- Services: Repair Active Vehicle Barriers Federal contract opportunity
- Solicitation number
- 36C24818Q0491
About this file
36C24818Q0491 ATTACHMENT B Main North East Barriers Survey v3-.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24818Q0491-00001000.docx | DOCX document | |
| 36C24818Q0491-00001001.docx | DOCX document | |
| 36C24818Q0491-009.pdf | ||
| 36C24818Q0491-011.pdf | ||
| 36C24818Q0491-002.docx | DOCX document | |
| 36C24818Q0491-004.pdf | ||
| 36C24818Q0491-005.pdf | ||
| 36C24818Q0491-013.pdf | ||
| 36C24818Q0491-010.pdf | ||
| 36C24818Q0491-008.pdf | ||
| 36C24818Q0491-012.pdf | ||
| 36C24818Q0491-006.pdf | ||
| 36C24818Q0491-003.pdf | ||
| 36C24818Q0491-001.docx | DOCX document | |
| 36C24818Q0491-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Main Entrance – North East - outbound Side Lane
Concrete was poured too high during installation resulting in the plate not resting properly in the down position and also damaging the paint and the galvanizing coating
Resolution: grind the concrete down, touch up paint with yellow and black paint
Concrete was poured too high during installation resulting in the plate not resting properly in the down position and also damaging the paint and the galvanizing coating
Resolution: grind the concrete down, touch up paint with yellow and black paint
Main Entrance - Left side - Middle Lane
General Notes:
-Limit Sensors wiring is not properly terminated for below grade application. The cable should be shortened, terminations should be soldiered, adhesive heat shrunk, and cable sleeved
Rubber pads on the front of the barrier needs to be replaced
Main Entrance - Side/Middle – Power Unit
Hydraulic unit is complete disrepair. All the lines, hand pump, mounting, fitting are in a major state of degradation. It is suggested to replace the entire power unit before putting the barrier system into operation. The hydraulic lines should be replaced. The hydraulic cylinder needs to be taken apart and cleaned also.
- General Notes:
--Hydraulic unit needs complete replacement -This PLC panel needs to be removed and functionality migrated to master panel -Noticeable rusting and paint chipping is on the outdoor enclosure. Full painting is suggested.
Main Entrance - Left side - Inbound Side Lane
Concrete was poured too high during installation resulting in the plate not resting properly in the down position and also damaging the paint and the galvanizing coating
Resolution: grind the concrete down, touch up paint with yellow and black paint
Concrete was poured too high during installation resulting in the plate not resting properly in the down position and also damaging the paint and the galvanizing coating
Resolution: grind the concrete down, touch up paint with yellow and black paint
General Notes:
-Limit Sensors wiring is not properly terminated for below grade application. The cable should be shortened, terminations should be soldiered, adhesive heat shrunk, and cable sleeved
-Hydraulic oil is extremely dirty. The oil, suction strainer needs to be replaced. The hydraulic hoses need to be blown out and flushed. The hydraulic drum needs to be wiped and cleaned thoroughly
-This PLC panel needs to be removed and functionality migrated to master panel
-Noticeable rusting and paint chipping is on the outdoor enclosure. The chipping spots at a minimum needs to be touched up. Full painting is suggested.
-Two areas of concrete need to be repaired
-Front rubber pad needs to be replaced