36A77619Q0091-005.xlsx

XLSX spreadsheet 1 MB Posted

Attached to
Phoenix OPC IOTA IDIQ CO: Heidi Gallaher
Solicitation number
36A77619Q0091
Issued by

About this file

36A77619Q0091 ATTACHMENT C - ProjectContentsList_2014 LEASE PHOENIX AZ OPC.xlsx

View the file

Other files

File Type Posted
36A77619Q0091-0001000.docx DOCX document
36A77619Q0091-0001001.docx DOCX document
36A77619Q0091-0001002.docx DOCX document
36A77619Q0091-004.doc DOC document
36A77619Q0091-012.docx DOCX document
36A77619Q0091-008.pdf PDF
36A77619Q0091-009.docx DOCX document
36A77619Q0091-010.docx DOCX document
36A77619Q0091-006.pdf PDF
36A77619Q0091-007.pdf PDF
36A77619Q0091-003.docx DOCX document
36A77619Q0091-015.pdf PDF
36A77619Q0091-002.docx DOCX document
36A77619Q0091-011.pdf PDF
36A77619Q0091-018.xls XLS spreadsheet
36A77619Q0091-017.docx DOCX document
36A77619Q0091-016.docx DOCX document
36A77619Q0091-014.pdf PDF
36A77619Q0091-013.xlsx XLSX spreadsheet
36A77619Q0091-000.docx DOCX document
36A77619Q0091-001.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Info

Project Contents List

2014 LEASE PHOENIX, AZ (COPIED 09 OCT 2014 10:17AM ET)

2014 LEASE PHOENIX, AZ

PHOENIX, AZ

Projected Year: 2014 Midpoint Year: 2016

VISN: 18 State: AZ Station ID: 644 Station: Phoenix Installation: VA Medical Center

Project Created: 08 Oct 2012 08:01PM ET by Mollie West Space Plan Last Edited: 09 Oct 2014 10:17AM ET by Linda Chan

Report Generated: 12 Apr 2019 10:55AM ET

Project Contents List

DepartmentFunctional AreaRoom CodeRoom NameRoom AreaBlueprint NumberJSNContent NameAcq CodeFund SrcQtyUnit CostTotal CostContent CommentsDept NotesFA NotesRoom CommentsEquip TypeNSNUnit Of IssueAverage PricePrice DatePosting DateWeightHeightWidthDepthUtil 1Util 2Util 3Util 4Util 5Util 6HertzBTU Per HourPhase 1Phase 2Volts 1Volts 2Amps 1Amps 2Watts 1Watts 2DescriptionLog Cat DescriptionLog Cat CommentAgency Code
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREALR001Locker Room60A1032Locker, Box, Personal EffectsVV43261304PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPROVIDER AREASRS01Storage, Patient Education Material60A1032Locker, Box, Personal EffectsVV1326326PP7125EA30804/24/201401/15/200360721212......000000000Personal effects locker box. Provides 6, one cubic foot spaces per locker with individually lockable doors. For use in staff lounges and patient areas where temporary storage of valuables and personal effects is required. Each box within the locker will be provided with a key lock that retains the key when open.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG4Exam Room, Group120A1132Rail, Accessory Mounting, Length As RequiredVV1122122PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV
PACT SPACE - 11 MODULESPATIENT AREAEXRG8OB/GYN Exam Room130A1132Rail, Accessory Mounting, Length As RequiredVV2122244PP6530LF9608/12/201309/15/200152482.....J0000000000Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.GOVT FURNISHED & INSTALLEDV

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.