This document package includes construction drawings and specifications for upgrading access controls station wide at the Canandaigua VA Medical Center in New York. The project involves installing new conduits, fiber, and access control equipment throughout multiple buildings and courtyards. The construction drawings depict the campus site plan and layout. Relevant details include requirements for contractors to maintain clean work areas, remove temporary facilities upon completion, verify field conditions, assist with final inspections, install conduits and systems per code, coordinate with other contracts, and obtain approval for deviations from plans. The related federal contract opportunity is a solicitation issued by the VA Veterans Health Administration Network 2 for project number 528A5-23-506 to upgrade access controls in accordance with the provided specifications and drawings.

View the file

Other files

File Type Posted
REV. 1 SOW 23-506-Upgrade Access Control.docx DOCX document
Attachment Spec section 08 71 00.pdf PDF
All drawing.pdf PDF
Attachment A-603.pdf PDF
S04 - Sign in - Pre-Bid Access Control.pdf PDF
All Specification.pdf PDF
S04 - Sign in - Pre-Bid Access Control Oct 19 2023.pdf PDF
QandA_528A5-23-506_upgrade Access Control.xlsx XLSX spreadsheet
852.219-75 VA Notice of Limitations on Subcontracting.pdf PDF
Attachment - TOC.pdf PDF
36C24223B0048 0001.docx DOCX document
P07 Wage Determination.pdf PDF
S02 All Drawing.pdf PDF
S02 All Spec.pdf PDF
013200 Construction Documentation.pdf PDF
36C24223B0048_1.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESERVED & VISITOR 2 HR TYP.

1 1A

CAMPUS SITE PLAN

VAMC Canandaigua

RAMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 engineering discipline <EDIT TEXT>:

Revisions: Date:

NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING

EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD

o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t

GENERAL NOTES,WORK

AREA

528A5-23-506

RA4/24/2023

100% CONSTRUCTION

DOCUMENTS

CANANDAIGUA, NY

RB

UPGRADE ACCESS CONTROL

STATION WIDE

GENERAL NOTES:

1. CONTRACTOR SHALL MAINTAIN THE WORK SITE IN AN ORDERLY CONDITION AND PROVIDE REGULAR

CLEAN UP OF THE CONSTRUCTION AREA ON A DAILY BASIS.

2. UPON COMPLETION OF ALL WORK, CONTRACTOR SHALL REMOVE ANY TEMPORARY FACILITIES, EQUIPMENT, SURPLUS MATERIAL AND SUPPLIES. FINAL CLEANUP SHALL LEAVE THE SITE IN AN

ORDERLY CONDITION.

3. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS

AND FIELD CONDITIONS, NOTIFY THE COR AND REQUEST CLARIFICATION UPON DISCOVERY.

4. THE CONTRACTOR SHALL BE PRESENT AND ASSIST IN THE FINAL WALK INSPECTION. THE

CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT TO DEMONSTRATE TO THE

COR THAT ALL UTILITIES OPERATE AS REQUIRED.

5. ALL CONDUITS SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH NFPA 70 AND PROJECT

SPECIFICATIONS. ALL CONDUITS SHALL BE A MINIMUM OF 3/4" UNLESS OTHERWISE NOTED

6. THE CONTRACTOR SHALL REMOVE ONE CEILING TILE PER 10FT TO PROVIDE ACCESS WHEN

INSTALLING THE CONDUIT AND FIBER ,AND SHOULD FOLLOWS ALL (ICRA) REQUIREMENT .

7. ALL SYSTEMS AND EQUIPMENT SHALL BE INSTALLED AND WIRED ACCORDING TO THE

MANUFACTURER'S RECOMMENDATION

8. THE LOCATIONS OF EXISTING UTILITIES, AND OTHER CONDITIONS SHOWN ON THE PLANS ARE APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND REPORT ANY

DISCREPANCIES TO THE ENGINEER PRIOR TO BEGINNING ANY WORK

9. THE CONTRACTOR SHALL TAKE CARE TO PREVENT DAMAGE TO EXISTING UTILITIES. DAMAGED UTILITIES SHALL BE IMMEDIATELY REPAIRED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.

10. ALL WORK SHALL BE DONE IN STRICT COMPLIANCE WITH ALL APPLICABLE NATIONAL AND STATE

CODES, STANDARDS, ORDINANCES, RULES, AND REGULATIONS.

11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE ALL PLAN SHEETS AND COORDINATE WORK

WITH ALL OTHER CONTRACTS ON THE SITE.

12. THE CONTRACTING OFFICER AND CONTRACTING OFFICER'S REPRESENTATIVE SHALL BE NOTIFIED, IN WRITING, OF ANY CONDITIONS THAT VARY FROM THOSE SHOWN ON THE PLANS. THE CONTRACTOR'S WORK SHALL NOT VARY FROM THE PLANS WITHOUT PRIOR WRITTEN APPROVAL OF THE CONTRACTING

0FFICER.

13. UNSUITABLE MATERIALS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED AT NO

ADDITIONAL COST TO THE GOVERNMENT.

14. CONTRACTOR SHALL TOUCH UP PAINT AND DOOR FRAMES OR WALLS WHERE NEW EQUIPMENT

INSTALLED DOES NOT COVER EXISTING CONDITION. PAINT WILL BE PROVIDED BY VA AFTER REQUEST

TO COR HAS BEEN PROVIDED.

AutoCAD SHX Text

EAST STREET

AutoCAD SHX Text

FORT HILL

AutoCAD SHX Text

SONNENBERG

AutoCAD SHX Text

GARDENS

AutoCAD SHX Text

AVENUE

AutoCAD SHX Text

PARK

AutoCAD SHX Text

EXERCISE

AutoCAD SHX Text

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

COURTYARD 1

AutoCAD SHX Text

2 HR VISITOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNDER

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

ZONED

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

LAYDOWN

AutoCAD SHX Text

STAGING

AutoCAD SHX Text

LAYDOWN

AutoCAD SHX Text

STAGING

AutoCAD SHX Text

LAYDOWN

AutoCAD SHX Text

STAGING

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

OFFICES

AutoCAD SHX Text

MODULAR

AutoCAD SHX Text

SHED

AutoCAD SHX Text

TEMP FD

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

OFFICES

AutoCAD SHX Text

MODULAR

AutoCAD SHX Text

ZONED

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
GENERAL

File details come from the government source that posted it. Updated .