This document is a Technical Exhibit detailing the Levels of Service required for a Base Operations Support Services contract opportunity at Fort Hamilton, NY. The exhibit lists 20 specific performance standards and acceptable quality levels for services including maintenance and repair, facility/grounds maintenance, snow/ice removal, demand work orders, preventive maintenance, and pest management. It specifies the method of surveillance, incentives for compliance or non-compliance, and the Performance Work Statement (PWS) paragraph where each requirement is detailed.

The related federal contract opportunity is a 100% HUBZone small business set-aside for Base Operations Support Services at Fort Hamilton, NY. It is a single, non-commercial hybrid Firm Fixed Price and Cost Reimbursement contract with a 1-month phase-in period, 11-month base period, and four 12-month option periods. Proposals are due by 14 November 2024. A site visit is scheduled for 22 October 2024. The government intends to award a single contract.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services - Fort Hamilton, NY, newest first.
File Type Posted
25-R-5001 - BASOPS CDRLs A001_A057.pdf PDF
DBA_WD_New York_NY20240003_Mod._No._9_Rev._Date_09.27.2024.txt TXT text file
25-R-5001 - Site Visit Attendees List.docx DOCX document
25R5001 - Attachment 0073 - Personnel Licensing and Certs (v1).pdf PDF
25-R-5001 - Solicitation Amendment 0006.pdf PDF
Attachment 0003 - Price Matrix (Rev. 2)(d. 12.18.2024).xlsx XLSX spreadsheet
25R5001 - Tech Exhibit 0605 GSA VEHICLES Updated (v.2).pdf PDF
25R5001 - Tech Exhibit 0803 Special Services and Events.docx DOCX document
25-R-5001 - Solicitation Amendment 0005.pdf PDF
25-R-5001 - Solicitation Amendment 0002.pdf PDF
25R5001 - Tech Exhibit 0807 Utilities Map.docx DOCX document
25R5001 - Tech Exhibit 0602 ArMA.pdf PDF
25R5001 - Tech Exhibit 0808 Natural Gas Utility Map.docx DOCX document
25R5001 - Tech Exhibit 0901 Paving Plan.docx DOCX document
25R5001 - Attachment 0073 - Personnel Licensing and Certs.pdf PDF
25R5001 - Tech Exhibit 0605 GSA VEHICLES.pdf PDF
25R5001 - Tech Exhibit 0601 IBE list per building GFEBS 2019_Revised.xlsx XLSX spreadsheet
25R5001 - Tech Exhibit 0603 lead lag procedures in the buildings.docx DOCX document
25R5001 - Tech Exhibit 0412 Auxiliary Generators.xlsx XLSX spreadsheet
25R5001 - Tech Exhibit 0410 Gas and Oil fired boilers.docx DOCX document
25R5001 - Tech Exhibit 0415 Sprinkler Systems.docx DOCX document
25R5001 - Tech Exhibit 0409 Grease Traps.docx DOCX document
25R5001 - Tech Exhibit 0407 Sump Pumps.docx DOCX document
25R5001 - Tech Exhibit 0008 Personnel Licensing and Certs.docx DOCX document
25R5001 - Annex A - Performance Work Statement (PWS).pdf PDF
25R5001 - Tech Exhibit 0201 Grass Areas for Grounds Maintenance.pdf PDF
25R5001 - Tech Exhibit 0502 Water Distribution Systems.pdf PDF
25R5001 - Tech Exhibit 0508 Fire Hydrant Map.pdf PDF
25R5001 - Tech Exhibit 0202_Bioretention Areas.pdf PDF
25R5001 - Tech Exhibit 0301 Sweeping and Snow Removal Areas.docx DOCX document
25R5001 - Tech Exhibit 0102 Map of Current Dumpster Location.docx DOCX document
25R5001 - Tech Exhibit 0006 Base Ops Office and Shop Locations.pdf PDF
25R5001 - Tech Exhibit 0003 RCI Housing Locations.pdf PDF
25R5001 - Tech Exhibit 0401 Publications and Forms.docx DOCX document
25R5001 - Tech Exhibit 0203 Parade Area Taylor Field.pdf PDF
25R5001 - Tech Exhibit 0302 Snow and Ice Removal Plan.docx DOCX document
25R5001 - Tech Exhibit 0604 Chiller Units Listed.docx DOCX document
25R5001 - Tech Exhibit 0505 Builder.docx DOCX document
25R5001 - Tech Exhibit 0413 Grounding Points.docx DOCX document
25R5001 - Tech Exhibit 0406 Air Compressor.docx DOCX document
25R5001 - Tech Exhibit 0101 Estimated Container Sizes and Frequencies.docx DOCX document
25R5001 - Tech Exhibit 0007 - Wage Rates for Federal Contracts.docx DOCX document
25R5001 - Tech Exhibit 0005 JOC Workload Requirements.docx DOCX document
Tech Exhibit 0806 Secretary of the Interior Standards for the Treatment of Historic Places.docx DOCX document
25R5001 - Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment 0003 - Price Matrix.xlsx XLSX spreadsheet
25R5001 - BASOPS CDRLs A001_A056 (Signed).pdf PDF
25R5001 - Annex J - Facility Maintenance Horizontal PWS.pdf PDF
25R5001 - Tech Exhibit 0506 Storm Water Management Plan (w comments).pdf PDF
25R5001 - Tech Exhibit 0503 Crosswalks.pdf PDF
Show all 50

Base Operations Support Services - Fort Hamilton, NY has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 0009 Levels of Service October 2023

Required Services

Performance Standard
Acceptable Quality Level (AQL)

Method of Surveillance Incentive (Positive and/or Negative)

# 1.

Contractor shall ensure all work accomplished meets all maintenance and repair standards listed in all applicable Federal, State, and local laws, regulations and directives to include, but not limited to applicable publications in Section 7, Related Documents.

The Contractor shall provide services IAW PWS, para. 1.2.
5% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

# 2.

The Program Manager shall be available after normal duty hours to serve as the central point of contact for Contractor operations.

The Contractor shall provide a central point of contact IAW PWS, para.

2.1.4.1.

Zero Deviation from performance standard
100% daily and verification/confirmation by the COR/ACOR.
Non-conforming services will result in Non- Conforming Reports issued to Contractor and potential negative CPARS report.

#3.

The Contractor shall develop and maintain a Quality Control Plan approved by the KO.

The Contractor shall provide a QCP IAW PWS, para, 4.2.

Zero Deviation from performance standard.
Review and acceptance by the by the KO on submission of QCP and each revised QCP.
Non-conforming services will result in Non- Conforming Reports issued and a potential

negative CPARS narrative.

# 4.

The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.

Employee conduct complies with 41 U.S.C. 423, Procurement Integrity, IAW PWS para.

2.1.11.1.6.

Zero Deviation from performance standard.
The COR/ACOR will review 100% of Contractor reported occurrences of Contractor employee misconduct, including but not limited to violations of any provision indicated at 41 U.S.C. 423, and/or security violation to ensure

the offending employee is removed from the job site.

Non-conforming services will result in Non- Conforming Reports issued to Contractor and potential equitable adjustment by the Contracting Officer.

#5.

Damages caused by Contractor employees shall be repaired at no cost to the Government.

The Contractor shall notify the COR/ACOR and return the damaged area to its previous condition AW PWS, para.

3.1.1.1.

Zero Deviation from performance standard
COR/ACOR will review 100% of damage reports.
Non-conforming services will result in Non- Conforming Reports issued and a potential negative CPARS narrative.

#6.

The Contractor will ensure that the licenses or certificates and training of Contractor personnel are kept current. Copies of these licenses or certifications will be provided to the COR/ACOR.

The Contractor shall perform IAW PWS, para. 2.3.4.1.
Zero Deviation from performance standard

(Risk assessed high risk)

100 Percent Inspection of copies of these licenses or certifications
Non-conforming services will result in Non- Conforming Reports issued and a potential negative CPARS narrative

#7.

Percentage of Non- hazardous solid waste diverted from the waste stream meets annual diversion goal of the DoD Strategic Sustainability Performance Plan 403- AC-03-03-B The Contractor shall perform IAW PWS, Annex E – 403 Solid Waste Management 10% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#8.

Percentage of improved grounds maintained IAW Enterprise Municipal Ground Maintenance Performance standards. Intellicode 404-AC-01- 01-A The Contractor shall perform IAW PWS, Annex F – 404 Grounds Maintenance 10% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#9 Clear snow, sleet, ice, and sand from primary roads, and sidewalks parking lots for critical building access, and ports. Intellicode 408- AC-03-04-A The Contractor shall perform IAW PWS, Annex G – 408 Pavement Clearance 10% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#10 Secondary pavements made passable within 12 hours of onset of event. Intellicode 408- AC-06-07-D The Contractor shall perform IAW PWS, Annex G – 408 Pavement Clearance 10% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#11 Percentage of validated emergency demand work orders completed IAW established completion times.

Intellicode 411-AC-01- 01-A The Contractor shall perform IAW PWS, Annex H – 411 Facilities Maintenance Vertical 5% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#12 Percentage of validated urgent and routine demand work orders completed IAW established completion times. Intellicode 411- AC-01-02-B The Contractor shall perform IAW PWS, Annex H – 411 Facilities Maintenance Vertical 5% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#13 Preventive Maintenance executed compared to required PM. Intellicode 411-AC-02-03-C The Contractor shall perform IAW PWS, Annex H – 411 Facilities Maintenance Vertical 10% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

#14 Percentage of emergency DMOs completed within standard IAW established completion times. Intellicode 420- AC-01-01-A The Contractor shall perform IAW PWS, Annex J – 420 Facilities Maintenance Horizontal 5% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#15 Percentage of validated urgent and routine demand work orders completed IAW established completion times. Intellicode 420- AC-01-02-B The Contractor shall perform IAW PWS, Annex J – 420 Facilities Maintenance Horizontal 5% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#16 Percentage of preventive maintenance executed compared to requuired PM. Intellicode 420-AC-02- 03-C The Contractor shall perform IAW PWS, Annex J – 420 Facilities Maintenance Horizontal 10% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

#17 Percentage of preventive maintenance executed compared to required PM.

The Contractor shall perform IAW PWS, Annex K – 420 Heating & Cooling Services 10% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#18 Percentage of preventive maintenance executed compared to required PM.

The Contractor shall perform IAW PWS, Annex L – 420 Wastewater Services 10% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#19 Percentage of scheduled Indoor Pest Management Services completed. Intellicode 510-AC-04-04-B
The Contractor shall perform IAW PWS,

Annex M – 510 Pest Management Services 5% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;

Contractor shall re-perform the service.

#20 Percentage of scheduled Outdoor Pest Management Services completed. Intellicode 510-AC-05-05-C The Contractor shall perform IAW PWS, Annex M – 510 Pest Management Services 5% Deviation from performance Standard;

% calculated by dividing the number of defects by the number of observations.

Random Sampling and Customer Complaints; Inspections and complaint validations performed by QA and the COR/ACOR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System;