36C25018B0823-006.pdf

PDF 11 MB Posted

Attached to
Replace Windows-Various Buildings 515-14-103 Federal contract opportunity
Solicitation number
36C25018B0823
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0823 S02 - Drawings - 515-14-103_Part4.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Windows-Various Buildings 515-14-103, newest first.
File Type Posted
36C25018B0823-0001001.pdf PDF
36C25018B0823-0001000.docx DOCX document
36C25018B0823-007.pdf PDF
36C25018B0823-014.pdf PDF
36C25018B0823-009.pdf PDF
36C25018B0823-004.pdf PDF
36C25018B0823-002.pdf PDF
36C25018B0823-003.pdf PDF
36C25018B0823-013.pdf PDF
36C25018B0823-011.pdf PDF
36C25018B0823-018.docx DOCX document
36C25018B0823-017.pdf PDF
36C25018B0823-012.pdf PDF
36C25018B0823-010.pdf PDF
36C25018B0823-016.pdf PDF
36C25018B0823-019.pdf PDF
36C25018B0823-001.docx DOCX document
36C25018B0823-008.pdf PDF
36C25018B0823-005.pdf PDF
36C25018B0823-015.pdf PDF
36C25018B0823-000.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INFILLED

A001 A002 A003 A004 A005 A006

A100 A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A115 A116 A117 A118 A119 A120 A121 A122 A123 A124 A125 A126 A127

AC

D100 D101 D102 D103

D001

INFILLED

B100 B101 B102

COVERED

WALKWAYINFILLED

T T

C001 C002 C003

C100 C101 C102 C103 C104 C105 C106 C107 C108 C109 C110 C111 C112 C113 C114 C115 C116 C117 C118 C119 C120 C121 C122

E100 F100

SCALE: 1/8" = 1'-0"

EXISTING ARCHITECTURAL ELEVATION A1

AS401

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

100% BID DOCUMENTS

SCALE: 1/8" = 1'-0"

EXISTING ARCHITECTURAL ELEVATION C2

AS401

SCALE: 1/8" = 1'-0"

EXISTING ARCHITECTURAL ELEVATION E6

AS401 SCALE: 1/8" = 1'-0"

EXISTING ARCHITECTURAL ELEVATION F5

AS401 SCALE: 1/8" = 1'-0"

EXISTING ARCHITECTURAL ELEVATION D4

AS401 SCALE: 1/8" = 1'-0"

EXISTING ARCHITECTURAL ELEVATION B3

AS401

NOT TO SCALE

BUILDING 3 KEY PLAN

A N

B

C

D

F E

1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED

OTHERWISE.

2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL

DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE

REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND

MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED

SCOPE.

5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME

FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID

THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL

NOT BE HELD TO BE ALL INCLUSIVE.

6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,

TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE

EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL

INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER

IMMEDIATELY.

7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR

ABILITIES AT THE END OF EACH WORK DAY.

8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL

COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO

OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.

UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL

REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS

WORK HAD OCCURRED.

MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE

EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN

WITH THE SURROUNDING SURFACES.

CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION

WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE

AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.

9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING

CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND

FINISHED TO MATCH ADJACENT SURFACES.

10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE

INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY

SHOWN OR NOTED IN THESE DOCUMENTS.

11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL

MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.

12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS

NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.

THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL

PROPRTY. COORDINATE WITH COR.

13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING

THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS

TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,

SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW

CONSTRUCTION.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR

SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

XXXX WINDOW TAG

T TEMPERED GLASS, FULL WINDOW

(ALL OTHER WINDOWS SHALL HAVE ANNEALED GLASS)

SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION.

AC WINDOW AIR CONDITIONER

WINDOW INFILL PANEL

WALL INFILL, THROUGH-WALL

WINDOW WALLED OVER AT INTERIOR ONLY

LOUVERED OPENING

VENT / FAN

SECURITY SCREEN

NOTE:

LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS

RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.

NOTE:

CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND

PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR

ADDITION INFORMATION.

NOTE:

THE PROPOSED WORK WITHIN AND AROUND CERTAIN BUILDINGS MUST BE

SCHEDULED AND COORDINATED WITH THE VA. THE GENERAL CONTRACTOR SHALL

PROVIDE A COMPREHENSIVE SCHEDULE OF EACH WINDOW IN ACCORDANCE WITH

THE FOLLOWING.

-WORK WITHIN AND AROUND BUILDING 3 SHALL OCCUR ON WEEKENDS.

NOTE:

-CONTRACTOR TO REMOVE ALL SECURITY SCREENS FROM LOWER LEVEL

WINDOWS AS NEEDED FOR INSTALLATION OF NEW WINDOW SYSTEMS.

CONTRACTOR TO REINSTALL SECURITY SCREENS ONCE NEW WINDOW SYSTEM IS

INSTALLED.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

100% BID DOCUMENTS

1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED

OTHERWISE.

2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL

DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE

REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND

MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED

SCOPE.

5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME

FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID

THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL

NOT BE HELD TO BE ALL INCLUSIVE.

6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,

TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE

EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL

INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER

IMMEDIATELY.

7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR

ABILITIES AT THE END OF EACH WORK DAY.

8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL

COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO

OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.

UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL

REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS

WORK HAD OCCURRED.

MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE

EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN

WITH THE SURROUNDING SURFACES.

CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION

WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE

AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.

9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING

CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND

FINISHED TO MATCH ADJACENT SURFACES.

10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE

INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY

SHOWN OR NOTED IN THESE DOCUMENTS.

11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL

MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.

12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS

NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.

THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL

PROPRTY. COORDINATE WITH COR.

13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING

THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS

TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,

SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW

CONSTRUCTION.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR

SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,

FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL

FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,

FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR

METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER

PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,

INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.

CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER

MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND

INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE

ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,

FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,

SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR

ADDITIONAL INFORMATION.

3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING

INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND

ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.

4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM

WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)

REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.

5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.

TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL

SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW

IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.

INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING

OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.

6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW

UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON

WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS

AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR

TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS

WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL

APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.

8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR

PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.

9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.

10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE

FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE

EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN

GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING

REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN

DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY

TIME.

12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR

OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR

REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER

CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM

AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.

13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.

FINISH TO MATCH ADJACENT.

14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA

MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH

COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING

CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING

BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND

OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL

EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION

THROUGH WINDOW OPENING. COORDINATE WITH COR.

15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR

ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND

CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL

INFORMATION.

16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO

ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS

NEEDED FROM J-BOX OR PANEL.

17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED

FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT

GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW

OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL

INFORMATION.

18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF

WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW

WINDOW INSTALLATION.

19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS

NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND

LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW

WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW

POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE

SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.

20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO

WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH

ADJACENT.

21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM

MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.

22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW

FRAME. CAP AT INTERIOR FOR FUTURE USE.

23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.

24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.

25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.

26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP

ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.

27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE

PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR

WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE

SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.

28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE

AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT

CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING

CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY

ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.

SEE SPECIFICATION FOR ADDITIONAL INFORMATION.

29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.

30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.

31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION

AND DETAIL DRAWINGS.

32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW

WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION

AND DETAILS.

33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.

34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE

WITH WINDOW OPENING.

35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN

DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF

MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,

OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK

OR OTHER MECHANICAL EQUIPMENT.

36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.

SH SINGLE HUNG

DH DOUBLE HUNG

FXD FIXED

CASE CASEMENT

HOP HOPPER

AWN AWNING

SL SLIDER

HS HORIZONTAL SLIDER

ALS ALUMINUM STOREFRONT

DC DROPPED CEILING (ACT)

ACT ACOUSTICAL TILE CEILING

DW DRYWALL / PLASTER

RO ROUGH OPENING

BO BOTTOM OF

TO TOP OF

WC WALL COVERING

VWC VINYL WALL COVERING

WD WOOD

SCRN SCREEN

MTL METAL

SS SOLID SURFACE

CT CERAMIC TILE

VIF VERIFY IN FIELD

NOTE:

ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL

CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN

RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM

TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.

NOTE:

LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS

RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.

NOTE:

CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND

PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR

ADDITION INFORMATION.

NOTE:

WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.

THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL

INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS

MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

NOTE:

WINDOW MUNTINS TO BE 7

8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.

RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW

ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO

BE INDICATED IN SHOP DRAWINGS FOR REVIEW BY THE VA AND ARCHITECT.

NOTE:

NOT ALL WINDOW REPLACEMENT NOTES APPEAR ON THIS SHEET.

NOTE:

ALL WINDOW FRAME DEPTHS TO MATCH EXISTING.

BUILDING 3 EXISTING WINDOW CONDITIONS REPLACEMENT WINDOWS

ROOM INTERIOR ROUGH OPENING EXTERIOR ROUGH OPENING WALL THICKNESS OPERATION FINISHES SILL SIZE & TYPE CEILING CONDITION SECURTIY SCREEN A/C OPENING ADDITIONAL COMMENTS ELECTRICAL ELEVATION / OPERATION DETAILS REMARKS

A001 CRAWL SPACE LOCKED PANEL - NO WINDOW -- -- -- -- -- -- -- -- -- -- 3.C / HOP 2/03.AS702 4,6 A002 CRAWL SPACE LOCKED PANEL - NO WINDOW -- -- -- -- -- -- -- -- -- -- 3.C / FXD 1/03.AS702 4,6 A003 CRAWL SPACE LOCKED PANEL - NO WINDOW -- -- -- -- -- -- -- -- -- -- 3.C / FXD 1/03.AS702 4,6 A004 CRAWL SPACE LOCKED PANEL - NO WINDOW -- -- -- -- -- -- -- -- -- -- 3.C / FXD 1/03.AS702 4,6 A005 CRAWL SPACE LOCKED PANEL - NO WINDOW -- -- -- -- -- -- -- -- -- -- 3.C / HOP 2/03.AS702 4,6 A006 CRAWL SPACE LOCKED PANEL - NO WINDOW -- -- -- -- -- -- -- -- -- -- 3.C / FXD 1/03.AS702 4,6

A100 OFFICE 109A 9'0-3/4" X 6'7-1/2" 6' X 7'1-1/2" 13" DHX2 -- 8-1/2" SS SILL -- -- -- SHADES, WALL FURRED, WALL @ R.O. (WILL

REQUIRE SOME REMOVAL OR RELOCATION

OF WALL)

-- 3.A / SH 5,6/AS702 1,6,10,15,20

A101 EXAM 109 COVERED AT INTERIOR 6' X 7'1-1/2" 13" DHX2 -- -- -- -- BLACKOUT GLASS -- 3.A / FXD 5,6/03.AS702 1,6,23,27 A102 EXAM 108 COVERED AT INTERIOR 6' X 7'1-1/2" 13" DHX2 -- -- -- -- -- BLACKOUT GLASS -- 3.A / FXD 5,6/03.AS702 1,6,23,27 A103 EXAM 107 COVERED AT INTERIOR 6' X 7'1-1/2" 13" DHX2 -- -- -- -- -- BLACKOUT GLASS -- 3.A / FXD 5,6/03.AS702 1,6,23,27 A104 EXAM 106 COVERED AT INTERIOR 3'4 X 7'1-1/2" 13" DH -- -- -- -- -- BLACKOUT GLASS -- 3.B / FXD 4,5/03.AS702 1,6,23,27 A105 EXAM 105 COVERED AT INTERIOR 3'4 X 7'1-1/2" 13" DH -- -- -- -- -- BLACKOUT GLASS -- 3.B / FXD 4,5/03.AS702 1,6,23,27 A106 EXAM 104 COVERED AT INTERIOR 3'4 X 7'1-1/2" 13" DH -- -- -- -- -- BLACKOUT GLASS -- 3.B / FXD 4,5/03.AS702 1,6,23,27 A107 EXAM 103 COVERED AT INTERIOR 8'10" X 7'1-1/2" 13" DHX2 -- -- -- -- -- BLACKOUT GLASS -- 3.A / FXD 5,6/03.AS702 1,6,23,27 A108 EXAM 102 COVERED AT INTERIOR 8'10" X 7'1-1/2" 13" DHX2 -- -- -- -- -- BLACKOUT GLASS -- 3.A / FXD 5,6/03.AS702 1,6,23,27 A109 TOILET 101A 9'0-3/4" X 6'7-1/2" 8'10" X 7'1-1/2" 13" DHX2 PAINT, TILE SS, 4.5" DEEP DW CUTS OFF R.O. -- -- SHADE, WHITE OPAQUE WINDOW FILM (RR), WALL @ R.O. (SIDE AND FRONT)

-- 3.A / SH 5,6/03.AS702 &

4,5/AS1101

1,6,10,17,20,23

A110 OFFICE 100B 4'7-1/4" X 7'0" 4'4" X 7'1-1'2" 13" DH WC -- DC @ R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 A111 OFFICE 100B 9'1-1/2" X 6'11" 8'10" X 7'1-1/2" 13" DHX2 WC -- DC @ R.O. -- -- BLINDS -- 3.A / SH 5,6/03.AS702 1,6,10,15,20 A112 OFFICE 100B 4'7-1/4" X 7'0" 4'4" X 7'1-1'2" 13" DH WC -- DC @ R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 A113 STOR 100A 4'7-1/2" X 7'1" 4'4" X 7'1-1'2" 13" DH PAINT -- CLEAR SCRN @ INT -- SHADE, INTERIOR SCREEEN, METAL PANEL @

UPPER SASH

-- 3.B / SH 4,5/03.AS702 1,6,10,12,15,20

A114 OFFICE 138A 4'7-1/2" X 7'1" 4'4" X 7'1-1'2" 13" DH PAINT -- CLEAR -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6 A115 WAITING ROOM 138 4'7-1/4" X 7'0" 4'4" X 7'1-1'2" 13" DH PAINT -- DC @ R.O. -- -- BLACKOUT SHADE WITH CHANNELS AND

RECESSED POCKET @ CLG

-- 3.B / SH 4,5/03.AS702 &

6,7/AS1101

1,6,10,15,20,28

A116 WAITING ROOM 139 9'1-1/2" X 6'11" 8'10-1/2" X 7'1-1/2" 13" DHX2 PAINT -- DC @ R.O. -- -- BLACKOUT SHADE WITH CHANNELS AND

RECESSED POCKET @ CLG

-- 3.A / SH 5,6/03.AS702 &

6,7/AS1101

1,6,10,15,20,28

A117 WAITING ROOM 140 4'7-1/4" X 7'0" 4'4" X 7'1-1'2" 13" DH PAINT -- DC @ R.O. -- -- BLACKOUT SHADE WITH CHANNELS AND

RECESSED POCKET @ CLG

-- 3.B / SH 4,5/03.AS702 &

6,7/AS1101

1,6,10,15,20,28

A118 TRAINING KITCHENT 1379'1-1/2" X 6'11" 8'10-1/2" X 7'1-1/2" 13" DHX2 PAINT -- -- -- -- DOUBLE WINDOW-BLACKOUT GLASS @

BOTTOM SASH- COUNTERTOP

-- 3.A / SH 5,6/03.AS702 &

6,7/AS1101

1,6,24

A119 EXAM/ TREATMENT ROOM

9'1-1/2" X 6'11" 8'10-1/2" X 7'1-1/2" 13" DHX2 -- -- -- -- -- WINDOW COVERINGS-BLACKOUT SHADES-

BLACK COVERING @EXT.

-- 3.A / SH 5,6/03.AS702 &

6,7/AS1101

1,6,23,28

A120 EXAM/ TREATMENT ROOM

9'1-1/2" X 6'11" 8'10-1/2" X 7'1-1/2" 13" DHX2 -- -- -- -- -- WINDOW COVERINGS-BLACKOUT SHADES-

BLACK COVERING @EXT.

-- 3.A / SH 5,6/03.AS702 &

6,7/AS1101

1,6,23,28

A121 OFFICE 135 3'1-1/2" X 6'6-1/2" 3'4 X 7'1-1/2" 13" DH PAINT DW DC @ R.O. -- -- WALLS FURRED IN, SHADE -- 3.B / SH 4,5/03.AS702 &

4,5/AS1101

1,6,10,15,19,20

A122 OFFICE 134 3'7-1/2" X 6'10-1/2" 3'4 X 7'1-1/2" 13" DH -- -- ACT @ R.O. -- -- BLINDS-WALL FURRED IN -- 3.B / SH 4,5/03.AS702 &

4,5/AS1101

1,6,10,15,20

A123 LAUNDRY 131 3'7-1/2" X 6'10-1/2" 3'4 X 7'1-1/2" 13" DH -- -- ACT @ R.O. -- -- SHADE, TEXTURED GLASS BOTTOM

SASH-WALL FURRED IN

-- 3.B / SH 4,5/03.AS702 &

4,5/AS1101

1,6,10,15,24

A124 OFFICE 130 4'8-1/4" X 7'0" 4'4" X 7'1-1'2" 13" DH PAINT -- DC @ R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 A125 OFFICE 130 4'8-1/4" X 7'0" 4'4" X 7'1-1'2" 13" DH PAINT -- DC 2" ABV R.O. -- -- BLINDS OUTLET 3" FROM R.O.3.B / SH 4,5/03.AS702 1,6,10,15,20 A126 EXAM 129B 4'8-1/2" X 7'0" 4'4" X 7'1-1'2" 13" DH PAINT -- DC 2" ABV R.O. -- -- BLINDS OUTLET 3" FROM R.O.3.B / SH 4,5/03.AS702 1,6,10,15,20 A127 EXAM 129B 7'4-3/4" X 5'9" 7'6" X 5'10" 13" DHX2 PAINT -- CLEAR -- -- BLINDS -- 3.A / SH 5,6/03.AS702 1,6,10,15,20

B100 ELECT 111 3'7-1/2" X 6'10-1/2" 3'4-1/4" X 7'1" 13" DH PAINT -- DC 1-2" ABV R.O. -- -- SHADE, TEXTURED GLASS BOTTOM SASH-- 3.B / SH 4,5/03.AS702 1,6,10,15,20,24 B101 EXAM 110 COVERED AT INTERIOR 8'10-1/4" X 7'1" -- DHX2 -- -- -- -- -- -- -- 3.A / FXD 5,7/03.AS702 1,6,23,27 B102 OFFICE 109A 7'7-1/4" X 6'8-1/4" 7'6-1/4" X 7'1" 13" DHX2 PAINT -- DW CUTS OFF R.O. -- -- SHADE WITH FASCIA, WALL AT R.0. -- 3.A / SH 5,6/03.AS702 &

4,5/AS1101

1,6,10,15,17,20

C001 CRAWL SPACE 3'4" X 1'6" 3'4" X 1'6" 13" -- -- -- -- -- -- -- -- 3.C / FXD 1,3/03.AS702 1,6 C002 CRAWL SPACE LOCKED PANEL - NO WINDOW -- -- -- -- -- -- -- -- -- -- 3.C / HOP 2/03.AS702 4,6 C003 CRAWL SPACE 3'4" X 1'6" 3'4" X 1'6" 13" -- -- -- -- -- -- PLEXIGLASS PANEL, NO WINDOW FRAME-- 3.C / FXD 1,3/03.AS702 1,6

C100 TRAINING ROOM 128A 3'11-1/2 X 6'6" 4'4-1/4" X 7'1-1/2" 13" DH PAINT -- DC 1" ABV R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C101 OFFICE 128A 3'11-1/2 X 6'6" 4'4-1/4" X 7'1-1/2" 13" DH PAINT -- DC 1" ABV R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C102 OFFICE 127 2'11-1/2 X 6'6" 3'4-1/4" X 7'1-1/2" 13" DH WC -- DC 1" ABV R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C103 HOPTEL 123 3'11-1/2 X 6'6" 4'4" X 7'1-1/2" 13" DH PAINT -- DC 1" ABV R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C104 TOIILDET 122A 3'11-1/2 X 6'6" 4'4" X 7'1-1/2" 13" DH PAINT -- DC 1" ABV R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C105 HOPTEL 122 3'11-1/2 X 6'6" 4'4" X 7'1-1/2" 13" DH PAINT -- DC 1" ABV R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C106 HOPTEL 121 3'11-1/2 X 6'6" 4'4" X 7'1-1/2" 13" DH PAINT -- DC 1" ABV R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C107 HOPTEL 120 2'11-1/2 X 6'6" 3'4-1/4" X 7'1-1/2" 13" DH PAINT -- DC @ R.O. -- -- BLINDS, FROSTED GLASS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20,23 C108 EXAM 119 2'11-1/2 X 6'6" 3'4-1/4" X 7'1-1/2" 13" DH PAINT -- DC @ R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20

C109 EXAM/ TREATMENT ROOM

3'7-1/2" X 6'10-1/2" 3'4-1/4" X 7'1-1/2" 13" DH PAINT -- ACT OVERLAPS R.O. -- -- BLACKOUT SHADE WITH CHANNELS, RECESSED INTO ACT CLG

-- 3.B / SH 4,5/03.AS702 &

6,7/AS1101

1,6,10,20,28

C110 EXAM/ TREATMENT ROOM

3'7-1/2" X 6'10-1/2" 3'4-1/4" X 7'1-1/2" 13" DH PAINT -- ACT OVERLAPS R.O. -- -- BLACKOUT SHADE WITH CHANNELS, RECESSED INTO ACT CLG

-- 3.B / SH 4,5/03.AS702 &

6,7/AS1101

1,6,10,20,28

C111 TOILET 114 3'7-1/2" X 6'10-1/2" 3'4-1/4" X 7'1-1/2" 13" DH PAINT -- DC 1" ABV R.O. -- -- RR, BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20,23 C112 CORRIDOR C12 4'7-1/4" X 6'10-1/4" 4'4" X 7'1" 13" DH PAINT -- DC 13-3/4" BELOW R.O. -- -- SHADE OUTLET @ WINDOW

FRAME

3.B / SH 4,5/03.AS702 &

4,5/AS1101

1,6,10,15,16,19,20

C113 STOR 112 3'7-1/2" X 6'10-1/2" 3'4" X 7'1" 13" DH PAINT, TILE TILE DC 1-2" ABV R.O. -- -- RR, NO LONGER USED -- 3.B / SH 4,5/03.AS702 1,6,10,15,20,23 C114 CORRIDOR C12 3'7-1/2" X 6'10-1/2" 3'4" X 7'1" 13" DH PAINT -- DC 1-2" ABV R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C115 CORRIDOR C12 3'7-1/2" X 6'10-1/4" 3'4" X 7'1" 13" DH PAINT -- DC 1-2" ABV R.O. -- -- SHADE OUTLET W/N 2" OF R.O.3.B / SH 4,5/03.AS702 1,6,10,15,20 C116 CORRIDOR C13 4'7-1/2" X 6'10-1/2" 4'4" X 7'1" 13" DH PAINT -- DC @ R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C117 CORRIDOR C13 4'7-1/2" X 6'10-1/2" 4'4" X 7'1" 13" DH PAINT -- DC @ R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C118 CORRIDOR C13 4'7-1/2" X 6'10-1/2" 4'4" X 7'1" 13" DH PAINT -- DC @ R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C119 CORRIDOR C13 4'7-1/2" X 6'10-1/2" 4'4" X 7'1" 13" DH PAINT -- DC @ R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C120 CORRIDOR C13 4'7-1/2" X 6'10-1/2" 4'4" X 7'1" 13" DH PAINT -- DC @ R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C121 CORRIDOR C13 4'7-1/2" X 6'10-1/2" 4'4" X 7'1" 13" DH PAINT -- DC @ R.O. -- -- SHADE -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 C122 OFFIE 109A 7'9" X 6'8" 7'6" X 7'1" 13" DHX2 PAINT -- DW CLG OVERLAPS WINDOW HEAD-- -- SHADE W/VALENCE -- 3.A / SH 5,6/03.AS702 &

4,5/AS1101

1,6,10,15,17,20

D001 IT 001E NO WINDOW - A/C UNIT AND SPRAY INSULATION-- -- -- -- -- -- -- Y -- -- 3.C / FXD 1,3/03.AS702 &

1,2/AS1101

4,6,14

D100 EXAM 129B 7'5" X 5'10" 7'6-1/4" X 5'10-1/4" 13" DHX2 PAINT -- CLEAR -- -- BLINDS OUTLET 4" FROM R.O.3.A / SH 5,6/03.AS702 1,6,10,15,20 D101 EXAM 129A 7'5" X 5'10" 7'6-1/4" X 5'10" 13" DHX2 PAINT -- DC @ R.O. -- -- BLINDS -- 3.A / SH 5,6/03.AS702 1,6,10,15,20 D102 TRAINING ROOM 128A 3'11-1/2" X 6'6" 4'4-12 X 7'1" 13" DH PAINT -- DC 1-2" FROM R.O. -- -- BLINDS -- 3.B / SH 4,5/03.AS702 1,6,10,15,20 D103 TRAINING ROOM 128A 3'11" X 6'6" 4'4-12 X 7'1" 13" DH PAINT -- DC 1-2" FROM R.O. -- -- BLINDS DATA OUTLET 4" FROM

R.O.

3.B / SH 4,5/03.AS702 1,6,10,15,20

E100 C15 9'1-3/4" X 6'9-1/4" 8'10-1/4" X 7'1" 13" DHX2 PAINT -- ACT 15" BELOW R.O. -- -- BLINDS -- 3.A / SH 5,6/03.AS702 &

6,7/AS1101

1,6,10,15,19,20

F100 OFFICE 111 9'1-1/2" X 6'10-1/4" 8'10-1/4" X 7'1" 13" DHX2 PAINT -- DW CLG 1" ABV R.O. -- -- SHADE -- 3.A / SH 5,6/03.AS702 1,6,10,15,20

NOTE:

THE PROPOSED WORK WITHIN AND AROUND CERTAIN BUILDINGS MUST BE

SCHEDULED AND COORDINATED WITH THE VA. THE GENERAL CONTRACTOR SHALL

PROVIDE A COMPREHENSIVE SCHEDULE OF EACH WINDOW IN ACCORDANCE WITH

THE FOLLOWING.

-WORK WITHIN AND AROUND BUILDING 3 SHALL OCCUR ON WEEKENDS.

2
10 515-14-103.03-AS401
Sheets and Views
AS401
11 515-14-103.03-AS701
Sheets and Views
AS701
12 515-14-103.03-AS702
Sheets and Views
AS702

File details come from the government source that posted it.