3-11. Attachment J General Conditions Pricing Breakdown.pdf
PDF 108 KB Posted
- Attached to
- Murray Unit - Install HVAC
- Solicitation number
- 696-FD-26-Q037
- Issued by
- Texas
About this file
This is a General Conditions Pricing Breakdown attachment for a Construction Manager at Risk project in Texas, specifically the Murray Unit HVAC installation for the Texas Department of Criminal Justice (TDCJ). The document provides a structured cost estimation template for general conditions expenses across multiple construction document (CD) phases at 65%, 95%, and 100% completion levels. General conditions are defined as project costs that are not incorporated into the completed work product and are not trade-specific, including project management staff, bonding and insurance requirements, utilities, equipment rentals, testing services, and safety materials.
The pricing breakdown template itemizes anticipated general conditions costs organized by category, including personnel on-site, bonds and insurance coverage (builder's risk, general liability, payment and performance), utilities (electricity, water for job and drinking water), temporary facilities (storage containers, office trailers, dumpsters), specialized services (crane rental, third-party commissioning, testing and balancing, as-built drawings), fire protection systems, information technology services, and safety equipment and materials. The document notes that the provided list is not exhaustive and contractors must identify all applicable general conditions costs based on project schedule in calendar days. Cost totals are presented as $0.00, indicating this is a blank template for bidders to complete with their estimated general conditions expenses broken down by the three CD phases.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL CONDITIONS PRICING BREAKDOWN Attachment J
SOLICITATION NO.
Cost
65% CD
95% CD
100% CD
Pre-Construction Fee Total $0.00
CD Milestones Breakdown Criteria
CONSTRUCTION DOCUMENTS (CD) COST BREAKDOWN
GENERAL CONDITIONS COST BREAKDOWN
COST ESTIMATE FORM
TDCJ UNIT:
CITY: COUNTY:
PROJECT NAME/DESC.: SCHEDULE (Calendar Days):
Project Management Staff Personnel (On-Site)
Bonds & Insurance
General Conditions
Builder's Risk Insurance General Liability Insurance (Auto, Umbrella, Products & Public Liability Insurance)
Payment and Performance Bonds
Electricity Water (Job)
696-FD-26-Q037 Page 1 of 2
GENERAL CONDITIONS PRICING BREAKDOWN Attachment J
$0.00
$0.00
***Please notice this this is not an exhaustive list. General conditions should include any item that is not incorporated in the completed work product and is not trade specific.
AVERAGE MONTHLY JOB BREAKDOWN TOTAL COST
General Conditions Total
a. Testing and Balancing
b. Construction Materials Testing
As-Built Drawings Fire Protection
Water (Drinking) & Associated Accessories Storage Containers/Trailers Office Trailer (Monthly Rental Cost) Dumpsters Crane
Third-Party Commissioning Services
Information Technology
Information Technology Office Supply - Monthly Safety Material Safety Equipment Fuel
Fire Protection
696-FD-26-Q037 Page 2 of 2