This is a Scope of Work document for the Orange County Transportation Authority (OCTA) related to a Request for Quotes for Vanta GRC Base Platform Subscription and Support renewal. OCTA seeks quotes from authorized resellers to provide a one-year subscription and support renewal for the Vanta GRC Base Platform. The contract term is for one year with no renewal options specified in the available documentation.

The total budget allocated for this procurement is $79,280. No approved equals will be accepted, meaning bidders must provide the exact Vanta GRC Base Platform product as specified. All bidders must certify compliance with Ukraine/Russia-related economic sanctions imposed by the State of California and the United States Government, including Presidential Executive Orders 13660, 13661, 13662, 13685, and 14065. Any individual or entity subject to these economic sanctions is ineligible to submit a quote, and all firms submitting quotes agree to comply with all economic sanctions imposed by the State or U.S. Government.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK VERIFICATION

This Form Must Be Submitted with Scope of Work (SOW)

FA-CAMM-071.docm (03/16/18) Page 1 of 1

The following general rules shall apply when preparing scopes of work and specifications:

a) Provide a clear and concise Scope of Work (SOW) and not impose unreasonable requirements.

b) Specifications and Scopes of Work shall identify all characteristics and specific tasks and functions of the items or services to be procured, and meet the Authority’s requirements.

c) Whenever possible, the expected quality of services to be provided or the performance characteristics of the item shall be specified.

d) The requestor shall identify all optional items, and the solicitation documents shall set forth the expected needs and the manner in which the related bid prices will be considered.

e) Brand name specifications must be accompanied by an explanation that clearly indicates that the specification is not intended to be restrictive.

f) The salient characteristics represented by the brand names shall be identified to allow for evaluation of possible “or equal” material.

g) Because standard specifications and requirements allow for more efficient operations and result in lower prices, they shall be used wherever suitable.

h) Industry, federal, state and local government specifications and requirements can be used.

Consultants are prohibited from writing the Scope of Work or assisting in the development or writing the Scope of Work in which they may bid.

INSTRUCTIONS

Project Managers (PM) must select one of the following certifications and submit this form with the scope of work/specifications. This form must be signed by the Project Manager and one of the following: the PM’s Department Manager or Director or Executive Director.

☐ I certify that the attached SOW/specifications was independently prepared to invite competition;

does not include reference to a brand name, or include unreasonable restrictions or an intent to favor any specific vendor or brand product.

OR

☒ The SOW/specifications prepared includes a “brand name or equal” description because it was determined to be “impractical or uneconomical” (as referenced in FTA Circular 4220.1F -revised March 18, 2013) to write a clear and accurate description of the technical requirements of the goods or services to be acquired. However, the specific features or salient characteristics of the named brand which must be met by offerors of “an equal” proposal have been clearly stated, as required by Federal Transit Administration regulations. (FTA Circular 4220.1F – revised March 18, 2013)

002418

Requisition Number Dept. Manager/Director/Executive Director Signature

Project Manager Signature

Information Systems 06/22/2026

Department Date