Rev Drawings pp 91-120 (19009 CLC Phase 2).pdf

PDF 9 MB Posted

Attached to
Construct Replacement Community Living Center (CLC) Federal contract opportunity
Solicitation number
36C24921R0059
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This solicitation is for a minor construction project to construct a replacement community living center at a Veterans Affairs medical center. The scope of work includes furnishing all labor, tools, materials, and expertise to complete the requirements of Project 596-333 in accordance with the contract documents, specifications, and drawings. Some work may be required outside standard administrative hours or in periods shorter than a standard shift for specific items. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Replacement Community Living Center (CLC), newest first.
File Type Posted
S06-36C24921R0059 0005 (Addendum) 04.20.2021.pdf PDF
Addendum 0001 - Drawings.pdf PDF
Addendum 0001 - Text.pdf PDF
S06-36C24921R0059 0004 (Addendum) 04.19.2021.pdf PDF
S06-36C24921R0059 0004.pdf PDF
Fill Placement - Compaction - 27310.pdf PDF
Fill Placement - Compaction - 23611.pdf PDF
Fill Placement - Compaction - 27376.pdf PDF
Fill Placement - Compaction - 27312.pdf PDF
Responses to RFIs_Questions (Minor Project 596-333).xlsx XLSX spreadsheet
S06-36C24921R0059 0003.pdf PDF
S04-Site Visit Sign-In_CLC Phase 2.pdf PDF
S06-36C24921R0059 0002.pdf PDF
19009 CLC Phase 2 - 100 percent CD - Drawings-2.23.2021 (1).pdf PDF
36C24921R0059 0001.pdf PDF
Rev Drawings pp 1-28 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 61-90 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 121-128 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 29-60 (19009 CLC Phase 2).pdf PDF
19009 CLC Phase 2 - 100 CD - Specifications-2-12-2021.pdf PDF
596-333 Geotechnical Report.pdf PDF
S02-36C24921R0059_1 (Revision 03.10.2021).pdf PDF
P07-General Wage Decision KY20210090 01.01.2021.pdf PDF
S15-PPQ-Template (Minor Project 596-333) Construct Replacement CLC-Long Term Rehab.pdf PDF
S02-Price Schedule (Minor Project 596-333) FY2021.xlsx XLSX spreadsheet
S03-(Presolicitation Notice ) 36C24921R0059 Minor Proj 596-333.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:0

:0

A M

Construct Replacement CLC - Long Term Rehab

02.12.2021

SCHEDULES

M601

AJGW JS

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

NOTES:

1. PROVIDE AT LEAST ONE VARIABLE CAPACITY COMPRESSOR THAT IS CAPABLE OF OPERATING AT A

MINIMUM OF 20% OF MAX COMPRESSOR OUTPUT.

2. PROVIDE REFRIGERATION CONTROL PACKAGE CAPABLE OF ACCEPTING ENABLE AND CAPACITY

MODULATION SIGNALS .

GENERAL NOTES:

A. COOLING CAPACITY BASED ON 95°F AMBIENT AIR TEMPERATURE.

B. REFRIGERANT PIPING - SIZES LISTED ARE APPROX. CIRCUITING, SIZING,

NUMBER OF PIPES AND CIRCUITS, ARRANGEMENT, ETC. SHALL BE IN

ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

C. ELECTRIC SERVICE - SINGLE POINT POWER SERVICE CONNECTION. ADEQUACY

OF LISTED CIRCUIT SIZES MUST BE VERIFIED BY CONTRACTOR AND UNIT

SUPPLIER. COST FOR INCREASE OR CHANGE OF ELECTRIC SERVICE FOR

EQUIPMENT SELECTED SHALL BE BORNE BY HVAC CONTRACTOR.

D. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR VIBRATION ISOLATOR TYPES AND SEISMIC

RESTRAINT REQUIREMENTS.

AIR-COOLED CONDENSING UNITS

M A

R K

DESCRIPTION SERVICE N

O

M

IN

A L

C A

P A

C

IT

Y

T O

N S

U N

IT

R

A T

IN

G

E

E R

R E

F R

IG

E

R A

N T

T Y

P E

CONDENSER FANS COMPRESSORS ELECTRICAL SERVICE DIMENSIONS MISC.

SEISMIC

RESTRAINTS BASIS OF DESIGN

S E

E N

O T

E

TYPE M

IN

Q

T Y

M O

T O

R

H P

W

A T

T S

E

A C

H

F L

A

E A

C H

V O

L T

A G

E

P H

A S

E

TYPE M

IN

Q

T Y

F L

A

E A

C H

V O

L T

A G

E

P H

A S

E

V O

L T

A G

E

P H

A S

E

F U

L L

L O

A D

A M

P S

F

L A

M

IN

C

IR

C U

IT

A

M P

S

M C

A

M A

X O

V E

R C

U R

R E

N T

P R

O T

E C

T

IO

N

M O

C P

M

IN

IM

U

M S

C C

R

A M

P S

L E

N G

T H

W

ID

T H

H E

IG

H

T

A P

P R

O X

W

E

IG

H T

L

B S

L O

W A

M B

IE

N

T C

O N

T R

O L

H O

T G

A S

B Y

P A

S S

C R

A N

K C

A S

E H

E A

T E

R

C O

N C

R E

T E

P A

D

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

MANUFACTURER MODEL

ACCU-204-1 ACCU AHU-204-1 30 11.4 R410A PROPELLER 3 1.0 4.1 208-3 SCROLL 2 56.1 208-3 208-3 - 141 175 5,000 60.125" 88.5" 74.25" 1,623 - - ● ● ● 1.5 TRANE RAU-30 1

ACCU-205-1 ACCU AHU-205-1 30 11.4 R410A PROPELLER 3 1.0 4.1 208-3 SCROLL 2 56.1 208-3 208-3 - 141 175 5,000 60.125" 88.5" 74.25" 1,623 - - ● ● ● 1.5 TRANE RAU-30 1

ACCU-205-G ACCU AHU-205-G 25 12.1 R410A PROPELLER 3 1.0 4.1 208-3 SCROLL 2 52.0 208-3 208-3 - 120 150 5,000 60.125" 88.5" 74.25" 1,623 - - ● ● ● 1.5 TRANE RAU-25 1

NOTES:

1. VFDS SHALL BE PROVIDED WITH AIR HANDLING UNITS. REFER TO SPECIFICATION

26 29 11 FOR REQUIREMENTS.

2. COORDINATE MAX SHIPPING SPLIT SIZE WITH MECHANICAL ROOM

ACCESS CORRIDOR IN ATTIC.

3. BASIS OF DESIGN IS TRANE - CLIMATE CHANGER

GENERAL NOTES:

A. HEATING CAPACITY BASED ON 140°F ENT. WATER / 0% GLYCOL.

B. VFD'S SHALL BE CONSTRUCTED AND LABELED FOR REQUIRED SCCR

(SHORT CIRCUIT CURRENT RATING). COORDINATE WITH DIVISION 26.

C. UNIT CONFIGURATIONS (SUPPLY FAN POSITION RELATIVE TO COOLING COIL) -

"HDT" - HORIZONTAL DRAW THRU; "VDT" - VERTICAL DRAW THRU;

"HBT" - HORIZONTAL BLOW THRU; "VBT" - VERTICAL BLOW THRU.

REFER TO DRAWINGS FOR LAYOUT.

D. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR SEISMIC RESTRAINT

REQUIREMENTS.

E. IF EC MOTORS ARE INDICATED OR SPECIFIED, EACH MOTOR SHALL BE PROVIDED

WITH FACTORY DISCONNECTING MEANS, INTERNAL OVERLOAD PROTECTION,

FIELD ADJUSTABLE SPEED CONTROL, AND REMOTE ANALOGUE SPEED CONTROL

INPUT WHEN REMOTE CONTROL IS SPECIFIED, COORDINATED WITH THE BUILDING

AUTOMATION SYSTEM.

F. THE LISTED MAX UNIT HEIGHT INCLUDES THE INTEGRAL UNIT BASE RAIL BUT DOES

NOT INCLUDE THE SPECIFIED CONCRETE PAD. IF THE HEIGHT OF THE SPECIFIED

CONCRETE PAD IS REQUIRED TO BE INCREASED, SUCH AS TO ACCOMMODATE

CONDENSATE TRAP HEIGHT, THEN THE LISTED MAX UNIT HEIGHT SHALL BE

DECREASED BY THAT SAME AMOUNT.

AIR HANDLING UNITS

U N

IT

N

U M

B E

R

LOCATION

U N

IT

C

O N

F

IG

U R

A T

IO

N

AREA SERVED

SUPPLY FAN RETURN FAN PREHEAT COIL COOLING COIL PRE-FILTER FINAL FILTER OUTSIDE AIR DIMENSIONS MISC.

SEISMIC

RESTRAINTS

S E

E N

O T

E

R O

O M

N A

M E

C F

M

T O

T A

L

E X

T

T O

T A

L S

T A

T

IC

P R

E S

S U

R E

IN

W

.C

W H

E E

L T

Y P

E

D

IA

M E

T E

R

F A

N Q

U A

N T

IT

Y

MOTOR(S)

I N

T E

G R

A L

P

IE

Z O

R

IN

G A

IR

F

L O

W S

T A

T

IO

N

C F

M

T O

T A

L

E X

T

T O

T A

L S

T A

T

IC

P R

E S

S U

R E

IN

W

.C

W H

E E

L T

Y P

E

D

IA

M E

T E

R

F A

N Q

U A

N T

IT

Y

MOTOR(S)

I N

T E

G R

A L P

IE

Z

O R

IN

G

A

IR

F L

O W

S T

A T

IO

N

M A

X V

E L

O C

IT

Y

F

P M

C A

P A

C

IT

Y

M B

H

E N

T E

R

IN

G A

IR

T

E M

P E

R A

T U

R E

D B

°F

L E

A V

IN

G

A

IR

T E

M P

E R

A T

U R

E D

B

°F

M A

X

IM

U M

A

IR

P R

E S

S U

R E

D R

O P

IN

W

.C

M A

X

IM

U M

W A

T E

R P

R E

S S

U R

E D

R O

P

F T

H

D

G P

M

P

IP

E R

U N

O U

T S

IZ

E

A U

T O

V A

L V

E T

Y P

E

A U

T O

V A

L V

E C

V

M A

X V

E L

O C

IT

Y

F

P M

T O

T A

L C

A P

A C

IT

Y

M

B H

S E

N S

IB

L

E C

A P

A C

IT

Y

M

B H

E N

T E

R

IN

G A

IR

T

E M

P E

R A

T U

R E

D B

W

B

°F

L E

A V

IN

G

A

IR

T E

M P

E R

A T

U R

E D

B

W B

°F

M A

X

IM

U M

A

IR

P R

E S

S U

R E

D R

O P

IN

W

.C

T H

IC

K

N E

S S

M

E R

V

M A

X V

E L

O C

IT

Y

F

P M

M A

X

IM

U M

C L

E A

N A

IR

P

R E

S S

D

R O

P

IN

W .C

T H

IC

K

N E

S S

M

E R

V

M A

X V

E L

O C

IT

Y

F

P M

M A

X

IM

U M

C L

E A

N A

IR

P

R E

S S

D

R O

P

IN

W .C

IM

U

M C

F M

E C

O N

O M

IZ

E

R

A

IR

F L

O W

M E

A S

U R

E M

E N

T S

T A

T

IO

N

M A

X U

N

IT

L E

N G

T H

IN

C H

E S

M A

X U

N

IT

W

ID

T H

IN

C H

E S

M A

X U

N

IT

H E

IG

H

T

IN

C

H E

S

(N O

T E

H

A P

P R

O X

U

N

IT

W E

IG

H

T

L B

S

H U

M

ID

IF

IE

R

S E

E S

E P

A R

A T

E S

C H

E D

U L

E

E N

E R

G Y

R E

C O

V

S E

C T

IO

N

S

E E

S E

P

S C

H E

D

A

IR

B L

E N

D E

R

S E

E S

E P

S

C H

E D

U V

G I (N

O T

E G

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

M O

T O

R

H P

E A

C H

V O

L T

A G

E

P H

A S

E

E L

E C

T R

O N

IC

A

L L

Y C

O M

M U

T A

T E

D M

O T

O R

S

A

A M

P S

T

O T

A L

M O

C P

A

M P

S T

O T

A L

V A

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

V A

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

Q

T Y

M

IN

IM

U

M S

C C

R

A M

P S

M O

T O

R

H P

E A

C H

V O

L T

A G

E

P H

A S

E

E L

E C

T R

O N

IC

A

L L

Y C

O M

M U

T A

T E

D M

O T

O

A

A M

P S

T

O T

A L

M O

C P

A

M P

S T

O T

A L

V A

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

V A

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

Q

T Y

M

IN

IM

U

M S

C C

R

A M

P S

AHU-204-1 ATTIC HDT 1ST FLOOR - B204 8,100 2.0 / 5.1 PLENUM / 16.5 2 10 208-3 - 66.4 90 ● 2 5,000 ● 5,560 1.4 / 1.7 PLENUM / 16.5 2 5 208-3 - 35.3 50 ● 2 5,000 ● 540 168.6 45.8 65.0 0.11 2 11.3 1.5 2-WAY 5.3 482 364.22 254.95 82.3 / 67.6 53.6 / 52.9 0.60 2" / 8 429 0.24 12" / 11 429 0.24 3000 ● ● 224.8" 72" 49" 3270 - - - - ● 1.5 1, 2, 3

AHU-205-1 ATTIC HDT 1ST FLOOR - B205 7,500 2.25 / 5.2 PLENUM / 16.5 2 7.5 208-3 - 50.4 70 ● 2 5,000 ● 4,950 1.5 / 2.4 PLENUM / 18.5 2 2 208-3 - 18.7 25 ● 2 5,000 ● 500 172.4 43.8 66.0 0.10 2 11.5 1.5 2-WAY 5.4 446 356.60 245.87 82.8 / 67.9 52.9 / 52.4 0.55 2" / 8 397 0.21 12" / 11 397 0.21 3000 ● ● 211.7" 72" 103.5" 4217 - - - - ● 1.5 1, 2, 3

AHU-205-G ATTIC HDT GROUND FLOOR - B205 5,700 2.25 / 5.5 PLENUM / 13.5 2 5 208-3 - 27.5 35 ● 2 5,000 ● 4,350 1.5 / 2.9 PLENUM / 13.5 2 5 208-3 - 14.6 20 ● 2 5,000 ● 507 110.0 47.2 65.0 0.10 2 7.4 1.25 2-WAY 3.5 463 279.82 193.00 82.5 / 67.5 51.6 / 51.2 0.72 2" / 8 462 0.27 12" / 11 462 0.27 2000 ● ● 192.1" 66.5" 83" 3309 - - - - ● 1.5 1, 2, 3

NOTES:

GENERAL NOTES:

A. ASSEMBLIES SHALL INCLUDE SHUT-OFF VALVE, STRAINER,

UNION, PRESSURE REDUCING VALVE, UNION, CHECK VALVE,

SHUT-OFF VALVE, SAFETY RELIEF VALVE, PRESSURE GAUGE,

AND FULL SIZE BYPASS WITH GLOBE VALVE. REFER TO PIPING

SCHEMATIC.

B. PIPE SAFETY RELIEF VALVE DISCHARGE TO SPILL OVER FLOOR

DRAIN.

C. COORDINATE DOMESTIC WATER SOURCE AND BACKFLOW

PREVENTION.

AUTOMATIC MAKE-UP WATER ASSEMBLIES

M A

R K

SYSTEM A

S

S E

M B

L Y

P

IP

E S

IZ

E

PRESSURE

REDUCING VALVE

SAFETY RELIEF

VALVE

B Y

P A

S S

G L

O B

E V

A L

V E

S

IZ

E

W

T E

R M

E T

E R

S E

E N

O T

E

S

IZ

E

S E

T P

R E

S S

U R

E

P S

IG

S

IZ

E

S E

T P

R E

S S

U R

E

P S

IG

MU-1 HEATING HOT WATER 1" 1" 35 1" 50 1" -

NOTES:

1. COORDINATE FINAL DUCT SIZES WITH APPROVED COORDINATION DRAWINGS.

GENERAL NOTES:

A. ELECTRIC SERVICE - SINGLE POINT POWER CONNECTION WITH

INTEGRAL CONTROLS TRANSFORMER. ADEQUACY OF LISTED

CIRCUIT SIZE MUST BE VERIFIED BY H.C. AND UNIT SUPPLIER.

COST FOR INCREASE OR CHANGE OF ELECTRIC SERVICE FOR

EQUIPMENT SELECTED SHALL BE BORNE BY H.C.

B. PROVIDE MODULATING OR STAGED CONTROL AS SPECIFIED, AIR

PROVING SWITCH, HIGH RH LIMIT, SPACE HUMIDITY SENSOR / STAT,

AND OTHER ACCESSORIES PER THE SPECIFICATIONS.

C. STEAM JACKET HUMIDIFIERS SHALL INCLUDE AUTO ISOLATION VALVE

FUNCTION TO STOP STEAM TO JACKET WHEN THERE IS NO CALL

FOR HUMIDITY.

D. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR SEISMIC

RESTRAINT REQUIREMENTS.

ELECTRIC HUMIDIFIERS

M A

R K

DESCRIPTION

TYPE

SERVICE S

P

A C

E C

O N

D

IT

IO

N

S

D B

R H

PERFORMANCE DISPERSION DEVICE ELECTRICAL SERVICE MISC.

SEISMIC

RESTRAINTS BASIS OF DESIGN

S E

E N

O T

E

E L

E C

T R

O D

E

E L

E C

T R

IC

R

E S

IS

T

A N

C E

I M

M E

R S

IO

N

E N

T E

R

IN

G A

IR

T

E M

P E

R A

T U

R E

D B

W

B

°F

L

A V

IN

G

A

IR

T E

M P

E R

A T

U R

E D

B

W B

°F

M

IN

IM

U

M C

F M

M A

X

IM

U M

C F

M

L B

S

H R

O U

T P

U T

A

T M

A X

C

F M

M

IN

S T

A G

E S

S T

E A

M O

U T

L E

T

Q T

Y S

IZ

E

V E

R T

IC

A

L T

U B

E S

H O

R

IZ

O N

T A

L T

U B

E S

S T

E A

M J

A C

K E

T E

D

I N

S U

L A

T E

D

M

IN

N U

M B

E R

O F

D

IS

T R

IB

U

T

IO

N T

U B

E S

M A

X D

IS

P

E R

S

IO

N D

IS

T

A N

C E

V O

L T

A G

E

P H

A S

E

F U

L L

L O

A D

A M

P S

F

L A

M A

X O

V E

R C

U R

R E

N T

P R

O T

E C

T

IO

N

M O

C

IM

U

M S

C C

R

A M

P S

D U

C T

C

A S

IN

G

W

ID

T H

N

O T

E

D U

C T

C

A S

IN

G

H E

IG

H

T

N O

T E

A P

P R

O X

O

P E

R A

T

IN

G W

E

IG

H T

L

B S

H U

M

ID

IF

IE

R G

R

ID

D R

A

IN

C O

O L

E R

T A

N K

D R

A

IN

C O

O L

E R

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

MANUFACTURER MODEL

EH-204-1 ELECTRIC STEAM HUMIDIFIER - ● AHU-204-1 70 / 25 54.5 / 33 55.0 / 42 5,545 8,100 46.1 SCR 1 / 1.5 - ● - ● 1 15" 208 - 3 44.4 60 5,000 38" 24" 139 - ● ● 1.5 DRI-STEEM VAPORMIST

EH-205-1 ELECTRIC STEAM HUMIDIFIER - ● AHU-205-1 70 / 25 54.5 / 33 55.0 / 42 5,210 7,500 43.6 SCR 1 / 1.5 - ● - ● 1 17" 208 - 3 44.4 60 5,000 26" 32" 139 - ● ● 1.5 DRI-STEEM VAPORMIST

EH-205-G ELECTRIC STEAM HUMIDIFIER - ● AHU-205-G 70 / 25 54.5 / 33 55.0 / 42 4,480 5,700 29.2 SCR 1 / 1.5 - ● - ● 1 15" 208 - 3 29.1 45 5,000 30" 26" 139 - ● ● 1.5 DRI-STEEM VAPORMIST

NOTES:

GENERAL NOTES:

A. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR VIBRATION

ISOLATOR TYPES AND SEISMIC RESTRAINT REQUIREMENTS.

B. VFD'S SHALL BE CONSTRUCTED AND LABELED FOR REQUIRED

SCCR (SHORT CIRCUIT CURRENT RATING). COORDINATE WITH

DIVISION 26.

C. IF EC MOTORS ARE INDICATED OR SPECIFIED, EACH MOTOR

SHALL BE PROVIDED WITH FACTORY DISCONNECTING MEANS,

INTERNAL OVERLOAD PROTECTION, FIELD ADJUSTABLE SPEED

CONTROL, AND REMOTE ANALOGUE SPEED CONTROL INPUT

WHEN REMOTE CONTROL IS SPECIFIED, COORDINATED WITH

THE BUILDING AUTOMATION SYSTEM.

D. PUMPS REQUIRED TO HAVE A PUMP EFFICIENCY INDEX (PEI)

RATING PER DOE MANDATES SHALL BE FACTORY LABELED

WITH THEIR RATING. PEIVL RATINGS ARE FOR PUMPS WITH

EC MOTORS OR FACTORY-MOUNTED VFD’S. PEICL RATINGS

ARE FOR PUMPS WITHOUT EC MOTORS OR FOR PUMPS WITH

REMOTE MOUNTED VFD’S.

HYDRONIC PUMPS

M A

R K

DESCRIPTION SERVICE

PERFORMANCE MOTOR

M

IN

IM

U

M P

U M

P E

F F

IC

IE

N C

Y

P U

M P

S U

C T

IO

N

S

IZ

E

P U

M P

D

IS

C H

A R

G E

S

IZ

E

SEISMIC

RESTRAINTS BASIS OF DESIGN

S E

E N

O T

E

G P

M

M

IN

R

E Q

U

IR

E D

F T

H

D

H O

R S

E P

O W

E R

H

P

V O

L T

A G

E

P H

A S

E

R P

M

E L

E C

T R

O N

IC

A

L L

Y C

O M

M U

T A

T

V

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

M

IN

IM

U

M S

C C

R

A M

P S

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

M A

N U

F A

C T

U R

E R

M O

D E

L

P-1 HWB-1 PRIMARY PUMP HEATING HOT WATER 36.0 15 1/2 120-1 1750 ● - 10,000 65.1 1.25" 1.25" ● 1.5 ARMSTRONG SERIES S

P-2 HWB-2 PRIMARY PUMP HEATING HOT WATER 36.0 15 1/2 120-1 1750 ● - 10,000 65.1 1.25" 1.25" ● 1.5 ARMSTRONG SERIES S

P-3 HWB-3 PRIMARY PUMP HEATING HOT WATER 36.0 15 1/2 120-1 1750 ● - 10,000 65.1 1.25" 1.25" ● 1.5 ARMSTRONG SERIES S

P-4 SECONDARY HOT WATER PUMP HEATING HOT WATER 72.0 55 2 208-3 3013 - ● 10,000 50.3 3" 3" ● 1.5 ARMSTRONG DESIGN ENVELOPE SERIES

P-5 SECONDARY HOT WATER PUMP HEATING HOT WATER 72.0 55 2 208-3 3013 - ● 10,000 50.3 3" 3" ● 1.5 ARMSTRONG DESIGN ENVELOPE SERIES

P-6 AHU-204-1 COIL PUMP HEATING HOT WATER 11.5 12 1/4 120-1 2000 ● - 10,000 10.7 1.5" 1.5" ● 1.5 ARMSTRONG SERIES COMPASS

P-7 AHU-205-1 COIL PUMP HEATING HOT WATER 11.5 12 1/4 120-1 2000 ● - 10,000 10.7 1.5" 1.5" ● 1.5 ARMSTRONG SERIES COMPASS

P-8 AHU-205-G COIL PUMP HEATING HOT WATER 7.5 12 1/16 120-1 3250 ● - 10,000 10.7 1" 1" ● 1.5 ARMSTRONG SERIES COMPASS

NOTES:

1. BASIS OF DESIGN IS BELL & GOSSETT - D-40

GENERAL NOTES:

A. AIR CHARGE TANK IN THE FIELD TO SCHEDULED AIR

PRESSURE.

B. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR

SEISMIC RESTRAINT REQUIREMENTS.

EXPANSION TANKS

M A

R K

SYSTEM

TYPE CAPACITY

APPROX.

DIMENSIONS

CONNECTION

SIZES

SEISMIC

RESTRAINTS

S E

E N

O T

E

D

IA

P H

R A

G M

B

L A

D D

E R

C O

N V

E N

T

IO

N A

L

V E

N T

E D

V E

R T

IC

A

L

H O

R

IZ

O N

T A

L

M

IN

T

O T

A L V

O L

U M

E

G A

A

C C

E P

T

V O

L

(G A

L

A

IR

P R

E S

S U

R E

P

S

IG

D

IA

M E

T E

R

H E

IG

H

T L

E N

G T

H

I N

L E

T C

O N

N E

C T

IO

N

D R

A

IN

C O

N N

E C

T

IO

N

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

ET-1 HEATING HOT WATER ● - - ● 21.7 11.3 12 24" 41" 1" 1" ● 1.5 1

Revisions Date

ZONE TAG ROOM NAME & NUMBER

ZONING SCHEDULE

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:0

:1

A M

Construct Replacement CLC - Long Term Rehab

02.12.2021

SCHEDULES

M602

AJGW JS

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

NOTES:

1. COOLING-ONLY UNIT

2. PROVIDE OCCUPANCY SENSORS WHERE NOT PROVIDED

WITH LIGHTING CONTROL.

3. PROVIDE WITH 3-WAY CONTROL VALVE.

GENERAL NOTES:

A. TYPES: "V.V." - VARIABLE VOLUME;

"V.V.R." - VARIABLE VOLUME REHEAT;

"C.V.R." - CONSTANT VOLUME REHEAT;

"V.V.E." - VARIABLE VOLUME EXHAUST;

"C.V.E." - CONSTANT VOLUME EXHAUST.

B. 0.35" MAX. S.P. DROP THRU UNIT & COIL

AT MAX. CFM.

C. REHEAT COIL CAPACITIES BASED ON HEATING MAX.

CFM, 55°F ENT. AIR & 140°F ENT. WATER, 110°F MIN.

LVG. WATER, AND MAX. 10 FT. HD. W.P.D.

D. AUTO VALVES SHALL BE 2-WAY TYPE UNLESS

NOTED OTHERWISE.

E. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR

SEISMIC RESTRAINT REQUIREMENTS.

F. WHEN PICV IS INDICATED, MINIMUM REQUIRED INLET

PRESSURE SHALL NOT EXCEED 5 PSIG.

G. IF REHEAT COIL IS FURNISHED SEPARATELY FROM

TERMINAL UNIT, PROVIDE DUCT TRANSITION AS

REQUIRED BETWEEN TERMINAL UNIT AND COIL.

AIR TERMINAL UNITS - HOT WATER HEAT

M A

R K

T Y

P E

MINIMUM

INLET

SIZE CFM REHEAT COIL

AUTO

CONTROL

VALVE

SEISMIC

RESTRAINTS

R E

F E

R T

O N

O T

E

D

IA

M E

T E

R

W

ID

T H

H E

IG

H

T

C O

O L

IN

G M

A X

IM

U

M

D E

A D

B A

N D

M

IN

IM

U

M

U N

O C

C U

P

IE

D A

IR

F

L O

W

H E

A T

IN

G

M A

X

IM

U M

M B

H

G P

M

P

IP

E R

U N

O U

T S

IZ

E S

S U

R E

D E

P E

N D

E N

T

P R

E S

S U

R E

D E

P E

N D

E N

T C

V

P R

E S

S U

R E

I N

D E

P E

N D

E N

T

P

IC

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O

204-101 V.V.R. 6" 330 140 0 285 10.7 0.8 0.75" ● 0.4 - ● 1.5 3

204-102 C.V.R. 12" 910 910 0 910 24.7 1.7 0.75" ● 0.8 - ● 1.5

204-103 V.V.R. 6" 280 170 0 215 8.2 0.6 0.75" ● 0.3 - ● 1.5

204-104 V.V.R. 8" 600 230 90 300 10.1 0.7 0.75" ● 0.3 - ● 1.5 2, 3

204-105 V.V.R. 6" 280 170 0 215 8.2 0.6 0.75" ● 0.3 - ● 1.5 3

204-106 V.V.R. 6" 150 30 0 75 2.9 0.3 0.75" ● 0.1 - ● 1.5

204-107 V.V.R. 6" 280 140 0 280 10.7 0.8 0.75" ● 0.4 - ● 1.5

204-108 V.V.R. 6" 330 140 0 215 7.6 0.6 0.75" ● 0.3 - ● 1.5

204-109 C.V.R. 6" 350 350 0 350 9.5 0.7 0.75" ● 0.3 - ● 1.5

204-110 V.V.R. 6" 200 120 30 120 3.3 0.3 0.75" ● 0.1 - ● 1.5 2, 3

204-111 V.V.R. 6" 280 140 0 185 7.1 0.5 0.75" ● 0.2 - ● 1.5

204-112 V.V.R. 6" 280 140 0 185 7.1 0.5 0.75" ● 0.2 - ● 1.5

204-113 C.V.R. 7" 425 425 0 425 11.6 0.8 0.75" ● 0.4 - ● 1.5

204-114 V.V.R. 6" 330 140 0 215 7.6 0.6 0.75" ● 0.3 - ● 1.5

204-115 C.V.R. 6" 100 100 0 100 2.8 0.3 0.75" ● 0.1 - ● 1.5

204-116 V.V.R. 6" 300 235 45 235 6.4 0.5 0.75" ● 0.2 - ● 1.5 2

204-117 V.V.R. 6" 125 50 0 65 1.8 0.3 0.75" ● 0.1 - ● 1.5

204-118 V.V.R. 6" 160 40 25 80 2.2 0.3 0.75" ● 0.1 - ● 1.5 2

204-119 C.V.R. 6" 125 125 0 125 3.4 0.3 0.75" ● 0.1 - ● 1.5

204-120 C.V.R. 9" 530 530 0 530 14.7 1.0 0.75" ● 0.4 - ● 1.5

204-121 V.V.R. 6" 280 140 0 185 7 0.5 0.75" ● 0.2 - ● 1.5

204-122 V.V.R. 6" 330 135 0 215 7.6 0.6 0.75" ● 0.3 - ● 1.5 3

204-123 V.V.R. 6" 215 80 35 190 7.2 0.5 0.75" ● 0.2 - ● 1.5 2, 3

204-124 V.V.R. 7" 460 115 70 400 13.2 0.9 0.75" ● 0.4 - ● 1.5 2

204-125 V.V.R. 7" 370 85 55 245 9.3 0.7 0.75" ● 0.3 - ● 1.5 2

204-126 V.V. 6" 150 0 0 0 - 0.0 0" ● 0 - - - 1

204-201 C.V.R. 8" 570 570 0 570 15.5 1.1 0.75" ● 1.1 - ● 1.5

205-101 C.V.R. 6" 240 240 0 240 9.2 0.7 0.75" ● 0.3 - ● 1.5 3

205-102 V.V.R. 6" 270 65 40 190 7.2 0.5 0.75" ● 0.2 - ● 1.5 2

205-103 V.V.R. 6" 300 140 0 225 8.5 0.6 0.75" ● 0.3 - ● 1.5

205-104 V.V.R. 6" 280 140 0 185 7 0.5 0.75" ● 0.2 - ● 1.5

205-105 V.V.R. 6" 280 140 0 185 7 0.5 0.75" ● 0.2 - ● 1.5

205-106 V.V.R. 6" 300 140 0 270 10.2 0.7 0.75" ● 0.3 - ● 1.5

205-107 C.V.R. 7" 400 400 0 400 10.9 0.8 0.75" ● 0.4 - ● 1.5

205-108 V.V.R. 6" 320 105 50 265 10 0.7 0.75" ● 0.3 - ● 1.5 2

205-109 C.V.R. 7" 420 420 0 420 12.4 0.9 0.75" ● 0.4 - ● 1.5

205-110 C.V.R. 6" 350 350 0 350 9.5 0.7 0.75" ● 0.3 - ● 1.5

205-111 V.V.R. 6" 300 175 45 175 5.7 0.4 0.75" ● 0.2 - ● 1.5 2

205-112 C.V.R. 7" 400 400 0 400 10.9 0.8 0.75" ● 0.4 - ● 1.5

205-113 V.V.R. 8" 600 270 90 300 10.7 0.8 0.75" ● 0.4 - ● 1.5 2, 3

205-114 V.V.R. 6" 300 160 45 160 4.4 0.3 0.75" ● 0.1 - ● 1.5 2

205-115 C.V.R. 6" 125 125 0 125 3.4 0.3 0.75" ● 0.1 - ● 1.5

205-116 V.V.R. 6" 100 20 15 50 1.4 0.3 0.75" ● 0.0 - ● 1.5 2

205-117 V.V.R. 6" 280 140 0 185 7 0.5 0.75" ● 0.2 - ● 1.5

205-118 V.V.R. 6" 280 140 0 185 7 0.5 0.75" ● 0.2 - ● 1.5

205-119 V.V.R. 6" 320 170 0 320 12.1 0.9 0.75" ● 0.4 - ● 1.5 3

205-120 V.V.R. 6" 320 170 0 210 7.6 0.5 0.75" ● 0.2 - ● 1.5 3

205-121 C.V.R. 6" 100 100 0 100 2.8 0.3 0.75" ● 0.1 - ● 1.5

205-122 V.V.R. 6" 160 35 25 80 2.2 0.3 0.75" ● 0.1 - ● 1.5 2

205-123 C.V.R. 6" 125 125 0 125 3.4 0.3 0.75" ● 0.1 - ● 1.5 3

205-124 V.V.R. 6" 280 140 0 185 7 0.5 0.75" ● 0.2 - ● 1.5

205-125 V.V.R. 6" 280 140 0 280 10.5 0.7 0.75" ● 0.3 - ● 1.5 3

205-126 V.V.R. 6" 200 40 30 100 2.8 0.3 0.75" ● 0.2 - ● 1.5 2

205-201 C.V.R. 9" 770 770 115 770 20.9 1.4 0.75" ● 0.7 - ● 1.5 2

205-G01 C.V.R. 6" 250 250 40 250 6.8 0.5 0.75" ● 0.2 - ● 1.5 2

205-G02 V.V.R. 9" 660 165 100 330 9.3 0.7 0.75" ● 0.3 - ● 1.5 2

205-G03 V.V.R. 6" 360 255 55 290 11 0.8 0.75" ● 0.4 - ● 1.5 2

205-G04 V.V.R. 6" 300 260 0 260 7.1 0.5 0.75" ● 0.2 - ● 1.5

205-G05 V.V.R. 6" 140 115 0 115 3.2 0.5 0.75" ● 0.1 - ● 1.5

205-G06 C.V.R. 8" 560 560 85 560 15.2 1.1 0.75" ● 0.5 - ● 1.5 2

205-G07 V.V.R. 6" 330 280 50 280 9.9 0.7 0.75" ● 0.3 - ● 1.5 2

205-G08 V.V.R. 6" 120 95 20 95 2.6 0.3 0.75" ● 0.1 - ● 1.5 2

205-G09 V.V. 7" 500 0 0 0 - 0.0 0" ● 0 - ● 1.5 1

205-G10 V.V.R. 7" 380 320 0 320 8.7 0.6 0.75" ● 0.3 - ● 1.5

205-G11 V.V.R. 6" 100 60 15 60 1.7 0.3 0.75" ● 0.1 - ● 1.5 2

205-G12 V.V.R. 7" 410 205 60 205 5.8 0.4 0.75" ● 0.2 - ● 1.5 2

205-G13 V.V.R. 7" 410 180 60 205 6 0.4 0.75" ● 0.2 - ● 1.5 2

205-G14 V.V.R. 9" 810 340 120 405 11 0.8 0.75" ● 0.4 - ● 1.5 2, 3

205-G15 C.V.R. 9" 840 840 0 840 22.8 1.6 0.75" ● 0.8 - ● 1.5

205-G16 V.V.R. 6" 100 80 0 80 2.3 0.3 0.75" ● 0.1 - ● 1.5

205-G17 V.V.R. 6" 120 60 20 60 1.7 0.3 0.75" ● 0.1 - ● 1.5 2

205-G18 V.V.R. 6" 160 60 25 140 5.3 0.4 0.75" ● 0.2 - ● 1.5 2, 3

205-G20 V.V.R. 6" 100 60 15 60 2 0.3 0.75" ● 0.1 - ● 1.5 2

205-G21 V.V.R. 7" 410 185 60 205 7.1 0.5 0.75" ● 0.2 - ● 1.5 2

205-G22 V.V.R. 6" 50 10 0 25 0.9 0.3 0.75" ● 0.0 - ● 1.5

205-G23 V.V.R. 6" 210 0 0 0 - 0.0 0" ● 0 - ● 1.5 1

DUCT CONSTRUCTION, SEALING, AND INSULATION

GENERAL NOTES:

A. REFER TO SPECIFICATIONS FOR DUCT CONSTRUCTION:

SHEET M ETAL DUCT; INTERIOR LINING; EXTERIOR

INSULATION; FIBERGLASS DUCTBOARD; ETC.

B. DUCT CONSTRUCTION AND SEALING SHALL BE PER

LATEST S.M .A.C.N.A. STANDARDS.

NOTES:

1. RETURN DUCTW ORK W ITHIN 15' OF AIR HANDLING UNIT SHALL BE EXTERNALLY LINED.

2. STAINLESS STEEL DUCTW ORK.

3. INSULATE FROM 24" UPSTREAM OF BACKDRAFT / ISOLATION DAM PER TO PENETRATION OF W ALL.

4. CONCEALED ROUND RUNOUT DUCTS TO AIR DEVICES MAY BE 1" S.P. CLASS.

DUCT SYSTEM

S.P. CON-

STRUCT.

SEAL

CLASS

LEAKAGE

CLASS

S.M.A.C.N.A. CLASS.

INTERNALLY

LINED

EXTERNAL

INSULATION

NOT

INSULATED

SEE

NOTE

DOUBLE

W ALL

INSULATEDRECT RND

NOTE 3

+3" A 8 4

A

A

A

A

SUPPLY DUCTW ORK UPSTREAM OF

VAV BOXES

SUPPLY DUCTW ORK DOW NSTREAM OF

VAV BOXES

EXHAUST DUCTW ORK UPSTREAM OF

EF-1

-1"

EXHAUST DUCTW ORK UPSTREAM OF

EF-2 & EF-3

-1"

RELIEF AIR DUCTW ORK AND PLENUM S

OUTSIDE AIR DUCTW ORK AND

PLENUMS

+1

-1"

1,4●--8A-2" 16 -

--8A-2" 16 -

RETURN DUCTW ORK

---●-+1" A 16 8

--8A-1" 16 -

HVAC DESIGN DATA

GENERAL NOTES:

A. OUTDOOR DESIGN CONDITIONS:

91.6°F DB SUM MER

73.9°F W B SUM MER

8.3°F DB W INTER

NOTES:

1. LISTED RH IS M AXIM UM ANTICIPATED AT LISTED

DB TEMPERATURE.

2. MINIM UM TOTAL AIR CHANGE RATE IS TO BE BASED

ON SUPPLY CFM .

SPACE NAM E / TYPE °F DB

INTERIOR DESIGN DATA

SEE NOTE

CONCIERGE STATION 2

COOLING HEATING

% RH

(NOTE 1) °F DB

% RH

(NOTE 1)

75 60 M AX 70 20 MIN

B. DESIGN ALTITUDE: 988 FT.

MINIMUM

TOTAL AIR

CHANGES

DESIGN

PRESSURE

RELATIONSHIP

NEG4

3. MINIMUM TOTAL AIR CHANGE RATE IS TO BE BASED

ON EXHAUST/RETURN CFM.

NOTES:

1. BOILER SHALL BE DUEL-FUEL WITH NATURAL GAS AS PRIMARY

FUEL SOURCE AND PROPANE BACKUP.

2. BASIS OF DESIGN IS CAMUS - ADVANTUS

GENERAL NOTES:

A. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR SEISMIC RESTRAINT

REQUIREMENTS.

B. LISTED GAS DELIVERY PRESSURE IS DELIVERY PRESSURE TO THE

BOILER'S GAS TRAIN.

C. ELECTRIC SERVICE SHALL BE SINGLE POINT POWER CONNECTION.

WHEN CONTROL POWER DIFFERS FROM SERVICE POWER, PROVIDE

FACTORY INSTALLED TRANSFORMER.

D. IT IS RECOGNIZED THAT SOME BOILER MANUFACTURERS REQUIRE AN

INTEGRAL Hx CIRCULATION PUMP IN ADDITION TO THE BOILER'S PRIMARY

PUMP. THE SINGLE POINT POWER CONNECTION TO THE BOILER SHALL

INCLUDE POWER FOR THE Hx CIRCULATION PUMP. REFER TO PUMP

SCHEDULE FOR ASSOCIATED PRIMARY PUMP.

HOT WATER BOILERS

M A

R K

DESCRIPTION

LOCATION TYPE CAPACITY BURNER ELECTRICAL SERVICE CONNECTION SIZES APPROX. DIMENSIONS MISC.

SEISMIC

RESTRAINTS

S E

E N

O T

E

ROOM NAME R

O

O M

N U

M B

E R

C O

N D

E N

S

IN

G

N O

N -C

O N

D E

N S

G

T U

R A

L G

A S

O

IL

-F

IR

E D

C O

M B

IN

A

T

IO

N G

A S

/O

IL

E L

E C

T R

IC

I N

P U

T

M B

H

O U

T P

U T

M

B H

E N

T E

R

IN

G W

A T

E R

T E

M P

E R

A T

U R

E

°F

L E

A V

IN

G

W A

T E

R T

E M

P E

R A

T U

R E

°F

G P

M

G A

S D

E L

IV

E

R Y

P R

E S

S U

R E

IN

W

.C

I N

T E

G R

A L

H x C

IR

C

P

U M

P

N O

T E

D

V O

L T

A G

E

P H

A S

E

F U

L L

L O

A D

A M

P S

F

L A

M A

X O

V E

R C

U R

R E

N T

P R

O T

E C

T

IO

N

M O

C

IM

U

M S

C C

R

A M

P S

W A

T E

R I

N L

E T

W A

T E

R O

U T

L E

T

G A

S

F L

U E

V E

N T

C O

M B

U S

T

IO

N A

IR

L E

N G

T H

W

ID

T H

H E

IG

H

T

A P

P R

O X

O

P E

R A

T

IN

G W

E

IG

H T

L

B S

C O

N C

R E

T E

P A

D

S A

F E

T Y

R E

L

IE

F V

A L

V E

S E

T T

IN

G

P

S

IG

B O

IL

E

R C

O N

T R

O L

A N

D S

E Q

U E

N C

IN

G

P A

N

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

HWB-1 HOT WATER

BOILER

MECHANICAL

ROOM

323 ● - ● - - - 600 540 110 140 36 11 - 120-1 8.0 15 10,000 2" 2" 1" 5" 6" 2'-10" 3'-2" 0'-4" 860 ● 75 ● ● 1.5 1, 2

HWB-2 HOT WATER

BOILER

MECHANICAL

ROOM

323 ● - ● - - - 600 540 110 140 36 11 - 120-1 8.0 15 10,000 2" 2" 1" 5" 6" 2'-10" 3'-2" 0'-4" 860 ● 75 ● ● 1.5 1, 2

HWB-3 HOT WATER

BOILER

MECHANICAL

ROOM

323 ● - ● - - - 600 540 110 140 36 11 - 120-1 8.0 15 10,000 2" 2" 1" 5" 6" 2'-10" 3'-2" 0'-4" 860 ● 75 ● ● 1.5 1, 2

CORRIDOR 75 60 M AX 70 20 MIN 4

OFFICE 75 60 M AX 70 20 MIN N/A4

M EDIA CENTER 75 60 M AX 70 20 MIN N/A6

REHABILITATION THERAPY

GYM

75 60 M AX 70 20 MIN 6

75 60 M AX 70 20 MIN 6

STAFF LOUNGE / LOCKERS 75 60 M AX 70 20 MIN 6

DEN 75 60 M AX 70 20 MIN N/A4

RESIDENT BEDROOM 75 60 M AX 70 20 MIN N/A4

LIVING ROOM 75 60 M AX 70 20 MIN N/A4

BATHING SUITE 75 60 M AX 82 N/A 10

KITCHEN AND SERVERY 75 60 M AX 70 20 MIN 6

75 60 M AX 70 20 MIN N/A4

DINING ROOM 75 60 M AX 70 20 MIN 4

M EDICATION ROOM 75 60 M AX 70 20 MIN POS4

TOILET 3N/A N/A 70 N/A 10

HAC N/A N/A N/A N/A 10

STORAGE -N/A N/A N/A N/A N/A-

EXTERIOR STAIRS -N/A N/A 50 N/A N/A-

VESTIBULE -N/A N/A 50 N/A -

GARAGE -N/A N/A 50 N/A N/A-

RESIDENT BATHROOM N/A N/A N/A N/A 10

PANTRY -N/A N/A N/A N/A N/A-

SOILED UTILITY ROOM N/A N/A N/A N/A 10

CLEAN LINEN STORAGE N/A N/A N/A N/A 4

COM MUNICATIONS CLOSET 68 N/A 68 N/A N/A6

ELECTRICAL ROOM -86 N/A 40 N/A N/A-

86 N/A 40 N/A N/A6

84 N/A 50 N/A N/A4

LAUNDRY 78 60 M AX 70 N/A 10

BIOM EDICAL INSTRUMENT

REPAIR SHOP

HEATING / M ECHANICAL

ROOM

M ULTIPURPOSE /

CONFERENCE ROOM

AIR HANDLING EQUIPM ENT

ROOM

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

POS

POS

POS 2

NOTES:

1. ALL VALVES ARE NORMALLY CLOSED.

CHEMICAL POT FEEDERS

M A

R K

SYSTEM C

A

P A

C

IT

Y

G A

L L

O N

SHUTOFF VALVES

F

IL

T E

R

S E

E N

O T

E

I N

L E

T S

IZ

E

O U

T L

E T

S

IZ

E

D R

A

IN

S

IZ

E

CPF-1 HEATING HOT WATER 5 1.25" 1.25" 1.25" - 1

NOTES:

1. BASIS OF DESIGN IS BELL & GOSSETT RL-3F.

GENERAL NOTES:

A. WHEN AUTO BLOW-DOWN VALVE IS REQUIRED,

INCLUDE BALANCING VALVE AND PIPE DISCHARGE

TO FLOOR DRAIN, AND COORDINATE SEQUENCING

WITH CHEMICAL TREATMENT.

B. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR SEISMIC

RESTRAINTS.

AIR / DIRT SEPARATORS

M A

R K

SYSTEM

TYPE CAPACITY

APPROXIMATE

DIMENSIONS

A U

T O

B L O

W -D

O W

N V

A L

V E

H

IG

H C

A P

A C

IT

Y

A U

T O

A

IR

V E

N T

SEISMIC

RESTRAINTS

S E

E N

O T

E

I N

-L

IN

E

S U

P P

O R

T F

R O

M F

L O

O R

S U

P P

O R

T F

R O

M S

T R

U C

T U

R E

W

IT

H S

T R

A

IN

E R

W

IT

H O

U T

S T

R A

IN

E

R

G P

M

M A

X

W A

T E

R P

R E

S S

D

R O

P

F T

H

IM

U

M I

N L

E T

S

IZ

E

D

IA

M E

T E

R

H E

IG

H

T

A P

P R

O X

O

P E

R A

T

IN

G W

E

IG

H T

L

B S

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

AS-1 HEATING HOT WATER - - ● - ● 80.0 2 3" 10.75" 26.875" 173 - ● ● 1.5 1

RETURN DUCTW ORK IN

UNCONDITIONED SPACES

EXHAUST DUCTW ORK UPSTREAM OF

ERU

●-8A+1" 16 - -

EXHAUST DUCTW O RK DOW NSTREAM

OF ERU

NOTE 3

●-8A-1" 16 -

VENTILATION DUCTW ORK UPSTREAM

OF ERU

NOTE 3

VENTILATION DUCTW ORK

DOW NSTREAM O F ERU

---8A+1" 16 -●

●-8A

EXHAUST DUCTW O RK DOW NSTREAM

OF EF-2 & EF-3

+1" 16 -NOTE 3

--8A-1" 16 - -

EXHAUST DUCTW O RK UPSTREAM OF

ERU IN UNCONDITIO NED SPACES

77 N/A N/A N/A N/AN/AELEVATOR M ACHINE ROOM -

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:0

:1

A M

Construct Replacement CLC - Long Term Rehab

02.12.2021

SCHEDULES

M603

AJGW JS

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

NOTES:

1. UNIT SHALL HAVE SINGLE POINT POWER CONNECTION.

GENERAL NOTES:

A. ELECTRIC SERVICE - SINGLE POINT POWER SERVICE CONNECTION TO UNIT

BY E.C. ADEQUACY OF LISTED CIRCUIT SIZE MUST BE VERIFIED BY H.C. AND

UNIT SUPPLIER. COST FOR INCREASE OR CHANGE OF ELECTRIC SERVICE

FOR EQUIPMENT SELECTED SHALL BE BORNE BY H.C.

B. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR SEISMIC RESTRAINT

REQUIREMENTS.

C. IF EC MOTORS ARE INDICATED OR SPECIFIED, EACH MOTOR SHALL BE

PROVIDED WITH FACTORY DISCONNECTING MEANS, INTERNAL OVERLOAD

PROTECTION, FIELD ADJUSTABLE SPEED CONTROL, AND REMOTE

ANALOGUE SPEED CONTROL INPUT WHEN REMOTE CONTROL IS SPECIFIED,

COORDINATED WITH THE BUILDING AUTOMATION SYSTEM.

D. REFER TO ASHRAE STANDARD 90.1 FOR DEFINITION / CALCULATION OF

ENERGY RECOVERY EFFECTIVENESS.

ENERGY RECOVERY UNITS

M A

R K

DESCRIPTION

SUPPLY FAN EXHAUST FAN OUTSIDE AIR INLET EXHAUST AIR INLET SUPPLY AIR DISCHARGE ENERGY RECOVERY DEVICE FILTERS ELECTRICAL SERVICE

SEISMIC

RESTRAINTS BASIS OF DESIGN

S E

E N

O T

E

C F

M

E X

T

S T

A T

IC

P

R E

S S

U R

E

IN

W .C

W H

E E

L D

IA

T

Y P

E

F A

N Q

U A

N T

IT

Y

M O

T O

R

H P

E

A C

H

SPEED

CONTROL

I N

T E

G R

A L P

IE

Z

O R

IN

G

A

IR

F L

O W

S T

A T

IO

N

C F

M

E X

T

S T

A T

IC

P

R E

S S

U R

E

IN

W .C

W H

E E

L D

IA

T

Y P

E

F A

N Q

U A

N T

IT

Y

M O

T O

R

H P

E

A C

H

SPEED

CONTROL

I N

T E

G R

A L P

IE

Z

O R

IN

G

A

IR

F L

O W

S T

A T

IO

N

S U

M M

T

A

IR

T

E M

P D

B /W

B

°F

W

IN

T

T

A

IR

T E

M P

D

B /W

B

°F

S U

M M

T

A

IR

T

E M

P D

B /W

B

°F

W

IN

T

T

A

IR

T E

M P

D

B /W

B

°F

S U

M M

E R

D

IS

C H

A

IR

T

E M

P D

B /W

B

°F

W

IN

T

IS

C H

A

IR

T

E M

P

D B

/W B

°F

S E

N S

IB

L

E

E N

T H

A L

P Y

TYPE

M

IN

A

H R

I E

F F

E C

T

IV

E N

E S

S

M

IN

A

S H

R A

E E

N E

R G

Y R

E C

O V

E R

Y E

F F

E C

T

IV

E N

E S

S

(N O

T E

L T

A G

E

P H

A S

E

S U

P P

L Y

S

ID

E

T H

IC

K

N E

S S

M

E R

V

E X

H A

U S

T S

ID

E

T

H

IC

K N

E S

S

M E

R V

V O

L T

A G

E

P H

A S

E

F U

L L

L O

A D

A M

P S

F

L A

M

IN

C

IR

C U

IT

A

M P

S

M C

A

M A

X O

V E

R C

U R

R E

N T

P R

O T

E C

T

IO

N

M O

C

IM

U

M S

C C

R

A M

P S

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

MANUFACTURER MODEL E

L

E C

T R

O N

IC

A

L L

Y C

O M

M U

T A

T E

D M

O T

O

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

V A

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

Q

T Y

E L

E C

T R

O N

IC

A

L L

Y C

O M

M U

T A

T E

D M

O T

O

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

V A

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

Q

T Y

W H

E E

L

P L

A T

E

H E

A T

P

IP

E

ERU-204 BUILDING 204 ERU 3,000 0.75 19.5 / B.I. 1 3.75 ● - - - 2,295 0.85 19.5 / B.I. 1 3.75 ● - - - 92.0 / 74.0 8.0 / 7.0 75.0 / 63.0 72.0 / 54.0 82.0 / 69.2 42.8 / 36.7 - ● ● - - 0.47 0.61 208 - 3 2" / 7 2" / 7 208-3 15.03 18.79 - 5,000 ● 1.5 MICROMETL EVH 1

ERU-205 BUILDING 205 ERU 5,000 0.75 19.5 / B.I. 2 3.75 ● - - - 3,365 0.85 19.5 / B.I. 1 3.75 ● - - - 92.0 / 74.0 8.0 / 7.0 75.0 / 65.0 72.0 / 54.0 81.5 / 68.9 45.0 / 37.8 - ● ● - - 0.49 0.73 208 - 3 2" / 7 2" / 7 208-3 23.12 28.9 - 5,000 ● 1.5 MICROMETL EVH 1

NOTES:

1. PANEL SHALL BE 24" X 48"

GENERAL NOTES:

A. CAPACITY DATA BASED ON 125°F AVERAGE HOT WATER

TEMPERATURE.

B. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR SEISMIC

RESTRAINT REQUIREMENTS.

RADIANT HEATING SYSTEMS

M A

R K

DESCRIPTION

TYPE CAPACITY CEILING PANELS MISC.

SEISMIC

RESTRAINTS BASIS OF DESIGN

S E

E N

O T

E

F L

O O

R

C E

IL

IN

G P

A N

E L

W A

L L

P A

N E

L

ELECTRIC

P E

R F

O R

A T

E D

N O

N -P

E R

F O

R A

T E

D

F L

U T

E D

I N

S U

L A

T

IO

N P

A D

S

C O

L O

R B

Y A

R C

H

IT

E C

T

M A

N

IF

O L

D

S U

P P

L Y

M A

N

IF

O L

D

R E

T U

R N

I N

-F L O

O R

T U

B

IN

G

L

IN

E V

O L T

A G

E T

H E

R M

O S

T A

T

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

MANUFACTURER MODEL W

A

T T

S

P A

N E

L

V O

L T

A G

E

P H

A S

E

RHS-1 ELECTRIC RADIANT PANEL - ● - 750 120 - 1 - ● - - - - - - - - - MARLEY CP 1

RHS-2 ELECTRIC RADIANT PANEL - ● - 750 120 - 1 - ● - - - - - - - - - MARLEY CP 1

INDOOR UNIT

M A

R K

DESCRIPTION

LOCATION FAN DX COOLING FILTERS ELECTRICAL SERVICE APPROX. DIMENSIONS

C O

O L

IN

G

C O

IL

C

O N

D E

N S

A T

E D

R A

IN

P

U M

P

N O

T E

SEISMIC

RESTRAINTS BASIS OF DESIGN

ROOM NAME R

O

O M

N U

M B

E R

C F

M

E X

T E

R N

A L

S T

A T

IC

P

R E

S S

U R

E

IN

W .C

M O

T O

R

H P

T O

T A

L C

A P

A C

IT

Y

M

B H

S E

N S

IB

L

E C

A P

A C

IT

Y

M

B H

M E

R V

R A

T

IN

G

V O

L T

A G

E

P H

A S

E

F U

L L

L O

A D

A M

P S

F

L A

M

IN

C

IR

C U

IT

A

M P

S

M C

A

L E

N G

T H

W

ID

T H

H E

IG

H

T

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

MANUFACTURER MODEL

AC-1 HORIZONTAL DUCTED CONCEALED FAN COIL BIOMED 004 600 0.6 0.1 18 14.4 4 208-1 1.35 1.69 29" 36" 10" - ● 1.5 MITSUBISHI PEAD-A18

AC-2 WALL HUNG SPLIT SYSTEM OIT 027 425 - 0.05 12 9.7 4 208-1 0.33 1 10" 36" 12" - ● 1.5 MITSUBISHI PKA-A12

NOTES:

1. REFRIGERANT PIPE SIZING SHALL BE BY M ANUFACTURER'S RECOM MENDATIONS

GENERAL NOTES:

A. UNLESS NOTED OTHERW ISE, CAPACITIES SHALL BE BASED ON INTERIOR DESIGN

CONDITIONS OF 80 DB / 67 W B COOLING; 70 DB HEATING.

B. CONDENSING UNITS SHALL INCLUDE LOW AM BIENT CONTROLS AND ACCESSORIES,

OPERATIONAL TO 0°F.

C. CONDENSING UNIT COOLING CAPACITY SHALL BE BASED ON 95°F AMBIENT

CONDITIONS.

D. W HEN APPLICABLE, REFER TO SPECIFICATIONS FOR VIBRATION ISOLATOR TYPES AND

SEISMIC RESTRAINT REQUIREM ENTS.

SPLIT SYSTEM A/C UNITS

OUTDOOR CONDENSING UNIT - AIR COOLED

REFRIGERANT

CONN. SIZE

S E

E N

O T

E

M A

R K

DESCRIPTION N

O

M

IN

A L T

O N

S

S

IZ

E D

T O

M A

T C

H C

O

IL

V A

R

IA

B L

E S

P E

E D

C O

M P

R E

S S

O R

(S

ELECTRICAL SERVICE

SEISMIC

RESTRAINTS BASIS OF DESIGN

L

IQ

U

ID

L

IN

E

S U

C T

IO

N

L

IN

E

V O

L T

A G

E

P H

A S

E

M

IN

C

IR

C U

IT

A

M P

S

M C

A

M A

X O

V E

R C

U R

R E

N T

P R

O T

E C

T

IO

N

M O

C

IM

U

M S

C C

R

A M

P S

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O R

MANUFACTURER MODEL

CU-1 OUTDOOR CONDENSING UNIT 1.5 - 208-1 11 28 10,000 ● 1.5 MITSUBISHI SUZ-KA18 NOTE 1 NOTE 1 2

CU-2 OUTDOOR CONDENSING UNIT 1 - 208-1 14 15 10,000 ● 1.5 MITSUBISHI PUY-A18 NOTE 1 NOTE 1 2

E. REFRIGERANT PIPING - SIZES LISTED ARE APPROX. CIRCUITING, SIZING, NUM BER OF

PIPES AND CIRCUITS, ARRANGEMENT, ETC. SHALL BE IN ACCORDANCE W ITH

MANUFACTURER'S RECOMM ENDATIONS.

F. COOLING COIL CONDENSATE PUM PS SHALL BE FACTORY-FURNISHED,

COMPATIBLE W ITH INDOOR FAN COIL UNIT VOLTAGE AND POW ERED FROM

THE INDOOR FAN COIL UNIT SINGLE POINT POW ER CONNECTION.

G. ELECTRIC SERVICES FOR OUTDOOR UNIT AND INDOOR UNIT - SINGLE POINT POW ER

SERVICE CONNECTIONS TO EACH UNIT. UNLESS NOTED OTHERW ISE, ADEQUACY OF

LISTED CIRCUIT SIZES M UST BE VERIFIED BY H.C. AND UNIT SUPPLIER. COST FOR

INCREASE OR CHANGE OF ELECTRIC SERVICE FOR EQUIPM ENT SELECTED SHALL BE

BORNE BY H.C.

H. IF EC M OTORS ARE INDICATED OR SPECIFIED, EACH MOTOR SHALL BE PROVIDED

W ITH FACTORY DISCONNECTING MEANS, INTERNAL OVERLOAD PROTECTION, FIELD

ADJUSTABLE SPEED CONTROL, AND REM OTE ANALOGUE SPEED CONTROL INPUT

W HEN REMOTE CONTROL IS SPECIFIED, COORDINATED W ITH THE BUILDING

AUTOM ATION SYSTEM .

NOTES:

1. BOOSTER FAN SHALL BE DESIGNED FOR DUCT RUNS UP TO 130 FT.

2. BOOSTER FAN SHALL HAVE INTEGRAL PRESSURE SWITCH.

GENERAL NOTES:

A. ALL FANS SHALL BE A.M.C.A. 211 AND 311 PERFORMANCE CERTIFIED

AND SHALL BEAR THE A.M.C.A. LABEL.

B. SONES VALUES BASED ON A.M.C.A. 301 MEASURED AT 5 FT.

C. MOTOR HORSEPOWERS LISTED SHALL BE CONSIDERED MINIMUM.

E. ROOF & WALL OPENINGS ARE APPROX. VERIFY SIZE & COORDINATE.

F. COORDINATE STEEL FRAMING AROUND ROOF OPENING WHERE REQUIRED

FOR DECK SUPPORT, AND WALL LINTELS FOR WALL OPENINGS.

G. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR VIBRATION ISOLATOR

TYPES AND SEISMIC RESTRAINT REQUIREMENTS.

H. VFD'S SHALL BE CONSTRUCTED AND LABELED FOR REQUIRED SCCR

(SHORT CIRCUIT CURRENT RATING). COORDINATE WITH DIVISION 26.

I. IF EC MOTORS ARE INDICATED OR SPECIFIED, EACH MOTOR SHALL

BE PROVIDED WITH FACTORY DISCONNECTING MEANS, INTERNAL

OVERLOAD PROTECTION, FIELD ADJUSTABLE SPEED CONTROL, AND

REMOTE ANALOGUE SPEED CONTROL INPUT WHEN REMOTE CONTROL IS

SPECIFIED, COORDINATED WITH THE BUILDING AUTOMATION SYSTEM.

FANS

M A

R K

DESCRIPTION SERVICE C

O

N N

E C

T E

D C

F M

F A

N C

F M

S T

A T

IC

P

R E

S S

U R

E

IN

W .C

A P

P R

O X

W

H E

E L

D

IA

M E

T E

R

M A

X

IM

U M

S O

N E

S

MOTOR

A P

P R

O X

R

O O

F /W

A L

L O

P E

N

IN

G

A P

P R

O X

W

E

IG

H T

L

B S

SEISMIC

RESTRAINTS BASIS OF DESIGN

S E

E N

O T

E

H O

R S

E P

O W

E R

H

P

V O

L T

A G

E

P H

A S

E

E L

E C

T R

O N

IC

A

L L

Y C

O M

M U

T A

T

R

IA

B L

E F

R E

Q U

E N

C Y

D R

IV

E

M

IN

IM

U

M S

C C

R

A M

P S

R E

Q U

IR

I

P O

R T

A N

C E

F A

C T

O R

MANUFACTURER MODEL

EF-1 SIDEWALL PRV BIOMEDICAL WORKROOM EXHAUST 325 360 0.3875 9 5.2 1/10 120-1 ● - 10,000 12.5 X 12.5 31 ● 1.5 GREENHECK CUE-090-VG

EF-2 INLINE EXHAUST FAN B205 BATHING SUITE EXHAUST 250 275 0.5 8 8.1 1/10 120-1 ● - 5,000 - 49 ● 1.5 GREENHECK SQ-80-VG

EF-3 INLINE EXHAUST FAN B204 BATHING SUITE EXHAUST 250 275 0.5 8 8.1 1/10 120-1 ● - 5,000 - 49 ● 1.5 GREENHECK SQ-80-VG

EF-4 INLINE EXHAUST FAN DRYER EXHAUST BOOSTER FAN 170 170 - - - 1/10 120-1 - - 5,000 - - ● 1.5 FANTECH DBF 4XLT 1, 2

NOTES:

1. MOUNTING HEIGHT TO BOTTOM OF UNIT, UNLESS NOTED

OTHERWISE ON FLOOR PLANS.

2. BASIS OF DESIGN IS TRANE - UHS

3. BASIS OF DESIGN IS TRANE - FFC040

4. BASIS OF DESIGN IS TRANE - FFB040

GENERAL NOTES:

A. HEATING CAPACITY BASED ON 50°F ENT. AIR, 140°F EWT.

& 110°F LWT / 0%GLYCOL.

B. MAXIMUM 2 FT. HD. W.P.D. THRU COIL.

C. MOTOR: 115V-1PH UNLESS NOTED OTHERWISE.

D. VERIFY / COORDINATE CABINET DIMENSIONS, MOUNTING & RECESS

REQUIREMENTS PRIOR TO ORDERING.

E. WHEN APPLICABLE, REFER TO SPECIFICATIONS FOR VIBRATION

ISOLATOR TYPES AND SEISMIC RESTRAINT REQUIREMENTS.

F. RECESSED UNITS SHALL HAVE FOUR(4) SIDE OVERLAP UNLESS

NOTED OTHERWISE.

G. COORDINATE LINTELS IN MASONRY WALLS FOR FULL & SEMI-

RECESSED UNIT WALL OPENINGS.

H. IF EC MOTORS ARE INDICATED OR SPECIFIED, EACH MOTOR

SHALL BE PROVIDED WITH FACTORY DISCONNECTING MEANS,

INTERNAL OVERLOAD PROTECTION, FIELD ADJUSTABLE SPEED

CONTROL, AND REMOTE ANALOGUE SPEED CONTROL INPUT WHEN

REMOTE CONTROL IS SPECIFIED, COORDINATED WITH THE

BUILDING AUTOMATION SYSTEM.

HOT WATER HEATING UNITS

M A

R K

DESCRIPTION MOUNTING C

F

M

H E

A T

IN

G

C A

P A

C

IT

Y

M B

H

G P

M

P

IP

E R

U N

O U

T S

IZ

E

A U

T O

V A

L V

E T

Y P

E

A U

T O

V A

L V

E C

V

MOTOR

APPROX. CABINET

DIMENSIONS

SEISMIC

RESTRAINTS THERMOSTAT

S E

E N

O T

E

H P

W

A T

T S

E L

E C

T R

O N

IC

A

L L

Y C

O M

M U

T A

T

ID

T H

D E

P T

H

H E

IG

H

T

M O

U N

T

IN

G H

E

IG

H T

A

F F

N

O T

E

Q U

IR

I

P O

R T

A N

C E

F A

C T

O R

U N

IT

M

O U

N T

E D

W A

L L

M O

U N

T E

D

UH-1 PROPELLER CABINET UNIT HEATER SEE PLANS 245 5.25 0.4 0.75" 2-WAY .4 - / 16 - 18" 5.25" 16" 8'-0" ● 1.5 ● - 1, 2

UH-2 HORIZONTAL DUCTED CONCEALED UNIT HEATER SEE PLANS 375 18.15 1.2 0.75" 2-WAY 0.5 - / 100 - 33" 27" 10" 10'-0" ● 1.5 - ● 1, 3

UH-3 PROPELLER CABINET UNIT HEATER SEE PLANS 580 16.14 1.1 0.75" 2-WAY 0.5 - / 25 - 18" 5.25" 15" 8'-0" ● 1.5 ● - 1, 2

UH-4 PROPELLER CABINET UNIT HEATER SEE PLANS 580 16.14 1.1 0.75" 2-WAY 0.5 - / 25 - 18" 5.25" 15" 8'-0" ● 1.5 ● - 1, 2

UH-5 PROPELLER CABINET UNIT HEATER SEE PLANS 245 5.25 0.4 0.75" 2-WAY 0.2 - / 16 - 18" 5.25" 15" 8'-0" ● 1.5 ● - 1, 2

UH-6 VERTICAL CABINET UNIT HEATER SEE PLANS 320 18.15 1.2 0.75" 2-WAY 0.5 - / 100 - 39" 10" 26" 0'-0" ● 1.5 ● - 1, 4

NOTES:

1. 48" LENGTH - ONE 1.5" SLOT

2. 48" LENGTH - TWO 1" SLOTS

3. 24" LENGTH - TWO 1" SLOTS

4. 48" LENGTH - ONE 1" SLOT

5. 48" LENGTH - TWO 1.5" SLOTS

GENERAL NOTES:

A. ALL LAY-IN AIR DEVICES SHALL FIT IN 24"X24" LAY-IN

CLG SYSTEM. VERIFY GRID TYPE AND COORDINATE

AIR DEVICE COMPATIBILITY.

B. FINISH KEY: "W.B.E." - WHITE BAKED ENAMEL;

"E.C.L." - ETCHED CLEAR LACQUER OR ANODIZED;

"C.C.B.A." - CUSTOM COLOR SELECTED BY

ARCHITECT.

C. SUPPLY AIR DIFFUSERS SHALL BE 4-WAY

BLOW, UNLESS INDICATED OTHERWISE ON

DRAWINGS.

D. PROVIDE AUX. FRAMES FOR AIR DEVICES IN

PLASTER, GYPSUM BOARD, TILE OR OTHER

HARD SURFACES.

AIR DISTRIBUTION DEVICES

M A

R K

DESCRIPTION

MOUNTING TYPE MATERIAL FINISH

O P

P O

S E

D B

L A

D E

D A

M P

E R

S Q

-T O

-R D

N E

C K

A D

A P

T O

R

BASIS OF DESIGN

S E

E N

O T

E

L A

Y -I

N

S U

R F

A C

E

D U

C T

S P

L

IN

E

S N

A P

-I N

S T

E E

L

A L

U M

IN

U

M

S T

A

IN

L E

S S

S T

E E

L

W .B

.E

E .C

.L

C .C

.B .A

MANUFACTURER MODEL

CD1 STANDARD SQ. PLAQUE CEILING

DIFFUSER ROUND NECK

● ● ● TITUS OMNI-AA

CD2 STANDARD SQ. PLAQUE CEILING

DIFFUSER ROUND NECK

● ● ● TITUS OMNI-AA

CD3 LINEAR PLENUM SLOT ADJUSTABLE

BLADE DIFFUSER

● ● ● TITUS TBD-10 1

CD4 LINEAR PLENUM SLOT ADJUSTABLE

BLADE DIFFUSER

● ● ● TITUS TBD-10 2

CD5 LINEAR PLENUM SLOT ADJUSTABLE

BLADE DIFFUSER

● ● ● TITUS TBD-10 5

CD6 LINEAR PLENUM SLOT ADJUSTABLE

BLADE DIFFUSER

● ● ● TITUS TBD-10 3

CD7 LINEAR PLENUM SLOT ADJUSTABLE

BLADE DIFFUSER

● ● ● TITUS TBD-10 4

CG1 EGGCRATE CEILING GRILLE ● ● ● TITUS 50F

CG2 EGGCRATE CEILING GRILLE ● ● ● TITUS 50F

CR1 EGGCRATE CEILING REGISTER ● ● ● TITUS 50F

CR2 EGGCRATE CEILING REGISTER ● ● ● TITUS 50F

TR1 ADJUSTABLE AIRFOIL BLADE SUPPLY

REGISTER - DOUBLE DEFLECTION

● ● ● TITUS 272-FL

TR2 ADJUSTABLE AIRFOIL BLADE SUPPLY

REGISTER - DOUBLE DEFLECTION

● ● ● TITUS 272-FL

TR3 FIXED AIRFOIL BLADE RETURN

REGISTER

● ● ● TITUS 23-RL

TR4 FIXED AIRFOIL BLADE RETURN

REGISTER

● ● ● TITUS 23-RL

2. PROVIDE UNIT W ITH LOW AM BIENT KIT TO ALLOW OPERATION DOW N TO 0

DEGREES F.

AI

AO

BI

BO

PI

OAT

MAT

RAT

SAT

CCAT

HCAT

OAHY

RAH

SAH

NC

NO

L

H

C

XX-01

LEGEND-

AUTOMATIC TEMPERATURE CONTROLS

CONTROL POINT - SEE POINTS SCHEDULE

ANALOG INPUT

ANALOG OUTPUT

BINARY INPUT

BINARY OUTPUT

PULSED INPUT

OUTSIDE AIR TEMPERATURE

MIXED AIR TEMPERATURE

RETURN AIR TEMPERATURE

SUPPLY AIR TEMPERATURE

COOLING COIL LEAVING AIR TEMPERATURE

HEATING COIL LEAVING AIR TEMPERATURE

OUTSIDE AIR HUMID ITY

RETURN AIR HUMIDITY

SUPPLY AIR HUMIDITY

NORMALLY CLOSED (CLOSES ON LOSS OF POW ER)

NORMALLY OPEN (OPENS ON LOSS OF POW ER)

LOW

HIGH

COMMON

2-W AY AUTOMATIC 2-POSITION CONTROL VALVE

3-W AY AUTOMATIC 2-POSITION CONTROL VALVE

2-W AY AUTOMATIC MODULATING CONTROL VALVE

3-W AY AUTOMATIC MODULATING CONTROL VALVE

DIFFERENTIAL PRESSURE SENSOR

DIFFERENTIAL PRESSURE SW ITCH

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CURRENT SENSOR TRANSMITTER

ELECTRONIC TO PNEUMATIC TRANSDUCER

FLOW METER TRANSMITTER

HUMIDITY SENSOR

LEVEL CONTROLLER

LEVEL TRANSMITTER

PRESSURE SENSOR

STATIC PRESSURE SENSOR

TEMPERATURE SENSOR

W ATER FLOW SENSOR

W ATER LEVEL SENSOR

CURRENT SW ITCH

END SW ITCH

FLOW SW ITCH

HUMIDISTAT

OCCUPANCY SENSOR

PRESSURE SW ITCH, HIGH LIMIT

PRESSURE SW ITCH, LOW LIMIT

TEMPERATURE LOW LIMIT (FREEZE STAT)

ROOM THERMOSTAT

W ATER LEVEL SW ITCH

EMERGENCY SHUT-OFF STATION

AIR FLOW MEASURING STATION

VARIABLE FREQUENCY DRIVE (ADJUSTABLE FREQUENCY MOTOR CONTROLLER)

ELECTRONICALLY COMMUTATED MOTOR

MOTOR STARTER

CONTACTOR

LOCAL TEMPERATURE CONTROL PANEL

PRESSURE SAFETY - HIGH

PRESSURE SAFETY - LOW

SMOKE DETECTOR

DAMPER OR VALVE ACTUATOR - MODULATING

DAMPER OR VALVE ACTUATOR - 2-POSITION

RELAY

UVGI LIGHT

PUMP

FAN

COOLING COIL

HEATING COIL

HUMIDIFIER

FILTER

ENERGY RECOVERY W HEEL

OPPOSED BLADE CONTROL DAMPER

PARALLEL BLADE CONTROL DAMPER

SMOKE DAMPER

MIN OA / ECON DAMPER

DX COIL

W ALL MOUNTED DEVICE

DUCT INSERTION DEVICE

PIPE INSERTION OR IMMERSION DEVICE W ITH W ELL

AVERAGING SENSOR OR DEVICE

OUTDOOR SENSOR OR DEVICE, SHIELDED

FAN ARRAY, "X" FANS VERTICAL x "Y" FANS HORIZONTAL

GENERAL NOTES-

AUTOMATIC TEMPERATURE CONTROLS

A A COMPLETE SYSTEM OF AUTOMATIC TEMPERATURE CONTROLS SHALL BE INSTALLED

AS REQUIRED TO ACCOMPLISH THE SEQUENCE OF CONTROL FOR VARIOUS ITEMS OF

EQUIPMENT AND SYSTEMS DESCRIBED HEREINAFTER. THE SYSTEM SHALL BE A DIRECT

DIGITAL CONTROL SYSTEM UTILIZING ELECTRIC OR PNEUMATIC ACTUATION AS

DEFINED IN THE SPECIFICATIONS.

B THE CONTROL DIAGRAMS AND INFORMATION CONTAINED W ITHIN ARE TO SHOW DESIGN

INTENT. IT IS THE CONTROL SYSTEM SUPPLIERS RESPONSIBILITY TO DEVELOP

DETAILED AND COMPLETE CONTROL DIAGRAMS AND SHOP DRAW INGS TO ACCOMPLISH

THE SPECIFIED SEQUENCES.

C THE POINTS LIST IS SHOW N AS AN AID TO THE CONTRACTOR INDICATING THE MINIMUM

POINTS REQUIRED FOR CONTROL, AND MONITORING. ALL INPUT AND OUTPUT POINTS,

AND THEIR REQUIRED INTERFACE AND ACCESSORY HARDW ARE, SHALL BE PROVIDED

FOR A COMPLETE AND FUNCTIONAL CONTROL SYSTEM. IF OR W HEN ADDITIONAL

POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL SPECIFIED,

THESE POINTS, ALONG W ITH ADDITIONAL DIRECT DIGITAL CONTROL PANE(S) (IF

REQUIRED), SHALL ALSO BE PROVIDED.

D PIPING W ORK SHALL INCLUDE PROPERLY SIZED W ELDOLET OR THREADOLET FITTINGS

PLACED AS DIRECTED BY THE CONTROL SYSTEM SUPPLIER.

E ELECTRICAL W ORK INCLUDES A POW ER SOURCE TO THE MOTOR STARTERS. PROVIDE

ALL HVAC POW ER SOURCES REQUIRED BEYOND THESE STARTERS OR BEYOND

SOURCES EXPLICITLY SHOW N ON THE ELECTRICAL DRAW INGS. TH IS SHALL INCLUDE

BUT NOT BE LIMITED TO W IRING, CONDUIT, TRANSFORMERS, RELAYS AND FUSES.

M

M

M

M

DPH

L

DP

H

L

C

CO

CS

EPT

FM

H

LC

LT

P

SP

T

W F

W L

CS

ES

FS

H

OS

HL

P

LL

P

T

LL

T

W L

LEGEND-

AUTOMATIC TEMPERATURE CONTROLS

AFMS

VFD

MS

CON

TCP

SD

M

M

SD

X

X

X

X

X

X

X

X

X

X

R

M M

MINECON

R

UV

3 x 1X x Y

PSH

PSL

ECM

MISCELANEOUS POINTS:

A. LOUNGE 022 - TIE INTO LOCAL VAV BOX. OPEN W HEN OCCUPIED AND CLOSE W HEN UNOCCUPIED.

1. EXHAUST AIR DAMPER COMMAND

B. SPLIT AC UNITS

1. STATUS

2. ALARM

3. SPACE TEMPERATURE

AIR TERMINAL UNIT ATC DIAGRAM - H.W. REHEAT

SCALE: NONE

TO SPACE

AIR TERMINAL UNIT - H.W.

REHEAT POINTS LIST SCHEDULE

NOTES:

1. CONNECT DP FLOW SENSOR PROVIDED W ITH AIR TERMINAL UNIT.

2. PROVIDE SENSOR IN ZONES AS SHOW N ON FLOOR PLANS.

3. PROVIDE FOR ZONES AS SCHEDULED ON M602.

4. PROVIDE FOR ZONES AS SHOW N ON FLOOR PLANS W ITH SUPPLEMENTAL

HEATING.

POINT NO.

TYPE

NOTES

POINT

NAME

ALARM

VAV-1 VAV-2

AI

D A

M P

E R

A C

T U

A T

O R

A

IR

F

LO

W

GENERAL NOTES:

A. THE FOLLOW ING LIST SHALL BE THE MINIMUM POINTS REQUIRED OF THE

DIRECT DIGITAL CONTROL SYSTEM (BUILDING AUTOMATION SYSTEM). IT IS

NOT THE INTENT TO SHOW ALL REQUIRED POINTS. IF OR W HEN ADDITIONAL

POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL

SPECIFIED, THOSE POINTS SHALL ALSO BE PROVIDED.

AO

SUPPLY AIR

VAV-5

ZONE SENSOR

VAV-3 VAV-4

V A

V S

U P

P

LY

TE

P

E R

A T

U R

E

AI

R E

H E

A T

C O

IL

C

O N

TR

O

L V

A

LV

E

AO

H

IG

H T

E M

P

5°

F

LO

W T

E M

P

0°

F

VAV-5

Z O

N E

S E

N S

O R

AI

REHEAT

COIL

M

VAV-3

RE-HEAT VALVE

VAV-1

AIRFLOW

VAV-2

DAMPER ACTUATOR

VAV-4

SUPPLY AIR

TEMPERATURE

T

M

T

2 OR 3-W AY PER SCHEDULE

AIR TERMINAL UNIT SEQUENCES

1. VAV SETPOINTS:

A. MAXIMUM DISCHARGE AIR TEMPERATURE LIMIT:

a. THE DISCHARGE AIR SHALL BE LIMITED TO 20 DEG F ABOVE ACTIVE HEATING

TEMPERATURE SETPOINT. THIS VALUE SHALL BE ADJUSTABLE BY THE NETW ORK PER

TERMINAL UNIT.

2. VAV COOLING MODE:

A. IF SPACE TEMPERATURE RISES ABOVE THE COOLING SETPOINT, THE CONTROL SHALL

MODULATE THE BOX DAMPER BETW EEN THE LISTED DEAD BAND MINIMUM CFM AND THE

LISTED COOLING MAXIMUM CFM TO SATISFY THE SPACE COOLING SETPOINT.

3. VAV DEADBAND MODE:

A. IF THE SPACE TEMPERATURE IS IN THE DEAD BAND BETW EEN HEATING AND COOLING

SET POINTS, THE BOX DAMPER SHALL BE POSITIONED TO THE LISTED DEAD BAND

MINIMUM CFM. (NOTE: UNLESS NOTED OTHERW ISE ON THE DRAW INGS DEAD BAND

MINIMUM CFM SHALL BE SET TO THE SCHEDULED VALUE EVEN IF BELOW

MANUFACTURER’S MINIMUM BOX CFM.)

4. VAV HEATING MODE:

A. IF SPACE TEMPERATURE DROPS BELOW THE HEATING SETPOINT AND HEATING IS

AVAILABLE, THE VAV SHALL CONTROL AS FOLLOW S.

a. THE FIRST STAGE OF HEATING SHALL BE THE SUPPLEMENTAL HEATING (IF

APPLICABLE).

b. THE SECOND STAGE OF HEATING SHALL BE TO RESET A DISCHARGE AIR SETPOINT

FROM 55 DEG F TO THE DISCHARGE AIR TEMPERATURE LIMIT. THE AIRFLOW

SETPOINT SHALL REMAIN AT THE DEADBAND VALUE.

c. THE THIRD STAGE OF HEATING SHALL BE TO RESET THE AIRFLOW SETPOINT FROM

THE DEADBAND VALUE TO THE HEATING MAXIMUM. W HILE IN THE SECOND STAGE OF

HEATING, DISCHARGE AIR TEMPERATURE SETPOINT SHALL REMAIN AT LIMIT.

B. IF HEATING IS NOT AVAILABLE THEN THE BOX SHALL REMAIN IN DEADBAND MODE.

5. VAV DAMPER CONTROL:

A. THE VAV SHALL MODULATE THE DAMPER POSITION TO MAINTAIN THE CURRENT AIRFLOW

SETPOINT.

6. VAV REHEAT VALVE CONTROL:

A. THE VAV SHALL MODULATE THE VALVE POSITION TO MAINTAIN THE CURRENT

DISCHARGE AIR TEMPERATURE SETPOINT W HILE IN THE HEATING MODE ONLY.

OTHERW ISE, THE VALVE SHALL BE CLOSED.

7. VAV SUPPLEMENTAL HEAT CONTROL:

A. THE VAV SHALL ENABLE THE SUPPLEMENTAL HEATING AS PART OF THE HEATING MODE

CONTROL SEQUENCE ABOVE.

8. DEMAND CONTROLLED VENTILATION: FOR ZONES NOTED TO HAVE ZONE OCCUPANCY

SENSOR, PROVIDE DEMAND CONTROLLED VENTILATION AS FOLLOW S.

A. W HEN THE ZONE IS UNOCCUPIED AS INDICATED BY THE ZONE OCCUPANCY SENSOR, THE

DEADBAND AIRFLOW SHALL BE REDUCED TO SCHEDULED UNOCCUPIED AIRFLOW .

B. W HEN THE ZONE IS RE-OCCUPIED, THE DEADBAND AIRFLOW SHALL BE THE SCHEDULED

VALUE AS NORMAL.

9. OIT ROOM UNIT

A. THE TERMINAL UNIT FOR THE OIT ROOM IS BACKUP ONLY. SET TERMINAL UNIT COOLING

SETPOINT TO 75 DEG F AND THE SPLIT SYSTEM SETPOINT TO 68 DEG F. IN ITIATE AN

ALARM IF THE ROOM TEMPERATURE RISES ABOVE 74 DEG F.

H

IG

H R

H

0%

VAV-6

Z O

N E

H U

M

ID

IT

Y

AI

VAV-6

ZONE

HUMIDITY

H

VAV-7

OCCUPANCY

SENSOR

OS

VAV-7

O C

C U

P A

N C

Y S

E N

S O

R

BI

VAV-8

SUPPLEMENTAL

HEAT ENABLE

VAV-8

S U

P P

LE

M

E N

T A

L H

E A

T V

A

LV

E

BO

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:0

:1

A M

Construct Replacement CLC - Long Term Rehab

02.12.2021

CONTROLS

M701

AJGW JS

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

NOTES:

1. CURRENT SENSOR.

2. COORDINATE W ITH BOILER CONTROLLER. S INGLE BUTTON SHALL SHUT DOW N ALL BOILERS. PROVIDE QUANTITY

OF TERMINAL BLOCKS AND RELAYS TO ENSURE PROPER W IRING PER BOILER CONTROL REQUREMENTS.

3. MASTER CONTROLLER FURNISHED BY BOILER SUPPLIER.

4. LOCATE DIFFERENTIAL PRESSURE SENSOR AS SHOW N ON FLOOR PLANS.

5. BACNET TO B.A.S. COORDINATE W ITH BOILER CONTROLLER.

6. COORDINATE W ITH VFD MANUFACTURER

POINT NO.

TYPE

NOTES

POINT

NAME

ALARM

HW -01 HW -02 HW -03 HW -04 HW -05 HW -06

AI

B O

IL

E

R P

R

IM

A R

Y P

U M

P (P

-1

S

TA

T U

S

C O

M M

O N

H O

T W

A

TE

R S

Y S

U P

P

LY

T E

M P

E R

A

TU

R E

S E

TP

O

IN

T

C O

M M

O N

H O

T W

A T

E R

S Y

S

TU

R

N T

E M

P E

R A

TU

R

E

HW -20

COMMON HW SYSTEM

SUPPLY TEMPERATURE

HW -13

H

IG

H /L

O W

HW -02

BOILER RETURN

TEMPERATURE

VFD

HW -17

START/STOP

HW -18

VFD SPEED

HW -19

VFD FAULT

HW -16

PUMP

STATUS

P-5

HW -21

DIFFERENTIAL

PRESSURE

T

FROM SYSTEM

TO SYSTEM

H O

T W

A T

E R

S E

C O

N D

A R

Y P

U M

P (P

-4

S T

A

TU

S

BI

O N

F A

IL

U

R E

H O

T W

A T

E R

S E

C O

N D

A R

Y P

U M

P (P

-4 ) S

TA

R

T /S

TO

P

BO

H O

T W

A T

E R

S E

C O

N D

A R

Y P

U M

P (P

-4 ) V

FD

S

P E

E D

AO

H O

T W

A T

E R

S E

C O

N D

A R

Y P

U M

P (P

-4 ) V

F D

F A

U

LT

BI

O N

T R

IP

H O

T W

A T

E R

S Y

S

IF

F E

R E

N

TI

A L

P R

E S

S U

R E

AI

H

IG

H /L

O W

O U

T D

O O

R A

IR

T

E M

P E

R A

T U

R E

A I

E M

E R

G E

N C

Y S

H U

T- O

FF

S

T A

TI

LA

R M

BI

HW R

H

DP

L

NC

HW -01

COMMON HW SYSTEM

RETURN

TEMPERATURE

2,3

H O

T W

A T

E R

B O

IL

E

R (H

W B

-1

F

LA

M E

F A

IL

U

R E

-T R

O U

B

LE

O N

T R

IP

HW -07 HW -08

H O

T W

A

TE

R B

O

IL

E R

(H W

B

1)

LE

A V

IN

G

W A

TE

R

T E

M P

E R

A

TU

R E

AI

H

IG

H /L

O W

HW -11 HW -12

BI

C O

M M

O N

H O

T W

A

TE

R S

Y S

T

U

P P

LY

T

E M

P E

R A

TU

R

E

AI

H

IG

H /L

O W

HW -14 HW -15 HW -16 HW -17

HW -18 HW -19

T

HW -11

COMMON

BOILER LEAVING

W ATER

TEMPERATURE

P-4

HW S

HW -12

PUMP

STATUSVFD

HW -13

HW -14

VFD SPEED

HW -15

VFD FAULT

C O

M M

O N

B O

IL

E

R R

E T

U

T E

R T

E M

P E

R A

T U

R E

AI

H

IG

H /L

O W

H O

T W

A T

E R

B O

IL

E

R P

LA

N

T E

N A

B

LE

/D

IS

A B

LE

BO

HW -09 HW -10

BI

B O

IL

E

R P

R

IM

A R

Y P

U M

P (P

-2

S

TA

TU

S

O N

F A

IL

U

R E

B I

H O

T W

A T

E R

B O

IL

E

R (H

W B

-2

F

LA

M E

F A

IL

U

R E

-T R

O U

B

LE

O N

T R

IP

H O

T W

A

TE

R B

O

IL

E R

(H W

B -2

LE

A V

IN

G

W A

T E

R T

E M

P E

R A

TU

R

E

AI

H

IG

H /L

O W

C O

M M

O N

B O

IL

E

R L

E A

V

TE

R

T E

M P

E R

A T

U R

E

AI

H

IG

H /L

O W

H O

T W

A

TE

R S

E C

O N

D A

R Y

P U

M P

(H W

P -2

) S T

A

TU

S O

N F

A

IL

U R

E

H O

T W

A

TE

R S

E C

O N

D A

R Y

P U

M P

(H W

P -2

) S T

A R

T/ S

T O

P

BO

H O

T W

A

TE

R S

E C

O N

D A

R Y

P U

M P

(H W

P -2

V

FD

S

P E

E D

AO

H O

T W

A

TE

R S

E C

O N

D A

R Y

P U

M P

(H W

P -2

V

FD

F

A U

LT

BI

O N

T R

IP

BI

HW -20 HW -21 HW -22 HW -23

H.W. BOILER

HWB-1

EMERGENCY SHUT-OFF

STATION

HW S

HW R

H.W. BOILER

HWB-2

HW -22

P-1

HW -05

PUMP

STATUS

T HW -07 LEAVING W ATER

TEMPERATURE

P-2

HW -08

PUMP

STATUS

T

HW -10

LEAVING

W ATER

TEMPERATURE

BYPASS

HW S

HW R

2,3

AO

O N

F A

IL

U

R E

HW -23

OUTDOOR AIR

TEMPERATURE

T

HW -03

ENABLE/DISABLE

HW -04

COMMON

SUPPLY W ATER

SETPOINT

BOILER PLANT

MASTER

CONTROLLER

(NOTE 5)

HW -06

BOILER CONTROL PANELS

TROUBLE

HW -09

TROUBLE

M

ES

COMBUSTION

AIR DAMPER

M

ES

COMBUSTION

AIR DAMPER

T

TT

REFER TO DETAIL

ON SHEET "M502"

BI

O N

T R

IP

GENERAL NOTES:

A. THE FOLLOW ING LIST SHALL BE THE MINIMUM POINTS REQUIRED OF THE D IRECT DIGITAL CONTROL SYSTEM (BUILD ING

AUTOMATION SYSTEM). IT IS NOT THE INTENT TO SHOW ALL REQUIRED POINTS. IF OR W HEN ADDITIONAL POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL SPECIFIED, THOSE POINTS SHALL ALSO BE PROVIDED.

HOT WATER SYSTEM POINTS LIST SCHEDULE

P A

R A

T O

R

22 2

H.W. BOILER

HWB-3

P-3

HW -24

PUMP

STATUS

T

HW -26

LEAVING

W ATER

TEMPERATURE

HW -25

TROUBLE

M

ES

COMBUSTION

AIR DAMPER

A. SYSTEM DESCRIPTION

1. THE PRIMARY-SECONDARY HEATING HOT W ATER BOILERS SYSTEM CONSISTS OF A

PLANT W ITH THREE (3) CONDENSING BOILERS (LEAD-LAG STAGING) W ITH DEDICATED

PRIMARY PUMPS; TW O (2) HOT W ATER PUMPS W ITH DEDICATED VARIABLE

FREQUENCY DRIVES. REFER TO THE DRAW INGS FOR DETAILS.

B. SYSTEM ENABLE AND INTERLOCK CONDITIONS:

1. EACH OF THE THREE (3) BOILERS IS SIZED FOR 50 PERCENT OF THE BUILDING LOAD

AND SHALL OPERATE AS LEAD-LAG. THE LEAD BOILER SHALL BE ENABLED 24/7.

2. A FLOW SW ITCH IS SPECIFIED FOR EACH BOILER, AND SHALL BE DIRECTLY W IRED TO

THE BOILER CONTROL PANEL. THE FLOW SW ITCH W ILL ALLOW THE BOILER TO

PERFORM AN ORDERLY SHUTDOW N W HEN THE HOT W ATER PUMPS ARE STOPPED.

W HEN FLOW IS PROVEN THE BOILER SHALL OPERATE AS SPECIFIED BELOW .

3. INTERLOCK THE COMBUSTION AIR DAMPER(S) / COMBUSTION AIR MAKE-UP AIR

SYSTEM W ITH THE BOILERS BURNER FIRING TO OPEN THE DAMPER(S) AND BE

PROVEN OPEN BY A DAMPER END SW ITCH PRIOR TO ALLOW ING THE BOILERS TO

OPERATE / ENSURE THE MAKE-UP AIR SYSTEM IS PROVED RUNNING PRIOR TO

ALLOW ING THE BOILERS TO OPERATE. PROVIDE ALL W IRING, RELAYS AND SW ITCHES

TO PROVIDE THE INTERLOCK SEQUENCE. COORDINATE THE ELECTRICAL TIE IN

POINTS W ITH THE BOILER MANUFACTURER.

4. THE BOILER STAGING AND FIRING SHALL BE DONE BY THE BOILER PLANT

SEQUENCING CONTROLLER FURNISHED BY THE BOILER MANUFACTURER. REFER TO

23 52 25. THE BAS SHALL PROVIDE A “BOILER SYSTEM ENABLE” SIGNAL AND “HOT

W ATER SUPPLY TEMPERATURE SET POINT” SIGNAL TO THE BOILER PLANT

SEQUENCING CONTROLLER. IN ADDITION, THE BAS SHALL INTERFACE W ITH THE

BOILER PLANT SEQUENCING CONTROLLER VIA BACNET PROTOCOL, AS COORDINATED

W ITH THE BOILER MANUFACTURER. INFORMATION SHALL INCLUDE ALL ALARMS,

OPERATING POINTS, SCHEDULES, SETPOINTS, AND TRENDING INFORMATION.

5. BOILER EMERGENCY SHUT-OFF STATION. A MANUAL BOILER EMERGENCY SHUT-OFF

STATION TO SHUT-DOW N ALL BOILERS IN CASE OF AN EMERGENCY, IN COMPLIANCE

W ITH ASME CSD-1. (NOTE THAT THE FUEL SUPPLY AT THE BOILERS W ILL BE SHUT OFF

IMMEDIATELY BY THE INTEGRAL BOILER CONTROLS (LOSS OF POW ER, NORMALLY

CLOSED VALVES). REFER TO SPECIFICATION SECTION 23 52 25 PRESSURE W ATER

HEATING BOILERS. COORDINATE INSTALLATION W ITH THE BOILER SUPPLIER AND

PROVIDE ALL REQUIRED POW ER AND INTERLOCK W IRING FOR A COMPLETE AND

FUNCTIONAL SYSTEM.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .