This Scope of Work document outlines a comprehensive audiovisual system upgrade for the Multipurpose Room at Southwest Technical College in Utah. The project encompasses video system integration supporting two wall-mounted televisions with presenter connectivity via HDMI, audio system upgrades maintaining existing in-ceiling speakers and wireless Sennheiser microphones with audio zoning capability, hybrid meeting support through Zoom or Microsoft Teams integration with existing room camera, installation of a complete assistive listening accessibility system, and replacement of existing wall-mounted touch control panels with a simplified, user-friendly control interface. The selected contractor must conduct an onsite assessment, provide complete system design documentation, supply and install all hardware and software, integrate existing equipment where feasible, and deliver initial staff training with comprehensive documentation. The College has established a project completion deadline of August 2026, with questions regarding the solicitation due by April 1, 2026, and formal submissions due May 1, 2026 to Jeff Swift at jswift@stech.edu. The contractor shall be responsible for all labor, equipment, programming, and services necessary to deliver a fully functional system.
Southwest Technical College has allocated approximately $50,000 for this project, which is intended to encompass all equipment, labor, installation, programming, accessibility components, and training required to deliver a complete operational system. The College will provide access to the Multipurpose Room and associated equipment spaces, existing infrastructure including rack space, cabling pathways, conduit, and installed speakers. The completed system must demonstrate reliable operation with minimal troubleshooting, simplified controls appropriate for faculty, staff, and outside groups, proper audio playback from all video sources through ceiling speakers, functional room-division audio zoning capability when the partition is closed, integrated hybrid meeting functionality with clear audio and video integration, and full compliance with accessibility requirements. The contractor is expected to propose a detailed project schedule including site assessment, equipment procurement, installation, programming and testing phases, and training and closeout activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-REQUEST FOR PROPOSALS (1).pdf | ||
| 1-Southwest Tech AV RFP Score Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
1. Introduction Southwest Technical College is seeking proposals from qualified audiovisual (A/V) contractors to provide a comprehensive upgrade and simplification of the existing A/V system in the Multipurpose Room. This space supports community events, banquets, and hybrid meetings and requires an updated solution that is reliable, intuitive, and easy for a wide range of users.
The goal of this project is extreme usability — an A/V system that “just works” — enabling faculty, staff, and outside groups to successfully operate room technology with minimal technical assistance.
The selected contractor will design, install, configure, and commission an integrated audio and video system supporting dual-display presentation, microphone reinforcement, assistive listening accessibility, and hybrid meeting capability. The project is expected to be completed by August 2026.
2. Background The Multipurpose Room currently contains an aging A/V system with existing infrastructure including an equipment rack, installed in-ceiling speakers, conduit, and cabling pathways. The room has a seating capacity of approximately 100 and is divisible by an operable partition (“air wall”), allowing the space to function as one large room or two separate zones.
Recently, the College replaced outdated projectors with two wall-mounted televisions. However, these displays are not currently integrated into the existing A/V system. Additionally, the current wall-mounted touch control panels are complicated, unreliable, and not suitable for typical end users.
This project is being initiated to modernize the room’s A/V capabilities, improve reliability, and provide simplified controls that support the room’s evolving needs.
3. Scope of Work The contractor shall provide all labor, equipment, programming, and services necessary to deliver a fully functional A/V system upgrade for the Multipurpose Room.
The scope includes, but is not limited to, the following:
A. Video System Integration
● Configure the system to support two televisions operating simultaneously.
● Provide presenter connectivity via existing wall-mounted HDMI input(s).
● Support laptop-based presentations as the primary content source.
● Vendors may propose optional secure wireless screen-sharing solutions; any wireless capability must include robust security protections.
B. Audio System Upgrade and Integration
● Ensure audio from televisions and presentation sources is properly routed through the existing in-ceiling speaker system.
● Maintain and integrate the College’s existing wireless handheld Sennheiser microphone system.
● The system must support multiple wireless microphones in simultaneous use.
● Provide audio zoning functionality to support the operable partition (“air wall”), allowing sound reinforcement to be separated or limited when the room is divided.
C. Hybrid Meeting and Conferencing Support
● Provide full system capability to support hybrid meetings (e.g., Zoom or Microsoft Teams).
● Integrate with the College’s existing built-in room camera, with the option to propose replacement or upgrade if necessary.
● Ensure appropriate audio input/output routing for remote participants.
D. Assistive Listening Accessibility
● Provide and install a complete assistive listening system compliant with accessibility standards.
● Ensure the system is integrated into the overall room audio design and is suitable for public/community events.
E. Control System Replacement and Simplification
● The contractor shall replace the existing wall-mounted touch control panels entirely.
● Provide a new control solution designed for maximum reliability and simplicity.
● Preference is for straightforward wall-button operation; however, alternative control approaches may be proposed if they improve usability.
● Preset room modes (e.g., Presentation, Hybrid Meeting, Banquet) are desirable but not mandatory.
4. Requirements
Contractor Responsibilities
The contractor must:
● Conduct an onsite assessment of existing A/V infrastructure.
● Provide a complete system design including equipment lists and signal flow diagrams.
● Supply and install all required hardware, software, programming, and accessories.
● Integrate existing equipment where feasible (speakers, microphones, cabling).
● Replace outdated or unreliable control components.
● Test, commission, and verify all system functionality prior to acceptance.
● Provide initial training and basic documentation for College staff.
College Responsibilities
Southwest Technical College will provide:
● Access to the Multipurpose Room and associated equipment spaces.
● Existing infrastructure including rack space, cabling pathways, conduit, and installed speakers.
5. Compliance and Performance Standards The completed system must meet the following expectations:
● Reliable operation with minimal troubleshooting required.
● Simplified controls appropriate for faculty, staff, and outside groups.
● Proper audio playback from all video sources through ceiling speakers.
● Functional room-division audio zoning when the air wall is closed.
● Hybrid meeting capability with clear audio/video integration.
● Compliance with accessibility requirements through assistive listening support.
6. Project Deliverables The contractor shall provide:
● Fully integrated dual-display presentation system.
● Working HDMI presenter connectivity.
● Audio playback through ceiling speakers from all sources.
● Support for multiple wireless microphones simultaneously.
● Hybrid meeting capability including camera integration/upgrades if needed.
● Complete assistive listening system installed and operational.
● New simplified control interface replacing existing touch panels.
● Initial staff training session.
● Final documentation including:
○ System diagrams
○ Equipment inventory
○ Basic operating instructions
7. Project Timeline The College desires project initiation as soon as possible following contract award, with full installation and commissioning completed no later than August 2026.
Vendors should propose a detailed schedule including:
● Site assessment
● Equipment procurement
● Installation
● Programming/testing
● Training and closeout
8. Project Budget
Southwest Technical College has budgeted approximately $50,000 for this project. This budget is intended to include all equipment, labor, installation, programming, accessibility components, and training necessary to deliver a complete operational system.
9. Reference Documents Reference documents (floor plans, equipment lists, site photos) may be provided during the solicitation process or upon request.
| Scope of Work |
| 1. Introduction |
| 2. Background |
| 3. Scope of Work |
| A. Video System Integration |
| B. Audio System Upgrade and Integration |
| C. Hybrid Meeting and Conferencing Support |
| D. Assistive Listening Accessibility |
| E. Control System Replacement and Simplification |
| 4. Requirements |
| Contractor Responsibilities |
| College Responsibilities |
| 5. Compliance and Performance Standards |
| 6. Project Deliverables |
| 7. Project Timeline |
| 8. Project Budget |
| 9. Reference Documents |
File details come from the government source that posted it. Updated .