This document contains a technical proposal template for a construction services contract opportunity with the Department of Veterans Affairs. The solicitation seeks proposals to expand outpatient clinics at the Altoona VA Medical Center in Altoona, Pennsylvania. Offerors must provide general construction, alterations, site work, and removal of existing structures in accordance with drawings and specifications for the project. The period of performance is 365 calendar days with a contract value between $5 million and $10 million. The NAICS code for this opportunity is 236220 with a small business size standard of $36.5 million in average annual receipts. The solicitation will be issued as a request for proposal conducted according to FAR Subpart 15. Proposals are due on or around January 23, 2020.
36C24420R0004 0002 EXHIBIT A _ Technical Proposal Data_Factor 36C24420R0004 02-18-20.docx
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A – TECHNICAL PROPOSAL DATA
Offerors are strongly encouraged to review the evaluation information located in the solicitation as they complete their Exhibit A.
Each question should be covered in sufficient detail to clearly address all required information. Answer questions in order presented. You are NOT limited to the space provided (However, there is an overall technical proposal page limit); use as much space as necessary to provide answers. It is advisable to state the question then give the answer. This will aid in the evaluation.
In the event you reference another document or part of the proposal you must be clear as to where the information can be found to answer the particular question(s). Such statements as see Company profile or see Safety Plan are not acceptable. You must indicate on what page of the proposal the answer can be found in the referenced document. Failure to do so may make your proposal non-compliant.
The data below is obtained for the purpose of evaluating technical capability. The offeror is required to provide required information to show experience and capability to manage multiple disciplined projects.
1. TECHNICAL CAPABILITY:
A. EXPERIENCE
1. Describe your experience and capability in managing construction projects for the dollar level, and disciplines needed to accomplish this project. (Why are you a good candidate for receiving an award?)
2. This contract requires short notice site visits/proposal meetings, normally within 2 calendar days, but can be as short as 2 hours (120 minutes). How will you ensure compliance with these requirements?
B. CAPABILITY
1. Provide as an attachment an Organizational Chart listing company personnel and their roles. (Titles)
2. Provide names, duties and levels of responsibility of key personnel to include the Project Manager, Site Superintendent(s), Quality Control Manager, Safety Manager and Infection Control Manager.
Indicate to whom the Quality Control, Safety and Infection Control Managers report. (Lines of authority)
3. Provide a list of the in-house trades that you employ. Provide the number (not names) of these employees and if they are full-time, part- time etc.
4. If applicable, describe the support and interface with your home office or corporate headquarters for such aspects as financial, management and technical support.
5. Discuss the education, training and experience in managing construction projects of the key personnel listed in B2 above (a resume may be submitted if it provides this information).
6. Provide list of major subcontractors and their trades that you intend to use on these projects.
7. Tell us if you have worked together in the past. If yes, on what kind of jobs?
8. Discuss your scheduling capabilities. Include such things as programs and staff to do scheduling. Submit a schedule for this project.
C. QUALITY CONTROL:
1. Discuss how quality issues will be dealt with on this construction project. Include in the discussion as a minimum, meetings, inspections, submittal reviews, correction of non-compliant work and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials. (Note: A full Quality Control Plan is required with the proposal. Also, provide on this form the page numbers where the required information (list of minimum information above) can be found. If you fail to follow these instructions, your proposal may not be adequately evaluated.)
2. Provide the names of testing laboratories to be used and the procedures for test data reporting
3. Discuss your procedures for contract closeout (Punch list, as built drawings, etc.).
4. Discuss your Safety Program in general, and provide as a minimum, details on training, documentation, and your plan to ensure adherence to OSHA Standards. (Note: A full Safety Plan will be required if you are awarded a contract and is NOT required with the proposal. If you do provide a plan, indicate if it is a draft for this contract, a sample from another project or a corporate plan. Also, provide on this form the page numbers where the required information (listed above) can be found. If you fail to follow these instructions, your proposal may not be adequately evaluated.)
5: Discuss the steps you took to promote safety during construction during the past five (5) years.
6. Provide a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If the number exceeds the criteria listed, explain why?
7. Offerors shall submit their current EMR rating. EMR rating should be less than or equal to 1.0. If the number exceeds the criteria listed, explain why?
Attachments to your Exhibit A:
1. Organization Chart (required); with brief relevant details of individuals experiences/qualifications
2. Resumes (optional);
3. Schedule (required)
4. Quality Control Plan (required - be sure to follow special instructions if you are submitting a plan). This plan does NOT count toward the forty (40) page maximum.
5. Safety Plan Synopsis (full safety plan optional - be sure to follow special instructions if you are submitting a plan). This plan does NOT count toward the forty (40) page maximum.
Page 1 of Page 1 of