A0004 - Replace Obsolete Lighting - Questions and Answers.pdf

PDF 121 KB Posted

Attached to
6210--596A4-24-102 - Replace Obsolete Lighting Federal contract opportunity
Solicitation number
36C24924R0035
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document includes a statement of work for a federal construction contract to replace obsolete lighting at a Veterans Affairs medical center. The contractor will remove approximately 9,300 existing ballast lamp fixtures and install new LED fixtures following VA specifications. The contractor must provide all labor, materials, equipment, tools, and construction services for the project. Specific requirements include working with an LED manufacturer to select fixtures that meet lighting levels in the VA Design Guide, submitting components to the contracting officer for approval, replacing whips or wiring as needed, and considering infection control and other medical environment factors. The expected completion time from notice to proceed is 270 calendar days.

The statement of work also outlines general conditions such as the contracting officer's representative serving as project manager and inspector, qualifications for key personnel, supervision and communication requirements, security procedures for badging contractor employees, records management obligations, and flowdown of contract terms to any subcontractors. Safety responsibilities and parking/traffic regulations are also defined.

View the file

Other files for this federal contract opportunity

Other files attached to 6210--596A4-24-102 - Replace Obsolete Lighting, newest first.
File Type Posted
36C24924R0035 0007.docx DOCX document
36C24924R0035 0006.docx DOCX document
36C24924R0035 0005.docx DOCX document
Amendment 0004 - 36C24924R0035 .pdf PDF
36C24924R0035 0003.pdf PDF
36C24924R0035 0002.pdf PDF
36C24924R0035 0001.pdf PDF
Attachment 10 - Wage Determination Fayette Co. KY20240090 01-05-2024.pdf PDF
Attachment 12 - UEI TAX ID.docx DOCX document
ATTACHMENT 1- Price Schedule - Sample Template revised.xlsx XLSX spreadsheet
Attachment 11 - RFI Form.docx DOCX document
Attachment 8 - Contractor Safety and Environmental Record Eval Form.pdf PDF
Attachment 2 - 017419 Specification - Construction Waste Management.pdf PDF
Attachment 1 - Pricing Schedule.xlsx XLSX spreadsheet
Attachment 9 - Past Performance Questionnaire.pdf PDF
Attachment 7 - Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 6 - Lighting Locations Excel Spread.xlsx XLSX spreadsheet
Attachment 3 - 262726 Specification - Wiring Devices.pdf PDF
36C24924R0035_1.docx DOCX document
Attachment 10 - WD Fayette County Building KY20230090 dated 12012023.pdf PDF
Attachment 5 - Lighting Design Manual.pdf PDF
Attachment 4 - 265100 Specification - Interior Lighting.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Obsolete Lighting – Questions and Answers

1. Is this project sales tax exempt? If the project is sales tax exempt will the government/ VA provide a sales tax exemption certificate?

Answer – No it is not tax exempt.

2. If an SSHO is required, can that position be doublehat by a qualified superintendent?

Answer – Yes

3. Describe any and all tasks that may be required for this project as it relates to infectious control?

Answer –

BUILDING ALTERATION, CONSTRUCTION, PROJECT, and MAINTENANCE

ACTIVITY INFECTION CONTROL RISK ASSESSMENT (ICRA) POLICY

MCP-ENG-138-21

b. Building Alteration, Construction, or Renovation Activity Phase.

(1) The COR, project manager, supervisor, technician, or journeyman is responsible for ongoing monitoring of the work to ensure Infection Control measures are implemented and carried out. Another Infection Control Risk Assessment (ICRA) will be performed if changes occur during the work that significantly increases the infection control risk of the work.

(2) Building alteration guidelines on the Building Alteration Permit are to be followed.

(3) During the work, Infection Control staff will make periodic compliance rounds for activities in Class III or IV and document compliance with Infection Control recommendations (See attached Form – 4 VAMC Infection Control Building Alteration, Construction, Project, and Maintenance Monitor).

(4) Non-compliance with requirements may result in work stoppage. Infection Control can halt work until the appropriate person is contacted.

c. Building Alteration, Construction, or Renovation Completion Phase:

(1) A walk through, done by the COR, project manager, supervisor, technician, or journeyman and including a representative from Infection Control, will be done at the end of projects for Class III or IV activities before any barriers are removed.

(2) Environmental Management Service should be contacted to schedule cleaning and disinfection of the area upon completion of the work.

4. What is the level of infectious disease control rating for this site?

Answer – This will vary with different locations in the Hospital.

5. Will the Government provide comprehensive written badging requirements for the project if badging is required?

Answer – Yes. The Vendor that’s awarded the contract will be sent an Orientation Package that covers badging.

6. Please confirm there will not be any commission requirements under this contract.

Answer – Correct

7. It is becoming increasingly difficult to obtain Past Performance Questionnaires from Contracting Officers on a project-by-project basis, especially when they have already filled out a CPARS evaluation for us. In light of this, will the VA accept completed CPARS evaluation forms in lieu of the provided PPQ?

Answer – CPARS will be accepted.

8. Can the prime contractor or subcontractor use their current GSA pricing for required materials for this project?

9. What working conditions would require us to have HEPA filtration?

Answer – Required for clean areas in Sterile Processing on the Ground floor.

10. Please confirm normal working hours?

Answer – 8:00am to 4:30pm

11. For fixtures with exposed bulbs, are direct wire LEDs an option?

Answer – Install Type B with Bypass Socket kits

12. On the site visit, they stated that they want center basket LEDs for the hallway fisstures. Are flat panel LED fixtures acceptable for other areas?

13. Please confirm that the color temperature is going to be 3500K throughout.

Answer – From the Lighting Design Manual (PG-18-10 January 1, 2022), LEDs will be 4000k.

14. Clarify ‘retrofitting the existing can lights’ – do you want us to use the existing housing or is fixture replacement and option?

Answer – Plan on replacing if the fixture is obsolete.

15. How many lights can be stored on site at the VA at one time. Or do we need to provide a container?

Answer – Very few can be stored on site- please provide a container.

File details come from the government source that posted it. Updated .