This document provides details on a federal contract opportunity for renovations to expand an emergency department at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves renovating an existing shelled space adjacent to the existing emergency department into a new radiology, police holding, and administrative area to serve the emergency department. The solicitation number is 36C24921B0008 and is expected to be posted on or around May 25, 2021, closing on or around June 24, 2021. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses under authority of 38 U.S.C section 8127(d). The NAICS code is 236220 for Commercial and Institutional Building Construction, with a small business size standard of $39.5 million. The estimated construction range is between $5 million to $10 million. The project will be procured using sealed bidding per FAR Part 14.101. Questions must be submitted in writing to the Contracting Officer.

View the file

Other files

File Type Posted
36C24921B0008 0002.pdf PDF
081710_Add1.pdf PDF
000110_Add1.pdf PDF
Amendment 0001.pdf PDF
087100_Add1.pdf PDF
013323.1 Master Submittal List_Add1.pdf PDF
010000_Add1.pdf PDF
224000 Add1.pdf PDF
099659_Add1.pdf PDF
Amendment Summary.pdf PDF
Pre bid sign in sheet.pdf PDF
RFI Form - Expand Emergency Dept.pdf PDF
Mt Home ED Final CD Specs_Revised 210512.pdf PDF
WD TN20210111 1-1-2021.pdf PDF
Mt Home ED Final CD Drawings _Revised 210512.pdf PDF
36C24921B0008_1.pdf PDF
Contractor EMR Certification Form.pdf PDF
36C24921B0008.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR COORDINATION

CONTRACTOR SHALL OBTAIN A COPY OF THE FINAL SITE LATEST VENDOR DRAWINGS

PRIOR TO PROCURING OR INSTALLING ANY EQUIPMENT. ANY REWORK REQUIRED BY THE

CONTRACTOR'S FAILURE TO OBTAIN THESE DRAWINGS, SHALL BE AT THE

CONTRACTOR'S EXPENSE AND SHALL NOT RESULT IN ANY ADDITIONAL TIME TO THE

PROJECT. THE CONTRACTOR SHALL MEET THE REPRESENTATIVE OF THE VENDOR PRIOR

TO THE START OF WORK. ALL WORK SHALL COMPLY WITH ALL VENDOR REQUIREMENTS.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK SHOWN ON THESE

DRAWINGS AND ALL WORK SHOWN ON THE VENDOR DRAWINGS. THE PHRASE "SUPPLIED

BY CUSTOMER" (OR DERIVATIVES) MEANS "PROVIDED BY CONTRACTOR."

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346

POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT

COPYRIGHT © 2021

WWW.HARRELLDG.COM

C A u to d e s k \2

R e v it L o c a l F ile s \1

A R

C H d w a tk in s V

P C

N C

.r v t

/1

/2

:2

:4

A

M

621-331

GI001

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

COVER SHEET FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026

CAMPUS AERIAL PHOTO

LOCATION MAP

COORDINATION NOTES

INDEX OF DRAWINGS

PROJECT

EXPAND EMERGENCY DEPARTMENT PHASE 2

MOUNTAIN HOME, TN 37684-4000

VETERANS HEALTH ADMINISTRATION

621-331

THE CONTRACTOR SHALL PREPARE COORDINATION DRAWINGS. SUCH DRAWINGS SHALL BE ARRANGED AND DESIGNED THROUGH AND FROM COORDINATION WITH ALL OTHER MAJOR AND MINOR SUBCONTRACTORS.

THE CONTRACTOR AT THEIR OWN EXPENSE SHALL PREPARE A THREE-DIMENSIONAL COORDINATION MODEL IN AUTODESK REVIT AND PRODUCE TWO-DIMENSIONAL COORDINATION DRAWINGS FROM MODEL, SPECIFICALLY CREATED BY THE CONTRACTOR FOR THIS PROJECT.

MODEL SHALL INCLUDE AND DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO: ALL DUCTWORK; ALL AIR DISTRIBUTION; MECHANICAL EQUIPMENT; MECHANICAL PIPING; FIRE PROTECTION PIPING; ALL PLUMBING PIPING;

CABLE TRAYS (WITH ELEVATIONS NOTED); LIGHTING FIXTURES (WHEN CEILING MOUNTED); CEILING GRID AND CEILING HEIGHT; MAJOR BEAMS AND JOISTS (WITH ELEVATIONS MARKED); FIRE ALARM DEVICES AND SPEAKERS (WHERE CEILING MOUNTED); ELECTRICAL CONDUITS LARGER THAN 2-INCH DIAMETER; ELECTRICAL BUSWAY AND REQUIRED CLEARANCES; EQUIPMENT PROVIDED BY OTHERS THAT PROTRUDE INTO CEILING CAVITIES OR IMPEDE THE LOCATION OR ACCESS TO ABOVE CEILING PIPING, DUCTWORK OF OTHER EQUIPMENT. SECTIONS SHALL BE CUT THROUGH AREAS SHOWING MATERIALS AND SYSTEMS OF ALL CONTRACTS.

IF THERE ARE ANY COORDINATION ISSUES THAT CANNOT BE RESOLVED BY THE GC’S COORDINATION DRAWING PREPARER, THE GC SHALL SUBMIT RFI TO THE VA.

CONTRACTOR SHALL PERFORM CLASH DETECTION ON ALL MODELED ELEMENTS AND RESOLVE IN COORDINATION WITH VA AND AE.

NOTE THAT ROUGH-IN / FABRICATION CANNOT BEGIN UNTIL COORDINATION MODEL AND DRAWINGS HAVE BEEN APPROVED. ANY MATERIAL, EQUIPMENT, SYSTEMS, ETC., PROCUREMENT OR INSTALLATION COMMENCED PRIOR TO APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK AND MAY HAVE TO BE MODIFIED, MOVED AND/OR RECONFIGURED AT NO INCREASE IN CONSTRUCTION TIME OR MONIES TO BE BURDENED BY THE GOVERNMENT. BOTH MODEL AND DRAWINGS ARE TO BE MADE A PART OF COORDINATION DRAWING SUBMISSION TO GOVERNMENT AND DESIGNER. ENSURE THAT ALL SUB-CONTRACTORS ARE RESPONSIBLE FOR

COORDINATION ACROSS ENTIRE SET OF CONSTRUCTION DOCUMENTS.

PROJECT

SITE

PROJECT SITE �

FIRE ALARM

FA001 GENERAL NOTES AND SCHEDULES

FA101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - FIRE ALARM

FA102 FIRST FLOOR PLAN - COURTYARD - FIRE ALARM

FIRE PROTECTION

FX001 GENERAL NOTES, SYMBOLS & LEGENDS

FX101 FIRST FLOOR PLAN - EMERGENCY DEPT. ( ED) - FIRE PROTECTION

FX102 FIRST FLOOR PLAN - COURTYARD - FIRE PROTECTION

FX501 FIRE PROTECTION DETAILS

PLUMBING

PL001 GENERAL NOTES, LEGENDS, SYMBOLS & SCHEDULES

PD101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION

PD201 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION

PD301 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION

PD102 FIRST FLOOR PLAN - COURTYARD - DEMOLITION

PL101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - SUPPLY

PL102 FIRST FLOOR PLAN - COURTYARD - SUPPLY

PL201 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - WASTE & VENT

PL202 FIRST FLOOR PLAN - COURTYARD - WASTE & VENT

PG101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - MEDICAL GAS

PG102 FIRST FLOOR PLAN - COURTYARD - MEDICAL GAS

PL501 PLUMBING DETAILS

MECHANICAL

MH001 GENERAL NOTES & LEGENDS

MD101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION

MD102 FIRST FLOOR PLAN - COURTYARD - DEMOLITION

MH101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DUCTWORK

MH102 FIRST FLOOR PLAN - COURTYARD - DUCTWORK

MH103 ROOF PLAN - COURTYARD

MP101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - PIPING

MP102 FIRST FLOOR PLAN - COURTYARD - PIPING

MH501 DETAILS

MH502 DETAILS

MH503 DETAILS

MH601 SCHEDULES

MI701 CONTROLS SCHEMATICS

ELECTRICAL

EG001 GENERAL NOTES AND SCHEDULES

ED101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION

ED102 FIRST FLOOR PLAN - COURTYARD - DEMOLITION

EL101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - LIGHTING

EL102 FIRST FLOOR PLAN - COURTYARD - LIGHTING

EP101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - POWER

EP102 FIRST FLOOR PLAN - COURTYARD - POWER

EP103 ROOF PLAN - POWER

EY101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - SYSTEMS

EY102 FIRST FLOOR PLAN - COURTYARD - SYSTEMS

EP501 DETAILS

EP601 ELECTRICAL RISER DIAGRAMS

EP701 PANEL SCHEDULES

EP702 PANEL SCHEDULES

EP703 PANEL SCHEDULES

EP704 ELECTRICAL EQUIPMENT SCHEDULE

VENDOR EQUIPMENT DRAWINGS

RJ001 CT SCAN VENDOR EQUIPMENT DRAWINGS

RJ002 XRAY VENDOR EQUIPMENT DRAWINGS

RJ003 XRAY VENDOR EQUIPMENT DRAWINGS

RJ004 XRAY VENDOR EQUIPMENT DRAWINGS

RJ005 XRAY VENDOR EQUIPMENT DRAWINGS

GENERAL

GI001 COVER SHEET

GI002 EQUIPMENT MOUNTING LEGEND

GI003 ACCESSIBILITY LEGEND

GI099 CODE SUMMARY

GI100 FIRST FLOOR LIFE SAFETY PLAN

GI501 PROJECT-WIDE PARTITION TYPES AND STANDARD DETAILS

GENERAL CONDITIONS

GC100 FIRST FLOOR EXISTING PLAN - EMERGENCY DEPARTMENT (ED)

GC101 FIRST FLOOR EXISTING PLAN - COURTYARD

SOC-2 STATEMENT OF CONDITIONS

GC103 FIRST FLOOR ICRA PLAN

GC121 FIRST FLOOR PHASING PLAN

ARCHITECTURAL

AI001 NOTES AND LEGENDS

AI002 ARCHITECTURAL ABBREVIATIONS

AD052 FIRST FLOOR DEMOLITION PLAN - EMERGENCY DEPARTMENT (ED)

AD053 FIRST FLOOR DEMOLITION PLAN - COURTYARD

AD054 DEMOLITION DETAILS

AE101 FIRST FLOOR PLAN - OVERALL

AE102 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED)

AE103 FIRST FLOOR PLAN - COURTYARD

AE104 FIRST FLOOR DIMENSION PLAN - EMERGENCY DEPARTMENT (ED)

AE106 FIRST FLOOR DIMENSION PLAN - COURTYARD

AE107 COURTYARD TOPPING PLAN

AE110 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEDUCT ALT 1

AE111 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEDUCT ALT 3

AE112 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEDUCT ALT 4

AE113 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEDUCT ALT 5

AE121 REFLECTED CEILING PLAN - EMERGENCY DEPT (ED)

AE122 REFLECTED CEILING PLAN - COURTYARD

AE150 ROOF PLAN

AE301 PARTIAL BUILDING SECTIONS AT COURTYARD

AE401 ENLARGED PLANS AND INTERIOR ELEVATIONS @ COURTYARD

AE402 ENLARGED PLAN AND INTERIOR ELEVATIONS @ COURTYARD

AE403 ENLARGED PLANS AND ELEVATIONS @ COURTYARD

AE404 INTERIOR ELEVATIONS @ COURTYARD

AE405 ENLARGED PLANS & INTERIOR ELEVATIONS @ ED

AE406 ENLARGED PLANS & INTERIOR ELEVATIONS @ ED

AE501 MISCELLANEOUS DETAILS

AE511 INTERIOR DETAILS

AE512 INTERIOR DETAILS

AE513 INTERIOR DETAILS

AE515 CASEWORK DETAILS

AE516 ENLARGED CASEWORK PLANS

AE601 DOOR SCHEDULE AND DETAILS

AE602 WINDOW TYPES & DETAILS

INTERIORS

AF100 FIRST FLOOR FINISH PLAN - EMERGENCY DEPARTMENT (ED)

AF101 FIRST FLOOR FINISH PLAN - COURTYARD

AF450 3D VIEWS - INTERIORS

AF452 3D VIEWS - INTERIORS

AF453 3D VIEWS INTERIORS

AF500 THRESHOLD DETAILS

AF501 WALL PROTECTION / SIGNAGE TYPES

AF601 INTERIOR FINISH SCHEDULE

AF602 INTERIOR MATERIALS LEGEND

EQUIPMENT

QH100 FIRST FLOOR ENLARGED EQUIPMENT PLAN

QH101 FIRST FLOOR ENLARGED EQUIPMENT PLAN

QH102 FIRST FLOOR ENLARGED EQUIPMENT PLAN

QH601 EQUIPMENT SCHEDULES

PROJECT DESCRIPTION

EXPAND AND RENOVATE PORTIONS OF EXISTING EMERGENCY DEPARTMENT (ED) AT THE JAMES H. QUILLEN VA MEDICAL CENTER, MOUNTAIN HOME (JOHNSON CITY), TENNESSEE. THE PROJECT WILL RENOVATE 4,400 SF OF NEW EXPANSION TO BUILD-OUT EXISTING 1ST FLOOR SHELL SPACE IN BLDG. 204 ADJACENT TO THE ED. THIS NEW EXPANDED AREA WILL INCLUDE SPACE FOR ADDITIONAL RADIOLOGY SERVICES, ADDITIONAL EMERGENCY DEPARTMENT EXAM & SUPPORT ROOMS AND A POLICE SECLUSION ROOM WITH SUPPORT SPACE. DESIGN MAY INCLUDE, BUT IS NOT LIMITED TO, MODIFICATION OF EXISTING BUILDING STRUCTURE, INFRASTRUCTURES, AND UTILITY SYSTEMS, DEMOLITION OF EXISTING, NEW STRUCTURAL, NEW WALLS AND DOORS, CEILINGS SYSTEMS, FLOORING, INTERIOR FINISHES, CASEWORK, NEW MECHANICAL HVAC, ELECTRICAL, PLUMBING, STEAM, CHILLED WATER, MEDICAL GAS, FIRE SPRINKLER, FIRE ALARM, DATA AND COMMUNICATIONS SYSTEMS, ALL APPLICABLE SECURITY ELEMENTS INCLUDING ACCESS CONTROL AND VIDEO SURVEILLANCE SYSTEMS AND MODIFICATION OF ALL APPLICABLE EXISTING SYSTEMS AS NECESSARY FOR A COMPLETE AND USABLE RENOVATION PROJECT.

1. PRODUCTS TO BE FURNISHED BY VA AND PREP WORK PROVIDED BY GC:

A. GE HEALTHCARE XR656 HD. GC PROVIDES SITE PREP WORK. SEE VENDOR

DRAWINGS SHEET RJ002.TO INCLUDE BUT NOT LIMITED TO:

a. JSN X5100 WALL STAND

b. JSN X5500 OTS BRIDGE, RAILS

c. JSN X5400 TABLE

B. SIEMENS SOMATOM DEFINITION EDGE. GC PROVIDES SITE PREP WORK. SEE

VENDOR DRAWINGS SHEET RJ001. TO INCLUDE BUT NOT LIMITED TO:

a. JSN X6240 GANTRY, TABLE, AND TV MONITOR BOOM

b. JSN X6250 CT INJECTOR

C. STRYKER MED GAS BOOM. GC TO INSTALL OVERHEAD STRUCTURE MOUNT.

OWNER FURNISHED AND NAME BRAND OR EQUAL ITEMS:

SCHEDULE OF BID ITEMS

A. ITEM 1; BASE BID: THE CONTRACTOR SHALL PROVIDE ALL NECESSARY TOOLS, LABOR, MATERIALS, EQUIPMENT, PERMITS, LICENSE, AND SUPERVISION FOR "EXPAND EMERGENCY DEPARTMENT PHASE 2," PROJECT NUMBER 621-328, LOCATED AT THE JAMES H. QUILLEN VA MEDICAL CENTER IN MOUNTAIN HOME TN., IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. WORK INCLUDES, BUT IS NOT LIMITED TO, INTERIOR RENOVATION WITHIN PROJECT LIMITS (FIRST FLOOR ONLY), GENERAL DEMOLITION, CONSTRUCTION, PLUMBING, STRUCTURAL, HVAC, ELECTRICAL, AND FIRE PROTECTION.

B. ITEM 2; DEDUCT ALTERNATE 1: PERFORM ALL WORK AS STATED IN BID ITEM 1, EXCEPT REMOVE FINISHES IN CORRIDOR C-7 (INCLUDING BUT NOT LIMITED TO REMOVING REPLACEMENT OF LVT AND VCT FLOORING) AND

ASSOCIATED WORK.

C. ITEM 3; DEDUCT ALTERNATE 2: PERFORM ALL WORK AS STATED IN BID ITEM 2, EXCEPT REMOVE EXAM ROOM L120D AND ASSOCIATED WORK, HOWEVER, INFILL AT REAR DOOR IN L120D TO REMAIN BASE BID.

D. ITEM 4; DEDUCT ALTERNATE 3: PERFORM ALL WORK AS STATED IN BID ITEM 3, EXCEPT REMOVE PATIENT TOILET ROOM L128 AND ASSOCIATED WORK.

E. ITEM 5; DEDUCT ALTERNATE 4: PERFORM ALL WORK AS STATED IN BID ITEM 4, EXCEPT REMOVE CLOSET L139, TOILET L139A, EXAM 11 AND 12 ROOM L116 AND L115 AND ASSOCIATED WORK.

F. ITEM 6; DEDUCT ALTERNATE 5: PERFORM ALL WORK AS STATED IN BID ITEM 5, EXCEPT REMOVE REMOVE LOGISTICS/EXAM ROOM L113, EXAM ROOM L114, SUPPLY ROOM L118, AND NURSE STATION ROOM L119 AND ASSOCIATED

WORK.

G. ITEM 7; DEDUCT ALTERNATE 6: PERFORM ALL WORK AS STATED IN BID ITEM 6, EXCEPT REMOVE ANTI-LIGATURE SINKS AND REPLACE WITH NON-ANTI-LIGATURE SINKS IN EXAM ROOMS L131, L132, AND L132.

2. NAME BRAND OR EQUAL ITEMS.

A. JSN X1000 PPE DISPENSER, SEMI-RECESSED: BOWMAN ITEM RE101-0012.

B. HEADWALL: AMICO MODEL # E-CON-9R

C. HERMAN MILLER COMPASS 04, FINISHES SELECTED BY VA INTERIORS.

D. SETRA FLEX ENVIRONMENTAL MONITOR. FLEX-R25WBRC7S6, MODEL 267

PRESSURE TRANSDUCER, 2671R25WB11A1FN.

E. LIKORALL ULTRATWIN OVERHEAD LIFT CEILING LIFT SYSTEM (JSN A1200 LIFT

SYSTEM, OVERHEAD)

F. STEEL GUARD ACOUSTIC BLANKETS, 2-INCH.

G. BEST HARDWARE

REFER TO SPECIFICATION 01 00 00 GENERAL REQUIREMENTS FOR ADDITIONAL DETAILS.

Revision Number Revisions: Date:

1 ADDENDUM 01 JUNE 18, 2021

2.3

2.6

2.6

2.7

2.7

3.9

3.9

4.5

4.5

5.2

5.2

6.3

6.3

7.2

7.2

7.7

7.7

8.2

8.2

9.2

9.2

9.7

9.7

JJ

LL

NN

RR

SS

TT

UU

PP

MM

4.3

4.3

4.7

4.7

5.0

5.0

5.3

5.3

5.8

5.8

6.0

6.0

17' - 10 1/2" 1' - 2" 7' - 8 5/8" 8' - 11" 3' - 10 7/8" 4' - 3 3/4"

2' - 4"

9' - 4" 34' - 2"

A3

8' - 8 1/8" 10' - 4 3/4" 5' - 4 1/2"

2.06

2.12

16' - 5 3/8" 5' - 7 5/8" 5' - 5 3/4" 7' - 10"

2' - 5 1/8"

7' - 10 5/8" 6' - 4 1/2" 6' - 4"

1' - 3 3/4" 7' - 10"

5' - 10 3/4"

8' - 0" 1' - 4 3/8" 8' - 5 1/4" 4' - 4" 7' - 10" 11 1/4"

2.06

A7

2.08

3' - 4"

1' - 5 3/4"

2.06

A7 A7

2.06 2.06

A7 A7

2.06

A7

2.06

A7

2.06

9' - 2 3/8"

/8

2.06

A7

A7A7

3' - 4" 4' - 1 3/4" 4' - 4" 14' - 3 5/8" 7' - 10" 22' - 1 5/8"

16' - 4 5/8"

7' - 5 1/2"

1' - 9 3/8"

4' - 1 3/8"

2.06 2.06

A7

2.06

A7

2.06

4"

3' - 4"

/8

2.06

7' - 10"

9 1/4"

A7

2 1/4" 3' - 10"

4 1/4" 3' - 10"

2.06

2.06

A7

" 4

2.06

A7

A7

4' - 10 1/8" 1' - 9 1/2" 8' - 0 5/8"

/8

2.07

2.07

/4 "6

"2.06

A7

2.13 2.13

7.05

7.05

FLOOR

FINISHES

DEDUCT ALT. 1

DEDUCT ALT. 2

DEDUCT ALT.1

DEDUCT ALT. 4

DEDUCT ALT. 5

A8

A7 2.06

A7 2.08

2.06

2.07

2.08

2.08

2.072.07

A7

A7

A8

A7

2.06

2.072.07

2.06

A7A7

A7

A7

A7

A7

A7

A7A7

5' - 11"

9' - 2" 4' - 0" 1' - 0"

/4

13' - 1" 7"

2.18

A3

A3

A3

A3

A3

A3

A3

A3 A3

A3

A3

A3

A3

A3

A3

A7

4' - 3 3/8"

A4

A4 A4

A4

A4

A4

A4

A4.1

A4

A4

A4 A4 EXISTING VCT FLOORING

EXISTING VCT FLOORING

EXISTING VCT FLOORING

EXISTING VCT FLOORING

EXISTING VCT FLOORING

EXISTING VCT FLOORING

EXISTING VCT FLOORING

A4

A4

A4

A4

A4

A4

A4

A4

A3

A4

A4

A4

2.07

A17

A17

A17

A17

A18A17

A17

A17

A17

2.07 2.08

2.072.08

BAY 3

N/A

71 SF

BIO-HAZARD

L144

CORRIDOR

C1-11

CLERK

REGISTRATION

L154

MECH

N/AEXAM ROOM

L159

DIRTY LINEN

L160E

CLERK RM

L160D

NURSE WK.

ROOM

L160

PHARM.

N/A

OFFICE

L160B

EQUIPMENT

L133

NURSE STATION

L135

WAITING

L137

EXAM RM

N/A

TOILET

N/A

POLICE WORK

ROOM

N/A

WORK ROOM

L132

TREATMENT RM

L131

TREATEMENT RM

- 12

L129 TREATMENT RM -

L127

TREATMENT RM -

L125

TREATMENT RM -

L124

TREATMENT RM -

L123

HC TOILET

L130

TELECOMM

L121

TREATMENT

ROOM

L120D

MEDS

L120B

NURSE STATION

L120C

ELECTRICAL

L150

BREAK ROOM

L151

STAFF MEN

L152

EXAM ROOM 15

L120

OFFICE

L120A

BUSINESS

OFFICE

L100H

ISOLATION

TREATMENT

ROOM 23

L111

ANTE ROOM

L111A

ALCOVE

L109A

VESTIBULE

L113

BAY 1

N / A

BAY 2

N/A

BAY 4

N/A

LOGISTICS

L113

ELECTRICAL

L108

RN / PSA MAA

L120C

OFFICE

L106B

SUPPLIES

L106A

MEDS

L116

SUPPLIES

L118

TOILET

L115A

BAY 6

N/A

BAY 5

N/A

STAIR NO 2

N/A

CORRIDOR

C1-2

POLICE

DISPATCH

L100K

CORRIDOR

C1-3

HC STAFF TOILET

L130A

NURSE STATION

L107

SUPPLIES

L117

NURSE STA.

L119

HALLWAY

L115

ED OFFICE

L140

EXAM ROOM

L141

EXAM ROOM

L142

EXAM ROOM

L143

EXAM ROOM

L144

TOILET

L157

SHARED EXAM ROOM

L111C

EXAM ROOM

L158

CHECK-OUT

L160A

CORRIDOR

C1-2

STAFF HC OFFICE

L128

STAFF HC OFFICE

L126

PROJECT LIMITS

(NOT IN SCOPE)

A. FOR GENERAL DEMOLITION NOTES, SEE SHEET AI001.

B. ALL EXISTING DATA JACKS ARE BAGGED AND TAGGED FOR

CONTRACTOR TO RE-INSTALL WHERE POSSIBLE. SEE AD

SERIES DEMOLITION SHEETS.

C. FOR TYPICAL SAWCUT DETAIL AT NEW OPENINGS, SEE DETAIL

B5 / AD054.

D. GC MUST X-RAY PRIOR TO CORE DRILLING EXISTING SLABS .

E. USE 2-INCH-THICK SOUND BLANKETS ON ENTIRE LENGTH OF

WALLS DURING CONSTRUCTION TO MITIGATE AGAINST

CONSTRUCTION NOISE TRANSMISSION. SEE SPEC SECTION 01

57 19. BASIS OF DESIGN: “STEEL GUARD ACOUSTIC BLANKETS,

OR EQUAL.”

1 HOUR FIRE RATED CONSTRUCTION

BARRIER.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

PARTITION GRAPHICS

NORTH LEGEND

PLAN

NORTHTRUE

NORTH

EXISTING PARTITION /

BARRIER - WALL TO REMAIN

EXISTING PARTITION /

BARRIER - WALL TO BE

REMOVED

NEW PARTITION / BARRIER - WALL

PARTITION PHASING

NO RATING

SMOKE RESISTIVE PARTITION - NON RATED

1 HOUR FIRE BARRIER

1 HOUR FIRE/SMOKE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/ SMOKE BARRIER

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346

POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT

FIRST FLOOR - FFE: 11'-0"

KEY PLAN

BLUE RENOVATION

AREA

COURTYARD

RENOVATION AREA

COPYRIGHT © 2021

WWW.HARRELLDG.COM

C A u to d e s k \2

R e v it L o c a l F ile s \1

A R

C H d w a tk in s V

P C

N C

.r v t

/1

/2

:0

:5

P

M

621-331

AD052

DWJCJUNE 18, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR DEMOLITION PLAN -

EMERGENCY DEPARTMENT (ED)

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026

3/16" = 1'-0" F2

FIRST FLOOR DEMOLITION PLAN - EMERGENCY DEPARTMENT (ED)

0 12'8'4'

- SHEET KEYNOTES

A7 REMOVE EXISTING WALLS IN THEIR ENTIRETY INCLUDING

STRUCTURE, BRACING, FACINGS, FASTENERS, SEALANT, ETC.,

FROM FINISH FLOOR SLAB TO UNDERSIDE OF STRUCTURE

ABOVE. REPAIR ALL DAMAGE TO EXISTING CONSTRUCTION THAT

IS TO REMAIN, READY TO RECEIVE NEW CONSTRUCTION.

A8 REMOVE EXISTING FURRING AND GYPSUM BOARD IN THEIR

ENTIRETY INCLUDING BRACING, FACINGS, FASTENERS, SEALANT,

ETC., FROM FINISH FLOOR SLAB TO UNDERSIDE OF STRUCTURE

ABOVE. LEAVE EXISTING FIRE RATED CMU WALL IN PLACE.

REPAIR ALL DAMAGE TO EXISTING CONSTRUCTION THAT IS TO

REMAIN, READY TO RECEIVE NEW CONSTRUCTION.

A17 CONSTRUCTION BARRIER: NON-RATED TEMPORARY WALL AND

3'-0" x 7'-0" DOOR. FIRE RETARDANT 60 MIL PLASTIC SHEETING

REQUIRED ABOVE CEILING.

A18 CONSTRUCTION BARRIER: NON-RATED TEMPORARY WALL. FIRE

RETARDANT 60 MIL PLASTIC SHEETING REQUIRED ABOVE

CEILING.

2.06 REMOVE EXISTING DOOR(S) AND DOOR FRAME IN THEIR

ENTIRETY INCLUDING REINFORCING, FASTENERS, ANCHORS,

HARDWARE, ETC. REPAIR ALL DAMAGE TO EXISTING

CONSTRUCTION THAT IS REMAIN, READY TO RECEIVE NEW

CONSTRUCTION.

2.07 REMOVE EXISTING PLUMBING FIXTURE(S) IN THEIR ENTIRETY

INCLUDING ALL ANCHORS, FLANGES, PIPING, ETC. REPAIR ALL

DAMAGE TO EXISTING CONSTRUCTION THAT IS TO REMAIN,

READY TO RECEIVE NEW CONSTRUCTION.

2.08 REMOVE EXISTING CASEWORK & FURNITURE IN ITS ENTIRETY

INCLUDING ALL ANCHORS, FASTENERS, CONDUIT, ETC. REPAIR

ALL DAMAGE TO EXISTING CONSTRUCTION THAT IS TO REMAIN,

READY TO RECEIVE NEW CONSTRUCTION AS SHOWN ON

DRAWINGS.

2.12 REMOVE EXISTING WINDOW AND FRAME IN THEIR ENTIRETY

INCLUDING FASTENERS, ANCHORS, HARDWARE, ETC. REPAIR

ALL DAMAGE TO EXISTING CONSTRUCTION THAT IS REMAIN,

READY TO RECEIVE NEW CONSTRUCTION.

2.13 REMOVE EXISTING WINDOW AND FRAME IN THEIR ENTIRETY

INCLUDING FASTENERS, ANCHORS, HARDWARE, ETC. EXCEPT

LEAVE EXISTING LINTEL INTACT / IN-PLACE.DEMOLISH MASONRY

WALL BELOW LINTEL AT THE EXTENTS OF THE OPENING. REPAIR

ALL DAMAGE TO EXISTING CONSTRUCTION THAT IS REMAIN,

READY TO RECEIVE NEW CONSTRUCTION.

2.18 REMOVE EXISTING WALL PROTECTION (CORNER GUARD, CRASH

RAIL, HANDRAIL, AND / OR SHEET WALL PROTECTION) AND DOOR

FRAME IN THEIR ENTIRETY INCLUDING REINFORCING,

FASTENERS, ANCHORS, HARDWARE, ETC. REPAIR ALL DAMAGE

TO EXISTING CONSTRUCTION THAT IS REMAIN, READY TO

RECEIVE NEW CONSTRUCTION.

A3 REMOVE EXISTING CLG IN ITS ENTIRETY INCLUDING ALL

SUPPORTS AND FASTENERS. REPAIR ALL DAMAGE TO EXISTING

CONSTRUCTION THAT IS TO REMAIN, READY TO RECEIVE NEW

CONSTRUCTION.

A4 REMOVE EXISTING FLOORING IN ITS ENTIRETY INCLUDING ALL

TRIM, ADHESIVES, GROUT, MORTAR, WALL BASES, ETC., TO

FINISH FLOOR SLAB. CLEAN EXISTING SLAB TO REMOVE ANY

RESIDUAL MATERIAL THAT MAY BE DETRIMENTAL TO

INSTALLATION OF NEW FLOORING.SEE DRAWINGS FOR EXTENTS.

A4.1 REMOVE EXISTING FLOORING IN ITS ENTIRETY INCLUDING ALL

TRIM, ADHESIVES, GROUT, MORTAR, WALL BASES, ETC., TO

FINISH FLOOR SLAB. CLEAN EXISTING SLAB TO REMOVE ANY

RESIDUAL MATERIAL THAT MAY BE DETRIMENTAL TO

INSTALLATION OF NEW FLOORING.SEE DRAWINGS FOR

EXTENTS.THIS WORK TO OCCUR NIGHTS AND WEEKENDS.

COORDINATE WORK WITH COR.

GENERAL SHEET NOTES

SYMBOLS LEGEND

- SHEET KEYNOTES

Revision Number Revisions: Date:

CR

CR

C R

E

N P

N P

NM

N P

C B

N D

C B

C B

N P

C B

N P

C B

E

N M

P A

C

RN

D

N P

C B

NM

2.3

2.3

2.6

2.6

2.7

2.7

3.9

3.9

4.5

4.5

5.2

5.2

6.3

6.3

7.2

7.2

7.7

7.7

8.2

8.2

9.2

9.2

9.7

9.7

JJ

LL

NN

RR

SS

TT

UU

PP

MM

4.3

4.3

4.7

4.7

5.0

5.0

5.3

5.3

5.8

5.8

6.0

6.0

EXAM ROOM

L144

EXAM ROOM

L143

EXAM ROOM

L142

EXAM ROOM

L141

ED OFFICE

L140

EXAM RM-8

L139

EXAM RM

L138

TOILET

L157

MECH

L25

SHARED EXAM

ROOM

L159

NEURO-TESTING

L160A

OFFICE

L160D

STORAGE

L26

SECLUSION RM

L135A

EXAM RM

L29

TOILET

L30

POLICE WORK

ROOM

L31

HC TOILET

L130

SOILED

L149

ELECTRICAL

L150

ISOLATION

TREATMENT

ROOM 15

L111

ANTE ROOM

L109

NOURISHMENT

L109A

VESTIBULE

L113

STAIR NO 2

L42

POLICE

DISPATCH

L100K

HC STAFF TOILET

L130A

CORRIDOR

L39

EXISTING EXAM 8

L123

EXISTING EXAM 7

L124

EXISTING EXAM 6

L125

EXISTING EXAM 5

L127

EXISTING EXAM 4

L129

EXAM 2

L132

CORRIDOR

C1-7

NURSE STATION

L107

ELECTRICAL

L108

TELECOMM

L121

NURSE STA.

L160B

OFFICE DIRECTOR

L160E

ALCOVE

L86B

ALCOVE

L109B

CORRIDOR

L86

/F2 AE103/F2 AE103

L86

/4

/4

MATCH LINEMATCH LINE

NURSE STATION

L135

WAITING

L137

CORRIDOR

L135B

EXAM 1

L133

INFILL OPENING AT WINDOW,

MATCH EXISTING PARTITION TYPE

EXISTING EXAM 3

L131

ANTI LIGATURE

SINKS

BREAK ROOM

L151 STAFF MALE

L152

EXAM 14

L120

PATIENT TOILET

L128

EXISTING EXAM 13

L120D

MED

L120B

NURSE STATION

L120C

CLEAN HOLD

L120A

INFILL AT

DOOR

INFILL AT DOOR

MEDS

L106B

LOCKER RM

L105

MAIN NURSE STATION

L106A

PNEUMATIC TUBE STA. (EXISTING

TO REMAIN)

INFILL AT

DOOR

WORK RM

L160

ALCOVE

L86A

7.05

7.05 ø 6' - 0"

FLOOR FINISHES,

REFER TO AF100

DEDUCT ALT. 1

DEDUCT ALT. 2

DEDUCT ALT.3

DEDUCT

ALT. 4

DEDUCT

ALT. 5

HAND

SENSOR

EXISTING LIFE SUPPORT

UNIT 10

L117

LOGISTICS / EXAM ROOM

L113

EXAM 9

L114

SUPPLY

L118

NURSE STA

L119

CLOSET

L139B

TLT

L139AEXAM 11

L116

EXAM 12

L115

AE405

C6

AE406

C6

AE406

F6

A10

AE404

A1

CORRIDOR

C1-3

B5

DEDUCT ALT.6

A25

A25

A24

A26

H E

A D

W A

L L

" A11

A. REFER TO SHEET AI001 FOR GENERAL FLOOR PLAN NOTES AND

SYMBOLS.

B. FOR TYPICAL HEADWALL CONFIGURATION REFERENCE XRAY

ROOM L15 IN COURTYARD, SEE SHEET QH102.

C. ALL RATED PENETRATIONS TO BE SEALED WITH RED FIRE

RATED CAULKING. USE ACOUSTICAL CAULKING ON ALL OTHER

WALL PENETRATIONS.

D. FOR DOOR INFORMATION SEE SHEETS AE104, AE106, & AE601.

E. FOR PARTITION TYPES SEE GI501, AND WALL IDENTIFICATION

TAGS, SEE SHEETS AE104 AND AE106.

F. FOR RAISED FLOOR LAYOUT SEE SHEET AE107.

G. FOR WINDOW TYPES, SEE SHEET AE602 FOR INFORMATION.

H. FOR WALL PROTECTION / CORNER GUARD LOCATIONS SEE

SHEETS AF100 AND AF101. FOR WALL PROTECTION TYPES, SEE

SHEET AF501.

I. FOR FURNITURE AND EQUIPMENT LOCATION, SEE SHEET

SERIESQH100, AND FOR EQUIPMENT SCHEDULE SEE SHEET

SERIES QH601.

J. FOR VENDOR EQUIPMENT DRAWINGS, SEE SHEET RJ001 AND

RJ002.

K. FOR SCHEDULED FINISHES SEE SHEETS AF601 AND AF602.

L. PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT.

M. FOR EQUIPMENT MOUNTING HEIGHTS, SEE SHEET GI002.

COORDINATE HEIGHTS WITH VA COR.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

PARTITION GRAPHICS

NORTH LEGEND

PLAN

NORTHTRUE

NORTH

EXISTING PARTITION /

BARRIER - WALL TO REMAIN

EXISTING PARTITION /

BARRIER - WALL TO BE

REMOVED

NEW PARTITION / BARRIER - WALL

PARTITION PHASING

NO RATING

SMOKE RESISTIVE PARTITION - NON RATED

1 HOUR FIRE BARRIER

1 HOUR FIRE/SMOKE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/ SMOKE BARRIER

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346

POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT

FIRST FLOOR - FFE: 11'-0"

KEY PLAN

BLUE RENOVATION

AREA

COURTYARD

RENOVATION AREA

COPYRIGHT © 2021

WWW.HARRELLDG.COM

C A u to d e s k \2

R e v it L o c a l F ile s \1

A R

C H d w a tk in s V

P C

N C

.r v t

/1

/2

:3

:2

A

M

621-331

AE102

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - EMERGENCY

DEPARTMENT (ED)

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026

3/16" = 1'-0" F2

ENLARGED FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED)

0 12'8'4'

- SHEET KEYNOTES

A10 EXISTING CEILING MOUNTED PATIENT LIFT TO REMAIN.

A11 NEW HEADWALL AND MED GAS.

A24 MEDICAL GAS ALARM PANEL, COORDINATE WITH PLUMBING

DRAWINGS PG101 AND PG102.

A25 ZONE CONTROL PANEL, COORDINATE WITH PLUMBING

DRAWINGS PG101 AND PG102.

A26 MEDICAL GAS MASTER ALARM PANEL, COORDINATE WITH

PLUMBING DRAWINGS PG101 AND PG102.

GENERAL SHEET NOTES

1 1

Revision Number Revisions: Date:

2.6

2.6

2.7

2.7

3.9

3.9

4.5

4.5

5.2

5.2

6.3

6.3

7.2

7.2

7.7

7.7

8.2

8.2

9.2

9.2

9.7

9.7

JJ

LL

NN

RR

SS

TT

UU

PP

MM

4.3

4.3

4.7

4.7

5.0

5.0

5.3

5.3

5.8

5.8

6.0

6.0

EXAM ROOM

L144

EXAM ROOM

L143

EXAM ROOM

L142

EXAM ROOM

L141

ED OFFICE

L140

EXAM RM-8

L139

EXAM RM

L138

TOILET

L157

MECH

L25

SHARED EXAM

ROOM

L159

NEURO-TESTING

L160A

OFFICE

L160D

STORAGE

L26

SECLUSION RM

L135A

EXAM RM

L29

TOILET

L30

POLICE WORK

ROOM

L31

HC TOILET

L130

SOILED

L149

ELECTRICAL

L150

TREATMENT

ROOM 22

L105

TREATMENT

ROOM 17

L104

WORKROOM

L100H

ISOLATION

TREATMENT

ROOM 15

L111

ANTE ROOM

L109

NOURISHMENT

L109A

VESTIBULE

L113

STAIR NO 2

L42

POLICE

DISPATCH

L100K

HC STAFF TOILET

L130A

CORRIDOR

L39

EXISTING EXAM 8

L123

EXISTING EXAM 7

L124

EXISTING EXAM 6

L125

EXISTING EXAM 5

L127

EXISTING EXAM 4

L129

EXAM 2

L132

CORRIDOR

C1-7

NURSE STATION

L107

ELECTRICAL

L108

TELECOMM

L121

NURSE STA.

L160B

OFFICE

DIRECTOR

L160E

ALCOVE

L86B

ALCOVE

L109B

6' - 8 5/8" 7' - 9 5/8"

11 1/4"

AL

ELEV

AL

8A

S

DG:T, DS: YES,CR

SH-3E

L106B

MEDS

L106B

MAIN NURSE STATION

L106A

LOCKER RM

L105

A L

IG

N

L

L

L

L

L

L

L

L

L D

AL

ELEV

AL

7C

AL

ELEV

AL

7C

AL

ELEV

AL

7CAL

ELEV

AL

7C

AL

ELEV

AL

7D

AL

ELEV

AL

MH7A

AL

ELEV

AL

MH7A

AL

ELEV

AL

MH7A

AL

ELEV

AL

7C

EXISTING EXAM 13

L120D

NURSE STATION

L120C

MED

L120B

CLEAN HOLD

L120A

EXAM 14

L120

STAFF MALE

L152

BREAK ROOM

L151

CORRIDOR

L86

CORRIDOR

C1-12

CORRIDOR

C1-11

CORRIDOR

C1-7

CORRIDOR

C1-11

PATIENT TOILET

L128

ALCOVE

L86A

SS

45 MIN.

12C

L

L86

CORRIDOR

C1-3

CORRIDOR

C1-1

EXISTING EXAM 3

L131

EXAM 1

L133

ALIGN

/2

3' - 4"

1' - 5 3/4"

/4 " 5

/8

24' - 5 3/8"

4 1/4"

3' - 10"

8 7/8"

2 1/4" 3' - 10"

1' - 10 1/8"

/8

/8

E Q

E Q

4"

3' - 4"

18' - 5 1/8"

17' - 5 3/16" 5' - 7 5/8" 5' - 5 3/4" 7' - 10"

2' - 5 3/16"

7' - 10" 6' - 5 1/16" 6' - 4"

1' - 3 3/4"

7' - 10" 5' - 10 11/16" 7' - 10"

1' - 6 5/16"

7' - 10"

7 3/16"

4' - 4 1/16" 7' - 10" 12' - 0"

9' - 9 1/16" 7' - 10"

7' - 10" 9 1/4"

12' - 0" 24' - 0" 12' - 0" 12' - 0" 22' - 8" 2' - 7 7/8"3' - 4 1/4" 11' - 11 3/4" 2' - 6 1/2" 4' - 8 1/2" 4' - 8 3/4" 4' - 8 3/8" 5' - 7" 6' - 5" 24' - 0" 1' - 1 1/8"

10' - 10 7/8"

12' - 0" 24' - 0" 12' - 0" 12' - 0" 22' - 8" 2' - 7 7/8"3' - 4 1/4" 11' - 11 3/4" 2' - 6 1/2" 4' - 8 1/2" 4' - 8 3/4" 4' - 8 3/8" 5' - 7" 6' - 5" 24' - 0"

1' - 1 1/8"

10' - 10 7/8"

111.4 T1

106.2

106.2

106.2

106.2

106.2

106.2

106.2106.2

106.2

106.2

106.2

106.2

106.2

106.2

106.2

106.2

100.3

103.1

103.1

105.2

111.4

111.4

111.4

102.6

104.6

100.3

105.2

105.2

106.2106.2106.2106.2106.2106.2

106.12

106.2

106.2

105.2105.2

7' - 0 3/8" 8' - 6 3/4" 3' - 7 7/8"

103.2

105.2

7 3/4" 8' - 0" 4' - 2 1/8"

105.2

105.2

7.05

7.05

1' - 6" 10' - 11 5/8" 105.2

105.6 T1

EQ EQ

T2

NEW HEADWALL

/ MED GAS

TLT

L139A

EXAM 11

L116

EXAM 12

L115

LOGISTICS / EXAM ROOM

L113

EXAM 9

L114

SUPPLY

L118

EXISTING LIFE SUPPORT

UNIT 10

L117

L113

L115

L113A

L114

L116

L139A

L

L118

L160D

X

MH2

S

DG: T

3E

AL

ELEV

AL

7C

AL

ELEV

AL

7C

AL

ELEV

AL

7C

AL

ELEV

AL

7C

V

DG, T

4F

S

2G

AL

VV

ADO

AL

8D

100.4

/8

/8

/8

NEW HEADWALL

/ MED GAS

NEW HEADWALL

/ MED GAS NEW HEADWALL

/ MED GAS

NEW HEADWALL

/ MED GAS

NEW HEADWALL

/ MED GAS

NEW HEADWALL

/ MED GAS

NEW HEADWALL

/ MED GAS

FEC

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

PARTITION GRAPHICS

NORTH LEGEND

PLAN

NORTHTRUE

NORTH

EXISTING PARTITION /

BARRIER - WALL TO REMAIN

EXISTING PARTITION /

BARRIER - WALL TO BE

REMOVED

NEW PARTITION / BARRIER - WALL

PARTITION PHASING

NO RATING

SMOKE RESISTIVE PARTITION - NON RATED

1 HOUR FIRE BARRIER

1 HOUR FIRE/SMOKE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/ SMOKE BARRIER

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346

POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT

FIRST FLOOR - FFE: 11'-0"

KEY PLAN

BLUE RENOVATION

AREA

COURTYARD

RENOVATION AREA

COPYRIGHT © 2021

WWW.HARRELLDG.COM

C A u to d e s k \2

R e v it L o c a l F ile s \1

A R

C H d w a tk in s V

P C

N C

.r v t

/1

/2

:2

:4

P

M

621-331

AE104

DWJCJUNE 18, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR DIMENSION PLAN -

EMERGENCY DEPARTMENT (ED)

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026

3/16" = 1'-0" F1

ENLARGED FIRST FLOOR DIMENSION PLAN - EMERGENCY

DEPARTMENT (ED)

0 12'8'4'

NEW BARIATRIC

RATED

- SHEET KEYNOTES

GENERAL SHEET NOTES

NEW ANTI-

LIGATURE

NEW ANTI-

LIGATURE

Revision Number Revisions: Date:

1 ADDENDUM 01 JUNE 18, 2021

2.62.73.94.55.26.37.27.7

DD

EE

FF

GG

HH

JJ

4.34.75.05.35.86.0 jj ff ee dd

ELECTRICAL

L02

SUB-WAITING

L10

UTILITY / SOIL

L04

UTILITY CLEAN

L05

X-RAY

L15

CT SCAN

L18

POLICE ENTRY

L20

SECLUSION RM

L23

OBSERVATION STATION

L22

POLICE TEAM WORK

L21

HOLD

8' - 0"

2' - 2"

MECH

L33

ELEVATOR

S-17

ELEVATOR

S-18

ELEVATOR LOBBY

L134

STAFF FEMALE

L102

TREATMENT ROOM 20

L105B

TREATMENT ROOM 21

L105A

TREATMENT ROOM 22

L105

TREATMENT ROOM 19

L104B

TREATMENT ROOM 18

L104A

TREATMENT ROOM 17

L104

SHARED CONTROL

L17

ALCOVE STRETCHER

L11TOILET PATIENT

L16

12' - 0" 22' - 8" 2' - 7 7/8" 3' - 4 1/4"

2' - 4 3/16"

9' - 7 9/16" 2' - 6 1/2" 4' - 8 1/2" 4' - 8 3/4" 4' - 8 3/8" 5' - 7" 6' - 5" 24' - 0" 1' - 1 1/16"

/8

/1

/1

/8

/8

/8

IT ROOM

L01

ALCOVE CLEAN LINEN

L06

H O

L D

TOILET STAFF

L09

F E

C

1-WAY (REFLECTIVE)

GLASS

CORRIDOR

C1-12

CORRIDOR

C1-13

BUILDING 77

L15

L05

L

L03

L20 L23

L

L18

L .2

L17.2

L

L

1' - 3"

HOLD

8' - 0"

X

DG:A

MH5

X

DS:CR, ADO

NRST

SH-3

SN

DL:LEAD

4Q

SN

DL:LEAD

4Q

S

VV

ADO, PACS

NRST

12B

S

DL:LEAD

4Q

S

DL:LEAD

SH-2J.1

S

DS:CR, PACS

90 MIN. /

SMOKE10

SH-3

S

DS:CR

90 MIN. /

SMOKE10

SH-3

V DG: F, DS: YES,

CR

45 MIN.

SH-3E

S

5D

C -1

.2

C1-12.3

L08

TEAM WORK

L12

RR

DG: T

NRST

3F

/8

/8

/4

/8

/8

/8

/4

/2

/2

7' - 0 1/8"

11 3/8"

R.O.

3' - 4" 4' - 3 1/2" 1' - 11 5/8" 6' - 11 7/8" 6' - 5 7/8" 11' - 1 1/4" 2' - 0" 9' - 9 1/2" 5' - 0 3/4" 3' - 0"

4' - 2 7/8" 3' - 1 1/4"

7' - 0 3/4" 12' - 2 5/8" 11' - 9" 36' - 1 1/8" 2' - 2 5/8"

ALCOVE

L86B

7' - 8 3/4" 3' - 0 5/8"

/8

/8

/8

/4

/2

/8

/8

/2

/2

/8

/8

20' - 5 7/8" 2' - 1 1/8"

7' - 8 3/4"

5' - 5 1/4" 3' - 5 3/8" 5' - 0"

3' - 5 3/8"

10' - 11 3/4"

12' - 3 5/8" 3' - 1 1/4"

1' - 7 5/8"

1' - 5 3/4"

9' - 8 3/4" 5' - 6 5/8" 3' - 1" 1' - 6"

1' - 5 3/8"

3' - 6 1/4"

2' - 4 5/8"

A L

IG

N

A L

IG

N

1' - 6"

/1

/1

/8

/8

2' - 7 3/4"

E Q

E Q

/1

/1

/4

/4

/4

/2

/8

/1

"3' - 4 1/8" 21' - 2 1/2" 8 5/8" 1' - 11"

/1

/1

/1

/4

/1

2' - 7 1/4"

2' - 5 1/2"

2' - 2 1/4" 11' - 2 3/4" 8' - 9 5/8" 2' - 8 3/4"

4' - 4"

135.00°3

3' - 6"

3' - 6"A L

IG

N

A L

IG

N

ALIGN

A L

IG

N

135.00°

9' - 8 3/4" 1' - 5 1/4"1

/4

EQ EQ

C -1

.1

SS

ADO, PACS

90 MIN.

12B

S

DG: F, DS: YES

45 MIN.

SH-3C

/8

/8

/8

/4

/4

/8

ALCOVE

L86A

CORRIDOR

L86

WHEELCHAIR ALCOVE

L114

TEAM WORK SATELLITE

L08

HAC

L03

CORRIDOR

C1-12

CORRIDOR

C1-12

CORRIDOR

C1-12

3' - 2 1/4"

A L

IG

N

/8

/8

/2

6' - 0" 9' - 2 3/8"

4' - 10 1/4"

EQ EQ

/8

ALIGN

ALIGN

CL

8' - 6 1/4" 9' - 6 3/8" 2' - 0"

ALIGN

9' - 4" 3' - 9"

S

NRST

3G

L

L86

SS

45 MIN.

12C

105.4

105.4

103.3

106.4

105.4

105.2

103.2

105.2

105.2

105.2105.2

105.4

118.6

118.14 118.14

118.6

105.4

103.2 118.15

118.11

105.4

102.2

118.11

118.11 118.4

118.15

105.2 T1

118.11

111.4 T1

105.2

103.6 T1

118.8

118.5 105.2

118.11

118.12118.14

105.5

118.11

105.4

106.2

105.4

105.4

106.4

118.11

105.2

107.2

107.2 115.5

107.2

105.2

103.2

105.2

115.2

106.2

105.2

107.2

107.2

115.5

107.2

105.3

102.3

105.3

102.1

105.1

102.1

106.2

105.2

106.2

103.1

106.2

105.4

106.2105.6 T1

111.4 T1

111.4 T1

105.2

105.2

105.4

103.4

103.4

102.2

105.2

102.2

105.2

106.2

106.2

106.1102.2105.2

106.1

106.2

105.4

118.11 118.13

106.2

118.4

EQ EQ

118.11

QQ

DL: LEAD

4Q

7.05

L .1

L17.1

L17.3

L17.0

RETROFIT EXISTING

DOOR WITH NEW

CARD READER

118.11 T1

102.1 T1

106.2

107.2

" 106.2

L

L18A.1EQUIP. RM

L18A

S

DG:T DS:CR

SH-3E

S

SH-2J

105.5

105.5 105.5

105.2

105.2

105.4

2" TYP.

106.4105.3

L18A.2

S

DL: LEAD

4Q

A22

A21A21A21A21

A23

A47

A45

A46

A14

A15

F E

C

A56

L18A.3

X

45 MIN. /

SMOKE19

3F

NEW ACCESS PANEL FOR

EXISTING 24"x24"x8"

JUNCTION BOX TO REMAIN

A9

A. REFER TO SHEET AI001 FOR GENERAL FLOOR PLAN NOTES AND

SYMBOLS.

B. FOR TYPICAL HEADWALL CONFIGURATION REFERENCE XRAY

ROOM L15 IN COURTYARD, SEE SHEET QH102.

C. ALL RATED PENETRATIONS TO BE SEALED WITH RED FIRE

RATED CAULKING. USE ACOUSTICAL CAULKING ON ALL OTHER

WALL PENETRATIONS.

D. FOR DOOR INFORMATION SEE SHEETS AE104, AE106, & AE601.

E. FOR PARTITION TYPES SEE GI501, AND WALL IDENTIFICATION

TAGS, SEE SHEETS AE104 AND AE106.

F. FOR RAISED FLOOR LAYOUT SEE SHEET AE107.

G. FOR WINDOW TYPES, SEE SHEET AE602 FOR INFORMATION.

H. FOR WALL PROTECTION / CORNER GUARD LOCATIONS SEE

SHEETS AF100 AND AF101. FOR WALL PROTECTION TYPES, SEE

SHEET AF501.

I. FOR FURNITURE AND EQUIPMENT LOCATION, SEE SHEET

SERIESQH100, AND FOR EQUIPMENT SCHEDULE SEE SHEET

SERIES QH601.

J. FOR VENDOR EQUIPMENT DRAWINGS, SEE SHEET RJ001 AND

RJ002.

K. FOR SCHEDULED FINISHES SEE SHEETS AF601 AND AF602.

L. PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT.

M. FOR EQUIPMENT MOUNTING HEIGHTS, SEE SHEET GI002.

COORDINATE HEIGHTS WITH VA COR.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

PARTITION GRAPHICS

NORTH LEGEND

PLAN

NORTHTRUE

NORTH

EXISTING PARTITION /

BARRIER - WALL TO REMAIN

EXISTING PARTITION /

BARRIER - WALL TO BE

REMOVED

NEW PARTITION / BARRIER - WALL

PARTITION PHASING

NO RATING

SMOKE RESISTIVE PARTITION - NON RATED

1 HOUR FIRE BARRIER

1 HOUR FIRE/SMOKE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/ SMOKE BARRIER

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346

POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT

FIRST FLOOR - FFE: 11'-0"

KEY PLAN

BLUE RENOVATION

AREA

COURTYARD

RENOVATION AREA

COPYRIGHT © 2021

WWW.HARRELLDG.COM

C A u to d e s k \2

R e v it L o c a l F ile s \1

A R

C H d w a tk in s V

P C

N C

.r v t

/1

/2

:2

:4

P

M

621-331

AE106

DWJCJUNE 18, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR DIMENSION PLAN -

COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026

- SHEET KEYNOTES

A9 NEW HIGH CAPACITY CEILING MOUNTED PATIENT LIFT, SEE

DETAIL C5 / AE501 FOR LIFT SUPPORTS.

A14 EXISTING ROOF LEADER TO REMAIN.

A15 RELOCATE EXISTING LINES COORDINATE NEW LOCATIONS

WITH MECHANICAL, PLUMBING AND MED GAS.

A21 CHILLED WATER LINES TO REMAIN.

A22 RAISE OFFSET OF CHILLED WATER LINE (CLEAR OPENING FOR

TEAM ROOM ENTRANCE), COORDINATE WITH MECHANICAL

DRAWINGS.

A23 EXISTING PLUMBING LINE TO REMAIN.

A45 CT SCANNER - POWER DISTRIBUTION CABINET, COORDINATE

WITH ELECTRICAL AND VENDOR DRAWINGS.

A46 CT SCANNER - IMAGE RECONSTRUCTION SYSTEM,

COORDINATE WITH ELECTRICAL AND VENDOR DRAWINGS.

A47 CT SCANNER - HEAT EXCHANGER, COORDINATE WITH

MECHANICAL AND VENDOR DRAWINGS.

A56 1" CABINET FILLER AND / OR END PANEL AT EXPOSED SIDES

AS APPLICABLE.

GENERAL SHEET NOTES

1/4" = 1'-0" F2

ENLARGED COURTYARD DIMENSION PLAN

2'0 4' 8'

1 1

Revision Number Revisions: Date:

1 ADDENDUM 01 JUNE 18, 2021

E

N P

C B

N P

C B

N M

N P

C B

A. FOR FURNITURE AND EQUIPMENT LOCATION, SEE SHEET

SERIES QH100, AND FOR EQUIPMENT SCHEDULE SEE SHEET

SERIES QH601.

B. FOR CASEWORK PLANS SEE SHEET AE516.

C. FOR EQUIPMENT MOUNTING HEIGHTS, SEE SHEET GI002.

COORDINATE HEIGHTS WITH VA COR.

D. PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT.

2.32.62.73.9

RR

SS

TT

PP

AE405C5

CORRIDOR

L39

LOGISTICS /

EXAM ROOM

L113

REF:L114

EXAM 9

L114

SUPPLY

L118

NURSE STA

L119 TLT

L139A

CLOSET

L139B

EXAM 12

L115

EXAM 11

L116

AE405 A2

AE405 B2

A4

A5

A1

B4

B5

B1

C4

C2

C1

AE405F1

AE516

B7

AE405 E7

AE404 D7D2

FIRST FLOOR

500' - 0"

RREXAM 12

L115

M8810

F0210

M4255 M7845

M7420

M3072

F0535

M4655

M4266

M4200

M4100 M5250.

A38A38 A38A38

A64

4' - 8" 1' - 6"1' - 2"

A61

FIRST FLOOR

500' - 0"

2.62.7

EXAM 12

L115 A5106

M4255

M4266

M4655

F0210F0210

F3200

WP-03

A38

1' - 10"

A5075

A5077

BOD: HERMAN

MILLER COMPASS 04

FIRST FLOOR

500' - 0"

2.6

EXAM 12

L115

F3010

M7845

M7420

M3070

M4655

A5145 (2)

FIRST FLOOR

500' - 0"

RR

EXAM 12

L115

M3072

BOD: HERMAN

MILLER COMPASS 04

A5106

F0210

M4655

M7420

F0340

A60

FIRST FLOOR

500' - 0"

2.62.7

F3010

BOD: HERMAN

MILLER COMPASS 04

EXAM 11

L116

A1014

F0340

M4655

M3070

FIRST FLOOR

500' - 0"

SS

EXAM 11

L116

M8810

M4255

M4266 M8810

M4655

M3072

F0535

M4100

M7845

M4200

M0755

M0750

M0765

M5250.

SLIDE

FIRST FLOOR

500' - 0"

2.6 2.7

EXAM 11

L116

A5145 (2)

F3200

A5106

M4655

F0210F0210

M8810

FIRST FLOOR

500' - 0"

SS

EXAM 11

L116

BOD: HERMAN

MILLER COMPASS 04

M4655

F2017

A5106

F0210

F0340 M3072

FIRST FLOOR

500' - 0"

3.9

EXAM 9

L114

M4266

M4255

M8810

A5145 (2)

M4655

F0210 (2)

FIRST FLOOR

500' - 0"

SS

EXAM 9

L114

F0210

M4655 M8810

F0340

M3072

A5075

BOD: HERMAN

MILLER COMPASS 04

FIRST FLOOR

500' - 0"

3.9

EXAM 9

L114

F3200 F3010

A1014

F0340

M3070

M4655

M7420

F0535

FIRST FLOOR

500' - 0"

SS

EXAM 9

L114 M4255

M4200

M7845

M4100

M4266

M8810

M4655M3072

F0535

SLIDE

M0765

MO750M0755

M5250.

FIRST FLOOR

500' - 0"

TLT

L139A

FIRST FLOOR

500' - 0"

TLT

L139A

A5077

A5077

A5075

FIRST FLOOR

500' - 0"

TLT

L139A

A5077

A5077

FIRST FLOOR

500' - 0"

TLT

L139A

FIRST FLOOR

500' - 0"

NURSE STA

L119

M7850

D

M1825

FIRST FLOOR

500' - 0"

TLT

L139A

SCHEDULED PAINT

T

IL

E

EQ EQ

TERMINATION

CAP

SCHEDULED PAINT

EQ EQ

SCHEDULED LIGHT FIXTURE

SCHEDULED

PLUMBING

FIXTURE

TOILET PAPER

HOLDER

GRAB BARS

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

PARTITION GRAPHICS

NORTH LEGEND

PLAN

NORTHTRUE

NORTH

EXISTING PARTITION /

BARRIER - WALL TO REMAIN

EXISTING PARTITION /

BARRIER - WALL TO BE

REMOVED

NEW PARTITION / BARRIER - WALL

PARTITION PHASING

NO RATING

SMOKE RESISTIVE PARTITION - NON RATED

1 HOUR FIRE BARRIER

1 HOUR FIRE/SMOKE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/ SMOKE BARRIER

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346

POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT

FIRST FLOOR - FFE: 11'-0"

KEY PLAN

BLUE RENOVATION

AREA

COURTYARD

RENOVATION AREA

COPYRIGHT © 2021

WWW.HARRELLDG.COM

C A u to d e s k \2

R e v it L o c a l F ile s \1

A R

C H d w a tk in s V

P C

N C

.r v t

/1

/2

:5

:4

A

M

621-331

AE405

DWJCJUNE 18, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

ENLARGED PLANS & INTERIOR

ELEVATIONS @ ED

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026

- SHEET KEYNOTES

A38 ELECTRICAL DEVICE, SEE ELECTRICAL DRAWINGS.

A60 SCHEDULED PLUMBING FIXTURES, SEE PLUMBING DRAWINGS.

A61 NURSE CALL DEVICE, SEE ELECTRICAL DRAWINGS.

A64 SECURITY CAMERA, SEE ELECTRICAL DRAWINGS.

GENERAL SHEET NOTES

1/4" = 1'-0" C6

ENLARGED FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) -

NORTHEAST

2'0 4' 8'

1/4" = 1'-0" A2

INTERIOR ELEVATION –

EAST

1/4" = 1'-0" A1

INTERIOR ELEVATION –

NORTH

1/4" = 1'-0" A4

INTERIOR ELEVATION –

SOUTH

1/4" = 1'-0" A5

INTERIOR ELEVATION -

WEST

1/4" = 1'-0" B1

INTERIOR ELEVATION –

NORTH

1/4" = 1'-0" B2

INTERIOR ELEVATION –

EAST

1/4" = 1'-0" B4

INTERIOR ELEVATION –

SOUTH

1/4" = 1'-0" B5

INTERIOR ELEVATION -

WEST

1/4" = 1'-0" C1

INTERIOR ELEVATION –

NORTH

1/4" = 1'-0" C2

INTERIOR ELEVATION –

EAST

1/4" = 1'-0" C4

INTERIOR ELEVATION –

SOUTH

1/4" = 1'-0" C5

INTERIOR ELEVATION -

WEST

1/4" = 1'-0" E1

INTERIOR ELEVATION –

NORTH

1/4" = 1'-0" E2

INTERIOR ELEVATION –

EAST

1/4" = 1'-0" E4

INTERIOR ELEVATION –

SOUTH

1/4" = 1'-0" E5

INTERIOR ELEVATION -

WEST

1/4" = 1'-0" F1

INTERIOR ELEVATION -

NORTH

2'0 4' 8' 2'0 4' 8' 2'0 4' 8' 2'0 4' 8'

2'0 4' 8'2'0 4' 8'2'0 4' 8'2'0 4' 8'

2'0 4' 8' 2'0 4' 8' 2'0 4' 8' 2'0 4' 8'

2'0 4' 8' 2'0 4' 8' 2'0 4' 8' 2'0 4' 8'

2'0 4' 8'

3/4" = 1'-0" E7

ENLARGED TOILET WALL ELEVATION

1' 2' 3'0

MIRROR

PAPER TOWEL HOLDER

SOAP DISPENSER

SCHEDULED PLUMBING FIXTURE

DOOR SIZES

MARK WIDTH HEIGHT

A 1' - 6" 6' - 8"

B 2' - 0" 6' - 8"

C 2' - 2" 6' - 8"

D 2' - 4" 6' - 8"

E 2' - 6" 6' - 8"

F 2' - 8" 6' - 8"

G 2' - 10" 6' - 8"

H 3' - 0" 6' - 8"

I 3' - 2" 6' - 8"

J 3' - 4" 6' - 8"

K 3' - 8" 6' - 8"

L 3' - 10" 6' - 8"

M 3' - 8 1/2" 7' 11 3/4"

N 2' - 0"

O 2' - 2"

P 2' - 4"

Q 2' - 6"

R 2' - 8"

S

T

3' - 0"

U

V

3' - 4"

W

3' - 8"

X

3' - 10"

MARK WIDTH HEIGHT

7' - 0"

7' - 0"

7' - 0"

7' - 0"

7' - 0"

7' - 0"

7' - 0"

7' - 0"

7' - 0"

7' - 0"

7' - 0"

3' - 6"

4' - 0"

9"

9" 9"

9"

12" MAX

9"

MUNTINS AS

REQ'D

T.A. OR W/F

LOUVER SIZE AS

REQ'D

100 SQ IN MAX

4"x25"

T.A. OR W/F

M

'A' LABEL

180 MINUTE

'B' LABEL

90 MINUTE

100 IN2 MAX

4"x25"

'F' GLASS

'B' LABEL

90 MINUTE

'C' LABEL

45 MINUTE

SOUND RATED INTEGRATED

DOOR

ASSEMBLY

40 42

INTEGRATED

DOOR

ASSEMBLY

1296 SQ IN MAX

EACH LEAF 4"x25"

'F' GLASS

DOOR MODIFICATIONS (APPLICATION CODES)

A LAMINATED GLAZING

ADO AUTOMATIC DOOR OPERATOR

CR CARD READER

D DOUBLE GLAZED TEMPERED GLASS

DA PIVOT HINGE AND EMERGANCY DOOR STOP

DG: GLAZING (DOOR)

DL: LINED (DOOR)

DS: SECURITY (DOOR)

'F' GLASS FIRE RATED GLAZING

H ELECTRIC HOLD

L LOUVER

LP LIGHT PROOF LOUVER

M MECHANICAL SEAL FOR LIGHT PROOF AND

SOUND RETARDING DOOR

T TEMPERED GLASS

U UNDERCUT 3/4"

V LEAD GLASS

W WIRE GLASS

SD SLIDING DOOR (SEE PLAN FOR CLEAR OPENING)

SL SLOPED TOP AND 3" LATCH SIDE GAP

VP VISION PANEL

DOOR NOTES:

1. ALL DOORS SHALL BE FLUSH - 1 3/4" THICK

UNLESS NOTED OTHERWISE

2. TOP AND SIDE RAILS SHALL BE 9" MIN.

BOTTOM RAILS SHALL BE 12" MIN.

3. DOOR TYPES 7,8, & 9 SHALL NOT BE USED

FOR OPPOSING DOORS.

4. EVEN NUMBERS ARE METAL; ODD NUMBER

ARE SOLID CORE WOOD.

5. NOT ALL DOOR TYPES ARE USED.

GLASS OR

LOUVER

REQUIRED BY

MODIFICATION

GLASS OR

LOUVER

REQUIRED BY

ELEVATION TYPE

AS SCH

A S

S C

H

A D

J U

S T

C

M U

T O

C O

U R

S E

2" 2"

AS SCH

A S

S C

H

A D

J U

S T

C

M U

T O

C O

U R

S E

2" 2"

UON

2' - 10"

T

AS SCH

A S

S C

H

AL

AL

WIDE STILE ALUMINUM

ENTRANCE

HOLLOW

METAL

HOLLOW

METAL w/ SIDE

LITE

ALUMINUM

STOREFRONT

REF: AE602 FOR

TYPES & SIZES

Z 2' - 10" 7' - 0"

Y 1' - 9" 7' - 8"

BASIS OF DESIGN:

HORTON HD SWING

15 / 17

LEAD LINED

8" x 10"

LEAD GLASS

IF REQ'D (DR. 15)

RAY PROOF

IF REQ'D (DR. 15)

ELEV

SEE DOOR ELEVATION (REFER TO

WINDOW ELEVATIONS ALSO)

TYPICAL FOR ALL INTERIOR DOOR FRAMES.

6"

45°

DOOR FRAME

DOOR STOP (END 6"

ABOVE FLOOR AND

TERMINATE AT 45 ANGLE)

SOLID CAP

WELDED TO STOP

FRAME TYPES

FRAME TYPE A

2"

WIDTH

SCHEDULED FRAME

2"

1/2" 1/2"

/8

/8

APPLIED STOP

FOR GLAZING

MAY OCCUR

FRAME TYPE B FRAME TYPE C

/2

/2

W

ID

T H

S C

H E

D U

L E

D F

R A

M E

3/8"

1 3/8" 5/8"

5/8"

STOP AT HEAD

E Q

E Q

2"

WIDTH

SCHEDULED FRAME

2"

/8

1/2" 1/2"

/8

APPLIED STOP

FOR GLAZING

MAY OCCUR

FRAME TYPE D

WIDTH

SCHEDULED FRAME

1/2" 1/2"

/8

S E

E M

F R

F

IX

E D

R A

IL

N

O T

C H

B

E Y

O N

D

FRAME TYPE E

WIDTH

SCHEDULED FRAME

1/2" 1/2"

/8

1/2"1/2"

WIDTH

SCHEDULED FRAME

/8

/8

JAMB

HEAD

METAL STUDS @ 12"

O.C. ABOVE HEAD ONLY

SCHEDULED FRAME

WIDTH & TYPE

SEE PLAN FOR DOOR

LOCATION

SEE PART. TYPES

VARIES

SEE PART. TYPES

VARIES

METAL STUDS @ 12"

O.C. ABOVE HEAD ONLY

SCHEDULED FRAME

WIDTH & TYPE

METAL STUDS @

12" O.C. ABOVE

HEAD ONLY

SCHEDULED FRAME

WIDTH & TYPE

GLAZING PANEL

MAY OCCUR

SEE PART. TYPES

VARIES

HM GLAZING STOP

MAY OCCUR

HD-1 HD-2 HD-3

HEAD DETAILSJAMB DETAILS

JD-1

JD-2

DOUBLE STUD @ JAMB, TYP.

SEE ROOM FINISH SCHEDULE

FOR WALL FINISHES.

WALL MAY OCCUR

SCHEDULED FRAME

WIDTH & TYPES

STUD ANCHORS

1 OR 2 LAYES OF GYP. BD. MAY

OCCUR, SEE PARTITION TYPES

SEE ROOM FINISH SCHEDULES

FOR WALL FINISHES

DOUBLE STUD @

FRAME (TYP.)

C OF OPENING

SCHEDULED DOOR

FRAME SEE PART. TYPES

VARIES

S E

E P

A R

T T

Y P

E S

V A

R

IE

S

L

A. CONTRACTOR IS RESPONSIBLE FOR COORDINATING DOORS, DOOR FRAMES, AND HARDWARE.

B. HARDWARE SUPPLIER IS RESPONSIBLE FOR BUILDING CODE AND FIRE RATED DOOR

REQUIREMENTS.

C. ALL FIRE RATED DOORS SHALL HAVE APPLIED U.L. LABEL ON HINGE SIDE. IF DOOR IS RATED, THEN

FRAME ALSO REQUIRES MATCHING UL LABEL.

D. FRAME SIZES TO BE COORDINATED WITH PARTITION WIDTHS ON THE JOB SITE BY CONTRACTOR.

E. PROVIDE TWO (2) 16 GAUGE METAL STUDS AT ALL DOOR JAMBS AND PARTITION CORNERS.

F. GLASS SHALL BE PERMANENTLY MARKED TO INDICATE THAT IT IS TEMPERED.

G. ALL DOORS REQUIRE BEVELED EDGES. BEVEL RADIUS 1/8 INCH MIN, TYP. ALL DOORS 1-3/4" THICK

AND 7'-0" HIGH UNLESS NOTED OTHERWISE. ALL DOORS ARE SOLID CORE WOOD UNLESS NOTED

OTHERWISE.

H. AFTER INSTALLATION OF EACH HOLLOW METAL DOOR FRAME, MARK THE ROOM NUMBER ON THE INTERIOR AND EXTERIOR OF THE FRAME WITH INK THAT WILL NOT BE VISIBLE AFTER THE SPECIFIED FINISHING IS COMPLETED.

I. DOORS AND FRAMES INDICATED AS NRST ON THE SCHEDULE ARE NON-RATED, SMOKE TIGHT.

J. ALL FRAMES ARE HOLLOW METAL UNLESS NOTED OTHERWISE.

K. ALL HARDWARE, SWITCH PLATES, AND OUTLET PLATES WITH MATCHING FASTENERS TO USE ANTIMICROBIAL

COPPER IN BASE BID. FOR A DEDUCT ALTERNATE ALL ITEMS WILL USE 304 STAINLESS STEEL.

L. FOR GLAZING LITES IN DOOR , SEE SCHEDULE REMARKS COLUMN AND DOOR APPLICATION CODES LEGEND; FOR

DASHED LINES IN ELEVATION TYPE LOOK FOR RELEVANT DOOR APPLICATION CODE IN DOOR I.E. A, D, F, T, VP, V, W, ETC.

H. WOOD VENEER AND FINISH TO MATCH FACILITY STANDARDS.

I. STANDARD DOOR UNDERCUT TO BE 1/2" (3/4" MAXIMUM) FROM FINISHED SURFACE OF HIGHEST ADJACENT FLOOR /

THRESHOLD.

1 2

A T, 90 MIN.

x xx

DOOR SYMBOL

PANEL TYPE

FRAME TYPE

DOOR RATING

DOOR SIZE DOOR MODIFICATION

DOOR RATINGS

UL LABEL RATING (HRS) RATING (MIN.) MAX. GLASS AREA

A 3 HR 180 MIN. 100 SQUARE INCHES PER LEAF

B 1 1/2 HR 90 MIN. 100 SQUARE INCHES PER LEAF

C 3/4 HR 45 MIN. 1296 SQUARE INCHES PER LEAF

D 1 1/2 HR 90 MIN. REFER TO LOCAL CODES

E 3/4 HR 45 MIN. REFER TO LOCAL CODES

1/3 HR 20 MIN. 1296 SQUARE INCHES PER LEAF

S SMOKE SMOKE

UL LABLES D AND E ARE FOR EXTERIOR DOORS THAT ARE SUBJECT TO FIRE HAZARDS FROM

THE OUTSIDE OF THE DOOR.

HW SET

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346

POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT

COPYRIGHT © 2021

WWW.HARRELLDG.COM

C A u to d e s k \2

R e v it L o c a l F ile s \1

A R

C H d w a tk in s V

P C

N C

.r v t

/1

/2

:5

:4

A

M

621-331

AE601

DWJCJUNE 18, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

DOOR SCHEDULE AND DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026

1/4" = 1'-0" B2

DOOR AND FRAME TYPES

PAINT: PAINT EXISTING DOOR & FRAME

FRAME: PATCH HINGE DEPRESSION ON FRAME & PAINT

1/2" = 1'-0" C2

HOSPITAL DOOR STOP

1'0 2' 4'

2'0 4' 8'

DOOR SYMBOLS LEGEND DOOR SCHEDULE

ROOM DOOR DOOR PANELS DOOR FRAME

RATING HW REMARKS

DETAIL

NO. NAME NUMBER SIZE

PAIR /

UNEQUAL

PAIR TYPE MAT'L TYPE MAT'L

FRAME /

HEAD SILL

FRAME /

JAMB

COURTYARD

C1-12 CORRIDOR C1-12.1 SS 42 WD 1 HM 90 MIN. 12B ADO, PACS

L86 CORRIDOR C1-12.2 VV - 40 HM 1 HM NRST 12B ADO, PACS A / HD-1 A / JD-1

L136 CORRIDOR C1-12.3 RR - 1 WD 1 HM NRST 3F DG: T A / HD-1 A / JD-1

C1-13 CORRIDOR L01 S - 10 HM 1 HM 90 MIN. /

SMOKE

SH-3 DS:CR, PACS A / HD-1 A / JD-1

C1-13 CORRIDOR L02 S - 10 HM 1 HM 90 MIN. /

SMOKE

SH-3 DS:CR A / HD-1 A / JD-1

L03 HAC L03 S - 1 WD 1 HM 5D A / HD-1 A / JD-1

C1-12 CORRIDOR L04 S - 11 WD 1 HM 45 MIN. SH-3C DG: F, DS: YES A / HD-1 A / JD-1

L05 UTILITY CLEAN L05 V - 11 WD 1 HM 45 MIN. SH-3E DG: F, DS: YES, CR A / HD-1 A / JD-1

L08 TEAM WORK SATELLITE L08 OPENING - - - 1 HM - - E E

L09 TOILET STAFF L09 S - 1 WD 1 HM 2 A / HD-1 A / JD-1

L12 TEAM WORK L12 S - 19 WD 1 HM NRST 3G

L15 X-RAY L15 SN YES 15 WD 1 HM 4Q DL:LEAD MFR MFR MFR

L16 TOILET PATIENT L16.1 S - 19 WD 1 HM SH-2J A / HD-1 A / JD-1

L16 TOILET PATIENT L16.2 S - 15 WD 1 HM SH-2J.1 DL:LEAD MFR MFR MFR

L17 SHARED CONTROL L17.1 S - 1 WD 1 HM SH-3E DG:T DS:CR

L17 SHARED CONTROL L17.2 S - 15 WD 1 HM 4Q DL:LEAD MFR MFR MFR

L17 SHARED CONTROL L17.3 OPENING - - - - -

L18 CT SCAN L18 SN YES 15 WD 1 HM 4Q DL:LEAD MFR MFR MFR

L18 CT SCAN L18A.1 QQ YES 15 WD 1 HM 4Q DL: LEAD MFR MFR MFR

L18 CT SCAN L18A.2 S 15 WD 1 HM 4Q DL: LEAD MFR MFR MFR

C1-12 CORRIDOR L18A.3 X 19 WD 1 HM 45 MIN. /

SMOKE

3F

L20 POLICE ENTRY L20 X - 1 WD 1 HM NRST SH-3 DS:CR, ADO

L21 POLICE TEAM WORK L22 OPENING - - - 1 HM - - E - E

L23 SECLUSION RM L23 X - 19 WD 1 HM MH5 DG:A

EMERGENCY DEPT RENOV

L86 CORRIDOR L86 SS YES 2 HM 1 HM 45 MIN. 12C

L106B MEDS L106B S - 1 WD 1 HM SH-3E DG:T, DS: YES,CR

L113 VESTIBULE L113 VV YES AL AL AL AL 8D ADO

L113 LOGISTICS / EXAM ROOM L113A ELEV - AL AL AL HM 7C

L114 EXAM 9 L114 ELEV - AL AL AL HM 7C

L115 EXAM 12 L115 ELEV - AL AL AL HM 7C

L116 EXAM 11 L116 ELEV - AL AL AL HM 7C

L118 SUPPLY L118 V - 1 WD 1 HM 4F DG, T

L120 EXAM 14 L120 ELEV - AL AL AL HM 8A

L120D EXISTING EXAM 13 L120D ELEV - AL AL AL HM 7C

L123 EXISTING EXAM 8 L123 ELEV - AL AL AL HM 7C MFR MFR

L124 EXISTING EXAM 7 L124 ELEV - AL AL AL HM 7C MFR MFR

L125 EXISTING EXAM 6 L125 ELEV - AL AL AL HM 7C MFR MFR

L127 EXISTING EXAM 5 L127 ELEV - AL AL AL HM 7C MFR MFR

L128 PATIENT TOILET L128 X - 19 WD 1 HM MH2

L129 EXISTING EXAM 4 L129 ELEV - AL WD AL HM 7D MFR MFR

L131 EXISTING EXAM 3 L131 ELEV - AL AL AL HM MH7A MFR MFR

L132 EXAM 2 L132 ELEV - AL AL AL HM MH7A MFR MFR

L133 EXAM 1 L133 ELEV - AL AL AL HM MH7A MFR MFR

L139A TLT L139A S - 19 WD 1 HM 2G

L160D OFFICE L160D S - 1 WD 1 HM 3E DG: T

GENERAL SHEET NOTES

1 1 1

FIRST FLOOR

500' - 0"

2" 4' - 0"2"3' - 4"2"

7' - 10"

ALUM. DOOR / SIDELITE ASSEMBLY ORIENTATION

VARIES, SEE PLAN FOR INFORMATION.

GLAZING TYPES LG #2

@ ANTI-LIGATURE

EXAM ROOMS

(L31, L132, L133)

GLAZING TYPES LG #1

TYPICAL UON.

METAL STUDS 2'-0" O.C.

4" (HEAVY GAGE) METAL TRACK & STUDS 12" O.C.

SCHEDULED CEILING, SEE REFLECTED

CEILING PLAN FOR HEIGHTS

ACOUSTICAL INSULATION

5/8" FINISH GYPSUM BOARD

FASTEN THE TOP PLATES WITH EITHER POWER ACTUATED FASTENERS @

24" O.C. PINS STAGGERED OR S12 SCREWS DEPENING ON SUBSTRATE

@ DECKING WITH CONCRETE USE POWERED FASTENERS

@ DECKING WITHOUT CONCRETE USE S12 SCREWS

CONTINUOUS SEALANT

BOTTOM OF STRUCTURE

1/2" THREADED

ROD

UNITSTRUT

3/4" FRT PLYWOOD

LEAD SHIELDING

LEAD SHIELDING 1/16" THICK LAMINATED TO GYPSUM BOARD

METAL STUDS 2'-0" O.C.

4" (HEAVY GAGE) METAL TRACK & STUDS 12" O.C.

CONTINUOUS SEALANT, EACH SIDE

POWER ACTUATED FASTENERS

@ 24" O.C. PINS STAGGERED

ACOUSTICAL INSULATION

OVERLAP LEAD SHIELDING

CONCRETE FILL

(EMBEDDED UTILITIES)

EXISTING CONCRETE SLAB

LEAD SHIELDING 1/16" THICK LAMINATED TO

GYPSUM BOARD FASTENED TO METAL STUDS

(LEAD BEARS ON SLAB)

5/8" FINISH GYPSUM BOARD

ELECTRICAL DEVICES, SEE

ELECTRICAL DRAWINGS

SCHEDULED FINISH

WRAP LEAD SHIELDING (PER MANUFCATURER

INSTRUCTION) AROUND INCLUDING BUT NOT

LIMITED TO ELECTRICAL DEVICES / BOXES

FIRST FLOOR

500' - 0"

2" 4' - 0"

2"

1' - 1 5/8"

LG

#2

± 5' - 7 5/8" FV

LG

#2

GLAZING TYPES LG #2

@ ANTI-LIGATURE

EXAM ROOMS

(L31, L132, L133)

FIRST FLOOR

500' - 0"

7' - 10"

2" 4' - 6" 3' - 0" 2"

LG

#1

LG

#1

FIRST FLOOR

500' - 0"

2"4' - 0"2' - 0"2"

6' - 4"

" LG

#1

LG

#1

+0' - 0"

EXISTING SLAB

DEPRESSION

-0' - 4"

CORRIDOR

EXISTING FLOOR

COURTYARD

±2" ARDEX OR EQUAL RAISED INFILL TO

MATCH EXISTING ADJACENT CORRDIDOR

HEIGHT, SEE TOPPING PLAN SHEET AE107

EXISTING CONCRETE

STRUCTURE

±4" ARDEX WITH AGGREGATE OR EQUAL RAISED INFILL

TO MATCH EXISTING ADJACENT CORRDIDOR HEIGHT,

SEE TOPPING PLAN SHEET AE107.

SCHEDULED FINISHED FLOOR

TO MATCH EXISTING ADJACENT CORRDIDOR HEIGHT

EXISTING

FINISHED FLOOR

0' - 0"

EXISTING SLAB

DEPRESSION

-0' - 2"

FINISHED FLOOR

LOWER SLAB DEPRESSION WIDTH

± 1' - 0" FV

EXISTING TO REMAIN TURNED UP

SLABS EXCEPT @ NEW OPENINGS

EXISTING CONCRETE

STRUCTURE

EXISTING PARTITION (BEYOND)

ACOUSTICAL

CEILING

PANELS

ATTACH

CLNG. EDGE

ANGLE TO

CHANNELS

SERIES

CHANNELS

1/2" [12mm] DIA.

HANGER RODS

FOR FINAL LEVELING

K-SERIES CHANNELS

WITH OPTIONAL

CEILING TILE FLANGES

OR

ACOUSTICAL

CEILING

PANELS

LAY-IN CEILING

TRACK(S) BY EQUIPMENT SUPPLIER

P3184 F WHERE P1001 IS EXPOSED

CLEARANCE FOR RECESSED LIGHTS AND CEILING

P E

N D

IN

G

T H

IS

D

IM

E

N S

IO

N

D

IA

G O

N A

L B

R A

C

IN

G M

A Y

B E

R E

Q U

IR

E

D

P2346

P1000

P2473

P2346

P5500

P1001

4'-0"

[1219mm]

SEE A OR

P1000

P2346

P2473

P5500

10"[230mm] MAX.

DIST. FROM WALL

P2346

-1

/1

-1

/1 "4

-7 /8

ANCHOR BOLTS THROUGH

CONCRETE SLAB

P2346

P1000

METAL PLATE

25" [625mm]

APPROX.

1/4"X4"X4"X6"BENT PL

ANCHOR BOLTS WITH

EXPANSION SHIELDS (MIN.

FACTOR OF SAFETY OF 4).

(PROVIDE ADEQUATE INSPECTION

OR TESTING FOR PULL OUT).

P1000

P1000

P2346

SLAB.

INSERTED IN CONCRETE

P1000 WITH ANCHORS

[1 m m

[1 m m

[1 m m

[6mmX100mmX100mmX150mm]

NOTES:

THE NUMBER SHOWN ON DRAWING WITH A "P"

CEILING.

OR PARTITIONS, EXCEPT FOR MEMBERS FLUSH WITH

TERMINATE APPROX. 6" [150mm] FROM FACE OF WALLS

AS SHOWN ON ARCHITECTURAL DRAWINGS AND SHALL

ALL SUPPORTS AND HANGERS SHALL BE ARRANGED

PREFIX ARE UNISTRUT CATALOG NUMBERS USED AS A

CONVENIENCE FOR IDENTIFYING DESIRED SHAPES AND

THICKNESS OF MEMBERS.

DETAILS A, B, C & D SHOW ANCHORAGE SUPPORT

NOTE FOR ARCHITECT:

INTO VARIOUS TYPES OF SLAB CONDITIONS. ACTUAL

SUPPORT MUST BE DESIGNED TO SUIT THE

PARTICULAR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .