20-00631-00-BT_Estimate_of_Time.pdf
PDF 133 KB Posted
- Solicitation number
- FY2026-ITB-151
- Issued by
- Champaign County, Illinois
About this file
The document is an Estimate of Time Required form from the Illinois Department of Transportation for the Bakers Lane project in Champaign County, with contract number L0106 and route 7137, section 20-00631-00-BT. The project involves various construction activities including tree removal (532 units for 6-15 trees and 459 units for over 15 trees), earth excavation of 3,423 cubic yards of unsuitable material, furnished excavation of 649 cubic yards, and porous granular embankment of 1,904 cubic yards. Additional work includes sidewalk construction (44,565 square feet), driveway pavement (500 square yards), curb and gutter (1,285 linear feet), electrical conduit and cable installation, light pole foundations and luminaires, and various other infrastructure improvements.
The total project is estimated to require 88 actual working days, with a total project duration of 90 days. The document was completed by Sarah Gieraltowski and checked by John Mayer on 08/25/25, with a digital signature from Regional Engineer Kensil A. Garnett. The estimate breaks down the time required for each specific construction item, with rates per day ranging from 1 to 7,000 depending on the complexity and scale of the task. The most time-consuming activities include PCC sidewalk construction (30 days), electrical conduit installation (9 days), and light pole foundation work (10 days).
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimate of Time Required
Page 1 of 1 BDE 220A (Rev. 10/02/24)
E-mail Reset Form
Contract
L0106 Project
Bakers Lane County
Champaign Notes
Route
Section
20-00631-00-BT
Item Unit Quantity Rate Per Day Days
Days Not Affecting
Time
Total Days Required
- Tree Removal (6 to 15 units) UNIT 532.00 400.00 1 0 1
- Tree Removal (over 15 units) UNIT 459.00 300.00 2 0 2
- Earth Excavation/Unsuitable
Materia CU YD 3,423.00 500.00 7 0 7
- Furnished Excavation CU YD 649.00 700.00 1 0 1
- Porous Granular Embankment CU YD 1,904.00 700.00 3 0 3
- Topsoil Excavation and Place CU YD 195.00 500.00 0 0
- Seeding Class 1A & 1B ACRE 2.00 5.00 0 0
- Mulch ACRE 2.00 1.00 2 0 2
- Trench Backfill CU YD 17.00 100.00 0 0
- PCC SideWalk SQ FT 44,565.00 1,500.00 30 0 30
- PCC Driveway Pavement SQ YD 500.00 150.00 3 0 3
- Curb & Gutter FOOT 1,285.00 500.00 3 0 3
- Electrical Conduit FOOT 2,923.00 325.00 9 0 9
- Electrical Cable in Conduit FOOT 14,385.00 7,000.00 2 0 2
- Electric controller EACH 1.00 1.00 1 0 1
- Light pole Foundation FOOT 192.00 20.00 10 0 10
- Luminaire EACH 32.00 10.00 3 0 3
- Light Pole Special EACH 32.00 6.00 5 0 5
- Sidewalk Removal SQ FT 8,800.00 2,500.00 4 0 4
- Inlet EACH 2.00 2.00 1 0 1
- Manhole EACH 2.00 2.00 1 0 1
Total Actual Working Days Required 88 Total Days 90
Completed by
Sarah Gieraltowski Date
08/25/25 Checked by
John Mayer Date
08/25/25
Regional Engineer Signature & Date
S:\Gen\Document Services\Forms Support\AEM Forms\DOTLOGO2.bmp Illinois Department of Transportation Illinois Department of Transportation logo Estimate of Time Required Form title Page of Page Number BDE 220A (Rev. 10/02/24) Form number Page of Page Number BDE 220A (Rev. 10/02/24) Form number Item Unit Quantity Rate Per Day Days Days Not Affecting Time Total Days Required Indexed Table Summary Total Actual Working Days Required Total Days 11.0.0.20130303.1.892433.887364 Estimate of Time Required
BDE 220A
Design and Environment Draft Draft L0106 Bakers Lane
20-00631-00-BT
Sarah Gieraltowski John Mayer
| btnEmail: |
| btnReset: |
| currentPage: |
| pageCount: |
| contract: |
| project: |
| county: Champaign |
| notes: |
| route: |
| section: |
| btnAdd: |
| btnRemove: |
| item: Tree Removal (6 to 15 units) |
| item: Tree Removal (over 15 units) |
| item: Earth Excavation/Unsuitable Materia |
| item: Furnished Excavation |
| item: Porous Granular Embankment |
| item: Topsoil Excavation and Place |
| item: Seeding Class 1A & 1B |
| item: Mulch |
| item: Trench Backfill |
| item: PCC SideWalk |
| item: PCC Driveway Pavement |
| item: Curb & Gutter |
| item: Electrical Conduit |
| item: Electrical Cable in Conduit |
| item: Electric controller |
| item: Light pole Foundation |
| item: Luminaire |
| item: Light Pole Special |
| item: Sidewalk Removal |
| item: Inlet |
| item: Manhole |
| ddunit: UNIT |
| ddunit: UNIT |
| ddunit: CU YD |
| ddunit: CU YD |
| ddunit: CU YD |
| ddunit: CU YD |
| ddunit: ACRE |
| ddunit: ACRE |
| ddunit: CU YD |
| ddunit: SQ FT |
| ddunit: SQ YD |
| ddunit: FOOT |
| ddunit: FOOT |
| ddunit: FOOT |
| ddunit: EACH |
| ddunit: FOOT |
| ddunit: EACH |
| ddunit: EACH |
| ddunit: SQ FT |
| ddunit: EACH |
| ddunit: EACH |
| quantity: 532.00 |
| quantity: 459.00 |
| quantity: 3,423.00 |
| quantity: 649.00 |
| quantity: 1,904.00 |
| quantity: 195.00 |
| quantity: 2.00 |
| quantity: 2.00 |
| quantity: 17.00 |
| quantity: 44,565.00 |
| quantity: 500.00 |
| quantity: 1,285.00 |
| quantity: 2,923.00 |
| quantity: 14,385.00 |
| quantity: 1.00 |
| quantity: 192.00 |
| quantity: 32.00 |
| quantity: 32.00 |
| quantity: 8,800.00 |
| quantity: 2.00 |
| quantity: 2.00 |
| ratePerDay: 400.00 |
| ratePerDay: 300.00 |
| ratePerDay: 500.00 |
| ratePerDay: 700.00 |
| ratePerDay: 700.00 |
| ratePerDay: 500.00 |
| ratePerDay: 5.00 |
| ratePerDay: 1.00 |
| ratePerDay: 100.00 |
| ratePerDay: 1,500.00 |
| ratePerDay: 150.00 |
| ratePerDay: 500.00 |
| ratePerDay: 325.00 |
| ratePerDay: 7,000.00 |
| ratePerDay: 1.00 |
| ratePerDay: 20.00 |
| ratePerDay: 10.00 |
| ratePerDay: 6.00 |
| ratePerDay: 2,500.00 |
| ratePerDay: 2.00 |
| ratePerDay: 2.00 |
| days: 1 |
| days: 2 |
| days: 7 |
| days: 1 |
| days: 3 |
| days: 0 |
| days: 0 |
| days: 2 |
| days: 0 |
| days: 30 |
| days: 3 |
| days: 3 |
| days: 9 |
| days: 2 |
| days: 1 |
| days: 10 |
| days: 3 |
| days: 5 |
| days: 4 |
| days: 1 |
| days: 1 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| totalDays: 1 |
| totalDays: 2 |
| totalDays: 7 |
| totalDays: 1 |
| totalDays: 3 |
| totalDays: 2 |
| totalDays: 30 |
| totalDays: 3 |
| totalDays: 3 |
| totalDays: 9 |
| totalDays: 2 |
| totalDays: 1 |
| totalDays: 10 |
| totalDays: 3 |
| totalDays: 5 |
| totalDays: 4 |
| totalDays: 1 |
| totalDays: 1 |
| totalDays: 90 |
| totalActual: 88 |
| madeyBy: |
| dateMade: 08/25/25 |
| checkedBy: |
| dateChecked: 08/25/25 |
| signatureElectronic: |