36C24618B0616-015.pdf

PDF 4 MB Posted

Attached to
Relocate and Expand Renal Dialysis
Solicitation number
36C24618B0616
Issued by

About this file

36C24618B0616 13 Mechanical.pdf

View the file

Other files

File Type Posted
36C24618B0616-0004000.docx DOCX document
36C24618B0616-0003002.pdf PDF
36C24618B0616-0003000.docx DOCX document
36C24618B0616-0003001.pdf PDF
36C24618B0616-0002001.pdf PDF
36C24618B0616-0002000.docx DOCX document
36C24618B0616-0001000.docx DOCX document
36C24618B0616-013.pdf PDF
36C24618B0616-002.pdf PDF
36C24618B0616-012.pdf PDF
36C24618B0616-001.docx DOCX document
36C24618B0616-016.pdf PDF
36C24618B0616-004.pdf PDF
36C24618B0616-003.pdf PDF
36C24618B0616-014.pdf PDF
36C24618B0616-011.pdf PDF
36C24618B0616-009.pdf PDF
36C24618B0616-008.pdf PDF
36C24618B0616-010.pdf PDF
36C24618B0616-007.pdf PDF
36C24618B0616-005.pdf PDF
36C24618B0616-006.pdf PDF
36C24618B0616-000.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIFFUSER, SUPPLY

RETURN AIR OUTLET

EXHAUST AIR OUTLET

VARIABLE AIR VOLUME

(NEW), "X" INDICATES

DEVICE NUMBER

POINT OF DISCONNECTION (P.O.D)

VAV-X

POINT OF DISCONNECTION (P.O.D)

POINT OF CONNECTION (P.O.C)

T

SPACE TEMPERATURE

SENSOR, "#" INDICATES

DEVICE CONTROLLED

NOTE NUMBER (SEE SCHEDULE)

1i

AIR TERMINAL TAG

TAG

CFM

BALANCING DAMPER -

RECTANGULAR

BALANCING DAMPER -

ROUND

AUTOMATIC CONTROL

DAMPER - RECTANGULAR

SIMPLE RECTANGULAR

FIRE DAMPER

BALANCING VALVE

BALL VALVE

BUTTEFLY VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

AIR SEPEERATOR W/

STRAINER INLINE

PRESSURE GAUGE

TEMPERATURE GAUGE

Y STRAINER - FLANGED

CAPPED PIPING

RISE

DROP

ECCENTRIC REDUCER

CENTRIFUGAL PUMP

EXPANSION TANK

HWR

HWS

CHR

CHS

LPS

CR

CD

HOT WATER RETURN

HOT WATER SUPPLY

CHILLED WATER RETURN

CHILLED WATER SUPPLY

AIR TERMINAL TAG

LOW PRESSURE STEAM

AIR TERMINAL TAG

DEMOLISH LINE TYPE

ITEMS TO BE DEMOLISHED

DN DOWN

EXH EXHAUST

EA EXHAUST AIR

(E) EXISTING

EXF EX-FILTRATE

INF INFILTRATE

NIC NOT IN CONTRACT

SA SUPPLY AIR

RA RETURN AIR

RH RE-HEAT

AHU-X AIR HANDLING UNIT DESIGNATION

CHWP-X CHILLED WATER PUMP DESIGNATION

CRU-X CONDENSATE RETURN UNIT DESIGNATION

EF-X EXHAUST FAN DESIGNATION

ET-X EXPANSION TANK DESIGNATION

HX-X HEAT EXCHANGER DESIGNATION

SPSS-X STATIC PRESSURE SENSOR DESIGNATION

ST-X STEAM TRAP DESIGNATION

V-X VALVE DESIGNATION

VF-X VENTILATION FAN DESIGNATION

HWP-X HEATING HOT WATER PUMP DESIGNATION

o n e e i g h t h i n c o e f o t t h r e e i n c h e s o t o n e a d a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL LEGENDS AND

ABBREVIATIONS

2 JDGCMD

2018.02.16

658-315

MH000

SALEM VA MEDICAL CENTER 12088

CONSTRUCTION DOCUMENTS

GENERAL MECHANICAL NOTES

1 THE DRAWINGS SHOW THE GENERAL ARRANGEMENT AND LOCATION OF EQUIPMENT, DUCTWORK,

PIPING, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE MECHANICAL

INSTALLATION W/ THE STRUCTURE AND OTHER TRADES AND SHALL PROVIDE ADDITIONAL OFFSETS AND

FITTINGS AS NECESSARY.

2 COORDINATE WORK WITH AUTHORITY HAVING JURISDICTION AND OBTAIN ALL PERMITS AND

INSPECTIONS.

3 THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS SHALL COMPLY WITH THE 2012 EDITION OF

THE INTERNATIONAL MECHANICAL CODE, NFPA 90A, LOCAL CODE AND ALL CODES HAVING JURISDICTION.

IN THE EVENT OF A CONFLICT BETWEEN CODES, THE MOST STRINGENT SHALL ALWAYS GOVERN.

4 DUCT DIMENSIONS ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS

5 THE CONTRACTOR SHALL CHECK AND VERIFY ALL CLEARANCES PRIOR TO FABRICATION OR

INSTALLATION OF EQUIPMENT, DUCTWORK, AND PIPING SYSTEMS. WHERE CONDITIONS REQUIRE A

CHANGE IN DUCT OR PIPE ROUTING, NOTIFY THE COR FOR AN ACCEPTABLE ALTERNATIVE METHOD.

AVOID ROUTING DUCTWORK DIRECTLY OVER LIGHT FIXTURES, DIFFUSERS, AND OTHER CEILING MTD.

DEVICES. LOCATE ALL MECHANICAL EQUIPMENT SO THAT FILTERS AND COMPONENTS REQUIRING

ACCESS (SERVICE AND MAINTENANCE) ARE FULLY ACCESSIBLE.

6 PROVIDE CURVED RADIUS ELBOW AT FIRST SUPPLY & RETURN FITTING FOR ALL HVAC UNITS. PROVIDE

TURNING VANES IN ALL 90 DEGREE ELBOWS IN ALL RECTANGULAR SUPPLY/RETURN/EXHAUST DUCT

SYSTEMS. ANY OFFSETS REQUIRED IN DUCT SYSTEMS SHALL BE INSTALLED PER SMACNA STANDARDS.

SHARP ANGLED TRANSITIONS OR OFFSETS 'WILL NOT BE ALLOWED'. PROVIDE DUCT ACCESS DOORS AT

LOCATIONS SPECIFIED.

7 INSTALL ALL DUCT MOUNTED DEVICES (DAMPERS, ACCESS DOORS, ETC.) AND PIPING SPECIALTIES IN

EASILY ACCESSIBLE LOCATIONS. ADVISE THE COR IN ADVANCE OF INSTALLATION IF ACCESS WILL BE

HINDERED SO AN ALTERNATE LOCATION CAN BE SELECTED.

8 ALL DUCT TAKE-OFFS SHALL BE INSTALLED AS SHOWN BY DETAILS ON THE PLANS WITH A MANUAL

BALANCE DAMPER AT EVERY TAKE-OFF. WHERE DUCT RUN-OUT SIZE IS NOT SHOWN PROVIDE DUCT

SAME SIZE AS GRILLE NECK SIZE. PRE-INSULATED FLEXIBLE DUCT MAY BE USED FOR FINAL CONNECTION

TO SUPPLY/RETURN GRILLES (MAX. LENGTH 5')

9 ALL ROTATING MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH VIBRATION ISOLATION. PROVIDE

FLEXIBLE NEOPRENE DUCT CONNECTORS BETWEEN DUCTWORK AND ISOLATED MECHANICAL

EQUIPMENT.

10 THE CONTRACTOR SHALL FIRESTOP ALL PENETRATIONS OF FIRE RATED WALLS/FLOORS/CEILINGS BY

DUCTWORK, PIPING, ETC., WITH U.L. LISTED FIRE STOPPING MATERIAL TO MAINTAIN FIRE RATING OF THE

BARRIER.

11 SEISMIC PROTECTION OF EQUIPMENT, DUCTWORK, PIPING AND UTILITIES SHALL BE PROVIDED IN

ACCORDANCE WITH SECTION 16 OF THE 2012 EDITION OF THE INTERNATIONAL BUILDING CODE. ALL

SEISMIC RESTRAINT AND BRACING SHALL BE SUBSTANTIATED BY MANUFACTURER'S SUBMITTALS AND

PE APPROVED PER THE SPECIFICATIONS.

12 BALANCE ALL AIR DISTRIBUTION DEVICES, EXHAUST FANS, AND OUTSIDE AIR QUANTITIES AS

SCHEDULED OR SHOWN ON THE DRAWINGS. PROVIDE MARKERS AT ALL DAMPER LOCATIONS SHOWING

FULL OPEN/CLOSED POSITIONS AND DAMPER SETTING FOR REQUIRED AIRFLOW. PROVIDE FINAL TEST

AND BALANCE REPORT ALONG W/ SCHEMATIC DRAWINGS SHOWING DIFFUSER LOCATION W/ DESIGN

AND ACTUAL CFM. THE DIFFUSER TAGS ON THE DRAWINGS SHALL CORRESPOND TO THE DIFFUSER

TAGS ON THE REPORT. THIS REPORT SHALL BE SUBMITTED BEFORE THE FINAL INSPECTION IS

PERFORMED. SEE THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

13 THE SYSTEMS SERVING THE RENOVATION AREA ARE CRITICAL FOR THE HOSPITAL. THESE FACILITIES

MUST REMAIN OPERATIONAL THROUGHOUT THE CONSTRUCTION CONTRACT. THE CONTRACTOR SHALL

BE RESPONSIBLE FOR COORDINATING ANY SYSTEM SHUTDOWNS WITH CONTRACTING OFFICER AT

LEAST 30 DAYS IN ADVANCE.

14 THE BUILDING WILL BE OCCUPIED AND WILL BE IN OPERATION DURING THE LIFE OF THE CONTRACT. THE

CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES AS REQUIRED TO MAINTAIN SYSTEMS (INCLUDING

BUT NOT LIMITED TO FIRE DETECTION/ALARM, CONTROL SYSTEMS, LIFE SAFETY, AND FIRE PROTECTION.

THE CONTRACTOR SHALL PROTECT ALL SYSTEMS OR PORTION OF SYSTMES TO REMAIN FOR REUSE

FROM DAMAGE. ALL SYSTEMS SHALL BE TESTED IN SERVICE AFTER COMPLETION OF THE CONTRACT

AND MADE COMPLETE AND OPERATIONAL AT NO ADDITIONAL COST TO THE GOVERMENT.

GENERAL DEMOLITION NOTES

1 ALL DUCTWORK, EQUIPMENT, AND PIPING SHOWN WITH DASHED AND DARK LINES INDICATE ITEMS TO BE

DEMOLISHED. ALL EXISTING TO REMAIN IS INDICATED AS LIGHT AND DASHED LINES. SEE

ARCHITECTURAL DRAWINGS AND CODED DEMOLITION NOTES FOR SPECIFIC INFORMATION. EXISTING

DUCT TAKE-OFFS MAY BE REUSED IN NEW WORK IF CORRECT SIZE AND LOCATION. ALL EXISTING

DUCTWORK TO BE REUSED SHALL BE COMPLIANT WITH THE VA'S HVAC DESIGN MANUAL. EXISTING

DUCTWORK SHALL BE CLEANED, SEALED AND TESTED TO MEET CURRENT DESIGN CRITERIA.

2 SHADED AREAS OF THIS PLAN ARE NOT WITHIN THE PROJECT SCOPE OF WORK AND ARE SHOWN FOR

REFERENCE ONLY.

3 LOCATION OF EXISTING EQUIPMENT, DUCTWORK, AIR OUTLETS, CONTROLS AND ALL CONCEALED

WORKS, ETC. ARE APPROXIMATE. THE CONTRACTOR SHALL EXAMINE THE SITE PRIOR TO BUILDING AND

AFTER DEMOLITION HAS EXPOSED "AS-BUILT" CONDITIONS TO VERIFY EACH AIR OUTLET, AND

EQUIPMENT LOCATION. THE CONTRACTOR SHALL MAKE ADJUSTMENTS AND/OR ALTERATIONS AS

NECESSARY TO INSTALL COMPLETE AND OPERABLE SYSTEMS IN ACCORDANCE WITH THE CODES

HAVING JURISDICTION AT NO ADDITIONAL COST TO THE GOVERNMENT

4 ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF AIR OUTLETS, EQUIPMENT, CONTROLS, ETC. SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH.

PREPARE SURFACES TO RECEIVE NEW FINISH, SEE ARCHITECTURAL DRAWINGS FOR NEW FINISH

SCHEDULE. ALL REPAIRS AND NEW FINISH SHALL BE BY TRADES SKILLED IN FINISH WORKS UNDER

EMPLOY OF THE GENERAL CONTRACTOR.

5 DURING THE LIFE OF THE CONTRACT (CONSTRUCTION AND DEMOLITION TO POINT OF BENEFICIAL

OCCUPANCY BY OWNER). THE CONTRACTOR SHALL PROTECT ALL SYSTEMS OR PORTIONS OF SYSTEMS

TO REMAIN FOR REUSE FROM DAMAGE. ALL SYSTEMS SHALL BE TESTED IN SERVICE AFTER

COMPLETION OF THE CONTRACT AND MADE COMPLETE AND OPERABLE AT NO ADDITIONAL COST TO

THE GOVERNMENT.

6 DEMOLISH CONTROLS AND DEVICES PERTAINING TO THE HVAC EQUIPMENT BEING DEMOLISHED, REPLACED OR RE-USED. PROVIDE NEW CONTROLS AND DEVICES FOR ALL RE-USED EQUIPMENT AND

CONNECT INTO THE EXISTING DDC SYSTEM.

7 SEE ARCHITECTURAL DRAWINGS AND SPECIFICATION FOR ADDITIONAL INFORMATION. COORDINATE ALL

DEMOLITION WITH ALL TRADES INVOLVED.

8 DEMOLISH ALL PIPING BACK TO THE MAIN AND CAP. LEAVE NO DEAD END BRANCHES. NO PIPING SHALL

BE ABANDONED ABOVE THE CEILING OR BELOW THE FLOOR UNLESS NOTED OTHERWISE. PATCH FLOOR

AND WALL PENETRATIONS LEFT BEHIND FROM DEMOLISHED PIPING TO MATCH EXISTING CONDITIONS .

9 ALL WORK MUST BE ACCOMPLISHED IN PHASES AS SPECIFIED AND/OR INDICATED. SEE ARCHITECTURAL

DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. THE BUILDING WILL BE OCCUPIED AND

IN OPERATION DURING THE LIFE OF THE CONTRACT. WORK SHALL BE ACCOMPLISHED IN AREAS AND/OR

PHASES SO AS TO PERMIT CONTINUOUS OPERATION OF THE FACILITIES. THESE FACILITIES ARE IN USE

24 HOURS PER DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES AS

REQUIRED TO MAINTAIN SYSTEMS (INCLUDING FIRE DETECTION/ALARM,LIFE SAFETY, FIRE PROTECTION

SYSTEMS, HVAC SYSTEMS, CONTROL SYSTEMS, ETC.)

10 THE CONTRACTOR SHALL COORDINATE WITH THE COR FOR ACCESS TO AREAS OF THE BUILDING NOT IN

CONTRACT WHICH WILL REMAIN OPERATIONAL DURING CONSTRUCTION. ANY BREAKS IN UTILITY OR

HVAC SERVICE SHALL BE COORDINATED WITH THE COR PRIOR TO WORK COMMENCING.

11 THE CONTRACTOR SHALL TAKE PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO PREVENT

FIRE ALARMS NOT INDICATIVE OF ACTUAL CONDITIONS (I.E. FALSE) BY THE SMOKE DETECTOR CAUSED

BY THE DISTURBANCE OF DUST.

LEGEND

ABBREVIATIONS

8"x8"

26"x10"

(E)VAV-B2B5B

(E) SSCU

14"x10"

20"x10"18"x10"

12"x6"

18"x10"

16"x10"

14"x8" 8"x4"

14"x8"

12"x8"

16"x10"

12"x8"

12"x8"

8"x8"

8"x4"

(E)VAV-B2B5A

(E)VAV-B2B9

(E)VAV-B2B4

NIC

30"x14"

8"x10"

UP

18"x10"

(E)SSFC

SA & RA DUCTS TO (E) 2-AHU-9

(E)VAV-B2B5C

o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

A

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL DUCTWORK

DEMOLITION PLAN - BASEMENT

2 JDGCMD

2018.02.16

658-315

MD101

SALEM VA MEDICAL CENTER 12089

CONSTRUCTION DOCUMENTS

1/8" = 1'-0"

MECHANICAL DUCTWORK DEMOLITION PLAN - BASEMENT

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

BASEMENT FFE: 1091.3'

PLAN

NORTH

X

DRAWING KEYED NOTES

1 EXISTING SPLIT SYSTEM FAN COIL UNIT TO BE RELOCATED TO AVOID

INTERFERENCE WITH NEW TELECOMM CLOSET. COORDINATE WITH

ELECTRICAL CONTRACTOR FOR THE RELOCATION. REFER TO SHEET

MH101.

2 DEMOLISH DUCTWORK BACK TO POINT INDICATED. CAP AND

INSLUATE TO MATCH EXISTING, TYPICAL.

3 DEMOLISH AIR DEVICE, AND ALL RELATED ACCESSORIES. CAP DUCT

AND INSULATE TO MATCH EXISTING, TYPICAL.

4 CAREFULLY DEMOLISH VAV TERMINAL UNIT, AND ALL RELATED

WIRING, AND CONTROLS. PROTECT AND DELIVER TERMINAL UNIT

WHERE DIRECTED BY THE COR WITHIN 5 MILES OF SITE, TYPICAL.

5 VAV TERMINAL UNIT SHALL REMAIN AS EXISTING, TYPICAL.

6 GENERAL: ALL DUCTWORK AND EQUIPMENT LOCATED ABOVE

CEILING UNO.

7 ALL REFRIGERANT CONTAINING EQUIPMENT SHALL BE EVACUATED

PRIOR TO REMOVAL, RELOCATION AND/OR DEMOLITION PER THE

LATEST EPA GUIDELINES. DISPOSAL OF REFRIGERANTS IS THE

RESPONSIBLITY OF THE CONTRACTOR.

5 5

3" LPS

3" HWS

3" HWR

2 1/2" GHS

2 1/2" GHR

4" CHS

4" CHR

1 1/2" CD

1 1/2" LPR

4" CHR

2 1/2" GHR

1 1/2" LPS

4" CHS

2" CD

2 1/2" GHS

3" HWR

1" LPR

VAV-EX

VAV-EXVAV-EX

VAV-EX

(E) SSCU

o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

A

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL PIPING

DEMOLITION - BASEMENT

2 JDGCMD

2018.02.18

658-315

MD102

SALEM VA MEDICAL CENTER 12090

CONSTRUCTION DOCUMENTS

1/8" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - BASEMENT

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

BASEMENT FFE: 1091.3'

PLAN

NORTH

X

DRAWING KEYED NOTES

1 CAREFULLY DEMOLISH VAV TERMINAL UNIT, ALL ASSOCIATED

PIPING, VALVES, CONTROL WIRING, AND POWER WIRING. PROTECT

TERMINAL UNIT AND DELIVER WHERE DIRECTED TO THE COR

WITHIN 5 MILES OF SITE, TYPICAL.

2 DEMOLISH PIPING AND INSULATION BACK TO POINT INDICATED, CAP

AND INSULATION TO MATCH EXISTING PIPING.

(E) SSCU

(E) SSFC

VAV-6

VAV-7

VAV-10

VAV-11

D

D

D

D

D

R1

R1

D

D

D

8"ø

38"x14"

8"ø

R1

16"x12"

12"x8"

30"x14"

10"x8"

10"x8"

6"ø

8"

10"x10"

10"x10"

20"x12"

L2

EF-5

12"x10"

6"x6"

8"x10"

20"x12"

16"x12"

50"x14" x

MH401

6C

8C

MH401

x x

6"ø

EF-1

36"x14"

L1

18"x12"

10"x14"

26"x14"

10"x14"

16"x14"

VAV-1

VAV-4

VAV-3

VAV-5

VAV-9

VAV-2

VAV-8

8"ø

12"ø

6"ø

VAV-15

12"ø

VAV-16

10"ø

30"x14"

VAV-17

8"ø

8"ø

VAV-20

6"ø

6"ø

6"ø

12"ø

8"ø

8"ø

26"x10"

14"x10"

10"x10"

12"x10"

14"x12"

VAV-19

VAV-21

8"ø

12"ø

12"ø

D

D

D

D

D

D

D

D

D

VAV-13

10"ø

6"ø

10"ø

8"ø

8"ø

VAV-14

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

CORRIDOR

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

E

FCU-4

FCU-1

FCU-2

D

D

D

D

R1

30"x12"

12"x8"

R

R R

R1

225E

R

R

R

R

R

D

D

E

E

E

SITE FOR FUTURE

VERTICAL CIRCULATION

PROJECT LIMITS

NOT IN SCOPE

TO

BUILDING

#1

CONNECTOR CORRIDOR

(CONNECTS BUILDING #1)

PROJECT LIMITS

NOT IN SCOPE

P R

O J E

C T

L I M

I T

S

NOT IN SCOPE

P R

O J E

M

I T

S

PROJECT LIMITS

E

X

I

S

T

I

N

G

N

E

W

E

X

I

S

T

I

N

G

N

E

W

VAV-12

E

E

E

E

E

D

D

R

R

E

875E

E

E

215E

520E

D

E

EF-2

EF-6

8"ø

10"ø

8"ø

8"ø

VAV-18

VAV-E-3

VAV-E-4

VAV-E-5

VAV-E-6

VAV-E-7

VAV-E-2

FCU-3

8"ø

8"ø

D

10"ø

14"x12"

EF-4

36"x24"

L3

24"x14"

18"x12" x

8"ø

8"ø

8"ø

8"ø

20"x12"

10"ø

12"x10"

1130E

18"x12"

14"x12"

8"ø

10"ø

10"ø

10"ø

6"ø

8"ø

12"x8"

8"ø

10"ø

8"ø 6"ø

D

8"ø

12"ø

6"ø

8"ø 8"ø

12"x12"

10"ø

10"ø

8"ø

8"ø

8"ø

6"ø

14"ø

12"ø

6"ø

6"ø

6"ø

6"ø

8"ø

10"ø

8"ø

8"ø

10"ø

10"ø

8"ø

8"ø

8"ø

10"ø

14"ø

10"ø

6"ø 6"ø

6"ø

6"ø

8" 8"ø

8"ø

14"ø

12"ø

8"ø

8"ø

14"x10"

8"ø

14"ø o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL DUCTWORK NEW

WORK PLAN - BASEMENT

2 JDGCMD

2018.02.16

658-315

MH101

SALEM VA MEDICAL CENTER 12091

1/8" = 1'-0"

8F

MECHANICAL DUCTWORK NEW WORK PLAN - BASEMENT

X

DRAWING KEYED NOTES

1 36"x14" EXTERIOR WALL LOUVER, WITH MINIMUM 1.9 SF FREE AREA.

SEE ARCHITECTURAL DETAILS AND ELEVATIONS FOR ADDITIONAL

INFORMATION.

2 36"x14" EXTERIOR WALL LOUVER, WITH MINIMUM 1.81 SF FREE AREA.

SEE ARCHITECTURAL DETAILS AND ELEVATIONS FOR ADDITIONAL

INFORMATION.

3 RELOCATE EXISTING SPLIT SYSTEM FAN COIL TO PREVENT

INTERFERNCES WITH PLUMBING DRAIN PIPING AND DUCTWORK IN

TELECOMM CLOSET. EXTEND REFRIGERANT AND PLUMBING LINES

TO (E)SSFC, AS REQUIRED. SEE SHEET MD01 FOR ADDITIONAL

INFORMATION.

4 42"x10" EXTERIOR WALL LOUVER, WITH MINIMUM 2.3 SF FREE AREA

PROVIDED BY OTHERS. SEE ARCHITECTURAL DETAILS AND

ELEVATIONS FOR ADDITIONAL INFORMATION.

5 MOUNT TEMPERATURE SENSOR ON CEILING. TYPICAL OF

TEMPERATURE SENSORS FOR VAV-1,2,3,4,5,6,7 & 9.

6 PROVIDE FIRE DAMPER AT DUCT PENETRATION

THROUGH 2 HR FIRE RATED WALL. (TYPICAL)

7 ROUTE 3/4" CONDENSATE FCU TO MECHANICAL ROOM FLOOR DRAIN.

8 NOT USED.

9 ROUTE 1/2" CONDENSATE FROM FCU SUMP PUMP TO EXISTING HUB

DRAIN A/C. FIELD VERIFY EXACT LOCATION.

10 ROUTE 3/4" CONDENSATE FROM (E) SSFC TO EXISTING HUB DRAIN

A/C. FIELD VERIFY EXACT LOCATION.

13 EF-2, ISOLATION ROOM EXHAUST FAN ON ROOF. LABEL ISOLATION

ROOM EXHAUST DUCTWORK BIO-HAZARDOUS.

CONSTRUCTION DOCUMENTS

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

BASEMENT FFE: 1091.3'

PLAN

NORTH

PROJECT AREAPROJECT AREA - OVERALL

BUILDING #2 (EXISTING)

14 PROVIDE PLENUM BOX OVER OUTLETS. TAP BOX APPROXIMATELY AS

SHOWN.

SITE FOR FUTURE

VERTICAL CIRCULATION

PROJECT LIMITS

NOT IN SCOPE

TO

BUILDING

#1

CONNECTOR CORRIDOR

(CONNECTS BUILDING #1)

PROJECT LIMITS

NOT IN SCOPE

P R

O J E

M

I T

S

NOT IN SCOPE

P R

O J E

M

I T

S

PROJECT LIMITS

E

X

I

S

T

I

N

G

N

E

W

E

X

I

S

T

I

N

G

N

E

W

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

2" HWS

2" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1" HWS

1" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

3/4" HWS

3/4" HWR

1" HWS

1" HWR

1 1/4" HWS

1 1/4" HWR

1 1/2" HWS

1 1/2" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1 1/4" CHS

1 1/4" CHR

3/4" HWS

3/4" HWR

1" CHS

1" CHR

3/4" CHS

3/4" CHR

3/4" CHS

3/4" CHR

3/4" HWS

3/4" HWR

o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL PIPING NEW WORK

PLAN - BASEMENT

2 JDGCMD

658-315

MH102

SALEM VA MEDICAL CENTER 12092

1/8" = 1'-0"

8F

MECHANICAL PIPING NEW WORK PLAN - BASEMENT

X

DRAWING KEY NOTES

1 CONNECT TO EXISTING STEAM AND CONDENSATE PIPING.

CONTRACTOR SHALL COORDINATE DISCONNECTION AND

RECOONECTION WITH OWNER, BEFORE ANY WORK BEGINS.

2 CONNECT TO EXISTING HEATING HOT WATER SUPPLY AND RETURN

PIPING. INSTALL SHUT OFF VALVES TO PROVIDE MEANS OF

BRANCH ISOLATION.

2018.02.16

CONSTRUCTION DOCUMENTS

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

KEY PLAN

BASEMENT FFE: 1091.3'

PLAN

NORTH

PROJECT AREAPROJECT AREA - OVERALL

BUILDING #2 (EXISTING)

H X

H W

P

H W

P

C H

W P

C H

W P

AHU-1

H X

H

W S

H

W R

C

H R

C

H S 3

H

W R

H

W S

C

H R

C

H S

L

P S

L

P R

C P

34"x12"

C

M H

E Q

U I P

M E

N T

P A

D

T

Y P

50"x14"

46"x14"

BASEMENT

0' - 0"

FIRST FLOOR

12' - 0"

AHU-1

34"x12"

OA

FINISHED FLOOR

EQUIPMENT PAD, TYP

1-1/2" HWS&R TO

PRE-HEAT COIL CONNECTIONS

2-1/2" CHS&R TO COOLING

COIL CONNECTIONS

RA

CONDENDSATE DRAIN CONNECTION

ROUTE CONDENSATE TO NEAREST

FLOOR DRAIN.

ROOF MOUNTED

OUTDOOR AIR

INTAKE

6" CHS&R B/G

CONNECT TO CAMPUS CHILLED WATER

DISTRIBUTION SYSTEM 12" CHS SEE

DRAWING CS104 & CU101 FOR

CONTINUATION OF CHILLED WATER

LINES.

CAP FOR FUTURE

WATER PIPING

FD E

o n e e i g h t h i n c e f o o t t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

ENLARGED MECHANICAL PLANS

AND SECTIONS

2 JDGCMD

2018.02.16

658-315

MH401

SALEM VA MEDICAL CENTER 12093

CONSTRUCTION DOCUMENTS

X

DRAWING KEY NOTES

1 2" HWS/R TO BASEMENT VAV TERMINAL UNITS

2 SHUT-OFF VALVE (TYPICAL)

3 4" CHILLED WATER SUPPLY AND RETURN UP THROUGH FUTURE

CHASE. PROVIDE CAPPED PIPING CONNECTIONS BELOW ROOF

DECK ABOVE FOR FUTURE CONNECTION.

4 3" HEATING HOT WATER SUPPLY AND RETURN UP THROUGH

FUTURE CHASE. PROVIDE CAPPED PIPING CONNECTIONS

BELOW ROOF DECK ABOVE FOR FUTURE CONNECTION.

5 6" CHILLED WATER SUPPLY AND RETURN. PROVIDE BUTTERFLY

SHUT-OFF VALVES IN VERTICAL RUN FOR BUILDING ISOLATION.

REFER TO CIVIL SITE DRAWINGS FOR CONTINUATION AND

CONNECTION TO EXISTING CAMPUS CHILLED WATER.

6 AFMS, DUCT MOUNTED AIR FLOW MEASURING STATION. FOLLOW

MANUFACTURER'S INSTALLATION INSTRUCTIONS TO ENSURE A

UNIFORM VELOCITY PROFILE NECESSARY FOR ACCURATE AIR

FLOW MEASUREMENT.

7 3" LPS AND 1" LPR DOWN TO HEAT EXCHANGER AND DOMESTIC

WATER HEATER. COORDINATE CONNECTION TO DOMESTIC

WATER HEATER WITH DIVISION 22 00 00 CONTRACTOR.

8 36X54 HOODED INTAKE WITH LOW-LEAKAGE MOTOR OPERATED

DAMPER, WITH MINIMUM THROAT AREA 13.5 SF FREE AREA.

COORDINATE INSTALLATION WITH ARCHITECT, TYP.

9 2 1/2" CHILLED WATER SUPPLY AND RETURN DOWN TO AHU-1.

10 1 1/2" HEATING HOT WATER SUPPLY AND RETURN DOWN TO

AHU-1 PRE HEAT COIL.

11 PROVIDE 4" EMERGENCY CHS&R CONNECTION POINTS WITH

BUTTERFLY SHUT-OFF VALVE AND BLANK FLANGE FOR FUTURE

CONNECTION.

12 TRANSITION 34X20 OA DUCT UP TO FULLSIZE OF HOODED

INTAKE.

13 HW LOOP BY-PASS CONTROL VALVE.

14 CHW DECOUPLER CONTROL VALVE.

15 CHW LOOP BY-PASS CONTROL VALVE.

16 PROVIDE 3" EMERGENCY HWS&R CONNECTION POINTS WITH

BUTTERFLY SHUT-OFF VALVE AND BLANK FLANGE FOR FUTURE

CONNECTION.

17 AHU COIL PULL CLEARANCE SHOWN DASHED.

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

1/4" = 1'-0"

3C

ENLARGED PIPING PLAN - MECHANICAL ROOM

1/4" = 1'-0"

6C

ENLARGED DUCTWORK PLAN - MECHANICAL ROOM

1/4" = 1'-0"

8C

MECHANICAL SECTION - HVAC ROOM - 1

NOTE:

1.

2.

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR

MULTI-BLADE DAMPERS & ROUND DAMPERS.

INSULATION SEE

SPECIFICATION

DAMPER BLADE

1/8" [6mm]

CLEARANCE

ALL AROUND

INSIDE END BEARING

HANDLE WITH

LOCKING

QUADRANT

INSULATION

STAND-OFF

1/2" [15mm] ROUND

ROD PIN

DUCT

STIFFEN BLADE

AS REQUIRED

SIDE ELEVATION SECTION

NOTE:

1.

2.

3.

4.

5.

A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, IS SIMILAR. FOLLOW

DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR

SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR

FLOOR AND NOT OUTSIDE THE PENETRATION.

GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER

FRAME AND TO PERIMETER ANGLES.

PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO

PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.

BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA.

ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.

PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH

ROCK WOOL FIRESTOP FIBER.

SLEEVE, NOTE 2

DUCT CONNECTION NOTE 4

DAMPER, NOTE 1

DAMPER COLLAR EXTENSION

INTEGRAL PART OF SLEEVE

SLEEVE, NOTE 2

NOTE 5

FIRE BARRIER PARTITION OR CHASE

TYPICAL DUCT INSULATION

PERIMETER ANGLE, NOTE 3

(NOTE FASTENED TO PARTITION)

ACCESS

PANEL

m m

WITH LOCKING

QUADRANT DAMPER

SPIN-IN COLLAR

NOTES

1. SUPPORT SYSTEM MUST NOT DAMAGE DUCT OR CAUSE OUT OF ROUND SHAPE.

FOOT OF SUPPORT SPACING

MAX SAG 1/2" PER

WIRE HANGER W/

1" BAND CLAMP

2. DUCTS ARE FLEXIBLE WITH EXTERNAL INSULATION AND VAPOR BARRIER JACKETING.

3. MINIMUM CENTERLINE BEND RADIUS IS ONE DIAMETER, (OR INSIDE RADIUS OF D/2).

4. MAXIMUM LENGTH OF FLEXIBLE DUCT RUNOUT IS FIVE (5) FEET.

1" MIN STRAP

1" MIN

M

A

X

AIR SPLIT DUCT TAKE-OFF PLAN

VIEW

BRANCH DUCT TAKE-OFF PLAN VIEW

AIR

FLOW

AIR

FLOW

A I R

F L

O W

SUPPLY REGISTER

OR BRANCH DUCT

TURNING VANES

MAIN

SUPPLY

DUCT

SEE FLOOR PLAN FOR

SPLIT DIMENSION

PROVIDE

BALANCING

DAMPER

PROVIDE BALANCING

DAMPER

1/4 W OR 4"

[100mm] MIN.

AIR

FLOW

MAIN SUPPLY

DUCT

W

A I R

F L

O W

NOTE:

1.

2.

3.

4.

5.

RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A

MINIMUM OF 3 TIMES THE DIAMETER OF INLET

A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT

ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0" [900mm].

A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET,

PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT

EXCEED 10 FEET (3 METERS). FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND

PROVIDE A DUCT TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR

BELOW 0.2"/100' [1.64Pa/m].

FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT

TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS FOR CHANGE OF

DIRECTION GREATER THAN 45°.

COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE

INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

AIR TERMINAL UNIT

(VAV)

REHEAT COIL

SOUND ATTENUATOR SEE

EQUIPMENT SCHEDULE

(IF APPLICABLE)

SEE SPECIFICATIONS

FOR CLAMPS AND

SEALANT (TYP.)

SEE NOTE 5

NOTE 4

TRAP

o n e e i g h t h i n c e f o o t t h r c h e o t o d o l f i n c h e e f o o t o e f o o t t h r e e q u a r t e r s i n c o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL DETAILS

2 JDGCMD

658-315

MH501

SALEM VA MEDICAL CENTER 12094

CONSTRUCTION DOCUMENTS

NTS

9B

DETAIL - VOLUME DAMPER

NTS

8F

DETAIL - FIRE DAMPER INSTALLATION

NTS

3B

DETAIL - STRAIGHT SECTION OF FLEXIBLE DUCTWORK

NTS

6F

DETAIL - SUPPLY DUCTWORK TAKE OFFS

NTS

3F

DETAIL - TYPICAL DUCT CONNECTIONS AIR TERMINAL UNITS

NTS

6C

AHU TWO-WAY VALVE, GAUGES AND THERMOMETERS

2018.02.16

WALL

FOR ACOUSTICAL CONTROL

PACKED ALL AROUND DUCT

1" INSULATION TIGHTLY

SUPPORT DUCT FROM HANGERS2

TOUCH DUCT

OTHER RIGID MATERIAL MUST NOT

DRYWALL, METAL STUDS OR ANY

NOTES:

FOR SIZE OF OPENINGS

COORDINATE W/ARCH DRAWINGS

GALV. DUCT

1/2" CLEAR

22 GA SHEET METAL (TYP)

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW

AIR

FLOW

PROVIDE BALANCING DAMPER

AT EACH BRANCH DUCT

1/4W OR 4" [100mm]

MIN.

BRANCH DUCT

VD

ROUND TO RECTANGULAR

OR SQUARE ADAPTER

UL 181 LABELED INSULATED FLEX

DUCT. SEE SPECS. NO SAGS OR

SHARP 90° TURNS ALLOWED

EXCEPT AT DIFFUSER CONNECTION.

DIFFUSER

CEILING

HANGER STRAP

NO. 10 x 3/4" SELF-TAPPING CADMIUM

NO POP RIVETS ALLOWED

PLATED SHEET METAL SCREWS TO ANCHOR STRAPS.

TO DUCT AND JOISTS. ALL STRAPS TO BE TIGHT

AGAINST DUCT AND SUPPORT MEMBERS. (TYPICAL)

TO STRUCTURE

WRAP ALL BRANCH DUCTS

AND COVER CONNECTIONS

WITH DUCT WRAP. SEE

BALANCE DAMPER WITH

LOCKING QUADRANT

ROUND RIGID DUCT

12" WIDE 24 GA SHIELD

W/ SHEET METAL SCREWS

TO SPIN-IN FITTING

FASTEN RIGID DUCT

2"x24" GA STRAP

OPERATED BAND

SCREW DRIVER

STAINLESS STEEL

SPECIFICATIONS.

WIRE HANGER

EXCEPT AT DIFFUSER CONNECTION.

SHARP 90° TURNS ALLOWED

DUCT. SEE SPECS. NO SAGS OR

UL 181 LABELED INSULATED FLEX

MAXIMUM LENGTH 5 FT.

(TYP)

BIRD SCREEN

1/2" X 1/2" MESH

VIBRATION

ISOLATORS

3" CHANNEL

FLEXIBLE CONNECTION

45°

ALL-THREAD ROD

SEISMIC

RESTRAINTS, TYP

1"

6'-0"NONE REQUIRED1" X 18 GAUGE STRAP34" TO 40"

HANGER STRAPS

NO POP RIVETS ALLOWED

NO. 10x3/4" SELF TAPPING CADMIUM PLATED SHEET METAL SCREWS

TO ANCHOR STRAPS TO DUCT AND JOISTS. ALL STRAPS SHALL BE

TIGHT AGAINST DUCT AND MEMBERS.

8'-0"NONE REQUIREDUP TO 34" 1" X 18 GAGE STRAP

HANGER SIZES FOR RECTANGULAR DUCT

SIDE

MAX.

HANGER

SUPPORT ANGLE

HORIZONTAL

SPACING

MAXIMUM

o n e e i g h t h i n c e f o o t t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL DETAILS

2 JDGCMD

2018.02.16

658-315

MH502

SALEM VA MEDICAL CENTER 12095

CONSTRUCTION DOCUMENTS

NTS

8B

DETAIL - TYPICAL DUCTWORK PENETRATION - NON FIRE RATED WALL

NTS

8E

DETAIL - EXHAUST OR RETURN BRANCH DUCTWORK

NTS

3B

DETAIL - TYPICAL DIFFUSER CONNECTION

NTS

6E

DETAIL - TYPICAL INLINE FAN INSTALLATION

NTS

3E

DETAIL - DUCT STRAP HANGER

SECTION VIEW

METAL PIPE OR

INSULATED METAL PIPE

1 HOUR FIRE RATED

1/2" WET DEPTH OF NON-SAG

METAL PIPE SLEEVE

DAMMING MATERIAL

CONCRETE BLOCK WALL.

FOR SOLID CONCRETE

WALLS SEE NOTE 1

FIRE CAULK ON EACH SIDE

CONCRETE

NOTES

1. FOR SOLID CONCRETE WALLS, CENTER NON-SAG FIRE CAULK

WITHIN WALL WITH DAMMING MATERIAL ON ONE SIDE.

A) FOR UNINSULATED METAL PIPE:

CLASSIFICATION FIRE STOP SYSTEM 49.

PER ASTM E-814 (UL 1479) FIRE TEST AND UL

CAULK IS ACCEPTABLE AFTER INITIAL WET DEPTH INSTALLATION.

MAXIMUM ANNULAR SPACE TO BE FILLED IS 2-1/2"

B) FOR INSULATED METAL PIPE:

MINIMUM ANNULAR SPACE TO BE FILLED IS 3/4".

MAXIMUM ANNULAR SPACE TO BE FILLED IS 2-1/2"

EXPOSURE. UL CLASSIFIED PER SYSTEM 91

IT IS NOT NECESSARY TO REMOVE INSULATION AS IT

PENETRATES THE WALL OR FLOOR.

OF WALL

RECOMMENDATIONS BASED ON PRODUCT PERFORMANCE

UP TO 40% SHRINKAGE OF NON-SAG OR SELF-LEVELING FIRE

DEPTH OF FIRE CAULK DEPENDS ON INSULATION THICKNESS:

1" OF INSULATION - 1" DEPTH OF FIRE CAULK

2"-3" OF INSULATION - 2" DEPTH OF FIRE CAULK

RECOMMENDATIONS BASED ON PRODUCT PERFORMANCE PER

ASTM E-814 (UL 1479) TIME TEMPERATURE CURVE FIRE

1.

2.

3.

1.

2.

3.

4.

V

NOTE:

VENT TO ATMOSPHERE

1. SEE FLOOR PLANS FOR PIPE SIZES.

2. INSTALL VALVES AS RECOMMENDED BY MANUFACTURER.

3. MAKE BYPASS VALVE DISCHARGE PIPE THE SAME SIZE AS THE LOWER VALVE PIPING FOR THE LARGEST PRV.

4. PROVIDE NECESSARY UNIONS FOR THE REMOVAL OF VALVE WITH SCREWED CONNECTIONS.

5. SET PRV-1 FOR 10 PSI AND PRV-2 FOR 2 PERCENT HIGHER.

SIPHON (TYP.)

PILOT CONTROL LINE

REDUCER (TYP.) IF REQUIRED.

NOTE 1

N.C.

NOTE 1

NOTE 3

INVERTER

BUCKET TRAP

ASSEMBLY TYP.

PSV

PRV-1

PRV-2

P

MOTOR

PUMP

PRESSURE GAUGE WITH SHUT-OFF VALVES.

ATTACH PRESSURE GAUGE MANIFOLD TO BOTH

SIDES OF PUMP AT TEST LOCATIONS

RECOMMENDED BY MANUFACTURER.

NON-SLAMMING CHECK VALVE

DISCHARGE

SUCTION

BUTTERFLY VALVE

FLEXIBLE CONNECTOR

SUCTION DIFFUSER WITH STRAINER

SERVICE CLEARANCE

FOR STRAINER REMOVAL

SUPPORT FOOT

ROUTE PUMP

PAN DRAIN

TO FLOOR

DRAIN

PUMP, MOTOR

BASE FRAME & VIBRATION

ISOLATION BASE. REFER TO

DETAIL 3D ON SHEET

MH504.

BUTTERFLY VALVE

M

I N

M

I N

D

D

NOTE:

TEST

PLUG

(TYP.)

THERMOMETER

(TYP.)

MPS

STEAM

SUPPLY

HEAT

EXCHANGER

(TYP.)

m m

T

Y P m m

T

Y P

RUN DRAIN LINE

FROM RELIEF

VALVE TO

NEAREST FLOOR

DRAIN. (TYP.)

H

W

R

H

W

S

M

P

R

O

T

A

N

K

Y

P

1/2" [15mm]

CHECK VALVE

VACUUM

BREAKER (TYP.)

S

C

A

E

C

K

E

T

T

Y

P

DDC

TEMPERATURE

SENSOR (TYP.)

SEE SCHEDULES FOR RELIEF

VALVE SETTING

T

T

T

T

P

I

P

I

T

H

E

R

M

O

S

T

A

T

R

V

E

Y

P

C

O

N

T

R

V

L

V

S

S

I

Z

R

A

N

G

E

M

E

N

Y

P

B

Y

P

A

S

S

1. THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN PARALLEL.

PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT SHALL BE ADJUSTED

TO FACILITATE GRAVITY RETURN OF STEAM CONDENSATE.

MAKE THE BYPASS THE SAME SIZE AS THE CONNECTIONS TO THE CONTROL VALVES.

CONTROL VALVES SHALL BE IN A 1/3 AND 2/3 SIZE ARRANGEMENT.

2.

3.

4.

DDC PREESSURE

SENSOR (TYP.)

UNION

WITH P/T PORT AND

MANUAL AIR VENT

COIL

COMBINATION BALL VALVE,

`Y'-STRAINER & "O" RING UNION WITH

P/T PORT & HOSE END DRAIN WITH

CAP & RETAINER STRAP

SUPPLY

COMBINATION BALL VALVE,

AUTOFLOW REGULATOR & "O"-RING

UNION WITH DUAL P/T PORTS

RETURN

HW & CHW

o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL DETAILS

2 JDGCMD

658-315

MH503

SALEM VA MEDICAL CENTER 12096

CONSTRUCTION DOCUMENTS

NTS

6B

DETAIL - FIRE RATED PIPING PENETRATION

NTS

9F

DETAIL - STEAM PRESSURE REDUCING STATION DBL VALVE

NTS

3B

DETAIL - BASE MOUNTED END SUCTION PUMP

NTS

6F

DETAIL - HEAT EXCHANGER STEAM TO HOT WATER

NTS

9B

VAV BOX AND FCU TWO-WAY COIL

DRAW

THRU

BLOW

THRU

2"[50mm]

PLUS X

1"[25mm]

MINIMUM

X

2X

UNIT

TYPE

A B

WHERE X = STATIC PRESSURE

IN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME

SIZE AS THE NIPPLE ON THE DRAIN PAN

PIPING SHALL BE RIGID COPPER TYPE L OR

TYPE M UNLESS NOTE BELOW IS MET

PITCH DOWN

TOWARD DRAIN

CLEAN OUT

ROUTE TO

NEAREST DRAIN

DRAIN

PAN

NOTE:

DIELECTRIC

FITTING

1. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE CONNECTED.

B

D

I

V

Q

U

I

P

M

E

N

T

M

O

T

O

R

TYPICAL STRUCTURAL

STEEL MEMBER FOR

EQUIPMENT

TYPE"B"

WELDED STEEL BASE

TYPE "1"

CONCRETE INERTIA BASE

NUMBER OF

ISOLATION

UNITS AS

REQUIRED

NUMBER OF ISOLATION

UNITS AS REQUIRED

TYPICAL

STRUCTURAL

STEEL MEMBER FOR

EQUIPMENT

ALL WELDED STEEL

FRAMEWORK

SECTION A-A

STRUCTURAL

STEEL FRAME

SPRING

ISOLATOR

ANCHOR

BOLT

REINFORCING BARSSLEEVE

A

S

H

A

F

T

M

O

T

O

R

S

H

A

F

D

I

V

Q

U

I

P

M

E

N

T

A

NOTE:

ISOLATION BASE INSTALLATIONS TYPICAL FOR BASE MOUNTED HW

AND CHW PUMPS

V

P P

V

V

3/4"

3"

TO HEATING WATER COILSHWS

3"

3"

AIR SEPERATOR

AS-1

EXPANSION

TANK

ET-1

PUMP

HWP-1

1. MAKE-UP WATER PIPING

2. APPROVED BACKFLOW PREVENTOR

3. 3/4" HOSE BIBB WITH VACUUM BREAKER

4. PRESSURE REDUCING VALVE SET at 12 PSI

5. DRAIN VALVE

6. PUMP INLET DIFFUSER

NOTES

HOT WATER HEAT EXCHANGER

HX-1

FROM HEATING WATER COILS

RETURN RESERVIOR / PUMP

CP-1

CONDENSATE RETURN

FROM PRESSURE REDUCING STATION (IF APPLICABLE)

TO CONDENSATE RETURN SYSTEM

1"

1"

3"

3"

VENT TO ROOF

7. DASHED LINE INDICATES CONDENSATE

RETURN PUMP PACKAGE

HWR

LPS

LPR

AUTOMATIC STEAM CONTROL VALVE (TYP)

1"

HWS

3"

PUMP

HWP-2

HOT WATER HEAT EXCHANGER

HX-2

1"

3"

THERMOSTATIC AIR

VENT (TYP)

STEAM

TRAP (TYP)

PRESSURE GAUGE (TYP)

THERMOMETER (TYP)

2 4

STEAM

TRAP (TYP)

HW LOOP BY PASS 2-WAY

CONTROL VALVE

8. MAKE -UP WATER FLOW SENSOR TO DDC

o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL DETAILS

2 JDGCMD

658-315

MH504

SALEM VA MEDICAL CENTER 12097

CONSTRUCTION DOCUMENTS

NTS

8B

DETAIL - AIR HANDLING UNIT DRAIN TRAP

NTS

3F

DETAIL - VIBRATION ISOLATION BASES

NTS

8F

DETAIL - STEAM TO HX

e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL FLOW CONTROL

DIAGRAMS

2 JDGCMD

658-315

MH601

SALEM VA MEDICAL CENTER 12098

CONSTRUCTION DOCUMENTS

NTS

8F

MECHANICAL AIR FLOW

2018.02.16

SALEM RENAL DIALYSIS HVAC AIRFLOW ANALYSIS

VA DESIGN MANUAL CALCULATONS

Unit Room

Air Changes OA Changes

% OA REQ'D OA REQ'D

AIRFLOW Room

# Name

Req'd Req'd

CFM CFM Pressure

AHU-1

Dialysis 6

2 33% 630 1865

(o)

Dialysis Corridor 4

2 50% 535 1070

Nurse Station 6

2 33% 225 675

(o)

Nourish Alcove 6

2 33% 45 130

(o)

Dialysis Toilet 10

0 0% 0 155

Exam/Treat 6

2 33% 60 180

(o)

Med Prep 6

2 33% 60 180

Isolation Room 12

2 17% 75 450

Private Room 6

2 33% 80 240

(o)

Equipment Storage 4

4 100% 100 100

(o)

Corridor CB-3 4

50% 410 825

Clean Linen 4

0 0% 0 60

(o)

Toilet 10

0 0% 0 165

Toilet 10

0 0% 0 175

Chief Office 4

2 50% 55 105

(o)

Chief Nurse 4

2 50% 50 105

(o)

Dietician 4

2 50% 55 110

(o)

Vestibule 0

0 0% 0 0

Stairway 0

0 0% 0 0 NA

Training Room 4

2 50% 60 120

(o)

Water Treatment 10

10 100% 670 670

Biomed Repair 6

33% 70 215

Dialysate Prep 4

4 100% 130 130

Corridor CB-4 4

50% 350 700

Elevator Room 0

0 0% 0 0 NA

Mechanical Room 0

0 0% 0 0 NA

Electrical Room 0

0 0% 0 0 NA

Electrical Room 0

0 0% 0 0 NA

Clean Storage 4

4 100% 190 190

Clean Prep 4

4 100% 200 200

AHU-E

Staff Lockers 6

0 0% 0 150

Staff Lounge 4

2 50% 75 150

Staff Unisex Tlt 10 10

20% 35 185

Patient Unixex Tlt 11 10

2 20% 40 200

Corridor CB-2B 4

50% 150 300

Elec Room 0

0 0% 0 0 NA

Telecom 0

0 0% 0 0 NA

Teledata 0

0 0% 0 0 NA

Physician Office 4

2 50% 115 235

(o)

Waiting 6

2 33% 370 1110

Reception 6

2 33% 90 270

Soiled Rec 6

0 0% 0 205

Soiled Utility 6

0 0% 0 145

Corridor CB-9 4

2 50% 65 135

Util, Sterile, Clean 4

4 100% 410 410 e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Date

Project No.

Drawing No.

Location

Sheet of

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

P

M

RELOCATE AND EXPAND RENAL

DIALYSIS

MECHANICAL CONTROL

SEQUENCES

2 CMDCMD

658-315

MH602

SALEM VA MEDICAL CENTER 12099

CONSTRUCTION DOCUMENTS

VAV TERMINAL UNITS (TYPICAL)

GENERAL:

EACH TERMINAL UNIT SHALL BE PROVIDED WITH APPLICATION SPECIFIC CONTROL MODULE (ASC). UNIT AIRFLOW SHALL BE

MONITORED BY AN INTEGRAL, MULTI-POINT, AVERAGING FLOW SENSING DEVICE AND TRANSDUCER TO MAINTAIN AIRFLOW

WITHIN 5% OF THE RATED CFM DOWN TO A MINIMUM CFM AS SCHEDULED, INDEPENDENT OF CHANGES IN SYSTEM STATIC

PRESSURE.

OCCUPIED COOLING CYCLE:

UPON A RISE IN SPACE TEMPERATURE ABOVE COOLING SETPOINT, THE TERMINAL UNIT SHALL MODULATE THE PRIMARY AIR

VALVE BETWEEN THE MINIMUM AND MAXIMUM AIR FLOW RATES SCHEDULED TO MAINTAIN SPACE TEMPERATURE SETPOINT.

OCCUPIED HEATING CYCLE:

IF THE TERMINAL UNITS AIR DAMPER IS IN THE MINIMUM POSITION AND THE SPACE TEMEPERATURE CONTINUES TO FALL BELOW

THE SPACE TEMPERATURE SET POINT, THEN THE TERMINAL UNIT HEATING WATER CONTROL VALVE SHALL MODULATE OPEN TO

MAINTAIN SPACE TEMPERATURE SETPOINT. WHEN IN HEATING MODE THE AIR TERMINAL UNIT SHALL REMAIN AT MINIMUM AIR

FLOW RATE (CFM) AS SCHEDULED.

UNOCCUPIED CYCLE:

IN ORDER TO MAINTAIN BUILDING PRESSURIZATION, THE AHU'S AND VAV AIR TERMINAL UNITS WILL OPERATE IN A SIMILAR

MANNER AS THE OCCUPIED MODE. HOWEVER, DURING THE UNOCCUPIED MODE SETBACK SPACE TEMPERATURE SETPOINTS WILL

BE USED.

VAV AIR HANDING UNIT WITH STATIC PRESSURE OPTIMIZATION (AHU-1):

OCCUPIED MODE:

COOLING:

WHEN THE AHU IS IN THE OCCUPIED COOLING MODE, THE SUPPLY FAN WILL OPERATE CONTINUOUSLY, THE VFD WILL MODULATE

TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT (AS DETERMINED BY TAB), AND THE COOLING VALVE WILL MODULATE IN

SEQUENCE TO MAINTAIN A CONSTANT DISCHARGE AIR TEMPERATURE OF 55 F (ADJ).

HEATING:

WHEN THE AHU IS IN THE OCCUPIED HEATING MODE, THE SUPPLY FAN WILL OPERATE CONTINUOUSLY, THE VFD WILL MODULATE

TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT (AS DETERMINED BY TAB), AND THE PRE-HEAT VALVE WILL MODULATE IN

SEQUENCE TO MAINTAIN A CONSTANT DISCHARGE AIR TEMPERATURE 52 F (ADJ). THE OA DAMPER SHALL BE SET TO THE

MINIMUM POSITION REQUIRED FOR SPACE VENTILATION. THE AIR SIDE ECOMONIZER MODE SHALL BE LOCKED OUT ANYTIME THE

UNIT IS IN HEATING MODE.

UNOCCUPIED MODE:

IN ORDER TO MAINTAIN BUILDING PRESSURIZATION, THE AHU'S AND VAV AIR TERMINAL UNITS WILL OPERATE IN A SIMILAR

MANNER AS THE OCCUPIED MODE. HOWEVER, DURING THE UNOCCUPIED MODE SETBACK SPACE TEMPERATURE SETPOINTS WILL

BE USED.

WARM UP AND COOL DOWN MODE:

THE DDC SYSTEM SHALL HAVE AN ALGORITHM TO ADJUST MORNING WARM-UP/COOL-DOWN SCHEDULE TO ENSURE THE SPACE

TEMPERATURE SETPOINTS ARE ACHIEVED PRIOR TO THE BUILDINGS OCCUPANCY SCHEDULE. MORNING WARM-UP/COOL-DOWN

SHALL BE SCHEDULED NO LESS THAN 1 HOUR (ADJ.) PRIOR TO OCCUPANCY. THE THE DDC SHALL ENERGIZE THE WATER LOOP

SYSTEMS TO MAINTAIN THE SPACE TEMPERATURE SET-POINTS .

SUPPLY FAN CONTROL:

THE SUPPLY FAN WILL OPERATE CONTINUOUSLY DURING OCCUPIED AND UNOCCUPIED MODES UNLESS THE STOP/AUTO

INTERLOCK IS OPEN, SMOKE DETECTION, THE MIXED AIR LOW LIMIT TRIPPED, OR THE SUPPLY FAN STATUS INDICATES A FAILURE

(AFTER A TWO MINUTE DELAY). THE LOW LIMIT, SMOKE DETECTION AND THE FAN FAILURE REQUIRE A MANUAL RESET.

VFD CONTROL:

WHEN THE SUPPLY FAN IS ON, THE VFD WILL SLOWLY RAMP (ADJUSTABLE) UP TO SETPOINT AND MODULATE TO MAINTAIN THE

PROPER DUCT STATIC PRESSURE SET POINT AS MEASURED BY A STATIC PRESSURE SENSORS LOCATED AT THE MID-POINTS OF

THE MEDIUM PRESSURE DUCT LOOP. THE FAN SPEED SHALL BE SET WITH WITH A HIGH STATIC LIMIT (3.75" IN W.C) AND IF THE

FAN EXCEEDS THE HIGH STATIC LIMIT AN ALARM SHALL BE SENT TO THE DDC. IF THE STATIC PRESSURE ACROSS THE FAN

EXCEEDS THE HIGH STATIC SHUTDOWN LIMIT (4 IN W.C.) THEN THE FAN SHALL BE DE-ENERGIZED AND ALARM SENT TO THE DDC.

THE VFD (VARIABLE FREQUENCY DRIVE) WILL BE OFF IF THE SUPPLY FAN IS OFF OR THE DUCT STATIC PRESSURE SENSOR

FAILS.

DUCT STATIC PRESSURE OPTIMIZATION:

THE DUCT STATIC PRESSURE SETPOINT SHALL BE RESET USING TRIM & RESPOND LOGIC WITHIN THE RANGE 0.15 IN. W.G. TO 1.3

IN. W.G. (35 PA TO 325 PA). WHEN THE FAN IS OFF, THE SETPOINT SHALL BE 0.5 IN. W.G. (125 PA). WHILE THE FAN IS PROVEN ON, EVERY TWO MINUTES, TRIM THE SETPOINT BY 0.04 IN. W.G. (10 PA) IF THERE ARE TWO OR FEWER ZONE PRESSURE REQUESTS. IF

THERE ARE MORE THAN TWO ZONE PRESSURE REQUESTS, RESPOND BY INCREASING THE SETPOINT BY 0.06 IN. W.G. (15 PA). A

ZONE PRESSURE REQUEST IS GENERATED WHEN THE VAV DAMPER IS GREATER THAN 95% OPEN UNTIL IT DROPS TO 80% OPEN.

COOLING VALVE CONTROL:

THE COOLING VALVE WILL MODULATE TO MAINTAIN THE SUPPLY AIR TEMPERATURE AT THE DISCHARGE COOLING SETPOINT OF

55°F (ADJUSTABLE). THE COOLING VALVE WILL BE CLOSED IF THE THE SUPPLY FAN IS OFF,OR THE DISCHARGE AIR SENSOR

HAS FAILED.

SMOKE DETECTION MODE:

WHEN SMOKE IS DETECTED AND FIRE ALARM SYSTEM ACTIVATED, THE BUILDING DDC SHALL INSTRUCT THE AHU TO STOP THE

FAN, CLOSE THE CHW & HW CONTROL VALVES, AND CLOSE THE OA & RA DAMPERS.

COOLING COIL FREEZE PROTECTION:

THE DDC SYSTEM SHALL CLOSE THE OA DAMPER ANYTIME THE COOLING COIL ENTERING AIR TEMPERAURE FALLS BELOW 40 F

FOR LONGER THAN 5 MINUTES. THE LOW LIMIT FREEZE STAT SHALL STOP THE AHU FAN ANYTIME THE COOLING COIL ENTERING

AIR TEMPERATURE FALLS BELOW 35 F. DURING LOW LIMIT FREEZE STAT CONDITION THE CHILLED WATER AND HOT WATER

CONTROL VALVES SHALL BE OPENED TO ALLOW CIRCULATION OF WATER TO PREVENT COIL FREEZE.

OUTSIDE AIR CONTROL:

THE DDC SYSTEM, WITH DUCT MOUNTED AIR FLOW MEASURING STATIONS (AFMS), SHALL MODULATE THE RA AND OA DAMPERS

AS REQUIRED TO MAINTAIN THE OA FLOW RATE CFM SCHEDULED. READOUT OF THE OA AIRFLOW RATE SHALL BE IN CFM. UPON

FAILURE THE OA DAMPER SHALL BE NORMALLY CLOSED.

AIR SIDE ECONOMIZER:

THE OA DAMPER SHALL MODULATE BETWEEN THE MINIMUM POSITION REQUIRED FOR SPACE VENTILATION TO FULLY OPEN

PROVIDING 100% OA IN ORDER TO MAINTAIN THE AHU SUPPLY AIR TEMPERATURE SETPOINT. THE AIR SIDE ECONOMIZER SHALL

BE ENABLED ANYTIME THE AMBIENT DRY BULB AIR TEMPERATURE IS BELOW 55 F AND THE AHU IS CALLING FOR COOLING. THE

AHU RA DAMPER SHALL BE LINKED WITH THE OA DAMPER OPERATION. THE OA DAMPER SHALL MODULATE TO PROVIDE ALL OR

SOME PORTION OF THE COOLING CAPACITY REQUIRED BY THE AIR HANDLING UNIT DURING COOLING MODE.

GENERAL EXHAUST SYSTEMS

EXHAUST FANS (EF-1, -2, -3, -4, -5):

A. EXHAUST FAN SHALL OPERATE CONTINUOUSLY 24 HR/7 DAY/WEEK.

ISOLATION ROOM SYSTEM

THE HVAC SYSTEMS SERVING THE ISOLATION ROOM SHALL OPERATE CONTINUOUSLY 24 HR/7 DAY/WEEK.

A SPACE PRESSURIZATION MONITOR PANEL (SPM) WILL MONITOR AND CONTROL THE SPACE PRESSURIZATION LEVEL AS

COMPARED WITH THE DIALYSIS STATION OPEN BAY AREA. THE SPM SHALL HAVE A 2-POSITION KEY SWITCH THAT

ALLOWS LOCAL CONTROL FOR SETTING THE ISOLATION ROOM TO BE MAINTAINED AT EITHER NEGATIVE OR NEUTRAL

PRESSURE. THE SPM SHALL MODULATE THE CONSTANT VOLUME SUPPLY AIR TERMINAL BOX AND THE PATIENT ROOM

EXHAUST AIR DAMPER TO MAINTAIN AIRFLOW DIFFERENTIAL BASED ON THE MODE OF OPERATION (NEGATIVE OR

NUETRAL). THE SPM SHALL REPORT SPACE PRESSURE DIFFERENATIAL READINGS AND SETPOINT VALUES TO THE DDC

SYSTEM AND A REMOTE PANEL MONITOR (RPM) LOCATED AT THE NURSE STATION. WHEN THE SPACE PRESURIZATION IS

OUT OF RANGE A LOCAL AUDIBLE AND VISUAL ALARM WILL BE INITIATED AT THE SPM, THE RPM AND A ALARM SIGNAL

WILL BE SENT TO THE DDC SYSTEM.

THE SUPPLY AIR TERMINAL UNIT REHEAT WILL MODULATE TO MAINTAIN ROOM TEMPERATURE SETPOINT.

CHILLED WATER SYSTEM (CHWP-1 & CHWP-2)

GENERAL:

THE CHILLED WATER LOOP SYSTEM IS A VARIABLE FLOW, BUILDING TERTIARY LOOP TYPE. THE CHILLED WATER IS

SUPPLED FROM A CAMPUS CHILLED WATER LOOP PROVIDED FROM OFFSITE CENTRAL ENERGY PLANT. THE CHILLED WATER

LOOP SYSTEM CONSISTS OF (2) CHILLED WATER PUMPS, (2) PUMP MOTOR VFD'S, ASSOCIATED CONTROLS AND VALVES.

EACH CHILLED WATER PUMP IS SIZED TO PROVIDE 100% OF THE REQUIRED CHILLED WATER WATER FLOW RATE INCLUDING

ADDITIONAL FLOORS (2-4) PLANNED FOR CONSTRUCTION IN THE FUTURE.

CHILLED WATER (CHWP-1 & CHWP-2):

STARTING AND STOPPING OF THE CHILLED WATER PUMP SHALL BE ACCOMPLISHED WITH A VFD. PROVIDE CHILLED WATER

PUMP WITH A HAND-OFF-AUTO SWITCH. IN THE "HAND" POSITION, THE PUMP SHALL BE CONTROLLED MANUALLY. IN THE

"AUTO" POSITION THE PUMP SHALL BE CONTROLLED BY THE DDC SYSTEM. THE DDC SYSTEM SHALL START THE MAIN

CHILLED WATER PUMP ANY TIME THE AHU OR FAN COIL UNIT IS CALLING FOR COOLING. UPON CALL FOR COOLING THE

DECOUPLER VALVE (NORMALLY CLOSED) SHALL MODULATE OPEN TO MAINTAIN THE PRIMARY CHWS LOOP TEMPERATURE

OF 42 F (ADJ).

THE CHILLED WATER PUMPS SHALL BE OPERATE IN A MAIN / STAND-BY CONFIGURATION TO ENSURE EQUAL PUMP RUN TIME.

THE ALTERNATION FUNCTION REVERSES THE OPERATION OF THE PUMPS. UPON ALTERNATION THE MAIN PUMP SHALL

ROTATE TO STAND-BY AND THE STAND-BY PUMP SHALL ROTAE TO THE MAIN POSITION. THE ALTERNATION FUNCTION

SHALL BE PROGRAMMED TO OCCUR ANYTIME THE ACTIVE MAIN PUMP COMES TO REST.

DIFFERENTIAL PRESSURE CONTROL:

THE OBJECTIVE FOR THE CHILLED WATER PUMP OPERATIONS IS TO ALWAYS HAVE THE PUMP OPERATE AT THE LOWEST

SPEED AND PRESSURE POSSIBLE TO SATISFY THE BUILDING LOAD. THE LOOP DIFFERENTIAL SETPOINT WILL BE MAINTAINED

AT THE PRESSURE SETPOINT REQUIRED TO PROVIDE FULL FLOW TO ALL CONTROL VALVES SIMULTANEOUSLY (PER TAB

REPORT).

HOWEVER, IF THE PUMP VFD HAS BEEN RESET TO THE MINIMUM SPEED ALLOWABLE (TAB VERIFY) AND THE LOOP

DIFFERENTIAL PRESSURE CONTINUES TO RISE ABOVE THE MAXIMUM PRESSURE SETPOINT. THEN THE LOOP BYPASS VALVE

SHALL OPEN TO MAINTAIN THE DIFFERENTIAL SETPOINT AND THE MINIMUM PUMP SPEED (15Hz).

HOT WATER LOOP SYSTEM (HX-1, HX-2, HWP-1 & HWP-2):

GENERAL:

THE HOT WATER LOOP SYSTEM IS A PRIMARY LOOP SERVING THE AHU AND AIR TERMINAL UNIT REHEAT COILS. THE HOT

WATER LOOP SYSTEM IS ENABLED YEAR ROUND AND WILL START UPON A CALL FOR HEATING FROM THE AHU OR FAN

COIL UNITS BY THE DDC SYSTEM. THE HOT WATER LOOP SYSTEM EQUIPMENT CONSISTS OF (2) PUMPS, (2) PUMP MOTOR

VFD'S (2) HEAT EXCHANGERS, ASSOCIATED CONTROLS AND VALVES. EACH HEAT EXCHANGER IS SIZED TO PROVIDE 115%

CAPACITY OF THE BUILDING'S HEATING LOAD INCLUDING ADDITIONAL FLOORS (2-4) PLANNED FOR CONSTRUCTION IN THE

FUTURE. EACH HOT WATER PUMP IS SIZED TO PROVIDE 100% OF THE REQUIRED HEATING HOT WATER WATER FLOW RATE

INCLUDING ADDITIONAL FLOORS (2-4) PLANNED FOR CONSTRUCTION IN THE FUTURE.

STEAM TO HOT WATER HEAT EXCHANGER (HX-1 & HX-2):

THE HEAT EXCHANGER SHALL BE PROVIDED WITH A 1/3 STEAM VALVE AND 2/3 STEAM VALVE FOR ACCURATE CONTROL

OF HOT WATER TEMPERATURE. THE 1/3 STEAM VALVE SHALL MODULATE MAINTAIN HOT WATER TEMPERATURE DURING A

LOW HEATING LOADS. ONCE THE 1/3 STEAM VALVE IS FULLY OPEN AND THE HOT WATER TEMPERATURE CONTINUES TO

DROP THEN THE 2/3 STEAM SHALL MODULATE TO MAINTAIN HOT WATER…