Revised drawings 6-21-2021.pdf
PDF 23 MB Posted
- Solicitation number
- 36C24921B0008
About this file
This document provides details on a federal contract opportunity for renovations to expand an emergency department at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves renovating an existing shelled space adjacent to the existing emergency department into a new radiology, police holding, and administrative area to serve the emergency department. The solicitation number is 36C24921B0008 and is expected to be posted on or around May 25, 2021, closing on or around June 24, 2021. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses under authority of 38 U.S.C section 8127(d). The NAICS code is 236220 for Commercial and Institutional Building Construction, with a small business size standard of $39.5 million. The estimated construction range is between $5 million to $10 million. The project will be procured using sealed bidding per FAR Part 14.101. Questions must be submitted in writing to the Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24921B0008 0002.pdf | ||
| 081710_Add1.pdf | ||
| 000110_Add1.pdf | ||
| Amendment 0001.pdf | ||
| 087100_Add1.pdf | ||
| 013323.1 Master Submittal List_Add1.pdf | ||
| 010000_Add1.pdf | ||
| 224000 Add1.pdf | ||
| 099659_Add1.pdf | ||
| Amendment Summary.pdf | ||
| Pre bid sign in sheet.pdf | ||
| RFI Form - Expand Emergency Dept.pdf | ||
| Mt Home ED Final CD Specs_Revised 210512.pdf | ||
| WD TN20210111 1-1-2021.pdf | ||
| Mt Home ED Final CD Drawings _Revised 210512.pdf | ||
| 36C24921B0008_1.pdf | ||
| Contractor EMR Certification Form.pdf | ||
| 36C24921B0008.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR COORDINATION
CONTRACTOR SHALL OBTAIN A COPY OF THE FINAL SITE LATEST VENDOR DRAWINGS
PRIOR TO PROCURING OR INSTALLING ANY EQUIPMENT. ANY REWORK REQUIRED BY THE
CONTRACTOR'S FAILURE TO OBTAIN THESE DRAWINGS, SHALL BE AT THE
CONTRACTOR'S EXPENSE AND SHALL NOT RESULT IN ANY ADDITIONAL TIME TO THE
PROJECT. THE CONTRACTOR SHALL MEET THE REPRESENTATIVE OF THE VENDOR PRIOR
TO THE START OF WORK. ALL WORK SHALL COMPLY WITH ALL VENDOR REQUIREMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK SHOWN ON THESE
DRAWINGS AND ALL WORK SHOWN ON THE VENDOR DRAWINGS. THE PHRASE "SUPPLIED
BY CUSTOMER" (OR DERIVATIVES) MEANS "PROVIDED BY CONTRACTOR."
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
C A u to d e s k \2
R e v it L o c a l F ile s \1
A R
C H d w a tk in s V
P C
N C
.r v t
/1
/2
:2
:4
A
M
621-331
GI001
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
COVER SHEET FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026
CAMPUS AERIAL PHOTO
LOCATION MAP
COORDINATION NOTES
INDEX OF DRAWINGS
PROJECT
EXPAND EMERGENCY DEPARTMENT PHASE 2
MOUNTAIN HOME, TN 37684-4000
VETERANS HEALTH ADMINISTRATION
621-331
THE CONTRACTOR SHALL PREPARE COORDINATION DRAWINGS. SUCH DRAWINGS SHALL BE ARRANGED AND DESIGNED THROUGH AND FROM COORDINATION WITH ALL OTHER MAJOR AND MINOR SUBCONTRACTORS.
THE CONTRACTOR AT THEIR OWN EXPENSE SHALL PREPARE A THREE-DIMENSIONAL COORDINATION MODEL IN AUTODESK REVIT AND PRODUCE TWO-DIMENSIONAL COORDINATION DRAWINGS FROM MODEL, SPECIFICALLY CREATED BY THE CONTRACTOR FOR THIS PROJECT.
MODEL SHALL INCLUDE AND DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO: ALL DUCTWORK; ALL AIR DISTRIBUTION; MECHANICAL EQUIPMENT; MECHANICAL PIPING; FIRE PROTECTION PIPING; ALL PLUMBING PIPING;
CABLE TRAYS (WITH ELEVATIONS NOTED); LIGHTING FIXTURES (WHEN CEILING MOUNTED); CEILING GRID AND CEILING HEIGHT; MAJOR BEAMS AND JOISTS (WITH ELEVATIONS MARKED); FIRE ALARM DEVICES AND SPEAKERS (WHERE CEILING MOUNTED); ELECTRICAL CONDUITS LARGER THAN 2-INCH DIAMETER; ELECTRICAL BUSWAY AND REQUIRED CLEARANCES; EQUIPMENT PROVIDED BY OTHERS THAT PROTRUDE INTO CEILING CAVITIES OR IMPEDE THE LOCATION OR ACCESS TO ABOVE CEILING PIPING, DUCTWORK OF OTHER EQUIPMENT. SECTIONS SHALL BE CUT THROUGH AREAS SHOWING MATERIALS AND SYSTEMS OF ALL CONTRACTS.
IF THERE ARE ANY COORDINATION ISSUES THAT CANNOT BE RESOLVED BY THE GC’S COORDINATION DRAWING PREPARER, THE GC SHALL SUBMIT RFI TO THE VA.
CONTRACTOR SHALL PERFORM CLASH DETECTION ON ALL MODELED ELEMENTS AND RESOLVE IN COORDINATION WITH VA AND AE.
NOTE THAT ROUGH-IN / FABRICATION CANNOT BEGIN UNTIL COORDINATION MODEL AND DRAWINGS HAVE BEEN APPROVED. ANY MATERIAL, EQUIPMENT, SYSTEMS, ETC., PROCUREMENT OR INSTALLATION COMMENCED PRIOR TO APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK AND MAY HAVE TO BE MODIFIED, MOVED AND/OR RECONFIGURED AT NO INCREASE IN CONSTRUCTION TIME OR MONIES TO BE BURDENED BY THE GOVERNMENT. BOTH MODEL AND DRAWINGS ARE TO BE MADE A PART OF COORDINATION DRAWING SUBMISSION TO GOVERNMENT AND DESIGNER. ENSURE THAT ALL SUB-CONTRACTORS ARE RESPONSIBLE FOR
COORDINATION ACROSS ENTIRE SET OF CONSTRUCTION DOCUMENTS.
PROJECT
SITE
PROJECT SITE �
FIRE ALARM
FA001 GENERAL NOTES AND SCHEDULES
FA101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - FIRE ALARM
FA102 FIRST FLOOR PLAN - COURTYARD - FIRE ALARM
FIRE PROTECTION
FX001 GENERAL NOTES, SYMBOLS & LEGENDS
FX101 FIRST FLOOR PLAN - EMERGENCY DEPT. ( ED) - FIRE PROTECTION
FX102 FIRST FLOOR PLAN - COURTYARD - FIRE PROTECTION
FX501 FIRE PROTECTION DETAILS
PLUMBING
PL001 GENERAL NOTES, LEGENDS, SYMBOLS & SCHEDULES
PD101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION
PD201 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION
PD301 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION
PD102 FIRST FLOOR PLAN - COURTYARD - DEMOLITION
PL101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - SUPPLY
PL102 FIRST FLOOR PLAN - COURTYARD - SUPPLY
PL201 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - WASTE & VENT
PL202 FIRST FLOOR PLAN - COURTYARD - WASTE & VENT
PG101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - MEDICAL GAS
PG102 FIRST FLOOR PLAN - COURTYARD - MEDICAL GAS
PL501 PLUMBING DETAILS
MECHANICAL
MH001 GENERAL NOTES & LEGENDS
MD101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION
MD102 FIRST FLOOR PLAN - COURTYARD - DEMOLITION
MH101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DUCTWORK
MH102 FIRST FLOOR PLAN - COURTYARD - DUCTWORK
MH103 ROOF PLAN - COURTYARD
MP101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - PIPING
MP102 FIRST FLOOR PLAN - COURTYARD - PIPING
MH501 DETAILS
MH502 DETAILS
MH503 DETAILS
MH601 SCHEDULES
MI701 CONTROLS SCHEMATICS
ELECTRICAL
EG001 GENERAL NOTES AND SCHEDULES
ED101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEMOLITION
ED102 FIRST FLOOR PLAN - COURTYARD - DEMOLITION
EL101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - LIGHTING
EL102 FIRST FLOOR PLAN - COURTYARD - LIGHTING
EP101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - POWER
EP102 FIRST FLOOR PLAN - COURTYARD - POWER
EP103 ROOF PLAN - POWER
EY101 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - SYSTEMS
EY102 FIRST FLOOR PLAN - COURTYARD - SYSTEMS
EP501 DETAILS
EP601 ELECTRICAL RISER DIAGRAMS
EP701 PANEL SCHEDULES
EP702 PANEL SCHEDULES
EP703 PANEL SCHEDULES
EP704 ELECTRICAL EQUIPMENT SCHEDULE
VENDOR EQUIPMENT DRAWINGS
RJ001 CT SCAN VENDOR EQUIPMENT DRAWINGS
RJ002 XRAY VENDOR EQUIPMENT DRAWINGS
RJ003 XRAY VENDOR EQUIPMENT DRAWINGS
RJ004 XRAY VENDOR EQUIPMENT DRAWINGS
RJ005 XRAY VENDOR EQUIPMENT DRAWINGS
GENERAL
GI001 COVER SHEET
GI002 EQUIPMENT MOUNTING LEGEND
GI003 ACCESSIBILITY LEGEND
GI099 CODE SUMMARY
GI100 FIRST FLOOR LIFE SAFETY PLAN
GI501 PROJECT-WIDE PARTITION TYPES AND STANDARD DETAILS
GENERAL CONDITIONS
GC100 FIRST FLOOR EXISTING PLAN - EMERGENCY DEPARTMENT (ED)
GC101 FIRST FLOOR EXISTING PLAN - COURTYARD
SOC-2 STATEMENT OF CONDITIONS
GC103 FIRST FLOOR ICRA PLAN
GC121 FIRST FLOOR PHASING PLAN
ARCHITECTURAL
AI001 NOTES AND LEGENDS
AI002 ARCHITECTURAL ABBREVIATIONS
AD052 FIRST FLOOR DEMOLITION PLAN - EMERGENCY DEPARTMENT (ED)
AD053 FIRST FLOOR DEMOLITION PLAN - COURTYARD
AD054 DEMOLITION DETAILS
AE101 FIRST FLOOR PLAN - OVERALL
AE102 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED)
AE103 FIRST FLOOR PLAN - COURTYARD
AE104 FIRST FLOOR DIMENSION PLAN - EMERGENCY DEPARTMENT (ED)
AE106 FIRST FLOOR DIMENSION PLAN - COURTYARD
AE107 COURTYARD TOPPING PLAN
AE110 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEDUCT ALT 1
AE111 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEDUCT ALT 3
AE112 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEDUCT ALT 4
AE113 FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) - DEDUCT ALT 5
AE121 REFLECTED CEILING PLAN - EMERGENCY DEPT (ED)
AE122 REFLECTED CEILING PLAN - COURTYARD
AE150 ROOF PLAN
AE301 PARTIAL BUILDING SECTIONS AT COURTYARD
AE401 ENLARGED PLANS AND INTERIOR ELEVATIONS @ COURTYARD
AE402 ENLARGED PLAN AND INTERIOR ELEVATIONS @ COURTYARD
AE403 ENLARGED PLANS AND ELEVATIONS @ COURTYARD
AE404 INTERIOR ELEVATIONS @ COURTYARD
AE405 ENLARGED PLANS & INTERIOR ELEVATIONS @ ED
AE406 ENLARGED PLANS & INTERIOR ELEVATIONS @ ED
AE501 MISCELLANEOUS DETAILS
AE511 INTERIOR DETAILS
AE512 INTERIOR DETAILS
AE513 INTERIOR DETAILS
AE515 CASEWORK DETAILS
AE516 ENLARGED CASEWORK PLANS
AE601 DOOR SCHEDULE AND DETAILS
AE602 WINDOW TYPES & DETAILS
INTERIORS
AF100 FIRST FLOOR FINISH PLAN - EMERGENCY DEPARTMENT (ED)
AF101 FIRST FLOOR FINISH PLAN - COURTYARD
AF450 3D VIEWS - INTERIORS
AF452 3D VIEWS - INTERIORS
AF453 3D VIEWS INTERIORS
AF500 THRESHOLD DETAILS
AF501 WALL PROTECTION / SIGNAGE TYPES
AF601 INTERIOR FINISH SCHEDULE
AF602 INTERIOR MATERIALS LEGEND
EQUIPMENT
QH100 FIRST FLOOR ENLARGED EQUIPMENT PLAN
QH101 FIRST FLOOR ENLARGED EQUIPMENT PLAN
QH102 FIRST FLOOR ENLARGED EQUIPMENT PLAN
QH601 EQUIPMENT SCHEDULES
PROJECT DESCRIPTION
EXPAND AND RENOVATE PORTIONS OF EXISTING EMERGENCY DEPARTMENT (ED) AT THE JAMES H. QUILLEN VA MEDICAL CENTER, MOUNTAIN HOME (JOHNSON CITY), TENNESSEE. THE PROJECT WILL RENOVATE 4,400 SF OF NEW EXPANSION TO BUILD-OUT EXISTING 1ST FLOOR SHELL SPACE IN BLDG. 204 ADJACENT TO THE ED. THIS NEW EXPANDED AREA WILL INCLUDE SPACE FOR ADDITIONAL RADIOLOGY SERVICES, ADDITIONAL EMERGENCY DEPARTMENT EXAM & SUPPORT ROOMS AND A POLICE SECLUSION ROOM WITH SUPPORT SPACE. DESIGN MAY INCLUDE, BUT IS NOT LIMITED TO, MODIFICATION OF EXISTING BUILDING STRUCTURE, INFRASTRUCTURES, AND UTILITY SYSTEMS, DEMOLITION OF EXISTING, NEW STRUCTURAL, NEW WALLS AND DOORS, CEILINGS SYSTEMS, FLOORING, INTERIOR FINISHES, CASEWORK, NEW MECHANICAL HVAC, ELECTRICAL, PLUMBING, STEAM, CHILLED WATER, MEDICAL GAS, FIRE SPRINKLER, FIRE ALARM, DATA AND COMMUNICATIONS SYSTEMS, ALL APPLICABLE SECURITY ELEMENTS INCLUDING ACCESS CONTROL AND VIDEO SURVEILLANCE SYSTEMS AND MODIFICATION OF ALL APPLICABLE EXISTING SYSTEMS AS NECESSARY FOR A COMPLETE AND USABLE RENOVATION PROJECT.
1. PRODUCTS TO BE FURNISHED BY VA AND PREP WORK PROVIDED BY GC:
A. GE HEALTHCARE XR656 HD. GC PROVIDES SITE PREP WORK. SEE VENDOR
DRAWINGS SHEET RJ002.TO INCLUDE BUT NOT LIMITED TO:
a. JSN X5100 WALL STAND
b. JSN X5500 OTS BRIDGE, RAILS
c. JSN X5400 TABLE
B. SIEMENS SOMATOM DEFINITION EDGE. GC PROVIDES SITE PREP WORK. SEE
VENDOR DRAWINGS SHEET RJ001. TO INCLUDE BUT NOT LIMITED TO:
a. JSN X6240 GANTRY, TABLE, AND TV MONITOR BOOM
b. JSN X6250 CT INJECTOR
C. STRYKER MED GAS BOOM. GC TO INSTALL OVERHEAD STRUCTURE MOUNT.
OWNER FURNISHED AND NAME BRAND OR EQUAL ITEMS:
SCHEDULE OF BID ITEMS
A. ITEM 1; BASE BID: THE CONTRACTOR SHALL PROVIDE ALL NECESSARY TOOLS, LABOR, MATERIALS, EQUIPMENT, PERMITS, LICENSE, AND SUPERVISION FOR "EXPAND EMERGENCY DEPARTMENT PHASE 2," PROJECT NUMBER 621-328, LOCATED AT THE JAMES H. QUILLEN VA MEDICAL CENTER IN MOUNTAIN HOME TN., IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. WORK INCLUDES, BUT IS NOT LIMITED TO, INTERIOR RENOVATION WITHIN PROJECT LIMITS (FIRST FLOOR ONLY), GENERAL DEMOLITION, CONSTRUCTION, PLUMBING, STRUCTURAL, HVAC, ELECTRICAL, AND FIRE PROTECTION.
B. ITEM 2; DEDUCT ALTERNATE 1: PERFORM ALL WORK AS STATED IN BID ITEM 1, EXCEPT REMOVE FINISHES IN CORRIDOR C-7 (INCLUDING BUT NOT LIMITED TO REMOVING REPLACEMENT OF LVT AND VCT FLOORING) AND
ASSOCIATED WORK.
C. ITEM 3; DEDUCT ALTERNATE 2: PERFORM ALL WORK AS STATED IN BID ITEM 2, EXCEPT REMOVE EXAM ROOM L120D AND ASSOCIATED WORK, HOWEVER, INFILL AT REAR DOOR IN L120D TO REMAIN BASE BID.
D. ITEM 4; DEDUCT ALTERNATE 3: PERFORM ALL WORK AS STATED IN BID ITEM 3, EXCEPT REMOVE PATIENT TOILET ROOM L128 AND ASSOCIATED WORK.
E. ITEM 5; DEDUCT ALTERNATE 4: PERFORM ALL WORK AS STATED IN BID ITEM 4, EXCEPT REMOVE CLOSET L139, TOILET L139A, EXAM 11 AND 12 ROOM L116 AND L115 AND ASSOCIATED WORK.
F. ITEM 6; DEDUCT ALTERNATE 5: PERFORM ALL WORK AS STATED IN BID ITEM 5, EXCEPT REMOVE REMOVE LOGISTICS/EXAM ROOM L113, EXAM ROOM L114, SUPPLY ROOM L118, AND NURSE STATION ROOM L119 AND ASSOCIATED
WORK.
G. ITEM 7; DEDUCT ALTERNATE 6: PERFORM ALL WORK AS STATED IN BID ITEM 6, EXCEPT REMOVE ANTI-LIGATURE SINKS AND REPLACE WITH NON-ANTI-LIGATURE SINKS IN EXAM ROOMS L131, L132, AND L132.
2. NAME BRAND OR EQUAL ITEMS.
A. JSN X1000 PPE DISPENSER, SEMI-RECESSED: BOWMAN ITEM RE101-0012.
B. HEADWALL: AMICO MODEL # E-CON-9R
C. HERMAN MILLER COMPASS 04, FINISHES SELECTED BY VA INTERIORS.
D. SETRA FLEX ENVIRONMENTAL MONITOR. FLEX-R25WBRC7S6, MODEL 267
PRESSURE TRANSDUCER, 2671R25WB11A1FN.
E. LIKORALL ULTRATWIN OVERHEAD LIFT CEILING LIFT SYSTEM (JSN A1200 LIFT
SYSTEM, OVERHEAD)
F. STEEL GUARD ACOUSTIC BLANKETS, 2-INCH.
G. BEST HARDWARE
REFER TO SPECIFICATION 01 00 00 GENERAL REQUIREMENTS FOR ADDITIONAL DETAILS.
Revision Number Revisions: Date:
1 ADDENDUM 01 JUNE 18, 2021
2.3
2.6
2.6
2.7
2.7
3.9
3.9
4.5
4.5
5.2
5.2
6.3
6.3
7.2
7.2
7.7
7.7
8.2
8.2
9.2
9.2
9.7
9.7
JJ
LL
NN
RR
SS
TT
UU
PP
MM
4.3
4.3
4.7
4.7
5.0
5.0
5.3
5.3
5.8
5.8
6.0
6.0
17' - 10 1/2" 1' - 2" 7' - 8 5/8" 8' - 11" 3' - 10 7/8" 4' - 3 3/4"
2' - 4"
9' - 4" 34' - 2"
A3
8' - 8 1/8" 10' - 4 3/4" 5' - 4 1/2"
2.06
2.12
16' - 5 3/8" 5' - 7 5/8" 5' - 5 3/4" 7' - 10"
2' - 5 1/8"
7' - 10 5/8" 6' - 4 1/2" 6' - 4"
1' - 3 3/4" 7' - 10"
5' - 10 3/4"
8' - 0" 1' - 4 3/8" 8' - 5 1/4" 4' - 4" 7' - 10" 11 1/4"
2.06
A7
2.08
3' - 4"
1' - 5 3/4"
2.06
A7 A7
2.06 2.06
A7 A7
2.06
A7
2.06
A7
2.06
9' - 2 3/8"
/8
2.06
A7
A7A7
3' - 4" 4' - 1 3/4" 4' - 4" 14' - 3 5/8" 7' - 10" 22' - 1 5/8"
16' - 4 5/8"
7' - 5 1/2"
1' - 9 3/8"
4' - 1 3/8"
2.06 2.06
A7
2.06
A7
2.06
4"
3' - 4"
/8
2.06
7' - 10"
9 1/4"
A7
2 1/4" 3' - 10"
4 1/4" 3' - 10"
2.06
2.06
A7
" 4
2.06
A7
A7
4' - 10 1/8" 1' - 9 1/2" 8' - 0 5/8"
/8
2.07
2.07
/4 "6
"2.06
A7
2.13 2.13
7.05
7.05
FLOOR
FINISHES
DEDUCT ALT. 1
DEDUCT ALT. 2
DEDUCT ALT.1
DEDUCT ALT. 4
DEDUCT ALT. 5
A8
A7 2.06
A7 2.08
2.06
2.07
2.08
2.08
2.072.07
A7
A7
A8
A7
2.06
2.072.07
2.06
A7A7
A7
A7
A7
A7
A7
A7A7
5' - 11"
9' - 2" 4' - 0" 1' - 0"
/4
13' - 1" 7"
2.18
A3
A3
A3
A3
A3
A3
A3
A3 A3
A3
A3
A3
A3
A3
A3
A7
4' - 3 3/8"
A4
A4 A4
A4
A4
A4
A4
A4.1
A4
A4
A4 A4 EXISTING VCT FLOORING
EXISTING VCT FLOORING
EXISTING VCT FLOORING
EXISTING VCT FLOORING
EXISTING VCT FLOORING
EXISTING VCT FLOORING
EXISTING VCT FLOORING
A4
A4
A4
A4
A4
A4
A4
A4
A3
A4
A4
A4
2.07
A17
A17
A17
A17
A18A17
A17
A17
A17
2.07 2.08
2.072.08
BAY 3
N/A
71 SF
BIO-HAZARD
L144
CORRIDOR
C1-11
CLERK
REGISTRATION
L154
MECH
N/AEXAM ROOM
L159
DIRTY LINEN
L160E
CLERK RM
L160D
NURSE WK.
ROOM
L160
PHARM.
N/A
OFFICE
L160B
EQUIPMENT
L133
NURSE STATION
L135
WAITING
L137
EXAM RM
N/A
TOILET
N/A
POLICE WORK
ROOM
N/A
WORK ROOM
L132
TREATMENT RM
L131
TREATEMENT RM
- 12
L129 TREATMENT RM -
L127
TREATMENT RM -
L125
TREATMENT RM -
L124
TREATMENT RM -
L123
HC TOILET
L130
TELECOMM
L121
TREATMENT
ROOM
L120D
MEDS
L120B
NURSE STATION
L120C
ELECTRICAL
L150
BREAK ROOM
L151
STAFF MEN
L152
EXAM ROOM 15
L120
OFFICE
L120A
BUSINESS
OFFICE
L100H
ISOLATION
TREATMENT
ROOM 23
L111
ANTE ROOM
L111A
ALCOVE
L109A
VESTIBULE
L113
BAY 1
N / A
BAY 2
N/A
BAY 4
N/A
LOGISTICS
L113
ELECTRICAL
L108
RN / PSA MAA
L120C
OFFICE
L106B
SUPPLIES
L106A
MEDS
L116
SUPPLIES
L118
TOILET
L115A
BAY 6
N/A
BAY 5
N/A
STAIR NO 2
N/A
CORRIDOR
C1-2
POLICE
DISPATCH
L100K
CORRIDOR
C1-3
HC STAFF TOILET
L130A
NURSE STATION
L107
SUPPLIES
L117
NURSE STA.
L119
HALLWAY
L115
ED OFFICE
L140
EXAM ROOM
L141
EXAM ROOM
L142
EXAM ROOM
L143
EXAM ROOM
L144
TOILET
L157
SHARED EXAM ROOM
L111C
EXAM ROOM
L158
CHECK-OUT
L160A
CORRIDOR
C1-2
STAFF HC OFFICE
L128
STAFF HC OFFICE
L126
PROJECT LIMITS
(NOT IN SCOPE)
A. FOR GENERAL DEMOLITION NOTES, SEE SHEET AI001.
B. ALL EXISTING DATA JACKS ARE BAGGED AND TAGGED FOR
CONTRACTOR TO RE-INSTALL WHERE POSSIBLE. SEE AD
SERIES DEMOLITION SHEETS.
C. FOR TYPICAL SAWCUT DETAIL AT NEW OPENINGS, SEE DETAIL
B5 / AD054.
D. GC MUST X-RAY PRIOR TO CORE DRILLING EXISTING SLABS .
E. USE 2-INCH-THICK SOUND BLANKETS ON ENTIRE LENGTH OF
WALLS DURING CONSTRUCTION TO MITIGATE AGAINST
CONSTRUCTION NOISE TRANSMISSION. SEE SPEC SECTION 01
57 19. BASIS OF DESIGN: “STEEL GUARD ACOUSTIC BLANKETS,
OR EQUAL.”
1 HOUR FIRE RATED CONSTRUCTION
BARRIER.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTHTRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION PHASING
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 11'-0"
KEY PLAN
BLUE RENOVATION
AREA
COURTYARD
RENOVATION AREA
COPYRIGHT © 2021
WWW.HARRELLDG.COM
C A u to d e s k \2
R e v it L o c a l F ile s \1
A R
C H d w a tk in s V
P C
N C
.r v t
/1
/2
:0
:5
P
M
621-331
AD052
DWJCJUNE 18, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR DEMOLITION PLAN -
EMERGENCY DEPARTMENT (ED)
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026
3/16" = 1'-0" F2
FIRST FLOOR DEMOLITION PLAN - EMERGENCY DEPARTMENT (ED)
0 12'8'4'
- SHEET KEYNOTES
A7 REMOVE EXISTING WALLS IN THEIR ENTIRETY INCLUDING
STRUCTURE, BRACING, FACINGS, FASTENERS, SEALANT, ETC.,
FROM FINISH FLOOR SLAB TO UNDERSIDE OF STRUCTURE
ABOVE. REPAIR ALL DAMAGE TO EXISTING CONSTRUCTION THAT
IS TO REMAIN, READY TO RECEIVE NEW CONSTRUCTION.
A8 REMOVE EXISTING FURRING AND GYPSUM BOARD IN THEIR
ENTIRETY INCLUDING BRACING, FACINGS, FASTENERS, SEALANT,
ETC., FROM FINISH FLOOR SLAB TO UNDERSIDE OF STRUCTURE
ABOVE. LEAVE EXISTING FIRE RATED CMU WALL IN PLACE.
REPAIR ALL DAMAGE TO EXISTING CONSTRUCTION THAT IS TO
REMAIN, READY TO RECEIVE NEW CONSTRUCTION.
A17 CONSTRUCTION BARRIER: NON-RATED TEMPORARY WALL AND
3'-0" x 7'-0" DOOR. FIRE RETARDANT 60 MIL PLASTIC SHEETING
REQUIRED ABOVE CEILING.
A18 CONSTRUCTION BARRIER: NON-RATED TEMPORARY WALL. FIRE
RETARDANT 60 MIL PLASTIC SHEETING REQUIRED ABOVE
CEILING.
2.06 REMOVE EXISTING DOOR(S) AND DOOR FRAME IN THEIR
ENTIRETY INCLUDING REINFORCING, FASTENERS, ANCHORS,
HARDWARE, ETC. REPAIR ALL DAMAGE TO EXISTING
CONSTRUCTION THAT IS REMAIN, READY TO RECEIVE NEW
CONSTRUCTION.
2.07 REMOVE EXISTING PLUMBING FIXTURE(S) IN THEIR ENTIRETY
INCLUDING ALL ANCHORS, FLANGES, PIPING, ETC. REPAIR ALL
DAMAGE TO EXISTING CONSTRUCTION THAT IS TO REMAIN,
READY TO RECEIVE NEW CONSTRUCTION.
2.08 REMOVE EXISTING CASEWORK & FURNITURE IN ITS ENTIRETY
INCLUDING ALL ANCHORS, FASTENERS, CONDUIT, ETC. REPAIR
ALL DAMAGE TO EXISTING CONSTRUCTION THAT IS TO REMAIN,
READY TO RECEIVE NEW CONSTRUCTION AS SHOWN ON
DRAWINGS.
2.12 REMOVE EXISTING WINDOW AND FRAME IN THEIR ENTIRETY
INCLUDING FASTENERS, ANCHORS, HARDWARE, ETC. REPAIR
ALL DAMAGE TO EXISTING CONSTRUCTION THAT IS REMAIN,
READY TO RECEIVE NEW CONSTRUCTION.
2.13 REMOVE EXISTING WINDOW AND FRAME IN THEIR ENTIRETY
INCLUDING FASTENERS, ANCHORS, HARDWARE, ETC. EXCEPT
LEAVE EXISTING LINTEL INTACT / IN-PLACE.DEMOLISH MASONRY
WALL BELOW LINTEL AT THE EXTENTS OF THE OPENING. REPAIR
ALL DAMAGE TO EXISTING CONSTRUCTION THAT IS REMAIN,
READY TO RECEIVE NEW CONSTRUCTION.
2.18 REMOVE EXISTING WALL PROTECTION (CORNER GUARD, CRASH
RAIL, HANDRAIL, AND / OR SHEET WALL PROTECTION) AND DOOR
FRAME IN THEIR ENTIRETY INCLUDING REINFORCING,
FASTENERS, ANCHORS, HARDWARE, ETC. REPAIR ALL DAMAGE
TO EXISTING CONSTRUCTION THAT IS REMAIN, READY TO
RECEIVE NEW CONSTRUCTION.
A3 REMOVE EXISTING CLG IN ITS ENTIRETY INCLUDING ALL
SUPPORTS AND FASTENERS. REPAIR ALL DAMAGE TO EXISTING
CONSTRUCTION THAT IS TO REMAIN, READY TO RECEIVE NEW
CONSTRUCTION.
A4 REMOVE EXISTING FLOORING IN ITS ENTIRETY INCLUDING ALL
TRIM, ADHESIVES, GROUT, MORTAR, WALL BASES, ETC., TO
FINISH FLOOR SLAB. CLEAN EXISTING SLAB TO REMOVE ANY
RESIDUAL MATERIAL THAT MAY BE DETRIMENTAL TO
INSTALLATION OF NEW FLOORING.SEE DRAWINGS FOR EXTENTS.
A4.1 REMOVE EXISTING FLOORING IN ITS ENTIRETY INCLUDING ALL
TRIM, ADHESIVES, GROUT, MORTAR, WALL BASES, ETC., TO
FINISH FLOOR SLAB. CLEAN EXISTING SLAB TO REMOVE ANY
RESIDUAL MATERIAL THAT MAY BE DETRIMENTAL TO
INSTALLATION OF NEW FLOORING.SEE DRAWINGS FOR
EXTENTS.THIS WORK TO OCCUR NIGHTS AND WEEKENDS.
COORDINATE WORK WITH COR.
GENERAL SHEET NOTES
SYMBOLS LEGEND
- SHEET KEYNOTES
Revision Number Revisions: Date:
CR
CR
C R
E
N P
N P
NM
N P
C B
N D
C B
C B
N P
C B
N P
C B
E
N M
P A
C
RN
D
N P
C B
NM
2.3
2.3
2.6
2.6
2.7
2.7
3.9
3.9
4.5
4.5
5.2
5.2
6.3
6.3
7.2
7.2
7.7
7.7
8.2
8.2
9.2
9.2
9.7
9.7
JJ
LL
NN
RR
SS
TT
UU
PP
MM
4.3
4.3
4.7
4.7
5.0
5.0
5.3
5.3
5.8
5.8
6.0
6.0
EXAM ROOM
L144
EXAM ROOM
L143
EXAM ROOM
L142
EXAM ROOM
L141
ED OFFICE
L140
EXAM RM-8
L139
EXAM RM
L138
TOILET
L157
MECH
L25
SHARED EXAM
ROOM
L159
NEURO-TESTING
L160A
OFFICE
L160D
STORAGE
L26
SECLUSION RM
L135A
EXAM RM
L29
TOILET
L30
POLICE WORK
ROOM
L31
HC TOILET
L130
SOILED
L149
ELECTRICAL
L150
ISOLATION
TREATMENT
ROOM 15
L111
ANTE ROOM
L109
NOURISHMENT
L109A
VESTIBULE
L113
STAIR NO 2
L42
POLICE
DISPATCH
L100K
HC STAFF TOILET
L130A
CORRIDOR
L39
EXISTING EXAM 8
L123
EXISTING EXAM 7
L124
EXISTING EXAM 6
L125
EXISTING EXAM 5
L127
EXISTING EXAM 4
L129
EXAM 2
L132
CORRIDOR
C1-7
NURSE STATION
L107
ELECTRICAL
L108
TELECOMM
L121
NURSE STA.
L160B
OFFICE DIRECTOR
L160E
ALCOVE
L86B
ALCOVE
L109B
CORRIDOR
L86
/F2 AE103/F2 AE103
L86
/4
/4
MATCH LINEMATCH LINE
NURSE STATION
L135
WAITING
L137
CORRIDOR
L135B
EXAM 1
L133
INFILL OPENING AT WINDOW,
MATCH EXISTING PARTITION TYPE
EXISTING EXAM 3
L131
ANTI LIGATURE
SINKS
BREAK ROOM
L151 STAFF MALE
L152
EXAM 14
L120
PATIENT TOILET
L128
EXISTING EXAM 13
L120D
MED
L120B
NURSE STATION
L120C
CLEAN HOLD
L120A
INFILL AT
DOOR
INFILL AT DOOR
MEDS
L106B
LOCKER RM
L105
MAIN NURSE STATION
L106A
PNEUMATIC TUBE STA. (EXISTING
TO REMAIN)
INFILL AT
DOOR
WORK RM
L160
ALCOVE
L86A
7.05
7.05 ø 6' - 0"
FLOOR FINISHES,
REFER TO AF100
DEDUCT ALT. 1
DEDUCT ALT. 2
DEDUCT ALT.3
DEDUCT
ALT. 4
DEDUCT
ALT. 5
HAND
SENSOR
EXISTING LIFE SUPPORT
UNIT 10
L117
LOGISTICS / EXAM ROOM
L113
EXAM 9
L114
SUPPLY
L118
NURSE STA
L119
CLOSET
L139B
TLT
L139AEXAM 11
L116
EXAM 12
L115
AE405
C6
AE406
C6
AE406
F6
A10
AE404
A1
CORRIDOR
C1-3
B5
DEDUCT ALT.6
A25
A25
A24
A26
H E
A D
W A
L L
" A11
A. REFER TO SHEET AI001 FOR GENERAL FLOOR PLAN NOTES AND
SYMBOLS.
B. FOR TYPICAL HEADWALL CONFIGURATION REFERENCE XRAY
ROOM L15 IN COURTYARD, SEE SHEET QH102.
C. ALL RATED PENETRATIONS TO BE SEALED WITH RED FIRE
RATED CAULKING. USE ACOUSTICAL CAULKING ON ALL OTHER
WALL PENETRATIONS.
D. FOR DOOR INFORMATION SEE SHEETS AE104, AE106, & AE601.
E. FOR PARTITION TYPES SEE GI501, AND WALL IDENTIFICATION
TAGS, SEE SHEETS AE104 AND AE106.
F. FOR RAISED FLOOR LAYOUT SEE SHEET AE107.
G. FOR WINDOW TYPES, SEE SHEET AE602 FOR INFORMATION.
H. FOR WALL PROTECTION / CORNER GUARD LOCATIONS SEE
SHEETS AF100 AND AF101. FOR WALL PROTECTION TYPES, SEE
SHEET AF501.
I. FOR FURNITURE AND EQUIPMENT LOCATION, SEE SHEET
SERIESQH100, AND FOR EQUIPMENT SCHEDULE SEE SHEET
SERIES QH601.
J. FOR VENDOR EQUIPMENT DRAWINGS, SEE SHEET RJ001 AND
RJ002.
K. FOR SCHEDULED FINISHES SEE SHEETS AF601 AND AF602.
L. PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT.
M. FOR EQUIPMENT MOUNTING HEIGHTS, SEE SHEET GI002.
COORDINATE HEIGHTS WITH VA COR.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTHTRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION PHASING
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 11'-0"
KEY PLAN
BLUE RENOVATION
AREA
COURTYARD
RENOVATION AREA
COPYRIGHT © 2021
WWW.HARRELLDG.COM
C A u to d e s k \2
R e v it L o c a l F ile s \1
A R
C H d w a tk in s V
P C
N C
.r v t
/1
/2
:3
:2
A
M
621-331
AE102
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - EMERGENCY
DEPARTMENT (ED)
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026
3/16" = 1'-0" F2
ENLARGED FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED)
0 12'8'4'
- SHEET KEYNOTES
A10 EXISTING CEILING MOUNTED PATIENT LIFT TO REMAIN.
A11 NEW HEADWALL AND MED GAS.
A24 MEDICAL GAS ALARM PANEL, COORDINATE WITH PLUMBING
DRAWINGS PG101 AND PG102.
A25 ZONE CONTROL PANEL, COORDINATE WITH PLUMBING
DRAWINGS PG101 AND PG102.
A26 MEDICAL GAS MASTER ALARM PANEL, COORDINATE WITH
PLUMBING DRAWINGS PG101 AND PG102.
GENERAL SHEET NOTES
1 1
Revision Number Revisions: Date:
2.6
2.6
2.7
2.7
3.9
3.9
4.5
4.5
5.2
5.2
6.3
6.3
7.2
7.2
7.7
7.7
8.2
8.2
9.2
9.2
9.7
9.7
JJ
LL
NN
RR
SS
TT
UU
PP
MM
4.3
4.3
4.7
4.7
5.0
5.0
5.3
5.3
5.8
5.8
6.0
6.0
EXAM ROOM
L144
EXAM ROOM
L143
EXAM ROOM
L142
EXAM ROOM
L141
ED OFFICE
L140
EXAM RM-8
L139
EXAM RM
L138
TOILET
L157
MECH
L25
SHARED EXAM
ROOM
L159
NEURO-TESTING
L160A
OFFICE
L160D
STORAGE
L26
SECLUSION RM
L135A
EXAM RM
L29
TOILET
L30
POLICE WORK
ROOM
L31
HC TOILET
L130
SOILED
L149
ELECTRICAL
L150
TREATMENT
ROOM 22
L105
TREATMENT
ROOM 17
L104
WORKROOM
L100H
ISOLATION
TREATMENT
ROOM 15
L111
ANTE ROOM
L109
NOURISHMENT
L109A
VESTIBULE
L113
STAIR NO 2
L42
POLICE
DISPATCH
L100K
HC STAFF TOILET
L130A
CORRIDOR
L39
EXISTING EXAM 8
L123
EXISTING EXAM 7
L124
EXISTING EXAM 6
L125
EXISTING EXAM 5
L127
EXISTING EXAM 4
L129
EXAM 2
L132
CORRIDOR
C1-7
NURSE STATION
L107
ELECTRICAL
L108
TELECOMM
L121
NURSE STA.
L160B
OFFICE
DIRECTOR
L160E
ALCOVE
L86B
ALCOVE
L109B
6' - 8 5/8" 7' - 9 5/8"
11 1/4"
AL
ELEV
AL
8A
S
DG:T, DS: YES,CR
SH-3E
L106B
MEDS
L106B
MAIN NURSE STATION
L106A
LOCKER RM
L105
A L
IG
N
L
L
L
L
L
L
L
L
L D
AL
ELEV
AL
7C
AL
ELEV
AL
7C
AL
ELEV
AL
7CAL
ELEV
AL
7C
AL
ELEV
AL
7D
AL
ELEV
AL
MH7A
AL
ELEV
AL
MH7A
AL
ELEV
AL
MH7A
AL
ELEV
AL
7C
EXISTING EXAM 13
L120D
NURSE STATION
L120C
MED
L120B
CLEAN HOLD
L120A
EXAM 14
L120
STAFF MALE
L152
BREAK ROOM
L151
CORRIDOR
L86
CORRIDOR
C1-12
CORRIDOR
C1-11
CORRIDOR
C1-7
CORRIDOR
C1-11
PATIENT TOILET
L128
ALCOVE
L86A
SS
45 MIN.
12C
L
L86
CORRIDOR
C1-3
CORRIDOR
C1-1
EXISTING EXAM 3
L131
EXAM 1
L133
ALIGN
/2
3' - 4"
1' - 5 3/4"
/4 " 5
/8
24' - 5 3/8"
4 1/4"
3' - 10"
8 7/8"
2 1/4" 3' - 10"
1' - 10 1/8"
/8
/8
E Q
E Q
4"
3' - 4"
18' - 5 1/8"
17' - 5 3/16" 5' - 7 5/8" 5' - 5 3/4" 7' - 10"
2' - 5 3/16"
7' - 10" 6' - 5 1/16" 6' - 4"
1' - 3 3/4"
7' - 10" 5' - 10 11/16" 7' - 10"
1' - 6 5/16"
7' - 10"
7 3/16"
4' - 4 1/16" 7' - 10" 12' - 0"
9' - 9 1/16" 7' - 10"
7' - 10" 9 1/4"
12' - 0" 24' - 0" 12' - 0" 12' - 0" 22' - 8" 2' - 7 7/8"3' - 4 1/4" 11' - 11 3/4" 2' - 6 1/2" 4' - 8 1/2" 4' - 8 3/4" 4' - 8 3/8" 5' - 7" 6' - 5" 24' - 0" 1' - 1 1/8"
10' - 10 7/8"
12' - 0" 24' - 0" 12' - 0" 12' - 0" 22' - 8" 2' - 7 7/8"3' - 4 1/4" 11' - 11 3/4" 2' - 6 1/2" 4' - 8 1/2" 4' - 8 3/4" 4' - 8 3/8" 5' - 7" 6' - 5" 24' - 0"
1' - 1 1/8"
10' - 10 7/8"
111.4 T1
106.2
106.2
106.2
106.2
106.2
106.2
106.2106.2
106.2
106.2
106.2
106.2
106.2
106.2
106.2
106.2
100.3
103.1
103.1
105.2
111.4
111.4
111.4
102.6
104.6
100.3
105.2
105.2
106.2106.2106.2106.2106.2106.2
106.12
106.2
106.2
105.2105.2
7' - 0 3/8" 8' - 6 3/4" 3' - 7 7/8"
103.2
105.2
7 3/4" 8' - 0" 4' - 2 1/8"
105.2
105.2
7.05
7.05
1' - 6" 10' - 11 5/8" 105.2
105.6 T1
EQ EQ
T2
NEW HEADWALL
/ MED GAS
TLT
L139A
EXAM 11
L116
EXAM 12
L115
LOGISTICS / EXAM ROOM
L113
EXAM 9
L114
SUPPLY
L118
EXISTING LIFE SUPPORT
UNIT 10
L117
L113
L115
L113A
L114
L116
L139A
L
L118
L160D
X
MH2
S
DG: T
3E
AL
ELEV
AL
7C
AL
ELEV
AL
7C
AL
ELEV
AL
7C
AL
ELEV
AL
7C
V
DG, T
4F
S
2G
AL
VV
ADO
AL
8D
100.4
/8
/8
/8
NEW HEADWALL
/ MED GAS
NEW HEADWALL
/ MED GAS NEW HEADWALL
/ MED GAS
NEW HEADWALL
/ MED GAS
NEW HEADWALL
/ MED GAS
NEW HEADWALL
/ MED GAS
NEW HEADWALL
/ MED GAS
FEC
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTHTRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION PHASING
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 11'-0"
KEY PLAN
BLUE RENOVATION
AREA
COURTYARD
RENOVATION AREA
COPYRIGHT © 2021
WWW.HARRELLDG.COM
C A u to d e s k \2
R e v it L o c a l F ile s \1
A R
C H d w a tk in s V
P C
N C
.r v t
/1
/2
:2
:4
P
M
621-331
AE104
DWJCJUNE 18, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR DIMENSION PLAN -
EMERGENCY DEPARTMENT (ED)
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026
3/16" = 1'-0" F1
ENLARGED FIRST FLOOR DIMENSION PLAN - EMERGENCY
DEPARTMENT (ED)
0 12'8'4'
NEW BARIATRIC
RATED
- SHEET KEYNOTES
GENERAL SHEET NOTES
NEW ANTI-
LIGATURE
NEW ANTI-
LIGATURE
Revision Number Revisions: Date:
1 ADDENDUM 01 JUNE 18, 2021
2.62.73.94.55.26.37.27.7
DD
EE
FF
GG
HH
JJ
4.34.75.05.35.86.0 jj ff ee dd
ELECTRICAL
L02
SUB-WAITING
L10
UTILITY / SOIL
L04
UTILITY CLEAN
L05
X-RAY
L15
CT SCAN
L18
POLICE ENTRY
L20
SECLUSION RM
L23
OBSERVATION STATION
L22
POLICE TEAM WORK
L21
HOLD
8' - 0"
2' - 2"
MECH
L33
ELEVATOR
S-17
ELEVATOR
S-18
ELEVATOR LOBBY
L134
STAFF FEMALE
L102
TREATMENT ROOM 20
L105B
TREATMENT ROOM 21
L105A
TREATMENT ROOM 22
L105
TREATMENT ROOM 19
L104B
TREATMENT ROOM 18
L104A
TREATMENT ROOM 17
L104
SHARED CONTROL
L17
ALCOVE STRETCHER
L11TOILET PATIENT
L16
12' - 0" 22' - 8" 2' - 7 7/8" 3' - 4 1/4"
2' - 4 3/16"
9' - 7 9/16" 2' - 6 1/2" 4' - 8 1/2" 4' - 8 3/4" 4' - 8 3/8" 5' - 7" 6' - 5" 24' - 0" 1' - 1 1/16"
/8
/1
/1
/8
/8
/8
IT ROOM
L01
ALCOVE CLEAN LINEN
L06
H O
L D
TOILET STAFF
L09
F E
C
1-WAY (REFLECTIVE)
GLASS
CORRIDOR
C1-12
CORRIDOR
C1-13
BUILDING 77
L15
L05
L
L03
L20 L23
L
L18
L .2
L17.2
L
L
1' - 3"
HOLD
8' - 0"
X
DG:A
MH5
X
DS:CR, ADO
NRST
SH-3
SN
DL:LEAD
4Q
SN
DL:LEAD
4Q
S
VV
ADO, PACS
NRST
12B
S
DL:LEAD
4Q
S
DL:LEAD
SH-2J.1
S
DS:CR, PACS
90 MIN. /
SMOKE10
SH-3
S
DS:CR
90 MIN. /
SMOKE10
SH-3
V DG: F, DS: YES,
CR
45 MIN.
SH-3E
S
5D
C -1
.2
C1-12.3
L08
TEAM WORK
L12
RR
DG: T
NRST
3F
/8
/8
/4
/8
/8
/8
/4
/2
/2
7' - 0 1/8"
11 3/8"
R.O.
3' - 4" 4' - 3 1/2" 1' - 11 5/8" 6' - 11 7/8" 6' - 5 7/8" 11' - 1 1/4" 2' - 0" 9' - 9 1/2" 5' - 0 3/4" 3' - 0"
4' - 2 7/8" 3' - 1 1/4"
7' - 0 3/4" 12' - 2 5/8" 11' - 9" 36' - 1 1/8" 2' - 2 5/8"
ALCOVE
L86B
7' - 8 3/4" 3' - 0 5/8"
/8
/8
/8
/4
/2
/8
/8
/2
/2
/8
/8
20' - 5 7/8" 2' - 1 1/8"
7' - 8 3/4"
5' - 5 1/4" 3' - 5 3/8" 5' - 0"
3' - 5 3/8"
10' - 11 3/4"
12' - 3 5/8" 3' - 1 1/4"
1' - 7 5/8"
1' - 5 3/4"
9' - 8 3/4" 5' - 6 5/8" 3' - 1" 1' - 6"
1' - 5 3/8"
3' - 6 1/4"
2' - 4 5/8"
A L
IG
N
A L
IG
N
1' - 6"
/1
/1
/8
/8
2' - 7 3/4"
E Q
E Q
/1
/1
/4
/4
/4
/2
/8
/1
"3' - 4 1/8" 21' - 2 1/2" 8 5/8" 1' - 11"
/1
/1
/1
/4
/1
2' - 7 1/4"
2' - 5 1/2"
2' - 2 1/4" 11' - 2 3/4" 8' - 9 5/8" 2' - 8 3/4"
4' - 4"
135.00°3
3' - 6"
3' - 6"A L
IG
N
A L
IG
N
ALIGN
A L
IG
N
135.00°
9' - 8 3/4" 1' - 5 1/4"1
/4
EQ EQ
C -1
.1
SS
ADO, PACS
90 MIN.
12B
S
DG: F, DS: YES
45 MIN.
SH-3C
/8
/8
/8
/4
/4
/8
ALCOVE
L86A
CORRIDOR
L86
WHEELCHAIR ALCOVE
L114
TEAM WORK SATELLITE
L08
HAC
L03
CORRIDOR
C1-12
CORRIDOR
C1-12
CORRIDOR
C1-12
3' - 2 1/4"
A L
IG
N
/8
/8
/2
6' - 0" 9' - 2 3/8"
4' - 10 1/4"
EQ EQ
/8
ALIGN
ALIGN
CL
8' - 6 1/4" 9' - 6 3/8" 2' - 0"
ALIGN
9' - 4" 3' - 9"
S
NRST
3G
L
L86
SS
45 MIN.
12C
105.4
105.4
103.3
106.4
105.4
105.2
103.2
105.2
105.2
105.2105.2
105.4
118.6
118.14 118.14
118.6
105.4
103.2 118.15
118.11
105.4
102.2
118.11
118.11 118.4
118.15
105.2 T1
118.11
111.4 T1
105.2
103.6 T1
118.8
118.5 105.2
118.11
118.12118.14
105.5
118.11
105.4
106.2
105.4
105.4
106.4
118.11
105.2
107.2
107.2 115.5
107.2
105.2
103.2
105.2
115.2
106.2
105.2
107.2
107.2
115.5
107.2
105.3
102.3
105.3
102.1
105.1
102.1
106.2
105.2
106.2
103.1
106.2
105.4
106.2105.6 T1
111.4 T1
111.4 T1
105.2
105.2
105.4
103.4
103.4
102.2
105.2
102.2
105.2
106.2
106.2
106.1102.2105.2
106.1
106.2
105.4
118.11 118.13
106.2
118.4
EQ EQ
118.11
DL: LEAD
4Q
7.05
L .1
L17.1
L17.3
L17.0
RETROFIT EXISTING
DOOR WITH NEW
CARD READER
118.11 T1
102.1 T1
106.2
107.2
" 106.2
L
L18A.1EQUIP. RM
L18A
S
DG:T DS:CR
SH-3E
S
SH-2J
105.5
105.5 105.5
105.2
105.2
105.4
2" TYP.
106.4105.3
L18A.2
S
DL: LEAD
4Q
A22
A21A21A21A21
A23
A47
A45
A46
A14
A15
F E
C
A56
L18A.3
X
45 MIN. /
SMOKE19
3F
NEW ACCESS PANEL FOR
EXISTING 24"x24"x8"
JUNCTION BOX TO REMAIN
A9
A. REFER TO SHEET AI001 FOR GENERAL FLOOR PLAN NOTES AND
SYMBOLS.
B. FOR TYPICAL HEADWALL CONFIGURATION REFERENCE XRAY
ROOM L15 IN COURTYARD, SEE SHEET QH102.
C. ALL RATED PENETRATIONS TO BE SEALED WITH RED FIRE
RATED CAULKING. USE ACOUSTICAL CAULKING ON ALL OTHER
WALL PENETRATIONS.
D. FOR DOOR INFORMATION SEE SHEETS AE104, AE106, & AE601.
E. FOR PARTITION TYPES SEE GI501, AND WALL IDENTIFICATION
TAGS, SEE SHEETS AE104 AND AE106.
F. FOR RAISED FLOOR LAYOUT SEE SHEET AE107.
G. FOR WINDOW TYPES, SEE SHEET AE602 FOR INFORMATION.
H. FOR WALL PROTECTION / CORNER GUARD LOCATIONS SEE
SHEETS AF100 AND AF101. FOR WALL PROTECTION TYPES, SEE
SHEET AF501.
I. FOR FURNITURE AND EQUIPMENT LOCATION, SEE SHEET
SERIESQH100, AND FOR EQUIPMENT SCHEDULE SEE SHEET
SERIES QH601.
J. FOR VENDOR EQUIPMENT DRAWINGS, SEE SHEET RJ001 AND
RJ002.
K. FOR SCHEDULED FINISHES SEE SHEETS AF601 AND AF602.
L. PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT.
M. FOR EQUIPMENT MOUNTING HEIGHTS, SEE SHEET GI002.
COORDINATE HEIGHTS WITH VA COR.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTHTRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION PHASING
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 11'-0"
KEY PLAN
BLUE RENOVATION
AREA
COURTYARD
RENOVATION AREA
COPYRIGHT © 2021
WWW.HARRELLDG.COM
C A u to d e s k \2
R e v it L o c a l F ile s \1
A R
C H d w a tk in s V
P C
N C
.r v t
/1
/2
:2
:4
P
M
621-331
AE106
DWJCJUNE 18, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR DIMENSION PLAN -
COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026
- SHEET KEYNOTES
A9 NEW HIGH CAPACITY CEILING MOUNTED PATIENT LIFT, SEE
DETAIL C5 / AE501 FOR LIFT SUPPORTS.
A14 EXISTING ROOF LEADER TO REMAIN.
A15 RELOCATE EXISTING LINES COORDINATE NEW LOCATIONS
WITH MECHANICAL, PLUMBING AND MED GAS.
A21 CHILLED WATER LINES TO REMAIN.
A22 RAISE OFFSET OF CHILLED WATER LINE (CLEAR OPENING FOR
TEAM ROOM ENTRANCE), COORDINATE WITH MECHANICAL
DRAWINGS.
A23 EXISTING PLUMBING LINE TO REMAIN.
A45 CT SCANNER - POWER DISTRIBUTION CABINET, COORDINATE
WITH ELECTRICAL AND VENDOR DRAWINGS.
A46 CT SCANNER - IMAGE RECONSTRUCTION SYSTEM,
COORDINATE WITH ELECTRICAL AND VENDOR DRAWINGS.
A47 CT SCANNER - HEAT EXCHANGER, COORDINATE WITH
MECHANICAL AND VENDOR DRAWINGS.
A56 1" CABINET FILLER AND / OR END PANEL AT EXPOSED SIDES
AS APPLICABLE.
GENERAL SHEET NOTES
1/4" = 1'-0" F2
ENLARGED COURTYARD DIMENSION PLAN
2'0 4' 8'
1 1
Revision Number Revisions: Date:
1 ADDENDUM 01 JUNE 18, 2021
E
N P
C B
N P
C B
N M
N P
C B
A. FOR FURNITURE AND EQUIPMENT LOCATION, SEE SHEET
SERIES QH100, AND FOR EQUIPMENT SCHEDULE SEE SHEET
SERIES QH601.
B. FOR CASEWORK PLANS SEE SHEET AE516.
C. FOR EQUIPMENT MOUNTING HEIGHTS, SEE SHEET GI002.
COORDINATE HEIGHTS WITH VA COR.
D. PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT.
2.32.62.73.9
RR
SS
TT
PP
AE405C5
CORRIDOR
L39
LOGISTICS /
EXAM ROOM
L113
REF:L114
EXAM 9
L114
SUPPLY
L118
NURSE STA
L119 TLT
L139A
CLOSET
L139B
EXAM 12
L115
EXAM 11
L116
AE405 A2
AE405 B2
A4
A5
A1
B4
B5
B1
C4
C2
C1
AE405F1
AE516
B7
AE405 E7
AE404 D7D2
FIRST FLOOR
500' - 0"
RREXAM 12
L115
M8810
F0210
M4255 M7845
M7420
M3072
F0535
M4655
M4266
M4200
M4100 M5250.
A38A38 A38A38
A64
4' - 8" 1' - 6"1' - 2"
A61
FIRST FLOOR
500' - 0"
2.62.7
EXAM 12
L115 A5106
M4255
M4266
M4655
F0210F0210
F3200
WP-03
A38
1' - 10"
A5075
A5077
BOD: HERMAN
MILLER COMPASS 04
FIRST FLOOR
500' - 0"
2.6
EXAM 12
L115
F3010
M7845
M7420
M3070
M4655
A5145 (2)
FIRST FLOOR
500' - 0"
RR
EXAM 12
L115
M3072
BOD: HERMAN
MILLER COMPASS 04
A5106
F0210
M4655
M7420
F0340
A60
FIRST FLOOR
500' - 0"
2.62.7
F3010
BOD: HERMAN
MILLER COMPASS 04
EXAM 11
L116
A1014
F0340
M4655
M3070
FIRST FLOOR
500' - 0"
SS
EXAM 11
L116
M8810
M4255
M4266 M8810
M4655
M3072
F0535
M4100
M7845
M4200
M0755
M0750
M0765
M5250.
SLIDE
FIRST FLOOR
500' - 0"
2.6 2.7
EXAM 11
L116
A5145 (2)
F3200
A5106
M4655
F0210F0210
M8810
FIRST FLOOR
500' - 0"
SS
EXAM 11
L116
BOD: HERMAN
MILLER COMPASS 04
M4655
F2017
A5106
F0210
F0340 M3072
FIRST FLOOR
500' - 0"
3.9
EXAM 9
L114
M4266
M4255
M8810
A5145 (2)
M4655
F0210 (2)
FIRST FLOOR
500' - 0"
SS
EXAM 9
L114
F0210
M4655 M8810
F0340
M3072
A5075
BOD: HERMAN
MILLER COMPASS 04
FIRST FLOOR
500' - 0"
3.9
EXAM 9
L114
F3200 F3010
A1014
F0340
M3070
M4655
M7420
F0535
FIRST FLOOR
500' - 0"
SS
EXAM 9
L114 M4255
M4200
M7845
M4100
M4266
M8810
M4655M3072
F0535
SLIDE
M0765
MO750M0755
M5250.
FIRST FLOOR
500' - 0"
TLT
L139A
FIRST FLOOR
500' - 0"
TLT
L139A
A5077
A5077
A5075
FIRST FLOOR
500' - 0"
TLT
L139A
A5077
A5077
FIRST FLOOR
500' - 0"
TLT
L139A
FIRST FLOOR
500' - 0"
NURSE STA
L119
M7850
D
M1825
FIRST FLOOR
500' - 0"
TLT
L139A
SCHEDULED PAINT
T
IL
E
EQ EQ
TERMINATION
CAP
SCHEDULED PAINT
EQ EQ
SCHEDULED LIGHT FIXTURE
SCHEDULED
PLUMBING
FIXTURE
TOILET PAPER
HOLDER
GRAB BARS
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTHTRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION PHASING
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 11'-0"
KEY PLAN
BLUE RENOVATION
AREA
COURTYARD
RENOVATION AREA
COPYRIGHT © 2021
WWW.HARRELLDG.COM
C A u to d e s k \2
R e v it L o c a l F ile s \1
A R
C H d w a tk in s V
P C
N C
.r v t
/1
/2
:5
:4
A
M
621-331
AE405
DWJCJUNE 18, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
ENLARGED PLANS & INTERIOR
ELEVATIONS @ ED
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026
- SHEET KEYNOTES
A38 ELECTRICAL DEVICE, SEE ELECTRICAL DRAWINGS.
A60 SCHEDULED PLUMBING FIXTURES, SEE PLUMBING DRAWINGS.
A61 NURSE CALL DEVICE, SEE ELECTRICAL DRAWINGS.
A64 SECURITY CAMERA, SEE ELECTRICAL DRAWINGS.
GENERAL SHEET NOTES
1/4" = 1'-0" C6
ENLARGED FIRST FLOOR PLAN - EMERGENCY DEPARTMENT (ED) -
NORTHEAST
2'0 4' 8'
1/4" = 1'-0" A2
INTERIOR ELEVATION –
EAST
1/4" = 1'-0" A1
INTERIOR ELEVATION –
NORTH
1/4" = 1'-0" A4
INTERIOR ELEVATION –
SOUTH
1/4" = 1'-0" A5
INTERIOR ELEVATION -
WEST
1/4" = 1'-0" B1
INTERIOR ELEVATION –
NORTH
1/4" = 1'-0" B2
INTERIOR ELEVATION –
EAST
1/4" = 1'-0" B4
INTERIOR ELEVATION –
SOUTH
1/4" = 1'-0" B5
INTERIOR ELEVATION -
WEST
1/4" = 1'-0" C1
INTERIOR ELEVATION –
NORTH
1/4" = 1'-0" C2
INTERIOR ELEVATION –
EAST
1/4" = 1'-0" C4
INTERIOR ELEVATION –
SOUTH
1/4" = 1'-0" C5
INTERIOR ELEVATION -
WEST
1/4" = 1'-0" E1
INTERIOR ELEVATION –
NORTH
1/4" = 1'-0" E2
INTERIOR ELEVATION –
EAST
1/4" = 1'-0" E4
INTERIOR ELEVATION –
SOUTH
1/4" = 1'-0" E5
INTERIOR ELEVATION -
WEST
1/4" = 1'-0" F1
INTERIOR ELEVATION -
NORTH
2'0 4' 8' 2'0 4' 8' 2'0 4' 8' 2'0 4' 8'
2'0 4' 8'2'0 4' 8'2'0 4' 8'2'0 4' 8'
2'0 4' 8' 2'0 4' 8' 2'0 4' 8' 2'0 4' 8'
2'0 4' 8' 2'0 4' 8' 2'0 4' 8' 2'0 4' 8'
2'0 4' 8'
3/4" = 1'-0" E7
ENLARGED TOILET WALL ELEVATION
1' 2' 3'0
MIRROR
PAPER TOWEL HOLDER
SOAP DISPENSER
SCHEDULED PLUMBING FIXTURE
DOOR SIZES
MARK WIDTH HEIGHT
A 1' - 6" 6' - 8"
B 2' - 0" 6' - 8"
C 2' - 2" 6' - 8"
D 2' - 4" 6' - 8"
E 2' - 6" 6' - 8"
F 2' - 8" 6' - 8"
G 2' - 10" 6' - 8"
H 3' - 0" 6' - 8"
I 3' - 2" 6' - 8"
J 3' - 4" 6' - 8"
K 3' - 8" 6' - 8"
L 3' - 10" 6' - 8"
M 3' - 8 1/2" 7' 11 3/4"
N 2' - 0"
O 2' - 2"
P 2' - 4"
Q 2' - 6"
R 2' - 8"
S
T
3' - 0"
U
V
3' - 4"
W
3' - 8"
X
3' - 10"
MARK WIDTH HEIGHT
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
3' - 6"
4' - 0"
9"
9" 9"
9"
12" MAX
9"
MUNTINS AS
REQ'D
T.A. OR W/F
LOUVER SIZE AS
REQ'D
100 SQ IN MAX
4"x25"
T.A. OR W/F
M
'A' LABEL
180 MINUTE
'B' LABEL
90 MINUTE
100 IN2 MAX
4"x25"
'F' GLASS
'B' LABEL
90 MINUTE
'C' LABEL
45 MINUTE
SOUND RATED INTEGRATED
DOOR
ASSEMBLY
40 42
INTEGRATED
DOOR
ASSEMBLY
1296 SQ IN MAX
EACH LEAF 4"x25"
'F' GLASS
DOOR MODIFICATIONS (APPLICATION CODES)
A LAMINATED GLAZING
ADO AUTOMATIC DOOR OPERATOR
CR CARD READER
D DOUBLE GLAZED TEMPERED GLASS
DA PIVOT HINGE AND EMERGANCY DOOR STOP
DG: GLAZING (DOOR)
DL: LINED (DOOR)
DS: SECURITY (DOOR)
'F' GLASS FIRE RATED GLAZING
H ELECTRIC HOLD
L LOUVER
LP LIGHT PROOF LOUVER
M MECHANICAL SEAL FOR LIGHT PROOF AND
SOUND RETARDING DOOR
T TEMPERED GLASS
U UNDERCUT 3/4"
V LEAD GLASS
W WIRE GLASS
SD SLIDING DOOR (SEE PLAN FOR CLEAR OPENING)
SL SLOPED TOP AND 3" LATCH SIDE GAP
VP VISION PANEL
DOOR NOTES:
1. ALL DOORS SHALL BE FLUSH - 1 3/4" THICK
UNLESS NOTED OTHERWISE
2. TOP AND SIDE RAILS SHALL BE 9" MIN.
BOTTOM RAILS SHALL BE 12" MIN.
3. DOOR TYPES 7,8, & 9 SHALL NOT BE USED
FOR OPPOSING DOORS.
4. EVEN NUMBERS ARE METAL; ODD NUMBER
ARE SOLID CORE WOOD.
5. NOT ALL DOOR TYPES ARE USED.
GLASS OR
LOUVER
REQUIRED BY
MODIFICATION
GLASS OR
LOUVER
REQUIRED BY
ELEVATION TYPE
AS SCH
A S
S C
H
A D
J U
S T
C
M U
T O
C O
U R
S E
2" 2"
AS SCH
A S
S C
H
A D
J U
S T
C
M U
T O
C O
U R
S E
2" 2"
UON
2' - 10"
T
AS SCH
A S
S C
H
AL
AL
WIDE STILE ALUMINUM
ENTRANCE
HOLLOW
METAL
HOLLOW
METAL w/ SIDE
LITE
ALUMINUM
STOREFRONT
REF: AE602 FOR
TYPES & SIZES
Z 2' - 10" 7' - 0"
Y 1' - 9" 7' - 8"
BASIS OF DESIGN:
HORTON HD SWING
15 / 17
LEAD LINED
8" x 10"
LEAD GLASS
IF REQ'D (DR. 15)
RAY PROOF
IF REQ'D (DR. 15)
ELEV
SEE DOOR ELEVATION (REFER TO
WINDOW ELEVATIONS ALSO)
TYPICAL FOR ALL INTERIOR DOOR FRAMES.
6"
45°
DOOR FRAME
DOOR STOP (END 6"
ABOVE FLOOR AND
TERMINATE AT 45 ANGLE)
SOLID CAP
WELDED TO STOP
FRAME TYPES
FRAME TYPE A
2"
WIDTH
SCHEDULED FRAME
2"
1/2" 1/2"
/8
/8
APPLIED STOP
FOR GLAZING
MAY OCCUR
FRAME TYPE B FRAME TYPE C
/2
/2
W
ID
T H
S C
H E
D U
L E
D F
R A
M E
3/8"
1 3/8" 5/8"
5/8"
STOP AT HEAD
E Q
E Q
2"
WIDTH
SCHEDULED FRAME
2"
/8
1/2" 1/2"
/8
APPLIED STOP
FOR GLAZING
MAY OCCUR
FRAME TYPE D
WIDTH
SCHEDULED FRAME
1/2" 1/2"
/8
S E
E M
F R
F
IX
E D
R A
IL
N
O T
C H
B
E Y
O N
D
FRAME TYPE E
WIDTH
SCHEDULED FRAME
1/2" 1/2"
/8
1/2"1/2"
WIDTH
SCHEDULED FRAME
/8
/8
JAMB
HEAD
METAL STUDS @ 12"
O.C. ABOVE HEAD ONLY
SCHEDULED FRAME
WIDTH & TYPE
SEE PLAN FOR DOOR
LOCATION
SEE PART. TYPES
VARIES
SEE PART. TYPES
VARIES
METAL STUDS @ 12"
O.C. ABOVE HEAD ONLY
SCHEDULED FRAME
WIDTH & TYPE
METAL STUDS @
12" O.C. ABOVE
HEAD ONLY
SCHEDULED FRAME
WIDTH & TYPE
GLAZING PANEL
MAY OCCUR
SEE PART. TYPES
VARIES
HM GLAZING STOP
MAY OCCUR
HD-1 HD-2 HD-3
HEAD DETAILSJAMB DETAILS
JD-1
JD-2
DOUBLE STUD @ JAMB, TYP.
SEE ROOM FINISH SCHEDULE
FOR WALL FINISHES.
WALL MAY OCCUR
SCHEDULED FRAME
WIDTH & TYPES
STUD ANCHORS
1 OR 2 LAYES OF GYP. BD. MAY
OCCUR, SEE PARTITION TYPES
SEE ROOM FINISH SCHEDULES
FOR WALL FINISHES
DOUBLE STUD @
FRAME (TYP.)
C OF OPENING
SCHEDULED DOOR
FRAME SEE PART. TYPES
VARIES
S E
E P
A R
T T
Y P
E S
V A
R
IE
S
L
A. CONTRACTOR IS RESPONSIBLE FOR COORDINATING DOORS, DOOR FRAMES, AND HARDWARE.
B. HARDWARE SUPPLIER IS RESPONSIBLE FOR BUILDING CODE AND FIRE RATED DOOR
REQUIREMENTS.
C. ALL FIRE RATED DOORS SHALL HAVE APPLIED U.L. LABEL ON HINGE SIDE. IF DOOR IS RATED, THEN
FRAME ALSO REQUIRES MATCHING UL LABEL.
D. FRAME SIZES TO BE COORDINATED WITH PARTITION WIDTHS ON THE JOB SITE BY CONTRACTOR.
E. PROVIDE TWO (2) 16 GAUGE METAL STUDS AT ALL DOOR JAMBS AND PARTITION CORNERS.
F. GLASS SHALL BE PERMANENTLY MARKED TO INDICATE THAT IT IS TEMPERED.
G. ALL DOORS REQUIRE BEVELED EDGES. BEVEL RADIUS 1/8 INCH MIN, TYP. ALL DOORS 1-3/4" THICK
AND 7'-0" HIGH UNLESS NOTED OTHERWISE. ALL DOORS ARE SOLID CORE WOOD UNLESS NOTED
OTHERWISE.
H. AFTER INSTALLATION OF EACH HOLLOW METAL DOOR FRAME, MARK THE ROOM NUMBER ON THE INTERIOR AND EXTERIOR OF THE FRAME WITH INK THAT WILL NOT BE VISIBLE AFTER THE SPECIFIED FINISHING IS COMPLETED.
I. DOORS AND FRAMES INDICATED AS NRST ON THE SCHEDULE ARE NON-RATED, SMOKE TIGHT.
J. ALL FRAMES ARE HOLLOW METAL UNLESS NOTED OTHERWISE.
K. ALL HARDWARE, SWITCH PLATES, AND OUTLET PLATES WITH MATCHING FASTENERS TO USE ANTIMICROBIAL
COPPER IN BASE BID. FOR A DEDUCT ALTERNATE ALL ITEMS WILL USE 304 STAINLESS STEEL.
L. FOR GLAZING LITES IN DOOR , SEE SCHEDULE REMARKS COLUMN AND DOOR APPLICATION CODES LEGEND; FOR
DASHED LINES IN ELEVATION TYPE LOOK FOR RELEVANT DOOR APPLICATION CODE IN DOOR I.E. A, D, F, T, VP, V, W, ETC.
H. WOOD VENEER AND FINISH TO MATCH FACILITY STANDARDS.
I. STANDARD DOOR UNDERCUT TO BE 1/2" (3/4" MAXIMUM) FROM FINISHED SURFACE OF HIGHEST ADJACENT FLOOR /
THRESHOLD.
1 2
A T, 90 MIN.
x xx
DOOR SYMBOL
PANEL TYPE
FRAME TYPE
DOOR RATING
DOOR SIZE DOOR MODIFICATION
DOOR RATINGS
UL LABEL RATING (HRS) RATING (MIN.) MAX. GLASS AREA
A 3 HR 180 MIN. 100 SQUARE INCHES PER LEAF
B 1 1/2 HR 90 MIN. 100 SQUARE INCHES PER LEAF
C 3/4 HR 45 MIN. 1296 SQUARE INCHES PER LEAF
D 1 1/2 HR 90 MIN. REFER TO LOCAL CODES
E 3/4 HR 45 MIN. REFER TO LOCAL CODES
1/3 HR 20 MIN. 1296 SQUARE INCHES PER LEAF
S SMOKE SMOKE
UL LABLES D AND E ARE FOR EXTERIOR DOORS THAT ARE SUBJECT TO FIRE HAZARDS FROM
THE OUTSIDE OF THE DOOR.
HW SET
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
C A u to d e s k \2
R e v it L o c a l F ile s \1
A R
C H d w a tk in s V
P C
N C
.r v t
/1
/2
:5
:4
A
M
621-331
AE601
DWJCJUNE 18, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
DOOR SCHEDULE AND DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026
1/4" = 1'-0" B2
DOOR AND FRAME TYPES
PAINT: PAINT EXISTING DOOR & FRAME
FRAME: PATCH HINGE DEPRESSION ON FRAME & PAINT
1/2" = 1'-0" C2
HOSPITAL DOOR STOP
1'0 2' 4'
2'0 4' 8'
DOOR SYMBOLS LEGEND DOOR SCHEDULE
ROOM DOOR DOOR PANELS DOOR FRAME
RATING HW REMARKS
DETAIL
NO. NAME NUMBER SIZE
PAIR /
UNEQUAL
PAIR TYPE MAT'L TYPE MAT'L
FRAME /
HEAD SILL
FRAME /
JAMB
COURTYARD
C1-12 CORRIDOR C1-12.1 SS 42 WD 1 HM 90 MIN. 12B ADO, PACS
L86 CORRIDOR C1-12.2 VV - 40 HM 1 HM NRST 12B ADO, PACS A / HD-1 A / JD-1
L136 CORRIDOR C1-12.3 RR - 1 WD 1 HM NRST 3F DG: T A / HD-1 A / JD-1
C1-13 CORRIDOR L01 S - 10 HM 1 HM 90 MIN. /
SMOKE
SH-3 DS:CR, PACS A / HD-1 A / JD-1
C1-13 CORRIDOR L02 S - 10 HM 1 HM 90 MIN. /
SMOKE
SH-3 DS:CR A / HD-1 A / JD-1
L03 HAC L03 S - 1 WD 1 HM 5D A / HD-1 A / JD-1
C1-12 CORRIDOR L04 S - 11 WD 1 HM 45 MIN. SH-3C DG: F, DS: YES A / HD-1 A / JD-1
L05 UTILITY CLEAN L05 V - 11 WD 1 HM 45 MIN. SH-3E DG: F, DS: YES, CR A / HD-1 A / JD-1
L08 TEAM WORK SATELLITE L08 OPENING - - - 1 HM - - E E
L09 TOILET STAFF L09 S - 1 WD 1 HM 2 A / HD-1 A / JD-1
L12 TEAM WORK L12 S - 19 WD 1 HM NRST 3G
L15 X-RAY L15 SN YES 15 WD 1 HM 4Q DL:LEAD MFR MFR MFR
L16 TOILET PATIENT L16.1 S - 19 WD 1 HM SH-2J A / HD-1 A / JD-1
L16 TOILET PATIENT L16.2 S - 15 WD 1 HM SH-2J.1 DL:LEAD MFR MFR MFR
L17 SHARED CONTROL L17.1 S - 1 WD 1 HM SH-3E DG:T DS:CR
L17 SHARED CONTROL L17.2 S - 15 WD 1 HM 4Q DL:LEAD MFR MFR MFR
L17 SHARED CONTROL L17.3 OPENING - - - - -
L18 CT SCAN L18 SN YES 15 WD 1 HM 4Q DL:LEAD MFR MFR MFR
L18 CT SCAN L18A.1 QQ YES 15 WD 1 HM 4Q DL: LEAD MFR MFR MFR
L18 CT SCAN L18A.2 S 15 WD 1 HM 4Q DL: LEAD MFR MFR MFR
C1-12 CORRIDOR L18A.3 X 19 WD 1 HM 45 MIN. /
SMOKE
3F
L20 POLICE ENTRY L20 X - 1 WD 1 HM NRST SH-3 DS:CR, ADO
L21 POLICE TEAM WORK L22 OPENING - - - 1 HM - - E - E
L23 SECLUSION RM L23 X - 19 WD 1 HM MH5 DG:A
EMERGENCY DEPT RENOV
L86 CORRIDOR L86 SS YES 2 HM 1 HM 45 MIN. 12C
L106B MEDS L106B S - 1 WD 1 HM SH-3E DG:T, DS: YES,CR
L113 VESTIBULE L113 VV YES AL AL AL AL 8D ADO
L113 LOGISTICS / EXAM ROOM L113A ELEV - AL AL AL HM 7C
L114 EXAM 9 L114 ELEV - AL AL AL HM 7C
L115 EXAM 12 L115 ELEV - AL AL AL HM 7C
L116 EXAM 11 L116 ELEV - AL AL AL HM 7C
L118 SUPPLY L118 V - 1 WD 1 HM 4F DG, T
L120 EXAM 14 L120 ELEV - AL AL AL HM 8A
L120D EXISTING EXAM 13 L120D ELEV - AL AL AL HM 7C
L123 EXISTING EXAM 8 L123 ELEV - AL AL AL HM 7C MFR MFR
L124 EXISTING EXAM 7 L124 ELEV - AL AL AL HM 7C MFR MFR
L125 EXISTING EXAM 6 L125 ELEV - AL AL AL HM 7C MFR MFR
L127 EXISTING EXAM 5 L127 ELEV - AL AL AL HM 7C MFR MFR
L128 PATIENT TOILET L128 X - 19 WD 1 HM MH2
L129 EXISTING EXAM 4 L129 ELEV - AL WD AL HM 7D MFR MFR
L131 EXISTING EXAM 3 L131 ELEV - AL AL AL HM MH7A MFR MFR
L132 EXAM 2 L132 ELEV - AL AL AL HM MH7A MFR MFR
L133 EXAM 1 L133 ELEV - AL AL AL HM MH7A MFR MFR
L139A TLT L139A S - 19 WD 1 HM 2G
L160D OFFICE L160D S - 1 WD 1 HM 3E DG: T
GENERAL SHEET NOTES
1 1 1
FIRST FLOOR
500' - 0"
2" 4' - 0"2"3' - 4"2"
7' - 10"
ALUM. DOOR / SIDELITE ASSEMBLY ORIENTATION
VARIES, SEE PLAN FOR INFORMATION.
GLAZING TYPES LG #2
@ ANTI-LIGATURE
EXAM ROOMS
(L31, L132, L133)
GLAZING TYPES LG #1
TYPICAL UON.
METAL STUDS 2'-0" O.C.
4" (HEAVY GAGE) METAL TRACK & STUDS 12" O.C.
SCHEDULED CEILING, SEE REFLECTED
CEILING PLAN FOR HEIGHTS
ACOUSTICAL INSULATION
5/8" FINISH GYPSUM BOARD
FASTEN THE TOP PLATES WITH EITHER POWER ACTUATED FASTENERS @
24" O.C. PINS STAGGERED OR S12 SCREWS DEPENING ON SUBSTRATE
@ DECKING WITH CONCRETE USE POWERED FASTENERS
@ DECKING WITHOUT CONCRETE USE S12 SCREWS
CONTINUOUS SEALANT
BOTTOM OF STRUCTURE
1/2" THREADED
ROD
UNITSTRUT
3/4" FRT PLYWOOD
LEAD SHIELDING
LEAD SHIELDING 1/16" THICK LAMINATED TO GYPSUM BOARD
METAL STUDS 2'-0" O.C.
4" (HEAVY GAGE) METAL TRACK & STUDS 12" O.C.
CONTINUOUS SEALANT, EACH SIDE
POWER ACTUATED FASTENERS
@ 24" O.C. PINS STAGGERED
ACOUSTICAL INSULATION
OVERLAP LEAD SHIELDING
CONCRETE FILL
(EMBEDDED UTILITIES)
EXISTING CONCRETE SLAB
LEAD SHIELDING 1/16" THICK LAMINATED TO
GYPSUM BOARD FASTENED TO METAL STUDS
(LEAD BEARS ON SLAB)
5/8" FINISH GYPSUM BOARD
ELECTRICAL DEVICES, SEE
ELECTRICAL DRAWINGS
SCHEDULED FINISH
WRAP LEAD SHIELDING (PER MANUFCATURER
INSTRUCTION) AROUND INCLUDING BUT NOT
LIMITED TO ELECTRICAL DEVICES / BOXES
FIRST FLOOR
500' - 0"
2" 4' - 0"
2"
1' - 1 5/8"
LG
#2
± 5' - 7 5/8" FV
LG
#2
GLAZING TYPES LG #2
@ ANTI-LIGATURE
EXAM ROOMS
(L31, L132, L133)
FIRST FLOOR
500' - 0"
7' - 10"
2" 4' - 6" 3' - 0" 2"
LG
#1
LG
#1
FIRST FLOOR
500' - 0"
2"4' - 0"2' - 0"2"
6' - 4"
" LG
#1
LG
#1
+0' - 0"
EXISTING SLAB
DEPRESSION
-0' - 4"
CORRIDOR
EXISTING FLOOR
COURTYARD
±2" ARDEX OR EQUAL RAISED INFILL TO
MATCH EXISTING ADJACENT CORRDIDOR
HEIGHT, SEE TOPPING PLAN SHEET AE107
EXISTING CONCRETE
STRUCTURE
±4" ARDEX WITH AGGREGATE OR EQUAL RAISED INFILL
TO MATCH EXISTING ADJACENT CORRDIDOR HEIGHT,
SEE TOPPING PLAN SHEET AE107.
SCHEDULED FINISHED FLOOR
TO MATCH EXISTING ADJACENT CORRDIDOR HEIGHT
EXISTING
FINISHED FLOOR
0' - 0"
EXISTING SLAB
DEPRESSION
-0' - 2"
FINISHED FLOOR
LOWER SLAB DEPRESSION WIDTH
± 1' - 0" FV
EXISTING TO REMAIN TURNED UP
SLABS EXCEPT @ NEW OPENINGS
EXISTING CONCRETE
STRUCTURE
EXISTING PARTITION (BEYOND)
ACOUSTICAL
CEILING
PANELS
ATTACH
CLNG. EDGE
ANGLE TO
CHANNELS
SERIES
CHANNELS
1/2" [12mm] DIA.
HANGER RODS
FOR FINAL LEVELING
K-SERIES CHANNELS
WITH OPTIONAL
CEILING TILE FLANGES
OR
ACOUSTICAL
CEILING
PANELS
LAY-IN CEILING
TRACK(S) BY EQUIPMENT SUPPLIER
P3184 F WHERE P1001 IS EXPOSED
CLEARANCE FOR RECESSED LIGHTS AND CEILING
P E
N D
IN
G
T H
IS
D
IM
E
N S
IO
N
D
IA
G O
N A
L B
R A
C
IN
G M
A Y
B E
R E
Q U
IR
E
D
P2346
P1000
P2473
P2346
P5500
P1001
4'-0"
[1219mm]
SEE A OR
P1000
P2346
P2473
P5500
10"[230mm] MAX.
DIST. FROM WALL
P2346
-1
/1
-1
/1 "4
-7 /8
ANCHOR BOLTS THROUGH
CONCRETE SLAB
P2346
P1000
METAL PLATE
25" [625mm]
APPROX.
1/4"X4"X4"X6"BENT PL
ANCHOR BOLTS WITH
EXPANSION SHIELDS (MIN.
FACTOR OF SAFETY OF 4).
(PROVIDE ADEQUATE INSPECTION
OR TESTING FOR PULL OUT).
P1000
P1000
P2346
SLAB.
INSERTED IN CONCRETE
P1000 WITH ANCHORS
[1 m m
[1 m m
[1 m m
[6mmX100mmX100mmX150mm]
NOTES:
THE NUMBER SHOWN ON DRAWING WITH A "P"
CEILING.
OR PARTITIONS, EXCEPT FOR MEMBERS FLUSH WITH
TERMINATE APPROX. 6" [150mm] FROM FACE OF WALLS
AS SHOWN ON ARCHITECTURAL DRAWINGS AND SHALL
ALL SUPPORTS AND HANGERS SHALL BE ARRANGED
PREFIX ARE UNISTRUT CATALOG NUMBERS USED AS A
CONVENIENCE FOR IDENTIFYING DESIRED SHAPES AND
THICKNESS OF MEMBERS.
DETAILS A, B, C & D SHOW ANCHORAGE SUPPORT
NOTE FOR ARCHITECT:
INTO VARIOUS TYPES OF SLAB CONDITIONS. ACTUAL
SUPPORT MUST BE DESIGNED TO SUIT THE
PARTICULAR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .