Addendum 0001 - Drawings.pdf

PDF 30 MB Posted

Attached to
Construct Replacement Community Living Center (CLC) Federal contract opportunity
Solicitation number
36C24921R0059
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document provides details for a federal contract opportunity to construct a replacement community living center. The solicitation is for minor project 596-333 to furnish all labor, tools, materials, and expertise to complete construction of the replacement community living center in accordance with contract documents, specifications, and drawings. Some work may be required outside standard administrative hours or in periods shorter than a standard shift for specific items in the project. The contract opportunity is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Replacement Community Living Center (CLC), newest first.
File Type Posted
S06-36C24921R0059 0005 (Addendum) 04.20.2021.pdf PDF
Addendum 0001 - Text.pdf PDF
S06-36C24921R0059 0004 (Addendum) 04.19.2021.pdf PDF
S06-36C24921R0059 0004.pdf PDF
Fill Placement - Compaction - 27310.pdf PDF
Fill Placement - Compaction - 23611.pdf PDF
Fill Placement - Compaction - 27376.pdf PDF
Responses to RFIs_Questions (Minor Project 596-333).xlsx XLSX spreadsheet
S06-36C24921R0059 0003.pdf PDF
Fill Placement - Compaction - 27312.pdf PDF
S04-Site Visit Sign-In_CLC Phase 2.pdf PDF
S06-36C24921R0059 0002.pdf PDF
36C24921R0059 0001.pdf PDF
19009 CLC Phase 2 - 100 percent CD - Drawings-2.23.2021 (1).pdf PDF
S02-Price Schedule (Minor Project 596-333) FY2021.xlsx XLSX spreadsheet
Rev Drawings pp 1-28 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 61-90 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 91-120 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 121-128 (19009 CLC Phase 2).pdf PDF
596-333 Geotechnical Report.pdf PDF
S02-36C24921R0059_1 (Revision 03.10.2021).pdf PDF
P07-General Wage Decision KY20210090 01.01.2021.pdf PDF
S15-PPQ-Template (Minor Project 596-333) Construct Replacement CLC-Long Term Rehab.pdf PDF
Rev Drawings pp 29-60 (19009 CLC Phase 2).pdf PDF
19009 CLC Phase 2 - 100 CD - Specifications-2-12-2021.pdf PDF
S03-(Presolicitation Notice ) 36C24921R0059 Minor Proj 596-333.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C001

190107.000

VA HOSPITAL

KLEINGERS

GROUP

THE www.kleingers.comCIVIL ENGINEERING

SURVEYING

LANDSCAPE

ARCHITECTURE

Louisville, KY 40299 502.365.9950

1100 Envoy Circle

UTILITY NOTE:

CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION AND

VERIFICATION OF ALL UTILITIES UPON FEDERAL LAND PRIOR

TO ANY LAND DISTURBANCE ACTIVITY UTILITIES SHALL BE

MARKED AT ALL TIMES. IF LOCATION/VERIFICATION OF

UTLITIES UPON STATE OR PRIVATE PROPERTY BECOMES

NECESSARY, PLEASE NOTIFY THE KENTUCKY UTILITY

PROTECTION SERVICE AT 1-800-752-6007 BEFORE ANY

PERIOD OF EXCAVATION OR CONSTRUCTION ACTIVITY.

UNDERGROUND UTILITIES ARE PLOTTED FROM A

COMPILATION OF AVAILABLE RECORD INFORMATION AND

SURFACE INDICATIONS OF UNDERGROUND STRUCTURES

AND MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE

EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES

CANNOT BE VERIFIED.

VA Project No. 596-333 Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management 2250 LEESTOWN ROAD

LEXINGTON, KY 40511

FAYETTE COUNTY

Revisions Date

100% 02.12.2021CONSTRUCTION DOCUMENTS

100%

CONSTRUCTION

DOCUMENTS

02-12-2020 PW JS

204 & 205

1 04.08.2021ADDENDUM #1

GENERAL NOTES

GENERAL NOTES

1. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH LOCAL, STATE, & FEDERAL

REGULATIONS.

2. THE CONTRACTOR IS TO PERFORM ALL INSPECTIONS AS REQUIRED BY THE KENTUCKY DEP FOR THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (KPDES) PERMIT AND FURNISH OWNERS REPRESENTATIVE WITH WRITTEN REPORTS. OWNER WILL OBTAIN PERMITS.

3. ITEM NUMBERS REFER TO THE KENTUCKY TRANSPORTATION CABINET CONSTRUCTION AND MATERIAL SPECIFICATIONS, AND ALL CONSTRUCTION WORK SHALL BE DONE ACCORDING TO SAID SPECIFICATIONS AND IN ACCORDANCE WITH APPLICABLE STANDARDS OF

FAYETTE COUNTY. WHEN IN CONFLICT, THE KYTC REQUIREMENTS SHALL PREVAIL.

4. PROTECTION OF EXISTING TREES AND VEGETATION: PROTECT EXISTING TREES AND OTHER VEGETATION AGAINST UNNECESSARY CUTTING, BREAKING OR SKINNING OF ROOTS, SKINNING OR BRUISING OF BARK, SMOTHERING OF TREES BY STOCKPILING CONSTRUCTION MATERIALS OR EXCAVATED MATERIALS WITHIN DRIP LINE, EXCESS FOOT OR VEHICULAR TRAFFIC, OR PARKING OF VEHICLES WITHIN DRIP LINE. PROVIDE TEMPORARY GUARDS TO PROTECT TREES AND VEGETATION TO BE LEFT STANDING.

5. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS, UNLESS OTHERWISE NOTED.

6. SUBGRADE EXCAVATION AND CONSTRUCTION TO BE PER GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. SUBGRADE PREPARATION SHALL BEGIN BY CLEARING & STRIPPING UNSUITABLE MATERIAL FROM SITE, THEN PLACE & COMPACT BACKFILL MATERIAL AT GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. ALL BACKFILL MATERIAL MUST BE ACCEPTABLE TO THE GEOTECHNICAL ENGINEER.

7. ALL FILL UNDER PAVEMENT SHALL BE COMPACTED TO THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.

8. COMPACTED FILLS ARE TO BE MADE TO A MINIMUM OF THREE FEET ABOVE THE CROWN OF ANY PROPOSED SEWER PRIOR TO CUTTING OF TRENCHES FOR PLACEMENT OF SAID SEWERS. ALL FILLS SHALL BE CONTROLLED, COMPACTED, AND INSPECTED BY AN APPROVED

TESTING LABORATORY OR AN INSPECTOR FROM THE APPROPRIATE GOVERNMENTAL AGENCY.

9. ADJUST ALL EXISTING CASTINGS AND CLEANOUTS WITHIN PROJECT AREA TO GRADE AS REQUIRED.

10. CONTRACTOR SHALL IMPLEMENT ALL SOIL AND EROSION CONTROL, PRACTICES REQUIRED BY LFUCG AND KDOW. COORDINATE MOVING OF

FENCE AND/OR SILT FENCE WITH PHASE 1 CONTRACTOR.

11. ALL GROUND SURFACE AREAS THAT HAVE BEEN EXPOSED OR LEFT BARE AS A RESULT OF CONSTRUCTION SHALL BE SEEDED AS SOON AS

PRACTICAL IN ACCORDANCE WITH SPECIFICATIONS. COORDINATE WITH PHASE 1 CONTRACTOR.

12. ALL PROPOSED STORM SEWERS, SURFACE OR OTHER DRAINAGE FACILITIES ARE PRIVATE AND MAINTAINED BY THE OWNER.

13. THE CONTRACTOR IS TO CONSTRUCT CURBS, CATCH BASINS, DOWNSPOUTS, PIPING AND CONNECTION ETC. AS REQUIRED TO CONVEY THE

PAVED SURFACE DRAINAGE TO THE EXISTING DRAINAGE SYSTEM.

14. CONTRACTOR TO REMOVE & REPLACE PAVEMENT AS SPECIFIED.

15. THE CONTRACTOR IS RESPONSIBLE FOR BALANCING THE SITE EARTHWORK BY IMPORTING OR EXPORTING AS NECESSARY TO ACHIEVE

DESIGN GRADES AND SPECIFICATIONS.

16. CONCRETE WALKS SHALL BE FORMED WITH CONTROL JOINTS EQUALLY SPACED AT NO MORE THAN 6' ON CENTER.

17. ANY FIELD TILE CUT MUST BE TIED INTO THE STORM DRAINAGE SYSTEM.

18. THE CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION OR

EARTH MOVING OPERATIONS.

19. ALL DIMENSIONS ARE TO THE OUTSIDE FACE OF BUILDING, EDGE OF PAVEMENT AND/OR FACE OF CURB, UNLESS OTHERWISE NOTED.

20. PARKING SPACES ARE 9' x 18' UNLESS OTHERWISE NOTED.

21. FINAL SITE STABILIZATION IS CONSIDERED ACHIEVED ONCE ALL TEMPORARY EROSION AND SEDIMENT CONTROL PRACTICES ARE REMOVED AND DISPOSED OF AND ALL TRAPPED SEDIMENT HAS BEEN PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION.

22. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE DISPOSED OF AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED. TRAPPED SEDIMENT AND OTHER DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES WILL BE PERMANENTLY STABILIZED TO PREVENT EROSION AND

SEDIMENTATION.

23. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES WILL BE MAINTAINED AND REPAIRED AS NEEDED TO

ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.

24. DANDY BAGS TO BE USED AT ALL STORM INLETS FOR EROSION CONTROL

25. ALL END OF CURBS TAPER SIX INCHES IN TWELVE INCHES.

26. SANITATION DISTRICT NO. 1 IS TO BE CONTACTED 72 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITY AT 859-578-6892.

27. CONTRACTOR TO LAYOUT BUILDING BASED ON ARCHITECTURAL/FOUNDATION PLANS. SITE PLAN IS FOR CONCEPTUAL PURPOSES

ONLY.

UTILITY NOTES

1. ROOF DRAINS, FOUNDATION DRAINS AND ALL OTHER CLEAR WATER CONNECTIONS TO THE SANITARY SEWER SYSTEM ARE

PROHIBITED.

2. ALL STORM STRUCTURES ARE KYTC TYPES UNLESS OTHERWISE INDICATED.

3. STORM SEWER PIPE LABELED "STM" SHALL BE ONE OF THE FOLLOWING: PVC SDR-35, OR HIGH DENSITY POLYETHYLENE. STORM SEWER PIPE LABELED "RCP" SHALL BE REINFORCED CONCRETE PIPE. ALL STORM PIPE USED MUST HAVE A MANUFACTURER SPECIFIED FRICTION FACTOR OF 0.013 (n=0.013) OR LESS.

4. STEPS SHALL BE PROVIDED IN ALL CATCH BASINS AND MANHOLES OVER 4' DEEP.

5. CONTRACTOR SHALL SECURE ALL PERMITS AND FURNISH ALL DRAWINGS REQUIRED FOR UTILITY TAPS PRIOR TO STARTING

CONSTRUCTION.

6. PROVIDE MANUFACTURERS RECOMMENDED COVER OVER TOP OF STORM PIPE DURING CONSTRUCTION, UNTIL PAVING OPERATIONS

BEGIN.

7. SITE UTILITY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING REQUIRED VERTICAL SEPARATION BETWEEN UTILITIES BY

VARYING DEPTH OF UNDERGROUND ELECTRIC, TELEPHONE, WATER AND GAS.

8. WATERLINE SHALL HAVE A MINIMUM OF 4.0' OF COVER.

9. A MINIMUM OF 1.5' OF VERTICAL CLEARANCE SHALL BE MAINTAINED BETWEEN UTILITIES AT ALL TIMES.

10. FIRE HYDRANT ASSEMBLY INCLUDES FIRE HYDRANT AND 6" WATER VALVE.

11. PROVIDE UNDERGROUND FLUSH CERTIFICATES PER NFPA

12. SANITARY SERVICE SHALL BE 6" PVC-SDR 35 OR APPROVED EQUAL (CONFORMING TO SD1 WATER & SEWER DEPARTMENT RULES AND REGULATIONS) INSTALLED AT A MINIMUM SLOPE OF ONE PERCENT (1.00%) UNLESS OTHERWISE NOTED SANITARY SERVICE SHALL BE INSTALLED AT A MINIMUM DEPTH OF FOUR FEET (4') UNLESS OTHERWISE NOTED. A MINIMUM OF 18" CLEARANCE SHALL BE MAINTAINED AT ALL WATERLINE CROSSINGS. SANITARY SERVICE JOINTS ALL CONFORM TO ASTM D-321.

13. FORTY-EIGHT HOURS BEFORE DIGGING IS TO COMMENCE, THE CONTRACTOR SHALL NOTIFY THE KENTUCKY UNDERGROUND PROTECTION SERVICE, AND ALL OTHER AGENCIES WHICH MAY HAVE UNDERGROUND UTILITIES INVOLVING THIS

PROJECT AND ARE NON-MEMBERS OF THE KENTUCKY UNDERGROUND PROTECTION SERVICE.

14. EXISTING UNDERGROUND UTILITIES AND SERVICES ARE SHOWN IN THEIR APPROXIMATE LOCATIONS ACCORDING TO THE BEST INFORMATION AVAILABLE. THE LOCATIONS SHOWN ARE INTENDED ONLY AS A GUIDE AND CANNOT BE

GUARANTEED ACCURATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR:

A. CONTACTING THE INDIVIDUAL UTILITY OWNERS TEN DAYS PRIOR TO CONSTRUCTION AND ADVISING THEM OF

THE WORK TO TAKE PLACE.

B. SOLICITING THEIR AID IN LOCATING AND PROTECTING ANY UTILITY WHICH MAY INTERFERE WITH

CONSTRUCTION.

C. EXCAVATING AND VERIFYING THE HORIZONTAL AND VERTICAL LOCATION OF EACH UTILITY.

D. ALL DAMAGE TO ANY EXISTING UTILITY.

GRADING & EROSION CONTROL NOTES

1. THE NPDES PERMIT REQUIRES THAT ALL AREAS WHICH ARE AT OR NEAR FINAL GRADE, OR WHICH REMAIN DORMANT FOR MORE THAN 21 DAYS OR LONGER BE STABILIZED WITHIN 7 DAYS OF LAST ACTIVITY. VELOCITY DISSIPATION DEVICES SHOULD BE PLACED AT THE OUTFALL OF ALL DETENTION OR RETENTION STRUCTURES AND ALONG THE LENGTH OF ANY OUTFALL CHANNEL AS NECESSARY TO

PROVIDE A NON-EROSIVE FLOW VELOCITY FROM THE STRUCTURE TO THE WATER COURSE.

2. THE NPDES PERMIT REQUIRES THAT SEDIMENT AND EROSION CONTROLS BE INSPECTED ONCE EVERY 7 DAYS AND WITHIN 24 HOURS OF 0.5" OR GREATER RAINFALL. A WRITTEN LOG SHOULD INDICATE THE DATE OF INSPECTION NAME OF INSPECTOR, WEATHER CONDITIONS, OBSERVATIONS, ACTIONS TAKEN TO CORRECT ANY PROBLEMS AND THE DATE ACTION WAS TAKEN.

3. SOLID, SANITARY AND TOXIC WASTE MUST BE DISPOSED OF IN A PROPER MANNER IN ACCORDANCE WITH STATE, LOCAL AND

FEDERAL REGULATIONS.

4. TEMPORARY SEEDING TYPES-

A.) TALL FESCUE--SEED AT A RATE OF 50 LBS./ACRE (1 LB./100 SQ. FT.) AND MULCH WITH STRAW AT A RATE OF 2 TONS PER ACRE (90

LBS./1000 SQ. FT.). ESTABLISH BETWEEN MARCH 15 AND SEPTEMBER 30. COVER THE SEED 1/4-1/2 INCH BY RAKE OR SIMILAR TOOL.

THIS IS THE MOST WIDELY USED AND BEST ADAPTED GRASS FOR STREAMBANK SEEDINGS. IT HAS GOOD TOLERANCE TO WET SOILS

AND FLOODING. IT IS ALSO WELL ADAPTED TO WELL DRAINED SOILS.

B.) REED CANARYGRASS (PHALARIS ARUNDINACAE) PLUS TALL FESCUE--SEED THE REED CANARYGRASS AT A RATE OF 15LBS./ACRE (1/3 LB./1000 SQ. FT.), PLUS 10 LBS./ACRE (1/4LB./1000 SQ. FT.) OF TALL FESCUE. MULCH WITH STRAW AT A RATE OF 2 TONS/ACRE (90 LBS./1000 SQ. FT.). THIS MIXTURE SHOULD ONLY BE SEEDED FROM MARCH 1 TO MAY 15, OR AUGUST 1 TO SEPTEMBER 30. COVER THE SEED 1/4-1/2 INCH BY RAKING OR SIMILAR TOOL. THIS MIXTURE IS ADAPTABLE TO SOILS THAT ARE VERY WET AS WELL AS WELL DRAINED SOIL CONDITIONS. REED CANARYGRASS CAN WITHSTAND EXTENDED PERIODS OF FLOODING. IT IS EXCELLENT FOR EROSION CONTROL. REED CANARYGRASS CAN ALSO BE ESTABLISHED BY SOD STRIPS, USING RHIZIMES, OR FRESHLY CUT CULMS.

THE LOCAL CONSERVATION SERVICE OFFICE CAN PROVIDE THE SPECIFIC DETAILS REQUIRED TO USE ONE OF THE ALTERNATIVE

ESTABLISHMENT METHODS.

AutoCAD SHX Text 33974

AutoCAD SHX Text

SPALDING

AutoCAD SHX Text

JUSTIN

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text K

AutoCAD SHX Text K

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text N

C002

190107.000

VA HOSPITAL

KLEINGERS

GROUP

THE www.kleingers.comCIVIL ENGINEERING

SURVEYING

LANDSCAPE

ARCHITECTURE

Louisville, KY 40299 502.365.9950

1100 Envoy Circle

UTILITY NOTE:

CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION AND

VERIFICATION OF ALL UTILITIES UPON FEDERAL LAND PRIOR

TO ANY LAND DISTURBANCE ACTIVITY UTILITIES SHALL BE

MARKED AT ALL TIMES. IF LOCATION/VERIFICATION OF

UTLITIES UPON STATE OR PRIVATE PROPERTY BECOMES

NECESSARY, PLEASE NOTIFY THE KENTUCKY UTILITY

PROTECTION SERVICE AT 1-800-752-6007 BEFORE ANY

PERIOD OF EXCAVATION OR CONSTRUCTION ACTIVITY.

UNDERGROUND UTILITIES ARE PLOTTED FROM A

COMPILATION OF AVAILABLE RECORD INFORMATION AND

SURFACE INDICATIONS OF UNDERGROUND STRUCTURES

AND MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE

EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES

CANNOT BE VERIFIED.

VA Project No. 596-333 Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management 2250 LEESTOWN ROAD

LEXINGTON, KY 40511

FAYETTE COUNTY

Revisions Date

100% 02.12.2021CONSTRUCTION DOCUMENTS

100%

CONSTRUCTION

DOCUMENTS

02-12-2020 PW JS

204 & 205

1 04.08.2021ADDENDUM #1

C002

C002

MONOLITHIC CURB & SIDEWALK DETAIL

N.T.S.

C002

SIDEWALK DETAIL

N.T.S.

C002

SIDEWALK RAMP DETAIL

N.T.S.

C002

COMMERCIAL ENTRANCE DETAIL

N.T.S.

C002

EDGE KEY DETAIL

MIN. EDGE KEY DETAIL

N.T.S.

GENERAL DETAILS

N.T.S.

β

RETAINED SOIL

SEGMENTAL RETAINING WALL DETAIL

N.T.S.

NOTES:

1. SUBMIT SAMPLES OF WALL AND CAP UNITS FOR ARCHITECT'S APPROVAL.

2. CONSTRUCT FIELD MOCK-UP PRIOR TO INSTALLATION FOR ARCHITECT'S

APPROVAL AS SPECIFIED.

3. CONSTRUCT WALLS PER MANUFACTURER'S SPECIFICATIONS.

4. SEE SHEET C400 FOR WALL GRADES.

4:1 MAX.

12 in (300 mm)

FINISHED GRADE TOP ELEVATION SEGMENTAL BLOCK

WALL BATTER

FROM VERTICAL

SEGMENTAL

BLOCK UNIT

TOE ELEVATION

1/2" EXPANSION

JOINT MATERIAL

PROPOSED WALK

4" TOE DRAIN PIPE

VENTED TO DAYLIGHT

WELL-GRADED GRANULAR WALL

ROCK 0.25 in to 1.5 in

(5 mm to 38 mm)

LESS THAN 10% FINES

C002

HEAVY DUTY

ASPHALT PAVEMENT DETAIL

N.T.S.

1 1/2" ASPHALT CONCRETE SURFACE COURSE,

TYPE 1, PG64-22

TACK COAT, APPLY IF TIME BETWEEN ASPHALT

LIFTS EXCEEDS 30 DAYS

3" ASPHALT CONCRETE INTERMEDIATE COURSE,

TYPE 2, PG64-22

10" AGGREGATE BASE

PAVEMENT MATERIALS TO CONFORM TO KYTC

STANDARD SPECIFICATIONS.

SUBGRADE COMPACTION, REFER TO

GEOTECHNICAL REPORT N3195011 DATED

12-16-2020 & STANDARD SPECIFICATION 31 20 00.

1 2 3 4 5 6

LIGHT DUTY

ASPHALT PAVEMENT DETAIL

N.T.S.

1 1/2" ASPHALT CONCRETE SURFACE COURSE,

TYPE 1, PG64-22

TACK COAT, APPLY IF TIME BETWEEN ASPHALT

LIFTS EXCEEDS 30 DAYS

2 1/2" ASPHALT CONCRETE INTERMEDIATE COURSE,

TYPE 2, PG64-22

6" AGGREGATE BASE

SUBGRADE COMPACTION, REFER TO

GEOTECHNICAL REPORT N3195011 DATED

12-16-2020 & STANDARD SPECIFICATION 31 20 00.

1 2 3 4 5

C002

C002

POROUS ASPHALT PAVEMENT DETAIL

N.T.S.

3" POROUS ASPHALT CONCRETE SURFACE COURSE

2" CHOKER COURSE (1" STONE)

6" UNIFORMLY GRADED 2" STONE. AGGREGATE

WITH 40% VOID SPACE FOR STORMWATER

STORAGE AND RECHARGE

GEOTEXTILE FILTER FABRIC

SUBGRADE COMPACTION, REFER TO

GEOTECHNICAL REPORT N3195011 DATED

12-16-2020 & STANDARD SPECIFICATION 31 20 00.

1 52 3 4

C002

ASPHALT PAVING

BUTT JOINT DETAIL

N.T.S.

INTERMEDIATE COURSE

SURFACE COURSE

SURFACE OF

EXISTING PAVEMENT

"t"

"t" M

IN

"t" M

IN

2'

1/ 2"

REMOVE ACCORDING TO

ODOT ITEM 202 WEARING

COURSE REMOVED.

REPLACE WITH THE

PLAN-SPECIFIED SURFACE

COURSE ASPHALT ITEM

MIN LENGTH = 15' PER INCH OF "d"

FOR SPEEDS 50 MPH OR GREATER,

USE 35' PER INCH OF "d"

"t"

"d

PERMISSIBLE REMOVAL

AND REPLACEMENT

ASPHALT CEMENT COATING

FOR PERMISSIBLE REMOVAL

AND REPLACEMENT

ASPHALT CEMENT COATING

WHEN PERMISSIBLE REMOVAL

AND REPLACEMENT IS NOT

APPLICABLE

HEAVY DUTY

CONCRETE PAVEMENT DETAIL

N.T.S.

6X6 W4XW4 WELDED WIRE REINFORCEMENT

6" NONREINFORCED PORTLAND CEMENT

CONCRETE PAVEMENT

8" AGGREGATE BASE

SUBGRADE COMPACTION, REFER TO

GEOTECHNICAL REPORT N3195011 DATED

12-16-2020 & STANDARD SPECIFICATION 31 20 00.

1 2 3

2"

ACCESSIBLE PARKING SIGN DETAIL

NTS

RESERVED

PARKING

RESERVED

PARKING

$250 FINE

MINIMUM

$250 FINE

MINIMUM

VAN

ACCESSIBLE

80" MIN80" MIN

GENERAL NOTES:

1. U-TYPE FLANGED STEEL SIGN POST SET

IN EARTH IF OUTSIDE PAVEMENT EDGE,

OR IN CONCRETE TO A MINIMUM DEPTH

OF 3'-0" IF WITHIN PAVEMENT.

R7-8 NOTES:

1. 12"X18"X16 GA. STEEL SIGN

2. GREEN LETTERING, BORDER, AND

ARROW WITH WHITE BACKGROUND.

WHITE HANDICAP SYMBOL IN BLUE BOX.

R7-8P NOTES:

1. 12"X6"X16 GA. STEEL SIGN

2. GREEN LETTERING AND BORDER WITH

WHITE BACKGROUND.

R7-H8bP NOTES:

1. 12"X6"X16 GA. STEEL SIGN.

2. GREEN LETTERING AND BORDER WITH

WHITE BACKGROUND.

NOTE:

1. ONE ACCESSIBLE PARKING SPACE FOR EVERY SIX OR FRACTION THERE OF SHALL BE

DESIGNATED AS "VAN ACCESSIBLE". LOCATION AS NOTED ON THE DRAWINGS.

2. ONE SIGN TO BE INSTALLED AT EACH ACCESSIBLE PARKING SPACE

C002

C002

C002

GENERATOR

CONCRETE PAD DETAIL

N.T.S.

6X6 W4XW4 WELDED WIRE REINFORCEMENT

8" NONREINFORCED PORTLAND CEMENT

CONCRETE PAVEMENT

8" AGGREGATE BASE

SUBGRADE COMPACTION, REFER TO

GEOTECHNICAL REPORT N3195011 DATED

12-16-2020 & STANDARD SPECIFICATION 31 20 00.

1 2 3

2"

" C

O N

C R

ET

E

TU

R

N D

O W

N

AL

O N

G

PE

R

IM

ET

ER

C002

PIPE BOLLARD DETAIL

N.T.S.

18" DIA.

CONC. BASE

FINISH GRADE

SEAL JOINT - TOTAL PERIMETER

SLOPE AWAY FOR PROPER DRAINAGE

6" DIA. GALV. STEEL PIPE -

FILL WITH CONCRETE -

CONC. TO BE 4000PSI WITH 4-5%

AIR ENTRAINMENT - PAINT SAFETY YELLOW

ROUND OFF CONC. TOP

TO SMOOTH FINISH

C002

RUBBER WHEEL STOP DETAIL

N.T.S.

PLAN VIEW

SECTION A-A

ASPHALT PAVEMENT

5"

7"

20 1/2" EMBEDMENT

9' STALL (TYP)

6'-0" 3'-0" E/P

7" 2'-0"

A

A

1"x6" SOCKET

FOR DOWELS

DRAINAGE SLOTS

2 - #4 REBAR (TYP)

3/4"X24" DOWEL

2 ANCHORS

3/4"X24" DOWEL

C002

NTS

DECORATIVE BLACK WROUGHT IRON FENCE

POST AT 8'-0" O.C. MAX

4' T

AL

L

BL

AC

K

AL

U M

IN

U

M F

EN

C

IN

G

C002

8"

NOTE:

1) ALUMINUM FENCING SHALL

HAVE BLACK WROUGHT IRON

APPEARANCE.

AutoCAD SHX Text 33974

AutoCAD SHX Text

SPALDING

AutoCAD SHX Text

JUSTIN

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text K

AutoCAD SHX Text K

AutoCAD SHX Text C

AutoCAD SHX Text U

FF=919.1

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.5

FF=919.5

FF=919.5

FF=919.5

FF=919.6

FF=919.5

FF=919.6

BLDG. UNDER

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

G

32"

36"

40"38"

34"

51"

25" 25" 18"14" 14" 14" 24"17"

48"

19"

9" 20"

28"

13"

30"

20" 26" 20"

18"18" 24" 30" 24"

18"

FF=902.2

BLDG. 52

UTILITY STUB UP

GAS LINE STUB UP

UTILITY STUB UP

W

AT

ER

LE

VE

L

EL

=9

.0'

SANITARY STUB UP

PE

R

PH

AS

E I P

LA

NS

PB

PB

E

PER PHASE I PLANS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

SECURITY CAMERA POLE

WWW

W

W

W

VIP VIP

W

CDF

CDF W

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

PER PHASE I P

LANS

PER PHASE I PLANS

FORCE MAIN

PER PHASE I PLANS

FORCE MAIN

CONSTRUCTION

CHAIN LINK

CO

S

CO

CO

S

S

S

CONTROL POINT #4

IRON PIN

N=57,933.29 E=56,509.14

CONTROL POINT #1

IRON PIN

N=57,759.49 E=56,581.64

CONTROL POINT #2

IRON PIN

N=57,781.05 E=56,894.67

CONTROL POINT #3

IRON PIN

N=57,613.18 E=57,069.08

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=922.68

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=916.34

BLOCK

CONC.

CONC.

CONC.

CONC.

CHAIN LINK

CONC.

BLDG. UNDER

CONSTRUCTION

CONDUIT STUB UP

50'

STR

EAM BUFF

ER

' S

TR

EA

M

BU

FF

ER

50'

STREAM BUFFER

MH

TOP =

916.73

INV = 909.52

MH

TOP =

914.11

INV =

903.83

8" PV

C

MH

TOP =

903.63

INV = 899.35

10" PVC (PER

RECORD)

10"

PVC (P

ER

RECORD)

MH

TOP =

925.80

CO

TOP =

918.93

CO

TOP =

918.54

CO

TOP =

917.02

CB

TOP = 917.38

INV (NW) =

914.20

CB

TOP = 918.23

INV (SE) =

913.67

INV (NW) =

913.13

12" CMP (PER

RECORD)

CB

TOP = 917.99

INV (NW) =

917.47

CB

TOP = 918.81

INV (SE) =

912.79

INV (N) = 912.69

12" CMP (PERRECORD)

CB

TOP = 914.90

INV (NW) =

910.75

12"CMP

12"

CMP

12"

CMP

INV =

912.35

INV =

909.93

INV =

910.10

CB

TOP = 904.26

INV (NW) =

899.24

INV(SE) = 899.15

INV(SE) = 901.99

INV(SE) = 903.01

18"CONC

INV =

899.14

30"

CONC

INV =

885.28

INV =

885.31

12"

CLAY

INV =

895.04

' S

TR

EAM B

UFF

ER

NO A

CTIV

ITY

/D

IS

TU

RBANCE

W

ITH

IN

TH

IS

A

REA

CO

WS

AS

C

ON

ST

RU

CT

ED

P

ER

V

A

AS

CONST

RUCTE

D PE

R VA

0 91

90588

89889

90490

C100

190107.000

VA HOSPITAL

KLEINGERS

GROUP

THE www.kleingers.comCIVIL ENGINEERING

SURVEYING

LANDSCAPE

ARCHITECTURE

Louisville, KY 40299 502.365.9950

1100 Envoy Circle

0 6015 30

UTILITY NOTE:

CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION AND

VERIFICATION OF ALL UTILITIES UPON FEDERAL LAND PRIOR

TO ANY LAND DISTURBANCE ACTIVITY UTILITIES SHALL BE

MARKED AT ALL TIMES. IF LOCATION/VERIFICATION OF

UTLITIES UPON STATE OR PRIVATE PROPERTY BECOMES

NECESSARY, PLEASE NOTIFY THE KENTUCKY UTILITY

PROTECTION SERVICE AT 1-800-752-6007 BEFORE ANY

PERIOD OF EXCAVATION OR CONSTRUCTION ACTIVITY.

UNDERGROUND UTILITIES ARE PLOTTED FROM A

COMPILATION OF AVAILABLE RECORD INFORMATION AND

SURFACE INDICATIONS OF UNDERGROUND STRUCTURES

AND MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE

EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES

CANNOT BE VERIFIED.

VA Project No. 596-333 Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management 2250 LEESTOWN ROAD

LEXINGTON, KY 40511

FAYETTE COUNTY

Revisions Date

100% 02.12.2021CONSTRUCTION DOCUMENTS

100%

CONSTRUCTION

DOCUMENTS

02-12-2020 PW JS

204 & 205

1 04.08.2021ADDENDUM #1

LEGEND:

IRON PIN FOUND (1/2" UNLESS OTHERWISE NOTED)

1/2" IRON PIN SET

MAG NAIL SET

BOX CUT SET

SANITARY MANHOLE

CLEANOUT

DOWNSPOUT

CATCH BASIN

SIGN

GUARD POST

MAILBOX

GAS VALVE

GAS SERVICE

AC UNIT

ELECTRIC METER

ELECTRIC BOX

TRANSFORMER

UTILITY POLE

GUY WIRE

WATER METER

WATER VALVE

FIRE DEPARTMENT CONNECTION

WATER SPIGOT

FIRE HYDRANT

DECIDUOUS TREE

TREE LINE

FENCE LINE

OVERHEAD UTILITIES

UNDERGROUND ELECTRIC

UNDERGROUND GAS

SANITARY SEWER

STORM SEWER

ASPHALT

CONCRETE

GRAVEL

LANDSCAPED AREA

RIPRAP

S

CO

GP

MB

G

GS

AC

E

E

W

W

CDF

SP

OU

UE

G

X

EXISTING

CONDITIONS

NOTES:

1. SURVEY WAS PREPARED BY OTHERS. ANY QUESTIONS REGARDING CONTROL

POINTS, ACCURACY, OR OTHER ISSUES SHOULD BE DIRECTED TO XXXX.

AutoCAD SHX Text

EH

AutoCAD SHX Text 33974

AutoCAD SHX Text

SPALDING

AutoCAD SHX Text

JUSTIN

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text K

AutoCAD SHX Text K

AutoCAD SHX Text C

AutoCAD SHX Text U

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.5

FF=919.5

FF=919.5

FF=919.5

FF=919.6

FF=919.5

FF=919.6

BLDG. UNDER

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

G

32"

36"

40"38"

34"

51"

25" 25" 18"14" 14" 14" 24"17"

48"

19"

9" 20"

28"

13"

30"

20" 26" 20"

18"18" 24"

18"

FF=902.2

BLDG. 52

GAS LINE STUB UP

UTILITY STUB UP

W

AT

ER

LE

VE

L

EL

=9

.0'

SANITARY STUB UP

PE

R

PH

AS

E I P

LA

NS

PB

PB

E

PER PHASE I PLANS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

SECURITY CAMERA POLE

WWW

W

W

W

VIP VIP

W

CDF

CDF W

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

PER PHASE I P

LANS

PER PHASE I PLANS

FORCE MAIN

PER PHASE I PLANS

FORCE MAIN

CO

S

CO

CO

S

S

S

CONTROL POINT #4

IRON PIN

N=57,933.29 E=56,509.14

CONTROL POINT #1

IRON PIN

N=57,759.49 E=56,581.64

CONTROL POINT #2

IRON PIN

N=57,781.05 E=56,894.67

CONTROL POINT #3

IRON PIN

N=57,613.18 E=57,069.08

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=922.68

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=916.34

BLOCK

CONC.

CONC.

CONC.

CONC.

CONC.

BLDG. UNDER

CONSTRUCTION

CONDUIT STUB UP

50'

STR

EAM BUFF

ER

' S

TR

EA

M

BU

FF

ER

50'

STREAM BUFFER

MH

TOP =

916.73

INV = 909.52

MH

TOP =

914.11

INV =

903.83

8" PV

C

MH

TOP =

903.63

INV = 899.35

10" PVC (PER

RECORD)

10"

PVC (P

ER

RECORD)

MH

TOP =

925.80

CO

TOP =

918.93

CO

TOP =

918.54

CO

TOP =

917.02

CB

TOP = 917.38

INV (NW) =

914.20

CB

TOP = 918.23

INV (SE) =

913.67

INV (NW) =

913.13

12" CMP (PER

RECORD)

CB

TOP = 917.99

INV (NW) =

917.47

CB

TOP = 918.81

INV (SE) =

912.79

INV (N) = 912.69

12" CMP (PERRECORD)

CB

TOP = 914.90

INV (NW) =

910.75

12"CMP

12"

CMP

12"

CMP

INV =

912.35

INV =

909.93

INV =

910.10

CB

TOP = 904.26

INV (NW) =

899.24

INV(SE) = 899.15

INV(SE) = 901.99

INV(SE) = 903.01

18"CONC

INV =

899.14

30"

CONC

INV =

885.28

INV =

885.31

12"

CLAY

INV =

895.04

' S

TR

EAM B

UFF

ER

NO A

CTIV

ITY

/D

IS

TU

RBANCE

W

ITH

IN

TH

IS

A

REA

CO

WS

AS

C

ON

ST

RU

CT

ED

P

ER

V

A

AS

CONST

RUCTE

D PE

R VA

C200

190107.000

VA HOSPITAL

KLEINGERS

GROUP

THE www.kleingers.comCIVIL ENGINEERING

SURVEYING

LANDSCAPE

ARCHITECTURE

Louisville, KY 40299 502.365.9950

1100 Envoy Circle

0 6015 30

UTILITY NOTE:

CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION AND

VERIFICATION OF ALL UTILITIES UPON FEDERAL LAND PRIOR

TO ANY LAND DISTURBANCE ACTIVITY UTILITIES SHALL BE

MARKED AT ALL TIMES. IF LOCATION/VERIFICATION OF

UTLITIES UPON STATE OR PRIVATE PROPERTY BECOMES

NECESSARY, PLEASE NOTIFY THE KENTUCKY UTILITY

PROTECTION SERVICE AT 1-800-752-6007 BEFORE ANY

PERIOD OF EXCAVATION OR CONSTRUCTION ACTIVITY.

UNDERGROUND UTILITIES ARE PLOTTED FROM A

COMPILATION OF AVAILABLE RECORD INFORMATION AND

SURFACE INDICATIONS OF UNDERGROUND STRUCTURES

AND MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE

EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES

CANNOT BE VERIFIED.

VA Project No. 596-333 Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management 2250 LEESTOWN ROAD

LEXINGTON, KY 40511

FAYETTE COUNTY

Revisions Date

100% 02.12.2021CONSTRUCTION DOCUMENTS

100%

CONSTRUCTION

DOCUMENTS

02-12-2020 PW JS

204 & 205

1 04.08.2021ADDENDUM #1

DEMOLITION PLAN

DEMOLITION PLAN KEY NOTES

REMOVE EXISTING TREE.

EXISTING HEADWALL TO BE RELOCATED

EXISTING OUTLET STRUCTURE TO REMAIN

EXISTING DETENTION POND TO REMAIN. SEE SHEET C400 FOR

MODIFICATIONS

CONTRACTOR TO MARK AND VERIFY PRECISE LOCATION OF FORCE

MAIN(S) PRIOR TO CONSTRUCTION AND REPORT ANY

DISCREPANCIES TO ENGINEER. ANY NECESSARY RELOCATION OF

FORCE MAIN TO BE COORDINATED WITH PROPER AGENCIES,

OWNER, AND ENGINEER.

ELECTRICAL SERVICE TO PHASE I CURRENTLY UNDER

CONSTRUCTION. CONTRACTOR TO FIELD VERIFY LOCATION OF

ELECTRICAL SERVICE PRIOR TO CONSTRUCTION AND COORDINATE

WITH ENGINEER.

PHASE I IS CURRENTLY UNDER CONSTRUCTION. PHASE I EDGE OF

PAVEMENT IS SHOWN APPROXIMATELY. EDGE OF PAVEMENT

SHALL BE REMOVED AS NECESSARY TO CONSTRUCT PHASE II. SEE

NOTE 7 BELOW.

EXISTING SANITARY SEWER TO BE RELOCATED. SEE SHEET C500

EXISTING STORM TO BE REMOVED. SEE SHEET C600.

CONTRACTOR TO REMOVE AND ADJUST TEMPORARY

CONSTRUCTION FENCING AS NECESSARY.

CONTRACTOR TO REMOVE AND ADJUST EXISTING SILT FENCE AS

NECESSARY.

CONTRACTOR TO VERIFY EXISTING STORM SEWER AND INLETS

WERE CONSTRUCTED AS PART OF PHASE I. REPORT INVERT AND

RIM ELEVATIONS TO ENGINEER PRIOR TO BEGINNING

CONSTRUCTION.

6"

DEMOLITION KEY

EXISTING TREE TO REMAIN

SAWCUT PAVEMENT/CONCRETE EDGE.

WHERE PROPOSED ASPHALT

PAVEMENT IS TO MATCH EX. ASPHALT

PAVEMENT, SAWCUT CRACKED OR

DAMAGED EX. PAVEMENT IN NEAT,

STRAIGHT LINES TO CREATE A CLEAN

BUTT JOINT AND REMOVE DAMAGED

PAVEMENT. COAT EDGE OF EX.

PAVEMENT WITH ASPHALT PRIOR TO

PLACING AND COVER JOINT WITH

SEALANT.

REMOVE EXISTING ASPHALT

10" EXISTING TREE TO BE REMOVED

DEMOLITION GENERAL NOTES:

1. CONTRACTOR IS TO REMOVE ALL ABANDONED UTILITIES AND

BACKFILL/COMPACT EXCAVATION.

2. CONTRACTOR SHALL ARRANGE FOR A SURVEYOR TO STAKE

NEW SERVICE LOCATIONS FOR LG&E.

3. CONTRACTOR SHALL COORDINATE ALL NECESSARY UTILITY

VACATIONS AND CONNECTIONS WITH ALL ASSOCIATED

UTILITY COMPANIES.

4. CONTRACTOR TO COORDINATE ANY WORK WITHIN

RIGHT-OF-WAY WITH KYTC AND FAYETTE COUNTY.

5. CONTRACTOR TO REMOVE, CAP, AND PLUG ALL EXISTING

RESIDENTIAL/COMMERCIAL BUILDING UTILITY SERVICES AS

NECESSARY. REPORT ANY DISCREPANCIES TO ENGINEER.

6. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES PRIOR TO

COMMENCING DEMOLITION AND EXCAVATION ACTIVITY.

7. PHASE I IS CURRENTLY UNDER CONSTRUCTION.

SURVEY WAS COLLECTED PRIOR TO COMPLETION OF

PHASE I UPON VA'S REQUEST. LIMITS OF PHASE I

PAVEMENT AND CONCRETE ARE APPROXIMATE AND

SHALL BE VERIFIED IN THE FIELD BY CONTRACTOR

PRIOR TO CONSTRUCTION.

REMOVE EXISTING SIDEWALK

REMOVE EXISTING LANDSCAPING

EXISTING CURB TO BE REMOVED

EXISTING CURB TO REMAIN

PHASE I CURRENTLY UNDER

CONSTRUCTION. SEE NOTE 7

THIS SHEET

REMOVE EXISTING GRAVEL

AutoCAD SHX Text

EH

AutoCAD SHX Text 33974

AutoCAD SHX Text

SPALDING

AutoCAD SHX Text

JUSTIN

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text K

AutoCAD SHX Text K

AutoCAD SHX Text C

AutoCAD SHX Text U

5 91091091

4 90 6 90

8 909909

9 91

FF=919.1

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.5

FF=919.5

FF=919.5

FF=919.5

FF=919.6

FF=919.5

FF=919.6

BLDG. UNDER

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

G

32"

36"

38"

34"

51"

24"17"

48"

19"

9" 20"

20"

28"

13"

30"

20" 26" 20"

18"18" 24" 30" 24"

18"

FF=902.2

BLDG. 52

UTILITY STUB UP

GAS LINE STUB UP

UTILITY STUB UP

W

AT

ER

LE

VE

L

EL

=9

.0'

SANITARY STUB UP

PE

R

PH

AS

E I P

LA

NS

PB

PB

E

PER PHASE I PLANS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

SECURITY CAMERA POLE

WWW

W

W

W

VIP VIP

W

CDF

CDF W

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

PER PHASE I P

LANS

PER PHASE I PLANS

FORCE MAIN

PER PHASE I PLANS

FORCE MAIN

CONSTRUCTION

CHAIN LINK

CO

S

CO

CO

S

S

S

CONTROL POINT #4

IRON PIN

N=57,933.29 E=56,509.14

CONTROL POINT #1

IRON PIN

N=57,759.49 E=56,581.64

CONTROL POINT #2

IRON PIN

N=57,781.05 E=56,894.67

CONTROL POINT #3

IRON PIN

N=57,613.18 E=57,069.08

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=922.68

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=916.34

BLOCK

CONC.

CONC.

CONC.

CHAIN LINK

CONC.

BLDG. UNDER

CONSTRUCTION

CONDUIT STUB UP

50'

STR

EAM BUFF

ER

' S

TR

EA

M

BU

FF

ER

50'

STREAM BUFFER

MH

TOP =

916.73

INV = 909.52

MH

TOP =

914.11

INV =

903.83

8" PV

C

MH

TOP =

903.63

INV = 899.35

10"

PVC (P

ER

RECORD)

MH

TOP =

925.80

CO

TOP =

918.93

CO

TOP =

918.54

CO

TOP =

917.02

CB

TOP = 917.38

INV (NW) =

914.20

CB

TOP = 918.23

INV (SE) =

913.67

INV (NW) =

913.13

12" CMP (PER

RECORD)

CB

TOP = 917.99

INV (NW) =

917.47

CB

TOP = 918.81

INV (SE) =

912.79

INV (N) = 912.69

12" CMP (PERRECORD)

CB

TOP = 914.90

INV (NW) =

910.75

12"CMP

12"

CMP

12"

CMP

INV =

909.93

INV =

910.10

CB

TOP = 904.26

INV (NW) =

899.24

INV(SE) = 899.15

INV(SE) = 901.99

INV(SE) = 903.01

18"CONC

INV =

899.14

30"

CONC

INV =

885.28

INV =

885.31

12"

CLAY

INV =

895.04

' S

TR

EAM B

UFF

ER

NO A

CTIV

ITY

/D

IS

TU

RBANCE

W

ITH

IN

TH

IS

A

REA

CO

WS

AS

C

ON

ST

RU

CT

ED

P

ER

V

A

AS

CONST

RUCTE

D PE

R VA

FF=919.1

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.5

FF=919.5

FF=919.5

FF=919.5

FF=919.6

FF=919.5

FF=919.6

BLDG. UNDER

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

G

32"

36"

38"

34"

51"

24"17"

48"

19"

9" 20"

20"

28"

13"

30"

20" 26" 20"

18"18" 24" 30" 24"

18"

FF=902.2

BLDG. 52

UTILITY STUB UP

GAS LINE STUB UP

UTILITY STUB UP

W

AT

ER

LE

VE

L

EL

=9

.0'

SANITARY STUB UP

PE

R

PH

AS

E I P

LA

NS

PB

PB

E

PER PHASE I PLANS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

SECURITY CAMERA POLE

WWW

W

W

W

VIP VIP

W

CDF

CDF W

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

PER PHASE I P

LANS

PER PHASE I PLANS

FORCE MAIN

PER PHASE I PLANS

FORCE MAIN

CONSTRUCTION

CHAIN LINK

CO

S

CO

CO

S

S

S

CONTROL POINT #4

IRON PIN

N=57,933.29 E=56,509.14

CONTROL POINT #1

IRON PIN

N=57,759.49 E=56,581.64

CONTROL POINT #2

IRON PIN

N=57,781.05 E=56,894.67

CONTROL POINT #3

IRON PIN

N=57,613.18 E=57,069.08

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=922.68

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=916.34

BLOCK

CONC.

CONC.

CONC.

CHAIN LINK

CONC.

BLDG. UNDER

CONSTRUCTION

CONDUIT STUB UP

50'

STR

EAM BUFF

ER

' S

TR

EA

M

BU

FF

ER

50'

STREAM BUFFER

MH

TOP =

916.73

INV = 909.52

MH

TOP =

914.11

INV =

903.83

8" PV

C

MH

TOP =

903.63

INV = 899.35

10"

PVC (P

ER

RECORD)

MH

TOP =

925.80

CO

TOP =

918.93

CO

TOP =

918.54

CO

TOP =

917.02

CB

TOP = 917.38

INV (NW) =

914.20

CB

TOP = 918.23

INV (SE) =

913.67

INV (NW) =

913.13

12" CMP (PER

RECORD)

CB

TOP = 917.99

INV (NW) =

917.47

CB

TOP = 918.81

INV (SE) =

912.79

INV (N) = 912.69

12" CMP (PERRECORD)

CB

TOP = 914.90

INV (NW) =

910.75

12"CMP

12"

CMP

12"

CMP

INV =

909.93

INV =

910.10

CB

TOP = 904.26

INV (NW) =

899.24

INV(SE) = 899.15

INV(SE) = 901.99

INV(SE) = 903.01

18"CONC

INV =

899.14

30"

CONC

INV =

885.28

INV =

885.31

12"

CLAY

INV =

895.04

' S

TR

EAM B

UFF

ER

NO A

CTIV

ITY

/D

IS

TU

RBANCE

W

ITH

IN

TH

IS

A

REA

CO

WS

AS

C

ON

ST

RU

CT

ED

P

ER

V

A

AS

CONST

RUCTE

D PE

R VA

CO

CO

S

W

W

W

UE UE

UE

UE

UE

EO

UE UE UE

UE

G G

G G

G G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

UU

U

U U

U

UU UU

UU UU

UU

UU

UU

UU UU

U U

UU

COCO

CO

CO

CO

CO

CO

CO CO

CO

CO

CO

CO

CO CO

CO

CO

CO

CO CO

CO

AC

AC

AC

EX. PHASE I

CONSTRUCTION TRAILER

GEN

UEUEUEU

E

E

X

X

CO

PI

V

X

X

FD

FD

8B

7B

6B

5B

ST

AI

R

9B

0B

1B

2B

3B

4B

0A

0D

0C

0B

4B

3B

2B

1B

0B

0C

0D 10

0A

8B

0B

9B

8B

7B

6B

5B

D ow n

D ow n

Bu ild in g

Bu ild in g

PROPOSED BUILDING

F.F.E. 918.50

BUILDING 204 & 205

TOTAL 18,764 SQ. FT

PR. PHASE II

CONSTRUCTION TRAILER

W

W

W

G

Y H

D

W V

PI

V

W

W

S

S

2 90

3 90 4 90

7 90

8 90

916.89 917.39

918.50

918.24

917.81

918.50

917.71

917.27 917.08

918.12 917.99

917.77

917.13

917.18

917.41

917.70

916.66

916.37

916.50

916.67916.41916.15

916.31 916.81

916.74916.31

915.51914.99 914.89

916.79

918.34

918.24

917.76

918.15

918.02

904.85

904.85

918.86 918.48

897.83

896.82 897.94

899.19

900.03

901.55 901.78

902.48

903.35

899.86

898.83 898.82

898.86

901.05

916.47

904.85 WB

904.73 WB

904.61 WB

904.65 WT

908.75 WT

911.24 WT

914.79 913.83

911.80911.42

913.36

913.36

912.63

908.58

910 91

898 899

902 903 904

HW200

OS201

917.08

C400

190107.000

VA HOSPITAL

KLEINGERS

GROUP

THE www.kleingers.comCIVIL ENGINEERING

SURVEYING

LANDSCAPE

ARCHITECTURE

Louisville, KY 40299 502.365.9950

1100 Envoy Circle

0 6015 30

UTILITY NOTE:

CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION AND

VERIFICATION OF ALL UTILITIES UPON FEDERAL LAND PRIOR

TO ANY LAND DISTURBANCE ACTIVITY UTILITIES SHALL BE

MARKED AT ALL TIMES. IF LOCATION/VERIFICATION OF

UTLITIES UPON STATE OR PRIVATE PROPERTY BECOMES

NECESSARY, PLEASE NOTIFY THE KENTUCKY UTILITY

PROTECTION SERVICE AT 1-800-752-6007 BEFORE ANY

PERIOD OF EXCAVATION OR CONSTRUCTION ACTIVITY.

UNDERGROUND UTILITIES ARE PLOTTED FROM A

COMPILATION OF AVAILABLE RECORD INFORMATION AND

SURFACE INDICATIONS OF UNDERGROUND STRUCTURES

AND MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE

EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES

CANNOT BE VERIFIED.

VA Project No. 596-333 Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management 2250 LEESTOWN ROAD

LEXINGTON, KY 40511

FAYETTE COUNTY

Revisions Date

100% 02.12.2021CONSTRUCTION DOCUMENTS

100%

CONSTRUCTION

DOCUMENTS

02-12-2020 PW JS

204 & 205

1 04.08.2021ADDENDUM #1

GRADING PLAN

PROPOSED CONTOURS

PROPOSED BACK OF CURB &

EDGE OF PAVEMENT SPOT ELEVATION

EXISTING LEGEND

EXISTING CONTOURS

PROPOSED LEGEND

PROPOSED TOP ELEVATION AT WALL

PROPOSED GROUND ELEVATION AT WALL

PROPOSED SPOT ELEVATION

EXISTING SPOT ELEVATION

MATCH EXISTING

GRADING NOTES

1. EXISTING UTILITIES TO BE PROTECTED DURING EARTHWORK

OPERATIONS.

2. ALL SPOT ELEVATIONS ARE TO FINISHED PAVEMENT

ELEVATIONS UNLESS OTHERWISE NOTED.

3.NO EXCAVATION ACTIVITIES TO BE PERFORMED OVER TOP OF

EXISTING FORCE MAIN BESIDES PLACING FILL MATERIAL.

CONST. BIO-SWALE

FLAT BOTTOM WIDTH = 2'

SEE DETAIL 9, SHEET C003

CONST. BERM TO ALLOW

PONDING WITHIN BIO-SWALE

CONST. BERM TO ALLOW

PONDING WITHIN BIO-SWALE

CONST. BIO-SWALE

FLAT BOTTOM WIDTH = 5'

SEE DETAIL 9, SHEET C003

PR. RETAINING WALL

SEE DETAIL 7, SHEET C002

SIDEWALK NOTES

1. SIDEWALK TO MEET ALL ADA AND VA STANDARDS FOR

PEDESTRIAN SAFETY.

2.SIDEWALKS SHALL NOT EXCEED 5.0% LONGITUDINAL SLOPE

AND 2.0% CROSS SLOPE

3.IF NECESSARY SIDEWALK RAMPS SHALL NOT EXCEED 8.33%

LONGITUDINAL SLOPE, 2.0% CROSS SLOPE.

LIMIT GRADING ACTIVITIES OVER EXISTING UTILITIES IN TO

PLACEMENT OF FILL MATERIAL ONLY.

NO CUTTING/EXCAVATION SHALL TAKE PLACE OVER EXISTING

FORCEMAINS AND UNDERGROUND ELECTRIC

TIE IN GRADES WITHIN PHASE I

PARKING LOT ARE SHOWN PER

PHASE I DESIGN. CONTRACTOR

TO VERIFY PHASE I FINISH

GRADE ELEVATIONS AT TIE IN

LOCATIONS PRIOR TO

BEGINNING CONSTRUCTION.

REPORT ANY DISCREPANCIES

TO ENGINEER.

AutoCAD SHX Text

EH

AutoCAD SHX Text

EH

AutoCAD SHX Text 33974

AutoCAD SHX Text

SPALDING

AutoCAD SHX Text

JUSTIN

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text K

AutoCAD SHX Text K

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BC=903.25

AutoCAD SHX Text

EP=902.75

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TW=904.50

AutoCAD SHX Text

BW=898.25

AutoCAD SHX Text 905.75

AutoCAD SHX Text 902.50

905.75 M.E.

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.5

FF=919.5

FF=919.5

FF=919.5

FF=919.6

FF=919.5

FF=919.6

BLDG. UNDER

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

G

32"

36"

38"

34"

51"

24"17"

48"

19"

9" 20"

20"

28"

13"

30"

20" 26" 20"

18"18" 24" 30" 24"

18"

FF=902.2

BLDG. 52

UTILITY STUB UP

GAS LINE STUB UP

UTILITY STUB UP

W

AT

ER

LE

VE

L

EL

=9

.0'

SANITARY STUB UP

PE

R

PH

AS

E I P

LA

NS

PB

PB

E

PER PHASE I PLANS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

SECURITY CAMERA POLE

WWW

W

W

W

VIP VIP

W

CDF

CDF W

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

PER PHASE I P

LANS

PER PHASE I PLANS

FORCE MAIN

PER PHASE I PLANS

FORCE MAIN

CONSTRUCTION

CHAIN LINK

CO

S

CO

CO

S

S

S

CONTROL POINT #4

IRON PIN

N=57,933.29 E=56,509.14

CONTROL POINT #1

IRON PIN

N=57,759.49 E=56,581.64

CONTROL POINT #2

IRON PIN

N=57,781.05 E=56,894.67

CONTROL POINT #3

IRON PIN

N=57,613.18 E=57,069.08

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=922.68

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=916.34

BLOCK

CONC.

CONC.

CONC.

CHAIN LINK

CONC.

BLDG. UNDER

CONSTRUCTION

CONDUIT STUB UP

50'

STR

EAM BUFF

ER

' S

TR

EA

M

BU

FF

ER

50'

STREAM BUFFER

MH

TOP =

916.73

INV = 909.52

MH

TOP =

914.11

INV =

903.83

8" PV

C

MH

TOP =

903.63

INV = 899.35

10"

PVC (P

ER

RECORD)

MH

TOP =

925.80

CO

TOP =

918.93

CO

TOP =

918.54

CO

TOP =

917.02

CB

TOP = 917.38

INV (NW) =

914.20

CB

TOP = 918.23

INV (SE) =

913.67

INV (NW) =

913.13

12" CMP (PER

RECORD)

CB

TOP = 917.99

INV (NW) =

917.47

CB

TOP = 918.81

INV (SE) =

912.79

INV (N) = 912.69

12" CMP (PERRECORD)

CB

TOP = 914.90

INV (NW) =

910.75

12"CMP

12"

CMP

12"

CMP

INV =

909.93

INV =

910.10

CB

TOP = 904.26

INV (NW) =

899.24

INV(SE) = 899.15

INV(SE) = 901.99

INV(SE) = 903.01

18"CONC

INV =

899.14

30"

CONC

INV =

885.28

INV =

885.31

12"

CLAY

INV =

895.04

' S

TR

EAM B

UFF

ER

NO A

CTIV

ITY

/D

IS

TU

RBANCE

W

ITH

IN

TH

IS

A

REA

CO

WS

AS

C

ON

ST

RU

CT

ED

P

ER

V

A

AS

CONST

RUCTE

D PE

R VA

FF=919.1

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.5

FF=919.5

FF=919.5

FF=919.5

FF=919.6

FF=919.5

FF=919.6

BLDG. UNDER

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

G

32"

36"

38"

34"

51"

24"17"

48"

19"

9" 20"

20"

28"

13"

30"

20" 26" 20"

18"18" 24" 30" 24"

18"

FF=902.2

BLDG. 52

UTILITY STUB UP

GAS LINE STUB UP

UTILITY STUB UP

W

AT

ER

LE

VE

L

EL

=9

.0'

SANITARY STUB UP

PE

R

PH

AS

E I P

LA

NS

PB

PB

E

PER PHASE I PLANS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

SECURITY CAMERA POLE

WWW

W

W

W

VIP VIP

W

CDF

CDF W

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

PER PHASE I P

LANS

PER PHASE I PLANS

FORCE MAIN

PER PHASE I PLANS

FORCE MAIN

CONSTRUCTION

CHAIN LINK

CO

S

CO

CO

S

S

S

CONTROL POINT #4

IRON PIN

N=57,933.29 E=56,509.14

CONTROL POINT #1

IRON PIN

N=57,759.49 E=56,581.64

CONTROL POINT #2

IRON PIN

N=57,781.05 E=56,894.67

CONTROL POINT #3

IRON PIN

N=57,613.18 E=57,069.08

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=922.68

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=916.34

BLOCK

CONC.

CONC.

CONC.

CHAIN LINK

CONC.

BLDG. UNDER

CONSTRUCTION

CONDUIT STUB UP

50'

STR

EAM BUFF

ER

' S

TR

EA

M

BU

FF

ER

50'

STREAM BUFFER

MH

TOP =

916.73

INV = 909.52

MH

TOP =

914.11

INV =

903.83

8" PV

C

MH

TOP =

903.63

INV = 899.35

10"

PVC (P

ER

RECORD)

MH

TOP =

925.80

CO

TOP =

918.93

CO

TOP =

918.54

CO

TOP =

917.02

CB

TOP = 917.38

INV (NW) =

914.20

CB

TOP = 918.23

INV (SE) =

913.67

INV (NW) =

913.13

12" CMP (PER

RECORD)

CB

TOP = 917.99

INV (NW) =

917.47

CB

TOP = 918.81

INV (SE) =

912.79

INV (N) = 912.69

12" CMP (PERRECORD)

CB

TOP = 914.90

INV (NW) =

910.75

12"CMP

12"

CMP

12"

CMP

INV =

909.93

INV =

910.10

CB

TOP = 904.26

INV (NW) =

899.24

INV(SE) = 899.15

INV(SE) = 901.99

INV(SE) = 903.01

18"CONC

INV =

899.14

30"

CONC

INV =

885.28

INV =

885.31

12"

CLAY

INV =

895.04

' S

TR

EAM B

UFF

ER

NO A

CTIV

ITY

/D

IS

TU

RBANCE

W

ITH

IN

TH

IS

A

REA

CO

WS

AS

C

ON

ST

RU

CT

ED

P

ER

V

A

AS

CONST

RUCTE

D PE

R VA

CO

CO

S

W

W

W

UE UE

UE

UE

UE

EO

UE UE UE

UE

G G

G G

G G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

UU

U

U U

U

UU UU

UU UU

UU

UU

UU

UU UU

U U

UU

COCO

CO

CO

CO

CO

CO

CO CO

CO

CO

CO

CO

CO CO

CO

CO

CO

CO CO

CO

AC

AC

AC

EX. PHASE I

CONSTRUCTION TRAILER

GEN

UEUEUEU

E

E

X

X

CO

PI

V

X

X

FD

FD

8B

7B

6B

5B

ST

AI

R

9B

0B

1B

2B

3B

4B

0A

0D

0C

0B

4B

3B

2B

1B

0B

0C

0D 10

0A

8B

0B

9B

8B

7B

6B

5B

D ow n

D ow n

Bu ild in g

Bu ild in g

PROPOSED BUILDING

F.F.E. 918.50

BUILDING 204 & 205

TOTAL 18,764 SQ. FT

PR. PHASE II

CONSTRUCTION TRAILER

W

W

W

G

Y H

D

W V

PI

V

W

W

S

S

OS101

HW100

0+35.51

0+00

MH301

HW300

HW200

OS201

0+00

0+58.08

0+94.04

0+

YD302

C500

190107.000

VA HOSPITAL

KLEINGERS

GROUP

THE www.kleingers.comCIVIL ENGINEERING

SURVEYING

LANDSCAPE

ARCHITECTURE

Louisville, KY 40299 502.365.9950

1100 Envoy Circle

VA Project No. 596-333 Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management 2250 LEESTOWN ROAD

LEXINGTON, KY 40511

FAYETTE COUNTY

Revisions Date

100% 02.12.2021CONSTRUCTION DOCUMENTS

100%

CONSTRUCTION

DOCUMENTS

02-12-2020 PW JS

204 & 205

1 04.08.2021ADDENDUM #1

LEGEND

EX. EXISTING

PR. PROPOSED

APPROX. APPOXIMATE

L.F. LINEAR FEET

M.H. MANHOLE

GAS VALVE

SANITARY CLEANOUT

SANITARY MANHOLE

3PH TRANSFORMER

G

CO

S

UTILITY PLAN

UTILITY NOTES

1. SANITARY PROPERTY SERVICE CONNECTIONS MUST BE

INSTALLED AT NO LESS THAN 1.00%.

2. UTILITY CROSSINGS SHALL MAINTAIN 18" MINIMUM

VERTICAL CLEARANCE.

3. REFER TO ELECTRICAL SITE PLAN FOR SITE LIGHTING

LOCATION, NOTES, AND DETAILS.

WATER NOTES:

1. ALL DISTRICT PIPING SHALL BE INSTALLED WITH

TRACER WIRE AND BLUE POLY WRAP.

2. ALL WATER MAINS MUST BE FIELD LOCATED.

3.ALL WATER MAINS AND WATERLINES SHALL HAVE

MINIMUM 48" OF COVER. CONTRACTOR SHALL FIELD

VERIFY DEPTHS OF EXISTING WATERMAIN AT

CONNECTIONS PRIOR TO CONSTRUCTION AND REPORT ANY

DISCREPANCIES TO ENGINEER.

UTILITY KEYNOTES

1. CONTRACTOR TO PROCEED EXCAVATION WITH CAUTION.

PROVIDE SHORING FOR SOIL STABILIZATION WHERE

NECESSARY. CONTRACTOR SHALL MARK AND LOCATE FORCE

MAIN LOCATION(S) PRIOR TO CONSTRUCTION. IF NECESSARY,

RELOCATION OR REPAIR OF FORCE MAIN SHALL BE

COORDINATED W/ ENGINEER AND CONFORM TO

REQUIREMENTS OF LFUCG SANITARY & PUMP STATION

DESIGN MANUAL SEC. 7.6.

2. 40 L.F. OF PROPOSED 6" SANITARY PVC SEWER. MINIMUM

SLOPE 1.04% & MINIMUM COVER OF 35 INCHES.

3. CONTRACTOR TO MAINTAIN EXISTING RIM ELEVATION.

COORDINATE WITH ENGINEER IF DISCREPANCIES ARE

ENCOUNTERED.

4. 82 L.F. OF PROPOSED 4" SANITARY PVC SEWER. MINIMUM

SLOPE 1.04% & MINIMUM COVER OF 35 INCHES.

5. PROPOSED SANITARY CLEANOUT.

6. PROPOSED AC UNITS. REFER TO MEP PLANS FOR DETAILS.

7. PROPOSED 400 L.F. EMERGENCY OXYGEN FEED LINES

REFER TO MEP PLANS FOR DETAILS AND DIVISION 22/23

SPECIFICATIONS SECTION 22.63.00 FOR PIPE MATERIAL AND

INSTALLATION

8. PROPOSED 230 L.F. 2 INCH DIAMETER NATURAL GAS SERVICE

LINE, REFER TO MEP PLANS FOR DETAILS AND DIVISION 22/23

SPECIFICATIONS SECTION 23.11.23 FOR PIPE MATERIALS AND

INSTALLATION.

9. 12 FT X 18 FT X 4 FT ABOVE GROUND PROPANE TANK PAD.

REFER TO MEP PLANS FOR DETAILS.

10. PROPOSED 220 L.F. 2 INCH PROPANE TANK PIPING. REFER

TO MEP PLANS FOR DETAILS AND DIVISION 22/23

SPECIFICATIONS SECTION 23.10.00 FOR PIPE MATERIALS AND

INSTALLATION.

11. PROPOSED 34 L.F. OF ELECTRICAL CONDUIT(S), REFER TO

ELECTRICAL PLANS FOR DETAILS AND SPECIFICATIONS.

12. PROPOSED ELECTRICAL MANHOLE. REFER TO ELECTRICAL

PLANS FOR DETAILS AND SPECIFICATIONS.

13. PROPOSED 92 L.F. OF ELECTRICAL CONDUIT(S), REFER TO

ELECTRICAL PLANS FOR DETAILS AND SPECIFICATIONS.

14. PROPOSED TRANSFORMER, REFER TO ELECTRICAL PLANS

FOR DETAILS AND SPECIFICATIONS. COORDINATE WITH

UTILITY PROVIDER.

15. PROPOSED 90 L.F. OF ELECTRICAL CONDUIT(S), REFER TO

ELECTRICAL PLANS FOR DETAILS AND SPECIFICATIONS.

16. CONSTRUCT NEW SANITARY MANHOLE. CONTRACTOR TO

VERIFY FINAL GRADE AT LOCATION AND COORDINATE WITH

ENGINEER PRIOR TO BEGINNING CONSTRUCTION.

17. PROPOSED SANITARY CLEANOUT. SEE DETAIL 6, SHEET C002.

18. PROPOSED GENERATOR AND CONCRETE PAD. REFER TO

SHEET C002 FOR GENERATOR SLAB DETAIL .

19. PROPOSED GENERATOR DOCKING STATION

20. PROPOSED 87 L.F. OF ELECTRICAL CONDUIT(S), REFER TO

MEP PLANS FOR DETAILS AND SPECIFICATIONS.

21. NOT USED

22. PROPOSED FIRE DEPARTMENT CONNECTION CONTRACTOR

TO COORDINATE WITH VA, MEP AND LOCAL FIRE

DEPARTMENT.

23. PROPOSED POST INDICATOR VALVE CONTRACTOR TO

COORDINATE WITH VA, MEP AND LOCAL FIRE DEPARTMENT.

24. PROPOSED FIRE HYDRANT.

25. PROPOSED 63 L.F. 3" DOMESTIC WATER SERVICE.

26. PROPOSED 66 L.F. 6" FIRE WATER SERVICE LINE.

27. PROPOSED 66 L.F. 4" FIRE WATER SERVICE LINE.

28. PROPOSED GAS METER. REFER TO MEP PLANS FOR DETAILS

AND SPECIFICATIONS. COORDINATE WITH SERVICE

PROVIDER.

29. CONSTRUCT 65 L.F. OF PROPOSED 8 INCH SANITARY SEWER.

MINIMUM 2.00% SLOPE AND 4 FEET OF COVER.

30. CONSTRUCT 81 L.F. OF PROPOSED 8 INCH SANITARY SEWER.

MINIMUM 2.00% SLOPE AND 4 FEET OF COVER.

31. CONSTRUCT NEW SANITARY MANHOLE ON EXISTING

SANITARY MAIN. CONTRACTOR TO VERIFY FINAL GRADE AT

LOCATION AND COORDINATE WITH ENGINEER PRIOR TO

BEGINNING CONSTRUCTION.

32. CONTRACTOR TO UTILIZE DIRECTIONAL BORING UNDER

EXISTING ROAD.

33. LOCATION OF PHASE II CONSTRUCTION TRAILER TO BE

COORDINATED WITH PHASE I CONTRACTOR.

PR. SANITARY STUB

INV. 904'-11"

PR.SANITARY STUB

INV. 916' - 4"

PR. SANMH100

PR. SANMH100

PR. SANMH100A

AutoCAD SHX Text

EH

AutoCAD SHX Text

EH

AutoCAD SHX Text 33974

AutoCAD SHX Text

SPALDING

AutoCAD SHX Text

JUSTIN

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text K

AutoCAD SHX Text K

AutoCAD SHX Text C

AutoCAD SHX Text U

PSTM-100

22' - 12" STM @ 0.51%

IN

V

O U

T=

5.

(1 2"

) N W

T/ C

=8

.9

O S1

N

.1

E

8.

IN

V

IN

=8

.0

(1

2" ) S

E

H W

N

.4

E

6.

PSTM-200

EXISTING GROUND

PROPOSED GRADE

2.4

6.2

8.8

2.

6.

8.

-0+25 0+00 0+75

IN

V

IN

=9

.2

(1

2" ) S

H W

N

.7

E

1.

41' - 12" STM @ 0.50%

IN

V

O U

T=

3.

(1 2"

) N G

R

AT

E=

8.

O S2

N

.5

E

2.

PSTM-300

0.2

0.0

0.

0.

-0+25 0+00 1+00 1+25

15' - 12" STM @ 0.50%

IN

V

IN

=9

.8

(1

2" ) N

E

H W

N

.0

E

7.

IN

V

O U

T=

3.

(1 2"

) S W

IN

V

IN

=9

.9

(1

2" ) S

E

R

IM

=9

.8

M H

N

.6

E

7.

IN

V

O U

T=

4.

(1 2"

) N W

G R

AT

E=

6.

YD

N

.6

E

2.

73' - 12" STM @ 0.50%

C501

190107.000

VA HOSPITAL

KLEINGERS

GROUP

THE www.kleingers.comCIVIL ENGINEERING

SURVEYING

LANDSCAPE

ARCHITECTURE

Louisville, KY 40299 502.365.9950

1100 Envoy Circle

VA Project No. 596-333 Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management 2250 LEESTOWN ROAD

LEXINGTON, KY 40511

FAYETTE COUNTY

Revisions Date

100% 02.12.2021CONSTRUCTION DOCUMENTS

100%

CONSTRUCTION

DOCUMENTS

02-12-2020 PW JS

204 & 205

1 04.08.2021ADDENDUM #1

STORM PROFILES

PROFILE SCALE: 1" = 10'H, 1" = 2'V

AutoCAD SHX Text 33974

AutoCAD SHX Text

SPALDING

AutoCAD SHX Text

JUSTIN

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text K

AutoCAD SHX Text K

AutoCAD SHX Text C

AutoCAD SHX Text U

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.0

FF=919.5

FF=919.5

FF=919.5

FF=919.5

FF=919.6

FF=919.5

FF=919.6

BLDG. UNDER

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CONSTRUCTION

CHAIN LINK

CHAIN LINK

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

CONSTRUCTION

SILT FENCE

G

32"

36"

38"

34"

51"

24"17"

48"

19"

9" 20"

20"

28"

13"

30"

20" 26" 20"

18"18" 24" 30" 24"

18"

FF=902.2

BLDG. 52

UTILITY STUB UP

GAS LINE STUB UP

UTILITY STUB UP

W

AT

ER

LE

VE

L

EL

=9

.0'

SANITARY STUB UP

PE

R

PH

AS

E I P

LA

NS

PB

PB

E

PER PHASE I PLANS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

SECURITY CAMERA POLE

WWW

W

W

W

VIP VIP

W

CDF

CDF W

PE

R

PH

AS

E I P

LA

NS

PER PHASE I PLANS

PER PHASE I P

LANS

PER PHASE I PLANS

FORCE MAIN

PER PHASE I PLANS

FORCE MAIN

CONSTRUCTION

CHAIN LINK

CO

S

CO

CO

S

S

S

CONTROL POINT #4

IRON PIN

N=57,933.29 E=56,509.14

CONTROL POINT #1

IRON PIN

N=57,759.49 E=56,581.64

CONTROL POINT #2

IRON PIN

N=57,781.05 E=56,894.67

CONTROL POINT #3

IRON PIN

N=57,613.18 E=57,069.08

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=922.68

EXISTING BENCHMARK

RAILROAD SPIKE IN TREE

EL=916.34

BLOCK

CONC.

CONC.

CONC.

CHAIN LINK

CONC.

BLDG. UNDER

CONSTRUCTION

CONDUIT STUB UP

50'

STR

EAM BUFF

ER

' S

TR

EA

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .