36C24618B0616-0003002.pdf

PDF 41 KB Posted

Attached to
Relocate and Expand Renal Dialysis
Solicitation number
36C24618B0616
Issued by

About this file

36C24618B0616 0003 Glazing Specification 088000.pdf

View the file

Other files

File Type Posted
36C24618B0616-0004000.docx DOCX document
36C24618B0616-0003000.docx DOCX document
36C24618B0616-0003001.pdf PDF
36C24618B0616-0002001.pdf PDF
36C24618B0616-0002000.docx DOCX document
36C24618B0616-0001000.docx DOCX document
36C24618B0616-013.pdf PDF
36C24618B0616-002.pdf PDF
36C24618B0616-012.pdf PDF
36C24618B0616-001.docx DOCX document
36C24618B0616-016.pdf PDF
36C24618B0616-004.pdf PDF
36C24618B0616-003.pdf PDF
36C24618B0616-014.pdf PDF
36C24618B0616-011.pdf PDF
36C24618B0616-009.pdf PDF
36C24618B0616-008.pdf PDF
36C24618B0616-010.pdf PDF
36C24618B0616-007.pdf PDF
36C24618B0616-005.pdf PDF
36C24618B0616-015.pdf PDF
36C24618B0616-006.pdf PDF
36C24618B0616-000.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RELOCATE AND EXPAND RENAL DIALYSIS Salem VA Medical Center Construction Documents April 2017

GLAZING 08 80 00-1

SECTION 08 80 00

GLAZING

PART 1 GENERAL

1.1 DESCRIPTION

This section specifies glass related glazing mater ials and accessories.

Glazing products specified apply to factory or fiel d glazed items.

1.2 RELATED WORK

A. Factory glazed by manufacturer in following unit s:

1. Mirrors: Section 10 28 00, TOILET, BATH, AND LAU NDRY ACCESSORIES.

1.3 LABELS

A. Temporary labels:

1. Provide temporary label on each light of glass i dentifying manufacturer or brand and glass type, quality and n ominal thickness.

2. Label in accordance with NFRC (National Fenestra tion Rating Council) label requirements.

3. Temporary labels shall remain intact until glass is approved by COR.

B. Permanent labels:

1. Locate in corner for each pane.

2. Label in accordance with ANSI Z97.1 and SGCC (Sa fety Glass Certification Council) label requirements.

a. Tempered glass.

b. Laminated glass or have certificate for panes wi thout permanent label.

1.4 PERFORMANCE REQUIREMENTS

A. Building Enclosure Vapor Retarder and Air Barrie r:

1. Utilize the inner pane of multiple pane sealed u nits for the continuity of the air barrier and vapor retarder se al.

2. Maintain a continuous air barrier and vapor reta rder throughout the glazed assembly from glass pane to heel bead of gla zing sealant.

B. Glass Thickness:

GLAZING 08 80 00-2

1. Select thickness of exterior glass to withstand dead loads and wind loads acting normal to plane of glass at design pre ssures calculated in accordance with ASCE 7.

2. Test in accordance with ASTM E 1300.

3. Thicknesses listed are minimum. Coordinate thick nesses with framing system manufacturers.

1.5 SUBMITTALS

A. In accordance with Section 01 33 23, SHOP DRAWIN GS, PRODUCT DATA, AND

SAMPLES.

B. Manufacturer's Certificates:

1. Certificate on shading coefficient.

2. Certificate that blast resistant glass meets the requirements of

UFC4-010-01.

C. Warranty: Submit written guaranty, conforming to General Condition requirements, and indicating plane of glass at desi gn pressures calculated.

D. Manufacturer's Literature and Data:

1. Glass, each kind required.

2. Laminated Insulating glass units.

3. Glazing cushion.

4. Sealing compound.

E. Samples:

1. Size: 150 mm by 150 mm (6 inches by 6 inches).

F. Preconstruction Adhesion and Compatibility Test Report: Submit glazing sealant manufacturererane ofreport indicating glazi ng sealants were tested for adhesion to glass and glazing channel su bstrates and for compatibility with glass and other glazing material s.

1.6 DELIVERY, STORAGE AND HANDLING

A. Delivery: Schedule delivery to coincide with gla zing schedules so minimum handling of crates is required. Do not open crates except as required for inspection for shipping damage.

B. Storage: Store cases according to printed instru ctions on case, in areas least subject to traffic or falling objects. Keep storage area clean and dry.

GLAZING 08 80 00-3

C. Handling: Unpack cases following printed instruc tions on case. Stack individual windows on edge leaned slightly against upright supports with separators between each.

D. Protect laminated security glazing units against face and edge damage during entire sequence of fabrication, handling, an d delivery to installation location. Provide protective covering on exposed faces of glazing plastics, and mark inside as "INTERIOR FACE " or "PROTECTED

FACE":

1. Treat security glazing as fragile merchandise, a nd packaged and shipped in export wood cases with width end in upri ght position and blocked together in a mass. Storage and handling sh all comply with Manufacturer's directions and as required to preven t edge damage or other damage to glazing resulting from effects of m oisture, condensation, temperature changes, direct exposure to sun, other environmental conditions, and contact with chemical solvents.

2. Protect sealed-air-space insulating glazing unit s from exposure to abnormal pressure changes, as could result from sub stantial changes in altitude during delivery by air freight. Provide temporary breather tubes which do not nullify applicable warr anties on hermetic seals.

3. Temporary protections: The glass front and polyc arbonate back of glazing shall be temporarily protected with compati ble, peelable, heat-resistant film which will be peeled for inspections and re-applied and finally removed after doors and windows are installed at destination. Since many adhesives will attack polyc arbonate, the film used on exposed polycarbonate surfaces shall b e approved and applied by manufacturer.

4. Edge protection: To cushion and protect glass cl ad, polycarbonate, and Noviflex edges from contamination or foreign ma tter, the four edges shall be sealed the depth of glazing with con tinuous standard-thickness Santoprene tape. Alternatively, continuou s channel shaped extrusion of Santoprene shall be used, with flanges extending into face sides of glazing.

5. Protect "Constant Temperature" units including e very unit where glass sheet is directly laminated to or directly se aled with metal-tube type spacer bar to polycarbonate sheet, from e xposures to ambient temperatures outside the range of 16 to 24 C, during the fabricating, handling, shipping, storing, installat ion, and subsequent protection of glazing.

1.7 PROJECT CONDITIONS

Field Measurements: Field measure openings before ordering tempered glass products. Be responsible for proper fit of fi eld measured products.

GLAZING 08 80 00-4

1.8 WARRANTY

A. Warranty: Conform to terms of "Warranty of Const ruction", FAR clause 52.246-21, except extend warranty period for the fo llowing:

1. Bullet resistive plastic material to remain visi bly clear without discoloration for 10 years.

2. Insulating glass units to remain sealed for 10 y ears.

3. Laminated glass units to remain laminated for 5 years.

4. Polycarbonate to remain clear and ultraviolet li ght stabilized for 5 years.

5. Insulating plastic to not have more than 6 perce nt decrease in light transmission and be ultraviolet light stabilized fo r 10 years.

1.9 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this sp ecification to extent referenced. Publications are referenced in text by basic designation only.

B. American National Standards Institute (ANSI):

Z97.1-09................Safety Glazing Material Use d in Building Safety Performance Specifications and Methods of Test.

C. American Society for Testing and Materials (ASTM ):

C542-05.................Lock-Strip Gaskets

C716-06.................Installing Lock-Strip Gaske ts and Infill Glazing Materials.

C794-10.................Adhesion-in-Peel of Elastom eric Joint Sealants

C864-05.................Dense Elastomeric Compressi on Seal Gaskets, Setting Blocks, and Spacers

C920-11.................Elastomeric Joint Sealants

C964-07.................Standard Guide for Lock-Str ip Gasket Glazing

C1036-06................Flat Glass

C1048-12................Heat-Treated Flat Glass-Kin d HS, Kind FT Coated and Uncoated Glass.

C1376-10................Pyrolytic and Vacuum Deposi tion Coatings on Flat Glass

GLAZING 08 80 00-5

D635-10.................Rate of Burning and/or Exte nt and Time of Burning of Self-Supporting Plastic in a Horizontal Position

D4802-10................Poly (Methyl Methacrylate) Acrylic Plastic Sheet

E84-10..................Surface Burning Characteris tics of Building Materials

E119-10.................Standard Test Methods for F ire Test of Building Construction and Material

E2190-10................Insulating Glass Unit

D. Commercial Item Description (CID):

A-A-59502...............Plastic Sheet, Polycarbonat e

E. Code of Federal Regulations (CFR):

16 CFR 1201 - Safety Standard for Architectural Gl azing Materials; 2010

F. National Fire Protection Association (NFPA):

80-13...................Fire Doors and Windows.

252-12..................Standard Method of Fire Tes t of Door Assemblies

257-12..................Standard on Fire Test for W indow and Glass Block Assemblies

G. National Fenestration Rating Council (NFRC)

H. Safety Glazing Certification Council (SGCC) 2012 :

Certified Products Directory (Issued Semi-Annually ).

I. Underwriters Laboratories, Inc. (UL):

752-11..................Bullet-Resisting Equipment.

J. Unified Facilities Criteria (UFC):

4-010-01-2012...........DOD Minimum Antiterrorism S tandards for Buildings

K. Glass Association of North America (GANA):

Glazing Manual (Latest Edition)

Sealant Manual (2009)

L. American Society of Civil Engineers (ASCE):

GLAZING 08 80 00-6

ASCE 7-10...............Wind Load Provisions

PART 2 PRODUCT

2.1 HEAT-TREATED GLASS

A. Interior Clear Tempered Glass:

1. ASTM C1048, Kind FT, Condition A, Type I, Class 1, Quality q3.

2. Thickness, 6 mm (1/4 inch)

2.2 LAMINATED EXTERIOR GLAZING ASSEMBLIES

Physical Security Design Manual: 6.2.1.1 Glass: All new exterior glazing is to use laminated glass. For insulated glazing units (IGUs) the laminated glass is required only for the inner lite. Exterior lite shall be tempered.

A. Tinted Tempered/Laminated Glazing:

1. Exterior pane ASTM C1036, Type I, Class 3, Quali ty q3, (1/8 inch) thick.

2. Interior laminated pane ASTM C1048, Kind FT, Con dition A, Type I, Class 1, Quality q3, 5/32 outer layer- PVB Interlay er .030 mm -and 5/32” interlayer

2.3 GLAZING ACCESSORIES

A. As required to supplement the accessories provid ed with the items to be glazed and to provide a complete installation. Ferr ous metal accessories exposed in the finished work shall have a finish that will not corrode or stain while in service.

B. Setting Blocks: ASTM C864:

1. Channel shape; having 6 mm (1/4 inch) internal d epth.

2. Shore a hardness of 80 to 90 Durometer.

3. Block lengths: 50 mm (two inches) except 100 to 150 mm (four to six inches) for insulating glass.

4. Block width: Approximately 1.6 mm (1/16 inch) le ss than the full width of the rabbet.

5. Block thickness: Minimum 4.8 mm (3/16 inch). Thi ckness sized for rabbet depth as required.

C. Spacers: ASTM C864:

1. Channel shape having a 6 mm (1/4 inch) internal depth.

GLAZING 08 80 00-7

2. Flanges not less 2.4 mm (3/32 inch) thick and we b 3 mm (1/8 inch) thick.

3. Lengths: One to 25 to 76 mm (one to three inches ).

4. Shore a hardness of 40 to 50 Durometer.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verification of Conditions:

1. Examine openings for glass and glazing units; de termine they are proper size; plumb; square; and level before instal lation is started.

2. Verify that glazing openings conform with detail s, dimensions and tolerances indicated on manufacturer’s approved sho p drawings.

B. Advise Contractor of conditions which may advers ely affect glass and glazing unit installation, prior to commencement of installation: Do not proceed with installation until unsatisfactory conditions have been corrected.

C. Verify that wash down of adjacent masonry is com pleted prior to erection of glass and glazing units to prevent dama ge to glass and glazing units by cleaning materials.

3.2 PREPARATION

A. For sealant glazing, prepare glazing surfaces in accordance with GANA- 02 Sealant Manual.

B. Determine glazing unit size and edge clearances by measuring the actual unit to receive the glazing.

C. Shop fabricate and cut glass with smooth, straig ht edges of full size required by openings to provide GANA recommended ed ge clearances.

D. Verify that components used are compatible.

E. Clean and dry glazing surfaces.

F. Prime surfaces scheduled to receive sealants, as determined by preconstruction sealant-substrate testing.

3.3 INSTALLATION - GENERAL

A. Install in accordance with GANA-01 Glazing Manua l and GANA-02 Sealant Manual unless specified otherwise.

GLAZING 08 80 00-8

B. Glaze in accordance with recommendations of glaz ing and framing manufacturers, and as required to meet the Performa nce Test Requirements specified in other applicable sections of specifications.

C. Set glazing without bending, twisting, or forcin g of units.

D. Do not allow glass to rest on or contact any fra ming member.

E. Glaze doors, in a securely fixed or closed and l ocked position, until sealant, glazing compound, or putty has thoroughly set.

F. Tempered Glass: Install with roller distortions in horizontal position unless otherwise directed.

G. Laminated Insulating Glass Units:

1. Glaze in compliance with glass manufacturer's wr itten instructions.

2. When glazing gaskets are used, they shall be of sufficient size and depth to cover glass seal or metal channel frame co mpletely.

3. Do not use putty or glazing compounds.

4. Do not grind, nip, cut, or otherwise alter edges and corners of fused glass units after shipping from factory.

5. Install with tape or gunnable sealant in wood sa sh.

3.4 REPLACEMENT AND CLEANING

A. Clean new glass surfaces removing temporary labe ls, paint spots, and defacement after approval by COR.

B. Replace cracked, broken, and imperfect glass, or glass which has been installed improperly.

C. Leave glass, putty, and other setting material i n clean, whole, and acceptable condition.

3.5 PROTECTION

Protect finished surfaces from damage during erect ion, and after completion of work. Strippable plastic coatings on colored anodized finish are not acceptable.

3.6 GLAZING SCHEDULE

A. Tempered Glass-Interior:

1. Install in full and half glazed doors unless ind icated otherwise.

2. Install in interior assembly of storefront, and door sidelights adjacent to doors.

GLAZING 08 80 00-9

3. Use clear tempered glass on interior side lights and doors, and on exterior doors and sidelights unless otherwise indi cated or specified.

4. Use SEU clear tempered insulating glass on inter ior storefronts and sidelights.

B. Laminated Glass for Exterior Entrance Doors

1. Install in full exterior glazed doors unless ind icated otherwise.

C. Insulated Laminated Glass Units: Install as spec ified in doors,and interior pane of dual glazed insulated storefront w here indicated.

1. Where insulated laminated glass is required for blast-resistant windows, follow UFC4-010-01, DOD Minimum Antiterror ism Standards for Buildings.

3.7 FIRE-PROTECTIVE AND FIRE-RESISTANCE GLAZING SCHEDULE:

A. Glass Type FR# B ’ Label: Fire-protection-rated laminated ceramic glazing.

1. Thickness: 5 mm.

2. Rating: 90-minute.

3. Application: Fire-protection-rated door and wind ow assemblies.

B. Glass Type FR# C ’ Label: Fire-protection-rated laminated glass with intumescent interlayers.

1. Thickness: 6 mm.

2. Rating: 45-minute.

3. Application: Fire-protection-rated door assembli es.

- - - E N D - - -