Rev Drawings pp 61-90 (19009 CLC Phase 2).pdf

PDF 10 MB Posted

Attached to
Construct Replacement Community Living Center (CLC) Federal contract opportunity
Solicitation number
36C24921R0059
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This federal contract opportunity notice is for the construction of a replacement community living center at a Department of Veterans Affairs medical facility. The solicitation seeks bids to furnish all labor, tools, materials and expertise to complete a minor project to construct a new community living center in accordance with contract documents, specifications and drawings. Some work may be required outside standard administrative hours or in shifts shorter than standard due to specific project items. Bids are requested through the identified solicitation number for the construction services described for Veterans Integrated Service Network 9 of the Veterans Health Administration.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Replacement Community Living Center (CLC), newest first.
File Type Posted
S06-36C24921R0059 0005 (Addendum) 04.20.2021.pdf PDF
Addendum 0001 - Drawings.pdf PDF
Addendum 0001 - Text.pdf PDF
S06-36C24921R0059 0004 (Addendum) 04.19.2021.pdf PDF
S06-36C24921R0059 0004.pdf PDF
Fill Placement - Compaction - 27312.pdf PDF
Fill Placement - Compaction - 27310.pdf PDF
Fill Placement - Compaction - 23611.pdf PDF
Fill Placement - Compaction - 27376.pdf PDF
Responses to RFIs_Questions (Minor Project 596-333).xlsx XLSX spreadsheet
S06-36C24921R0059 0003.pdf PDF
S04-Site Visit Sign-In_CLC Phase 2.pdf PDF
S06-36C24921R0059 0002.pdf PDF
19009 CLC Phase 2 - 100 percent CD - Drawings-2.23.2021 (1).pdf PDF
36C24921R0059 0001.pdf PDF
Rev Drawings pp 29-60 (19009 CLC Phase 2).pdf PDF
19009 CLC Phase 2 - 100 CD - Specifications-2-12-2021.pdf PDF
Rev Drawings pp 1-28 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 91-120 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 121-128 (19009 CLC Phase 2).pdf PDF
S02-Price Schedule (Minor Project 596-333) FY2021.xlsx XLSX spreadsheet
596-333 Geotechnical Report.pdf PDF
S02-36C24921R0059_1 (Revision 03.10.2021).pdf PDF
P07-General Wage Decision KY20210090 01.01.2021.pdf PDF
S15-PPQ-Template (Minor Project 596-333) Construct Replacement CLC-Long Term Rehab.pdf PDF
S03-(Presolicitation Notice ) 36C24921R0059 Minor Proj 596-333.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING NOTES:

1. REFER TO S000 SERIES FOR TYPICAL DETAILS AND GENERAL NOTES.

2. REFER TO S104 FOR ROOF FRAMING PLAN AND ROOF TRUSS GIRDER LOCATIONS.

3. REFER TO S300 SERIES FOR FRAMING DETAILS.

4. REFER TO S005 FOR WIND LOADING.

KEY NOTES:

1.

TG-H3

SNOW LOAD = 80 PLF

DEAD LOAD = 100 PLF

ROOF LIVE LOAD = 100 PLF

L

S 270

D

310 L = 30 PLF

S = 30 PLF

D = 20 PLF180

SNOW LOAD = 270 PLF

DEAD LOAD = 180 PLF

ROOF LIVE LOAD = 310 PLF

TG-H1

DEAD LOAD = 370 PLF

ROOF LIVE LOAD = 430 PLF

SNOW LOAD = 370 PLF

DEAD LOAD = 100 PLF

LIVE LOAD = 220 PLF

ROOF TRUSS GIRDER A1, A2, A3 AND A4 - LOAD DIAGRAM

DEAD LOAD = 180 PLF

SNOW LOAD = 270 PLF

LIVE LOAD = 320 PLF

TG-B

DEAD LOAD = 180 PLF

ROOF LIVE LOAD = 320 PLF

SNOW LOAD = 270 PLF

DEAD LOAD = 110 PLF

ROOF LIVE LOAD = 200 PLF

SNOW LOAD = 170 PLF

D 310 D = 60 PLF

L = 60 PLF

DEAD LOAD = 310 PLF

ROOF TRUSS GIRDER B - LOAD DIAGRAM ROOF TRUSS GIRDER C - LOAD DIAGRAM

DEAD LOAD = 290 PLF

LIVE LOAD = 40 PLF

ROOF TRUSS GIRDER D - LOAD DIAGRAM ROOF TRUSS GIRDER E - LOAD DIAGRAM

DEAD LOAD = 320 PLF

DEAD LOAD = 200 PLF

LIVE LOAD = 40 PLF

ROOF TRUSS GIRDER F1 AND F2 - LOAD DIAGRAM

DEAD LOAD = 200 PLF

ROOF TRUSS GIRDER G1 - LOAD DIAGRAM ROOF TRUSS GIRDER H1, H2 AND H3 - LOAD DIAGRAM

LVL

DEAD LOAD = 200 PLF

ROOF LIVE LOAD = 360 PLF

SNOW LOAD = 300 PLF

DEAD LOAD = 460 PLF

ROOF LIVE LOAD = 670 PLF

SNOW LOAD = 570 PLF

LIVE LOAD = 40 PLF

DEAD LOAD = 100 PLF

ROOF TRUSS GIRDER I - LOAD DIAGRAM

DEAD LOAD = 180 PLF

LIVE LOAD = 500 PLF

ROOF TRUSS GIRDER J - LOAD DIAGRAM

DEAD LOAD = 40 PLF

ROOF LIVE LOAD = 50 PLF

SNOW LOAD = 40 PLF

DEAD LOAD = 220-310 PLF

ROOF LIVE LOAD = 390 PLF

SNOW LOAD = 330 PLF

ROOF TRUSS GIRDER K - LOAD DIAGRAM ROOF TRUSS GIRDER L - LOAD DIAGRAM ROOF TRUSS GIRDER M1 AND M2 - LOAD DIAGRAM ROOF TRUSS GIRDER N - LOAD DIAGRAM

TG-Q

S = 390 PLF

D = 260 PLF

L = 460 PLF

DEAD LOAD = 210 PLF

ROOF LIVE LOAD = 350 PLF

SNOW LOAD = 300 PLF

ROOF TRUSS GIRDER O1 AND O2 - LOAD DIAGRAM ROOF TRUSS GIRDER P - LOAD DIAGRAM

DL = 460 PLF DEAD LOAD = 300 PLF

ROOF TRUSS GIRDER R - LOAD DIAGRAM

DEAD LOAD = 420-0 PLF

ROOF TRUSS GIRDER S - LOAD DIAGRAM ROOF TRUSS GIRDER T - LOAD DIAGRAM

DEAD LOAD = 70 PLF

LIVE LOAD = 370 PLF DEAD LOAD = 390 PLF

SNOW LOAD = 40 PLF

ROOF LIVE LOAD = 50 PLF

DEAD LOAD = 30 PLF

SNOW LOAD = 20 PLF

ROOF LIVE LOAD = 30 PLF

DEAD LOAD = 20 PLF

SNOW LOAD = 0-405 PLF

DEAD LOAD = 0-270 PLF

ROOF LL = 0-490 PLF DEAD LOAD = 110-220 PLF

SNOW LOAD = 170-330 PLF

ROOF LIVE LOAD = 190-390 PLF

SNOW LOAD = 40 PLF

ROOF LIVE LOAD = 50 PLF

DEAD LOAD = 30 PLF

PASSAGE FOR

ATTIC ACCESS

PASSAGE FOR

ATTIC ACCESS

IN TG-A2

SNOW LOAD = 40 PLF

ROOF LIVE LOAD = 50 PLF

DEAD LOAD = 30 PLF

LVL

PASSAGE FOR

ATTIC ACCESS

TG-C TG-E TG-G3TG-B

TG-C TG-E TG-G3

TG-G2

TG-F1 TG-F2

TG-A2 TG-A4

TG-A3TG-A1

LIVE LOAD = 690 PLF

DEAD LOAD = 70 PLF

LL = 690 PLF

DL = 70 PLF

TG-A3TG-A4

TG-A1

TG-A3

TG-A2

TG-A4

ROOF LIVE LOAD = 0 - 590 PLF

SNOW LOAD = 0 - 510 PLF

DEAD LOAD = 0 - 410 PLF

DEAD LOAD = 0 -590 PLF

COLUMN LOCATION AT TG-H3

LIVE LOAD = 690 PLF

DEAD LOAD = 70 PLF

LVL

TG-F2

ROOF TRUSS GIRDER G2 AND G3 - LOAD DIAGRAM

TG-G1 TG-H2

TG-G2 TG-G3

LVLTG-M2

DEAD LOAD = 170 PLF

LIVE LOAD = 70 PLF

TG-P

DEAD LOAD = 0-490 PLF

TG-M1 TG-M2

DEAD LOAD = 340 PLF

ROOF LIVE LOAD = 320 PLF

SNOW LOAD = 280 PLF

DEAD LOAD = 40 PLF

LIVE LOAD = 50 PLF

DEAD LOAD = 240-0 PLF

ROOF LIVE LOAD = 420-0 PLF

SNOW LOAD = 360-0 PLF

TG-S

DEAD LOAD = 150 PLF

ROOF LIVE LOAD = 250 PLF

SNOW LOAD = 210 PLF

SNOW LOAD = 40 PLF

DEAD LOAD = 30 PLF

ROOF LIVE LOAD = 50 PLF

DEAD LOAD = 250 PLF DEAD LOAD = 50 PLF

ROOF TRUSS GIRDER U1 AND U2 - LOAD DIAGRAM

DEAD LOAD = 50 PLF

SNOW LOAD = 40 PLF

DEAD LOAD = 50 PLF

ROOF LIVE LOAD = 50 PLF

ROOF TRUSS GIRDER V - LOAD DIAGRAM

DL = 70 PLF

DEAD LOAD = 70 PLF

ROOF LIVE LOAD = 110 PLF

SNOW LOAD = 100 PLF

LVL

ROOF TRUSS GIRDER W - LOAD DIAGRAM

DEAD LOAD = 460 PLF

DEAD LOAD = 260 PLF

ROOF LIVE LOAD = 460 PLF

SNOW LOAD = 400 PLF

TG-V

ROOF TRUSS GIRDER Q - LOAD DIAGRAM

DEAD LOAD = 250 PLF

DEAD LOAD = 140-300 PLF

ROOF LIVE LOAD = 250 PLF

SNOW LOAD = 220 PLF

DL = 270 PLF

LL = 220 PLF

LVL

SNOW LOAD = 40 PLF

DEAD LOAD = 30 PLFROOF LIVE LOAD = 50 PLF SL = 230 PLF

DL = 150 PLF

LL = 270 PLF

DL = 70 PLF

LL = 710 PLF

DEAD LOAD = 470 PLF

DEAD LOAD = 260 PLF

ROOF LIVE LOAD = 470 PLF

SNOW LOAD = 400 PLF

DL = 110-190 PLF

DEAD LOAD = 190 PLF

ROOF LIVE LOAD = 320 PLF

SNOW LOAD = 280 PLF

DL = 200 PLF DEAD LOAD = 230 PLF

DEAD LOAD = 320 PLF DEAD LOAD = 480 PLF

LIVE LOAD = 530 PLF

DEAD LOAD = 230 PLF

ROOF LIVE LOAD = 410 PLF

SNOW LOAD = 360 PLF

DEAD LOAD = 670 PLFDEAD LOAD = 200 PLF

LIVE LOAD = 40 PLF

SNOW LOAD = 40 PLF

ROOF LIVE LOAD = 50 PLF

DEAD LOAD = 30 PLF

SNOW LOAD = 150 PLF

LIVE LOAD = 170 PLFDEAD LOAD = 100 PLF

DEAD LOAD = 50 PLF

LIVE LOAD = 70 PLF

DEAD LOAD = 50 PLF

LIVE LOAD = 70 PLF

ROOF LIVE LOAD = 250-390 PLF

SNOW LOAD = 210-330 PLF

DEAD LOAD = 140-220 PLF

DEAD LOAD = 250-390 PLF

DL = 270 PLF

LL = 350 PLF

SL = 300 PLF

DL = 260 PLF

LL = 390 PLF

SL = 340 PLF

DEAD LOAD = 190-390 PLF

LIVE LOAD = 500 PLF

DEAD LOAD = 560 PLF

DEAD LOAD = 400 PLF

ROOF LIVE LOAD = 560 PLF

SNOW LOAD = 480 PLF

DEAD LOAD = 320 PLF

ROOF LIVE LOAD = 470 PLF

SNOW LOAD = 400 PLF

DEAD LOAD = 580 PLF

DEAD LOAD = 350 PLF

ROOF LIVE LOAD = 520 PLF

SNOW LOAD = 440 PLF

DL = 290 PLF

THP Limited, Inc.

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202

Phone: 513.241.3222 www.thpltd.com Cincinnati • Cleveland

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

THP JOB #19184.00

Revisions Date

/1

/2

:2

:3

P

M

Construct Replacement CLC - Long Term Rehab

2.12.2021

ROOF TRUSS DIAGRAMS

S401

JPHFJE

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

100% CONSTRUCTION DOCUMENTS 2.12.2021

ABBREVIATIONS

AC - AIR COMPRESSOR

ACC - ACCESS

AD - ACCESS DOOR

ADB - ACID DILUTION BASIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

BFP - BACKFLOW PREVENTER

BLDG - BUILDING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BTW N - BETW EEN

CA - COMPRESSED AIR

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CLG - CEILING

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

COR - CONTRACTING OFFICER'S REPRESENTATIVE

CORR - CORRIDOR

CTR - CENTER

CW S - COMBINATION W ATER SERVICE

D - DEPTH

DET - DETAIL

DIA - DIAMETER

DIM - DIMENSION

DN - DOW N

DS - SPRINKLER (DRY)

DW G - DRAW ING

EA - EACH

EC - ELECTRICAL (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQ - EQUAL

EQUIP - EQUIPMENT

ETR - EXISTING TO REMAIN

EQS - EQUIPMENT SUPPLIER

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)

FCE - FIRE CONTROL EQUIPMENT

FCO - FLOOR CLEANOUT

FD - FLOOR DRAIN

FDC - FIRE DEPARTMENT CONNECTION

FDV - FIRE DEPARTMENT VALVE

FF - FINISHED FLOOR ELEVATION

FHC - FIRE HOSE CABINET

FLR - FLOOR

FPM - FEET PER MINUTE

FR - FIRE RISER

FS - FIRE SERVICE

FSC - FIRE SUPPRESSION (DIVISION 21)

FT - FEET

FTG - FOOTING

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES

GPM - GALLONS PER MINUTE

HC - HVAC (D IVISION 23)

HD - HUB DRAIN

HP - HORSEPOW ER OR H IGH POINT

HR - HOSE REEL

HT - HEAT TRACE

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

JS - JANITOR SINK

L - LENGTH

LBS - POUNDS

MAX - MAXIMUM

MB - MOP BASIN

MC - MECHANICAL (D IVISION 23)

MEZZ - MEZZANINE

MFR - MANUFACTURER

MIN - MINIMUM

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

N/C - NORMALLY CLOSED

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NOM - NOMINAL

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

OA - OUTDOOR AIR

OD - OUTSIDE DIAMETER

OFCI - OW NER FURNISHED CONTRACTOR

INSTALLED

OFOI - OW NER FURNISHED OW NER INSTALLED

PC - PLUMBING (DIVISION 22)

OR PUMPED CONDENSATE RETURN

PIV - POST INDICATOR VALVE

PLBG - PLUMBING

PS - PRE-ACTION/DELUGE SPRINKLER

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSV - PRESSURE SUSTAINING VALVE

PSIG - POUNDS PER SQUARE INCH GAUGE

RAD - RADIUS

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RPM - REVOLUTIONS PER MINUTE

S - SPRINKLER (W ET)

SCH - SCHEDULE

SD - SPRINKLER DRAIN

SHT - SHEET

SK - SINK

SPEC - SPECIFICATIONS

SQ - SQUARE

STD - STANDARD

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TYP - TYPICAL

UNO - UNLESS NOTED OTHERW ISE

VEL - VELO CITY

VIB - VALVE IN BOX

VOL - VOLUME

W / - W ITH

W /O - W ITHOUT

W IV - W ALL INDICATOR VALVE

W S - W ATER SERVICE

A1

P1 P1OR

A1

OH

P2

B

P2

GENERAL FLOOR PLAN NOTES

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

P2 = SHEET W HERE DETAIL IS LOCATED

FIRE SUPPRESSION HAZARD CLASSIFICATION AND

HAZARD CLASSIFICATION GROUP

SECTION: 1 = SECTION DESIGNATION

P2 = SHEET W HERE DETAIL IS LOCATED

EQUIPMENT REFERENCE. LETTER DESIGNATION

VARIES. REFER TO SCHEDULES.

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK.

LETTER DESIG NATIONS REFER TO SCHEDULES.

CONNECT TO EXISTING

PLAN NOTE. APPLIES ONLY TO THE SHEET W HICH

IT IS SHOW N UNLESS NOTED OTHERW ISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

FIRE SUPPRESSION SYMBOLS

CONCEALED PENDENT SPRINKLER

FS

PIV

S

FIRE HYDRANT

FLOW SW ITCH

GATE VALVE OS&Y

INSTITUTIONAL PENDENT SPRINKLER

PENDENT SPRINKLER

POST INDICATOR VALVE

RECESSED PENDENT SPRINKLER

SIDE W ALL SPRINKLER

SUPERVISED VALVE

UPRIGHT SPRINKLER

PIPING DESIGNATIONS

FIRE DEPARTMENT VALVE

SPRINKLER PIPE (DRY)

FIRE SUPPRESSION (STANDPIPE/

SPRINKLER MAIN)

FIRE SERVICE

PRE-ACTION / DELUGE SPRINKLER PIPE

SPRINKLER PIPE (W ET)

SPRINKLER DRAIN PIPE

DS

F

FS

PS

S

SD

COM MM MBINATION FIRE SUPPRESSION &

DOM ESTIC W ATER SERVICE

CW S

VALVES AND FITTINGS

T

P

FOB

FOT

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

GAUGE - PRESSURE

GAUGE - TEMPERATURE OR THERMOMETER

UNION

CLEANOUT

STRAINER

STRAINER - W ITH A BLOW DOW N VALVE AND HOSE

CONNECTION

VALVE - DRAIN W ITH HOSE END CONNECTION

VALVE - PRESSURE REGULATING

VALVE - SAFETY RELIEF. PIPE DISCHARGE AIR

GAPPED TO FLOOR DRAIN UNLESS NOTED

OTHERW ISE.

PLUG - PRESSURE AND TEMPERATURE TEST

TRAP PRIMER

GAUGE - VACUUM W ITH STOP

CLEANOUT - TO GRADE OR FINISHED FLOOR

END CAP

MIXING FAUCET

PLUG

HOSE BIB

W ALL HYDRANT

VALVE - PLUG

VALVE - SHUTOFF AND BOX

VALVE - SHUTOFF ON RISER

V

VB

TP

CO

VALVE - SOLENOID

S

P/T VALVE - PRESSURE AND TEM PERATURE SAFETY

RELIEF. PIPE DISCHARGE AIR GAPPED TO

FLOOR DRAIN UNLESS NOTED OTHERW ISE.

VALVE - CHECK

VALVE - SHUTOFF: BALL, GATE, BUTTERFLY VALVE

(REFER TO SPECIFICATIONS FOR REQUIRED TYPE

BASED ON APPLICATIONS)

AUTOMATIC FLOW CONTROLLER W ITH P/T PLUG IN

AND OUT

VALVE - COMBINATION SHUTOFF AND

BALANCING (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

EXISTING PIPE TO REMAIN

EXISTING PIPE TO BE REMOVED

EXPANSION JOINT

W ATER METERM

PIPING SYMBOLS

BOTTOM CONNEC TION (45°)

BRANCH TEE CONNECTION (NOTE :

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOW N

ELBOW UP

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

D

R

PIPE RISER

BC

TC

FLEX PIPING

A PROVIDE A COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM.

B COORDINATE W ORK W ITH VAMC, PHASING PLAN AND OTHER TRADES.

C DESIGN SERVICES SHALL FOLLOW ALL VA STANDARD DESIGN PRACTICES,

DETAILS, SPECIFICATIONS AND SITE SPECIFIC COR REQUIREMENTS AS W ELL AS

W ORK SHOW N ON THESE DOCUMENTS. ALL DEVIATIONS FROM

AFOREMENTIONED REQUIREMENTS SHALL BE APPROVED BY THE COR.

D VERIFY THAT THERE IS ADEQUATE SPACE TO INSTALL ALL NEW PIPING

REQUIRED TO COMPLETE THIS W ORK.

E ALL SPRINKLER PIPING IS LOCATED ABOVE THE CEILING (AT THE BOTTOM OF

STRUCTURE IN EXPOSED STRUCTURAL AREAS), UNLESS OTHERW ISE INDICATED.

F THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE FIRE

SUPPRESSION SPRINKLER SYSTEM SHALL BE FOR A W ET PIPE SYSTEM

HYDRAULICALLY CALCULATED FOR A:

1 LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER SPRINKLER

W ITH THE DENSITY OF 0.10 GPM/SQ. FT. OVER THE MOST REMOTE 1500 SQ.

FT. PROVIDE AN ADDITION OF 100 GPM HOSE ALLOW ANCE.

2 ALL MECHANICAL, ELECTRICAL AND SIMILAR SPACE AREAS SHALL BE

ORDINARY HAZARD (GROUP 1) LIM ITED TO A MAXIMUM OF 130 SQ. FT. PER

SPRINKLER W ITH A DENSITY OF 0.15 GPM/SQ. FT. PROVIDE AN ADDITION OF

250 GPM HOSE ALLOW ANCE.

3 ALL STORAGE, TRASH, FILE STORAGE AND SIMILAR SPACE AREAS SHALL BE

ORDINARY HAZARD (GROUP 2) LIM ITED TO A MAXIMUM OF 130 SQ. FT. PER

SPRINKLER W ITH A DENSITY OF 0.20 GPM/ SQ. FT. PROVIDE AN ADDITION OF

250 GPM HOSE ALLOW ANCE.

G PROVIDE SPRINKLER LOCATIONS AND RELATED PIPING.

H THE ENTIRE SPRINKLER SYSTEM SHALL CONFORM TO VAMC STANDARDS, RULES

AND REGULATIONS. REFER TO VA FIRE PROTECTION DESIGN MANUAL.

I CAREFULLY COORDINATE THE LOCATION OF ALL SPRINKLERS AND PIPING W ITH

ALL OTHER TRADES AND THE ARCHITECT.

J VERIFY THE LOCATION OF ALL LIGHTING FIXTURES AND AIR DEVICES BEFORE

INSTALLATION OF SPRINKLERS.

K PROVIDE SPRINKLER PIPING LAYOUT AND SIZING.

L ALL SPRINKLER LOCATIONS MUST BE COORDINATED W ITH ALL EQUIPMENT

KINDRED TO OTHER TRADES. SPRINKLER LOCATIONS MUST BE APPROVED BY

THE ARCHITECT BEFORE W ORK COMMENCES. REFER TO THE ARCHITECTURAL

AND REFLECTIVE CEILING PLANS FOR ADDITIONAL INFORMATION ON ALL CEILING

TYPES, HEIGHTS AND OTHER ARCHITECTURAL FEATURES.

M MAKE NECESSARY FLOW TESTS, LAYOUT SYSTEMS, OBTAIN APPROVALS FROM

THE AUTHORITIES HAVING JURISDICTION PRIOR TO BEGINNING ANY

FABRICATION OR INSTALLATION W ORK.

N SPRINKLER PIPING SHALL BE 1" MINIMUM SIZE.

O SPRINKLERS (UNLESS OTHERW ISE NOTED):

EXPOSED AREAS - UPRIGHT OR PENDENT TYPE - STANDARD BRASS

CEILING AREAS - RECESSED PENDENT TYPE

ALL HEADS SHALL BE UL LISTED AND FM APPROVED.

P SPRINKLERS SHALL BE "QUICK RESPONSE" TYPE IN ALL AREAS EXCEPT HIGH

TEMPERATURE AREAS.

Q ALL PENDENT TYPE SPRINKLERS LOCATED IN SUSPENDED CEILING TILE AREAS

SHALL BE LOCATED IN THE CENTER OF THE CEILING TILE.

R ANNULAR SPACE AT PIPE AND OTHER SIMILAR PENETRATION OF FIRE RATED

ASSEMBLIES SHALL BE FIRE STOPPED. REFER TO SPECIFICATIONS FOR FIRE

STOPPING. REFER TO ARCHITECTURAL DRAW INGS FOR CONSTRUCTION, LAYOUT

AND FIRE RATING OF FLOORS, W ALLS, PARTITIONS AND OTHER BUILD ING

ELEMENTS.

S A FLOW TEST IS REQUIRED. REFER TO SPECIFICATION SECTION 21 13 13 FOR

FLOW TEST INFORMATION.

T ALL SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS.

U REFER TO ARCHITECTURAL DRAW INGS FOR INFORMATION ON SMOKE

COMPARTMENTS, SMOKE PARTITIONS AND FIRE BARRIERS.

V PHASING: REFER TO ARCHITECTURAL DRAW INGS FOR AN OUTLINE OF PROJECT

PHASING. ADDITIONAL NOTES DESCRIBING PHASING DETAILS MAY BE INCLUDED

THROUGHOUT THIS DRAW ING SET. INCLUDE ALL LABOR AND MATERIAL TO

ACCOMMODATE PHASING.

W BID ITEMS: REFER TO ARCHITECTURAL DRAW ING AND SPECIFICATION SECTION

01 00 00 FOR AN OUTLINE OF BID ITEMS. ADDITIONAL NOTES DESCRIBING BID

ITEM DETAILS MAY BE INCLUDED THROUGHOUT THIS DRAW ING SET.

X SPRINKLER SYSTEM PIPING AND FITTINGS SHALL BE IN ACCORDANCE W ITH NFPA

13.

1 PIPING SIZES 2 INCHES AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40

W ITH THREADED END CONNECTIONS.

2 PIPING SIZES 2.5 INCHES AND LARGER SHALL BE BLACK STEEL SCHEDULE 10

W ITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE

ROLLED GROOVED ONLY.

FIRE SUPPRESSION DESIGN NOTES

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:0

A

M

Construct Replacement CLC - Long Term Rehab

02.12.2021

ABBREVIATIONS, LEGEND & INDEX

OF DRAWINGS

FX001

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

INDEX OF DRAWINGS - FIRE SUPPRESSION

SHEET NUMBER SHEET NAME

FX001 ABBREVIATIONS, LEGEND & INDEX OF DRAWINGS

FX100 GROUND FLOOR PLAN

FX101 FIRST FLOOR PLAN

FX102 ATTIC PLAN

BASIS OF DESIGN FLOW TEST DATA

LOCATION: 2250 LEESTOW N ROAD, LEXINGTON, KY 40511

STATIC PRESSURE: 82 PSI

RESIDUAL PRESSURE: 38 PSI

FLOW : 2354 GPM

DATE: JUNE 24, 2019

NOTE: PERFORM HYDRAULIC CALCULATIONS UTILIZING THE BASIS OF DESIGN FLOW

TEST DATA PROVIDED TO BID THE FIRE SUPPRESSION SPRINKLER SYSTEM. UPON

AW ARD OF THE PROJECT, A HYDRANT FLOW TEST ALONG W ITH CORRESPONDING

HYDRAULIC CALCULATIONS SHALL BE PERFORMED TO VERIFY ADEQUATE PRESSURE

AND FLOW .

Revisions Date

SS

FS

F S

Rehabilitation

Media Center

Pathologist

Elec.

Storage Multi

Purpose Conference

OIT

Corridor 000A

Elevator

Lounge

MD

Superviser

Office

Assistant Nurse

Manager Office

Med Gas

Emergency Elec.

Elev. Mach. Rm .

OH

OH

OH

OH

OH

OH

Workstations

Workstations

Workstations

Director Office

Mech.

HAC

Public Toilet

Toilet - Staff

6"

F S

Nurse Manager

Office

Storage-Site Managem ent

OH

OH

OH

Biomed

FX100

4"

FROM FDC

ZONE AA

EXTEND MAIN (SIZED PER

HYDRAULIC CALCULATIONS) TO

SERVE W ET-PIPE FIRE SUPPRESSION

SPRINKLER SYSTEM IN ZONE AA

Media Center

Lobby

000B Corridor

OH

FIRE SUPPRESSION RISERS

S S

S D S

D S

S S

D S

S S

ZONE AB

EXTEND MAIN (SIZED PER

HYDRAULIC CALCULATIONS) TO

SERVE W ET-PIPE FIRE SUPPRESSION

SPRINKLER SYSTEM IN ZONE AB

S

S

S

4"

4"

4"

4" 4"

4"

4"

4"

4"

4"

Storage

OH

4 2

90 ELL PLUG

45 ELLTEE

1. UNDISTURBED EARTH SURFACE

2. CONCRETE PAD - SEE SCHEDULE

3. PLUG

4. TW O - 1.5" THICK OAK BLOCKS

PIPE

SIZE

90 ELL

45 ELL

TEE &

PLUG

3" 4" 6" 8" 10"

1.5" 2" 3" 4" 8"

1" 1" 1.5" 2" 5"

1" 1.5" 2" 8" 7"

(APPROX. ONE CU.FT. CONCRETE/SQ.FT. BEARING AREA)

EARTH BEARING AREA - SQ. FT.

NOTES

1. UNDERGROUND W ATER SERVICE.

2. UNDISTURBED EARTH-SMOOTH BEARING

FOR SUPPORTING STEEL.

3. 5" X 5" X 0.375"L-18" LONG - W ELD TO

CHANNEL/BEAM.

4. CONCRETE INSERTS - (TW O) BOLTS 0.75"

DIA. X 2.5" LONG MINIMUM.

5. STRUCTURAL STEEL SPAN SUPPORT,

TAR COATED. SEE SCHEDULE.

6. FILL CHANNEL W ITH CONCRETE MORTAR

FOR PIPE BEARING.

7. MECHANICAL RUBBER SEALING

ASSEMBLY EQUAL TO THUNDERLINK

CORP. "LINK SEAL"

8. PIPE SLEEVE W ITH W ATER STOP, OR

CORE DRILLED OPENING.

9. EXCAVATION SPAN, REFER TO

SCHEDULE.

6 5

2 5

3 4

3 FT.

BACKFILL

UNDISTURBED

EARTH

SECTION A-A

GRADE

BSMT.

FLR.

STEEL SPAN SUPPORT

EXCAVATIO N SPANPIPE

SIZE 3 FT. 5 FT. 8 FT. 12 FT.

2"

3"

4"

6"

8"

NONE

NONE

NONE

NONE

NONE

3"[-5#

4"[-5.4#

4"[-5.4#

NONE

NONE

4"[5.4#

6"[-10.5#

6"[-10.5#

6"W F-20#

6"W F-20#

4"W F-13#

4"W F-13#

6"W F-20#

6"W F-25#

6"W F-25# A

A

NOTES

Level 0 86'-4"

TO ZONE AA/AB

TO ZONE B

TO ZONE C

TO ATTIC

DRY-PIPE VALVE ASSEMBLY

4" DOUBLE CHECK

DETECTOR ASSEMBLY

SV

(TYP.)

FS (TYP.)

4"4" 4"4"

FROM FDC

4"

FIRE SERVICE

2'

FLOW

SW ITCH

(TYP.)

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:1

A

M

Construct Replacement CLC - Long Term Rehab

02.12.2021

GROUND FLOOR PLAN

FX100

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

N Scale: 1/8" = 1'-0"1

GROUND FLOOR PLAN - BUILDING 205

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET FX001 FOR ABBREVIATIONS, LEGEND, & INDEX OF DRAW INGS.

SCALE: NONE

UNDER GROUND WATER PIPE THRUST BLOCKS

A

SCALE: NONE

WATER SERVICE SUPPORT

B

1. FIRE SERVICE ENTRANCE - REFER TO DETAIL '2' FOR ADDITIONAL INFORMATION.

2. EXTEND SPRINKLER MAIN (SIZED PER HYDRAULIC CALCULATIONS) TO SERVE

W ET-PIPE FIRE SUPPRESSION SPRINKLER SYSTEM THROUGH-OUT ENTIRE NEW

BUILDING EXCEPT FOR THE ATTIC W HICH W ILL BE PROVIDED W ITH A DRY PIPE SYSTEM.

3. ONLY SPRINKLER PIPING SERVING ROOM'S SPRINKLER(S) SHALL BE ALLOW ED

ABOVE THIS ROOM.

4. PROVIDE SIDEW ALL SPRINKLER IN THE ELEVATOR PIT LOCATED NO MORE THAN 2 FEET

ABOVE THE PIT.

5. PROVIDE SUPERVISED VALVE TO ISOLATE SPRINKLERS SERVING THIS ROOM.

6. LOCATION OF PATIENT LIFT, NO SPRINKLERS SHALL BE LOCATED BETW EEN SIDE

RAILS, BELOW MOVEABLE LIFT RAIL OR MOTOR.

7. PROVIDE ORDINARY OR INTERMEDIATE TEMPERATURE SPRINKLERS IN THE ELEVATOR

MACHINE ROOM.

8. PROVIDE SEPARATE SPRINKLER ZONES TO SERVE EACH SIDE OF SMOKE BARRIER

INDIVIDUALLY ON GROUND FLOOR (TOTAL OF 2 SPRINKLER ZONES).

9. DRY PIPE SPRINKLER SYSTEM AIR COMPRESSOR. AIR COMPRESSOR SHALL COMPLY

W ITH NFPA STANDARDS AND INSTALLED PER MANUFACTURER'S INSTALLATION

REQUIREMENTS.

SCALE: NONE

FIRE SERVICE ENTRANCE

Elevator

Equipm ent

HAC

121Supplies

Med Room

Workroom, Resident

Soiled Holding

Clean Linen

Laundry

Bathing

Den

Bedroom

Bedroom

Bedroom

Bedroom

Bath

108B

Bath

107B

Bath

106B

Bath

105B

Special Care Bedroom

Bath 109B

Special Care Bedroom

Bath

110B

Bedroom

Bath

101B

Bedroom

Bath

102B

Bedroom

Bath

103B

Kitchen 116 Dining

Corridor

100B

IT

Bedroom

Bath

104B

Living

Storage

Public Restroom

Consult

Bedroom

Bath 107B

Bedroom

Bath

108B

Bath

109B Bedroom

Bedroom

Bath 110B

Corridor

100D

IT

Vestibule

Den

Public Toilet

Bath 101B

Bedroom

Bedroom

Bath 102B

Bath

103B

Bedroom

Bedroom

Bath

104B

Supplies

Special Care Bedroom

Special Care Bedroom

Bath 105B

Bath

106B

Soiled Holding

Clean Linen

Laundry

HAC

4 5

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

4 5 4 5 4 5

4 54 54 54 5

4 5

4 5

4 5

4 5

4 5

4 5

4 5

4 5

4 5

4 54 5

4 5

OH

4 5

4 5

4 5

4 5

4 5

4 54 5

4 5

4 5

4 5

4 5

4 5

4 5

4 5

4 4 5

4 5

OH

118B Storage

OH

Dining

Kitchen

Workroom , Resident

100B Corridor

Bathing Suite

Pantry

Living

Electric

Med R oom

Consult

Reception

Garage/Receiving

118C Storage

Screen Porch

OH

OH

OH

Pantry

Screen Porch

4 5

OH

ZONE B

ZONE C

EXTEND MAIN (SIZED PER

HYDRAULIC CALCULATIONS) TO

SERVE W ET-PIPE FIRE SUPPRESSION

SPRINKLER SYSTEM IN ZONE C

EXTEND MAIN (SIZED PER

HYDRAULIC CALCULATIONS) TO

SERVE W ET-PIPE FIRE SUPPRESSION

SPRINKLER SYSTEM IN ZONE B

100C Corridor

FIRE SUPPRESSION R ISER

S S

S

OH

DRY-SPRINKLER SYSTEM

UP TO ATTIC.

4" 4"

4"

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:4

A

M

Construct Replacement CLC - Long Term Rehab

02.12.2021

FIRST FLOOR PLAN

FX101

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

N Scale: 1/8" = 1'-0"1

FIRST FLOOR PLAN - BUILDINGS 204 & 205

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET FX001 FOR ABBREVIATIONS, LEGEND & INDEX OF DRAW INGS.

1. EXTEND SPRINKLER MAIN (SIZED PER HYDRAULIC CALCULATIONS) TO SERVE

W ET-PIPE FIRE SUPPRESSION SPRINKLER SYSTEM THROUGH-OUT ENTIRE NEW

BUILDING IN SPRINKLER ZONE C .

2. EXTEND SPRINKLER MAIN (SIZED PER HYDRAULIC CALCULATIONS) TO SERVE

W ET-PIPE FIRE SUPPRESSION SPRINKLER SYSTEM THROUGH-OUT ENTIRE NEW

BUILDING IN SPRINKLER ZONE B.

3. ONLY SPRINKLER PIPING SERVING ROOM'S SPRINKLER(S) SHALL BE ALLOW ED

ABOVE THIS ROOM.

4. GYPSUM BOARD/ PLASTER/ W OOD CEILING.

5. LOCATION OF PATIENT LIFT, NO SPRINKLERS SHALL BE LOCATED BETW EEN SIDE

RAILS, BELOW MOVEABLE LIFT RAIL OR MOTOR.

6. SERVE SCREENED PORCHES/ PORTE COCHERE/ GARAGE W ITH DRY-PENDENT TYPE

OR DRY-SIDEW ALL TYPE SPRINKLERS.

7. KITCHEN COOKTOP HOOD LOCATION.

Revisions Date

Building 204

Building 205

T

EXTEND MAIN (SIZED PER

HYDRAULIC CALCULATIONS) TO

SERVE DRY-PIPE FIRE SUPPRESSION

SPRINKLER SYSTEM IN ATTIC

Mechanical Space

Mechanical Space

UP FROM BELOW .

D S

4"

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:4

A

M

Construct Replacement CLC - Long Term Rehab

02.12.2021

ATTIC PLAN

FX102

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET FX001 FOR ABBREVIATIONS, LEGEND & INDEX OF DRAW INGS.

1. PROVIDE DRY-PIPE SPRINKLER SYSTEM IN UNCONDITIONED ATTIC AREA.

N Scale: 1/8" = 1'-0"1

ATTIC PLAN - BUILDING 204 & 205

Revisions Date

ABBREVIATIONS

AAP - AREA ALARM PANEL (MEDICAL GAS)

AC - AIR COMPRESSOR OR AIR CONDITIONER

ACC - ACCESS

ACCU - AIR COOLED CONDENSING UNIT

AD - ACCESS DOOR OR AREA DRAIN

ADB - ACID DILUTION BASIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

AR - AIR RECEIVER OR ARGON

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

AV - ACID VENT

AW - ACID W ASTE

BDD - BACK DRAFT DAMPER

BFP - BACKFLOW PREVENTER

BLDG - BUILDING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BT - BATHTUB

BTU - BRITISH THERMAL UNIT

BTUH - BRITISH THERMAL UNIT PER HOUR

BTW N - BETW EEN

CA - COMPRESSED AIR

CB - CATCH BASIN

CBD - COUNTER BALANCED BACKDRAFT DAMPER

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFM - CUBIC FEET PER MINUTE

CHS - CHILLED W ATER SUPPLY

CHR - CHILLED W ATER RETURN

CI - CAST IRON

CK - CLINICAL SINK

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CO - CLEAN OUT

CO2 - MEDICAL CARBON DIOXIDE

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

COR - CONTRACTING OFFICER'S REPRESENTATIVE

CORR - CORRIDOR

CS - CLINICAL SINK OR COLD SOFT W ATER

CTR - CENTER

CU - COPPER

CW - COLD W ATER

CW S - COMBINATION W ATER SERVICE

OR CONDENSER W ATER SUPPLY

CW R - CONDENSER W ATER RETURN

D - DEPTH OR DRAIN LINE

DD - DECK DRAIN

DET - DETAIL

DF - DRINKING FOUNTAIN OR W ATER COOLER

OR DIESEL FUEL

DFU - DRAINAGE FIXTURE UNIT

DI - DEIONIZED W ATER

DIA - DIAMETER

DIM - DIMENSION

DN - DOW N

DS - DOW N SPOUT OR SPRINKLER (DRY)

DT - PERFORATED DRAIN TILE

DW G - DRAW ING

EA - EACH

EC - ELECTRICAL (DIVISION 26)

EEW - EMERGENCY EYE W ASH

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQ - EQUAL

EQUIP - EQUIPMENT

ET - EXPANSION TANK

ETR - EXISTING TO REMAIN

ES - EMERGENCY SHOW ER

EQS - EQUIPMENT SUPPLIER

EW C - ELECTRICAL W ATER COOLER

EXH - EXHAUST AIR

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER

MAIN)

FCE - FIRE CONTROL EQUIPMENT

FCO - FLOOR CLEANOUT

FD - FLOOR DRAIN

FDC - FIRE DEPARTMENT CONNECTION

FDV - FIRE DEPARTMENT VALVE

FF - FINISHED FLOOR ELEVATION

FHC - FIRE HOSE CABINET

FLR - FLOOR

FM - FORCE MAIN

FOB - FLAT ON BOTTOM

FOF - FUEL OIL FLOW

FOG - FUEL OIL GAUGE

FOR - FUEL OIL RETURN

FOS - FUEL OIL SUPPLY

FOT - FLAT ON TOP

FPM - FEET PER MINUTE

FR - FIRE RISER

FS - FLOOR SINK OR FIRE SERVICE

FSC - FIRE SUPPRESSION (DIVISION 21)

FT - FEET

FTG - FOOTING

G - GAS OR NATURAL GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES

GD - GARAGE DRAINAGE

GPM - GALLONS PER MINUTE

GS - GAS SERVICE

GW - GREASE W ASTE

H2 - HYDROGEN

HB - HOSE BIBB

HC - HVAC (DIVISION 23)

HD - HUB DRAIN

HE - HELIUM

HG - REFRIGERANT HOT GAS

HP - HORSEPOW ER OR HIGH POINT

HPC - H IGH PRESSURE CONDENSATE RETURN

HPS - H IGH PRESSURE STEAM SUPPLY

HPW - HIGH PURITY W ATER

HPW R - HIGH PURITY W ATER RETURN

HR - HOSE REEL

HT - HEAT TRACE

HTR - HEATER

HVAC - HEATING, VENTILATING, AND AIR

CONDITIONING

HW - HOT W ATER

HW R - HEATING HOT W ATER RETURN

HW S - HEATING HOT W ATER SUPPLY

IA - MEDICAL INSTRUMENT AIR

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

IV - INDIRECT VENT

IW - INDIRECT W ASTE

JS - JANITOR SINK

K - KITCHEN W ASTE

KEC - KITCHEN EQUIPMENT

L - LENGTH

LA - LABORATORY COMPRESSED AIR

LAV - LAVATORY

LBS - POUNDS

LCW - LABORATORY COLD W ATER

LEC - LABORATORY EQUIPMENT

LHW - LABORATORY HOT W ATER

LHW R - LABORATORY HOT W ATER RETURN

LPC - LOW PRESSURE CONDENSATE RETURN

LPS - LOW PRESSURE STEAM SUPPLY

LV - LABORATORY VACUUM OR LABORATORY

VENT

LW - LABORATORY W ASTE

MA - MEDICAL COMPRESSED AIR

MAP - MASTER ALARM PANEL (MEDICAL GAS)

MAX - MAXIMUM

MB - MOP BASIN

MC - MECHANICAL (DIVISION 23)

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE

MIN - MIN IMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

MPC - MEDIUM PRESSURE CONDENSATE RETURN

MPS - MEDIUM PRESSURE STEAM SUPPLY

MU - W ATER MAKE-UP

MV - MEDICAL SURGICAL VACUUM

N2 - MEDICAL N ITROGEN

N/C - NORMALLY CLOSED

NG - GASOLINE (NON-LEAD)

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NO - MEDICAL N ITROUS OXIDE

NOM - NOMINAL

NPW - NON-POTABLE W ATER

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

O2 - MEDICAL OXYGEN

OA - OUTDOOR AIR

OD - OUTSIDE DIAMETER OR OVERFLOW

DRAIN

OFCI - OW NER FURNISHED CONTRACTOR

INSTALLED

OFOI - OW NER FURNISHED OW NER INSTALLED

P - PROPANE GAS

PC - PLUMBING (DIVISION 22) OR PUMPED

CONDENSATE RETURN

PD - PUMP DISCHARGE OR PARAPET DRAIN

PIV - POST INDICATOR VALVE

PLBG - PLUMBING

PS - PRE-ACTION/DELUGE SPRINKLER

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSV - PRESSURE SUSTAINING VALVE

PSIG - POUNDS PER SQUARE INCH GAUGE

PW - PURE W ATER

RA - RETURN AIR

RAD - RADIUS

RCP - REINFORCED CONCRETE PIPE

RD - ROOF DRAIN

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RL - REFRIGERANT LIQUID

ROS - REVERSE OSMOSIS W ATER SUPPLY

ROR - REVERSE OSMOSIS W ATER RETURN

RPM - REVOLUTIONS PER MINUTE

RS - REFRIGERANT SUCTION

RV - RELIEF VALVE

S - SPRINKLER (W ET)

SA - SHOCK ARRESTOR OR SUPPLY AIR

SAN - SANITARY OR SANITARY DRAIN

SCH - SCHEDULE

SCW - SOFT COLD W ATER

SD - SPRINKLER DRAIN OR SUBSOIL DRAIN

SH - SHOW ER

SHT - SHEET

SK - SINK

SPEC - SPECIFICATIONS

SQ - SQUARE

SR - SUPPLY RISER

SS - SANITARY STACK (SOIL OR W ASTE) OR

STAINLESS STEEL

STD - STANDARD

STM - STORM OR STORM DRAINAGE

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

T - FUEL TANK VENT

TD - TRENCH DRAIN

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TF - TRAP FILLER

TP - TRAP PRIMER OR TRAP PRIMER

DISCHARGE

TW - TEMPERED W ATER

TYP - TYPICAL

UR - URINAL

UNO - UNLESS NOTED OTHERW ISE

V - VENT OR SANITARY SEW ER VENT

VAC - VACUUM

VC - VACUUM CLEANING

VCV - VACUUM CLEANING VALVE

VE - VACUUM EXHAUST

VEL - VELO CITY

VIB - VALVE IN BOX

VOL - VOLUME

VP - VACUUM PUMP

VS - VENT STACK

VTR - VENT THROUGH ROOF

VR - VENT RISER

W / - W ITH

W /O - W ITHOUT

W - W ASTE

W AGD - W ASTE ANESTHESIA GAS DISPOSAL

W C - W ATER CLOSET

W CO - W ALL CLEANOUT

W H - W ALL HYDRANT OR W ATER HEATER

W IV - W ALL INDICATOR VALVE

W S - W ATER SERVICE

YCO - YARD CLEANOUT

ZVC - ZONE VALVE CABINET

NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT TO MODIFICATIONS ON OTHER DRAWINGS. ADDITIONALLY, ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT NECESSARILY BE USED ON THIS PROJECT.

A1

P1 P1OR

A1

OH

P2

B

P2

GENERAL FLOOR PLAN NOTES

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

P2 = SHEET W HERE DETAIL IS LOCATED

FIRE SUPPRESSION HAZARD CLASSIFICATION AND

HAZARD CLASSIFICATION GROUP

SECTION: 1 = SECTION DESIGNATION

P2 = SHEET W HERE DETAIL IS LOCATED

EQUIPMENT REFERENCE. LETTER DESIGNATION

VARIES. REFER TO SCHEDULES.

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK.

LETTER DESIG NATIONS REFER TO SCHEDULES.

CONNECT TO EXISTING

PLAN NOTE. APPLIES ONLY TO THE SHEET W HICH

IT IS SHOW N UNLESS NOTED OTHERW ISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

FIRE SUPPRESSION SYMBOLS

SPRINKLER - CONCEALED PENDENT

FS

PIV

S

FIRE HYDRANT

FLOW SW ITCH

VALVE - GATE OS&Y

SPRINKLER - INSTITUTIONAL PENDENT

SPRINKLER - PENDENT

VALVE - POST INDICATOR

SPRINKLER - RECESSED PENDENT

SPRINKLER - SIDE W ALL

VALVE - SUPERVISED

SPRINKLER - UPRIGHT

SPECIALTY GAS SYMBOLS

AIR OUTLET - LAB TYPE

VC

VC

NATURAL GAS OUTLET - LAB TYPE

VACUUM OUTLET - LAB TYPE

VACUUM CLEANING STATION - W ALL

VACUUM CLEANING STATION - FLOOR

PIPING DESIGNATIONS

DOMESTIC COLD W ATER

DOMESTIC HOT W ATER

DOMESTIC HOT W ATER RETURN

EXISTING PIPE TO REMAIN

EXISTING PIPE TO BE REMOVED

HOT W ATER PIPE (140 DEGS. F.)

HOT W ATER RETURN PIPE (140 DEGS. F.)

HOT W ATER RETURN PIPE (180 DEGS. F.)

140R

180R

EXPANSION JOINT

VALVE - FIRE DEPARTMENT

W ATER METERM

PIPING SYMBOLS

BOTTOM CONNEC TION (45°)

BRANCH TEE CONNECTION (NOTE :

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOW N

ELBOW UP

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

D

R

PIPE RISER

HOT W ATER PIPE (180 DEGS. F.)

ARGO N PIPE

COMPRESSED AIR PIPE

DIESEL FUEL PIPE

SPRINKLER PIPE (DRY)

FIRE SUPPRESSION (STANDPIPE / SPRINKLER MAIN)

FIRE SERVICE

FUEL OIL FLOW LINE

FUEL OIL GAUGE LINE

FUEL OIL RETURN LINE

FUEL OIL SUPPLY LINE

NATURAL GAS PIPE

GARAGE DRAINAGE PIPE

GAS SERVICE

HYDROGEN PIPE

HELIUM PIPE

KITCHEN W ASTE PIPE

LABORATORY COMPRESSED AIR PIPE

LABORATORY VENT PIPE

LABORATORY VACUUM PIPE

LABORATORY W ASTE PIPE

GASOLINE PIPE (NON-LEAD)

NON-POTABLE

(OVERFLOW ) SECONDARY STORM DRAINAGE PIPE

PROPANE GAS PIPE

PUMP DISCHARGE PIPE

PRE-ACTION / DELUGE SPRINKLER PIPE

PURE W ATER PIPE

SPRINKLER PIPE (W ET)

SANITARY DRAINAGE PIPE

SOFT COLD W ATER

SPRINKLER DRAIN PIPE

STORM DRAINAGE PIPE

FUEL TANK VENT PIPE

TRAP PRIMER DISCHARG E PIPE

TEMPERED W ATER PIPE

SANITARY SEW ER VENT

W ATER SERVICE

LV

AR

CA

DF

DS

F

FS

FOF

FOG

FOR

FOS

G

GD

GS

H2

HE

IV

IW

LA

LV

LW

NG

NPW

OD

P

PD

PS

PW

S

SAN

SCW

SD

STM

T

TP

TW

V

W S

INDIR ECT VEN T PIPE

INDIRECT W ASTE PIPE

K

ACID VENT PIPEAV

ACID W ASTE PIPEAW

BC

TC

COM BINATION FIRE SUPPRESSION &

DOM ESTIC W ATER SERVICE

CW S

FLEX PIPING

CAR BON DIOXIDE OUTLET - H OSPITAL TYPE

M EDIC AL AIR OU TLET - HOSPITAL TYPE

M EDIC AL VACUUM INLET - HOSPITAL TYPE

NITROGEN OUTLET - H OSPITAL TYPE

NITROUS OXIDE OUTLET - HOSPITAL TYPE

OXYGEN OU TLET - HOSPITAL TYPE

W AGD INLET - HOSPITAL TYPE

M EDICAL INSTRUM ENT AIR PIPE

M EDICAL NITR OGEN PIPE

M EDIC AL COM PRESSED AIR PIPE

MEDICAL SURGICAL VACUUM-EXHAUST PIPE

MEDICAL NITROUS OXIDE PIPE

MEDICAL OXYGEN PIPE

W ASTE ANESTHESIA GAS DISPOSAL PIPE

IA

N2

MA

MV

NO

O2

W AGD

MEDICAL CARBON DIOXIDE PIPECO2

MEDICAL SURGICAL VACUUM PIPE

MEDICAL COMPRESSED AIR-INTAKE PIPEMA-IN

MV-EX

VALVES AND FITTINGS

T

P

FOB

FOT

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

GAUGE - PRESSURE

GAUGE - TEMPERATURE OR THERMOMETER

UNION

CLEANOUT

STRAINER

STRAINER - W ITH A BLOW DOW N VALVE AND HOSE

CONNECTION

VALVE - DRAIN W ITH HOSE END CONNECTION

VALVE - PRESSURE REGULATING

VALVE - SAFETY RELIEF. PIPE DISCHARGE AIR

GAPPED TO FLOOR DRAIN UNLESS NOTED

OTHERW ISE.

PLUG - PRESSURE AND TEMPERATURE TEST

TRAP PRIMER

GAUGE - VACUUM W ITH STOP

CLEANOUT - TO GRADE OR FINISHED FLOOR

END CAP

MIXING FAUCET

PLUG

HOSE BIB

W ALL HYDRANT

VALVE - PLUG

VALVE - SHUTOFF AND BOX

VALVE - SHUTOFF ON RISER

V

VB

TP

CO

VALVE - SOLENOID

S

P/T VALVE - PRESSURE AND TEM PERATURE SAFETY

RELIEF. PIPE DISCHARGE AIR GAPPED TO

FLOOR DRAIN UNLESS NOTED OTHERW ISE.

VALVE - CHECK

VALVE - SHUTOFF: BALL, GATE, BUTTERFLY VALVE

(REFER TO SPECIFICATIONS FOR REQUIRED TYPE

BASED ON APPLICATIONS)

AUTOMATIC FLOW CONTROLLER W ITH P/T PLUG IN

AND OUT

VALVE - COMBINATION SHUTOFF AND

BALANCING (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

GENERAL NOTES

A ALL PIPING IS ABOVE THE CEILING (AT THE UNDERSIDE OF STRUCTURE IN

EXPOSED STRUCTURE AREAS), UNLESS OTHERW ISE NOTED.

B REFER TO SCHEDULES, DETAILS AND D IAGRAMS FOR PIPING, PIPE SIZES AND

PIPELINE DEVICES NOT INDICATED ON THE FLOOR PLAN.

C ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION W ITH ALL TRADES IS

CRITICAL, PRIOR TO INSTALLATION OF ANY W ORK.

D REFER TO THE ARCHITECTURAL PLANS FOR PROJECT PHASING

REQUIREMENTS.

E REFER TO ARCHITECTURAL FIRE RATED PARTITION PLAN(S) FOR LOCATIONS

AND FIRE RATINGS OF NEW W ALL ASSEMBLIES. ALL PENETRATIONS THROUGH FIRE

RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE STOPPED AS REQUIRED TO

MAINTAIN FIRE RATINGS INDICATED. COORDINATE W ITH ALL TRADES TO ENSURE

FIRE RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.

F ANNULAR SPACE OF ALL PIPE & OTHER SIMILAR PENETRATIONS OF FIRE RATED

ASSEMBLIES SHALL BE FIRE STOPPED.

G PHASING: REFER TO ARCHITECTURAL DRAW INGS FOR AN OUTLINE OF PROJECT

PHASING. ADDITIONAL NOTES DESCRIBING PHASING DETAILS MAY BE INCLUDED

THROUGHOUT THIS DRAW ING SET.

H BID ITEMS: REFER TO ARCHITECTURAL DRAW ING AND SPECIFICATION SECTION

01 00 00 FOR AN OUTLINE OF BID ITEMS. ADDITIONAL NOTES DESCRIBING BID

ITEM DETAILS MAY BE INCLUDED THROUGHOUT THIS DRAW ING SET.

I OXYGEN AND MEDICAL AIR PIPING SHALL BE MINIMUM 0.5" SIZE. MEDICAL VACUUM

PIPING SHALL BE MINIMUM 0.75" S IZE.

J ALL MEDICAL GAS SYSTEM INSTALLERS SHALL BE CERTIFIED TO THE

REQUIREMENTS OF ASSE 6010. ALL MEDICAL GAS SYSTEM VERIFIERS SHALL BE

CERTIFIED TO THE REQUIREMENTS OF ASSE 6030.

K MEDICAL GAS SYSTEM INSTALLATION AND VERIFICATION SHALL COMPLY W ITH THE

REQUIREMENTS OF NFPA 99, GAS AND VACUUM SYSTEMS.

L DOMESTIC W ATER PIPING SYSTEM SHALL BE DISINFECTED AND TESTED IN ITS

ENTIRETY. DISINFECTION AND TESTING PROCEDURES SHALL FOLLOW LEXINGTON VA

W ATER SAFETY PLAN AND ALL OTHER VA DESIGN MANUAL, VA SPECIFICATIONS, AND

LOCAL REQUIREMENTS.

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:2

P M

Construct Replacement CLC - Long Term Rehab

02.12.2021

ABBREVIATIONS, LEGEND & INDEX

OF DRAWINGS

P001

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

INDEX OF DRAWINGS - PLUMBING

SHEET NUMBER SHEET NAME

P001 ABBREVIATIONS, LEGEND & INDEX OF DRAWINGS

PS100 SITE PLAN - PLUMBING UTILITIES

PL099 FOUNDATION PLAN - DRAINAGE

PL100 GROUND FLOOR PLAN - DRAINAGE

PL101 FIRST FLOOR PLAN - DRAINAGE

PL102 ATTIC PLAN

PP100 GROUND FLOOR PLAN - DISTRIBUTION

PP101 FIRST FLOOR PLAN - DISTRIBUTION

P501 DETAILS

P601 SCHEDULES & DIAGRAMS

P901 SOIL, WASTE &VENT DIAGRAM

P902 SOIL, WASTE &VENT DIAGRAM

Down

Down

F D

FD

C O

C O

C O

C O

C O

C O

C O

C

OC

O

C O

C O

C O

C O

C O

C O

C O

C O

C O

C O

C O

C O

C O

C O

C O

C O

S

C O

C O

O2

8' CHAIN LINK FENCE WITH BARBED WIRE

G A

T E

VI

P

VI

P

W

CDF

W S

T

G E

N

E

E H

TEST-Y & CO

TEST-Y & CO

O

1"

2" 3"

4"

6"

PROPOSED BLDG.

FF: 918.50'

S A

N

F S

F S

W S

6"

6 7

P

1"

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:0

P M

Construct Replacement CLC - Long Term Rehab

02.12.2021

SITE PLAN - PLUMBING UTILITIES

PS100

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

N Scale: 1" = 20'-0"1

SITE PLAN - PLUMBING

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET P001 FOR ABBR EVIATIONS, LEGEND & INDEX OF DRAW INGS.

1. EXISTING BULK OXYGEN TANK.

2. NEW ABOVEGROUND PROPANE TANK(S).

BASIS OF DESIGN: FERRELGAS

CONTACT: SABRA OLLER - (502) 523-8506

3. PROVIDE GAS METER AND REGULATOR. OPERATING PRESSURE SHALL BE SET TO 2 PSI.

4. PROVIDE ADAPTOR AND CONNECT TO STUB PROVIDED BY S.U.C.

5. APPROXIMATE LOCATION OF FIRE DEPARTMENT CONNECTION AND POST INDICATOR

VALVE BY S.U.C.

6. PIPING CONTINUED ON SHEET PP100.

7. PIPING CONTINUED ON SHEET PL100.

P609

P103

P103

P502

P524

CO

P418

P418

SAN

S A

N

SAN

1.5" VR

FD2

FD2

FD3

FD3

SE1

FD3

SP1

UP4" PD

UP2" PD

D

INV: 902' - 4 9/32"

INV: 902' - 4 5/16"

2" VR

2" VR

G

P501

J

P501

2" VR

P419

P419

CO

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:5

P M

Construct Replacement CLC - Long Term Rehab

02.12.2021

FOUNDATION PLAN - DRAINAGE

PL099

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET P001 FOR ABBR EVIATIONS, LEGEND & INDEX OF DRAW INGS.

1. ELEVATOR SUMP PUMP. REFER TO DETAIL J/ SHEET P501.

2. SEW AGE EJECTOR. REFER TO DETAIL G/ SHEET P501.

N Scale: 1/8" = 1'-0"1

FOUNDATION PLAN - DRAINAGE - BUILDING 205

Rehabilitation

Media Center

Pathologist

Elec.

Storage Multi

Purpose Conference

Mech.

OIT

Corridor

000A

Elevator

Lounge

Workstations

Workstations

MD

Superviser

Office

Assistant Nurse

Manager Office

Workstations

Director Office

Emergency Elec.

Elev. Mach.

Rm.

S A

N

V

V

V

S A

N

SAN

SAN

S A

N

Nurse Manager

Office

SP1

P103

P103

P524

P418 P418

P609 P502

SE1

Public Toilet

HAC

Toilet - Staff

Biomed

Storage-Site Managem ent

000B Corridor

P103

P418

P418 P103

FD1

FD1

P103

FD1

P418 P103

FD1

P418

P103

FD1

P502

P418

P524

P418

P103

FD1

P808

P103 P418

FD1

FD1

P103

FD1

FD1

P103 P418

P418

P103

FD1

FD1

P418

FD1 FD1

P418

P103

P524

P502

P103

P418

FD1 FD1

P103

P418

P521

P418

P103 P418

FD1

FD1

P103 P418

FD1

FD1

P103 P418

(2)

(2)(2)

(2)

2" VR

1.5" VR

2" VR

(2)

(2)

(2) (2)

P103 P418

P103

2" VR

P418

2" VR

CO

CO

CO

2" VR

2" VR2" VR

FD2

P418

2" VR

2" VR

P528

P521

P526

P419

S A

N

SAN

P103

CO

CO

CO

P526

P419

P808

FD2

P301 P103

SAN

S A

N

S A

N

SAN

SAN SAN

S A

N

SAN

S A

N

P301

P528

2" VR

2" VR

1.5" VR

2" VR

2" VR

2" VR

CO

CO

2" VR

CO

2" VR 2" VR

2" VR

2" VR2" VR

2" VR

FD2

FD2

FD3

FD3

FD2

FD3

1.5" VR

FD2

UP2" PD

FD3

FD3

1.5" VR

UP3" SAN

PD

1FD3

FD3

UP3" V

UP3" SAN

UP3" SAN

FD3

1.5" VR

FD3

MVP1

W S1

INV: 904' - 11"

INV: 916' - 4"

D

D

1 .5" VR

DD

(P301)

(P301)

CO

D

SAN

SAN

SAN

SAN

V SAN

2" VR

CO

CO

SAN

MAC1

2" VR

J

P501

2" VR

UP6" W H-INT

UP8" W H-EXH

(TYP.)

(TYP.)

W H

-I N

T

W H

-E X

H

Med Gas

1.5" VRP419

P419

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:0

P M

Construct Replacement CLC - Long Term Rehab

02.12.2021

GROUND FLOOR PLAN - DRAINAGE

PL100

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, LEGEND & INDEX OF DRAW INGS.

1. PROVIDE STAINLESS STEEL DRAIN PAN BELOW SANITARY PIPING. EXTEND PAN

DISCHARGE TO MOP SINK IN HAC RM 101.

2. FIXTURE SHALL BE VENTED BY A COMBINATION W ASTE AND VENT SYSTEM.

3. PROVIDE SUMP PUMP ALARM AND CONTROL PANEL. COORDINATE LOCATION AND

REQUIREMENTS W ITH DIVISION 26.

4. PROVIDE SEW AGE EJECTOR ALARM AND CONTROL PANEL. COORDINATE LOCATION AND

REQUIREMENTS W ITH DIVISION 26.

N Scale: 1/8" = 1'-0"1

GROUND FLOOR PLAN - DRAINAGE

Revisions Date

C O

CO

C O

Elevator

Equipm ent

HAC

Supplies

Med Room

Workroom, Resident

Soiled Holding

Clean Linen

Laundry

Bathing

Den

Bedroom

Bedroom

Bedroom

Bedroom

Bath 108B

Bath 107B

Bath

106B

Bath 105B

Special Care Bedroom

Bath

109B

Special Care Bedroom

Bath

110B

Bedroom

Bath 101B

Bedroom

Bath

102B

Bedroom

Bath

103B

Kitchen

Dining

Corridor 100B

Bedroom

Bath

104B

Living

Storage

Public Restroom

Consult

Bedroom

Bath

107B

Bedroom

Bath

108B

Bath

109B

Bedroom

Bedroom

Corridor 100D

IT

Vestibule

Den

Public Toilet

Storage

118B

Bedroom

Bedroom

Bedroom

Bedroom

Supplies

Special Care Bedroom

106Special Care Bedroom

Bath

106B

Soiled Holding

Clean Linen

Laundry

HAC

3" VR

V

V

V

V V

V

V

V

VV

V

V

V

V

VV

V V

V

V V

V

V V

V V V

V V

Garage/Receiving

118C Storage

Consult

Screen Porch

Pantry

Living

Kitchen

Med R oom

Workroom , Resident

Bathing Suite

Dining

Electric

Reception

Screen Porch

Pantry

P103

P418

P418 P103

P301

P103 P418

P418

P103

P418

P502

P418 P103

P103

P418

P524

P418

P103

P103 P418

P103 P418

P418 P103

P808

P521

P528

P103 P418

P418

P103

P418

P103

P418

P103

P418

P103

P103 P418

P524

P528

P502

P103

P418

P103

P418

P301 P418

FD2

P419

P521

P103 P418

P103 P418

P418 P103

P103 P418

FD2

P103

P808

P526

103B Bath

102B Bath

101B Bath

P103

UP3" V

UP3" V

2" VR

FD3

1.5" VRV

FD2

FD2

DN2" PD

P419

FD3

FD3

Equipm ent

TEST-Y & CO

TEST-Y & CO

FD3 1.5" VR

FD3

FD3

FD3

1.5" VR

1.5" VR

1.5" VR

2" VR

DN3" SAN

DN3" SAN

2" VR

2" VR 2" VR 2" VR

2" VR

2" VR

2" VR

2" VR

2" VR

2" VR

2" VR

2" VR

2" VR

2" VR2" VR

2" VR

2" VR

2" VR

2" VR

DN3" SAN

P526

FD3

FD3

CO

CO

CO

CO

FD1 FD1 FD1 FD1

FD1

FD1

FD1

FD1

FD1 FD1

FD1

FD1

FD1

FD1

FD1FD1

FD1

FD1

FD1

FD1

1.5" VR

V

2" VR

UP & DN6" W H-INT

UP & DN8" W H-EXH

(TYP.)

(TYP.)

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:2

P M

Construct Replacement CLC - Long Term Rehab

02.12.2021

FIRST FLOOR PLAN - DRAINAGE

PL101

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, LEGEND & INDEX OF DRAW INGS.

1. EXTEND SUMP PUMP PUMPED DRAINAGE PIPING TO EXTERIOR. PROVIDE DOW NTURNED

ELBOW TO SPLASHBLOCK. PROVIDE SLEEVE THROUGH W ALL W ITH W ATERTIGHT SEAL.

N Scale: 1/8" = 1'-0"1

FIRST FLOOR PLAN - DRAINAGE

Revisions Date

3" VTR

3" VTR

FD3

FD3

FD3

3" VTR

1.5" VR

V

3" VTR

P802

P802

Mechanical Space

Mechanical Space

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:2

P M

Construct Replacement CLC - Long Term Rehab

02.12.2021

ATTIC PLAN

PL102

DesignerApprover

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

N Scale: 1/8" = 1'-0"1

ATTIC PLAN - DRAINAGE & DISTRIBUTION

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, LEGEND & INDEX OF DRAW INGS.

1. PROVIDE 1" STUB FOR HVAC EQUIPMENT. PIPING TO BE CONTINUED/ COORDINATED BY

DIV 23.

2. 3" MEDICAL AIR INTAKE. TURN DOW N W ITH GOOSENECK FITTING AND PROVIDE BUG

SCREEN. EXTEND PIPING THROUGH ATTIC AND TERMINATE ABOVE ROOF ON BACK

SIDE OF BUILDING. COORDINATE LOCATION W ITH ALL HVAC EXHAUST DUCTS/ FANS

AND SANITARY ROOF VENTS TO BE A MINIMUM DISTANCE OF 25' FROM AIR INTAKE.

3. 3" VACUUM EXHAUST. TURN DOW N W ITH GOOSENECK FITTING AND PROVIDE BUG

SCREEN. EXTEND PIPING THROUGH ATTIC AND TERMINATE ABOVE ROOF ON BACK

SIDE OF BUILDING. COORDINATE LOCATION W ITH ALL HVAC AIR INTAKES. TO BE A

MINIMUM OF 25' FROM EXHAUST VENTING.

4. W ATER HEATER INTAKE - EXHAUST PIPING. EXTEND PIPING THROUGH ATTIC AND

TERMINATE ABOVE ROOF ON BACK SIDE OF BUILDING. REFER TO D IVISION 23

DRAW INGS FOR APPROXIMATE ROUTE. INTAKE PIPING SHALL BE TURNED DOW N

ABOVE ROOF W ITH GOOSENECK FITTING AND PROVIDE BUG SCREEN. REFER TO

DETAIL I/ P501.

Revisions Date

M B

F P

B F

P

PP100

Rehabilitation

Pathologist

Elec.

Storage Multi

Purpose Conference

Mech.

OIT

Corridor

000A

Elevator

Stair

Lounge

Workstations

MD Superviser Office

Assistant Nurse

Manager Office

Med Gas

Workstations

Director Office

Emergency Elec.

Elev. Mach.

Rm.

SLAB ON GRADE

P103

P103

P524

P418

P418

P609

P502

P801

P812

Nurse Manager

Office

Workstations

Public Toilet

HAC

Toilet - Staff

3"

W S

Biomed

000B Corridor

Storage-Site Managem ent

MVP1

0.5" - DHW

0.5" - DCW

P801

Media Center

0.5 GPM

UP0.5" DCW

UP0.5" DHW

0.75"

2"

M V

1"

1"

2"

2.5"

UP1" MV

UP1" DHW RUP2" DHW

UP2.5" DCW

0.75"

2"

2"

0.5"

2" 1"0.75"0.5"1"

1"

O

G S

MAC1

1"

1"

1"

MA

M A

M A

3"

G

2"

SE1

ET1

P524

UP1" MA

P524

4 4 4

P601

MAP

W S1

DW H1 DW H1 DW H1

1"

P

General Storage

MV

2.5" 2" 1"

M V

-E X

H

0.75"

0.75"

P419

P419

Level 0 86'-4"

3"

W S

D C

W

3"

BFP

BFP

3" 3"

3'

W ATER METER

Mech.

N.C.

W ATER METER BY-PASS

SUPPORT BRACKET

ANCHOR TO W ALL.

N.C.

80 MESH

STRAINER

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

100% CONSTRUCTION DOCUMENTS 02.12.2021

/1

/2

:4

:3

P M

Construct Replacement CLC - Long Term Rehab

02.12.2021

GROUND FLOOR PLAN -

DISTRIBUTION

PP100

RLCKMB

596-333

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

19009.00

2019-05137

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, LEGEND & INDEX OF DRAW INGS.

N Scale: 1/8" = 1'-0"1

GROUND FLOOR PLAN - DISTRIBUTION

1. BOX MOUNTED TRANSFORMER LO CATED ABOVE THE CEILING TO CONTROL SENSOR

OPERATED FAUCET ON FIXTURE(S) BELOW . 120V-1PH POW ER W ILL BE LOCATED IN A

W IR ING BOX ABOVE THE CEILING BY DIVISION 26. A 0.75” CONDUIT (FOR LOW VOLTAGE

W IR ING) STUBBED ABOVE THE CEILING AND EXTENDED DOW N TO AN ELECTRICAL W ALL

BOX LOCATED BELOW EACH LAVATORY W ILL BE PROVIDED BY DIVISION 26. THE

TRANSFORMERS AND LOW VOLTAGE W IRING SHALL BE BY DIVISION 22. COORDINATE ALL

W ORK W ITH DIVISION 26.

2. BOX MOUNTED TRANSFORMER LO CATED ABOVE THE CEILING TO CONTROL SENSOR

OPERATED FLUSH VALVE ON FIXTURE(S) BELOW . 120V-1PH POW ER W ILL BE LOCATED IN

A W IR ING BOX ABOVE THE CEILING BY DIVISION 26. A 0.75” CONDUIT (FOR LOW VOLTAGE

W IR ING) STUBBED ABOVE THE CEILING AND EXTENDED DOW N TO AN ELECTRICAL W ALL

BOX LOCATED ABOVE EACH W ATER CLOSET W ILL BE PROVIDED BY DIVISION 26. THE

TRANSFORMER AND LOW VOLTAGE W IRING SHALL BE BY DIVISION 22. COORDINATE ALL

W ORK W ITH THE DIVISION 26.

3. 3" MEDICAL AIR INTAKE/ VACUUM EXHAUST UP.

4. CONNECT TO EQUIPMENT PER MANUFACTURERS REQUIREMENTS.

5. NO PIPING SHALL BE INSTALLED IN THIS SPACE.

6. PROVIDE GAS REGULATOR FOR EACH W ATER HEATER. OPERATING PRESSURE SHALL

BE SET AT 11" W .C.

SCALE: 1/4" = 1'-0"

WATER SERVICE ENTRANCE

Revisions Date

F D

FD

BFP

BFP

Elevator

Stair

Equipm ent

HAC

Supplies

Med Room

Workroom, Resident

Soiled Holding

Clean Linen

Laundry

Bathing

Den

Bedroom

Bedroom

Bedroom

Bedroom 108Bath

108B

Bath

107B

Bath

106B

Bath

105B

Special Care Bedroom

Bath

109B

Special Care Bedroom

Bath

110B

Bedroom

Bath

101B

Bedroom

Bath

102B

Bedroom

Bath

103B

Kitchen

Dining

Corridor

100B

Bedroom

Bath

104B

Living

Storage

Public Restroom

Consult

Bedroom

Bath

107B

Bedroom

Bath 108B

Bath

109B

Bedroom

Bedroom

Bath

110B

Corridor

100D

IT

Vestibule

Den

Public Toilet

Bath

101B

Bedroom

Bedroom

Bath

102B

Bath

103B

Bedroom

Bedroom

Bath

104B Supplies

Special Care Bedroom

Special Care Bedroom

Bath 105B Bath

106B

Soiled Holding

Clean Linen

Laundry

HAC

P103 P418

P701

P103

P418

P701

P103 P418

P701

P103

P418

P701

P103 P418

P701

P103 P418

P701

P103

P418

P701 P103

P418

P701

P103

P418

P701 P103

P418

P701

P103

P418

P701 P103

P418

P701

P103 P418

P701

P103

P418

P701

P103

P418

P701

P103 P418

P701

P103

P418

P701

P103P418

P701

P103P418

P701

P103

P418

P701

P524 P418

P528

P528

P524

P502

P418

P418

P418

P103

P103

P419

P521

P521

P808

P812

P812

P801

P801

P801

P801

P502

P809

P809

1"

2"

1"

ZVC,AAP

2" 2.5"

2.5" 2" 1"

0.75" 0.5"

0.75" 0.5"

MAP

1.25"

2"

0.5" 0.75"

1"

2"

1"

2"

0.5"

0.75"

0.5" 0.75"

1"2"

1"

0.75" 0.5"

0.5"

0.75"

0.5" 0.75"

0.75" 1"1"

2"2.5" 1.5"

0.5"

0.75"

Pantry

Screen Porch

Reception

Screen Porch

Consult

Garage/Receiving

Living

Kitchen

Pantry

Workroom , Resident

Electric

Med Room

EOSC

M V

O

O2

MV

O2 O2

MV

O2

MV

O…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .