36C24818Q0491-007.pdf

PDF 4 MB Posted

Attached to
Services: Repair Active Vehicle Barriers Federal contract opportunity
Solicitation number
36C24818Q0491
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

36C24818Q0491 ATTACHMENT B Main North East Barriers Survey v3-.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Services: Repair Active Vehicle Barriers, newest first.
File Type Posted
36C24818Q0491-00001000.docx DOCX document
36C24818Q0491-00001001.docx DOCX document
36C24818Q0491-009.pdf PDF
36C24818Q0491-011.pdf PDF
36C24818Q0491-002.docx DOCX document
36C24818Q0491-004.pdf PDF
36C24818Q0491-005.pdf PDF
36C24818Q0491-013.pdf PDF
36C24818Q0491-010.pdf PDF
36C24818Q0491-008.pdf PDF
36C24818Q0491-012.pdf PDF
36C24818Q0491-006.pdf PDF
36C24818Q0491-003.pdf PDF
36C24818Q0491-001.docx DOCX document
36C24818Q0491-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Main Entrance – North East - outbound Side Lane

Concrete was poured too high during installation resulting in the plate not resting properly in the down position and also damaging the paint and the galvanizing coating

Resolution: grind the concrete down, touch up paint with yellow and black paint

Concrete was poured too high during installation resulting in the plate not resting properly in the down position and also damaging the paint and the galvanizing coating

Resolution: grind the concrete down, touch up paint with yellow and black paint

Main Entrance - Left side - Middle Lane

General Notes:

-Limit Sensors wiring is not properly terminated for below grade application. The cable should be shortened, terminations should be soldiered, adhesive heat shrunk, and cable sleeved

Rubber pads on the front of the barrier needs to be replaced

Main Entrance - Side/Middle – Power Unit

Hydraulic unit is complete disrepair. All the lines, hand pump, mounting, fitting are in a major state of degradation. It is suggested to replace the entire power unit before putting the barrier system into operation. The hydraulic lines should be replaced. The hydraulic cylinder needs to be taken apart and cleaned also.

- General Notes:

--Hydraulic unit needs complete replacement -This PLC panel needs to be removed and functionality migrated to master panel -Noticeable rusting and paint chipping is on the outdoor enclosure. Full painting is suggested.

Main Entrance - Left side - Inbound Side Lane

Concrete was poured too high during installation resulting in the plate not resting properly in the down position and also damaging the paint and the galvanizing coating

Resolution: grind the concrete down, touch up paint with yellow and black paint

Concrete was poured too high during installation resulting in the plate not resting properly in the down position and also damaging the paint and the galvanizing coating

Resolution: grind the concrete down, touch up paint with yellow and black paint

General Notes:

-Limit Sensors wiring is not properly terminated for below grade application. The cable should be shortened, terminations should be soldiered, adhesive heat shrunk, and cable sleeved

-Hydraulic oil is extremely dirty. The oil, suction strainer needs to be replaced. The hydraulic hoses need to be blown out and flushed. The hydraulic drum needs to be wiped and cleaned thoroughly

-This PLC panel needs to be removed and functionality migrated to master panel

-Noticeable rusting and paint chipping is on the outdoor enclosure. The chipping spots at a minimum needs to be touched up. Full painting is suggested.

-Two areas of concrete need to be repaired

-Front rubber pad needs to be replaced