36C24618B0616-015.pdf
PDF 4 MB Posted
- Attached to
- Relocate and Expand Renal Dialysis
- Solicitation number
- 36C24618B0616
About this file
36C24618B0616 13 Mechanical.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24618B0616-0004000.docx | DOCX document | |
| 36C24618B0616-0003002.pdf | ||
| 36C24618B0616-0003000.docx | DOCX document | |
| 36C24618B0616-0003001.pdf | ||
| 36C24618B0616-0002001.pdf | ||
| 36C24618B0616-0002000.docx | DOCX document | |
| 36C24618B0616-0001000.docx | DOCX document | |
| 36C24618B0616-013.pdf | ||
| 36C24618B0616-002.pdf | ||
| 36C24618B0616-012.pdf | ||
| 36C24618B0616-001.docx | DOCX document | |
| 36C24618B0616-016.pdf | ||
| 36C24618B0616-004.pdf | ||
| 36C24618B0616-003.pdf | ||
| 36C24618B0616-014.pdf | ||
| 36C24618B0616-011.pdf | ||
| 36C24618B0616-009.pdf | ||
| 36C24618B0616-008.pdf | ||
| 36C24618B0616-010.pdf | ||
| 36C24618B0616-007.pdf | ||
| 36C24618B0616-005.pdf | ||
| 36C24618B0616-006.pdf | ||
| 36C24618B0616-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIFFUSER, SUPPLY
RETURN AIR OUTLET
EXHAUST AIR OUTLET
VARIABLE AIR VOLUME
(NEW), "X" INDICATES
DEVICE NUMBER
POINT OF DISCONNECTION (P.O.D)
VAV-X
POINT OF DISCONNECTION (P.O.D)
POINT OF CONNECTION (P.O.C)
T
SPACE TEMPERATURE
SENSOR, "#" INDICATES
DEVICE CONTROLLED
NOTE NUMBER (SEE SCHEDULE)
1i
AIR TERMINAL TAG
TAG
CFM
BALANCING DAMPER -
RECTANGULAR
BALANCING DAMPER -
ROUND
AUTOMATIC CONTROL
DAMPER - RECTANGULAR
SIMPLE RECTANGULAR
FIRE DAMPER
BALANCING VALVE
BALL VALVE
BUTTEFLY VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
AIR SEPEERATOR W/
STRAINER INLINE
PRESSURE GAUGE
TEMPERATURE GAUGE
Y STRAINER - FLANGED
CAPPED PIPING
RISE
DROP
ECCENTRIC REDUCER
CENTRIFUGAL PUMP
EXPANSION TANK
HWR
HWS
CHR
CHS
LPS
CR
CD
HOT WATER RETURN
HOT WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
AIR TERMINAL TAG
LOW PRESSURE STEAM
AIR TERMINAL TAG
DEMOLISH LINE TYPE
ITEMS TO BE DEMOLISHED
DN DOWN
EXH EXHAUST
EA EXHAUST AIR
(E) EXISTING
EXF EX-FILTRATE
INF INFILTRATE
NIC NOT IN CONTRACT
SA SUPPLY AIR
RA RETURN AIR
RH RE-HEAT
AHU-X AIR HANDLING UNIT DESIGNATION
CHWP-X CHILLED WATER PUMP DESIGNATION
CRU-X CONDENSATE RETURN UNIT DESIGNATION
EF-X EXHAUST FAN DESIGNATION
ET-X EXPANSION TANK DESIGNATION
HX-X HEAT EXCHANGER DESIGNATION
SPSS-X STATIC PRESSURE SENSOR DESIGNATION
ST-X STEAM TRAP DESIGNATION
V-X VALVE DESIGNATION
VF-X VENTILATION FAN DESIGNATION
HWP-X HEATING HOT WATER PUMP DESIGNATION
o n e e i g h t h i n c o e f o t t h r e e i n c h e s o t o n e a d a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL LEGENDS AND
ABBREVIATIONS
2 JDGCMD
2018.02.16
658-315
MH000
SALEM VA MEDICAL CENTER 12088
CONSTRUCTION DOCUMENTS
GENERAL MECHANICAL NOTES
1 THE DRAWINGS SHOW THE GENERAL ARRANGEMENT AND LOCATION OF EQUIPMENT, DUCTWORK,
PIPING, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE MECHANICAL
INSTALLATION W/ THE STRUCTURE AND OTHER TRADES AND SHALL PROVIDE ADDITIONAL OFFSETS AND
FITTINGS AS NECESSARY.
2 COORDINATE WORK WITH AUTHORITY HAVING JURISDICTION AND OBTAIN ALL PERMITS AND
INSPECTIONS.
3 THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS SHALL COMPLY WITH THE 2012 EDITION OF
THE INTERNATIONAL MECHANICAL CODE, NFPA 90A, LOCAL CODE AND ALL CODES HAVING JURISDICTION.
IN THE EVENT OF A CONFLICT BETWEEN CODES, THE MOST STRINGENT SHALL ALWAYS GOVERN.
4 DUCT DIMENSIONS ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS
5 THE CONTRACTOR SHALL CHECK AND VERIFY ALL CLEARANCES PRIOR TO FABRICATION OR
INSTALLATION OF EQUIPMENT, DUCTWORK, AND PIPING SYSTEMS. WHERE CONDITIONS REQUIRE A
CHANGE IN DUCT OR PIPE ROUTING, NOTIFY THE COR FOR AN ACCEPTABLE ALTERNATIVE METHOD.
AVOID ROUTING DUCTWORK DIRECTLY OVER LIGHT FIXTURES, DIFFUSERS, AND OTHER CEILING MTD.
DEVICES. LOCATE ALL MECHANICAL EQUIPMENT SO THAT FILTERS AND COMPONENTS REQUIRING
ACCESS (SERVICE AND MAINTENANCE) ARE FULLY ACCESSIBLE.
6 PROVIDE CURVED RADIUS ELBOW AT FIRST SUPPLY & RETURN FITTING FOR ALL HVAC UNITS. PROVIDE
TURNING VANES IN ALL 90 DEGREE ELBOWS IN ALL RECTANGULAR SUPPLY/RETURN/EXHAUST DUCT
SYSTEMS. ANY OFFSETS REQUIRED IN DUCT SYSTEMS SHALL BE INSTALLED PER SMACNA STANDARDS.
SHARP ANGLED TRANSITIONS OR OFFSETS 'WILL NOT BE ALLOWED'. PROVIDE DUCT ACCESS DOORS AT
LOCATIONS SPECIFIED.
7 INSTALL ALL DUCT MOUNTED DEVICES (DAMPERS, ACCESS DOORS, ETC.) AND PIPING SPECIALTIES IN
EASILY ACCESSIBLE LOCATIONS. ADVISE THE COR IN ADVANCE OF INSTALLATION IF ACCESS WILL BE
HINDERED SO AN ALTERNATE LOCATION CAN BE SELECTED.
8 ALL DUCT TAKE-OFFS SHALL BE INSTALLED AS SHOWN BY DETAILS ON THE PLANS WITH A MANUAL
BALANCE DAMPER AT EVERY TAKE-OFF. WHERE DUCT RUN-OUT SIZE IS NOT SHOWN PROVIDE DUCT
SAME SIZE AS GRILLE NECK SIZE. PRE-INSULATED FLEXIBLE DUCT MAY BE USED FOR FINAL CONNECTION
TO SUPPLY/RETURN GRILLES (MAX. LENGTH 5')
9 ALL ROTATING MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH VIBRATION ISOLATION. PROVIDE
FLEXIBLE NEOPRENE DUCT CONNECTORS BETWEEN DUCTWORK AND ISOLATED MECHANICAL
EQUIPMENT.
10 THE CONTRACTOR SHALL FIRESTOP ALL PENETRATIONS OF FIRE RATED WALLS/FLOORS/CEILINGS BY
DUCTWORK, PIPING, ETC., WITH U.L. LISTED FIRE STOPPING MATERIAL TO MAINTAIN FIRE RATING OF THE
BARRIER.
11 SEISMIC PROTECTION OF EQUIPMENT, DUCTWORK, PIPING AND UTILITIES SHALL BE PROVIDED IN
ACCORDANCE WITH SECTION 16 OF THE 2012 EDITION OF THE INTERNATIONAL BUILDING CODE. ALL
SEISMIC RESTRAINT AND BRACING SHALL BE SUBSTANTIATED BY MANUFACTURER'S SUBMITTALS AND
PE APPROVED PER THE SPECIFICATIONS.
12 BALANCE ALL AIR DISTRIBUTION DEVICES, EXHAUST FANS, AND OUTSIDE AIR QUANTITIES AS
SCHEDULED OR SHOWN ON THE DRAWINGS. PROVIDE MARKERS AT ALL DAMPER LOCATIONS SHOWING
FULL OPEN/CLOSED POSITIONS AND DAMPER SETTING FOR REQUIRED AIRFLOW. PROVIDE FINAL TEST
AND BALANCE REPORT ALONG W/ SCHEMATIC DRAWINGS SHOWING DIFFUSER LOCATION W/ DESIGN
AND ACTUAL CFM. THE DIFFUSER TAGS ON THE DRAWINGS SHALL CORRESPOND TO THE DIFFUSER
TAGS ON THE REPORT. THIS REPORT SHALL BE SUBMITTED BEFORE THE FINAL INSPECTION IS
PERFORMED. SEE THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
13 THE SYSTEMS SERVING THE RENOVATION AREA ARE CRITICAL FOR THE HOSPITAL. THESE FACILITIES
MUST REMAIN OPERATIONAL THROUGHOUT THE CONSTRUCTION CONTRACT. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR COORDINATING ANY SYSTEM SHUTDOWNS WITH CONTRACTING OFFICER AT
LEAST 30 DAYS IN ADVANCE.
14 THE BUILDING WILL BE OCCUPIED AND WILL BE IN OPERATION DURING THE LIFE OF THE CONTRACT. THE
CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES AS REQUIRED TO MAINTAIN SYSTEMS (INCLUDING
BUT NOT LIMITED TO FIRE DETECTION/ALARM, CONTROL SYSTEMS, LIFE SAFETY, AND FIRE PROTECTION.
THE CONTRACTOR SHALL PROTECT ALL SYSTEMS OR PORTION OF SYSTMES TO REMAIN FOR REUSE
FROM DAMAGE. ALL SYSTEMS SHALL BE TESTED IN SERVICE AFTER COMPLETION OF THE CONTRACT
AND MADE COMPLETE AND OPERATIONAL AT NO ADDITIONAL COST TO THE GOVERMENT.
GENERAL DEMOLITION NOTES
1 ALL DUCTWORK, EQUIPMENT, AND PIPING SHOWN WITH DASHED AND DARK LINES INDICATE ITEMS TO BE
DEMOLISHED. ALL EXISTING TO REMAIN IS INDICATED AS LIGHT AND DASHED LINES. SEE
ARCHITECTURAL DRAWINGS AND CODED DEMOLITION NOTES FOR SPECIFIC INFORMATION. EXISTING
DUCT TAKE-OFFS MAY BE REUSED IN NEW WORK IF CORRECT SIZE AND LOCATION. ALL EXISTING
DUCTWORK TO BE REUSED SHALL BE COMPLIANT WITH THE VA'S HVAC DESIGN MANUAL. EXISTING
DUCTWORK SHALL BE CLEANED, SEALED AND TESTED TO MEET CURRENT DESIGN CRITERIA.
2 SHADED AREAS OF THIS PLAN ARE NOT WITHIN THE PROJECT SCOPE OF WORK AND ARE SHOWN FOR
REFERENCE ONLY.
3 LOCATION OF EXISTING EQUIPMENT, DUCTWORK, AIR OUTLETS, CONTROLS AND ALL CONCEALED
WORKS, ETC. ARE APPROXIMATE. THE CONTRACTOR SHALL EXAMINE THE SITE PRIOR TO BUILDING AND
AFTER DEMOLITION HAS EXPOSED "AS-BUILT" CONDITIONS TO VERIFY EACH AIR OUTLET, AND
EQUIPMENT LOCATION. THE CONTRACTOR SHALL MAKE ADJUSTMENTS AND/OR ALTERATIONS AS
NECESSARY TO INSTALL COMPLETE AND OPERABLE SYSTEMS IN ACCORDANCE WITH THE CODES
HAVING JURISDICTION AT NO ADDITIONAL COST TO THE GOVERNMENT
4 ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF AIR OUTLETS, EQUIPMENT, CONTROLS, ETC. SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH.
PREPARE SURFACES TO RECEIVE NEW FINISH, SEE ARCHITECTURAL DRAWINGS FOR NEW FINISH
SCHEDULE. ALL REPAIRS AND NEW FINISH SHALL BE BY TRADES SKILLED IN FINISH WORKS UNDER
EMPLOY OF THE GENERAL CONTRACTOR.
5 DURING THE LIFE OF THE CONTRACT (CONSTRUCTION AND DEMOLITION TO POINT OF BENEFICIAL
OCCUPANCY BY OWNER). THE CONTRACTOR SHALL PROTECT ALL SYSTEMS OR PORTIONS OF SYSTEMS
TO REMAIN FOR REUSE FROM DAMAGE. ALL SYSTEMS SHALL BE TESTED IN SERVICE AFTER
COMPLETION OF THE CONTRACT AND MADE COMPLETE AND OPERABLE AT NO ADDITIONAL COST TO
THE GOVERNMENT.
6 DEMOLISH CONTROLS AND DEVICES PERTAINING TO THE HVAC EQUIPMENT BEING DEMOLISHED, REPLACED OR RE-USED. PROVIDE NEW CONTROLS AND DEVICES FOR ALL RE-USED EQUIPMENT AND
CONNECT INTO THE EXISTING DDC SYSTEM.
7 SEE ARCHITECTURAL DRAWINGS AND SPECIFICATION FOR ADDITIONAL INFORMATION. COORDINATE ALL
DEMOLITION WITH ALL TRADES INVOLVED.
8 DEMOLISH ALL PIPING BACK TO THE MAIN AND CAP. LEAVE NO DEAD END BRANCHES. NO PIPING SHALL
BE ABANDONED ABOVE THE CEILING OR BELOW THE FLOOR UNLESS NOTED OTHERWISE. PATCH FLOOR
AND WALL PENETRATIONS LEFT BEHIND FROM DEMOLISHED PIPING TO MATCH EXISTING CONDITIONS .
9 ALL WORK MUST BE ACCOMPLISHED IN PHASES AS SPECIFIED AND/OR INDICATED. SEE ARCHITECTURAL
DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. THE BUILDING WILL BE OCCUPIED AND
IN OPERATION DURING THE LIFE OF THE CONTRACT. WORK SHALL BE ACCOMPLISHED IN AREAS AND/OR
PHASES SO AS TO PERMIT CONTINUOUS OPERATION OF THE FACILITIES. THESE FACILITIES ARE IN USE
24 HOURS PER DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES AS
REQUIRED TO MAINTAIN SYSTEMS (INCLUDING FIRE DETECTION/ALARM,LIFE SAFETY, FIRE PROTECTION
SYSTEMS, HVAC SYSTEMS, CONTROL SYSTEMS, ETC.)
10 THE CONTRACTOR SHALL COORDINATE WITH THE COR FOR ACCESS TO AREAS OF THE BUILDING NOT IN
CONTRACT WHICH WILL REMAIN OPERATIONAL DURING CONSTRUCTION. ANY BREAKS IN UTILITY OR
HVAC SERVICE SHALL BE COORDINATED WITH THE COR PRIOR TO WORK COMMENCING.
11 THE CONTRACTOR SHALL TAKE PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO PREVENT
FIRE ALARMS NOT INDICATIVE OF ACTUAL CONDITIONS (I.E. FALSE) BY THE SMOKE DETECTOR CAUSED
BY THE DISTURBANCE OF DUST.
LEGEND
ABBREVIATIONS
8"x8"
26"x10"
(E)VAV-B2B5B
(E) SSCU
14"x10"
20"x10"18"x10"
12"x6"
18"x10"
16"x10"
14"x8" 8"x4"
14"x8"
12"x8"
16"x10"
12"x8"
12"x8"
8"x8"
8"x4"
(E)VAV-B2B5A
(E)VAV-B2B9
(E)VAV-B2B4
NIC
30"x14"
8"x10"
UP
18"x10"
(E)SSFC
SA & RA DUCTS TO (E) 2-AHU-9
(E)VAV-B2B5C
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL DUCTWORK
DEMOLITION PLAN - BASEMENT
2 JDGCMD
2018.02.16
658-315
MD101
SALEM VA MEDICAL CENTER 12089
CONSTRUCTION DOCUMENTS
1/8" = 1'-0"
MECHANICAL DUCTWORK DEMOLITION PLAN - BASEMENT
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
KEY PLAN
BASEMENT FFE: 1091.3'
PLAN
NORTH
X
DRAWING KEYED NOTES
1 EXISTING SPLIT SYSTEM FAN COIL UNIT TO BE RELOCATED TO AVOID
INTERFERENCE WITH NEW TELECOMM CLOSET. COORDINATE WITH
ELECTRICAL CONTRACTOR FOR THE RELOCATION. REFER TO SHEET
MH101.
2 DEMOLISH DUCTWORK BACK TO POINT INDICATED. CAP AND
INSLUATE TO MATCH EXISTING, TYPICAL.
3 DEMOLISH AIR DEVICE, AND ALL RELATED ACCESSORIES. CAP DUCT
AND INSULATE TO MATCH EXISTING, TYPICAL.
4 CAREFULLY DEMOLISH VAV TERMINAL UNIT, AND ALL RELATED
WIRING, AND CONTROLS. PROTECT AND DELIVER TERMINAL UNIT
WHERE DIRECTED BY THE COR WITHIN 5 MILES OF SITE, TYPICAL.
5 VAV TERMINAL UNIT SHALL REMAIN AS EXISTING, TYPICAL.
6 GENERAL: ALL DUCTWORK AND EQUIPMENT LOCATED ABOVE
CEILING UNO.
7 ALL REFRIGERANT CONTAINING EQUIPMENT SHALL BE EVACUATED
PRIOR TO REMOVAL, RELOCATION AND/OR DEMOLITION PER THE
LATEST EPA GUIDELINES. DISPOSAL OF REFRIGERANTS IS THE
RESPONSIBLITY OF THE CONTRACTOR.
5 5
3" LPS
3" HWS
3" HWR
2 1/2" GHS
2 1/2" GHR
4" CHS
4" CHR
1 1/2" CD
1 1/2" LPR
4" CHR
2 1/2" GHR
1 1/2" LPS
4" CHS
2" CD
2 1/2" GHS
3" HWR
1" LPR
VAV-EX
VAV-EXVAV-EX
VAV-EX
(E) SSCU
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL PIPING
DEMOLITION - BASEMENT
2 JDGCMD
2018.02.18
658-315
MD102
SALEM VA MEDICAL CENTER 12090
CONSTRUCTION DOCUMENTS
1/8" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - BASEMENT
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
KEY PLAN
BASEMENT FFE: 1091.3'
PLAN
NORTH
X
DRAWING KEYED NOTES
1 CAREFULLY DEMOLISH VAV TERMINAL UNIT, ALL ASSOCIATED
PIPING, VALVES, CONTROL WIRING, AND POWER WIRING. PROTECT
TERMINAL UNIT AND DELIVER WHERE DIRECTED TO THE COR
WITHIN 5 MILES OF SITE, TYPICAL.
2 DEMOLISH PIPING AND INSULATION BACK TO POINT INDICATED, CAP
AND INSULATION TO MATCH EXISTING PIPING.
(E) SSCU
(E) SSFC
VAV-6
VAV-7
VAV-10
VAV-11
D
D
D
D
D
R1
R1
D
D
D
8"ø
38"x14"
8"ø
R1
16"x12"
12"x8"
30"x14"
10"x8"
10"x8"
6"ø
8"
10"x10"
10"x10"
20"x12"
L2
EF-5
12"x10"
6"x6"
8"x10"
20"x12"
16"x12"
50"x14" x
MH401
6C
8C
MH401
x x
6"ø
EF-1
36"x14"
L1
18"x12"
10"x14"
26"x14"
10"x14"
16"x14"
VAV-1
VAV-4
VAV-3
VAV-5
VAV-9
VAV-2
VAV-8
8"ø
12"ø
6"ø
VAV-15
12"ø
VAV-16
10"ø
30"x14"
VAV-17
8"ø
8"ø
VAV-20
6"ø
6"ø
6"ø
12"ø
8"ø
8"ø
26"x10"
14"x10"
10"x10"
12"x10"
14"x12"
VAV-19
VAV-21
8"ø
12"ø
12"ø
D
D
D
D
D
D
D
D
D
VAV-13
10"ø
6"ø
10"ø
8"ø
8"ø
VAV-14
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
CORRIDOR
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
E
FCU-4
FCU-1
FCU-2
D
D
D
D
R1
30"x12"
12"x8"
R
R R
R1
225E
R
R
R
R
R
D
D
E
E
E
SITE FOR FUTURE
VERTICAL CIRCULATION
PROJECT LIMITS
NOT IN SCOPE
TO
BUILDING
#1
CONNECTOR CORRIDOR
(CONNECTS BUILDING #1)
PROJECT LIMITS
NOT IN SCOPE
P R
O J E
C T
L I M
I T
S
NOT IN SCOPE
P R
O J E
M
I T
S
PROJECT LIMITS
E
X
I
S
T
I
N
G
N
E
W
E
X
I
S
T
I
N
G
N
E
W
VAV-12
E
E
E
E
E
D
D
R
R
E
875E
E
E
215E
520E
D
E
EF-2
EF-6
8"ø
10"ø
8"ø
8"ø
VAV-18
VAV-E-3
VAV-E-4
VAV-E-5
VAV-E-6
VAV-E-7
VAV-E-2
FCU-3
8"ø
8"ø
D
10"ø
14"x12"
EF-4
36"x24"
L3
24"x14"
18"x12" x
8"ø
8"ø
8"ø
8"ø
20"x12"
10"ø
12"x10"
1130E
18"x12"
14"x12"
8"ø
10"ø
10"ø
10"ø
6"ø
8"ø
12"x8"
8"ø
10"ø
8"ø 6"ø
D
8"ø
12"ø
6"ø
8"ø 8"ø
12"x12"
10"ø
10"ø
8"ø
8"ø
8"ø
6"ø
14"ø
12"ø
6"ø
6"ø
6"ø
6"ø
8"ø
10"ø
8"ø
8"ø
10"ø
10"ø
8"ø
8"ø
8"ø
10"ø
14"ø
10"ø
6"ø 6"ø
6"ø
6"ø
8" 8"ø
8"ø
14"ø
12"ø
8"ø
8"ø
14"x10"
8"ø
14"ø o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL DUCTWORK NEW
WORK PLAN - BASEMENT
2 JDGCMD
2018.02.16
658-315
MH101
SALEM VA MEDICAL CENTER 12091
1/8" = 1'-0"
8F
MECHANICAL DUCTWORK NEW WORK PLAN - BASEMENT
X
DRAWING KEYED NOTES
1 36"x14" EXTERIOR WALL LOUVER, WITH MINIMUM 1.9 SF FREE AREA.
SEE ARCHITECTURAL DETAILS AND ELEVATIONS FOR ADDITIONAL
INFORMATION.
2 36"x14" EXTERIOR WALL LOUVER, WITH MINIMUM 1.81 SF FREE AREA.
SEE ARCHITECTURAL DETAILS AND ELEVATIONS FOR ADDITIONAL
INFORMATION.
3 RELOCATE EXISTING SPLIT SYSTEM FAN COIL TO PREVENT
INTERFERNCES WITH PLUMBING DRAIN PIPING AND DUCTWORK IN
TELECOMM CLOSET. EXTEND REFRIGERANT AND PLUMBING LINES
TO (E)SSFC, AS REQUIRED. SEE SHEET MD01 FOR ADDITIONAL
INFORMATION.
4 42"x10" EXTERIOR WALL LOUVER, WITH MINIMUM 2.3 SF FREE AREA
PROVIDED BY OTHERS. SEE ARCHITECTURAL DETAILS AND
ELEVATIONS FOR ADDITIONAL INFORMATION.
5 MOUNT TEMPERATURE SENSOR ON CEILING. TYPICAL OF
TEMPERATURE SENSORS FOR VAV-1,2,3,4,5,6,7 & 9.
6 PROVIDE FIRE DAMPER AT DUCT PENETRATION
THROUGH 2 HR FIRE RATED WALL. (TYPICAL)
7 ROUTE 3/4" CONDENSATE FCU TO MECHANICAL ROOM FLOOR DRAIN.
8 NOT USED.
9 ROUTE 1/2" CONDENSATE FROM FCU SUMP PUMP TO EXISTING HUB
DRAIN A/C. FIELD VERIFY EXACT LOCATION.
10 ROUTE 3/4" CONDENSATE FROM (E) SSFC TO EXISTING HUB DRAIN
A/C. FIELD VERIFY EXACT LOCATION.
13 EF-2, ISOLATION ROOM EXHAUST FAN ON ROOF. LABEL ISOLATION
ROOM EXHAUST DUCTWORK BIO-HAZARDOUS.
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
KEY PLAN
BASEMENT FFE: 1091.3'
PLAN
NORTH
PROJECT AREAPROJECT AREA - OVERALL
BUILDING #2 (EXISTING)
14 PROVIDE PLENUM BOX OVER OUTLETS. TAP BOX APPROXIMATELY AS
SHOWN.
SITE FOR FUTURE
VERTICAL CIRCULATION
PROJECT LIMITS
NOT IN SCOPE
TO
BUILDING
#1
CONNECTOR CORRIDOR
(CONNECTS BUILDING #1)
PROJECT LIMITS
NOT IN SCOPE
P R
O J E
M
I T
S
NOT IN SCOPE
P R
O J E
M
I T
S
PROJECT LIMITS
E
X
I
S
T
I
N
G
N
E
W
E
X
I
S
T
I
N
G
N
E
W
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
2" HWS
2" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
1" HWS
1" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
3/4" HWS
3/4" HWR
1" HWS
1" HWR
1 1/4" HWS
1 1/4" HWR
1 1/2" HWS
1 1/2" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
1 1/4" CHS
1 1/4" CHR
3/4" HWS
3/4" HWR
1" CHS
1" CHR
3/4" CHS
3/4" CHR
3/4" CHS
3/4" CHR
3/4" HWS
3/4" HWR
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL PIPING NEW WORK
PLAN - BASEMENT
2 JDGCMD
658-315
MH102
SALEM VA MEDICAL CENTER 12092
1/8" = 1'-0"
8F
MECHANICAL PIPING NEW WORK PLAN - BASEMENT
X
DRAWING KEY NOTES
1 CONNECT TO EXISTING STEAM AND CONDENSATE PIPING.
CONTRACTOR SHALL COORDINATE DISCONNECTION AND
RECOONECTION WITH OWNER, BEFORE ANY WORK BEGINS.
2 CONNECT TO EXISTING HEATING HOT WATER SUPPLY AND RETURN
PIPING. INSTALL SHUT OFF VALVES TO PROVIDE MEANS OF
BRANCH ISOLATION.
2018.02.16
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
KEY PLAN
BASEMENT FFE: 1091.3'
PLAN
NORTH
PROJECT AREAPROJECT AREA - OVERALL
BUILDING #2 (EXISTING)
H X
H W
P
H W
P
C H
W P
C H
W P
AHU-1
H X
H
W S
H
W R
C
H R
C
H S 3
H
W R
H
W S
C
H R
C
H S
L
P S
L
P R
C P
34"x12"
C
M H
E Q
U I P
M E
N T
P A
D
T
Y P
50"x14"
46"x14"
BASEMENT
0' - 0"
FIRST FLOOR
12' - 0"
AHU-1
34"x12"
OA
FINISHED FLOOR
EQUIPMENT PAD, TYP
1-1/2" HWS&R TO
PRE-HEAT COIL CONNECTIONS
2-1/2" CHS&R TO COOLING
COIL CONNECTIONS
RA
CONDENDSATE DRAIN CONNECTION
ROUTE CONDENSATE TO NEAREST
FLOOR DRAIN.
ROOF MOUNTED
OUTDOOR AIR
INTAKE
6" CHS&R B/G
CONNECT TO CAMPUS CHILLED WATER
DISTRIBUTION SYSTEM 12" CHS SEE
DRAWING CS104 & CU101 FOR
CONTINUATION OF CHILLED WATER
LINES.
CAP FOR FUTURE
WATER PIPING
FD E
o n e e i g h t h i n c e f o o t t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
ENLARGED MECHANICAL PLANS
AND SECTIONS
2 JDGCMD
2018.02.16
658-315
MH401
SALEM VA MEDICAL CENTER 12093
CONSTRUCTION DOCUMENTS
X
DRAWING KEY NOTES
1 2" HWS/R TO BASEMENT VAV TERMINAL UNITS
2 SHUT-OFF VALVE (TYPICAL)
3 4" CHILLED WATER SUPPLY AND RETURN UP THROUGH FUTURE
CHASE. PROVIDE CAPPED PIPING CONNECTIONS BELOW ROOF
DECK ABOVE FOR FUTURE CONNECTION.
4 3" HEATING HOT WATER SUPPLY AND RETURN UP THROUGH
FUTURE CHASE. PROVIDE CAPPED PIPING CONNECTIONS
BELOW ROOF DECK ABOVE FOR FUTURE CONNECTION.
5 6" CHILLED WATER SUPPLY AND RETURN. PROVIDE BUTTERFLY
SHUT-OFF VALVES IN VERTICAL RUN FOR BUILDING ISOLATION.
REFER TO CIVIL SITE DRAWINGS FOR CONTINUATION AND
CONNECTION TO EXISTING CAMPUS CHILLED WATER.
6 AFMS, DUCT MOUNTED AIR FLOW MEASURING STATION. FOLLOW
MANUFACTURER'S INSTALLATION INSTRUCTIONS TO ENSURE A
UNIFORM VELOCITY PROFILE NECESSARY FOR ACCURATE AIR
FLOW MEASUREMENT.
7 3" LPS AND 1" LPR DOWN TO HEAT EXCHANGER AND DOMESTIC
WATER HEATER. COORDINATE CONNECTION TO DOMESTIC
WATER HEATER WITH DIVISION 22 00 00 CONTRACTOR.
8 36X54 HOODED INTAKE WITH LOW-LEAKAGE MOTOR OPERATED
DAMPER, WITH MINIMUM THROAT AREA 13.5 SF FREE AREA.
COORDINATE INSTALLATION WITH ARCHITECT, TYP.
9 2 1/2" CHILLED WATER SUPPLY AND RETURN DOWN TO AHU-1.
10 1 1/2" HEATING HOT WATER SUPPLY AND RETURN DOWN TO
AHU-1 PRE HEAT COIL.
11 PROVIDE 4" EMERGENCY CHS&R CONNECTION POINTS WITH
BUTTERFLY SHUT-OFF VALVE AND BLANK FLANGE FOR FUTURE
CONNECTION.
12 TRANSITION 34X20 OA DUCT UP TO FULLSIZE OF HOODED
INTAKE.
13 HW LOOP BY-PASS CONTROL VALVE.
14 CHW DECOUPLER CONTROL VALVE.
15 CHW LOOP BY-PASS CONTROL VALVE.
16 PROVIDE 3" EMERGENCY HWS&R CONNECTION POINTS WITH
BUTTERFLY SHUT-OFF VALVE AND BLANK FLANGE FOR FUTURE
CONNECTION.
17 AHU COIL PULL CLEARANCE SHOWN DASHED.
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
1/4" = 1'-0"
3C
ENLARGED PIPING PLAN - MECHANICAL ROOM
1/4" = 1'-0"
6C
ENLARGED DUCTWORK PLAN - MECHANICAL ROOM
1/4" = 1'-0"
8C
MECHANICAL SECTION - HVAC ROOM - 1
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR
MULTI-BLADE DAMPERS & ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [6mm]
CLEARANCE
ALL AROUND
INSIDE END BEARING
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND
ROD PIN
DUCT
STIFFEN BLADE
AS REQUIRED
SIDE ELEVATION SECTION
NOTE:
1.
2.
3.
4.
5.
A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, IS SIMILAR. FOLLOW
DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR
SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR
FLOOR AND NOT OUTSIDE THE PENETRATION.
GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER
FRAME AND TO PERIMETER ANGLES.
PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO
PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA.
ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.
PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH
ROCK WOOL FIRESTOP FIBER.
SLEEVE, NOTE 2
DUCT CONNECTION NOTE 4
DAMPER, NOTE 1
DAMPER COLLAR EXTENSION
INTEGRAL PART OF SLEEVE
SLEEVE, NOTE 2
NOTE 5
FIRE BARRIER PARTITION OR CHASE
TYPICAL DUCT INSULATION
PERIMETER ANGLE, NOTE 3
(NOTE FASTENED TO PARTITION)
ACCESS
PANEL
m m
WITH LOCKING
QUADRANT DAMPER
SPIN-IN COLLAR
NOTES
1. SUPPORT SYSTEM MUST NOT DAMAGE DUCT OR CAUSE OUT OF ROUND SHAPE.
FOOT OF SUPPORT SPACING
MAX SAG 1/2" PER
WIRE HANGER W/
1" BAND CLAMP
2. DUCTS ARE FLEXIBLE WITH EXTERNAL INSULATION AND VAPOR BARRIER JACKETING.
3. MINIMUM CENTERLINE BEND RADIUS IS ONE DIAMETER, (OR INSIDE RADIUS OF D/2).
4. MAXIMUM LENGTH OF FLEXIBLE DUCT RUNOUT IS FIVE (5) FEET.
1" MIN STRAP
1" MIN
M
A
X
AIR SPLIT DUCT TAKE-OFF PLAN
VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
AIR
FLOW
AIR
FLOW
A I R
F L
O W
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
PROVIDE
BALANCING
DAMPER
PROVIDE BALANCING
DAMPER
1/4 W OR 4"
[100mm] MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
W
A I R
F L
O W
NOTE:
1.
2.
3.
4.
5.
RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A
MINIMUM OF 3 TIMES THE DIAMETER OF INLET
A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT
ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0" [900mm].
A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET,
PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT
EXCEED 10 FEET (3 METERS). FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND
PROVIDE A DUCT TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR
BELOW 0.2"/100' [1.64Pa/m].
FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT
TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS FOR CHANGE OF
DIRECTION GREATER THAN 45°.
COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
AIR TERMINAL UNIT
(VAV)
REHEAT COIL
SOUND ATTENUATOR SEE
EQUIPMENT SCHEDULE
(IF APPLICABLE)
SEE SPECIFICATIONS
FOR CLAMPS AND
SEALANT (TYP.)
SEE NOTE 5
NOTE 4
TRAP
o n e e i g h t h i n c e f o o t t h r c h e o t o d o l f i n c h e e f o o t o e f o o t t h r e e q u a r t e r s i n c o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL DETAILS
2 JDGCMD
658-315
MH501
SALEM VA MEDICAL CENTER 12094
CONSTRUCTION DOCUMENTS
NTS
9B
DETAIL - VOLUME DAMPER
NTS
8F
DETAIL - FIRE DAMPER INSTALLATION
NTS
3B
DETAIL - STRAIGHT SECTION OF FLEXIBLE DUCTWORK
NTS
6F
DETAIL - SUPPLY DUCTWORK TAKE OFFS
NTS
3F
DETAIL - TYPICAL DUCT CONNECTIONS AIR TERMINAL UNITS
NTS
6C
AHU TWO-WAY VALVE, GAUGES AND THERMOMETERS
2018.02.16
WALL
FOR ACOUSTICAL CONTROL
PACKED ALL AROUND DUCT
1" INSULATION TIGHTLY
SUPPORT DUCT FROM HANGERS2
TOUCH DUCT
OTHER RIGID MATERIAL MUST NOT
DRYWALL, METAL STUDS OR ANY
NOTES:
FOR SIZE OF OPENINGS
COORDINATE W/ARCH DRAWINGS
GALV. DUCT
1/2" CLEAR
22 GA SHEET METAL (TYP)
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW
AIR
FLOW
PROVIDE BALANCING DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [100mm]
MIN.
BRANCH DUCT
VD
ROUND TO RECTANGULAR
OR SQUARE ADAPTER
UL 181 LABELED INSULATED FLEX
DUCT. SEE SPECS. NO SAGS OR
SHARP 90° TURNS ALLOWED
EXCEPT AT DIFFUSER CONNECTION.
DIFFUSER
CEILING
HANGER STRAP
NO. 10 x 3/4" SELF-TAPPING CADMIUM
NO POP RIVETS ALLOWED
PLATED SHEET METAL SCREWS TO ANCHOR STRAPS.
TO DUCT AND JOISTS. ALL STRAPS TO BE TIGHT
AGAINST DUCT AND SUPPORT MEMBERS. (TYPICAL)
TO STRUCTURE
WRAP ALL BRANCH DUCTS
AND COVER CONNECTIONS
WITH DUCT WRAP. SEE
BALANCE DAMPER WITH
LOCKING QUADRANT
ROUND RIGID DUCT
12" WIDE 24 GA SHIELD
W/ SHEET METAL SCREWS
TO SPIN-IN FITTING
FASTEN RIGID DUCT
2"x24" GA STRAP
OPERATED BAND
SCREW DRIVER
STAINLESS STEEL
SPECIFICATIONS.
WIRE HANGER
EXCEPT AT DIFFUSER CONNECTION.
SHARP 90° TURNS ALLOWED
DUCT. SEE SPECS. NO SAGS OR
UL 181 LABELED INSULATED FLEX
MAXIMUM LENGTH 5 FT.
(TYP)
BIRD SCREEN
1/2" X 1/2" MESH
VIBRATION
ISOLATORS
3" CHANNEL
FLEXIBLE CONNECTION
45°
ALL-THREAD ROD
SEISMIC
RESTRAINTS, TYP
1"
6'-0"NONE REQUIRED1" X 18 GAUGE STRAP34" TO 40"
HANGER STRAPS
NO POP RIVETS ALLOWED
NO. 10x3/4" SELF TAPPING CADMIUM PLATED SHEET METAL SCREWS
TO ANCHOR STRAPS TO DUCT AND JOISTS. ALL STRAPS SHALL BE
TIGHT AGAINST DUCT AND MEMBERS.
8'-0"NONE REQUIREDUP TO 34" 1" X 18 GAGE STRAP
HANGER SIZES FOR RECTANGULAR DUCT
SIDE
MAX.
HANGER
SUPPORT ANGLE
HORIZONTAL
SPACING
MAXIMUM
o n e e i g h t h i n c e f o o t t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL DETAILS
2 JDGCMD
2018.02.16
658-315
MH502
SALEM VA MEDICAL CENTER 12095
CONSTRUCTION DOCUMENTS
NTS
8B
DETAIL - TYPICAL DUCTWORK PENETRATION - NON FIRE RATED WALL
NTS
8E
DETAIL - EXHAUST OR RETURN BRANCH DUCTWORK
NTS
3B
DETAIL - TYPICAL DIFFUSER CONNECTION
NTS
6E
DETAIL - TYPICAL INLINE FAN INSTALLATION
NTS
3E
DETAIL - DUCT STRAP HANGER
SECTION VIEW
METAL PIPE OR
INSULATED METAL PIPE
1 HOUR FIRE RATED
1/2" WET DEPTH OF NON-SAG
METAL PIPE SLEEVE
DAMMING MATERIAL
CONCRETE BLOCK WALL.
FOR SOLID CONCRETE
WALLS SEE NOTE 1
FIRE CAULK ON EACH SIDE
CONCRETE
NOTES
1. FOR SOLID CONCRETE WALLS, CENTER NON-SAG FIRE CAULK
WITHIN WALL WITH DAMMING MATERIAL ON ONE SIDE.
A) FOR UNINSULATED METAL PIPE:
CLASSIFICATION FIRE STOP SYSTEM 49.
PER ASTM E-814 (UL 1479) FIRE TEST AND UL
CAULK IS ACCEPTABLE AFTER INITIAL WET DEPTH INSTALLATION.
MAXIMUM ANNULAR SPACE TO BE FILLED IS 2-1/2"
B) FOR INSULATED METAL PIPE:
MINIMUM ANNULAR SPACE TO BE FILLED IS 3/4".
MAXIMUM ANNULAR SPACE TO BE FILLED IS 2-1/2"
EXPOSURE. UL CLASSIFIED PER SYSTEM 91
IT IS NOT NECESSARY TO REMOVE INSULATION AS IT
PENETRATES THE WALL OR FLOOR.
OF WALL
RECOMMENDATIONS BASED ON PRODUCT PERFORMANCE
UP TO 40% SHRINKAGE OF NON-SAG OR SELF-LEVELING FIRE
DEPTH OF FIRE CAULK DEPENDS ON INSULATION THICKNESS:
1" OF INSULATION - 1" DEPTH OF FIRE CAULK
2"-3" OF INSULATION - 2" DEPTH OF FIRE CAULK
RECOMMENDATIONS BASED ON PRODUCT PERFORMANCE PER
ASTM E-814 (UL 1479) TIME TEMPERATURE CURVE FIRE
1.
2.
3.
1.
2.
3.
4.
V
NOTE:
VENT TO ATMOSPHERE
1. SEE FLOOR PLANS FOR PIPE SIZES.
2. INSTALL VALVES AS RECOMMENDED BY MANUFACTURER.
3. MAKE BYPASS VALVE DISCHARGE PIPE THE SAME SIZE AS THE LOWER VALVE PIPING FOR THE LARGEST PRV.
4. PROVIDE NECESSARY UNIONS FOR THE REMOVAL OF VALVE WITH SCREWED CONNECTIONS.
5. SET PRV-1 FOR 10 PSI AND PRV-2 FOR 2 PERCENT HIGHER.
SIPHON (TYP.)
PILOT CONTROL LINE
REDUCER (TYP.) IF REQUIRED.
NOTE 1
N.C.
NOTE 1
NOTE 3
INVERTER
BUCKET TRAP
ASSEMBLY TYP.
PSV
PRV-1
PRV-2
P
MOTOR
PUMP
PRESSURE GAUGE WITH SHUT-OFF VALVES.
ATTACH PRESSURE GAUGE MANIFOLD TO BOTH
SIDES OF PUMP AT TEST LOCATIONS
RECOMMENDED BY MANUFACTURER.
NON-SLAMMING CHECK VALVE
DISCHARGE
SUCTION
BUTTERFLY VALVE
FLEXIBLE CONNECTOR
SUCTION DIFFUSER WITH STRAINER
SERVICE CLEARANCE
FOR STRAINER REMOVAL
SUPPORT FOOT
ROUTE PUMP
PAN DRAIN
TO FLOOR
DRAIN
PUMP, MOTOR
BASE FRAME & VIBRATION
ISOLATION BASE. REFER TO
DETAIL 3D ON SHEET
MH504.
BUTTERFLY VALVE
M
I N
M
I N
D
D
NOTE:
TEST
PLUG
(TYP.)
THERMOMETER
(TYP.)
MPS
STEAM
SUPPLY
HEAT
EXCHANGER
(TYP.)
m m
T
Y P m m
T
Y P
RUN DRAIN LINE
FROM RELIEF
VALVE TO
NEAREST FLOOR
DRAIN. (TYP.)
H
W
R
H
W
S
M
P
R
O
T
A
N
K
Y
P
1/2" [15mm]
CHECK VALVE
VACUUM
BREAKER (TYP.)
S
C
A
E
C
K
E
T
T
Y
P
DDC
TEMPERATURE
SENSOR (TYP.)
SEE SCHEDULES FOR RELIEF
VALVE SETTING
T
T
T
T
P
I
P
I
T
H
E
R
M
O
S
T
A
T
R
V
E
Y
P
C
O
N
T
R
V
L
V
S
S
I
Z
R
A
N
G
E
M
E
N
Y
P
B
Y
P
A
S
S
1. THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN PARALLEL.
PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT SHALL BE ADJUSTED
TO FACILITATE GRAVITY RETURN OF STEAM CONDENSATE.
MAKE THE BYPASS THE SAME SIZE AS THE CONNECTIONS TO THE CONTROL VALVES.
CONTROL VALVES SHALL BE IN A 1/3 AND 2/3 SIZE ARRANGEMENT.
2.
3.
4.
DDC PREESSURE
SENSOR (TYP.)
UNION
WITH P/T PORT AND
MANUAL AIR VENT
COIL
COMBINATION BALL VALVE,
`Y'-STRAINER & "O" RING UNION WITH
P/T PORT & HOSE END DRAIN WITH
CAP & RETAINER STRAP
SUPPLY
COMBINATION BALL VALVE,
AUTOFLOW REGULATOR & "O"-RING
UNION WITH DUAL P/T PORTS
RETURN
HW & CHW
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL DETAILS
2 JDGCMD
658-315
MH503
SALEM VA MEDICAL CENTER 12096
CONSTRUCTION DOCUMENTS
NTS
6B
DETAIL - FIRE RATED PIPING PENETRATION
NTS
9F
DETAIL - STEAM PRESSURE REDUCING STATION DBL VALVE
NTS
3B
DETAIL - BASE MOUNTED END SUCTION PUMP
NTS
6F
DETAIL - HEAT EXCHANGER STEAM TO HOT WATER
NTS
9B
VAV BOX AND FCU TWO-WAY COIL
DRAW
THRU
BLOW
THRU
2"[50mm]
PLUS X
1"[25mm]
MINIMUM
X
2X
UNIT
TYPE
A B
WHERE X = STATIC PRESSURE
IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME
SIZE AS THE NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR
TYPE M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
ROUTE TO
NEAREST DRAIN
DRAIN
PAN
NOTE:
DIELECTRIC
FITTING
1. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE CONNECTED.
B
D
I
V
Q
U
I
P
M
E
N
T
M
O
T
O
R
TYPICAL STRUCTURAL
STEEL MEMBER FOR
EQUIPMENT
TYPE"B"
WELDED STEEL BASE
TYPE "1"
CONCRETE INERTIA BASE
NUMBER OF
ISOLATION
UNITS AS
REQUIRED
NUMBER OF ISOLATION
UNITS AS REQUIRED
TYPICAL
STRUCTURAL
STEEL MEMBER FOR
EQUIPMENT
ALL WELDED STEEL
FRAMEWORK
SECTION A-A
STRUCTURAL
STEEL FRAME
SPRING
ISOLATOR
ANCHOR
BOLT
REINFORCING BARSSLEEVE
A
S
H
A
F
T
M
O
T
O
R
S
H
A
F
D
I
V
Q
U
I
P
M
E
N
T
A
NOTE:
ISOLATION BASE INSTALLATIONS TYPICAL FOR BASE MOUNTED HW
AND CHW PUMPS
V
P P
V
V
3/4"
3"
TO HEATING WATER COILSHWS
3"
3"
AIR SEPERATOR
AS-1
EXPANSION
TANK
ET-1
PUMP
HWP-1
1. MAKE-UP WATER PIPING
2. APPROVED BACKFLOW PREVENTOR
3. 3/4" HOSE BIBB WITH VACUUM BREAKER
4. PRESSURE REDUCING VALVE SET at 12 PSI
5. DRAIN VALVE
6. PUMP INLET DIFFUSER
NOTES
HOT WATER HEAT EXCHANGER
HX-1
FROM HEATING WATER COILS
RETURN RESERVIOR / PUMP
CP-1
CONDENSATE RETURN
FROM PRESSURE REDUCING STATION (IF APPLICABLE)
TO CONDENSATE RETURN SYSTEM
1"
1"
3"
3"
VENT TO ROOF
7. DASHED LINE INDICATES CONDENSATE
RETURN PUMP PACKAGE
HWR
LPS
LPR
AUTOMATIC STEAM CONTROL VALVE (TYP)
1"
HWS
3"
PUMP
HWP-2
HOT WATER HEAT EXCHANGER
HX-2
1"
3"
THERMOSTATIC AIR
VENT (TYP)
STEAM
TRAP (TYP)
PRESSURE GAUGE (TYP)
THERMOMETER (TYP)
2 4
STEAM
TRAP (TYP)
HW LOOP BY PASS 2-WAY
CONTROL VALVE
8. MAKE -UP WATER FLOW SENSOR TO DDC
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL DETAILS
2 JDGCMD
658-315
MH504
SALEM VA MEDICAL CENTER 12097
CONSTRUCTION DOCUMENTS
NTS
8B
DETAIL - AIR HANDLING UNIT DRAIN TRAP
NTS
3F
DETAIL - VIBRATION ISOLATION BASES
NTS
8F
DETAIL - STEAM TO HX
e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL FLOW CONTROL
DIAGRAMS
2 JDGCMD
658-315
MH601
SALEM VA MEDICAL CENTER 12098
CONSTRUCTION DOCUMENTS
NTS
8F
MECHANICAL AIR FLOW
2018.02.16
SALEM RENAL DIALYSIS HVAC AIRFLOW ANALYSIS
VA DESIGN MANUAL CALCULATONS
Unit Room
Air Changes OA Changes
% OA REQ'D OA REQ'D
AIRFLOW Room
# Name
Req'd Req'd
CFM CFM Pressure
AHU-1
Dialysis 6
2 33% 630 1865
(o)
Dialysis Corridor 4
2 50% 535 1070
Nurse Station 6
2 33% 225 675
(o)
Nourish Alcove 6
2 33% 45 130
(o)
Dialysis Toilet 10
0 0% 0 155
Exam/Treat 6
2 33% 60 180
(o)
Med Prep 6
2 33% 60 180
Isolation Room 12
2 17% 75 450
Private Room 6
2 33% 80 240
(o)
Equipment Storage 4
4 100% 100 100
(o)
Corridor CB-3 4
50% 410 825
Clean Linen 4
0 0% 0 60
(o)
Toilet 10
0 0% 0 165
Toilet 10
0 0% 0 175
Chief Office 4
2 50% 55 105
(o)
Chief Nurse 4
2 50% 50 105
(o)
Dietician 4
2 50% 55 110
(o)
Vestibule 0
0 0% 0 0
Stairway 0
0 0% 0 0 NA
Training Room 4
2 50% 60 120
(o)
Water Treatment 10
10 100% 670 670
Biomed Repair 6
33% 70 215
Dialysate Prep 4
4 100% 130 130
Corridor CB-4 4
50% 350 700
Elevator Room 0
0 0% 0 0 NA
Mechanical Room 0
0 0% 0 0 NA
Electrical Room 0
0 0% 0 0 NA
Electrical Room 0
0 0% 0 0 NA
Clean Storage 4
4 100% 190 190
Clean Prep 4
4 100% 200 200
AHU-E
Staff Lockers 6
0 0% 0 150
Staff Lounge 4
2 50% 75 150
Staff Unisex Tlt 10 10
20% 35 185
Patient Unixex Tlt 11 10
2 20% 40 200
Corridor CB-2B 4
50% 150 300
Elec Room 0
0 0% 0 0 NA
Telecom 0
0 0% 0 0 NA
Teledata 0
0 0% 0 0 NA
Physician Office 4
2 50% 115 235
(o)
Waiting 6
2 33% 370 1110
Reception 6
2 33% 90 270
Soiled Rec 6
0 0% 0 205
Soiled Utility 6
0 0% 0 145
Corridor CB-9 4
2 50% 65 135
Util, Sterile, Clean 4
4 100% 410 410 e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
P
M
RELOCATE AND EXPAND RENAL
DIALYSIS
MECHANICAL CONTROL
SEQUENCES
2 CMDCMD
658-315
MH602
SALEM VA MEDICAL CENTER 12099
CONSTRUCTION DOCUMENTS
VAV TERMINAL UNITS (TYPICAL)
GENERAL:
EACH TERMINAL UNIT SHALL BE PROVIDED WITH APPLICATION SPECIFIC CONTROL MODULE (ASC). UNIT AIRFLOW SHALL BE
MONITORED BY AN INTEGRAL, MULTI-POINT, AVERAGING FLOW SENSING DEVICE AND TRANSDUCER TO MAINTAIN AIRFLOW
WITHIN 5% OF THE RATED CFM DOWN TO A MINIMUM CFM AS SCHEDULED, INDEPENDENT OF CHANGES IN SYSTEM STATIC
PRESSURE.
OCCUPIED COOLING CYCLE:
UPON A RISE IN SPACE TEMPERATURE ABOVE COOLING SETPOINT, THE TERMINAL UNIT SHALL MODULATE THE PRIMARY AIR
VALVE BETWEEN THE MINIMUM AND MAXIMUM AIR FLOW RATES SCHEDULED TO MAINTAIN SPACE TEMPERATURE SETPOINT.
OCCUPIED HEATING CYCLE:
IF THE TERMINAL UNITS AIR DAMPER IS IN THE MINIMUM POSITION AND THE SPACE TEMEPERATURE CONTINUES TO FALL BELOW
THE SPACE TEMPERATURE SET POINT, THEN THE TERMINAL UNIT HEATING WATER CONTROL VALVE SHALL MODULATE OPEN TO
MAINTAIN SPACE TEMPERATURE SETPOINT. WHEN IN HEATING MODE THE AIR TERMINAL UNIT SHALL REMAIN AT MINIMUM AIR
FLOW RATE (CFM) AS SCHEDULED.
UNOCCUPIED CYCLE:
IN ORDER TO MAINTAIN BUILDING PRESSURIZATION, THE AHU'S AND VAV AIR TERMINAL UNITS WILL OPERATE IN A SIMILAR
MANNER AS THE OCCUPIED MODE. HOWEVER, DURING THE UNOCCUPIED MODE SETBACK SPACE TEMPERATURE SETPOINTS WILL
BE USED.
VAV AIR HANDING UNIT WITH STATIC PRESSURE OPTIMIZATION (AHU-1):
OCCUPIED MODE:
COOLING:
WHEN THE AHU IS IN THE OCCUPIED COOLING MODE, THE SUPPLY FAN WILL OPERATE CONTINUOUSLY, THE VFD WILL MODULATE
TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT (AS DETERMINED BY TAB), AND THE COOLING VALVE WILL MODULATE IN
SEQUENCE TO MAINTAIN A CONSTANT DISCHARGE AIR TEMPERATURE OF 55 F (ADJ).
HEATING:
WHEN THE AHU IS IN THE OCCUPIED HEATING MODE, THE SUPPLY FAN WILL OPERATE CONTINUOUSLY, THE VFD WILL MODULATE
TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT (AS DETERMINED BY TAB), AND THE PRE-HEAT VALVE WILL MODULATE IN
SEQUENCE TO MAINTAIN A CONSTANT DISCHARGE AIR TEMPERATURE 52 F (ADJ). THE OA DAMPER SHALL BE SET TO THE
MINIMUM POSITION REQUIRED FOR SPACE VENTILATION. THE AIR SIDE ECOMONIZER MODE SHALL BE LOCKED OUT ANYTIME THE
UNIT IS IN HEATING MODE.
UNOCCUPIED MODE:
IN ORDER TO MAINTAIN BUILDING PRESSURIZATION, THE AHU'S AND VAV AIR TERMINAL UNITS WILL OPERATE IN A SIMILAR
MANNER AS THE OCCUPIED MODE. HOWEVER, DURING THE UNOCCUPIED MODE SETBACK SPACE TEMPERATURE SETPOINTS WILL
BE USED.
WARM UP AND COOL DOWN MODE:
THE DDC SYSTEM SHALL HAVE AN ALGORITHM TO ADJUST MORNING WARM-UP/COOL-DOWN SCHEDULE TO ENSURE THE SPACE
TEMPERATURE SETPOINTS ARE ACHIEVED PRIOR TO THE BUILDINGS OCCUPANCY SCHEDULE. MORNING WARM-UP/COOL-DOWN
SHALL BE SCHEDULED NO LESS THAN 1 HOUR (ADJ.) PRIOR TO OCCUPANCY. THE THE DDC SHALL ENERGIZE THE WATER LOOP
SYSTEMS TO MAINTAIN THE SPACE TEMPERATURE SET-POINTS .
SUPPLY FAN CONTROL:
THE SUPPLY FAN WILL OPERATE CONTINUOUSLY DURING OCCUPIED AND UNOCCUPIED MODES UNLESS THE STOP/AUTO
INTERLOCK IS OPEN, SMOKE DETECTION, THE MIXED AIR LOW LIMIT TRIPPED, OR THE SUPPLY FAN STATUS INDICATES A FAILURE
(AFTER A TWO MINUTE DELAY). THE LOW LIMIT, SMOKE DETECTION AND THE FAN FAILURE REQUIRE A MANUAL RESET.
VFD CONTROL:
WHEN THE SUPPLY FAN IS ON, THE VFD WILL SLOWLY RAMP (ADJUSTABLE) UP TO SETPOINT AND MODULATE TO MAINTAIN THE
PROPER DUCT STATIC PRESSURE SET POINT AS MEASURED BY A STATIC PRESSURE SENSORS LOCATED AT THE MID-POINTS OF
THE MEDIUM PRESSURE DUCT LOOP. THE FAN SPEED SHALL BE SET WITH WITH A HIGH STATIC LIMIT (3.75" IN W.C) AND IF THE
FAN EXCEEDS THE HIGH STATIC LIMIT AN ALARM SHALL BE SENT TO THE DDC. IF THE STATIC PRESSURE ACROSS THE FAN
EXCEEDS THE HIGH STATIC SHUTDOWN LIMIT (4 IN W.C.) THEN THE FAN SHALL BE DE-ENERGIZED AND ALARM SENT TO THE DDC.
THE VFD (VARIABLE FREQUENCY DRIVE) WILL BE OFF IF THE SUPPLY FAN IS OFF OR THE DUCT STATIC PRESSURE SENSOR
FAILS.
DUCT STATIC PRESSURE OPTIMIZATION:
THE DUCT STATIC PRESSURE SETPOINT SHALL BE RESET USING TRIM & RESPOND LOGIC WITHIN THE RANGE 0.15 IN. W.G. TO 1.3
IN. W.G. (35 PA TO 325 PA). WHEN THE FAN IS OFF, THE SETPOINT SHALL BE 0.5 IN. W.G. (125 PA). WHILE THE FAN IS PROVEN ON, EVERY TWO MINUTES, TRIM THE SETPOINT BY 0.04 IN. W.G. (10 PA) IF THERE ARE TWO OR FEWER ZONE PRESSURE REQUESTS. IF
THERE ARE MORE THAN TWO ZONE PRESSURE REQUESTS, RESPOND BY INCREASING THE SETPOINT BY 0.06 IN. W.G. (15 PA). A
ZONE PRESSURE REQUEST IS GENERATED WHEN THE VAV DAMPER IS GREATER THAN 95% OPEN UNTIL IT DROPS TO 80% OPEN.
COOLING VALVE CONTROL:
THE COOLING VALVE WILL MODULATE TO MAINTAIN THE SUPPLY AIR TEMPERATURE AT THE DISCHARGE COOLING SETPOINT OF
55°F (ADJUSTABLE). THE COOLING VALVE WILL BE CLOSED IF THE THE SUPPLY FAN IS OFF,OR THE DISCHARGE AIR SENSOR
HAS FAILED.
SMOKE DETECTION MODE:
WHEN SMOKE IS DETECTED AND FIRE ALARM SYSTEM ACTIVATED, THE BUILDING DDC SHALL INSTRUCT THE AHU TO STOP THE
FAN, CLOSE THE CHW & HW CONTROL VALVES, AND CLOSE THE OA & RA DAMPERS.
COOLING COIL FREEZE PROTECTION:
THE DDC SYSTEM SHALL CLOSE THE OA DAMPER ANYTIME THE COOLING COIL ENTERING AIR TEMPERAURE FALLS BELOW 40 F
FOR LONGER THAN 5 MINUTES. THE LOW LIMIT FREEZE STAT SHALL STOP THE AHU FAN ANYTIME THE COOLING COIL ENTERING
AIR TEMPERATURE FALLS BELOW 35 F. DURING LOW LIMIT FREEZE STAT CONDITION THE CHILLED WATER AND HOT WATER
CONTROL VALVES SHALL BE OPENED TO ALLOW CIRCULATION OF WATER TO PREVENT COIL FREEZE.
OUTSIDE AIR CONTROL:
THE DDC SYSTEM, WITH DUCT MOUNTED AIR FLOW MEASURING STATIONS (AFMS), SHALL MODULATE THE RA AND OA DAMPERS
AS REQUIRED TO MAINTAIN THE OA FLOW RATE CFM SCHEDULED. READOUT OF THE OA AIRFLOW RATE SHALL BE IN CFM. UPON
FAILURE THE OA DAMPER SHALL BE NORMALLY CLOSED.
AIR SIDE ECONOMIZER:
THE OA DAMPER SHALL MODULATE BETWEEN THE MINIMUM POSITION REQUIRED FOR SPACE VENTILATION TO FULLY OPEN
PROVIDING 100% OA IN ORDER TO MAINTAIN THE AHU SUPPLY AIR TEMPERATURE SETPOINT. THE AIR SIDE ECONOMIZER SHALL
BE ENABLED ANYTIME THE AMBIENT DRY BULB AIR TEMPERATURE IS BELOW 55 F AND THE AHU IS CALLING FOR COOLING. THE
AHU RA DAMPER SHALL BE LINKED WITH THE OA DAMPER OPERATION. THE OA DAMPER SHALL MODULATE TO PROVIDE ALL OR
SOME PORTION OF THE COOLING CAPACITY REQUIRED BY THE AIR HANDLING UNIT DURING COOLING MODE.
GENERAL EXHAUST SYSTEMS
EXHAUST FANS (EF-1, -2, -3, -4, -5):
A. EXHAUST FAN SHALL OPERATE CONTINUOUSLY 24 HR/7 DAY/WEEK.
ISOLATION ROOM SYSTEM
THE HVAC SYSTEMS SERVING THE ISOLATION ROOM SHALL OPERATE CONTINUOUSLY 24 HR/7 DAY/WEEK.
A SPACE PRESSURIZATION MONITOR PANEL (SPM) WILL MONITOR AND CONTROL THE SPACE PRESSURIZATION LEVEL AS
COMPARED WITH THE DIALYSIS STATION OPEN BAY AREA. THE SPM SHALL HAVE A 2-POSITION KEY SWITCH THAT
ALLOWS LOCAL CONTROL FOR SETTING THE ISOLATION ROOM TO BE MAINTAINED AT EITHER NEGATIVE OR NEUTRAL
PRESSURE. THE SPM SHALL MODULATE THE CONSTANT VOLUME SUPPLY AIR TERMINAL BOX AND THE PATIENT ROOM
EXHAUST AIR DAMPER TO MAINTAIN AIRFLOW DIFFERENTIAL BASED ON THE MODE OF OPERATION (NEGATIVE OR
NUETRAL). THE SPM SHALL REPORT SPACE PRESSURE DIFFERENATIAL READINGS AND SETPOINT VALUES TO THE DDC
SYSTEM AND A REMOTE PANEL MONITOR (RPM) LOCATED AT THE NURSE STATION. WHEN THE SPACE PRESURIZATION IS
OUT OF RANGE A LOCAL AUDIBLE AND VISUAL ALARM WILL BE INITIATED AT THE SPM, THE RPM AND A ALARM SIGNAL
WILL BE SENT TO THE DDC SYSTEM.
THE SUPPLY AIR TERMINAL UNIT REHEAT WILL MODULATE TO MAINTAIN ROOM TEMPERATURE SETPOINT.
CHILLED WATER SYSTEM (CHWP-1 & CHWP-2)
GENERAL:
THE CHILLED WATER LOOP SYSTEM IS A VARIABLE FLOW, BUILDING TERTIARY LOOP TYPE. THE CHILLED WATER IS
SUPPLED FROM A CAMPUS CHILLED WATER LOOP PROVIDED FROM OFFSITE CENTRAL ENERGY PLANT. THE CHILLED WATER
LOOP SYSTEM CONSISTS OF (2) CHILLED WATER PUMPS, (2) PUMP MOTOR VFD'S, ASSOCIATED CONTROLS AND VALVES.
EACH CHILLED WATER PUMP IS SIZED TO PROVIDE 100% OF THE REQUIRED CHILLED WATER WATER FLOW RATE INCLUDING
ADDITIONAL FLOORS (2-4) PLANNED FOR CONSTRUCTION IN THE FUTURE.
CHILLED WATER (CHWP-1 & CHWP-2):
STARTING AND STOPPING OF THE CHILLED WATER PUMP SHALL BE ACCOMPLISHED WITH A VFD. PROVIDE CHILLED WATER
PUMP WITH A HAND-OFF-AUTO SWITCH. IN THE "HAND" POSITION, THE PUMP SHALL BE CONTROLLED MANUALLY. IN THE
"AUTO" POSITION THE PUMP SHALL BE CONTROLLED BY THE DDC SYSTEM. THE DDC SYSTEM SHALL START THE MAIN
CHILLED WATER PUMP ANY TIME THE AHU OR FAN COIL UNIT IS CALLING FOR COOLING. UPON CALL FOR COOLING THE
DECOUPLER VALVE (NORMALLY CLOSED) SHALL MODULATE OPEN TO MAINTAIN THE PRIMARY CHWS LOOP TEMPERATURE
OF 42 F (ADJ).
THE CHILLED WATER PUMPS SHALL BE OPERATE IN A MAIN / STAND-BY CONFIGURATION TO ENSURE EQUAL PUMP RUN TIME.
THE ALTERNATION FUNCTION REVERSES THE OPERATION OF THE PUMPS. UPON ALTERNATION THE MAIN PUMP SHALL
ROTATE TO STAND-BY AND THE STAND-BY PUMP SHALL ROTAE TO THE MAIN POSITION. THE ALTERNATION FUNCTION
SHALL BE PROGRAMMED TO OCCUR ANYTIME THE ACTIVE MAIN PUMP COMES TO REST.
DIFFERENTIAL PRESSURE CONTROL:
THE OBJECTIVE FOR THE CHILLED WATER PUMP OPERATIONS IS TO ALWAYS HAVE THE PUMP OPERATE AT THE LOWEST
SPEED AND PRESSURE POSSIBLE TO SATISFY THE BUILDING LOAD. THE LOOP DIFFERENTIAL SETPOINT WILL BE MAINTAINED
AT THE PRESSURE SETPOINT REQUIRED TO PROVIDE FULL FLOW TO ALL CONTROL VALVES SIMULTANEOUSLY (PER TAB
REPORT).
HOWEVER, IF THE PUMP VFD HAS BEEN RESET TO THE MINIMUM SPEED ALLOWABLE (TAB VERIFY) AND THE LOOP
DIFFERENTIAL PRESSURE CONTINUES TO RISE ABOVE THE MAXIMUM PRESSURE SETPOINT. THEN THE LOOP BYPASS VALVE
SHALL OPEN TO MAINTAIN THE DIFFERENTIAL SETPOINT AND THE MINIMUM PUMP SPEED (15Hz).
HOT WATER LOOP SYSTEM (HX-1, HX-2, HWP-1 & HWP-2):
GENERAL:
THE HOT WATER LOOP SYSTEM IS A PRIMARY LOOP SERVING THE AHU AND AIR TERMINAL UNIT REHEAT COILS. THE HOT
WATER LOOP SYSTEM IS ENABLED YEAR ROUND AND WILL START UPON A CALL FOR HEATING FROM THE AHU OR FAN
COIL UNITS BY THE DDC SYSTEM. THE HOT WATER LOOP SYSTEM EQUIPMENT CONSISTS OF (2) PUMPS, (2) PUMP MOTOR
VFD'S (2) HEAT EXCHANGERS, ASSOCIATED CONTROLS AND VALVES. EACH HEAT EXCHANGER IS SIZED TO PROVIDE 115%
CAPACITY OF THE BUILDING'S HEATING LOAD INCLUDING ADDITIONAL FLOORS (2-4) PLANNED FOR CONSTRUCTION IN THE
FUTURE. EACH HOT WATER PUMP IS SIZED TO PROVIDE 100% OF THE REQUIRED HEATING HOT WATER WATER FLOW RATE
INCLUDING ADDITIONAL FLOORS (2-4) PLANNED FOR CONSTRUCTION IN THE FUTURE.
STEAM TO HOT WATER HEAT EXCHANGER (HX-1 & HX-2):
THE HEAT EXCHANGER SHALL BE PROVIDED WITH A 1/3 STEAM VALVE AND 2/3 STEAM VALVE FOR ACCURATE CONTROL
OF HOT WATER TEMPERATURE. THE 1/3 STEAM VALVE SHALL MODULATE MAINTAIN HOT WATER TEMPERATURE DURING A
LOW HEATING LOADS. ONCE THE 1/3 STEAM VALVE IS FULLY OPEN AND THE HOT WATER TEMPERATURE CONTINUES TO
DROP THEN THE 2/3 STEAM SHALL MODULATE TO MAINTAIN HOT WATER…