The document is an Estimate of Time Required form from the Illinois Department of Transportation for Contract L0106, Bakers Lane project located in Champaign County. The project involves multiple construction and infrastructure activities, including tree removal (532 units for 6-15 trees, 459 units for over 15 trees), earth excavation (3,423 cubic yards), porous granular embankment (1,904 cubic yards), and extensive sidewalk and electrical work. The project includes installing 44,565 square feet of PCC sidewalk, 500 square yards of driveway pavement, 1,285 linear feet of curb and gutter, electrical conduit and cabling, light pole foundations, and related infrastructure components. The total estimated project duration is 90 days, with 88 actual working days required, as documented on 08/25/25 by Sarah Gieraltowski and checked by John Mayer.
The document details the quantity and rate per day for each project element, providing a comprehensive breakdown of the expected time and resources needed for each construction activity. The project involves significant infrastructure improvements, with the most time-intensive tasks being PCC sidewalk installation (30 days), electrical conduit work (9 days), and light pole foundation installation (10 days). The estimated quantities and daily rates suggest a complex, multi-faceted infrastructure project with precise scheduling and resource allocation. The form includes a digital signature by Kensil A. Garnett, indicating final review and approval of the time estimate.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimate of Time Required
Page 1 of 1 BDE 220A (Rev. 10/02/24)
E-mail Reset Form
Contract
L0106 Project
Bakers Lane County
Champaign Notes
Route
Section
20-00631-00-BT
Item Unit Quantity Rate Per Day Days
Days Not Affecting
Time
Total Days Required
- Tree Removal (6 to 15 units) UNIT 532.00 400.00 1 0 1
- Tree Removal (over 15 units) UNIT 459.00 300.00 2 0 2
- Earth Excavation/Unsuitable
Materia CU YD 3,423.00 500.00 7 0 7
- Furnished Excavation CU YD 649.00 700.00 1 0 1
- Porous Granular Embankment CU YD 1,904.00 700.00 3 0 3
- Topsoil Excavation and Place CU YD 195.00 500.00 0 0
- Seeding Class 1A & 1B ACRE 2.00 5.00 0 0
- Mulch ACRE 2.00 1.00 2 0 2
- Trench Backfill CU YD 17.00 100.00 0 0
- PCC SideWalk SQ FT 44,565.00 1,500.00 30 0 30
- PCC Driveway Pavement SQ YD 500.00 150.00 3 0 3
- Curb & Gutter FOOT 1,285.00 500.00 3 0 3
- Electrical Conduit FOOT 2,923.00 325.00 9 0 9
- Electrical Cable in Conduit FOOT 14,385.00 7,000.00 2 0 2
- Electric controller EACH 1.00 1.00 1 0 1
- Light pole Foundation FOOT 192.00 20.00 10 0 10
- Luminaire EACH 32.00 10.00 3 0 3
- Light Pole Special EACH 32.00 6.00 5 0 5
- Sidewalk Removal SQ FT 8,800.00 2,500.00 4 0 4
- Inlet EACH 2.00 2.00 1 0 1
- Manhole EACH 2.00 2.00 1 0 1
Total Actual Working Days Required 88 Total Days 90
Completed by
Sarah Gieraltowski Date
08/25/25 Checked by
John Mayer Date
08/25/25
Regional Engineer Signature & Date
S:\Gen\Document Services\Forms Support\AEM Forms\DOTLOGO2.bmp Illinois Department of Transportation Illinois Department of Transportation logo Estimate of Time Required Form title Page of Page Number BDE 220A (Rev. 10/02/24) Form number Page of Page Number BDE 220A (Rev. 10/02/24) Form number Item Unit Quantity Rate Per Day Days Days Not Affecting Time Total Days Required Indexed Table Summary Total Actual Working Days Required Total Days 11.0.0.20130303.1.892433.887364 Estimate of Time Required
BDE 220A
Design and Environment Draft Draft L0106 Bakers Lane
20-00631-00-BT
Sarah Gieraltowski John Mayer
| btnEmail: |
| btnReset: |
| currentPage: |
| pageCount: |
| contract: |
| project: |
| county: Champaign |
| notes: |
| route: |
| section: |
| btnAdd: |
| btnRemove: |
| item: Tree Removal (6 to 15 units) |
| item: Tree Removal (over 15 units) |
| item: Earth Excavation/Unsuitable Materia |
| item: Furnished Excavation |
| item: Porous Granular Embankment |
| item: Topsoil Excavation and Place |
| item: Seeding Class 1A & 1B |
| item: Mulch |
| item: Trench Backfill |
| item: PCC SideWalk |
| item: PCC Driveway Pavement |
| item: Curb & Gutter |
| item: Electrical Conduit |
| item: Electrical Cable in Conduit |
| item: Electric controller |
| item: Light pole Foundation |
| item: Luminaire |
| item: Light Pole Special |
| item: Sidewalk Removal |
| item: Inlet |
| item: Manhole |
| ddunit: UNIT |
| ddunit: UNIT |
| ddunit: CU YD |
| ddunit: CU YD |
| ddunit: CU YD |
| ddunit: CU YD |
| ddunit: ACRE |
| ddunit: ACRE |
| ddunit: CU YD |
| ddunit: SQ FT |
| ddunit: SQ YD |
| ddunit: FOOT |
| ddunit: FOOT |
| ddunit: FOOT |
| ddunit: EACH |
| ddunit: FOOT |
| ddunit: EACH |
| ddunit: EACH |
| ddunit: SQ FT |
| ddunit: EACH |
| ddunit: EACH |
| quantity: 532.00 |
| quantity: 459.00 |
| quantity: 3,423.00 |
| quantity: 649.00 |
| quantity: 1,904.00 |
| quantity: 195.00 |
| quantity: 2.00 |
| quantity: 2.00 |
| quantity: 17.00 |
| quantity: 44,565.00 |
| quantity: 500.00 |
| quantity: 1,285.00 |
| quantity: 2,923.00 |
| quantity: 14,385.00 |
| quantity: 1.00 |
| quantity: 192.00 |
| quantity: 32.00 |
| quantity: 32.00 |
| quantity: 8,800.00 |
| quantity: 2.00 |
| quantity: 2.00 |
| ratePerDay: 400.00 |
| ratePerDay: 300.00 |
| ratePerDay: 500.00 |
| ratePerDay: 700.00 |
| ratePerDay: 700.00 |
| ratePerDay: 500.00 |
| ratePerDay: 5.00 |
| ratePerDay: 1.00 |
| ratePerDay: 100.00 |
| ratePerDay: 1,500.00 |
| ratePerDay: 150.00 |
| ratePerDay: 500.00 |
| ratePerDay: 325.00 |
| ratePerDay: 7,000.00 |
| ratePerDay: 1.00 |
| ratePerDay: 20.00 |
| ratePerDay: 10.00 |
| ratePerDay: 6.00 |
| ratePerDay: 2,500.00 |
| ratePerDay: 2.00 |
| ratePerDay: 2.00 |
| days: 1 |
| days: 2 |
| days: 7 |
| days: 1 |
| days: 3 |
| days: 0 |
| days: 0 |
| days: 2 |
| days: 0 |
| days: 30 |
| days: 3 |
| days: 3 |
| days: 9 |
| days: 2 |
| days: 1 |
| days: 10 |
| days: 3 |
| days: 5 |
| days: 4 |
| days: 1 |
| days: 1 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| daysNotAffecting: 0 |
| totalDays: 1 |
| totalDays: 2 |
| totalDays: 7 |
| totalDays: 1 |
| totalDays: 3 |
| totalDays: 2 |
| totalDays: 30 |
| totalDays: 3 |
| totalDays: 3 |
| totalDays: 9 |
| totalDays: 2 |
| totalDays: 1 |
| totalDays: 10 |
| totalDays: 3 |
| totalDays: 5 |
| totalDays: 4 |
| totalDays: 1 |
| totalDays: 1 |
| totalDays: 90 |
| totalActual: 88 |
| madeyBy: |
| dateMade: 08/25/25 |
| checkedBy: |
| dateChecked: 08/25/25 |
| signatureElectronic: |