| JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 | Solicitation Number | Project Number | Project Title | Proposal Date |
| 36C24921R0101 | 614-19-116 | Complete Site Prep 1st Bldg. 1A SPECT-CT | |
SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 33 23 | Shop Drawings, Product Data, & Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 00 | Quality Control | |
| 01 45 35 | Special Inspections | |
| 01 57 19 | Temporary Environmental Controls | |
| 01 58 16 | Temporary Interior Signage | |
| 01 74 19 | Construction Waste Management | |
| DIVISION 2 | Existing Conditions | $0.00 |
| 02 41 00 | Demolition | |
| DIVISION 3 | CONCRETE | $0.00 |
| 03 30 53 | Cast in Place Concrete | |
| DIVISION 4 | MASONRY | |
| 04 05 13 | Masonry Mortaring | |
| DIVISION 5 | Metals | $0.00 |
| 05 12 00 | Structrural Steel Framing | |
| 05 50 00 | Metal Fabrications | |
| DIVISION 6 | Wood, plastics and Composites | $0.00 |
| 06 10 00 | Rough Carpentry | |
| 06 20 00 | Finish Carpentry | |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 |
| 07 81 00 | Applied Fireproofing | |
| 07 92 00 | Joint Sealants | |
| DIVISION 8 | Openings | $0.00 |
| 08 11 13 | Hollow Metal Doors & Frames | |
| 08 14 00 | Interior Wood Doors | |
| 08 71 00 | Door Hardware | |
| 08 80 00 | Glazing | |
| DIVISION 9 | FINISHES | $0.00 |
| 09 22 16 | Non Struct Metal Framing | |
| 09 29 00 | Gypsum Board | |
| 09 51 00 | Acoustical Ceilings | |
| 09 91 00 | Painting | |
| DIVISION 10 | Specialties | $0.00 |
| 10 14 00 | Signage | |
| DIVISION 11 | EQUIPMENT | |
| DIVISION 12 | Furnishings | $0.00 |
| 12 32 00 | Manufactured Wood Casework | |
| 12 36 00 | Countertops | |
| DIVISION 13 | Special Construction | $0.00 |
| 13 05 41 | Seismic Restraint Requirements for Non- Structural Components | |
| 13 49 00 | Radiation Protection | |
| Radiation Shielding Calculations | |
| Shielding Survey of New CT Room | |
| DIVISION 21 | Fire Suppression | $0.00 |
| 21 13 13 | Wet-Pipe Sprinkler Systems | |
| DIVISION 22 | Plumbing | $0.00 |
| 22 05 11 | Common Work Results for Plumbing | |
| 22 05 23 | General-Duty Valves for Plumbing Piping | |
| 22 07 11 | Plumbing Insulation | |
| 22 11 00 | Facility Water Distribution | |
| 22 13 00 | Facility Sanitary & Vent Piping | |
| 22 40 00 | Plumbing Fixtures | |
| 22 62 00 | Vacuum Systems for Laboratory & Healthcare Facilities | |
| 22 63 00 | Gas Systems for Laboratory & Healthcare Facilities | |
| DIVISION 23 | Heating, Ventilating and Air Conditioning HVAC | $0.00 |
| 23 05 11 | Common Work Results for HVAC | |
| 23 05 12 | General Motor Requriments for HVAC and Steam Generation Equipment | |
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | |
| 23 07 11 | HVAC and Boiler Plant Insulation | |
| 23 09 23 | Direct Digital Control System for HVAC | |
| 23 21 13 | Hydronic Piping | |
| 23 31 00 | HVAC Ducts and Casing | |
| 23 37 00 | Air Outlets & Inlets | |
| 23 82 00 | Convection Heating and Cooling Units | |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirements for Electrical Installations | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway & Boxes for Electrical Systems | |
| 26 05 36 | Wireways for Radiology Equipment | |
| 26 09 23 | Lighting Controls | |
| 26 27 26 | Wiring Devices | |
| 26 29 21 | Enclosed Switches & Circuit Breakers | |
| 26 51 00 | Interior Lighting | |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 33 | Raceways & Boxes for Communications Systems | |
| 27 08 00 | Commissioning of Communications Systems | |
| 27 10 00 | Control, Communication and Signal Wiring | |
| 27 11 00 | Communications Equipment Room Fittings | |
| 27 15 00 | Communications Structured Cabling | |
| 27 52 23 | Nurse Call & Code Blue Systems | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 |
| 28 05 00 | Common Work Results for Electronic Safety and Security | |
| 28 05 13 | Conductors and Cables for Electronic Safety and Security | |
| 28 05 28.33 | Conduits & Backboxes for Electronic Safety & Security | |
| 28 13 00 | Physical Access Control System | |
| 28 31 00 | Fire Detection & Alarm | |
| DIVISION 32 | EXTERIOR IMPROVEMENTS | $0.00 |
| 32 05 23 | Cement & Concrete for Exterior Improvements | |
| TOTALS | | | | |
| $0.00 | | | |
| TOTAL LABOR | | | | |
| | $0.00 | | |
| TOTAL MATERIALS | | | | |
| 6% | $0.00 | | |
| TAX FOR MATERIALS | | | | |
| | | $0.00 | |
| TOTAL EQUIPMENT | | | | |
| DIVISION GRAND TOTALS | | | | $0.00 |
| $0 | INSTRUCTIONS |
| DIVISION GRAND TOTALS | $0 | |
| TAX FOR MATERIALS | | 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; |
| SUBTOTAL | $0 | |
| OVERHEAD | 10% | $0 | |
| PROFIT | 10% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| BOND/FEE | 3% | $0 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| PERMITS/LICENSES | | | |
GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and