Amendment Summary.pdf
PDF 131 KB Posted
- Solicitation number
- 36C24921B0008
About this file
This document is an amendment summary for the Mountain Home Expand Emergency Department Phase 2 project. The amendment revises drawings, adds new drawings and specification sections, and clarifies scope details. Key changes include revising room layouts and equipment locations on first floor plans, adding integrated door assembly and wall coating specifications, and updating plumbing fixtures to match schedules.
The related federal contract opportunity is a pre-solicitation notice for the Z1DA-- Project 621-331- Expand Emergency Department Phase 2 at the James H. Quillen VA Medical Center. The project scope involves renovating shelled space adjacent to the existing emergency department into a new radiology, police holding and administrative area. The estimated value is between $5-10 million. The solicitation is expected to post on May 25th, 2021 and close on June 24th, 2021. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The awarded contractor must be verified in the CVE and SAM databases and submit a VETS-4212 report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24921B0008 0002.pdf | ||
| 081710_Add1.pdf | ||
| 000110_Add1.pdf | ||
| Amendment 0001.pdf | ||
| 087100_Add1.pdf | ||
| 013323.1 Master Submittal List_Add1.pdf | ||
| Revised drawings 6-21-2021.pdf | ||
| 010000_Add1.pdf | ||
| 224000 Add1.pdf | ||
| 099659_Add1.pdf | ||
| Pre bid sign in sheet.pdf | ||
| RFI Form - Expand Emergency Dept.pdf | ||
| Mt Home ED Final CD Specs_Revised 210512.pdf | ||
| WD TN20210111 1-1-2021.pdf | ||
| Mt Home ED Final CD Drawings _Revised 210512.pdf | ||
| 36C24921B0008_1.pdf | ||
| Contractor EMR Certification Form.pdf | ||
| 36C24921B0008.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Harrell Design Group, PC
AMENDMENT 01
June 18, 2021
MOUNTAIN HOME EXPAND EMERGENCY DEPARTMENT
PHASE 2
Mountain Home VA Medical Center
HDG Project Number: 19026
I. BIDDER’S QUESTION RESPONSES (QUESTIONS 1-184)
II. DRAWINGS
1. The following drawings are revised as follows:
a. GI001 Cover Sheet
i. Revised Schedule of Bid Items E, F, and G to provide clarify.
ii. Added specification reference note to Schedule of Bid Items.
b. AD052 First Floor Demolition Plan- Emergency Department:
i. Revised Bid Alternate designations to agree with Cover Sheet and Specifications.
ii. Revised location of room tags to improve readability of keynote tags and dimensions.
iii. Revised General notes A4 and A4.1 to call out wall base as part of the demolition.
c. AE102 First Floor Plan – Emergency Department:
i. Removed elevation tags that are on the enlarged plans for clarity.
ii. Revised location of room tags, column grids, and Deduct Alt. text to improve readability of keynote tags, line work, and dimensions.
iii. Added reference to AF100 for more information on Deduct Alt. 1.
d. AE104 First Floor Dimension Plan – Emergency Department:
i. Added Dimension for exam room alum. Door assembly.
ii. Identified Headwall locations
e. AE106 Expanded Emergency Department Phase 2
i. Revised Door and wall information to clarify lead lined locations.
ii. Added note for Access Panel in Shared Control L17.
iii. Revised General Sheet Notes K, L and M.
f. AE405 Enlarged Plans and Interior Elevations @ ED
i. Revised details A1 and A2, including showing electrical and nurse call devices.
ii. Revised Sheet Keynotes A38, A61 and A64
g. AE601 Door Schedule and Details
i. Added Corridor doors and L18A.2 to door schedule.
ii. Revised information for doors: L05, L12, L16.1, L16.2, L17.2, L17.3 and L106B.
h. AE602 Window Types & Details
i. Added alum. assembly type elevation
i. AF501 Wall Protection / Signage Types
i. Revised wall protection type in detail D2
j. AF601 Interior Finish Schedule: Revised finish information for rooms: L03, L04, L05,L18A, L23, L120A, L123, L124, L125, and L127.
k. AF602 Interior Materials Legend: Added Finish RES-W.
l. QH100 First Floor Equipment Plan
i. Identified Herman Miller Compass 04 Casework, Keynote A66
m. QH102 First Floor Equipment Plan
i. Added patient lift in CT Scan room L18
n. RJ002 XRAY vendor Equipment Drawings
i. Updated Vendor sheets 1 - 4 with latest set
o. MH503 – Added seismic details.
2. The following new sheets are added as follows:
a. RJ003 XRAY Vendor Equipment Drawings
b. RJ004 XRAY Vendor Equipment Drawings
c. RJ005 XRAY Vendor Equipment Drawings
III. SPECIFICATIONS
a. Spec Section 00 01 01 Revised to add new specification sections 08 17 10 Integrated Door
Assemblies and 09 96 59 Resinous Specialty Glazed Coating Systems for Walls.
b. Spec Section 01 00 00 Revised the following sections to clarify scope of work:
i. 1.3, B. Deduct Alternates, 1, a. revised reference column lines
ii. 1.3, B. Deduct Alternates, 4, added room number information for clarity
iii. 1.3, B. Deduct Alternates, 5, added room number information for clarity
c. Spec Section 01 33 23.1 Added submittal requirements for new specifications sections added.
d. Spec Section 08 17 01 Integrated Door Assemblies new specification section added.
e. Spec Section 08 71 00 Added hardware set HW-SH-2J.1.
f. Spec Section 09 96 59 Resinous Specialty Glazed Coating Systems for Walls new specification section added.
g. Spec Section 22 40 00 – Plumbing Fixtures – revised fixtures to match schedule.
END OF AMENDMENT 01