Mt Home ED Final CD Drawings _Revised 210512.pdf

PDF 30 MB Posted

Attached to
Z1DA-- Project 621-331- Expand Emergency Department Phase 2
Solicitation number
36C24921B0008
Issued by

About this file

This document provides details of a federal contract opportunity for the expansion of an emergency department at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves renovating an existing shelled space adjacent to the existing emergency department into a new radiology, police holding, and administrative area to serve the emergency department. The estimated value is between $5 million and $10 million. The solicitation is expected to be posted on May 25, 2021 and close on June 24, 2021. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses under authority of U.S. Code Title 38 Section 8127(d). The NAICS code is 236220 for Commercial and Institutional Building Construction, with a small business size standard of $39.5 million. The agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

File Type Posted
36C24921B0008 0002.pdf PDF
081710_Add1.pdf PDF
000110_Add1.pdf PDF
Amendment 0001.pdf PDF
087100_Add1.pdf PDF
013323.1 Master Submittal List_Add1.pdf PDF
Revised drawings 6-21-2021.pdf PDF
010000_Add1.pdf PDF
224000 Add1.pdf PDF
099659_Add1.pdf PDF
Amendment Summary.pdf PDF
Pre bid sign in sheet.pdf PDF
RFI Form - Expand Emergency Dept.pdf PDF
Mt Home ED Final CD Specs_Revised 210512.pdf PDF
WD TN20210111 1-1-2021.pdf PDF
36C24921B0008_1.pdf PDF
Contractor EMR Certification Form.pdf PDF
36C24921B0008.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026

EXPAND EMERGENCY DEPARTMENT PHASE 2

VETERANS HEALTH ADMINISTRATION

Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB, CDT

2021.04.23 11:30:13 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB, CDT

2021.04.23 11:30:42 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:30:59 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:31:21 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:32:23 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB, CDT

2021.04.23 11:33:20 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:33:55 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:34:24 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:34:58 -04'00'

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

GC121

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PHASING PLAN FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:35:28 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AI001

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

NOTES AND LEGENDS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:36:17 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AI002

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

ARCHITECTURAL A REVIATIONS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:36:51 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AD052

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR DEMOLITION PLAN -

EMERGENCY DEPARTMENT ED

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:37:27 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AD053

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR DEMOLITION PLAN -

COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:38:11 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AD054

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

DEMOLITION DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:38:55 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AE101

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - OVERALL FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:41:11 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AE102

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - EMERGENCY

DEPARTMENT ED

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:41:55 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AE103

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - COURTYARD FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:42:41 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AE104

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR DIMENSION PLAN -

EMERGENCY DEPARTMENT ED

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026

NE ARIATRIC

RATED

NE ANTI-

LIGATURE

NE ANTI-

LIGATURE

Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:43:30 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT HARRELLDG COM

621-331

AE106

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

E PAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR DIMENSION PLAN -

COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:44:27 -04'00'

EXISTING ARCHED

WINDOWS AT LOCATION

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW HARRELLDG COM

621-331

AE10

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

COURTYARD TOPPING PLAN FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:45:15 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE110

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - EMERGENCY

DEPARTMENT (ED) - DEDUCT ALT 1

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.05.12 14:37:01 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW HARRELLDG COM

621-331

AE111

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - EMERGENCY

DEPARTMENT ED - DEDUCT ALT 3

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:47:04 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW HARRELLDG COM

621-331

AE112

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - EMERGENCY

DEPARTMENT ED - DEDUCT ALT 4

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:47:58 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW HARRELLDG COM

621-331

AE113

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - EMERGENCY

DEPARTMENT ED - DEDUCT ALT 5

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:48:51 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE121

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

REFLECTED CEILING PLAN -

EMERGENCY DEPT (ED)

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.05.11 11:01:43 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW HARRELLDG COM

621-331

AE122

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

REFLECTED CEILING PLAN -

COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA,

2021.04.23 11:51:04 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW HARRELLDG COM

621-331

AE150

KBJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

ROOF PLAN FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:52:03 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE301

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

PARTIAL BUILDING SECTIONS AT

COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:42:57 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE401

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

ENLARGED PLANS AND INTERIOR

ELEVATIONS @ COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:43:32 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE402

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

ENLARGED PLAN AND INTERIOR

ELEVATIONS @ COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:45:57 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE403

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

ENLARGED PLANS AND

ELEVATIONS @ COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:53:09 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE404

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

INTERIOR ELEVATIONS @

COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:53:37 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE405

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

ENLARGED PLANS & INTERIOR

ELEVATIONS @ ED

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:54:01 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE406

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

ENLARGED PLANS & INTERIOR

ELEVATIONS @ ED

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:54:19 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE501

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

MISCELLANEOUS DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:54:40 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE511

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

INTERIOR DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:55:04 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE512

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

INTERIOR DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:56:40 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE513

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

INTERIOR DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:57:06 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE515

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

CASEWORK DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 10:57:31 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346

CONSULTING STRUCTURAL ENGINEERS

LAURENE, RICKHER & SORRELL, P.C.

8701 RED OAK BLVD. SUITE 500

CHARLOTTE, NORTH CAROLINA 28217

PHONE: 704-522-0495

POC: MARK RICKHER, PE

CIVIL ENGINEERS

DEVELOPMENT CONSULTANTS INC

2200 RODNEY PARHAM RD. SUITE 220

LITTLE ROCK, ARKANSAS 72212

PHONE: (501) 221-7880

POC: BEN KUDDES POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE516

GGJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

ENLARGED CASEWORK PLANS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:09:22 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE601

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

DOOR SCHEDULE AND DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:09:44 -04'00'

2"

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AE602

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

WINDOW TYPES & DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:11:13 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF100

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR FINISH PLAN -

EMERGENCY DEPARTMENT (ED)

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:11:34 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF101

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR FINISH PLAN -

COURTYARD

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:12:18 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF450

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

3D VIEWS - INTERIORS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:13:21 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF452

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

3D VIEWS - INTERIORS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:14:10 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF453

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

3D VIEWS INTERIORS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:15:02 -04'00'

DOOR

C/L

DOOR

C/L

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF500

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

THRESHOLD DETAILS FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:15:31 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF501

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

WALL PROTECTION / SIGNAGE

TYPES

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:15:56 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF601

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

INTERIOR FINISH SCHEDULE FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:16:23 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

AF602

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

INTERIOR MATERIALS LEGEND FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:16:49 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

QH100

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR ENLARGED

EQUIPMENT PLAN

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:17:20 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

QH101

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR ENLARGED

EQUIPMENT PLAN

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

2021.04.23 11:17:54 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

QH102

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR ENLARGED

EQUIPMENT PLAN

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:18:39 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

QH601

DWJCAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

EQUIPMENT SCHEDULES FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Jonathan M. Carr, AIA, NCARB,

2021.04.23 11:19:14 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

FA001

CSRCSR

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

GENERAL NOTES AND SCHEDULES

HDG PROJECT: 19026Revision Number Revisions: Date:

FINAL CONSTRUCTION

DOCUMENTS

APRIL 23, 2021John G. Ross, PE

2021.04.23 09:53:25 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

FA101

CSRCSR

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - EMERGENCY

DEPARTMENT (ED) - FIRE ALARM

HDG PROJECT: 19026Revision Number Revisions: Date:

FINAL CONSTRUCTION

DOCUMENTS

2021.04.23 09:53:09 -04'00'

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

FA102

CSRCSR

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - COURTYARD -

FIRE ALARM

HDG PROJECT: 19026Revision Number Revisions: Date:

FINAL CONSTRUCTION

DOCUMENTS

2021.04.23 09:52:48 -04'00'

DENOTES AREA BEING PROTECTED BY AUTOMATIC WET SPRINKLERS.

OCCUPANCY CLASSIFICATION..........LIGHT HAZARD

DESIGN DENSITY..............................0.10 GPM/S.F.

REMOTE HYDRAULIC AREA...............1,500 S.F.

MAXIMUM SPRINKLER COVERAGE.....225 S.F.

OUTSIDE HOSE STREAM...................100 GPM

DURATION OF SUPPLY.....................30 MINUTES

DENOTES AREA BEING PROTECTED BY AUTOMATIC WET SPRINKLERS.

OCCUPANCY CLASSIFICATION..........ORDINARY HAZARD, GROUP 1

DESIGN DENSITY..............................0.15 GPM/S.F.

REMOTE HYDRAULIC AREA...............1,500 S.F.

MAXIMUM SPRINKLER COVERAGE.....130 S.F.

OUTSIDE HOSE STREAM...................250 GPM

DURATION OF SUPPLY.....................60-90 MINUTES

DENOTES AREA BEING PROTECTED BY AUTOMATIC WET SPRINKLERS.

OCCUPANCY CLASSIFICATION..........ORDINARY HAZARD, GROUP 2

DESIGN DENSITY..............................0.20 GPM/S.F.

REMOTE HYDRAULIC AREA...............1,500 S.F.

MAXIMUM SPRINKLER COVERAGE.....130 S.F.

OUTSIDE HOSE STREAM...................250 GPM

DURATION OF SUPPLY.....................60-90 MINUTES

1. SEE SHEET FX501 FOR DETAILS.

2. SOME SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY NOT APPLY.

SMOKE DETECTOR

HEAT DETECTOR

POINT BETWEEN EXISTING WORK TO REMAIN AND EXISTING

WORK TO BE REMOVED

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

ROOM NUMBER

OS&Y VALVE

Y-TYPE STRAINER WITH HOSE DRAIN VALVE

Y-TYPE STRAINER

BACKFLOW PREVENTER

PLUG

WATERFLOW DETECTOR

SIAMESE FIRE DEPARTMENT CONNECTION

FIRE PROTECTION DEMOLITION PIPING

FIRE PROTECTION SUPPLY PIPING

WET PIPE FIRE PROTECTION VALVE

DRY PIPE FIRE PROTECTION VALVE

PRE-ACTION FIRE PROTECTION VALVEFIRE PROTECTION DRAIN

PRESSURE GAGE

FLEXIBLE PIPE CONNECTION

UNION

ECCENTRIC REDUCER (STRAIGHT INVERT)

CONCENTRIC REDUCER

TEE, OUTLET TURNED DOWN

TEE, OUTLET TURNED UP

TEE

ELBOW, 45°

ELBOW, 90° TURNED DOWN

ELBOW, 90° TURNED UP

ELBOW, 90°

CAP

ELECTRICALLY OPERATED VALVE

CHECK VALVE

BUTTERFLY VALVE

FIRE DEPT HOSE VALVE W/CAP

FIRE HOSE CABINET

FIRE VALVE CABINET

FIRE DEPARTMENT CONNECTION

FIRE DEPARTMENT VALVE

TAMPER SWITCH

FLOW SWITCH

EXISTING

MINIMUM

FHC

FVC

TS

FS

EX. EXIST.

FDC

FDV

WATER MOTOR GONG

MIN.

TYPICALTYP.

UNDER GROUNDU/G

GALLONS PER MINUTEGPM

CAPACITYCAP

PRESSURE SWITCHP.S.

FIRE PROTECTION COMPRESSED AIR SUPPLY

DESCRIPTION / LOCATIONITEMS APPROXIMATE

AREA SERVED (SQ.FT.)

SERVED BY ZONE

CONTROL ASSEMBLY

NOTES:

1 FIRST FLOOR - EMERGENCY DEPARTMENT/COURTYARD 8,739 ZONE 1

FIRE ALARM GRAPHIC ANNUNICIATOR PANEL

SPARE SPRINKLER CABINET

FIRE ALARM CONTROL PANEL

FIRE ALARM ANNUNICIATOR PANEL

FAGAP

FACP

FAAP

SD

HD

F

F.S.

T.S.

SPRINKLER PLANS AS SHOWN ARE FOR BIDDING PURPOSES ONLY. THE SPRINKLER

CONTRACTOR IS TO OBTAIN A CURRENT WATER FLOW TEST AND PROVIDE HYDRAULIC

CALCULATIONS FOR SYSTEM PIPE SIZING IN ACCORDANCE WITH THE LATEST EDITION

OF NFPA 13. THE SPRINKLER CONTRACTOR IS TO SUBMIT SHOP DRAWINGS AND

HYDRAULIC CALCULATION, PIPING LAYOUT AND SIZING. SHOP DRAWINGS AND

CALCULATIONS SHALL BE SEALED AND SIGNED BY A NICET LEVEL IV DESIGNER OR A

PROFESSIONAL ENGINEER.

REFER TO THE FOLLOWING PUBLICATIONS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

FOR THE DESIGN OF THE FIRE PROTECTION SYSTEM ON THIS PROJECT:

1. NFPA 13, (LATEST EDITION) - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS.

2. NFPA 25, (LATEST EDITION) - STANDARD FOR THE TESTING, INSPECTION, AND MAINTENANCE OF WATER BASED

FIRE PROTECTION SYSTEMS.

A. DESIGN THE SPRINKLER SYSTEM THROUGHOUT PROPOSED SCOPE OF WORK IN ACCORDANCE WITH NFPA 13.

B. ALL PIPING, VALVE, SPRINKLER HEADS, HANGERS, ETC. SHALL BE UL LISTED AND FM APPROVED.

C. DESIGN SHALL BE PERFORMED BY NICET LEVEL IV DESIGNER OR A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF ARKANSAS AND SHALL BE SIGNED AND SEALED AS APPLICABLE. PROVIDE FIRE PROECTION SYSTEM DESIGN AND SHOP

DRAWINGS, MEETING ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS.

D. HYDRAULICALLY CALCULATE THE SYSTEM SIZING IN ACCORDANCE WITH NFPA 13. CONDUCT A NEW FLOW TEST AT THE NEAREST FIRE HYDRANTS IN ACCORDANCE WITH NFPA 291 TO UTILIZE AS A BASIS FOR HYDRAULIC CALCULATIONS. SUBMIT

TEST TO ARCHITECT IN WRITING.

E. DESIGN THE SYSTEM USING SPRINKLER HEADS THAT ARE FM APPROVED, QUICK RESPONSE TYPE, SEMI-RECESSED HEADS IN ALL AREAS, EXCEPT WHERE SPECIFICALLY PROHIBITED IN UNFINISHED AREAS WITHOUT CEILINGS. USE QUICK RESPONSE ROUGH BRASS UPRIGHT HEADS WITH FRANGIBLE GLASS ELEMENT. FLEXIBLE SPRINKLER HEADS ARE PROHIBITED.

F. ALL HEADS SHALL HAVE A K FACTOR OF 5.6 - 5.8. TEMPERATURE RATINGS OF ALL SPRINKLER HEADS SHALL BE IN

ACCORDANCE WITH THE LATEST EDITION OF NFPA 13.

G. DESIGN THE SPRINKLER SYSTEM FOR THE ENTIRE WORK AREA TO BE CLASSIFIED AS LIGHT HAZARD OCCUPANCY EXCEPT

AS NOTED BY HATCHING ON THE FLOOR PLANS.

H. COORDINATE PIPE ROUTING WITH DUCT ROUTING, EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND BUILDING

STRUCTURAL MEMBERS. AVOID PENETRATING ANY MAIN STRUCTURAL BEAM.

I. HYDRAULIC CALCULATIONS SHALL TAKE INTO ACCOUNT ALL FITTINGS, OFFSETS, HARDWARE, DEVICES, CHARACTERISTICS

AND TRIM DETERMINED NECESSARY FOR A COMPLETE SPRINKLER INSTALLATION.

J. CENTER SPRINKLER HEADS IN CEILING TILES IN AREAS WITH LAY-IN TILES AND VISUALLY ALIGN IN AREAS WITH HARD

CEILINGS.

K. ELEVATIONS OF SPRINKLER PIPING AND HEADS MUST BE DETERMINED BY PROPOSED CEILING HEIGHTS. REFER TO

ARCHITECTURAL DRAWINGS FOR REFLECTED CEILING PLANS.

L. PROVIDE SEISMIC BRACING FOR ALL PIPING IN ACCORDANCE WITH NFPA 13. PROVIDE SHOP DRAWINGS OF ALL SEISMIC CALCULATIONS, SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF TENNESSEE.

M. SPRINKLER HEADS AND ASSOCIATED BRANCH PIPING SHALL BE LOCATED AND SUPPORTED IN ACCORDANCE WITH NFPA 13.

N. TEST SPRINKLER SYSTEM, CONTROLS, PIPING, AND MONITORING IN ACCORDANCE WITH NFPA 25.

O. CAGES SHALL BE ADDED TO THE IT ROOMS WITH HIGHER TEMPERATURE HEADS.

P. DO NOT INTERRUPT SPRINKLER SERVICE TO OCCUPIED SPACES. NOTIFY COR NO FEWER THAN TWO DAYS IN ADVANCE OF PROPOSED INTERRUPTION OF SPRINKLER SERVICE. DO NOT PROCEED WITH INTERRUPTION OF SERVICE WITHOUT WRITTEN

PERMISSION.

Q. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND COMPLETED IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH THE BEST METHODS AND PRACTICES. ANY MATERIAL WHICH DOES NOT PRESENT AN ORDERLY AND REASONABLY NEAT AND WORKMANLIKE APPEARANCE, SHALL BE REMOVED AND REPLACED WHEN SO DIRECTED BY THE OWNER. THE REMOVAL AND REPLACEMENT OF THIS WORK SHALL BE DONE WHEN DIRECTED IN WIRTING BY THE OWNER AT THE CONTRACTOR'S

EXPENSE.

R. INCLUDE TEMPORARY COVERAGE AND SUPPLIES AS REQUIRED SO THAT NO AREA IS LEFT IMPAIRED DURING PERIODS WHERE NO SPRINKLER WORK IS BEING PERFORMED AND ALL OCCUPIED AREAS HAVE SPRINKLER COVERAGE AT ALL TIMES EXCEPT AS ALLOWED BY THE OWNER. AT NO TIME MAY SPRINKLER SYSTEM AND FIRE ALARM SYSTEMS BE IMPAIRED AT THE SAME TIME. INVERT HEADS TO UPRIGHT HEADS DURING CONSTRUCTION WHERE CEILINGS ARE TEMPORARILY REMOVED.

DESIGN CRITERIA:

GENERAL NOTES:

D

A

REMOVE EXISTINGRX

2 378 ZONE 2

3 1,800 ZONE 3

FIRST FLOOR - EMERGENCY DEPARTMENT/COURTYARD

FIRST FLOOR - EMERGENCY DEPARTMENT/COURTYARD

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

FX001

LSRBGAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

GENERAL NOTES, SYMBOLS &

LEGENDS

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date: Brad W. Bumgarner, PE, LEED AP

2021.04.23 10:23:14 -04'00'

1. REFER TO SHEET FX001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND

GENERAL NOTES.

(E) 4" FIRE RISER

(E) 4" F

(E) 4" F

(E) 4" F

(E) FDV

(E) 2" TEST DRAIN RISER

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

FX101

LSRBBAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - EMERGENCY

DEPT. ( ED) - FIRE PROTECTION

FINAL CONSTRUCTION

DOCUMENTS

2021.04.23 10:22:42 -04'00'

P104

1. REFER TO SHEET FX001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND

GENERAL NOTES.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

FX102

LSRBBAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRST FLOOR PLAN - COURTYARD -

FIRE PROTECTION

FINAL CONSTRUCTION

DOCUMENTS

HDG PROJECT: 19026Revision Number Revisions: Date:

Brad W. Bumgarner, PE, LEED AP

2021.04.23 10:22:11 -04'00'

CEILING

SEMI-RECESSED HEAD

BRANCH LINE

NIPPLE - 1"x 4" 1" x 9" UNLESS

NOTED OTHERWISE.

FLEXIBLE HEAD

ASSEMBLIES ARE NOT

ALLOWED

TYPICAL NIPPLE -

1" x 4", EXCEPT AS

NOTED ON PLAN

8" MIN

1'-0"PENDANT TYPE

SP. HEAD

PARTIAL ACOUSTIC

CEILING TILE

2'-0"

1'-0"1'-0"

1'-0"

2"x4" ACOUSTIC

CEILING TILE

2"x2" ACOUSTIC

CEILING TILE

PENDANT TYPE

SP. HEAD

PENDANT TYPE

SP. HEAD

PE

R

NF

PA

UPRIGHT HEAD

BRANCH LINE

EXISTING WALL

STRUCTURE OR FLOOR

BRANCHLINE

DUCT GREATER THAN 48" WIDE

UPRIGHT SPRINKLER

1"

3/4" PLUG

1" x 3/4" x 1" TEE

1" D

RO

P

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT WWW.HARRELLDG.COM

621-331

FX501

LSRBBAPRIL 23, 2021

JAMES H. QUILLEN VA MEDICAL CENTER

EXPAND EMERGENCY DEPARTMENT

PHASE 2

FIRE PROTECTION DETAILS FINAL CONSTRUCTION

DOCUMENTS

2021.04.23 10:21:45 -04'00'

DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER

DOMESTIC COLD WATER

PIPE DESCRIPTIONNEW PIPE

VENT

SANITARY WASTE

DEMOLITION PIPING

A. COORDINATE PLUMBING PIPING WITH OTHER TRADES TO AVOID CONFLICTS AND INTERFERENCES.

B. SLOPE WATER PIPING FOR DRAINAGE WITH DRAIN VALVES INSTALLED AT LOW POINTS.

C. PROVIDE ACCESS PANELS AT CONCEALED VALVES, WATER HAMMER ARRESTORS AND OTHER DEVICES ABOVE HARD

CEILINGS AND WALLS.

D. PROVIDE CLEANOUTS WITH TOPS DESIGNED FOR SPECIFIC FLOOR FINISHES SUCH AS CARPET, TILE, ETC. UNLESS

NOTED OTHERWISE.

E. COORDINATE WALL AND FLOOR PENETRATIONS AND INSTALL SLEEVES IN FLOORS.

F. REFER TO EQUIPMENT DETAILS FOR VENT PIPING AND VALVING NOT INDICATED ON THE PLANS.

G. DO NOT SCALE DRAWINGS. REFERENCE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF DOORS, WINDOWS, WALLS, ETC.

H. LOCATE VERTICAL SUPPLY, STORM DRAINS, SANITARY WASTE, AND VENT PIPING IN WALLS OR PARTITIONS, UNLESS

NOTED OTHERWISE.

I. LOCATE SUPPLY PIPING ABOVE CEILING , UNLESS NOTED OTHERWISE.

J. EXTEND VENTS UP AND COLLECT VENTS ABOVE THE CEILING.

K. PROVIDE FOR ACCESS TO EQUIPMENT REQUIRING CLEANING, ADJUSTMENT OR MAINTENANCE.

L. COORDINATE ALL PHASES OF WORK AND INTERRUPTIONS IN SERVICE.

M. THESE ENGINEERING DRAWINGS ARE DIAGRAMMATIC. PROVIDE WORK AND MATERIAL FOR A COMPLETE INSTALLATION. MAKE PROPER HOT AND COLD WATER, WASTE, VENT, ETC., PIPING CONNECTION TO FIXTURES AND EQUIPMENT. PROVIDE PIPE ESCUTCHEONS, DIELECTRIC UNIONS, DRIP PANS, PIPE LABELS. VALVE TAGS, ANCHORS, SUPPORT SEALS, SLEEVE SEALS, ISOLATION VALVES, CLEANOUTS, ETC. IN QUANTITIES FOR A COMPLETE SYSTEM.

PROVIDE EQUIPMENT, PLUMBING FIXTURES, TRIM HARDWARE AND / OR DEVICES UTILIZED IN THIS CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT ARE NECESSARY FOR THE

SATISFACTORY COMPLETION OF THE WORK.

N. PROVIDE INSULATION ON NEW PIPING PER SPECIFICATIONS.

O. LOCATE PIPING STACKS AND RISERS OUTSIDE OF LOAD BEARING WALLS.

P. PIPING SHALL NOT BE ROUTED ABOVE IT ROOMS, ELECTRICAL ROOMS, ELECTRICAL EQUIPMENT, OR UNDERNEATH

ELECTRICAL ROOMS.

Q. PIPE HANGERS, BRACES AND RESTRAINTS SHALL ADEQUATELY SUPPORT THE SYSTEM HORIZONTALLY AND VERTICALLY AND SHALL ALLOW FOR MOVEMENT WITHOUT TRANSMITTING STRESS OR VIBRATION TO THE STRUCTURE.

HANGERS ON INSULATED PIPING SHALL BE PROVIDED WITH AND SHALL BE SIZED TO ACCOMMODATE HANGER SHIELDS. HORIZONTAL SOIL, WASTE AND VENT PIPING HUNG FROM BUILDING CONSTRUCTION SHALL BE SUPPORTED AT NOT OVER 5 FEET NEXT TO FITTINGS. PROVIDE ADDITIONAL SUPPORT AT JOINT, CHANGES IN DIRECTION AND

ELSEWHERE AS REQUIRED TO MAINTAIN PROPER ALIGNMENT.

R. CLEAN FIXTURES, ADJUST VALVES, AND LEAVE THE SYSTEM IN GOOD WORKING ORDER. REMOVE DEBRIS AND

RUBBISH AND REPAIR ANY DAMAGE CAUSED BY THE WORK.

S. SEAL PENETRATIONS OF FIRE RATED WALLS USING UL LISTED PENETRATION MATERIALS.

T. PROVIDE SUPPORT DEVICES. ALL LOCATIONS SHOULD BE COORDINATED WITH OTHER TRADES PRIOR TO

INSTALLATION. DO NOT USE THE SUPPORTS OF OTHER TRADES.

U. PROVIDE NON-KOHLER P-TRAPS WITH CLEANOUT.

PIPE TURNING DOWN

TEE TURNING UP

TEE TURNING DOWN

PIPE CAP

PIPE TURNING UP

BALANCING VALVE (PLUG TYPE)

CHECK VALVE

SHUT-OFF VALVE

END-OF-LINE CLEANOUT

WALL CLEANOUT

FLOOR CLEANOUT

UNION

SHOCK ARRESTER (SUFFIX INDICATES PDI SIZE)

DIRECTION OF FLOW

TRAP PRIMER

HOSE BIB

FLOOR DRAIN

POINT OF DEMOLITION

CONNECT TO EXISTING

FLEXIBLE CONNECTOR

MIXING VALVE

ROOF DRAIN

OVERFLOW ROOF DRAIN

PRESSURE REDUCING VALVE

SA-A

TP

HB

FD

CO

WCO

FCO

RD

ORD

DESCRIPTIONSYMBOL ABBREVIATIONS

YARD CLEANOUTYCO

FROST PROOF HOSE BIBFPHB

ABV ABOVE

AFF ABOVE FINISH FLOOR

BLW BELOW

BF BARRIER FREE

BFF BELOW FINISH FLOOR

CO CLEANOUT

CONT CONTINUATION

CW COLD WATER

DFU SANITARY DRAINAGE FIXTURE UNITS

DN DOWN

E, (E) EXISTING

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FLR FLOOR

HB HOSE BIBB

HW HOT WATER

HWR HOT WATER RETURN

LAV LAVATORY

MH MOUNTING HEIGHT

N.C. NC NORMALLY CLOSED

PSI POUNDS PER SQUARE INCH

SA SHOCK ARRESTOR

SAN, S SANITARY

SS SERVICE SINK

TYP TYPICAL

V VENT or VACUUM

VB VACUUM BREAKER

VTR VENT THRU ROOF

WCO WALL CLEANOUT

I.E., INV. EL. HOT WATER RETURN

FR, FRM FROM

N.O. NORMALLY…