013200 Construction Documentation.pdf
PDF 64 KB Posted
- Solicitation number
- 36C24223B0048
About this file
This document outlines construction documentation requirements for a federal contract opportunity with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. Construction contractors and design firms selected for work on VISN 2 VA facilities projects must utilize the VISN 2 Autodesk Build Construction Cloud platform for project collaboration, communication, and documentation. These include submitting RFIs, submittals, schedules, shutdown requests, tasks, reports, testing, inspections, photos, and surveys. Access to the platform and training is provided at no cost. Selected firms must request platform access and complete required training within 14 days of award. Only assigned staff are granted access, and changes must be reported within 2 days. All contract submissions and correspondence must use the platform, and no additional time or funds will be provided for failure to do so.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REV. 1 SOW 23-506-Upgrade Access Control.docx | DOCX document | |
| Attachment Spec section 08 71 00.pdf | ||
| All drawing.pdf | ||
| Attachnent - General Note.pdf | ||
| Attachment A-603.pdf | ||
| S04 - Sign in - Pre-Bid Access Control.pdf | ||
| All Specification.pdf | ||
| S04 - Sign in - Pre-Bid Access Control Oct 19 2023.pdf | ||
| QandA_528A5-23-506_upgrade Access Control.xlsx | XLSX spreadsheet | |
| 852.219-75 VA Notice of Limitations on Subcontracting.pdf | ||
| Attachment - TOC.pdf | ||
| 36C24223B0048 0001.docx | DOCX document | |
| P07 Wage Determination.pdf | ||
| S02 All Drawing.pdf | ||
| S02 All Spec.pdf | ||
| 36C24223B0048_1.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09-01-23
01 32 00 - 1
SECTION 01 32 00
CONSTRUCTION DOCUMENTATION
PART 1- GENERAL
1.1 DESCRIPTION:
A. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2
Autodesk Build Construction management platform, also called Autodesk
Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer
Representative (COR) at no cost for the duration of the project.
Autodesk Build is the management and collaborative environment that
VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform.
1.2 REQUIREMENTS:
A. Contractor shall accomplish and complete the following tasks upon award of contract:
1. Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR NLT 14 days from contract award.
2. Only staff that shall utilize the platform to be granted access.
Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.
3. The access request shall be in writing and include a list of staff.
The list shall include the following information:
• Full Name
• Company Name
• Email Address
• Role/Position on the project (i.e., Project manager, site super)
4. Upon granting access, staff shall complete required ACC training through ProductivityNOW platform within 12 Calendar days.
5. Upon successful completion of training, contractor shall submit certificates of completion to COR NLT 2 Business days.
B. Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period.
09-01-23
01 32 00 - 2
C. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above.
D. The contractor shall only use the ACC platform for all contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor’s failure to utilize the
ACC platform as the project’s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor’s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.
E. Contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertains to staff who was granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform.
F. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.