36C25018B0823-014.pdf
PDF 15 MB Posted
- Attached to
- Replace Windows-Various Buildings 515-14-103 Federal contract opportunity
- Solicitation number
- 36C25018B0823
About this file
36C25018B0823 S02 - Drawings - 515-14-103_Part12.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0823-0001000.docx | DOCX document | |
| 36C25018B0823-0001001.pdf | ||
| 36C25018B0823-002.pdf | ||
| 36C25018B0823-003.pdf | ||
| 36C25018B0823-013.pdf | ||
| 36C25018B0823-011.pdf | ||
| 36C25018B0823-018.docx | DOCX document | |
| 36C25018B0823-019.pdf | ||
| 36C25018B0823-001.docx | DOCX document | |
| 36C25018B0823-008.pdf | ||
| 36C25018B0823-005.pdf | ||
| 36C25018B0823-015.pdf | ||
| 36C25018B0823-006.pdf | ||
| 36C25018B0823-017.pdf | ||
| 36C25018B0823-012.pdf | ||
| 36C25018B0823-010.pdf | ||
| 36C25018B0823-016.pdf | ||
| 36C25018B0823-007.pdf | ||
| 36C25018B0823-009.pdf | ||
| 36C25018B0823-004.pdf | ||
| 36C25018B0823-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVERED
WALKWAY AC
AC
AC
TTTTTT
TT
TTTT
L001 L002 L003 L004 L005 L006 L007 L008 L009 L010 L011 L012
L100 L101 L102 L103 L104
L105
L106 L107 L108 L109 L110
L201 L202 L203 L204 L205 L206 L207 L208L200 L209 L210
L111
L211
L112
L212
L300
AC AC
BEYOND
T
T
T
T
T
TT
TTTTTTTTTTTTTT
I001 I002 I003 I004 I005 I006 I007 I008 I009 I010 I011 I012 I013 I014 I015 I016 I017 I018 I019
I100 I101 I102 I103
I104
I105 I106 I107 I108 I109 I110 I111 I112 I113 I114 I115 I116 I117
I118
I119
I120
I211 I212 I213 I214 I215 I216 I217 I218 I219 I220I201 I202 I203 I204 I205 I206 I207 I208I200 I209 I210
I300
I020
BEYOND
BEYONDBEYOND
BEYONDBEYOND
BEYOND
DECORATIVE METAL
SCREEN
AC AC AC ACACT T T T T T T T T T T
T TT T T T
AC
T
G001 G002 G003 G004 G005 G006
G100
G101 G102 G103 G104 G105
G201 G202 G203 G204 G205G200
H001 H002 H003
H100 H101 H102
H200 H201 H202
K001 K002 K003 K004 K005 K006
K100 K101 K102 K103 K104
K105
K201
K202 K203 K204 K205
K200
J001 J002 J003
J100 J101 J102
J200 J201 J202
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION I1
AS402
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
SCALE: 1/8" = 1'-0"
ARCHITECTURAL ELEVATION L 6
AS402
SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION K5
AS402 SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION J4
AS402 SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION H3
AS402 SCALE: 1/8" = 1'-0"
EXISTING ARCHITECTURAL ELEVATION G2
AS402
NOT TO SCALE
BUILDING 14 KEY PLAN
A
N
B
C
L
D
E
F
G
H
I
J
K
XXXX WINDOW TAG
T TEMPERED GLASS, FULL WINDOW
(ALL OTHER WINDOWS SHALL HAVE ANNEALED GLASS)
SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION.
AC WINDOW AIR CONDITIONER
WINDOW INFILL PANEL
WALL INFILL, THROUGH-WALL
WINDOW WALLED OVER AT INTERIOR ONLY
LOUVERED OPENING
VENT / FAN
SECURITY SCREEN
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
THE PROPOSED WORK WITHIN AND AROUND CERTAIN BUILDINGS MUST BE
SCHEDULED AND COORDINATED WITH THE VA. THE GENERAL CONTRACTOR SHALL
PROVIDE A COMPREHENSIVE SCHEDULE OF EACH WINDOW IN ACCORDANCE WITH
THE FOLLOWING.
WORK WITHIN AND AROUND BUILDING 14 SHALL OCCUR DURING NORMAL WORKING
HOURS, THE CONTRACTOR WILL BE ALLOWED ONE ROOM PER FLOOR (USUALLY
BOTH FLOORS, ONE ABOVE THE OTHER.). WINDOWS SHALL BE GROUPED BY ROOM.
GENERAL CONTRACTOR TO PROVIDE AND MAINTAIN SCHEDULE.
NOTE:
-CONTRACTOR TO REMOVE ALL SECURITY SCREENS FROM LOWER LEVEL
WINDOWS AS NEEDED FOR INSTALLATION OF NEW WINDOW SYSTEMS.
CONTRACTOR TO REINSTALL SECURITY SCREENS ONCE NEW WINDOW SYSTEM IS
INSTALLED.
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,
FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL
FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,
FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR
METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER
PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,
INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.
CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER
MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND
INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE
ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,
FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,
SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR
ADDITIONAL INFORMATION.
3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING
INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND
ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.
4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM
WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)
REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.
5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.
TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL
SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW
IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.
INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING
OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON
WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS
AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR
TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS
WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL
APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR
PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.
9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.
10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE
FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE
EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN
GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING
REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN
DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY
TIME.
12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR
OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR
REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER
CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM
AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.
13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.
FINISH TO MATCH ADJACENT.
14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA
MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH
COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING
BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND
OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL
EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION
THROUGH WINDOW OPENING. COORDINATE WITH COR.
15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR
ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND
CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL
INFORMATION.
16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO
ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS
NEEDED FROM J-BOX OR PANEL.
17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED
FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT
GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW
OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL
INFORMATION.
18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF
WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW
WINDOW INSTALLATION.
19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS
NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND
LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW
WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW
POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE
SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.
20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO
WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH
ADJACENT.
21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM
MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.
22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW
FRAME. CAP AT INTERIOR FOR FUTURE USE.
23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.
24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.
25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.
26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP
ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.
27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE
PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR
WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE
SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.
28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE
AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT
CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY
ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.
SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.
30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.
31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION
AND DETAIL DRAWINGS.
32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
AND DETAILS.
33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.
34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE
WITH WINDOW OPENING.
35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN
DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF
MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,
OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK
OR OTHER MECHANICAL EQUIPMENT.
36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.
SH SINGLE HUNG
DH DOUBLE HUNG
FXD FIXED
CASE CASEMENT
HOP HOPPER
AWN AWNING
SL SLIDER
HS HORIZONTAL SLIDER
ALS ALUMINUM STOREFRONT
DC DROPPED CEILING (ACT)
ACT ACOUSTICAL TILE CEILING
DW DRYWALL / PLASTER
RO ROUGH OPENING
BO BOTTOM OF
TO TOP OF
WC WALL COVERING
VWC VINYL WALL COVERING
WD WOOD
SCRN SCREEN
MTL METAL
SS SOLID SURFACE
CT CERAMIC TILE
VIF VERIFY IN FIELD
NOTE:
ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN
RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM
TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.
THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL
INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS
MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
NOTE:
WINDOW MUNTINS TO BE 7
8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.
RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW
ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO
BE INDICATED IN SHOP DRAWINGS FOR REVIEW BY THE VA AND ARCHITECT.
NOTE:
NOT ALL WINDOW REPLACEMENT NOTES APPEAR ON THIS SHEET.
NOTE:
ALL WINDOW FRAME DEPTHS TO MATCH EXISTING.
WINDOW SCHEDULE CONTINUED ON SHEET 14.AS702.
BUILDING 14 EXISTING WINDOW CONDITIONS REPLACEMENT WINDOWS
ROOM INTERIOR ROUGH OPENING EXTERIOR ROUGH OPENING WALL THICKNESS OPERATION FINISHES SILL SIZE &
TYPE
CEILING CONDITION SECURTIY SCREEN A/C OPENING ADDITIONAL COMMENTS ELECTRICAL ELEVATION /
OPERATION
DETAILS REMARKS
A001 VACANT 007 4' 4 1/2" X 4' 5" 4' 3" X 4' 5" 16" DH PAINT PAINT CLEAR -- -- SHADES -- SH / 14.B 1,2/14.AS705 1,6,10,15,20
A002 VACANT 007 4' 4 1/2" X 4' 5" 4' 3" X 4' 5" 16" DH PAINT PAINT CLEAR -- -- -- -- SH / 14.B 1,2/14.AS705 1,6,10,20
A003 VACANT 007 4' 4 1/2" X 4' 5" 4' 3" X 4' 5" 16" DH PAINT PAINT CLEAR -- -- SHADES -- SH / 14.B 1,2/14.AS705 1,6,10,15,20
A004 OFFICE 006 4' 3" X 3' 2" 4' 3" X 3' 3" 16" METAL INFILL PAINT PAINT -- -- 26" X 14" -- -- HOP / 14.G 4,5/14.AS705 &
3/AS1101
4,14,6,35
A005 OFFICE 006 4' 3" X 3' 2" 4' 3" X 3' 3" 16" HOPPER PAINT PAINT -- -- -- -- -- HOP / 14.G 4,5/14.AS705 1,6,10,20
A006 VACANT 005 4' 3" X 3' 2" 3' 1" X 2' 8" 16" PAINT PLYWOOD DC CUTS OFF R.O. -- 24" X 16" WALL FURRED OUT 19"D -- HOP / 14.G 4,5/14.AS705 &
3/AS1101
4,14,6,35
A007 COMM. 005A 4' 3" X 3' 2" 4' 3" X 3' 3" 16" METAL INFILL -- 26" X 14" WALL FURRED OUT 19"D -- HOP / 14.G 4,5/14.AS705 &
3/AS1101
4,14,6,35
A008 VENDING 004 4' 3" X 3' 2" 4' 3" X 3' 4" 16" METAL INFILL PAINTED CMU CMU CMU -- -- METAL INFILL W/ VENT -- HOP / 14.G 4,5/14.AS705 &
1,2/AS1101
4,5,6,35
A009 CONF RM 002 4' 3" X 3' 1" 4' 3" X 3' 4" 16" HOPPER PAINTED VCW MARBLE DW AT TOP OF R.O. -- -- -- -- HOP / 14.G 4,5/14.AS705 1,6,10,20
A010 CONF RM 002 4' 3" X 3' 1" 4' 3" X 3' 4" 16" HOPPER PAINTED VCW MARBLE DW AT TOP OF R.O. -- -- -- -- HOP / 14.G 4,5/14.AS705 1,6,10,20
A011 HKA 022 4' 2" X 3' 1" 4' 3" X 3' 4" 16" HOPPER PAINTED VCW PAINT DC CUTS OFF R.O. -- -- -- -- HOP / 14.G 4,5/14.AS705 1,6,10,20
A012 PRINTING 021 3' 11" X 3' 11" 4' 3" X 3' 4" 16" HOPPER PAINT PLYWOOD DC CUTS OFF R.O. -- 26" X 14" -- -- HOP / 14.G 4,5/14.AS705 &
3/AS1101
4,14,6,35
A013 PRINTING 021 3' 11" X 3' 11" 4' 3" X 3' 4" 16" HOPPER PAINT PAINT CLEAR -- -- -- -- HOP / 14.G 4,5/14.AS705 1,6,10,20
A014 CONF RM 020 3' 11" X 3' 11" 4' 3" X 3' 4" 16" HOPPER PAINT PAINT CLEAR -- 19" X 14" -- RECEPT ON FRAME HOP / 14.G 4,5/14.AS705 &
3/AS1101
4,14,6,35
A015 CONF RM 020 3' 11" X 3' 11" 4' 3" X 3' 4" 16" HOPPER PAINT PLYWOOD DC CUTS OFF R.O. -- -- -- -- HOP / 14.G 4,5/14.AS705 1,6,10,20
A016 OFFICE 019 4' 3" X 4' 5" 4' 3" X 4' 5" 16" DH PAINT PAINT DC CUTS OFF R.O. -- -- ROLLER SHADE, BLINDS -- SH / 14.B 1,2/14.AS705 1,6,10,15,20
A017 OFFICE 019 4' 3" X 4' 5" 4' 3" X 4' 5" 16" DH PAINT PAINT DC CUTS OFF R.O. -- -- -- -- SH / 14.B 1,2/14.AS705 1,6,10,20
A018 OFFICE 019 4' 3" X 4' 5" 4' 3" X 4' 5" 16" DH PAINT PAINT DC CUTS OFF R.O. -- -- -- -- SH / 14.B 1,2/14.AS705 1,6,10,20
A019 OFFICE 018 3' 7" X 5' 6" 4' 3" X 5' 6" 16" DH PAINT PLYWOOD DC CUTS OFF R.O. -- -- -- -- SH / 14.B 1,2/14.AS705 1,6,10,20
A100 DRESSING RM 115A 3' 4" X 6' 5-1/2" 3' 5" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- SHADES -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A101 3 BED 113 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH CT- 48", PAINT ABV CT DW AT TOP OF R.O. -- -- FROSTED GLAZING -- SH / 14.A 7,8/14.AS705 1,6,10,20,23
A102 4 BED 112 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A103 4 BED 112 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A104 1 BED 109 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A105 1 BED 108 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A106 1 BED 106 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A107 CMS 105 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A108 OFFICE 102 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH VWC VWC DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A109 WAITING RM 101 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH VWC VWC DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A110 OFFICE 154 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- SHADES -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A111 OFFICE 153 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A112 OFFICE 152 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH VWC VWC DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A113 OFFICE 151 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH VWC VWC DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A114 OFFICE 150 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH VWC VWC DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A115 REC ROOM 148C 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- 19" X 14" -- -- SH / 14.A 7,8/14.AS705 &
3/AS1101
1,6,10,14,20
A116 REC ROOM 148C 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- SHADES, CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A117 CONF RM 148B 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A118 SHOWER RM 147 3' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- WALL FURRED OUT -- SH / 14.A 7,8/14.AS705 1,6,10,20
A200 SHOWER RM 215 3' 4" X 6' 0" 3' 5" X 6' 1" 17" DH CT- 48", PAINT ABV CT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A201 3 BED 213 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A202 3 BED 212 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A203 3 BED 212 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A204 1 BED 209 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A205 1 BED 208 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A206 RR 207A 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- FROSTED GLAZING, 1/2
SHADE
-- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A207 1 BED 206 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A208 1 BED 205 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
A209 OFFICE 202 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A210 CORRIDOR 21 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A211 FAM WAIT 201 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH VWC VWC DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A212 OFFICE 254 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A213 OFFICE 253 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH VWC VWC DW AT TOP OF R.O. -- -- CURTAINS -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A214 OFFICE 252 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH VWC VWC DC AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A215 OFFICE 251 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A216 OFFICE 250 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A217 GROUP RM 248B 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A218 GROUP RM 248B 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A219 GROUP RM 248B 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,15,10,20
A220 CONF RM 247 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
A300 MECH PENTHOUSE 2' 7 1/2" X 3' 4" 2' 7 1/2" X 3' 4" 17" TILT & TURN BRICK BRICK CLEAR -- -- -- -- SH / 14.D 1,2/14.AS705 1,6,20
A301 PENTHOUSE 3' 4" DIA 3' 4" DIA 17" FIXED/ ROSE BRICK BRICK CLEAR -- -- DECORATIVE -- FXD / 14.C 9,10/14.AS705 1,32
A302 MECH PENTHOUSE 2' 7 1/2" X 3' 4" 2' 7 1/2" X 3' 4" 17" LOUVER BRICK BRICK CLEAR -- -- -- -- -- -- --
B001 OFFICE 019 4' 5" X 3' 2" 4' 3" X 3' 3" 16" METAL INFILL PAINT PAINT DC CUTS OFF R.O. -- 26"X18" A/C AND MTL PANEL -- HOP / 14.G 4,5/14.AS705 &
3/AS1101
4,14,6,35
B002 OFFICE 019 4' 5" X 3' 2" 4' 3" X 3' 3" 16" METAL INFILL PAINT PAINT DC CUTS OFF R.O. -- 26"X18" A/C AND MTL PANEL, CURTAINS
-- HOP / 14.G 4,5/14.AS705 &
3/AS1101
4,14,6,35
B003 OFFICE 019 4' 5" X 3' 2" 4' 3" X 3' 3" 16" DH PAINT PAINT DC CUTS OFF R.O. -- -- CURTAIN -- HOP / 14.G 4,5/14.AS705 1,6,10,15,20
B004 OFFICE 019 4' 5" X 3' 2" 4' 3" X 3' 3" 16" METAL INFILL PAINT PAINT DC CUTS OFF R.O. -- 26"X18" A/C AND MTL PANEL -- HOP / 14.G 4,5/14.AS705 &
3/AS1101
4,14,6,35
B100 1 BED 148F 4' 2" X 6' 5" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
B101 OFFICE 148D 4' 2" X 6' 5" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- SHADE -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
B102 REC RM 148C 4' 2" X 6' 5" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
B103 REC RM 148C 4' 2" X 6' 5" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
B200 GROUP RM 248C 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
B201 GROUP RM 248C 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- 18" X 14" ROLLER SHADE -- SH / 14.A 7,8/14.AS705 &
3/AS1101
1,6,10,14,15,20
B202 GROUP RM 248B 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
B203 GROUP RM 248B 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
C001 CONF RM 002 4' 5" X 3' 2" 4' 3" X 3' 3" 16" HOPPER PAINTED VCW MARBLE PAINT -- -- ROLLER SHADE -- HOP / 14.G 4,5/14.AS705 1,6,10,15,20
C100 WAITING RM 101 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH VCW VCW DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
C200 FAM WAIT 201 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH VCW VCW DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
C300 MECH PENTHOUSE 2' 7 1/2" X 3' 4" 2' 7 1/2" X 3' 4" 17" TILT & TURN BRICK BRICK CLEAR -- -- -- -- SH / 14.D 1,2/14.AS705 1,6,20
D001 CONF RM 002 4' 5" X 3' 2" 4' 3" X 3' 3" 16" HOPPER PAINTED VCW MARBLE PAINT -- -- ROLLER SHADE -- HOP / 14.G 4,5/14.AS705 1,6,10,15,20
D100 OFFICE 102 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH VCW VCW DW AT TOP OF R.O. -- -- BLINDS -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
D200 OFFICE 202 4' 3" X 6' 1" 17" -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
D300 MECH PENTHOUSE 2' 7 1/2" X 3' 4" 2' 7 1/2" X 3' 4" 17" LOUVER BRICK BRICK CLEAR -- -- -- -- -- -- --
NOTE:
THE PROPOSED WORK WITHIN AND AROUND CERTAIN BUILDINGS MUST BE
SCHEDULED AND COORDINATED WITH THE VA. THE GENERAL CONTRACTOR SHALL
PROVIDE A COMPREHENSIVE SCHEDULE OF EACH WINDOW IN ACCORDANCE WITH
THE FOLLOWING.
WORK WITHIN AND AROUND BUILDING 14 SHALL OCCUR DURING NORMAL WORKING
HOURS, THE CONTRACTOR WILL BE ALLOWED ONE ROOM PER FLOOR (USUALLY
BOTH FLOORS, ONE ABOVE THE OTHER.). WINDOWS SHALL BE GROUPED BY ROOM.
GENERAL CONTRACTOR TO PROVIDE AND MAINTAIN SCHEDULE.
sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% BID DOCUMENTS
1. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED
OTHERWISE.
2. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. ALL MATERIALS IN DEMOLITION DETAILS INDICATED AS DASHED ARE TO BE
REMOVED, SEE DETAILS ON THE A700 SHEETS. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED
SCOPE.
5. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. THESE DRAWINGS SHALL SERVE TO AID
THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION : BUT SHALL
NOT BE HELD TO BE ALL INCLUSIVE.
6. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL,
TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE
EXISTING BUILDING . IF THE INSPECTION INDICATES THAT THE STRUCTURAL
INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER
IMMEDIATELY.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR
ABILITIES AT THE END OF EACH WORK DAY.
8. THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL
COORDINATE WITH THE ELECTRICAL CONTRACTOR, ALL NECESSARY DEMOLITION TO
OCCUR WHERE ELECTRICAL ACCESS WORK MUST TAKE PLACE.
UPON COMPLETION OF ACCESS WORK, THE GENERAL CONTRACTOR SHALL
REPAIR AND REFINISH ACCESS AREAS TO APPEAR AS THOUGH NO ACCESS
WORK HAD OCCURRED.
MATERIALS NECESSARY FOR THIS WORK SHALL BE COMPATIBLE WITH THE
EXISTING CONSTRUCTION AND FINISH MATERIALS AND COLORS SHALL BLEND IN
WITH THE SURROUNDING SURFACES.
CONTRACTORS SHALL COORDINATE ALL DEMOLITION AND RECONSTRUCTION
WORK WITH OTHER TRADES, TO BE ASSURED THAT WORK IN EITHER OF THESE
AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS.
9. WHERE ANCHORING DEVICES, ADHESIVES OR MASTICS OCCUR ON EXISTING
CONSTRUCTION THEY SHALL BE REMOVED FROM ALL SURFACES, REPAIRED AND
FINISHED TO MATCH ADJACENT SURFACES.
10. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE
INSTALLATION OF NEW CONSTRUCTION, WHETHER OR NOT IT IS SPECIFICALLY
SHOWN OR NOTED IN THESE DOCUMENTS.
11. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL
MATERIALS AND EQUIPMENT WITH OWNER PRIOR TO BEGINNING OF CONSTRUCTION.
12. THE GC SHALL TEMPORARILY RELOCATE FURNITURE WITHIN THE SPACE AS
NECESSARY TO COMPLETE THE WORK AND REINSTALL IN ITS ORIGINAL LOCATION.
THE VA WILL REMOVE OR OTHERWISE SECURE ALL PIH, PPI, AND PERSONAL
PROPRTY. COORDINATE WITH COR.
13. ALL CONTRACTORS RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING
THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS
TO CONTACT COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
14. FOR FURTHER INFORMATION WITH REGARD TO THE EXACT EXTENT OF DEMOLITION,
SEE THE CONSTRUCTION PLANS WHICH ILLUSTRATE THE ADJACENT NEW
CONSTRUCTION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY, INCLUDING ALUMINUM SASHES,
FRAMING, PANNING, AND TRIM. REMOVE ANY REMAINING WINDOW MATERIAL
FROM ALL PREVIOUS WINDOW UNITS INCLUDING, BUT NOT LIMITED TO, FRAMING,
FASTENERS, ANCHORS, STOOLS, APRONS, BLOCKING / BUCKS (WOOD AND / OR
METAL) , AND WEIGHTS. TAKE CARE NOT TO DISTURB INTERIOR PERIMETER
PLASTER WORK OR FINISHED DRYWALL ROUGH OPENING. STRUCTURAL ELEMENTS,
INCLUDING HEADERS, LINTELS, AND STRUCTURAL MULLIONS TO REMAIN IN PLACE.
CONCRETE OR MASONRY SILLS TO REMAIN IN PLACE. REMOVE ANY OTHER
MATERIAL PRESENT SO THAT ONLY THE WINDOW ROUGH OPENING, SILL, AND
INTERIOR PERIMETER PLASTER WORK OR FINISHED DRYWALL REMAIN. INSULATE
ANY WALL CAVITIES EXPOSED BY WINDOW REMOVAL. SEE DETAILS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING ALUMINUM WINDOW IN ITS ENTIRETY, INCLUDING SASHES,
FRAMING, AND ANY OTHER WINDOW MATERIAL FROM PREVIOUS INSTALLATIONS,
SO THAT ONLY THE ROUGH MASONRY OPENING REMAINS. SEE DETAILS FOR
ADDITIONAL INFORMATION.
3. REMOVE WINDOW AND / OR WALL INFILL MATERIAL TO ROUGH OPENING
INCLUDING CLADDING, BRICK, STUDS, INSULATION, DRYWALL, WINDOWS, AND
ANY OTHER MATERIALS. SEE DETAILS FOR ADDITIONAL INFORMATION.
4. REMOVE INFILL PANEL OR DOOR PANEL AND ANY FRAMING MATERIAL FROM
WINDOW OPENING SO THAT ONLY A ROUGH MASONRY OPENING (WITH LENTIL)
REMAINS. SEE DETAILS FOR ADDITIONAL INFORMATION.
5. LOUVER, VENT, OR OTHER MECHANICAL DEVICE TO REMAIN IN OPENING.
TEMPORARILY DISCONNECT FROM MECHANICAL EQUIPMENT AND ELECTRICAL
SERVICE. TEMPORARILY SUPPORT FOR REMOVAL OF WINDOW ABOVE OR BELOW
IN SAME WINDOW OPENING. INSTALL NEW FRAMING SUPPORT FOR EQUIPMENT.
INSTALL NEW ALUMINUM DOUBLE-GLAZED INSULATED WINDOW IN REMAINING
OPENING. SEE WINDOW SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
6. PROVIDE AND INSTALL NEW DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
UNIT. SIZE TO FIT INTO ROUGH OPENING. WINDOW TO OPERATE AS INDICATED ON
WINDOW SCHEDULE. SEE WINDOW SCHEDULE FOR APPROXIMATE DIMENSIONS
AND DETAILS. SEE SPECIFICATION FOR ADDITIONAL INFORMATION. CONTRACTOR
TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
7. PROVIDE AND INSTALL BLAST RESISTANT WINDOW FILM ON ALL SASHES OF THIS
WINDOW UNIT. PRODUCT BASIS OF DESIGN: 3M ULTRA 800 OR EQUAL
APPROVED BY THE VA. SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
8. RELOCATE ELECTRICAL OUTLET AND REROUTE IN-WALL CONDUIT FROM J-BOX OR
PANEL TO NEW ADJACENT LOCATION OUTSIDE AREA OF WINDOW REPLACEMENT.
9. ADJUST INTERIOR HVAC DUCTING SO THAT VENT OCCURS AT TOP SASH.
10. PROVIDE AND INSTALL NEW 1/2" THICK SOLID SURFACE WINDOW STOOL. SEE
FINISH SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
11. PROVIDE AND INSTALL NEW SECURITY SCREEN AT WINDOW INTERIOR TO REPLACE
EXISTING. NEW SECURITY SCREEN SHALL CONFORM TO VA SECURITY DESIGN
GUIDE. SECURITY SCREEN SHALL REMAIN FUNCTIONAL EXCEPT WHEN BEING
REPLACED. CONTRACTOR SHALL REMOVE AND REPLACE SECURITY SCREEN
DURING WORKING HOURS. WINDOW SHALL NOT BE LEFT UNSECURED AT ANY
TIME.
12. REMOVE SECURITY SCREEN AND ALL ASSOCIATED HARDWARE FROM EXTERIOR
OR INTERIOR OF WINDOW. TEMPORARILY CATALOGUE AND STORE FOR
REINSTALLATION. CLEAN, REFINISH, AND REINSTALL AT SAME LOCATION AFTER
CORRESPONDING WINDOW HAS BEEN INSTALLED. PROVIDE ANY ADDITIONAL TRIM
AND HARDWARE REQUIRED FOR COMPLETE AND SECURE INSTALLATION.
13. PROVIDE AND INSTALL NEW EXTERIOR SECURITY SCREEN TO MATCH ADJACENT.
FINISH TO MATCH ADJACENT.
14. REMOVE AND TURN WINDOW AIR CONDITIONING UNIT (AC) OVER TO VA
MECHANICAL MAINTENANCE SHOP DURING CONSTRUCTION, COORDINATE WITH
COR. CLEAN AC UNIT (INTERIOR AND EXTERIOR), AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT WITH COMMERCIAL GRADE MOUNTING
BRACKET, GASKETS, 1" INSULATED PANEL, WEATHERPROOFING, FASTENERS, AND
OTHER MATERIALS AS SHOWN IN AC MOUNTING DETAIL 3/AS1101. INSTALL
EXISTING AC UNIT AND CAULK AROUND ALL EDGES TO ELIMINATE AIR INFILTRATION
THROUGH WINDOW OPENING. COORDINATE WITH COR.
15. REMOVE ALL BLINDS, CURTAINS, SHADES, AND ASSOCIATED HARDWARE IN THEIR
ENTIRETY. PROVIDE AND INSTALL NEW 1" ALUMINUM HORIZONTAL BLINDS AND
CORRESPONDING HARDWARE. SEE SPECIFICATION FOR ADDITIONAL
INFORMATION.
16. RELOCATE SURFACE MOUNTED ELECTRICAL OUTLET AND SURFACE CONDUIT TO
ADJACENT LOCATION OUTSIDE OF AREA OF WINDOW REPLACEMENT. REWIRE AS
NEEDED FROM J-BOX OR PANEL.
17. CAREFULLY REMOVE DRYWALL OR PLASTER CEILING OR BULKHEAD AS NEEDED
FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND LIGHT
GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW WINDOW
OPENING. SEE SPECIFICATIONS AND DETAILS 4&5 / AS1101 FOR ADDITIONAL
INFORMATION.
18. CAREFULLY REMOVE PORTION OF WALL AS NECESSARY FOR REMOVAL OF
WINDOW MATERIAL. PATCH AND REPAIR TO MATCH ADJACENT AFTER NEW
WINDOW INSTALLATION.
19. CAREFULLY REMOVE PORTION OF SUSPENDED ACOUSTICAL TILE CEILING AS
NEEDED FOR REMOVAL OF WINDOW MATERIAL. CONSTRUCT NEW DRYWALL AND
LIGHT GAUGE STEEL FRAMING POCKET/ BULKHEAD AT CEILING AROUND NEW
WINDOW OPENING. REPAIR SUSPENDED ACOUSTICAL TILE CEILING AROUND NEW
POCKET/BULKHEAD SO THAT NO GAPS IN THE CEILING REMAIN. SEE
SPECIFICATIONS AND DETAILS 6&7 / AS1101 FOR ADDITIONAL INFORMATION.
20. REPAIR AND RESTORE DRYWALL / PLASTER WALL SURFACES ADJACENT TO
WINDOW OPENING AND REFINISH (PAINT OR WALL COVERING) TO MATCH
ADJACENT.
21. CLEAN ALL ADHESIVES, DEBRIS, CAULKING, OR OTHER MATERIALS FROM
MASONRY OPENING. REFINISH TO MATCH ADJACENT MASONRY WALL.
22. REMOVE SPEAKER WIRING / CONDUIT RUNNING THROUGH EXISTING WINDOW
FRAME. CAP AT INTERIOR FOR FUTURE USE.
23. 1" INSULATED WINDOW GLASS TO BE FROSTED AT UPPER AND LOWER SASHES.
24. 1" INSULATED WINDOW GLASS TO BE FROSTED AT LOWER SASH ONLY.
25. 1" INSULATED WINDOW GLASS TO BE WIRE SAFETY GLASS.
26. REMOVE EXISTING LIGHT FIXTURE AT WINDOW OPENING IN ITS ENTIRETY. CAP
ELECTRICAL. PATCH AND REFINISH CEILING / BULKHEAD TO MATCH ADJACENT.
27. DO NOT DISTURB EXISTING WALL INFILL. ALL WINDOW REPLACEMENT WORK TO BE
PERFORMED FROM THE EXTERIOR FOR HUNG UNITS COVERED BY AN INTERIOR
WALL, LOCK SASHES IN PLACE AND SEAL AROUND ALL EDGES OF OPERABLE
SASH, INTERIOR AND EXTERIOR. SEE DETAILS 1&2 / AS1101.
28. TEMPORARILY REMOVE, CATALOGUE, AND STORE EXISTING BLACKOUT SHADE
AND ALL CORRESPONDING HARDWARE INCLUDING CEILING POCKETS, BLACKOUT
CHANNELS, AND MOUNTING DEVICES. CLEAN AND REINSTALL FOLLOWING
CORRESPONDING WINDOW REPLACEMENT. PROVIDE AND INSTALL ANY
ADDITIONAL HARDWARE REQUIRED FOR SECURE LIGHT-BLOCKING INSTALLATION.
SEE SPECIFICATION FOR ADDITIONAL INFORMATION.
29. INFILL REMAINING ROUGH OPENING TO MATCH ADJACENT WALL CONSTRUCTION.
30. PROVIDE FROSTED GLASS AT RESTROOM HALF OF WINDOW ONLY.
31. PROVIDE DOOR AT HALF OF WINDOW OPENING AS INDICATED ON THE ELEVATION
AND DETAIL DRAWINGS.
32. PROVIDE NEW DECORATIVE DOUBLE-GLAZED INSULATED ALUMINUM WINDOW
WITH APPLIED MUNTINS. SEE WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
AND DETAILS.
33. 1" INSULATED GLASS TO BE COLORED AT TOP PANE. COLOR TO MATCH EXISTING.
34. REMOVE CONDUIT ADJACENT TO WINDOW. RELOCATE SO NOT TO INTERFERE
WITH WINDOW OPENING.
35. INSULATED INFILL PANEL TO BE GLAZED INTO WINDOW SASH INDICATED IN
DRAWING. CUT OPENING IN INFILL PANEL AS NEED FOR RE-INSTALLATION OF
MECHANICAL EQUIPMENT, LOUVER, OR VENT. RECONNECT EQUIPMENT, LOUVER,
OR VENT AT THE INTERIOR AND ALIGN WITH ALL EXISTING ADJACENT DUCTWORK
OR OTHER MECHANICAL EQUIPMENT.
36. INTERIOR METAL SECURITY SCREEN TO BE REPLACED. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
37. CONTRACTOR TO PROTECT FLOOR. COORDINATE WITH COR.
SH SINGLE HUNG
DH DOUBLE HUNG
FXD FIXED
CASE CASEMENT
HOP HOPPER
AWN AWNING
SL SLIDER
HS HORIZONTAL SLIDER
ALS ALUMINUM STOREFRONT
DC DROPPED CEILING (ACT)
ACT ACOUSTICAL TILE CEILING
DW DRYWALL / PLASTER
RO ROUGH OPENING
BO BOTTOM OF
TO TOP OF
WC WALL COVERING
VWC VINYL WALL COVERING
WD WOOD
SCRN SCREEN
MTL METAL
SS SOLID SURFACE
CT CERAMIC TILE
VIF VERIFY IN FIELD
NOTE:
ASBESTOS ABATEMENT: THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
CONFIRMATION TESTING AND ABATEMENT OF HAZARDOUS MATERIALS IN
RENOVATION AREAS. SEE SPECIFICATIONS, EXISTING ASBESTOS SURVEY, AND ACM
TABLE ON SHEET GI004 FOR ADDITIONAL INFORMATION. COORDINATE WITH COR.
NOTE:
LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS
RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF LEAD PAINT.
NOTE:
CONTRACTOR TO REMOVE ALL RUST IN ITS ENTIRETY FROM STEEL LINTELS AND
PRIME AND PAINT WHITE TO MATCH NEW WINDOW. SEE SPECIFICATIONS FOR
ADDITION INFORMATION.
NOTE:
WINDOW DRAWINGS DO NOT REPRESENT A SPECIFIC PRODUCT OR MANUFACTURER.
THEY INTEND TO DESCRIBE WINDOW TYPES, GENERAL FEATURES, AND GENERAL
INSTALLATION REQUIREMENTS. ALL MEASUREMENTS AND EXISTING CONDITIONS
MUST BE VERIFIED IN FIELD BY THE CONTRACTOR. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
NOTE:
WINDOW MUNTINS TO BE 7
8" WIDE AND LOCATED BETWEEN IGU GLASS LAYERS ONLY.
RESULTING "DIVIDED" LITES SHALL BE APPROX. 9"-12" WIDE. SEE WINDOW
ELEVATIONS FOR GUIDANCE. ALL WINDOW MUNTIN DIMENSIONS AND LOCATIONS TO
BE INDICATED IN SHOP DRAWINGS FOR REVIEW BY THE VA AND ARCHITECT.
NOTE:
NOT ALL WINDOW REPLACEMENT NOTES APPEAR ON THIS SHEET.
NOTE:
ALL WINDOW FRAME DEPTHS TO MATCH EXISTING.
WINDOW SCHEDULE CONTINUED ON SHEET 14.AS703.
BUILDING 14 EXISTING WINDOW CONDITIONS REPLACEMENT WINDOWS
ROOM INTERIOR ROUGH OPENING EXTERIOR ROUGH OPENING WALL THICKNESS OPERATION FINISHES SILL SIZE & TYPE CEILING CONDITION SECURTIY SCREEN A/C OPENING ADDITIONAL COMMENTS ELECTRICAL ELEVATION /
OPERATION
DETAILS REMARKS
E001 VACANT 007 4' 3" X 3' 3" 4' 3" X 3' 3" 16" METAL INFILL PAINT PAINT CLEAR -- -- VENT CONDUIT TO
VENT
HOP / 14.G 4,5/14.AS705 &
1,2/AS1101
4,5,6,35
E002 VACANT 007 4' 3" X 3' 3" 4' 3" X 3' 3" 16" HOPPER PAINT PAINT CLEAR -- -- SHADES -- HOP / 14.G 4,5/14.AS705 1,6,10,15,20
E003 VACANT 007 4' 3" X 3' 3" 4' 3" X 3' 3" 16" HOPPER PAINT PAINT CLEAR -- -- SHADES -- HOP / 14.G 4,5/14.AS705 1,6,10,15,20
E004 VACANT 007 4' 3" X 3' 3" 4' 3" X 3' 3" 16" HOPPER PAINT PAINT CLEAR -- -- SHADES -- HOP / 14.G 4,5/14.AS705 1,6,10,15,20
E100 4 BED 112 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
E101 4 BED 112 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
E102 2 BED 111 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
E103 2 BED 111 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
E200 3 BED 212 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
E201 3 BED 212 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
E202 3 BED 211 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
E203 3 BED 211 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F001 OFFICE 009F 4' 2" X 5' 4" 4' 3" X 5' 6" 16" DH PAINT PAINT DC CUTS OFF R.O. -- -- BLINDS -- SH / 14.A 1,2/14.AS705 1,6,10,15,20
F002 COVERED LANDING NEW COVERED ENTRY V.I.F. 16" DH X 2 V.I.F. V.I.F. V.I.F. -- -- -- -- SH / 14.H 6,7/14.AS705 1,6,10,20
F003 RECEPTION 4' 2" X 5' 4" 4' 3" X 5' 6" 16" DH PAINT PAINT DC CUTS OFF R.O. -- 18" X 14" BLINDS -- SH / 14.A 1,2/14.AS705 &
3/AS1101
1,6,10,15,20
F004 SOC WK WAIT 009 4' 2" X 5' 4" 4' 3" X 5' 6" 16" DH PAINT PAINT DC CUTS OFF R.O. -- 18" X 14" BLINDS -- SH / 14.A 1,2/14.AS705 &
3/AS1101
1,6,10,15,20
F005 OFFICE 009D V.I.F. 4' 3" X 5' 6" 16" DH -- 18" X 14" BLINDS -- SH / 14.A 1,2/14.AS705 &
3/AS1101
1,6,10,15,20
F006 OFFICE 009C 4' 0" X 5' 2" 4' 3" X 5' 6" 16" DH PAINT PAINT DC CUTS OFF R.O. -- 18" X 14" BLINDS -- SH / 14.A 1,2/14.AS705 &
3/AS1101
1,6,10,15,20
F007 STORAGE 009B 4' 0" X 5' 4" 4' 3" X 5' 6" 16" DH PAINT PAINT DC CUTS OFF R.O. -- -- BLINDS -- SH / 14.B 1,2/14.AS705 1,6,10,20
F008 CORRIDOR 02 4' 2" X 5' 4" 4' 3" X 5' 6" 16" DH PAINT PAINT DC CUTS OFF R.O. -- -- -- -- SH / 14.B 1,2/14.AS705 1,6,10,20
F009 TRANSFORMER RM
008E
4' 2" X 2' 7" 4' 3" X 2' 9" 16" LOUVER BRICK BRICK CLEAR MTL SCRN -- CONDUIT / PANEL IN FRONT
OF OPENING
SEE ADD.
COMMENTS
F010 VACANT 007 4' 4" X 4' 5" 4' 3" X 4' 4" 16" -- PAINT PAINT CLEAR -- -- METAL INFILL W/ EXH FAN CONDUIT TO
FAN
SH / 14.B 1,2/14.AS705 1,6,10,20
F011 VACANT 007 4' 4" X 4' 5" 4' 3" X 4' 4" 16" DH PAINT PAINT CLEAR -- -- ROLLER SHADE -- SH / 14.B 1,2/14.AS705 1,6,10,15,20
F012 VACANT 007 4' 4" X 4' 5" 4' 3" X 4' 4" 16" DH PAINT PAINT CLEAR -- -- ROLLER SHADE -- SH / 14.B 1,2/14.AS705 1,6,10,15,20
F013 VACANT 007 4' 4" X 4' 5" 4' 3" X 4' 4" 16" DH PAINT PAINT CLEAR -- -- ROLLER SHADE -- SH / 14.B 1,2/14.AS705 1,6,10,15,20
F100 DAY ROOM121B 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F101 DAY ROOM121B 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F102 2 BED 121A 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F103 2 BED 121A 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F104 1 BED 120 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F105 1 BED 119 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F106 MENS RR 118 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH CT- 48",
PAINT ABV
CT DW AT TOP OF R.O. -- -- -- -- SH / 14.F 7,8/14.AS705 &
1,2/AS1101
5,10,20
F107 MENS RR 118 17" DH CT- 48",
PAINT ABV
CT DW AT TOP OF R.O. -- -- FROSTED PANES -- SH / 14.A 7,8/14.AS705 1,6,10,20,23
F108 DRESSING RM
115A
4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH CT- 48",
PAINT ABV
CT DW AT TOP OF R.O. -- -- -- -- SH / 14.F 7,8/14.AS705 &
1,2/AS1101
5,10,20
F109 1 BED 114 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
F110 3 BED 113 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F111 3 BED 113 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F112 3 BED 113 4' 2" X 6' 5-1/2" 4' 3" X 6' 6" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F200 4 BED 221 3' 10-1/2" X 5' 9" 3' 11" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,20
F201 4 BED 221 3' 10-1/2" X 5' 9" 3' 11" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F202 2 BED 220 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F203 2 BED 220 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F204 3 BED 219 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F205 3 BED 219 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F206 M RR 218 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- EXHAUST FAN, FROSTED
GLASS
-- SH / 14.F 7,8/14.AS705 &
1,2/AS1101
5,10,20,24
F207 SHOWER RM 215 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH CT CT CT AT TOP OF R.O. -- -- -- SH / 14.A 7,8/14.AS705 1,6,10,20
F208 SHOWER RM 215 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- EXHAUST FAN, FROSTED
GLASS
-- SH / 14.F 7,8/14.AS705 &
1,2/AS1101
5,10,20,24
F209 1 BED 214 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F210 3 BED 213 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F211 3 BED 213 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F212 3 BED 213 4' 2" X 6' 0" 4' 3" X 6' 1" 17" DH PAINT PAINT DW AT TOP OF R.O. -- -- ROLLER SHADE, CURTAIN -- SH / 14.A 7,8/14.AS705 1,6,10,15,20
F300…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.