3-Room Divider Installation Project RFB (2) (1).docx

DOCX document 134 KB Posted

Attached to
Supporting Voices of Survivors- Construction Service
Solicitation number
RA27-114
Issued by
Utah

About this file

This Request for Bids (RFB) is issued by South Valley Sanctuary, a nonprofit organization serving domestic abuse and sexual violence survivors, for room divider installation services funded through the Community Development Block Grant Program Year 2025. The project involves providing and installing durable room dividers in two shelter resident rooms on the second floor of the facility located at 1853 W 7705 S, West Jordan, Utah 84084 to create shared spaces while maintaining privacy and accessibility. The contractor must supply all labor, materials, fasteners, hardware, tools, and equipment necessary for installation. Attendance at the mandatory pre-bid meeting scheduled for September 16, 2026 from 12:00 to 1:00 PM (held virtually via Microsoft Teams) is required for bid submission eligibility. The deadline for written questions is September 21, 2026 at 5:00 PM, with bids due September 24, 2026 at 5:00 PM through the U3P platform. Bid opening is scheduled for September 28, 2026, with estimated contractor selection on September 29, 2026. The project must be completed by October 31, 2026, with work anticipated to begin in September 2026. The scope includes sequential installation in two rooms to maintain shelter bed availability during construction, with no demolition work required.

The contract will be awarded to the lowest responsive and responsible bidder. All contractors and subcontractors must be properly licensed in Utah, maintain good standing, possess relevant experience, and obtain a Unique Entity Identifier (UEI) registered in SAM.gov. This federally funded project is subject to Davis-Bacon prevailing wage requirements, and contractors must comply with all federal, state, and local regulations including weekly certified payroll submission. Contractors must obtain any required permits at their own expense and carry insurance meeting minimum organizational requirements. Access to the secure 24/7 facility is restricted between 10:00 PM and 6:00 AM, with all staff check-in and check-out procedures required. Confidentiality is paramount; contractors are prohibited from photographing or recording staff or residents, disclosing the facility address to third parties, or interacting with residents. The RFB was posted September 11, 2026 for the minimum three-week bidding period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR BIDS (RFB) Template (Community Development Block Grant – Program Year 2025)

Bid Posting Period The Request for Bids (RFB) will be posted for a minimum of three (3) weeks to allow contractors sufficient time to review the project details, visit the site if required, and prepare complete and responsive bids.

1. Project Information Project Name: Room Divider Installation Grantee/Agency: South Valley Sanctuary Agency Address: PO Box 1028, West Jordan, UT, 84084 Project Location: 1853 W 7705 S, West Jordan, UT, 84084 Funding Source: Community Development Block Grant (CDBG), Program Year 2025

2. Project Overview SVS is a nonprofit organization and survivor-centered program that serves individuals impacted by domestic abuse and sexual violence by providing free and confidential services including emergency shelter, safe housing, trauma-informed counseling, advocacy, and tools for life.

This project includes building improvements to increase access and bed utilization at South Valley Sanctuary. The goal of the project is to ensure the space is accessible, safe, and usable for all community members, including people with disabilities and mobility limitations.

3. Scope of Work Provide and install room dividers in two rooms to convert them to shared rooms where we can combine small households while offering more privacy and maintaining easy access and circulation within the space.

A. Description of the Work Describe the work in detail, including:

· Areas of the building or site involved: Shelter resident room, second floor.

· Improvements to be made: Provide and install one room divider between the two bed bunks, running East to West. The bunk beds will be located on the East and West sides of the room. Two small families share this room so it will improve privacy between the families while maintaining easy access and circulation.

Once the first room is finished, we will repeat the process in the second room. We can’t shut down two rooms at the same time, so we’ll need to do one at a time to avoid limiting access to shelter beds during the project.

· Any demolition, removal, or replacement work: No demolition/removal/replacement work is anticipated. Contractor shall remove and dispose of any incidental materials or obstructions necessary to complete installation of the room dividers.

· Existing conditions contractors should be aware of: The room is located on the second floor and contains two bed bunks. There is an open shelf space located on the farthest North wall that will stay; it will need to be easily accessible for the two families. The shelves are NOT in the way of this project. Installation must maintain easy access, safe circulation, and usability of the space during and after work.

B. Design and Plans Indicate whether:

· Architectural or engineering plans are provided We have a bid provided (see below) and we have an architectural plan underway.

· Contractors must follow specific drawings or specifications

· Accessibility or ADA requirements apply Accessibility and ADA requirements do not apply to this room as it is on the second floor.

Attach all plans and drawings to the RFB.

*The 84" dimension is the measurement from the end of the baseplate to the end of the baseplate. The 80.5" dimension is the measurement from center post to center post.

C. Materials and Equipment:

No materials will be provided by the grantee unless otherwise stated in writing.

· The contractor must provide all labor, materials, fasteners, hardware, tools, and equipment necessary to complete the installation.

· Room dividers shall be durable, appropriate for institutional or residential shelter use, and suitable for maintaining privacy while allowing easy access and circulation. Emphasis on durability as multiple families will use this room; it must be able to resist wear and tear and cannot be a safety hazard (no glass).

· The contractor shall provide all labor, materials, fasteners, hardware, tools, and equipment necessary to complete the installation. Grantee will not provide anything for the contractor.

D. Permits and Inspections

· Permits should not be required for this project, but if they are required, the contractor shall be responsible for obtaining them and including all associated fees in the bid.

E. Site Conditions and Access

· South Valley Sanctuary is a 24/7 operation and secure facility. Contractors will be required to announce themselves at our secure gate intercom when they arrive to shelter. They will be asked to provide their name and reason for being there. Once granted access, a staff member will let them in through the gate. They will also be required to answer to the front door intercom, where another staff member will then let them into the facility. Contractors are required to check in with front desk staff by signing the visitor log. When contractors leave the facility, they are also required to check out with the front desk staff. For safety reasons, we cannot allow contractors to come between 10 PM-6 AM.

· The room will be empty while this project is in progress. The parking lot is shared among staff and shelter residents. If needed, contractors can park in the culdesac outside of the facility and front gate. SVS will still run shelter services throughout the duration of the project.

· Parking, staging, or safety requirements: We are a domestic violence shelter, so we MUST uphold confidentiality for our residents and staff. If it is necessary to take video or photos of the space/project, it is imperative that NO staff or shelter residents are in the photos/videos. We also expect vendors to not disclose the shelter address to any third party, not to converse or interact with any shelter residents, and not to disclose the identity of any residents the vendor/contractor/crew member may recognize/know.

F. Subcontractors

· Any subcontractors used must be properly licensed, qualified, and comply with all project requirements and applicable to federal, state, and local regulations, including Davis Bacon requirements, Prevailing Wages and Certified Payroll weekly submission.

G. Schedule Expectations

· Anticipated start timeframe: Contractor needs to coordinate with the facility staff and executive director, Lindsey, to coordinate their schedule and give them access through the gate. Our estimated/desired timeframe for the project will be during the month of September.

We ask that the completion of the divider installation take no longer than necessary to avoid prolonged inaccessibility to the room/beds that are in critical need by survivors seeking shelter. The completion date (for both room dividers) needs to be no later than October 31, 2026.

4. Mandatory Pre-Bid Meeting Attendance at the pre-bid meeting is required for contractors intending to submit a bid.

Grantee guidance:

Use this meeting to walk through the scope of work, highlight site conditions, and explain expectations clearly. This is an opportunity to reduce questions and avoid confusion later.

Pre-Bid Meeting Details:

· Date: September 16, 2026

· Time: 12-1 pm

· Location:

https://teams.microsoft.com/meet/254455931040889?p=9TrPA5l5ulrpDvVbMB Meeting ID: 254 455 931 040 889 Passcode: Sf9zc3Jk

*For safety and confidentiality reasons, this meeting will be held virtually.

5. Schedule of Events Include realistic dates that allow time for questions and review.

Event
Date & Time
RFB Posted
September 11
Mandatory Pre-Bid Meeting
September 16
Deadline for Questions
September 21 by 5 PM
Responses to Questions Posted
September 22
Bid Due Date
September 24 by 5 PM
Bid Opening
September 28
Estimated Contractor Selection
September 29

Dates may be adjusted through written addenda.

*Contractor bids MUST be submitted through U3P

6. Questions and Addenda All questions should be submitted in writing using U3P Grantee guidance:

Designate one point of contact and respond to all questions in writing so all bidders receive the same information.

7. Contractor Requirements Licensing and Experience Contractors must be properly licensed and in good standing with the State of Utah and have relevant experience performing similar work.

Unique Entity Identifier (UEI) All contractors and subcontractors must have a UEI registered in SAM.gov in addition to full SAM.gov registration.

8. Federal Requirements – Davis-Bacon and CDBG (Summary for Contractors – Reviewed in Detail Later) This is a federally funded project and subject to Davis-Bacon prevailing wage requirements. Contractors will receive detailed guidance during the pre-bid meeting and the required pre-construction compliance orientation.

9. Insurance Requirements Contractors must carry insurance meeting minimum requirements. Grantees should verify insurance requirements align with their organizational policies.

10. Change Orders Any changes must be approved in writing before work proceeds. Clear scope definitions help reduce the need for change orders.

11. Bid Evaluation and Selection Contracts will be awarded to the lowest responsive and responsible bidder. Grantees should document their review and selection process for their records.

12. Attachments Include all documents needed for bidders to understand the project fully:

· Scope of Work

· Plans and drawings

· Wage Determination

· Pre-Bid Davis Bacon Compliance Packet

· Required bid forms

13. Closing Thank you for your interest in this project. We look forward to receiving bids.