Fill Placement - Compaction - 27312.pdf

PDF 333 KB Posted

Attached to
Construct Replacement Community Living Center (CLC) Federal contract opportunity
Solicitation number
36C24921R0059
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document contains a soils compaction report and details of a related federal contract opportunity to construct a replacement community living center. The soils compaction report provides results of density and moisture content tests conducted at five locations during fill placement and compaction activities. Test locations, gauge information, weather conditions, specifications, and field density test results are detailed. The related federal contract opportunity is to furnish all labor, materials, tools and expertise to complete a minor project constructing a replacement community living center for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. Some work will require periods outside standard administrative hours or shifts.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Replacement Community Living Center (CLC), newest first.
File Type Posted
Addendum 0001 - Drawings.pdf PDF
Addendum 0001 - Text.pdf PDF
S06-36C24921R0059 0005 (Addendum) 04.20.2021.pdf PDF
S06-36C24921R0059 0004 (Addendum) 04.19.2021.pdf PDF
S06-36C24921R0059 0004.pdf PDF
Responses to RFIs_Questions (Minor Project 596-333).xlsx XLSX spreadsheet
S06-36C24921R0059 0003.pdf PDF
Fill Placement - Compaction - 27310.pdf PDF
Fill Placement - Compaction - 23611.pdf PDF
Fill Placement - Compaction - 27376.pdf PDF
S06-36C24921R0059 0002.pdf PDF
S04-Site Visit Sign-In_CLC Phase 2.pdf PDF
36C24921R0059 0001.pdf PDF
19009 CLC Phase 2 - 100 percent CD - Drawings-2.23.2021 (1).pdf PDF
S02-Price Schedule (Minor Project 596-333) FY2021.xlsx XLSX spreadsheet
Rev Drawings pp 29-60 (19009 CLC Phase 2).pdf PDF
19009 CLC Phase 2 - 100 CD - Specifications-2-12-2021.pdf PDF
596-333 Geotechnical Report.pdf PDF
S02-36C24921R0059_1 (Revision 03.10.2021).pdf PDF
P07-General Wage Decision KY20210090 01.01.2021.pdf PDF
S15-PPQ-Template (Minor Project 596-333) Construct Replacement CLC-Long Term Rehab.pdf PDF
Rev Drawings pp 1-28 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 61-90 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 91-120 (19009 CLC Phase 2).pdf PDF
Rev Drawings pp 121-128 (19009 CLC Phase 2).pdf PDF
S03-(Presolicitation Notice ) 36C24921R0059 Minor Proj 596-333.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/2/2021 _ https://app.ireport360.com/projects#/myviewreport 1/3

Thoroughbred Engineering 238 Jefferson Street Lexington, KY 40508

(502) 863-1756

Continuing Care Facilities- Phase 1 IBC 1704.7 SOILS - Fill Placement & Compaction (Report # 27312)

Project Name Continuing Care Facilities- Phase 1

Company Thoroughbred Engineering

Project Number

Representative David Brunker, S.I.

Date 6/3/20

Client

Gauge Make:

Troxler

Standaridization Time:

4 Minutes

Gauge Model:

Density Standard Count:

Gauge Serial Number:

28371

Moisture Standard Count:

What was the Density Standard Accuracy?

What was the Moisture Standard Accuracy?

Were the Density Moisture Standard Counts with tolerance?

Not Selected

Project Information

Standardize Nuclear Gauge

Was standardization of a nuclear gauge conducted? Yes No

The gauge was used at the following location(s):

Please see Plan Image above

Results:

Tolerance and Adjustments:

Describe Adjustments/Additional Remarks:

https://app.ireport360.com/projects#/myviewreport 2/3

Weather:

Partly Cloudy

Temperature in Fahrenheit:

On-Site Contact/Company:

Mr. Scott Wharton of Semper Tek

Nuclear Gauge #:

28371

Density Standard:

Moisture Standard:

Specified % Compaction:

Specified Moisture % Range:

-2 to +2.5

Observations Reported To Mr. Scott Wharton of Semper Tek

Report Status

FINAL

Reviewed By Jhonnathan Ballesteros

Site Information

Compaction Report (Nuclear Method)

General Location of Fill Placement Please see Plan Image above

Reference Point for Test Locations Below:

Moisture-Density Relationship Curves

Proctor Sample ID

Max Dry Density

Optimum Moisture % Soil Description

No Density Curves

Field Density Test Results

FDT

Number Test Location Elevation

Dry Density

(pcf)

Moisture Content

Max Dry Density

Optimum Moisture

Compaction

1 Central -5' 103.7 16.6 2 Central -5' 103.1 17.6 3 Central -5' 103.4 17.1

Additional Comments

Additional Comments: Yes No

Report Status https://app.ireport360.com/projects#/myviewreport 3/3

Approximate location of density testing

File details come from the government source that posted it. Updated .