Mt Home ED Final CD Drawings _Revised 210512.pdf
PDF 30 MB Posted
- Solicitation number
- 36C24921B0008
About this file
This document provides details of a federal contract opportunity for the expansion of an emergency department at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves renovating an existing shelled space adjacent to the existing emergency department into a new radiology, police holding, and administrative area to serve the emergency department. The estimated value is between $5 million and $10 million. The solicitation is expected to be posted on May 25, 2021 and close on June 24, 2021. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses under authority of U.S. Code Title 38 Section 8127(d). The NAICS code is 236220 for Commercial and Institutional Building Construction, with a small business size standard of $39.5 million. The agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24921B0008 0002.pdf | ||
| 081710_Add1.pdf | ||
| 000110_Add1.pdf | ||
| Amendment 0001.pdf | ||
| 087100_Add1.pdf | ||
| 013323.1 Master Submittal List_Add1.pdf | ||
| Revised drawings 6-21-2021.pdf | ||
| 010000_Add1.pdf | ||
| 224000 Add1.pdf | ||
| 099659_Add1.pdf | ||
| Amendment Summary.pdf | ||
| Pre bid sign in sheet.pdf | ||
| RFI Form - Expand Emergency Dept.pdf | ||
| Mt Home ED Final CD Specs_Revised 210512.pdf | ||
| WD TN20210111 1-1-2021.pdf | ||
| 36C24921B0008_1.pdf | ||
| Contractor EMR Certification Form.pdf | ||
| 36C24921B0008.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026
EXPAND EMERGENCY DEPARTMENT PHASE 2
VETERANS HEALTH ADMINISTRATION
Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB, CDT
2021.04.23 11:30:13 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB, CDT
2021.04.23 11:30:42 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:30:59 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:31:21 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:32:23 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB, CDT
2021.04.23 11:33:20 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:33:55 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:34:24 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:34:58 -04'00'
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
GC121
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PHASING PLAN FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:35:28 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AI001
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
NOTES AND LEGENDS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:36:17 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AI002
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
ARCHITECTURAL A REVIATIONS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:36:51 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AD052
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR DEMOLITION PLAN -
EMERGENCY DEPARTMENT ED
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:37:27 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AD053
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR DEMOLITION PLAN -
COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:38:11 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AD054
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
DEMOLITION DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:38:55 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AE101
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - OVERALL FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:41:11 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AE102
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - EMERGENCY
DEPARTMENT ED
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:41:55 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AE103
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - COURTYARD FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:42:41 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AE104
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR DIMENSION PLAN -
EMERGENCY DEPARTMENT ED
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026
NE ARIATRIC
RATED
NE ANTI-
LIGATURE
NE ANTI-
LIGATURE
Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:43:30 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT HARRELLDG COM
621-331
AE106
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
E PAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR DIMENSION PLAN -
COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:44:27 -04'00'
EXISTING ARCHED
WINDOWS AT LOCATION
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW HARRELLDG COM
621-331
AE10
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
COURTYARD TOPPING PLAN FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:45:15 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE110
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - EMERGENCY
DEPARTMENT (ED) - DEDUCT ALT 1
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.05.12 14:37:01 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW HARRELLDG COM
621-331
AE111
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - EMERGENCY
DEPARTMENT ED - DEDUCT ALT 3
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:47:04 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW HARRELLDG COM
621-331
AE112
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - EMERGENCY
DEPARTMENT ED - DEDUCT ALT 4
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:47:58 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW HARRELLDG COM
621-331
AE113
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - EMERGENCY
DEPARTMENT ED - DEDUCT ALT 5
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:48:51 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE121
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
REFLECTED CEILING PLAN -
EMERGENCY DEPT (ED)
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.05.11 11:01:43 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW HARRELLDG COM
621-331
AE122
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
REFLECTED CEILING PLAN -
COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA,
2021.04.23 11:51:04 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW HARRELLDG COM
621-331
AE150
KBJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
ROOF PLAN FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:52:03 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE301
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
PARTIAL BUILDING SECTIONS AT
COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:42:57 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE401
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
ENLARGED PLANS AND INTERIOR
ELEVATIONS @ COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:43:32 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE402
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
ENLARGED PLAN AND INTERIOR
ELEVATIONS @ COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:45:57 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE403
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
ENLARGED PLANS AND
ELEVATIONS @ COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:53:09 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE404
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
INTERIOR ELEVATIONS @
COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:53:37 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE405
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
ENLARGED PLANS & INTERIOR
ELEVATIONS @ ED
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:54:01 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE406
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
ENLARGED PLANS & INTERIOR
ELEVATIONS @ ED
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:54:19 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE501
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
MISCELLANEOUS DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:54:40 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE511
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
INTERIOR DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:55:04 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE512
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
INTERIOR DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:56:40 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE513
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
INTERIOR DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:57:06 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE515
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
CASEWORK DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 10:57:31 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
LAURENE, RICKHER & SORRELL, P.C.
8701 RED OAK BLVD. SUITE 500
CHARLOTTE, NORTH CAROLINA 28217
PHONE: 704-522-0495
POC: MARK RICKHER, PE
CIVIL ENGINEERS
DEVELOPMENT CONSULTANTS INC
2200 RODNEY PARHAM RD. SUITE 220
LITTLE ROCK, ARKANSAS 72212
PHONE: (501) 221-7880
POC: BEN KUDDES POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE516
GGJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
ENLARGED CASEWORK PLANS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:09:22 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE601
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
DOOR SCHEDULE AND DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:09:44 -04'00'
2"
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AE602
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
WINDOW TYPES & DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:11:13 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF100
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR FINISH PLAN -
EMERGENCY DEPARTMENT (ED)
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:11:34 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF101
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR FINISH PLAN -
COURTYARD
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:12:18 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF450
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
3D VIEWS - INTERIORS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:13:21 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF452
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
3D VIEWS - INTERIORS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:14:10 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF453
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
3D VIEWS INTERIORS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:15:02 -04'00'
DOOR
C/L
DOOR
C/L
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF500
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
THRESHOLD DETAILS FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:15:31 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF501
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
WALL PROTECTION / SIGNAGE
TYPES
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:15:56 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF601
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
INTERIOR FINISH SCHEDULE FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:16:23 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
AF602
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
INTERIOR MATERIALS LEGEND FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:16:49 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
QH100
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR ENLARGED
EQUIPMENT PLAN
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:17:20 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
QH101
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR ENLARGED
EQUIPMENT PLAN
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
2021.04.23 11:17:54 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
QH102
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR ENLARGED
EQUIPMENT PLAN
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:18:39 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
QH601
DWJCAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
EQUIPMENT SCHEDULES FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Jonathan M. Carr, AIA, NCARB,
2021.04.23 11:19:14 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
FA001
CSRCSR
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
GENERAL NOTES AND SCHEDULES
HDG PROJECT: 19026Revision Number Revisions: Date:
FINAL CONSTRUCTION
DOCUMENTS
APRIL 23, 2021John G. Ross, PE
2021.04.23 09:53:25 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
FA101
CSRCSR
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - EMERGENCY
DEPARTMENT (ED) - FIRE ALARM
HDG PROJECT: 19026Revision Number Revisions: Date:
FINAL CONSTRUCTION
DOCUMENTS
2021.04.23 09:53:09 -04'00'
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
FA102
CSRCSR
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - COURTYARD -
FIRE ALARM
HDG PROJECT: 19026Revision Number Revisions: Date:
FINAL CONSTRUCTION
DOCUMENTS
2021.04.23 09:52:48 -04'00'
DENOTES AREA BEING PROTECTED BY AUTOMATIC WET SPRINKLERS.
OCCUPANCY CLASSIFICATION..........LIGHT HAZARD
DESIGN DENSITY..............................0.10 GPM/S.F.
REMOTE HYDRAULIC AREA...............1,500 S.F.
MAXIMUM SPRINKLER COVERAGE.....225 S.F.
OUTSIDE HOSE STREAM...................100 GPM
DURATION OF SUPPLY.....................30 MINUTES
DENOTES AREA BEING PROTECTED BY AUTOMATIC WET SPRINKLERS.
OCCUPANCY CLASSIFICATION..........ORDINARY HAZARD, GROUP 1
DESIGN DENSITY..............................0.15 GPM/S.F.
REMOTE HYDRAULIC AREA...............1,500 S.F.
MAXIMUM SPRINKLER COVERAGE.....130 S.F.
OUTSIDE HOSE STREAM...................250 GPM
DURATION OF SUPPLY.....................60-90 MINUTES
DENOTES AREA BEING PROTECTED BY AUTOMATIC WET SPRINKLERS.
OCCUPANCY CLASSIFICATION..........ORDINARY HAZARD, GROUP 2
DESIGN DENSITY..............................0.20 GPM/S.F.
REMOTE HYDRAULIC AREA...............1,500 S.F.
MAXIMUM SPRINKLER COVERAGE.....130 S.F.
OUTSIDE HOSE STREAM...................250 GPM
DURATION OF SUPPLY.....................60-90 MINUTES
1. SEE SHEET FX501 FOR DETAILS.
2. SOME SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY NOT APPLY.
SMOKE DETECTOR
HEAT DETECTOR
POINT BETWEEN EXISTING WORK TO REMAIN AND EXISTING
WORK TO BE REMOVED
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK
ROOM NUMBER
OS&Y VALVE
Y-TYPE STRAINER WITH HOSE DRAIN VALVE
Y-TYPE STRAINER
BACKFLOW PREVENTER
PLUG
WATERFLOW DETECTOR
SIAMESE FIRE DEPARTMENT CONNECTION
FIRE PROTECTION DEMOLITION PIPING
FIRE PROTECTION SUPPLY PIPING
WET PIPE FIRE PROTECTION VALVE
DRY PIPE FIRE PROTECTION VALVE
PRE-ACTION FIRE PROTECTION VALVEFIRE PROTECTION DRAIN
PRESSURE GAGE
FLEXIBLE PIPE CONNECTION
UNION
ECCENTRIC REDUCER (STRAIGHT INVERT)
CONCENTRIC REDUCER
TEE, OUTLET TURNED DOWN
TEE, OUTLET TURNED UP
TEE
ELBOW, 45°
ELBOW, 90° TURNED DOWN
ELBOW, 90° TURNED UP
ELBOW, 90°
CAP
ELECTRICALLY OPERATED VALVE
CHECK VALVE
BUTTERFLY VALVE
FIRE DEPT HOSE VALVE W/CAP
FIRE HOSE CABINET
FIRE VALVE CABINET
FIRE DEPARTMENT CONNECTION
FIRE DEPARTMENT VALVE
TAMPER SWITCH
FLOW SWITCH
EXISTING
MINIMUM
FHC
FVC
TS
FS
EX. EXIST.
FDC
FDV
WATER MOTOR GONG
MIN.
TYPICALTYP.
UNDER GROUNDU/G
GALLONS PER MINUTEGPM
CAPACITYCAP
PRESSURE SWITCHP.S.
FIRE PROTECTION COMPRESSED AIR SUPPLY
DESCRIPTION / LOCATIONITEMS APPROXIMATE
AREA SERVED (SQ.FT.)
SERVED BY ZONE
CONTROL ASSEMBLY
NOTES:
1 FIRST FLOOR - EMERGENCY DEPARTMENT/COURTYARD 8,739 ZONE 1
FIRE ALARM GRAPHIC ANNUNICIATOR PANEL
SPARE SPRINKLER CABINET
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNICIATOR PANEL
FAGAP
FACP
FAAP
SD
HD
F
F.S.
T.S.
SPRINKLER PLANS AS SHOWN ARE FOR BIDDING PURPOSES ONLY. THE SPRINKLER
CONTRACTOR IS TO OBTAIN A CURRENT WATER FLOW TEST AND PROVIDE HYDRAULIC
CALCULATIONS FOR SYSTEM PIPE SIZING IN ACCORDANCE WITH THE LATEST EDITION
OF NFPA 13. THE SPRINKLER CONTRACTOR IS TO SUBMIT SHOP DRAWINGS AND
HYDRAULIC CALCULATION, PIPING LAYOUT AND SIZING. SHOP DRAWINGS AND
CALCULATIONS SHALL BE SEALED AND SIGNED BY A NICET LEVEL IV DESIGNER OR A
PROFESSIONAL ENGINEER.
REFER TO THE FOLLOWING PUBLICATIONS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
FOR THE DESIGN OF THE FIRE PROTECTION SYSTEM ON THIS PROJECT:
1. NFPA 13, (LATEST EDITION) - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS.
2. NFPA 25, (LATEST EDITION) - STANDARD FOR THE TESTING, INSPECTION, AND MAINTENANCE OF WATER BASED
FIRE PROTECTION SYSTEMS.
A. DESIGN THE SPRINKLER SYSTEM THROUGHOUT PROPOSED SCOPE OF WORK IN ACCORDANCE WITH NFPA 13.
B. ALL PIPING, VALVE, SPRINKLER HEADS, HANGERS, ETC. SHALL BE UL LISTED AND FM APPROVED.
C. DESIGN SHALL BE PERFORMED BY NICET LEVEL IV DESIGNER OR A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF ARKANSAS AND SHALL BE SIGNED AND SEALED AS APPLICABLE. PROVIDE FIRE PROECTION SYSTEM DESIGN AND SHOP
DRAWINGS, MEETING ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS.
D. HYDRAULICALLY CALCULATE THE SYSTEM SIZING IN ACCORDANCE WITH NFPA 13. CONDUCT A NEW FLOW TEST AT THE NEAREST FIRE HYDRANTS IN ACCORDANCE WITH NFPA 291 TO UTILIZE AS A BASIS FOR HYDRAULIC CALCULATIONS. SUBMIT
TEST TO ARCHITECT IN WRITING.
E. DESIGN THE SYSTEM USING SPRINKLER HEADS THAT ARE FM APPROVED, QUICK RESPONSE TYPE, SEMI-RECESSED HEADS IN ALL AREAS, EXCEPT WHERE SPECIFICALLY PROHIBITED IN UNFINISHED AREAS WITHOUT CEILINGS. USE QUICK RESPONSE ROUGH BRASS UPRIGHT HEADS WITH FRANGIBLE GLASS ELEMENT. FLEXIBLE SPRINKLER HEADS ARE PROHIBITED.
F. ALL HEADS SHALL HAVE A K FACTOR OF 5.6 - 5.8. TEMPERATURE RATINGS OF ALL SPRINKLER HEADS SHALL BE IN
ACCORDANCE WITH THE LATEST EDITION OF NFPA 13.
G. DESIGN THE SPRINKLER SYSTEM FOR THE ENTIRE WORK AREA TO BE CLASSIFIED AS LIGHT HAZARD OCCUPANCY EXCEPT
AS NOTED BY HATCHING ON THE FLOOR PLANS.
H. COORDINATE PIPE ROUTING WITH DUCT ROUTING, EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND BUILDING
STRUCTURAL MEMBERS. AVOID PENETRATING ANY MAIN STRUCTURAL BEAM.
I. HYDRAULIC CALCULATIONS SHALL TAKE INTO ACCOUNT ALL FITTINGS, OFFSETS, HARDWARE, DEVICES, CHARACTERISTICS
AND TRIM DETERMINED NECESSARY FOR A COMPLETE SPRINKLER INSTALLATION.
J. CENTER SPRINKLER HEADS IN CEILING TILES IN AREAS WITH LAY-IN TILES AND VISUALLY ALIGN IN AREAS WITH HARD
CEILINGS.
K. ELEVATIONS OF SPRINKLER PIPING AND HEADS MUST BE DETERMINED BY PROPOSED CEILING HEIGHTS. REFER TO
ARCHITECTURAL DRAWINGS FOR REFLECTED CEILING PLANS.
L. PROVIDE SEISMIC BRACING FOR ALL PIPING IN ACCORDANCE WITH NFPA 13. PROVIDE SHOP DRAWINGS OF ALL SEISMIC CALCULATIONS, SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF TENNESSEE.
M. SPRINKLER HEADS AND ASSOCIATED BRANCH PIPING SHALL BE LOCATED AND SUPPORTED IN ACCORDANCE WITH NFPA 13.
N. TEST SPRINKLER SYSTEM, CONTROLS, PIPING, AND MONITORING IN ACCORDANCE WITH NFPA 25.
O. CAGES SHALL BE ADDED TO THE IT ROOMS WITH HIGHER TEMPERATURE HEADS.
P. DO NOT INTERRUPT SPRINKLER SERVICE TO OCCUPIED SPACES. NOTIFY COR NO FEWER THAN TWO DAYS IN ADVANCE OF PROPOSED INTERRUPTION OF SPRINKLER SERVICE. DO NOT PROCEED WITH INTERRUPTION OF SERVICE WITHOUT WRITTEN
PERMISSION.
Q. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND COMPLETED IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH THE BEST METHODS AND PRACTICES. ANY MATERIAL WHICH DOES NOT PRESENT AN ORDERLY AND REASONABLY NEAT AND WORKMANLIKE APPEARANCE, SHALL BE REMOVED AND REPLACED WHEN SO DIRECTED BY THE OWNER. THE REMOVAL AND REPLACEMENT OF THIS WORK SHALL BE DONE WHEN DIRECTED IN WIRTING BY THE OWNER AT THE CONTRACTOR'S
EXPENSE.
R. INCLUDE TEMPORARY COVERAGE AND SUPPLIES AS REQUIRED SO THAT NO AREA IS LEFT IMPAIRED DURING PERIODS WHERE NO SPRINKLER WORK IS BEING PERFORMED AND ALL OCCUPIED AREAS HAVE SPRINKLER COVERAGE AT ALL TIMES EXCEPT AS ALLOWED BY THE OWNER. AT NO TIME MAY SPRINKLER SYSTEM AND FIRE ALARM SYSTEMS BE IMPAIRED AT THE SAME TIME. INVERT HEADS TO UPRIGHT HEADS DURING CONSTRUCTION WHERE CEILINGS ARE TEMPORARILY REMOVED.
DESIGN CRITERIA:
GENERAL NOTES:
D
A
REMOVE EXISTINGRX
2 378 ZONE 2
3 1,800 ZONE 3
FIRST FLOOR - EMERGENCY DEPARTMENT/COURTYARD
FIRST FLOOR - EMERGENCY DEPARTMENT/COURTYARD
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
FX001
LSRBGAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
GENERAL NOTES, SYMBOLS &
LEGENDS
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date: Brad W. Bumgarner, PE, LEED AP
2021.04.23 10:23:14 -04'00'
1. REFER TO SHEET FX001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND
GENERAL NOTES.
(E) 4" FIRE RISER
(E) 4" F
(E) 4" F
(E) 4" F
(E) FDV
(E) 2" TEST DRAIN RISER
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
FX101
LSRBBAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - EMERGENCY
DEPT. ( ED) - FIRE PROTECTION
FINAL CONSTRUCTION
DOCUMENTS
2021.04.23 10:22:42 -04'00'
P104
1. REFER TO SHEET FX001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND
GENERAL NOTES.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
FX102
LSRBBAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRST FLOOR PLAN - COURTYARD -
FIRE PROTECTION
FINAL CONSTRUCTION
DOCUMENTS
HDG PROJECT: 19026Revision Number Revisions: Date:
Brad W. Bumgarner, PE, LEED AP
2021.04.23 10:22:11 -04'00'
CEILING
SEMI-RECESSED HEAD
BRANCH LINE
NIPPLE - 1"x 4" 1" x 9" UNLESS
NOTED OTHERWISE.
FLEXIBLE HEAD
ASSEMBLIES ARE NOT
ALLOWED
TYPICAL NIPPLE -
1" x 4", EXCEPT AS
NOTED ON PLAN
8" MIN
1'-0"PENDANT TYPE
SP. HEAD
PARTIAL ACOUSTIC
CEILING TILE
2'-0"
1'-0"1'-0"
1'-0"
2"x4" ACOUSTIC
CEILING TILE
2"x2" ACOUSTIC
CEILING TILE
PENDANT TYPE
SP. HEAD
PENDANT TYPE
SP. HEAD
PE
R
NF
PA
UPRIGHT HEAD
BRANCH LINE
EXISTING WALL
STRUCTURE OR FLOOR
BRANCHLINE
DUCT GREATER THAN 48" WIDE
UPRIGHT SPRINKLER
1"
3/4" PLUG
1" x 3/4" x 1" TEE
1" D
RO
P
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT WWW.HARRELLDG.COM
621-331
FX501
LSRBBAPRIL 23, 2021
JAMES H. QUILLEN VA MEDICAL CENTER
EXPAND EMERGENCY DEPARTMENT
PHASE 2
FIRE PROTECTION DETAILS FINAL CONSTRUCTION
DOCUMENTS
2021.04.23 10:21:45 -04'00'
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
PIPE DESCRIPTIONNEW PIPE
VENT
SANITARY WASTE
DEMOLITION PIPING
A. COORDINATE PLUMBING PIPING WITH OTHER TRADES TO AVOID CONFLICTS AND INTERFERENCES.
B. SLOPE WATER PIPING FOR DRAINAGE WITH DRAIN VALVES INSTALLED AT LOW POINTS.
C. PROVIDE ACCESS PANELS AT CONCEALED VALVES, WATER HAMMER ARRESTORS AND OTHER DEVICES ABOVE HARD
CEILINGS AND WALLS.
D. PROVIDE CLEANOUTS WITH TOPS DESIGNED FOR SPECIFIC FLOOR FINISHES SUCH AS CARPET, TILE, ETC. UNLESS
NOTED OTHERWISE.
E. COORDINATE WALL AND FLOOR PENETRATIONS AND INSTALL SLEEVES IN FLOORS.
F. REFER TO EQUIPMENT DETAILS FOR VENT PIPING AND VALVING NOT INDICATED ON THE PLANS.
G. DO NOT SCALE DRAWINGS. REFERENCE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF DOORS, WINDOWS, WALLS, ETC.
H. LOCATE VERTICAL SUPPLY, STORM DRAINS, SANITARY WASTE, AND VENT PIPING IN WALLS OR PARTITIONS, UNLESS
NOTED OTHERWISE.
I. LOCATE SUPPLY PIPING ABOVE CEILING , UNLESS NOTED OTHERWISE.
J. EXTEND VENTS UP AND COLLECT VENTS ABOVE THE CEILING.
K. PROVIDE FOR ACCESS TO EQUIPMENT REQUIRING CLEANING, ADJUSTMENT OR MAINTENANCE.
L. COORDINATE ALL PHASES OF WORK AND INTERRUPTIONS IN SERVICE.
M. THESE ENGINEERING DRAWINGS ARE DIAGRAMMATIC. PROVIDE WORK AND MATERIAL FOR A COMPLETE INSTALLATION. MAKE PROPER HOT AND COLD WATER, WASTE, VENT, ETC., PIPING CONNECTION TO FIXTURES AND EQUIPMENT. PROVIDE PIPE ESCUTCHEONS, DIELECTRIC UNIONS, DRIP PANS, PIPE LABELS. VALVE TAGS, ANCHORS, SUPPORT SEALS, SLEEVE SEALS, ISOLATION VALVES, CLEANOUTS, ETC. IN QUANTITIES FOR A COMPLETE SYSTEM.
PROVIDE EQUIPMENT, PLUMBING FIXTURES, TRIM HARDWARE AND / OR DEVICES UTILIZED IN THIS CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT ARE NECESSARY FOR THE
SATISFACTORY COMPLETION OF THE WORK.
N. PROVIDE INSULATION ON NEW PIPING PER SPECIFICATIONS.
O. LOCATE PIPING STACKS AND RISERS OUTSIDE OF LOAD BEARING WALLS.
P. PIPING SHALL NOT BE ROUTED ABOVE IT ROOMS, ELECTRICAL ROOMS, ELECTRICAL EQUIPMENT, OR UNDERNEATH
ELECTRICAL ROOMS.
Q. PIPE HANGERS, BRACES AND RESTRAINTS SHALL ADEQUATELY SUPPORT THE SYSTEM HORIZONTALLY AND VERTICALLY AND SHALL ALLOW FOR MOVEMENT WITHOUT TRANSMITTING STRESS OR VIBRATION TO THE STRUCTURE.
HANGERS ON INSULATED PIPING SHALL BE PROVIDED WITH AND SHALL BE SIZED TO ACCOMMODATE HANGER SHIELDS. HORIZONTAL SOIL, WASTE AND VENT PIPING HUNG FROM BUILDING CONSTRUCTION SHALL BE SUPPORTED AT NOT OVER 5 FEET NEXT TO FITTINGS. PROVIDE ADDITIONAL SUPPORT AT JOINT, CHANGES IN DIRECTION AND
ELSEWHERE AS REQUIRED TO MAINTAIN PROPER ALIGNMENT.
R. CLEAN FIXTURES, ADJUST VALVES, AND LEAVE THE SYSTEM IN GOOD WORKING ORDER. REMOVE DEBRIS AND
RUBBISH AND REPAIR ANY DAMAGE CAUSED BY THE WORK.
S. SEAL PENETRATIONS OF FIRE RATED WALLS USING UL LISTED PENETRATION MATERIALS.
T. PROVIDE SUPPORT DEVICES. ALL LOCATIONS SHOULD BE COORDINATED WITH OTHER TRADES PRIOR TO
INSTALLATION. DO NOT USE THE SUPPORTS OF OTHER TRADES.
U. PROVIDE NON-KOHLER P-TRAPS WITH CLEANOUT.
PIPE TURNING DOWN
TEE TURNING UP
TEE TURNING DOWN
PIPE CAP
PIPE TURNING UP
BALANCING VALVE (PLUG TYPE)
CHECK VALVE
SHUT-OFF VALVE
END-OF-LINE CLEANOUT
WALL CLEANOUT
FLOOR CLEANOUT
UNION
SHOCK ARRESTER (SUFFIX INDICATES PDI SIZE)
DIRECTION OF FLOW
TRAP PRIMER
HOSE BIB
FLOOR DRAIN
POINT OF DEMOLITION
CONNECT TO EXISTING
FLEXIBLE CONNECTOR
MIXING VALVE
ROOF DRAIN
OVERFLOW ROOF DRAIN
PRESSURE REDUCING VALVE
SA-A
TP
HB
FD
CO
WCO
FCO
RD
ORD
DESCRIPTIONSYMBOL ABBREVIATIONS
YARD CLEANOUTYCO
FROST PROOF HOSE BIBFPHB
ABV ABOVE
AFF ABOVE FINISH FLOOR
BLW BELOW
BF BARRIER FREE
BFF BELOW FINISH FLOOR
CO CLEANOUT
CONT CONTINUATION
CW COLD WATER
DFU SANITARY DRAINAGE FIXTURE UNITS
DN DOWN
E, (E) EXISTING
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FLR FLOOR
HB HOSE BIBB
HW HOT WATER
HWR HOT WATER RETURN
LAV LAVATORY
MH MOUNTING HEIGHT
N.C. NC NORMALLY CLOSED
PSI POUNDS PER SQUARE INCH
SA SHOCK ARRESTOR
SAN, S SANITARY
SS SERVICE SINK
TYP TYPICAL
V VENT or VACUUM
VB VACUUM BREAKER
VTR VENT THRU ROOF
WCO WALL CLEANOUT
I.E., INV. EL. HOT WATER RETURN
FR, FRM FROM
N.O. NORMALLY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .