20-00631-00-BT_Estimate_of_Time.pdf

PDF 133 KB Posted

Attached to
Bakers Lane Shared-Use Path, Section 20-00631-00-BT
Solicitation number
FY2026-ITB-151
Issued by
Champaign County, Illinois

About this file

The document is an Estimate of Time Required form from the Illinois Department of Transportation for the Bakers Lane project in Champaign County, with contract number L0106 and route 7137, section 20-00631-00-BT. The project involves various construction activities including tree removal (532 units for 6-15 trees and 459 units for over 15 trees), earth excavation of 3,423 cubic yards of unsuitable material, furnished excavation of 649 cubic yards, and porous granular embankment of 1,904 cubic yards. Additional work includes sidewalk construction (44,565 square feet), driveway pavement (500 square yards), curb and gutter (1,285 linear feet), electrical conduit and cable installation, light pole foundations and luminaires, and various other infrastructure improvements.

The total project is estimated to require 88 actual working days, with a total project duration of 90 days. The document was completed by Sarah Gieraltowski and checked by John Mayer on 08/25/25, with a digital signature from Regional Engineer Kensil A. Garnett. The estimate breaks down the time required for each specific construction item, with rates per day ranging from 1 to 7,000 depending on the complexity and scale of the task. The most time-consuming activities include PCC sidewalk construction (30 days), electrical conduit installation (9 days), and light pole foundation work (10 days).

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimate of Time Required

Page 1 of 1 BDE 220A (Rev. 10/02/24)

E-mail Reset Form

Contract

L0106 Project

Bakers Lane County

Champaign Notes

Route

Section

20-00631-00-BT

Item Unit Quantity Rate Per Day Days

Days Not Affecting

Time

Total Days Required

- Tree Removal (6 to 15 units) UNIT 532.00 400.00 1 0 1

- Tree Removal (over 15 units) UNIT 459.00 300.00 2 0 2

- Earth Excavation/Unsuitable

Materia CU YD 3,423.00 500.00 7 0 7

- Furnished Excavation CU YD 649.00 700.00 1 0 1

- Porous Granular Embankment CU YD 1,904.00 700.00 3 0 3

- Topsoil Excavation and Place CU YD 195.00 500.00 0 0

- Seeding Class 1A & 1B ACRE 2.00 5.00 0 0

- Mulch ACRE 2.00 1.00 2 0 2

- Trench Backfill CU YD 17.00 100.00 0 0

- PCC SideWalk SQ FT 44,565.00 1,500.00 30 0 30

- PCC Driveway Pavement SQ YD 500.00 150.00 3 0 3

- Curb & Gutter FOOT 1,285.00 500.00 3 0 3

- Electrical Conduit FOOT 2,923.00 325.00 9 0 9

- Electrical Cable in Conduit FOOT 14,385.00 7,000.00 2 0 2

- Electric controller EACH 1.00 1.00 1 0 1

- Light pole Foundation FOOT 192.00 20.00 10 0 10

- Luminaire EACH 32.00 10.00 3 0 3

- Light Pole Special EACH 32.00 6.00 5 0 5

- Sidewalk Removal SQ FT 8,800.00 2,500.00 4 0 4

- Inlet EACH 2.00 2.00 1 0 1

- Manhole EACH 2.00 2.00 1 0 1

Total Actual Working Days Required 88 Total Days 90

Completed by

Sarah Gieraltowski Date

08/25/25 Checked by

John Mayer Date

08/25/25

Regional Engineer Signature & Date

S:\Gen\Document Services\Forms Support\AEM Forms\DOTLOGO2.bmp Illinois Department of Transportation Illinois Department of Transportation logo Estimate of Time Required Form title Page of Page Number BDE 220A (Rev. 10/02/24) Form number Page of Page Number BDE 220A (Rev. 10/02/24) Form number Item Unit Quantity Rate Per Day Days Days Not Affecting Time Total Days Required Indexed Table Summary Total Actual Working Days Required Total Days 11.0.0.20130303.1.892433.887364 Estimate of Time Required

BDE 220A

Design and Environment Draft Draft L0106 Bakers Lane

20-00631-00-BT

Sarah Gieraltowski John Mayer

btnEmail:
btnReset:
currentPage:
pageCount:
contract:
project:
county: Champaign
notes:
route:
section:
btnAdd:
btnRemove:
item: Tree Removal (6 to 15 units)
item: Tree Removal (over 15 units)
item: Earth Excavation/Unsuitable Materia
item: Furnished Excavation
item: Porous Granular Embankment
item: Topsoil Excavation and Place
item: Seeding Class 1A & 1B
item: Mulch
item: Trench Backfill
item: PCC SideWalk
item: PCC Driveway Pavement
item: Curb & Gutter
item: Electrical Conduit
item: Electrical Cable in Conduit
item: Electric controller
item: Light pole Foundation
item: Luminaire
item: Light Pole Special
item: Sidewalk Removal
item: Inlet
item: Manhole
ddunit: UNIT
ddunit: UNIT
ddunit: CU YD
ddunit: CU YD
ddunit: CU YD
ddunit: CU YD
ddunit: ACRE
ddunit: ACRE
ddunit: CU YD
ddunit: SQ FT
ddunit: SQ YD
ddunit: FOOT
ddunit: FOOT
ddunit: FOOT
ddunit: EACH
ddunit: FOOT
ddunit: EACH
ddunit: EACH
ddunit: SQ FT
ddunit: EACH
ddunit: EACH
quantity: 532.00
quantity: 459.00
quantity: 3,423.00
quantity: 649.00
quantity: 1,904.00
quantity: 195.00
quantity: 2.00
quantity: 2.00
quantity: 17.00
quantity: 44,565.00
quantity: 500.00
quantity: 1,285.00
quantity: 2,923.00
quantity: 14,385.00
quantity: 1.00
quantity: 192.00
quantity: 32.00
quantity: 32.00
quantity: 8,800.00
quantity: 2.00
quantity: 2.00
ratePerDay: 400.00
ratePerDay: 300.00
ratePerDay: 500.00
ratePerDay: 700.00
ratePerDay: 700.00
ratePerDay: 500.00
ratePerDay: 5.00
ratePerDay: 1.00
ratePerDay: 100.00
ratePerDay: 1,500.00
ratePerDay: 150.00
ratePerDay: 500.00
ratePerDay: 325.00
ratePerDay: 7,000.00
ratePerDay: 1.00
ratePerDay: 20.00
ratePerDay: 10.00
ratePerDay: 6.00
ratePerDay: 2,500.00
ratePerDay: 2.00
ratePerDay: 2.00
days: 1
days: 2
days: 7
days: 1
days: 3
days: 0
days: 0
days: 2
days: 0
days: 30
days: 3
days: 3
days: 9
days: 2
days: 1
days: 10
days: 3
days: 5
days: 4
days: 1
days: 1
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
daysNotAffecting: 0
totalDays: 1
totalDays: 2
totalDays: 7
totalDays: 1
totalDays: 3
totalDays: 2
totalDays: 30
totalDays: 3
totalDays: 3
totalDays: 9
totalDays: 2
totalDays: 1
totalDays: 10
totalDays: 3
totalDays: 5
totalDays: 4
totalDays: 1
totalDays: 1
totalDays: 90
totalActual: 88
madeyBy:
dateMade: 08/25/25
checkedBy:
dateChecked: 08/25/25
signatureElectronic: