO BOTTOM OF

TO TOP OF

WC WALL COVERING

VWC VINYL WALL COVERING

WD WOOD

SCRN SCREEN

MTL METAL

SS SOLID SURFACE

CT CERAMIC TILE

VIF VERIFY IN FIELD

NOTE:

ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL

CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN

RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM

TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.

NOTE:

LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS

RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.

NOTE:

CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND

PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR

ADDITION INFORMATION.

NOTE:

WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.

THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL

INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS

MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

NOTE:

WINDOW MUNTINS TO BE 7

8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.

RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW

ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO

BE INDICATED IN SHOP DRAWINGS FOR REVIEW BY THE VA AND ARCHITECT.

NOTE:

NOT ALL WINDOW REPLACEMENT NOTES APPEAR ON THIS SHEET.

NOTE:

ALL WINDOW FRAME DEPTHS TO MATCH EXISTING.

WINDOW SCHEDULE CONTINUED ON SHEET 01.AS702.

BUILDING 1 EXISTING WINDOW CONDITIONS REPLACEMENT WINDOWS

ROOM INTERIOR ROUGH OPENING EXTERIOR ROUGH OPENING WALL THICKNESS OPERATION FINISHES SILL SIZE & TYPE CEILING CONDITION SECURTIY SCREEN A/C OPENING ADDITIONAL COMMENTS ELECTRICAL ELEVATION /

OPERATION

DETAILS REMARKS

A001 OFFICE 002 3'3" X 4'2" 3'2" X 4'4" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- 18" x 14" BLINDS -- SH / 1.B 3,4/01.AS703 &

3/AS1101

1,6,10,14,15,20

A002 CONF RM 001 3'2" X 4'2" 3'2" X 4'4" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- 24" x 14" BLINDS, PIPE AT TOP OF WINDOW WELL OUTLET IN

BUILD OUT

SH / 1.B 3,4/01.AS703 &

3/AS1101

1,6,10,14,15,16, A003 CONF RM 001 3'2" X 4'2" 3'2" X 4'4" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- -- BLINDS -- SH / 1.B 3,4/01.AS703 1,6,10,15,20

A004 CONF RM 001 3'2" X 4'2" 3'2" X 4'4" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- 24" x 14" BLINDS, PIPE AT TOP OF WINDOW WELL -- SH / 1.B 3,4/01.AS703 &

3/AS1101

1,6,10,14,15,20

A005 CONF RM 001 3'2" X 4'2" 3'2" X 2'4" 8" (FURRED OUT 12"-15") HOP PAINT PAINT DW 1" ABV R.O. -- -- BLINDS, PIPE AT TOP OF WINDOW WELL -- HOP / 1.C 7,8/AS703 1,6,10,15,20

A006 OFFICE 015 3'1" X 2'2" 3'2" X 2'4" 8" (FURRED OUT 12"-15") HOP PAINT PAINT DW 1" ABV R.O. -- -- BLINDS, PIPE AT TOP OF WINDOW WELL -- HOP / 1.C 7,8/AS703 1,6,10,15,20

A007 OFFICE 014 3'1" X 2'0" 3'2" X 2'4" 8" (FURRED OUT 12"-15") HOP PAINT PAINT DW 1" ABV R.O. -- -- BLINDS, PIPE AT TOP OF WINDOW WELL -- HOP / 1.C 7,8/AS703 1,6,10,15,20

A008 OFFICE 013 3'1" X 2'0" 3'2" X 2'4" 8" (FURRED OUT 12"-15") HOP PAINT PAINT DW 1" ABV R.O. -- -- BLINDS, PIPE AT TOP OF WINDOW WELL -- HOP / 1.C 7,8/AS703 1,6,10,15,20

A009 OFFICE 013A 3'1" X 2'0" 3'2" X 2'4" 8" (FURRED OUT 12"-15") HOP PAINT PAINT DW 1" ABV R.O. -- -- BLINDS, PIPE AT TOP OF WINDOW WELL -- HOP / 1.C 7,8/AS703 1,6,10,15,20

A010 OFFICE 013A 3'1" X 2'0" 3'2" X 2'4" 8" (FURRED OUT 12"-15") HOP PAINT PAINT DW 1" ABV R.O. -- -- BLINDS, PIPE AT TOP OF WINDOW WELL -- HOP / 1.C 7,8/AS703 1,6,10,15,20

A100 DIR OFFICE 101A 3'6" X 5'8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS, FABRIC VALANCE, BLAST-RESISTANT

FILM

-- SH / 1.A 5,6/01.AS703 1,6,7.10,15,20

A101 DIR OFFICE 101A 3'6" X 5'8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- 24" x 14" BLINDS, FABRIC VALANCE, BLAST-RESISTANT

FILM

-- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,7,10,14,15,2

A102 MED CTR OFF 101 3'6" X 5'8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS, FABRIC VALANCE -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A103 MED CTR OFF 101 3'6" X 5'8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- 18" x 14" BLINDS, FABRIC VALANCE -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A104 OFFICE 100 3'6" X 5'8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- 18" x 14" BLINDS, FABRIC VALANCE OUTLET @ RO SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,15,16,20

A105 LOBBY 3' 5" X 5' 10" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A106 LOBBY 3' 5" X 5' 10" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,,15,20

A107 OFFICE 110 3' 6" X 5' 8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- 18" x 14" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A108 OFFICE 109 3' 6" X 5' 8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- 18" x 14" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A109 OFFICE 108 3' 6" X 5' 8" 3' 6" X 6' 0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A110 OFFICE 108 3' 6" X 5' 8" 3' 6" X 6' 0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A111 OFFICE 108 3' 6" X 5' 8" 3' 6" X 6' 0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A200 OFFICE 201C 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A201 OFFICE 201B 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A202 OFFICE 201A 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A203 OFFICE 201A 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A204 OFFICE 200 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A205 OFFICE 200A 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A206 OFFICE 200A 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A207 OFFICE 209 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A208 OFFICE 208 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A209 OFFICE 207 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A210 OFFICE 207 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

A211 CONF RM 206 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

A212 CONF RM 206 3' 7" X 5' 9" 3' 7" X 5' 9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

B001 OFFICE 003 3'2" X 4'2" 3'4" X 4'4" 8" (FURRED OUT 12"-15") DH PAINT WOOD R.O. CLEAR OF CLG -- 18" x 14" BLINDS -- SH / 1.B 3,4/01.AS703 &

3/AS1101

1,6,10,14,15,20

B002 OFFICE 002 3'2" X 4'2" 3'4" X 4'4" 8" (FURRED OUT 12"-15") DH PAINT WOOD R.O. CLEAR OF CLG -- -- BLINDS, PIPE AT TOP OF WINDOW WELL -- SH / 1.B 3,4/01.AS703 1,6,10,15,20

B100 OFFICE 102A 3' 6" X 5' 8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- 24" x 18" BLINDS, FABRIC VALANCE -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

B101 DIR OFFICE 101A 3' 6" X 5' 8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS, BLAST-RESISTANT FILM -- SH / 1.A 5,6/01.AS703 1,6,7,10,15,20

B102 DIR OFFICE 101A 3' 6" X 5' 8" 3' 6" X 6' 0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS, BLAST-RESISTANT FILM -- SH / 1.A 5,6/01.AS703 1,6,7,10,15,20

B200 OFFICE 201 3' 6" X 5' 9" 3' 6" X 6' 0" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

B201 OFFICE 201C 3' 6" X 5' 9" 3' 6" X 6' 0" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C001 OFFICE 012A 3'1" X 2' 6" 3'2" X 2'10" 8" (FURRED OUT 12"-15") FIXED PAINT PAINT DW 1" ABV R.O. -- 18" x 14" AC ONLY, BLINDS OUTLET IN

BUILD OUT

HOP / 1.B 7,8/01.AS703 &

3/AS1101

4,14,6,10,20,35

C002 OFFICE 012 3'1" X 2' 6" 3'2" X 2'10" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- -- BLINDS OUTLET IN

BUILD OUT

SH / 1.B 3,4/01.AS703 1,6,10,15,20

C003 MECH/JC/COMM 011E 3'1" X 3' 3" 3'2" X 2'10" 8" (FURRED OUT 12"-15") FIXED PAINT (CMU) PAINT (CMU) DW 1" ABV R.O. -- -- 1/3 GLAZING & 2/3 METAL INFILL, DUCTWORK IN

FRONT OF WINDOW

-- FXD / 1.G 2,9/01.AS703 &

1,2/AS1101

4,5,6,10,20,35

C004 MECH/JC/COMM 011E 3'1" X 3' 3" 3'2" X 3'3" 8" (FURRED OUT 12"-15") DH PAINT (CMU) PAINT (CMU) R.O. CLEAR OF CLG -- -- METAL INFILL WITH VENT, PIPING ON FRONT OF

WINDOW.

-- FXD / 1.G 2,9/01.AS703 &

1,2/AS1101

4,5,6,10,20,35

C005 STAIR S1 3'3" x 3' 2 1/2" 3'2" X 3'3" 8" (FURRED OUT 12"-15") DH PAINT PAINT R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.B 3,4/01.AS703 1,6,10,15,20

C006 OFFICE 008 3'3" X 3'7" 3'2" X 3'8" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- 18" x 14" BLINDS OUTLET @ RO SH / 1.B 3,4/01.AS703 &

3/AS1101

1,6,10,14,16,20

C007 OFFICE 008 3'3" X 3'7" 3'2" X 3'8" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- -- BLINDS OUTLET @ RO SH / 1.B 3,4/01.AS703 1,6,10,16,20

C008 ELEC 007A 3'3" X 3'7" 3'2" X 3'8" 8" (FURRED OUT 12"-15") DH PAINT (CMU) PAINT (CMU) DW 1" ABV R.O. -- -- PIPES IN FRONT OF WINDOW -- SH / 1.B 3,4/01.AS703 1,6,10,20

C009 RR 005 3'3" X 4'0" 3'2" X 3'8" 8" (FURRED OUT 12"-15") DH PAINT PAINT R.O. CLEAR OF CLG -- -- METAL INFILL WITH LOUVER/EXH FAN , BOTTOM

OF WINDOW BELOW GRADE. PIPING AT TOP OF

OPENING.

CONDUIT TO

FAN

SH / 1.F 3,4/01.AS703 &

1,2/AS1101

5,8,15,20

C010 OFFICE 004 3'3" X 4'0" 3'2" X 3'8" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- 18" x 14" BLINDS, BOTTOM OF WINDOW BELOW GRADE, PIPING AT TOP OF WINDOW.

OUTLET IN

BUILD OUT

SH / 1.B 3,4/01.AS703 &

3/AS1101

1,6,8,10,15,20

C011 OFFICE 003 3'3" X 4'0" 3'2" X 3'8" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- -- BLINDS, BOTTOM OF WINDOW BELOW GRADE -- SH / 1.B 3,4/01.AS703 1,6,10,15,20

C012 OFFICE 003 3'3" X 4'0" 3'2" X 3'8" 8" (FURRED OUT 12"-15") DH PAINT PAINT DW 1" ABV R.O. -- -- BLINDS, PIPING AT TOP OF WINDOW. -- SH / 1.B 3,4/01.AS703 1,6,10,15,20

C013 CLOSET 003E 3'3" X 4'3" 3'2" X 4'4" 8" (FURRED OUT 12"-15") DH PAINT (CMU) PAINT (CMU) DW 1" ABV R.O. -- -- METAL INFILL WITH VENT/ EXH FAN CONDUIT TO

FAN

SH / 1.E 3,4/01.AS703 5,10,20

C101 OFFICE 107 3'6" x 5'8" 3'6" x 6'0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C102 OFFICE 107 3'6" x 5'8" 3'6" x 6'0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C103 OFFICE 106 3'6" x 5'8" 3'6" x 6'0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- 18" x 14" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

C104 OFFICE 106 3'6" x 5'8" 3'6" x 6'0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C105 OFFICE 105 3'6" x 5'8" 3'6" x 6'0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS, ACCENT TRIM -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C106 OFFICE 105 3'6" x 5'8" 3'6" x 6'0" 13" DH VWC VWC R.O. CLEAR OF CLG -- 18" x 14" BLINDS, ACCENT TRIM -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

C107 RR 104 3'6" x 5'9" 3'6" x 6'0" DH VWC WOOD R.O. CLEAR OF CLG -- -- TOP PANE- METAL INFILL CONDUIT TO

EXH FAN

SH / 1.D 5,6/01.AS703 &

1,2/AS1101

1,5,10,15,20,30

C108 KITCHENETTE 102B 3'6" x 5'8" 3'6" x 6'0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C109 OFFICE 102 3'6" x 5'8" 3'6" x 6'0" 13" DH VWC VWC R.O. CLEAR OF CLG -- 18" x 14" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

C110 OFFICE 102 3'6" x 5'8" 3'6" x 6'0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C111 OFFICE 102A 3'6" x 5'8" 3'6" x 6'0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS, FABRIC VALANCE -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C112 OFFICE 102A 3'6" x 5'8" 3'6" x 6'0" 13" DH VWC VWC R.O. CLEAR OF CLG -- -- BLINDS, FABRIC VALANCE -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

SCALE: 1/4" = 1'-0"

NEW WINDOW ELEVATIONS

SEE SCHEDULE, VIF

SE

E

SC

HE

DU

LE

, V

IF

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SCALE: 1/4" = 1'-0"

NEW WINDOW ELEVATIONS

SEE SCHEDULE, VIF

SE

E

SC

HE

DU

LE

, V

IF

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SEE SCHEDULE,

VIF

SE

E

SC

HE

DU

LE

VI

F

SCALE: 1" = 1'-0"

DEMO WINDOW - HUNG

SCALE: 1" = 1'-0"

NEW WINDOW - HUNG

SCALE: 1" = 1'-0"

DEMO WINDOW - HOPPER

SCALE: 1" = 1'-0"

NEW WINDOW - HOPPER

HEAD

JAMB

SILL

HEAD

JAMB

SILL

APPLIED MUNTIN APPLIED MUNTIN

REMOVE EXISTING WINDOW UNIT

REMOVE EXISTING WINDOW TRIM

REMOVE EXISTING BLOCKING

TEMPORARILY REMOVE

SCREEN

TEMPORARILY REMOVE

SCREEN

REMOVE EXISTING WINDOW UNIT

REMOVE EXISTING WINDOW TRIM

REMOVE EXISTING BLOCKING

REMOVE EXISTING WINDOW UNIT

REMOVE EXISTING WINDOW TRIM

TEMPORARILY REMOVE

SCREEN

REINSTALL/ NEW SECURITY

SCREEN

NEW ALUMINUM INSULATED

GLASS WINDOW UNIT

NEW WOOD OR ALUMINUM

BLOCKING

NEW ALUMINUM PANNING / TRIM

NEW ALUMINUM PANNING /

TRIM

NEW BLOCKING OR PANNING

REINSTALL / NEW SECURITY

SCREENNEW ALUMINUM INSULATED

GLASS WINDOW UNIT

NEW ALUMINUM PANNING / TRIM

NEW ALUMINUM INSULATED

GLASS WINDOW UNIT

NEW ALUMINUM PANNING / TRIM

REMOVE EXISTING PANNING

EXISTING LINTEL(S) TO

REMAIN

REMOVE EXISTING FRAMING /

TRIM

DRYWALL / PLASTER WALL

SURFACE AND CORNER DETAIL TO

REMAIN. DO NOT DAMAGE

DURING CONSTRUCTION.

REMOVE EXISTING WINDOW UNIT

REMOVE EXISTING WINDOW TRIM

REMOVE EXISTING BLOCKING /

BUCKS

REMOVE EXISTING PANNING

REMOVE EXISTING FRAMING

& TRIMREMOVE EXISTING WINDOW UNIT

REMOVE EXISTING WINDOW TRIM

REMOVE EXISTING BLOCKING /

BUCKS

DRYWALL / PLASTER WALL

SURFACE AND CORNER DETAIL TO

REMAIN. DO NOT DAMAGE DURING

CONSTRUCTION.

NEW INTERNAL MUNTIN

EXTERIORINTERIOR

NEW INTERNAL MUNTIN

EXTERIORINTERIOR

REMOVE EXISTING WINDOW UNIT

REMOVE EXISTING WINDOW TRIM

REMOVE EXISTING BLOCKING /

BUCKS

REMOVE EXISTING PANNING

REMOVE EXISTING FRAMING /

TRIM

EXISTING SILL TO REMAIN

DRYWALL / PLASTER WALL

SURFACE AND CORNER DETAIL TO

REMAIN. DO NOT DAMAGE

DURING CONSTRUCTION.

REINSTALL / NEW SECURITY

SCREEN

* APPLY SEALANT AT

PERIMETER OF NEW WINDOW

AND PANNING/TRIM, ALL

SIDES, CONTINUOUS.

NEW ALUMINUM INSULATED GLASS

NEW ALUMINUM INSULATED GLASS

HEAD

JAMB

NEW ALUMINUM PANNING

NEW REMOVABLE INSECT

SCREEN

NEW ALUMINUM INSULATED

GLASS WINDOW UNIT, SASHES

FIXED

NEW 12" THICK SOLID SURFACE

STOOL

NEW WOOD OR ALUMINUM

BLOCKING

NEW ALUMINUM PANNING

NEW ALUMINUM INSULATED

GLASS WINDOW UNIT, SASHES

FIXED

NEW WOOD OR ALUMINUM

BLOCKING EXISTING LINTEL, REMOVE

RUST, PRIME, AND PAINT

EXTERIORINTERIOR

NEW ALUMINUM PANNING &

TRIM

NEW FIXED ALUMINUM

INSULATED GLASS WINDOW

UNIT

* APPLY SEALANT AT

PERIMETER OF NEW WINDOW

AND PANNING/TRIM, ALL

SIDES, CONTINUOUS.

NEW WOOD OR ALUMINUM

BLOCKING

NEW 12" THICK SOLID SURFACE

SILL, SECURE TO WALL OPENING,

PROJECT 1

2" BEYOND FACE OF

WALL (NOTE: NO SILL FOR

WINDOWS BLOCKED OFF AT

INTERIOR)

CLEAN / SCRAPE ALL

CAULKING, PAINT, AND OTHER

DEBRIS FROM EXISTING SILL

NEW REMOVABLE INSECT

SCREEN

NEW WOOD OR ALUMINUM TRIM

EXTERIORINTERIOR

MEETING RAILS

SILL

JAMB

HEAD

EXTERIORINTERIOR

SILL

NEW FIXED ALUMINUM

INSULATED GLASS WINDOW

UNIT

EXTERIORINTERIOR

EXTERIORINTERIOR

EXTERIORINTERIOR

NEW REMOVABLE INSECT

SCREEN

SCALE: 1" = 1'-0"

DEMO WINDOW - PARTIAL LOUVER

SCALE: 1" = 1'-0"

NEW WINDOW - PARTIAL LOUVER

HEAD

JAMB

SILL

MEETING RAIL

JAMB

SILL

REMOVE EXISTING

PANNING

EXISTING LINTEL(S)

TO REMAIN

DRYWALL / PLASTER WALL

SURFACE AND CORNER

DETAIL TO REMAIN. DO NOT

DAMAGE DURING

CONSTRUCTION.

REMOVE EXISTING

BLOCKING/BUCKS

REMOVE EXISTING

PANNING

REMOVE EXISTING

FRAMING & TRIMREMOVE EXISTING WINDOW

UNIT

REMOVE EXISTING WINDOW

TRIM

REMOVE EXISTING

BLOCKING/BUCKS

DRYWALL / PLASTER WALL SURFACE

AND CORNER DETAIL TO REMAIN. DO

NOT DAMAGE DURING

CONSTRUCTION

NEW ALUMINUM

PANNING / TRIM

NEW FIXED ALUMINUM

INSULATED GLASS WINDOW

UNIT

NEW ALUMINUM

PANNING / TRIM

NEW ALUMINUM INSULATED

ALUMINUM GLASS WINDOW

UNIT

NEW SOLID SURFACE SILL

NEW WOOD OR ALUMINUM

BLOCKING

NEW ALUMINUM

PANNING / TRIM

FACTORY INSTALLED MECHANICAL

EQUIPMENT IN NEW WINDOW FRAME

EXISTING LINTEL,

REMOVE RUST,

PRIME AND PAINT

EXTERIORINTERIOR

EXTERIORINTERIOR

EXTERIORINTERIOR

EXTERIORINTERIOR

EXTERIORINTERIOR

REMOVE EXISTING WINDOW

UNIT

REMOVE EXISTING WINDOW

TRIM

REMOVE EXISTING

BLOCKING/BUCKS

REMOVE EXISTING

PANNING

REMOVE EXISTING

FRAMING/ TRIM

EXISTING SILL TO

REMAINDRYWALL / PLASTER WALL

SURFACE AND CORNER DETAIL TO

REMAIN. DO NOT DAMAGE

DURING CONSTRUCTION.

CAULK AROUND PERIMETER

OF MECHANICAL

EQUIPMENT, CONTINUOUS

@ INTERIOR AND EXTERIOR

TEMPORARILY REMOVE EXISTING

VENT, LOUVER, OR OTHER

MECHANICAL EQUIPMENT

TEMPORARILY REMOVE EXISTING

VENT, LOUVER, OR OTHER

MECHANICAL EQUIPMENT

REMOVE EXISTING WINDOW

UNIT NEW FIXED INSULATED

GLASS WINDOW UNIT

FACTORY INSTALLED

MECHANICAL EQUIPMENT

APPLY SEALANT AT

PERIMETER OF NEW

WINDOW AND

PANNING/TRIM, ALL

SIDES, CONTINUOUS.

NEW WOOD OR ALUMINUM

BLOCKING

NEW WOOD OR ALUMINUM

BLOCKING

NEW 12" THICK SOLID

SURFACE SILL, SECURE TO

WALL OPENING CLEAN / SCRAPE

ALL CAULKING,

PAINT, AND OTHER

DEBRIS FROM

EXISTING SILL

HEAD

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

100% BID DOCUMENTS

AS702

1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED

OTHERWISE.

2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL

DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE

REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND

MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED

SCOPE.

5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME

FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID

THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL

NOT BE HELD TO BE ALL INCLUSIVE.

6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,

TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE

EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL

INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER

IMMEDIATELY.

7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR

ABILITIES AT THE END OF EACH WORK DAY.

8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL

COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO

OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.

UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL

REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS

WORK HAD OCCURRED.

MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE

EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN

WITH THE SURROUNDING SURFACES.

CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION

WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE

AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.

9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING

CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND

FINISHED TO MATCH ADJACENT SURFACES.

10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE

INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY

SHOWN OR NOTED IN THESE DOCUMENTS.

11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL

MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.

12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS

NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.

THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL

PROPRTY. COORDINATE WITH COR.

13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING

THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS

TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,

SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW

CONSTRUCTION.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR

SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

AS702

AS702

AS702

AS702

1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,

FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL

FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,

FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR

METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER

PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,

INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.

CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER

MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND

INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE

ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,

FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,

SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR

ADDITIONAL INFORMATION.

3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING

INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND

ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.

4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM

WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)

REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.

5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.

TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL

SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW

IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.

INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING

OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.

6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW

UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON

WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS

AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR

TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS

WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL

APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.

8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR

PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.

9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.

10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE

FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE

EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN

GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING

REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN

DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY

TIME.

12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR

OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR

REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER

CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM

AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.

13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.

FINISH TO MATCH ADJACENT.

14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA

MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH

COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING

CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING

BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND

OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL

EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION

THROUGH WINDOW OPENING. COORDINATE WITH COR.

15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR

ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND

CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL

INFORMATION.

16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO

ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS

NEEDED FROM J-BOX OR PANEL.

17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED

FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT

GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW

OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL

INFORMATION.

18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF

WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW

WINDOW INSTALLATION.

19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS

NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND

LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW

WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW

POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE

SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.

20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO

WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH

ADJACENT.

21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM

MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.

22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW

FRAME. CAP AT INTERIOR FOR FUTURE USE.

23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.

24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.

25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.

26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP

ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.

27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE

PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR

WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE

SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.

28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE

AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT

CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING

CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY

ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.

SEE SPECIFICATION FOR ADDITIONAL INFORMATION.

29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.

30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.

31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION

AND DETAIL DRAWINGS.

32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW

WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION

AND DETAILS.

33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.

34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE

WITH WINDOW OPENING.

35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN

DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF

MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,

OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK

OR OTHER MECHANICAL EQUIPMENT.

36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.

SH SINGLE HUNG

DH DOUBLE HUNG

FXD FIXED

CASE CASEMENT

HOP HOPPER

AWN AWNING

SL SLIDER

HS HORIZONTAL SLIDER

ALS ALUMINUM STOREFRONT

DC DROPPED CEILING (ACT)

ACT ACOUSTICAL TILE CEILING

DW DRYWALL / PLASTER

RO ROUGH OPENING

BO BOTTOM OF

TO TOP OF

WC WALL COVERING

VWC VINYL WALL COVERING

WD WOOD

SCRN SCREEN

MTL METAL

SS SOLID SURFACE

CT CERAMIC TILE

VIF VERIFY IN FIELD

NOTE:

ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL

CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN

RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM

TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.

NOTE:

LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS

RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.

NOTE:

CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND

PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR

ADDITION INFORMATION.

NOTE:

WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.

THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL

INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS

MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

NOTE:

WINDOW MUNTINS TO BE 7

8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.

RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW

ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO

BE INDICATED IN SHOP DRAWINGS FOR REVIEW BY THE VA AND ARCHITECT.

NOTE:

NOT ALL WINDOW REPLACEMENT NOTES APPEAR ON THIS SHEET.

NOTE:

ALL WINDOW FRAME DEPTHS TO MATCH EXISTING.6

AS702

AS702

ROOM INTERIOR ROUGH OPENING EXTERIOR ROUGH OPENING WALL THICKNESS OPERATION FINISHES SILL SIZE & TYPE CEILING CONDITION SECURTIY SCREEN A/C OPENING ADDITIONAL COMMENTS ELECTRICAL ELEVATION /

OPERATION

DETAILS REMARKS

C200 CONF RM 206 3'7" x 5'9" 3'6" x 6'0" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C201 CONF RM 206 3'7" x 5'9" 3'6" x 6'0" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C202 OFFICE 205 3'7" x 5'9" 3'6" x 6'0" 13" DH VWC WOOD R.O. CLEAR OF ACT -- 18" x 14" BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

C203 OFFICE 205 3'7" x 5'9" 3'6" x 6'0" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS, WD CASEWORK DATA CABLE

THRU FRAME

SH / 1.A 5,6/01.AS703 1,6,10,15,20

C204 STAIR S1 3'7" x 5'9" 3'6" x 6'0" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- WD CASEWORK -- SH / 1.A 5,6/01.AS703 1,6,10,20

C205 OFFICE 204 3'7" x 5'9" 3'6" x 6'0" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C206 OFFICE 204 3'7" x 5'9" 3'6" x 6'0" 13" DH VWC WOOD R.O. CLEAR OF ACT -- 24" x 14" BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

C207 FILE RM 204A 3'7" x 5'9" 3'6" x 6'0" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- -- SHADE, WD CASEWORK -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C208 RR 202 3'7" x 5'9" 3'6" x 6'0" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- -- WD CASEWORK,TOP PANE-

METAL INFILL

CONDUIT TO

EXH FAN

SH / 1.D 5,6/01.AS703 &

1,2/AS1101

1,5,10,20,30

C209 OFFICE 201 3'7" x 5'9" 3'6" x 6'0" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- -- BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

C210 OFFICE 201 3'7" x 5'9" 3'6" x 6'0" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- 18" x 14" BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

C211 OFFICE 201 3'7" x 5'9" 3'6" x 6'0" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- 18" x 14" BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

C212 OFFICE 201 3'7" x 5'9" 3'6" x 6'0" 13" DH PAINT WOOD R.O. CLEAR OF ACT -- -- BLINDS, WD CASEWORK -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

D001 OFFICE 013A 3'1" x 2'0" 3'2" x 2'5" 8" (FURRED OUT 12"-15")

DH PAINT PAINT -- -- BLINDS, PIPE AT TOP OF

WINDOW WELL

-- HOP / 1.C 7,8/AS703 1,6,10,15,20

D100 OFFICE 108 3'7" x 5'8" 3'6" x 6'0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- 18" x 14" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

D101 OFFICE 107 3'6" x 5'8" 3'6" x 6'0" 13" DH PANELING WOOD R.O. CLEAR OF CLG -- 24" x 18" BLINDS -- SH / 1.A 5,6/01.AS703 &

3/AS1101

1,6,10,14,15,20

D200 CONF RM 206 3'7" x 5'9" 3'7" x 5'9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

D201 CONF RM 206 -- 3'7" x 5'9" 13" -- -- -- -- -- -- INTERIOR INFILLED- NO

ACCESS

-- SH / 1.A 5,6/01.AS703 1,6,27

D202 CONF RM 206 3'7" x 5'9" 3'7" x 5'9" 13" DH VWC WOOD R.O. CLEAR OF ACT -- -- BLINDS -- SH / 1.A 5,6/01.AS703 1,6,10,15,20

2
08 515-14-103.01-AS701
Sheets and Views
AS701
09 515-14-103.01-AS702
Sheets and Views
AS702
10 515-14-103.03-AS401
Sheets and Views
AS401

File details come from the government source that posted it.