2-[Bulk Fuels and Bulk Fuels Propane] BPM004763 Price Increase Percentages.pdf
PDF 168 KB Posted
- Attached to
- Master Agreement AZ|CTR063144
- Contract number
- CTR063144
- Issued by
- Arizona
About this file
This document is a Price Increase Percentages form from the Arizona Department of Transportation (ADOT) Procurement division, associated with Solicitation No. BPM04763. The document is designed for potential contractors to specify maximum price increase percentages for contract renewal periods.
The form allows offerors to propose up to 50% maximum price increases for each of four potential renewal periods, with the critical stipulation that each increase is calculated against the original contract price. The State of Arizona does not automatically approve price increases and requires documentation justifying any requested increase at the time of renewal. An example table demonstrates how the percentage increases would be applied, showing incremental increases computed from the original contract price, ranging from 2% to 8% in the illustrative scenario. The document emphasizes that if no increase percentages are specified, prices will remain consistent with the original contract term.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement
PRICE INCREASE PERCENTAGES
Solicitation No: BPM04763 Available online at https://appstate.az.gov/
Rev. 12/2020
The offeror should use the space below to identify the maximum price increase percentage that they may want to request at the time of renewal if ADOT exercises its option per the applicable provisions under any resultant contract(s).
1st Renewal Period ___________________% Maximum Increase
2nd Renewal Period ___________________% Maximum Increase
3rd Renewal Period ___________________% Maximum Increase
4th Renewal Period ___________________% Maximum Increase
The offeror is cautioned that each renewal period’s increase percentage shall be computed against the ORIGINAL contract price. If information is not provided in the space above, prices shall remain the same as the original contract term. Please see the following example for further clarification.
Example: If the offeror anticipates requesting a 2% increase at each renewal period per Special Terms and Conditions, they should enter 2%, 4%, 6%, and 8% in the attachment.
Each percentage increase is calculated using the original contract price. See example in table below.
Renewal Period
% Maximum Increase from Attachment
Original Contract
Price
Maximum Increase Allowed
Maximum Contract
Price 1 2% $100.00 $2.00 $102.00 2 4% $100.00 $4.00 $104.00 3 6% $100.00 $6.00 $106.00 4 8% $100.00 $8.00 $108.00
Furthermore, the offeror is advised that the State of Arizona does not automatically grant any increase when renewing the contract. If an increase is requested, documentation of need must be provided at the time of renewal.
50%
50%
50%
50% https://appstate.az.gov/